HomeMy WebLinkAboutpitkin.planning.245900000000, 246100000000, 264900000000, 265100000000, 2645300000000 (1988)DOCUMENT LAYOUT
THIS FILE MAY OR MAY NOT CONTAIN ALL OF THE INFORMATION
LISTED BELOW IN THE FOLLOWING ORDER
Summary Sheet
Resolution for the BOCC and/or P&Z
Ordinance for the BOCC and/or P&Z
Determinafion for the Hearing Officer
Administrative Determination
Staff Memo
Application
Public Notice, Acceptance Letter, Referral(s) Letter
Site Plan
Miscellaneous
Plat copies (11x17)
~ lli'F?+~.~ t3txie Scann9d: ` 5/29/08..
F'~te Location: file finders box #1 q4 ~~
UOOOO~ Off' ~3
DATE
DATE
RECEIVED: S~~/06
COMPLETE:
PROJECT NAME:
Project Address
APPLICANT'
Applicant Addr
REPRESENTATIVE
Representative
PAID: YES ~ AMOUNT•
1) TYPE OF APPLICATION:
1 STEP: // 2 STEP:
2) IF 1 STEP APPLICATION GOES TO:
P&Z ~BOCC PUBLIC HEARING DATE: n
1-
VESTED RIGHT: YES NO _
3) PUBLIC HEARING IS BEFORE:
P&Z BOCC N/A~n ,,
DATE REFERRED• , "0 C~ INITIALS:-~/WC~
STAFF LEVEL: 1041 HAZARD REVIEW; DATE OF APPROVAL
REFERRALS:
'~ County Atty
County Engr
Housing Dir.
Aspen water
City Electric
Envir. Hlth.
County Mgr.
Div. Wildlife
Trails Dir.
CASELAAD SUMMARY SHEET 7 ~S ~.~
PITKIN COUNTY ~ y to l
Aspen Consol S.D.
Mtn. Bell
Envir. Coordin.
Holy Cross Electric
Fire Marshall
Snownass will.
FAA
State Plan. Off.
Other:
School District
Rocky Mtn Gas
State Hwy Dept
(Glwd) (GrJtn)
Bldg Zon/Inspt.
Colo Geo Survey
USFS
Div. Water Res.
Other
FZNAL ROUTING: DATE ROUTED; INITIAL'
County Atty County Engineer Building Dept.
Housing Dir. Envir. Health
other:
00~100~
FILE STATUS AND LOCATION:
2~~(9
PARCEL ZD AND CASE NO. u,,~l~
STAFF MEMBER: - ~ rc
RESOLUTION OF THE-BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COLORADO GRANTING A PROSPECTING PERMIT
TO NEW FRONTIER EXPLORATION TO CONDUCT
SEISMIC EXPLORATION
Resolution No. 88-~
WHEREAS, the Board of County Commissioners of Pitkin County,
Colorado (hereinafter the "Board") reviewed a prospecting permit
application by New Frontier Exploration (hereinafter "Applicant")
at their regular meeting on June 28, 1988; and
WHEREAS, the proposal includes approximately 21 miles along
two lines located Southwest of Carbondale (in the area described
in Exhibit "A" attached); and
WHEREAS, the Applicant has applied to the U.S. Forest
Service for a permit for the lands under Forest Service
jurisdiction and has used the recommendations of the Division of
Wildlife with regard to the time that the activity may take
place; and
WHEREAS, the Board recognizes that the applicants have
acquired the necessary permits from private landowners; and
WHEREAS, the Board recognizes that the applicant shall
notify surrounding landowners, within one mile of the lines,
regarding the temporary disturbances associated with the
activity; and
WHEREAS, the Board acknowledges that this review in no way
signifies the approval of the future development of oil and gas
activities in Pitkin County.
NOW, THEREFORE, BE IT RESOLVED that the Board does hereby
OOOOUJ
/ i
Resolution No. 88-~
Page 2
grant the requested prospecting permit to the applicant, with the
following conditions of approval:
1) All landowners within one mile of the proposed active lines
shall be noticed prior to commencement of work along that
line.
2) Prior to commencement of any of the approved lines and cross
lines the applicant shall verify to the Planning Office that
the Valley Journal and local radio station have been
notified and this notification will take place prior to
commencement of the operation.
3) The approval for the lines shall run from the time
conditions ~'1 and $2 are met and shall expire on August 15,
1987.
