Loading...
HomeMy WebLinkAboutbocc.con.197.2007CLERK'S CHECK LIST FOR CONTRACTS SUBMITTED TO CLERK AND RECORDER FOR SCANNING/ARCHIVING CONTRACT #: 197-2007 Originating Department/Division: Facilities Management Contact Person: Jodi Smith Phone #: x5396 Project Name: Jail Communications roofreplacement -Design ^ BOCC AGENDA ITEM ®STAFF AUTHORIZED SIGNATURE (BOCC signature required) (per Revised Procurement Code 7/2005) Check procurement e: ®None ^Informal Formal ^Sole Source ^Emergency ^State Bid ^ Check Contract Tvce• Dollar Amount: 9,325.00 Budget Line Item/I,edger Number 00134.92834.86286 (for county employees) ental Agreement (Requires BOCC Action) ^Goods, Equipment, Supplies ^Grant Agreements (Requires BOCC Action) ^Other (e.g. revenue) ^Change Order/Contract Amendment ContractorBusiness Rooftech Consultants, Inc. Complete Legal Name: Contract Execution 8/13!07 Contract End Date: 11/15/07 Automatic Renewal yes Term of Contract: 120 days All Contracts should be proofed for the following: ®No Pages Missing ~If a Page is Left Intentionally Blank Note on Page ®Page numbered consecutively ®All Signatures Affixed ®All Dates Filled In ®All Other Blanks Filled In ®All Exhibits Attached ^All Legal Descriptions Attached pf appropriate) ®Notice of Award/Proceed Attached (if appropriate) ®Special Instructions for Finance Department: Check to see if PO already issued please ®Sent to Clerk and Recorder for Scanning/Archiving ®Authorized Staff Person's Name: Jodi Smith ^Warranty, if applicable BY CHECKING ABOVE AND ENTERING NAME, THE AUTHORIZED STAFF PERSON INDICATES THAT DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING. 1~ P~5 PITKIN COUNTY JAIL COMMUNCATION CENTER RE-ROOF -PROJECT # =2007 Budget Line Item #001.34.92834.86286 THIS CONTRACT is made and entered by and between the Pitkin County Board of County Commissioners ("County") and Rooftech Consultants, Inc. 441 Wadsworth Suite 200 Lakewood, Colorado 80226 (3031233-1092 (hereinafter "Contractor"). 1. Term. The term of this contract is from Au~,ust 13, 2007 to November 15.2007 for both Phases of Project, including project closeout. 2. Contractor's Obli ag tions. Contractor shall provide Roof Consulting Services for the Pitkin County Jail over the Communication Center, located at 506 E Main Street, behind the Courthouse, Aspen Colorado. Scope of work is detailed in Exhibit A, dated July 11, 2007. 3. Compensation and Expenses Invoicing Payment and Offset. The County shall compensate Contractor for its services in accordance with the Project Budget and Schedule set out in Paragraph 2. It is expressly understood and agreed that in no event will the total compensation and reimbursement to be paid hereunder exceed the sum of Nine Thousand Three Hundred Twenty Five Dollars and Zero Cents f$ 9 325 00) for all services rendered. By contract or amendment, the County and Contractor may reallocate the budget among project tasks if the total budget amount remains unchanged. Contractor shall invoice for the project monthly based on hours worked, with payment expected within thirty (30) days of invoice, but any payment by the County may be offset by any amount the Contractor owes the County for any reason. RETAINAGE. Payment of five percent (5%) of each invoice will be withheld by the County until the Contractor's obligations aze completed. In the event the Contractor incurs time and expenses in excess of the total compensation stated above, no compensation for said additional time and expenses shall be required to be paid by the County without written amendment to this contract executed by the County. 4. County's Exclusive Ownership of Work Product Drawings, specifications, guidelines and other documents prepazed by Contractor in connection with this contract shall be the property of the County. However, Contractor shall have the right to utilize such documents in the course of its marketing, professional presentations, and for other business purposes. Contractor assigns to County the copyrights to all work prepazed, developed, or created pursuant to this contract, including the right to: 1) reproduce the work; 2) prepare derivative works; 3) distribute copies to the public; 4) perform the works publicly; and 5) to display the work publicly. Contractor shall have right to use materials produced in the course of this contract for marketing purposes and professional presentations, articles, speeches and other business I Pitkin County Facilities Management, 53o E. Main, Suite BGM, Aspen, Co 8i6ii 970-920-5396, 970-920-5285 Fax or email: jodis~a co.pitkin.co.us CONTRACT FOR PROVISION OF SERVICES PITKIN COUNTY JAIL COMMUNCATION CENTER RE-ROOF -PROJECT # -2007 Budget Line Item #001.34.92834.86286 purposes. 