Loading...
HomeMy WebLinkAboutpitkin.planning.273514200000DOCUMENT LAYOUT THIS FILE MAY OR MAY NOT CONTAIN ALL OF THE INFORMATION LISTED BELOW IN THE FOLLOWING ORDER Summary Sheet Resolution for the BOCC and/or P&Z Ordinance for the BOCC and/or P&Z Determination for the Hearing Officer Administrative Determination Staff Memo Application Public Notice, Acceptance Letter, Referral(s) Letter Site Plan Miscellaneous Plat copies (11x17) PARCEL ID: 2735-142-00-651 TERCVD: ~ #COPIES: CASE NAME: Iselin Park Ice Rink Temp Use Permit Planners PROJ ADDR: 0861 Maroon Creek Rd OWN/APP: Aspen Youth Hockey ADf2~ GSIZ:~ PHN:~ REPo ADR:~- GSIZ;,~. PHN:~ Email Addr: ALLOCATED HOURS: FEES DUE: FEES RCVD:~ ^/o OVER: eeeveow~e REFt~ BY~--, DUE:.~- MTG DATE > REV.BODY : PH NOTICED -' DATE OF FINAL ACTION: ~_~ N0 ~_ BOCC Reso:~ BOCC Ord: ~+-~. No REMARKS 2735-142-00-001 GF PZ:. 'HRGOFF: CLOSED:- BY:. ~ HO INDEX: ADMIN: PLAT RECORDED~r' PLAT (BK,PG): ~ ADMIN INDEX: ' VR APPROVAL DATE:.r I VR EXPIRES: CASE TYP:: ;Temp Use Permit CASETYP6:. CASE TYP2t CASE TYPE: CASE TYP3:~ CASE TYP7:.. CASE TYP4: Date Scanned: ' 8/27/09 File Locations .. Box 173 CASELOAD SUMMARY SHEET PITKIN COUNTY DATE RECEIVED: 11/16/94 DATE COMPLETE: STAFF MEMBER: RM CASE # P140-94 PARCEL ID# 2735-142-00-001 PROJECT NAME: Iselin Park Ice Rink Temoorarv Use Permit Project Address: Maroon Creek Road APPLICANT: Youth Hockev Program Applicant Address: REPRESENTATIVE: Steve Hanson 920-1558 Representative Address/Phone: Box 10493 Aspen, CO FEES: PLANNING $ # APPS RECEIVED ENGINEER $ # PLATS RECEIVED HOUSING $ ENV. HEALTH $ /~ TOTAL $ 0 (/ TYPE OF APPLICATION: STAFF APPROVAL: X 1 STEP: 2 STEP: DRC MEETING DATE P&Z MEETING DATE BOCC MEETING DATE IZ o HEARING OFFICER MEETING DATE: REFERRALS: I/ Attorney ~~Engineer Housing Aspen Water ~Envir.Hlth. -~ZOning Land Mgmt. Airport Mgr. Sheriff City P & Z Building Dept Aspen Consol Rocky Mtn Nat -Holy Cross _Aspen Fire -Basalt Fire S.D. / School District Gas USES (Carbondale) -Carbondale Fire -Div. Water Res. -State Forest Ser. CO Geo.SUrvey CDOT -Clean Air Board _ Brush Ck Metro Dist USES (Aspen) Div. of Wildlife BLM Snowmass Village Risk Manager Ca c~us ~ _ '~ finis Glu~ Open Space Bo rd ~iu6• Other: Other: DATE REFERRED: ~ I ~ Z~- INITIALS: ~W DATE DUE: ~~ U RESOLUTION #: DATE: PLAT OR SITE PLAN RECORDED AT BOOK PAGE(S) FINAL ROUTING:~~G~~L DATE ROUTED: ~~ ~-~ "`1S INITIAL: ~ County Attorney -County Engineer Zoning Housing _Envir. Health Applicant Open Space Bd. Other: FILED: PUBLIC HEARING: YES NO PUBLIC HEARING: YES NO Revised 05/16/94 MESSAGE DISPLAY TO Rick Magill CC Bud CC PCSKB From: Bud Eylar Postmark: Nov 30,94 10:33 AM Subject: Iselin Ice Rink Message: Rick, I have reviewed the application comments: With the hours of operation, minimal. I have a questions as to the parking lot and the ice rink surface a hours of operations. Will plowing take late evening? Bud and have the following traffic impacts should be need for maintaining the s to the ability to meet the place early in the morning or ----------=====X=====___------- .~ . MESSAGE DISPLAY TO Lee Cassin CC Rick Magill From: Suzanne Koncha Postmar __9:33 AM Subject: Iselin Park Ice Rink ----------------------------------------------------------------- Message: Upon closer inspection of the Land Use Code, Parks and all their playfields, etc. are uses allowed by right in the AFR zone districts and NO land use reviews are triaaered by the ice hockey rink installation. Thus, there is no way to require any air quality mitigi ation of the proposed use through a land use arena. I am sensitive to the perception of unequal treatment of public v. private sector, and have two comments. 1) As always we can voice our concerns to the City as property owner. and 2) on the adjacent improvements to Rotary park no mitigation was required (private park) ----------=====X=====___------- -~ ~~f?2 Govcrie6lS~-~tz~'- t;~iJ~4 ~1~~/ ~wv6,12~ ~Kdc~~// ~2i~~oH /~sf~.e Caws ~ v~~~ l.~l~ /G~ l~iv~ _ ~~. r ,. MEMORANDUM To: Rick Magill, Planning Office V From: Chris Chiola, Environmental Health Department ~~ AseEN.PiTxIN EN\'IN06MENTAL HEALTH DfiPARTMLNT Through: Lee Cassin, Senior Environmental Health Officer aS'~G Date: November 28, 1994 Re: Iselin Park Ice Rink Temporary Use Permit ParcellD # 2735-142-00-004 The Aspen/Pitkin Environmental Health Department has reviewed the details of the Aspen Youth Hockey Program application under the authority of the Pitkin Countv Code, Title II, and has the following comments. ADEQUATE PROVISIONS FOR WATER NEEDS: Sections 2-6 and 5-205: •n is the policy of the County to ensure that land is not committed to any use and that no use is initiated without adequate evidence that a water supply of adequate quality, quantity, pressure and dependability is available to support the use intended.' This Department requires that adequate water be available to the site. There is a sufficient water supply to this site for the purposes of an ice rink. SEWAGE TREATMENT AND COLLECTION: Sections 2-7 and~.5-200: •It is the policy of the County to ensure that land is not committed to any use and that no use is initiated without adequate evidence that facilities to collect, treat and dispose of anticipated types and quantities