4) The applicant shall notify the Planning Office when the
operation of each line has been completed.
5) The applicants shall notify the Planning Office of what
their operations are on a weekly basis.
6) No helicopters shall be used to the east of Assignation
Ridge.
7) The applicants shall schedule a time at the beginning of the
operation for the Planning Office to inspect the shot hole
activity and reclamation.
APPROVED by the Board at its regular meeting on June 28,
1988.
BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COIARADO
Fred Crowley,
APPROVED AS TO F RM:
Thomas F. Smith, County
Attorney
FK.SEISMIC
APPROVED AS TO CONTENT:
Alan Richman, Planning
Director
00000
EXPLORATION 7388 S REVERE PARKVJAV, BLDG. 902 ENGLEWOOD COLORADO 80112
A JOINT VENTURE caoa~79oo3oa
FIELD OPERATIONS: PORTABLE (SHOT-HOLE)
III. DATA ACQUISITION (continued)
PAGE 3
Method: After the surveying operation (and archaeological
clearance, when required) have been completed, drilling
rigs will be flown into the shot point locations on the line.
This is accomplished by several trips with individual
components being assembled at the drill site. Flight
corridors set by the Forest Service would be used in
order to cause a minimal disturbance to wildlife. Drill
holes, usually under 4 inches in diameter, are cut to
a depth predetermined by the parameters set forth
by the client. (In this case 60 feet) The completed hole
is then "loaded" with the explosive charge and blasting cap.
After it has been determined that the charge is at the bottom
of the hole, the hole is then filled to within 3 feet
of the surface with coarse ground Bentonite if water
is encountered, or natural cuttings if the hole is dry.
A hole plug is then inserted at the aft. mark and natural
cuttings are tamped to the top of the hole until
completely filled. Excess cuttings are then spread t,o
less than 1 inch of the surface to allow vegetation t,o
continue its natural growth. The cap wire leads are then
secured to the lath or other suitable high place so that
they may be readily located in the event of a snow storm
that might occur prior to the recording operation. The
hole is now ready for detonation by the recording opera-
tion and the drill rig is flown out.
The recording operation is done from a depot or staging
area that has been established as close as possible to
the line but accessible by vehicle (Wilderness areas excluded)
Virtually all equipment, vehicles, and supplies are stocked
at this temporary location. Transporation of workers and
equipment is accomplished via helicopter from this location
to the actual seismic line. As work progresses, this
"Staging" area will be continually relocated for convenience
purposes and also to minimize flight time and expedite the
entire operation. Generally speaking, the helicopter "LZ"
locations will be spaced anywhere from 6 to 10 miles apart.
Seismic recording cables and geophones are coiled in canvas
bags, and are "spotted" by helicopter at the 110 foot station
intervals that have been surveyed in on the line.
OQQnUJ
EXPLORATION 7388 S REVERE PARKVJAV, BLDG. 902 - ENGLEWOOD COLORADO 80112
A JOINT VENTURE ~303~ 790-0303
FIELD OPERATIONS:
(SHOT-HOLE)
III. DATA ACQUISITION (continued)
Method: (continued)
PAGE 4
A ground crew arranges and connects the geophones to
the cables. The geophones are planted into the ground,
usually by a stomping action with the foot (the phones
have a small spike at the bottom which aids in the
stablization).
The recording equipment (instrument package) is flown
in to the line and is integrated to the cables
that have already been laid out. A crew member may
be flown up or down line to correct any electrical
problems or connection problems that the recorder has
been able to detect prior to actual charge detonation.
As soon as all the wire (approximately 1+ miles worth)
that has been laid out on line has been determined to
be "good" and ready for quality recording, the shooter
member of the crew will begin to detonate the shots,
one at a time. Working closely with the recorder, this
shooting operation will progress at a fairly rapid pace
sometimes 2 to 4 miles per day, barring any equipment,
helicopter, or weather delays.
At the leeward end of the recording operation, a final
ground crew coils and re-packs the cables and geophones
into the canvas bags for helicopter swing up to the
front of the line (a continual leap-frog situation).
This "back" crew picking up equipment is also responsible
for removing all remnants of debris and trash and cap
wire from the work areas, storing it in canvas bags
for eventual helicopter pick-up and disposal. The re-
cording operation is considered complete when all work
areas are clean and all shot holes are checked to make
sure that none have blown out and been left open.