5. Pitkin Countv's Obligations. Pitkin County shall administer this contract through a County Representative. Jodi Smith, Project Manager will manage the project as the County's Representative. In the event that Jodi is not available for more than 72 hours, Jeff Pendarvis shall assume the County Representative's duties. The services provided and products delivered by the Contractor under this contract will be subject to review by the County's Representatives, or a designee, for compliance with Contractor's obligations prior to fmal payment. 6. Termination Prior to Expiration of Contract Term. The County has the right to terminate this contract, with or without cause, by giving written notice to the Contractor of such termination and specifying the effective date thereof. Such notice shall be given at least ten (1Q) days before the effective date of such termination. In such event all finished or unfmished documents, data, studies and reports prepared by the Contractor pursuant to this contract shall become the County's properly. Contractor shall be entitled to receive compensation in accordance with the contract for any satisfactory work completed pursuant to the terms of this contract prior to the date of termination. Not withstanding the above, Contractor shall not be relieved of liability to the County for damages sustained by the County by virtue of any breach of the contract by the Contractor. 7. Independent Contractor Status. A. The parties to this contract intend that the relationship between them contemplated by the contract is that of independent Contractor. Contractor, and any agent, employee, or servant of Contractor shall not be deemed to be an employee, agent, or servant of Pitkin County: B. Contractor is not required to offer his services exclusively to Pitkin County under this contract. Contractor may choose to work for other individuals or entities during the term of this contract,' provided that the basic services and deliverable products required under this contract are submitted in the manner and on the schedule defined under this contract. C. Contractor warrants that all work produced will conform to all applicable industry standard of care, skill and diligence in the performance of Contractor's obligations under this contract. D. Contractor shall not attempt to oversee or supervise the work or actions of any Pitkin County employee, servant or agent in the course of completing work under this contract. E. Contractor is not entitled to any Workers' Compensation benefits through Pitkin County and is responsible for payment of any federal, state, FICA and other income taxes. 8. Assignability. This contract is not assignable by either party. Any use of subcontractors by the Contractor for performance of this contract must be accepted in writing by the County. 2 Pitkin County Facilities Management, 53o E. Main, Suite BGM, Aspen, Co 8i6ii 970-920-5396 970-920-5285 Fax or email: jodis@co.pitkin.co.us PITKIN COUNTY JAIL COMMUNCATTON CENTER RE-ROOF -PROJECT # -2007 Budget Line Item #001.34.92834.86286 9. Binding Arbitration. Any disputes arising out of this contract shall be subject to binding azbitration. The parties agree that any disputes concerning the terms and conditions of this contract shall be submitted and finally settled by arbitration. Arbitration shall be conducted pursuant to the rules of the American Arbitration Association and shall be presided over by the Pitkin County Hearing Officer appointed to arbitrate Pitkin County contract disputes. Costs of the azbitration shall be awazded to the substantially prevailing party. 10. Severability. In the event that any provision of this contract shall be held to be invalid or unenforceable, the remaining provisions of this contract shall remain valid and binding upon the parties hereto 11. Integration and Modification. A. This contract represents the entire and integrated contract between the County and the Contractor and supersedes all prior negotiations, representations, or contract, either written or oral. This contract may be amended only by written contract signed by both the County and the Contractor. B. The County may, from time to time, request changes in the scope of services of the Contractor to be performed hereunder. Such changes, including the increase or decrease in the amount of the Contractor's compensation, which are mutually agreed upon between the County and the Contractor, shall be in writing and upon execution shall become part of this contract. 