Reclamation:
Due to the type of operation and procedures used. The
impact to the environment is really very minimal. The
drilling operation, as explained in paragraph one of
Section III Data Aquisition, consists of a small heli-
portable drill being flown into a location predetermined
by the Survey Crew. When the drill is set up it is set in
a manner which insures that no trees or brush will be disturbed.
ooaoos
EXPLORATION ]388 5 REVERE PARKWAY, BLDG 902 - ENGLEWOOD COLORADO 80112
A JOINT VENTURE ~300~]9oo3oB
(SHOT-HOLE)
III. DATA AQUISITION (continued)
PAGE 5
Reclamation: (continued)
The man spotting the rig locates a spot ahead of time
that is clear of trees and brush and is not too steep
so that the rig will remain stable during the drilling
process. Again, no trees or brush would be cleared to
accomodate the drilling or recording operation. The
drilling process usually takes 1 - 2 hours per location,
after which the drill is flown to the next location.
The small amount of vegetation (grasses and small plants)
that would be depressed by the drilling rig usually pops
back very quickly.
After the hole has been drilled and the explosive charge
loaded. The driller is ready to plug the hole. The plugging
of shot holes is regulated by the Colorado Oil & Gas Commission
and all plugging is done as specified by them. The hole is
plugged immediately after it is drilled. This procedure goes
as follows...
If water is encountered in the hole the hole is filled to
within 3 feet of the surface with coarse Bentonite pellets.
These pellets consists of dried Bentonite clay. When
poured into the hole and water is encountered these
pellets swell to many times their original size sealing off
any aquifers encountered and insuring that the water will
maintain its natural course. (Usually very little water is
encountered with 60 ft. holes.) This also insures that the
hole will not blow out when the charge is detonated. If a
hole is dry with no water encountered, then natural cuttings
are put back in the hole to the 3 foot mark.
After the hole is filled to the aft. mark with Bentonite
a plastic hole plug is inserted. This plug has an identi-
fication tag marked NFX. This identifies the hole as New
Frontier's in case of any future problems which may arise.
The plug also helps prevent the blowing out or slumping
of holes.
After the hole plug is inserted the last 3 feet of the hole is
tamped with natural cuttings. At this point any excess cuttings
which have piled up as a result of the drilling process are
raked out to less than one inch of the surface. This allows the
vegetation to continue its natural growth. Usually after one
rain storm the hole and the area around the hole look ,just as
they did before the operation began.
QOQQU~
EXPLORATION 7388 S REVERE PARkWAV, BLDG. 902 - ENGLEWOOD COLORADO 80112
A JOINT VENTURE (303) ]900303
FIELD OPERATIONS: PORTABLE (SHOT-HOLE) Page 6
III. DATA AQUISTION (continued)
Reclamation: continued
After the recording crew has completed shooting the shot holes,
the back crew comes through and picks up all flagging and other
debris which may have been left by the operations.
It is required that any personal trash which may be packed in
by the work force (such as lunch items and pop cans) be packed
out on a daily basis. As the back crew removes the trash they
also double check the shot holes to insure that there are no
blowouts and that the work area has been properly cleared.
All lines are checked upon completion by New Frontier's
management to insure that everything is cleaned up
satisfactorily.
It is very important to New Frontier that this work be
carried out with a minimum of impact to the forest area
and the residents surrounding it in order to be able to
continue work like this in the future.
Helicopters
Every effort will be made to streamline our operation,
as helicopter flight time is very expensive. Generally
2 helicopters will be used periodically for recording
activities, and a crew's working hours in any given
work day will vary from 8 to 15 hours per day.
Helicopters will travel only in flight corridors set forth
by the Forest Service in order to minimize the impact on
wildlife and other residents of the forest area.
Safety: Safety is paramount in all phases of New Frontier
seismic operations. Weekly meetings for helicopter
safety procedures as well as other on the job safety
practices are mandatory and part of our Compe.ny Policy.
000008
i
EXPLORATION 7388 S REVERE PARKWAY, BLDG. 902 - ENGLEWOOD COLORADO 80112
A JOINT VENTURE caoa~79ooaoa
FIELD OPERATIONS: PORTABLE (SHOT-HOLE) PAGE 7
III. DATA AQUISITIOON (continued)
Safety: (continued)
Explosives Safety: Explosives storage magazines are
built in strict compliance with ATF requirements.