12. Indemni . A. The Contractor (including, by definition here and hereinafter, its officials, employees, agents and representatives, subcontractors and suppliers), shall and hereby does release, discharge, indemnify and hold harmless the County of Pitkin and its officials, employees, agents and representatives from and against liability for any claim, demand, loss, damages, penalty, judg- ment, expenses, costs (including costs of investigation and defense), fees. (including reasonable attorney and expert witness fees) or compensation in any form or kind whatsoever for any bodily injury, death, personal injury or property damage arising out of or in connection with any negligent act, intentional act, error or omission by the Contractor, and for any consequential liability alleged to accrue against the County on account of the Contractor's acts, errors or omissions; provided, however, that such indemnity shall not be construed as an indemnity for bodily injury or property damage arising from the sole negligence of the County or its employees. B. The Contractor further shall investigate, process, respond to, adjust, provide defense for and defend, pay or settle all claims, demands, or lawsuits related hereto at its sole expense and shall bear all other costs and expenses related thereto, even if the claim, demand or lawsuit is groundless, false or fraudulent. 13. Insurance. A. In whole or in part, the Contractor shall secure and maintain for the term of its contractual relationship with the County such insurance policies, from companies licensed in the State of Colorado, as will protect itself, the County and others as specified, from claims for bodily injuries, death, personal injury or property damage, which may arise out of or result from the 3 Pitkin County Facilities Management, 53o E. Main, Suite BGM, Aspen, Co 8i6ii 97o-g2o-5396, 97o-g2o-5285 Fax or email: jodis@co.pitkin.co.us PITKIN COi7NTY JAIL COMMUNCATION CENTER RE-ROOF -PROJECT # -2007 Budget Line Item #001.34.92834.86286 Contractor's acts, errors or omissions. The following insurance coverage, at or above the limits indicated and including such endorsements as are indicated by an "X", aze required: Statutory Workers' Compensation: Colorado statutory minimums 2. Commercial General Liability -ISO 1998 Form or equivalent (With County named additional insured) Each Occurrence Limit $1,000,000.00 General Aggregate Limit $2,000,000.00 Products/Completed Operations Aggregate Limit $2,000,000.00 Comprehensive Form (All risks) to include (place x by applicable provisions): X Premises/Operations Underground, Explosion & Collapse Hazard X Products/Completed Operations X Contractual Liability X Independent Contractors and Subcontractors X Broad Form Property Damage X Personal Injury 3. Business Auto Coverage: Combined Single Limit Liability (each accident) $1,000,000.00 Including all owned, non-owned, and hired vehicles. 4. Special Coverages (check as appropriate and insert amount): (1) Performance Bond Labor and Material Payment Bond X (2) Professional Errors and Omissions (3) Aircraft Liability (4) Owner's Protective (5) Builder's Risk (6) Boiler and Machinery _ (7) Loss of Use Insurance _ (8) Pollution Liability _ (9) Crime, including Employee Dishonesty Coverage, or Fidelity Bond B. Proof of Insurance: 1. To provide evidence of the required insurance coverage, copies of Certificates of Insurance in a form acceptable to the County shall be filed with the County through the representative identified in Paragraph 5, no later than ten (10) calendar days prior to com- mencement of operations affecting the County. Failure to file or maintain acceptable Certificates of Insurance with the County is agreed to be a material breach of any contract. These Certificates of Insurance shall contain a provision that coverage afforded under the policies will not be 4 Pitkin County Facilities Management, 53o E. Main, Suite BGM, Aspen, Co 8i6u 970-920-5396, 970-920-5285 Fax or email: jodis@co.pitkin.co.us PITKIN COUNTY JAIL COMMUNCATION CENTER RE-ROOF -.PROJECT # -2007 Budget Line Item #001.34.92834.86286 canceled or materially altered