Any transportation, handling and/or use will be in
correct compliance with all ATF, DOT and OSHA
requirements. Our company policy aims toward advance
planning in order to coordinate our exploration
activities safely with other land uses and requirements.
'U 'J
Scott D. Nish
Operations Manager
000009
AGENDA ITEM SUMMARY
TO: Pitkin County Board of County Commissioners
Regular Meeting - June 28, 1988
RE: New Frontier Exploration - Seismic Exploration Permi
FROM: Francis Krizmanich, Planning Office
ISSUE: New Frontier Exploration has applied for a prospecting
permit, pursuant to Section 3-8.14 of the Land Use Code. The
applicant plans to use an exploration program consisting of 21
miles of shot holes with 12 holes per mile. The application and
maps are attached.
This operation is similar to that conducted last year. The staff
opinion is that this project will have minimal impacts. There
are no helicopter flights planned in the Crystal River Valley-
the closest point of operation will be approximately 3 miles west
of Highway 133. Nineteen miles of the "line" will be on Forest
Service lands. The applicants have agreements with the property
owners of the two miles of private lands affected by this
project. The staff opinion is that the performance guarantees
and reclamation bonds required by the Forest Service and Colorado
Oil and Gas Commission will adequately mitigate environmental
impacts.
ALTERNATIVES:
1) The Board may deny this application if you find that it does
not conform to Section 3-8.14 of the Land Use Code.
2) The Board may approve this application with conditions as
you deem appropriate to mitigate impacts.
RECOMMENDATION: The Planning staff recommends that the Board
approve this application with the same basic conditions that were
imposed in 1987. A resolution for your review and approval is
attached.
FK.NEW
DDD~lU
DENVER
DENVER TECH CENTER
COLORADO SPRINGS
ASPEN
BILLINGS
BOISE
CHEYENNE
WASHINGTON, D. C.
HAND DELIVERED
HOLLAND & HART
ATTORNEYS AT LAW
600 EAST MAIN STREET TELEPHONE (30.3)9253476
ASPEM, COLORADO 8161 I TELECOPIER 130.3) 925-936J
May 13, 1988
CHARLES T. BRA.\DT
MAY 13
Mark Fuller, Assistant County Manager
Pitkin County
Courthouse Plaza Building
530 Fast Main Street
Aspen, Colorado 81611
Re: Prospecting Permits (Seismic Exploration)
on Federal Lands
Dear Mark:
Thank you for taking the time to meet with us on Wednesday con-
cerning Texaco's intention to conduct seismic exploration work on lands
where it holds mineral rights.
In thinking about a couple of your comments made during the meet-
ing, I have become increasingly disturbed by them. I'm referring to
your statements that "the County has nothing to gain in granting a
seismic permit" and that it was your sense that "the Board of County
Commissions didn't want to deal with these kinds of applications". You
should be aware of the legal aspects surrounding such an application
where federal lands are involved. In this regard, I encourage you to
consult with Tom Smith or, better yet, request Tom to attend the County
Commissioners' meeting when you intend to seek direction from the Com-
missions on this matter.
Briefly, the case law holds that state and local governmental
agencies can only require an operator on federal lands to obtain a per-
mit and impose reasonable regulations on the permit. Such agencies
cannot veto the operations on public lands. In California Coastal
Commission vs. Granite Rock Co., the U.S. Supreme Court held that fed-
eral statutes and regulations governing mining operations and national
forests did not o~ se preclude a state agency from requiring a permit
for such operations. The Court first determined that while the Prop-
erty Clause of the U.S. Constitution gives Congress plenary power over
the use of public lands, it does not follow that all state regulation
of that use is pre-empted. There must be evidence of Congressional
intent to occupy a given field, or evidence that the State law actually
conflicts with federal law. The Court then concluded that federal law
concerning mining on public lands did not reveal an intent to occupy
the field, nor did it conflict with state law requiring a permit.
The Court emphasized that its decision was "narrow," and only
involved a facial challenge to a permit requirement where the state
agency disavowed any intent to prohibit mining operations.
~~~Q1~
HOLLAND & HART
ATTORNEYS AT LAW
Mark Fuller, Assistant County Manager
May 13, 1988
Page 2 .
Consequently, Granite Rock does not stand for the proposition that
state agencies can veto mining operations on public lands. They can
only require operators to obtain a permit, and impose reasonable condi-
tions on the permit.