unless at least thirty (30) calendar days prior written notice by certified mail, return receipt requested (effective upon proper mailingj, has been sent to the Procurement Officer. (For purposes of this provision, "materially altered" shall mean a change affecting the coverage's required herein, including a change to policy limits as set out in the then- current policy declarations page). Simultaneously with the Certificates of Insurance, the Contractor shall file with the Procurement Officer a certified statement as to claims pending against the required coverages, reserves established on account of such claims, defense costs expended and amounts re,,,_aining on policy limits. 2. In addition, these Certificates of Insurance shall contain the following clauses: • a. The clause "other insurance provisions," in a policy in which the County of Pitkin holds a Certificate, shall not apply to the County of Pitkin. b. The insurance companies issuing the policy or policies hereunder shall have no recourse against the County of Pitkin for payment of any premiums or for assessments under any form of policy. c. Any and all deductibles in the above-described insurance policies shall be assumed by and be for the amount of, and at the sole expense of the Contractor. d. Location of operations shall be: "all operations and locations at which work for the referenced Project is being done." 3. Certificates of Insurance for all renewal policies shall be delivered to the County's Representative at least fifteen (15}days prior to a policy's expiration date except for any policy expiring on the expiration date of this contract or thereafter. 4. The County reserves the right to request and receive a copy of any policy and any policy endorsement at any time during the term of this contract. 14. Exemptions. All purchases of construction, building or any other materials for this contract shall not include Federal Excise Taxes or Colorado State or local sales or use taxes. Pitkin County is exempt from such taxes under registration numbers 98-02624 and 84-78000-SK. 15. Records. The Contractor shall maintain comprehensive, complete and accurate books, records, and documents concerning its performance relating to this contract for a period of three (3) years after fmal payment under'the contract and the County shall have the right within the three (3) year period to inspect and audit these books, records and documents, upon demand, in a reasonable manner and at reasonable times, for the purpose of determining, by accepted accounting and auditing standards, compliance with all provisions of the contract and applicable law. 16. Contract Made in Colorado. The parties agree that this contract was made in 5 Pitkin County Facilities Management, 53o E. Main, Suite BGM, Aspen, Co 8i6ii 970-920-5396, 970-920-5285 Fax or email: jodis@co.pitkin.co.us PITKIN COUNTY JAIL COMMUNCATION CENTER RE-ROOF -PROJECT # -2007 Budget Line Item #001.34.92834.86286 accordance with the.laws of the State of Colorado and shall be so construed. Venue is agreed to be exclusively in the courts of Pitkin County, Colorado. 17. Attome 's Fees. In the event that legal action is necessary to enforce any of the provisions of this contract beyond the arbitration described in Paragraph 9, the substantially prevailing party shall be entitled to its costs and reasonable attorney's fees. 18. Governmental Immunity. Contractor agrees and understands that Pitkin County is relying on and does not waive, by any provision of this contract, the monetary limitations or terms (presently $150,000.00 per person and $600,000 per occurrence) or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, 24-10-101, et. Seq., C.R.S., as from time to time amended, or otherwise available to Pitkin County or any of its officers, agents or employees. Further, nothing in this contract shall be construed or interpreted to require or provide for indemnification of the Contractor by the County. for any injury to any person or any property damage whatsoever which is caused by the negligence or other misconduct of the County or its agent or employees. 19. Current Year Obli ag tions. The parties acknowledge and agree that any payments provided for hereunder or requirements for future appropriations shall constitute only currently budgeted expenditures of Pitkin County. Pitkin County's obligations under this contract are subject to Pitkin County's annual right to budget and appropriate the sums necessary to provide the services set forth herein. No provisions of the contract shall constitute a mandatory charge or requirement in any ensuing fiscal year beyond the then current fiscal year of Pitkin County. No provision of the contract shall be construed or interpreted ascreating amultiple-fiscal year direct or indirect debt or other financial obligation of Pitkin County within the meaning of any constitutional or statutory debt limitation. This contract shall not directly or indirectly obligate Pitkin County to make any payments beyond those appropriated for Pitkin County's then current fiscal year. No provisions of this contract shall be construed to pledge or create a lien on any class or source of Pitkin County's moneys, nor shall any provision of this contract restrict the future issuance of Pitkin County's bonds or any obligations payable from any class or source of Pitkin County's money. 20. Notice. Any written notice required by this contract shall be deemed delivered through any of the following: (1) hand delivery to the person at the address below; (2) delivery by facsimile with confirmation of receipt to the fax number below; or (3) within three (3) days of being sent certified first class mail, postage prepaid, return receipt requested addressed as follows: A. To Pitkin County with copies to• Jodi Smith, Project Manger 76 Service Center Road Aspen, Colorado 81611 (970) 920-5374 Fax B. To Contractor: Rooftech Consultants, Inc. 441 Wadsworth, Suite 200 Pitkin County Attomey's Office 530 E. Main Street, #302 Aspen, Colorado 81611 (970)920-5198 Fax 6 Pitkin County Facilities Management, 53o E. Main, Suite,BGM, Aspen, Co 8i6ii 970-920-5396 970-920-5285 Fax or email: jodis@co.pitkin.co.us r ROOFTECH conisu~Tanrrs we July 11, 2007 Jodi Smith Pitkin County Public Works 76 Service Center Road Aspen, CO 81611 ~~ITA re: Replace Roof -Design & CA Services Statement of Work and Proposal Pitkin County Jail -Partial Reroof Dear Jodi: As per your request, this document has been prepared .in order to outline the services to be provided on the above project. We have done this in order to show some of the deliverable items normally included in a roofing project of this type. The description below covers the basic work items for each major project phase. Also attached is a spreadsheet that breaks down the fees for the anticipated work. I have included all of the listed Phase I and Phase II work items in the statement of work. Note that many of the items are even further defined. PART 1 QESIGN PHASE 1.1 Field Site Visit A. Conduct on-site investigation of each roofing surface to determine existing conditions and cut exploratory samples and temporarily patch sample areas. B. :Measurements will be taken of the roof in order to develop a to-scale roof plan. 441 Wadsworth Blvd. ^ Suite 200 ^ Lakewood, CO 80226 Phone: 303/233-1092 ^ Fax: 303/233-2205 ,~ July 11, 2007 Statement of Work & Proposal Replace Roof- Pitkin County Jail C. A roof plug (core) will be taken from the system and flashings. The plugged area will be patched with a five course roof cement and mesh patch. The plug will be taken in order to determine the exact roof construction. D. Review detail concerns such as low flashing heights, difficult to access flashings and other aspects of roofing and sheet metal flashing design. E. Review roofing related items for damage such as parapet walls, stone copings and soffits. F. Photographs will be taken of the typical roof conditions. 1.2 Design Analysis Report (Schematic Design/Design Development) A. The SD/DD (F&R) report will verbally describe the findings from the field investigation in a logical manner. This includes the description of the roof system and its associated strong and weak points. B. A to-scale roof plan will be developed. All penetrations will be shown with a drawing legend included. C. Photos of existing conditions will be included. One set of original photos is included with other survey report copies containing photocopies. D. The report will include the analysis and listing of code and insurance requirements. E. At Least three roof system types at different levels of insulation will be presented. Cost estimates will be given for each option. F. /R fuel savings cafcuation wilt tie performed for each level of insulation. G: The pros and cons for each system will be presented along with the expected service life. 1.3 Construction Documents A. Taking the Owners