In Brubaker_vs. The_Board of County Commissions, E1 Paso County,
G52 P.2d. 1050 (1982), the Colorado Supreme Court held that where test
drilling operations had received federal approval the preemption doc-
trine precluded the board from denying permission to conduct test
drilling.
This doctrine was recognized by our local District Court Judge,
J. E. DeVilbiss, in Board of County Commissions of Pitkin County vs.
Colorado-Conundrum Marble Corporation and Stefan Albouv because it did
not appear that there was any actual conflict between the federal and
local requirements (in that case the County had issued a prospecting
permit authorizing the Defendants to proceed).
Texaco is a willing participant in the County's land use permit
application process and, as indicated yesterday, is' willing to abide by
a decision by the Board to conduct a public hearing on the application
even though the applicable Land Use Code provisions do not require such
a hearing. Texaco is also willing to abide reasonable conditions and
mitigation requirements imposed by the Board. The Board, notwithstand-
ing whatever bias it may have against seismic activity or concerns
about what exploration work might lead to, is legally obligated and
required to fairly consider the application as it does any other land
use application.
I trust you will speak with Tom Smith on the subject
intend to advise you by this letter. I only wish to point
legal cansiderations involved and our client's position on
siderations.
Very truly yours,
r_ .~~-
Charles T. Brandt
for HOLLAND & HART
CTB/sb
cc: Thomas F. Smith, Esq.
Paul Bradley, U.S.F.S
Francis Rrizmanich
Michael 0. Coulter
as I do not
out the
these con-
Scott Nish
John Ramsey, Esq.
00001?
ASPEN/PITKIN PLANNING OFFICE
130 South Galena Street
Aspen, Colorado 81611 ~
,
/-, ~,
Y
(303) 925-2020
LAND USE APPLICATION FEES
Clty
00113 -63721 -47331 GMP/CONCEPTUAL
- 63722 - 47332 GMP/PRELIMINARY
- 63723 - 47333 GMP/FINAL
- 63724 - 47341 SUB/CONCEPTUAL
- 63725 - 47342 SUB/PRELIM INARV
-63726 -47343 SUB/FINAL
- 63727 - 47350 ALL 2-STEP APPLICATIONS
- 63728 - 47360 ALL 1-STEP APPLICATIONS/
CONSENT AGENDA ITEMS
REFERRAL FEES.
00125 -63730 - 47380 ENVIRONMENTAL HEALTH
00123 -63730 -47380 HOUSING
00115 -63730 -47380 ENGINEERING
SUB-TOTAL
County
00113 -63711 -47431 GMP/GENERAL
' - 63712 - 47432 GMP/DETAILED
-63713 -47433 GMP/FINAL
-63714 -47441 SUB/GENERAL
-.63715 -47442 SUB/DETAILED
- 63716 - 47443 SUB/FINAL
- 63717 - 47450 ALL 2-STEP APPLICATIONS
- 63718 - 47460 ALL 1-STEP APPLICATIONS/ Q - y 'Y
CONSENT AGENDA ITEMS
REFERRAL FEES.
00125 -63730 -47480 ENVIRONMENTAL HEALTH
00123 -63730 - 47480 HOUSING
00113 - 63731 - 47480 ENVIRONMENTAL COORD.
00113 -63732 -47480 ENGINEERING
SUB-TOTAL
PLANN ING OFFICE SALES
00113 -63061 -09000 COUNTY CODE
- 63062 - 09000 COMP. PLAN
-63066 -09060 COPY FEES O:Q {~~'~~~
-63069 -09000 OTHER SJ
SUB-TOTAL
'~ O ®
~~~
i
i
TOTAL --
~
Name:
~
/ 1/"I _
- ~ ~" i ' ~ pMOhe: -
Atltlress: _ -- ~ ~ ~ •" ~ r ~" ~ 1f ~ ~ " ~ project:
_
Check $~ pate ~ ~ ~U
Adtlitiona l Billing: _- _ N of Hours:
•:
'4'
t •T .
~~ ~ s~ t
(; ,.)
~'
p ~ .,'
> st' ~;11~~~
i )~ f I
i)U
vi f
~~.,r}...,f~j ...
(fir(
,~'-
s
~~' ~ y`
..1x YY. • ...,,
' u«
{ y ~
/ 1
.-YP '