choice for a new roof system into account, prepare construction documents for the removal and replacement of the roofing system. B. Prepare the roofing related technical specification. Incorporate Owner's Front End Document for the specification project manual. Page - 2 ,. July 11, 2007 Statement of Work & Proposal Replace Roof- Pitkin County Jail C. Include a review of 10 and 15 year leak free warranties for the proposed new roof design. D. Review and update the cost estimate. E. At the 100% submittal, provide up to 15 copies of the drawings and specifications. PART 2 Construction Manaaement Phase 2.1 Pre-bid Conference A. Attend and provide support for queries at the pre-bid conference. B. Provide assistance in preparation of any addendums as a result of questions that arise during and after the pre-bid conference. C. Review the bids submitted for the Owner. 2.2 Pre-Construction Conference A. Attend and take notes during the pre-construction conference. B. Provide assistance in resolving any issues that arise during the conference. C. Issue notes on the technical issues that may arise during the pre- construction conference. 2.3 Site Visits A. Four (4) site visits will be made.. Five (.~) hours will be assigned to each. visit with an issued observation report. B. Provide written reports for all of the visits. 2.4 Punchlist Inspection A. A separate visit will be made to the site in order to perform a punchlist inspection. B. A punchlist will be issued with all of the noted items. C. As-built documents will be prepared. Page - 3 f . ~' July 11, 2007 Statement of Work & Proposal Replace Roof - Pitkin County Jail 2.5 Finallnspection A. A visit will be made to insure that the items noted during the punchlist visit are corrected and the roof is completed. B. We will make sure all warranties are received. n PROJECT COSTS The work autlioed in this document has been taken into account when preparing the proposal. The attached spreadsheets break down the prices by discipline and phase. The fee total comes to $9,325. This price includes all phases of the project. Should this project change in scope a price adjustment and new statement of work will be made to revise the actual price. At this time all base contract reproduction expenses, and mileage is included in the overhead for the stated fees. If there are any questions or concerns, feel free to call. Sincerely, r Ronald D. Scott, Colo. P.E. 20989 cents ame - ante Clients Signature & Date of Approval attachment RDS/jr/O IlmoelwordlpropbindlPitkin Co-JaiIISOW.doc Page - 4 FEE PROPOSAL BREAKDOWN REPLACE ROOFING -DESIGN 8 CA SERVICES PITKIN COUNTY JAIL -PARTIAL REROOF PITKIN COUNTY PUBLIC WORKS PROPOSAL DATE: 7/11/2007 HOURS FEE WORK PHASE SUB-ITEM DISCIPLINE RATE $/HR CONSULTANT SERVICES CONSULTANT SERVCES 1-DESIGN PHASE 1.1 FIELD SITE VISIT ENGINEER $135 8.00 $1,080.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 0.00 $0.00 ASSISTANT $60 0.00 $0.00 $1,080.00 1-DESIGN PHASE 1.2 DESIGN ANAL. ENGINEER $135 4.00 $540.00 REPORT CAD/DESIGNER $90 4.00 $360.00 ISD/DD REPORTI TECNICIAN $80 0.00 $0.00 ASSIS_ T_ANT $60 0.00 $0.00 ' $900.00 1-DESIGN PHASE 1.3 CONSTRUCTION ENGINEER $135 8.00 $1,080.00 DOCUMENTS CAD/DESIGNER $90 24.00 $2,160.00 TECNICIAN $80 0.00 $0.00 ASSISTANT $60 8.00 $480.00 $3,720.00 2-CM PHASE 2.1 PRE-BID CONF. ENGINEER $135 0.00 $0.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 5.00 $400.00 ASSISTANT $60 0.00 $0.00 $400.00 2-CM PHASE 2.2 PRE-CON ENGINEER $135 0.00 $0.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 5.00 $400.00 ASSISTANT $60 0.00 $0.00 $400.00 2-CM PHASE 2.3 SITE VISITS ENGINEER $135 0.00 $0.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 15.00 $1,200.00 ASSISTANT $60 0.00 $0.00 $1,200.00 2-CM PHASE 2.4 PUNCHLIST ENGINEER $135 0.00 $0.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 5.00 $400.00 ASSISTANT $60 0.00 $0.00 $400.00 2-CM PHASE 2.5 FINAL INSPECTION ENGINEER $135 0.00 $0.00 & AS-BUILRS CAD/DESIGNER $90 4.00 $360.00 TECNICIAN $80 5.00 $400.00 ASSISTANT $60 4.00 $240.00 $1,000.00 OTHER FEES ~ RATE QUANTRY PHOTOS $50.00 1.00 $50.00 REPRO. $0.10 1000.00 $100.00 DELIVERIES $25.00 3.00 $75.00 ASBESTOS $50.00 0.00 $0.00 FEE TOTAL ROOFING SERVICES TOTAL $9,325.00 Rpr 30 08 D9:Dla RoofTech (3031233-2205 Rpr 29 2008 10:23RM Pitkin County 970-920-5285 ' PfTKTN COUNTY lA1L COMMIINCATION CENTER RE-ROOF - PROl1:CT f~- 007 Budget Line Item ~tq¢1.34.92834.8628~ Iskew¢:od, Coloindo 80226 (303)233-2205 Fax IN WITNESS WIiERSOF, the parties have oxacuted thia contact as of the date first set out herein above. CONTRACTOR: By:~d`~ Ronald D. tt, PE Title /~/'CSi~n ~" `~~~~t`~ T PrTIQN COU,ti'rY: ;_.: ,~ Jodi Smith, Project Manager Date p.2 p.2 7 Pitlrin County Facilities Management, 53o E. Main, Suite BGM, Aspen. Co 816it 97a9ao-5396, 97o-ggo-5285 Fax ar emat7: Jodis~co.pitkin.co.us ROOFTECH coNSU~TaKrs ~Nc December 18, 2007 Jodi Smith Pitkin County Public Works 76 Service Center Road Aspen, CO 81611 re: Replace Roof -Design & CA Services Statement of Work and Proposal Pitkin County Jai! - Partial Reroof Dear Jodi: As per your request, this document has been prepared in order to outline the services to be provided on the above project. We have done this in order to show some of the deliverable items normally included in a roofing project of this type. The description below covers the basic work items for each major project phase. Also attached is a spreadsheet that breaks down the fees for the anticipated work. I have included all of the listed Phase I and Phase II work items in the statement of work. Note that many of the items are even further defined. PART 1 DESIGN PHASE 1.1 Construction Documents A. Modify the original construction documents dated August 28, 2007 to reflect the addition of the new roof section added per the owner's request. B. Review the original technical specifications dated August 28, 2007. C. Review and update the cost estimate. D. At the 100% submittal, provide up to 5 copies of the drawings and specifications. 14828 West 6th Avenue ^ Suite 68 ^ Golden, CO 80401 Phone: 303/233-1092 ^ Fax: 303/233-2205 December 18, 2007 Statement of Work & Proposal Replace Roof- Pitkin Counfy Jail PART 2 Construction Management Phase 2.1 Site Visits A. Three (3) site visits will be made. Eight (8) hours will be assigned to each visit with an issued observation report. B. Provide written reports for aA of the visits. 2.2 Punchlist Inspection A. Included in the original contract. 2.3 Finallnspection A. Included in the original contract. PROJECT COSTS The work outlined in this document has been taken into account when preparing the proposal. The attached spreadsheets break down the prices by discipline and phase. The fee total comes to $2,640. This price includes all phases of the project. Should this project change in scope a price adjustment and new statement of work will be made to revise the actual price. At this time all base contract reproduction expenses, and mileage is included in the overhead for the stated fees. If there are any questions or concerns, feel free to call. Sincerely, Ronald D. Scott, Colo. P.E. 20989 attachment RDS/tjr/lam IlmoelwordlpropbindlPitkin CoJaiIISOW #1.doc cents ame - ante Clients Signature & Date of Approval Page - 2 FEE PROPOSAL BREAKDOWN REPLACE ROOFING - DE31GN & CA SERVICES PITKIN COUNTY JAIL -THE OTHER HALF OF PARTIAL REROOF PITKIN COUNTY PUBLIC WORKS PROPOSAL DATE: 12!18!2007 HOURS FEE WORK PHASE SUB-REM DISCIPLINE RATE $/HR CONSULTANT SERVICES CONSULTANT SERVCES 1-0ESIGN PHASE 1.1 FIELD SITE VIS IT ENGINEER $135 0.00 $0.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 0.00 $0.00 ASSISTAN7 $60 0 00 $0 00 $0.00 1-DESIGN PHASE 1.2 DESIGN ANAL ENGINEER $135 0.00 $0.00 REPORT CAD/DESIGNER $90 0.00 $0.00 (SD/DD REPORT) TECNICIAN $80 0.00 $0.00 ASSISTANT $60 000 $0 00 $0.00 1-DESIGN PHASE 1.3 CONSTRUCTIO N ENGINEER $135 0.00 $0.00 DOCUMENTS CAD/DESIGNER $90 8.00 $720.00 TECNICIAN $80 0.00 $0.00 ASSISTANT $60 0 00 $0 DO $720.00 2-CM PHASE 2.1 PRE-BID CONS ENGINEER $135 0.00 $0.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 0.00 $0.00 ASSISTANT $60 0 00 $0 00 $0.00 2-CM PHASE 2.2 PRE-CON ENGINEER $135 0.00 $0.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 0.00 $0.00 ASSISTANT $80 0 00 $0 00 $0.00 2-CM PHASE 2.3 SITE VISITS ENGINEER $135 0.00 $0.00 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 24.00 $1,920.00 ASSISTANT $60 000 $p p0 $1,920.00 2-CM PHASE 2.4 PUNCHLIST ENGINEER $135 0.00 $p,p0 CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 0.00 $0.00 ASSISTANT $60 0.00 SO 00 $0.00 2-CM PHASE 2.5 FINAL INSPECTI ON ENGINEER $135 0.00 $0.00 &AS-BUILITS CAD/DESIGNER $90 0.00 $0.00 TECNICIAN $80 0.00 $0.00 ASSISTANT $60 0.00 $0.00 $0.00 OTHER FEES RATE Q UANTITY PHOTOS $50.00 0.00 $0.00 REPRO. $0.10 0.00 $0.00 DELIVERIES $25.00 0.00 $0.00 ASBESTOS $50.00 D.00 $0.00 FEE TOTAL ROOFING SERVICES TOTAL $2,640.00