of waste water are available or can and will be provided with suitable capacity, quality of discharge, suitable point of discharge and dependability.' Iselin park is serviced by the Aspen Consolidated Sanitation District anal meets all requirements from this Department. WATER QUALITY IMPACTS: Seetions_2-22 and 5-107.2: •n is the policy of the County to preserve and protect ks presets water resources. To this end it is the policy of the County that no land use beinitiated which would adversey affect the quantity, quality, or accessibility of the County's water resources; or which would occur at the expense of established water-dependent agricukural activities; or which would result in increased salinization of water resources, loss of minimum stream flows, further destruction of wildlife habitat, or major expenditures to reacquire or. redistribute major water resources, his also the policy of the County to maintain a natural vegetative butter along its surface waters such that the surface and groundwaters of the area are not encroached upon by land uses or other human activities which could cause deterioration of water quality or impair the natural treatment processes provided by meadows and wetlands.' The Environmental Health Department will be addressing water quality impacts only on down stream water quality. This application is not expected to impact down stream water quality. 130 SocTrr GALenA STReeT Asres, COIOxAI)0 81611. PHONe 303.920.5070 Fax 303.9205197 - Vrin,tt~ oo n~nrn1N pzpee Iselin Park Temporary Use Permit 2 November 28, 1994 AIR QUALITY: SeCtIOnS 2-17 and 5-106: 'only that development is permitted which will not contribute signHicantly to degradation of air quality in Pitkin Couny.' As is required of all proposed development, such as the Hines Interests and Moore plans, increases in traffic in the non-attainment area must be completely mitigated or offset. There will be a significant increase in traffic to and from the proposed rink, in that the stated purpose of the application is to "accommodate the increasing number of kids." The traffic increases will be partly offset by allowing kids (in the earliest session of the day only) to walk from school. But this may be negated by the fact that parents must drive farther to Iselin to pick their kids up instead of the existing rink closer to where the parent's work. The use of Iselin cannot be granted and still be consistent with requirements that are imposed on the private sector without a detailed analysis of traffic increases and how they will be mitigated. For this proposal to be approved by this Department, it will have to be proposed by the applicant how Iselin can function as an additional ice rink and bringing the kids to and from the rink without increasing traffic by any such means as car pooling, busing, etc. A condition of approval for this application is that prior to construction, the Environmental Health Department must receive and approve a traffic mitigation plan. CONFORMANCE WITH OTHER ENVIRONMENTAL HEALTH LAWS: Section 2-2 •ni~tne policy of the County to ensure that no use or development of land is permitted which is in violation of the laws of the County, the State of Colorado, or the United States of America.' Any amplified music or P.A. systems will require a noise variance from this Department if used. Otherwise no required permits are necessary. This Department is not aware of any issues of concern regarding other environmental health laws.. Conditions of approval for this application are -None. ...NV:WP:LAND USErtSEUN.TEMP.USE. ASPEN/PITHIN COMMUMiJNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado 81611 Phone 920-5090 FAX 920-5439 MEMORANDUM TO: County Attorney County Engineer Environmental Health Zoning Aspen Water Aspen School District Risk Manager Maroon/Castle Caucus Aspen Tennis Club Subdivision FROM: Rick Magill, Planning Office RE: Iselin Park Ice Rink Temporary Use Permit Parcel ID #2735-142-00-004 DATE: November 22, 1994 Attached for your review and comments is an application submitted by the Aspen Youth Hockey Program. Please return your comments to me no later than NOVEMBER 30. Thank you. /' f ~~pG (I-Q ~~^ ~b~ ~ I b I o Cpu~~f ~~~~5 ~ Honien ConiE~u~tion, In~_ po box 10493 • oipen,co_ 81618.980-1558 November 15, 1994 Ms. Suzanne Konchan Pitkin County Planning and Zoning 130 South Galena Aspen, Colorado 81611 RE: Iselin ir_e _ink Dear Suzanne, The Aspen Youth Hockey Program is in need of more ice to accommodate the increasing number of kids. We have researched various sites around the community to install a temporary outside rink and feel that the baseball diamond at Iselin Park would be ideal. An outside rink has five requirements: 1. Lighting. 2. Water. 3. Flat surface. 4. Parking. 5. Heated storage area (to keep the hose from freezing). Iselin Park fulfills all of these requirements. We propose the following: 1. HOURS OF OPERATION We would schedule our practices around peak hours of traffic congestion from skiing: Monday - Friday 4:30 pm - 9:00 pm Saturday - Sunday 10:00 am - 2:00 pm 4:30 pm - 9:00 pm The rink would be covered up with a tarp during off hours. 2. NO AMPLIFIED MUSIC Some low level music may be needed for figure skaters. 3. LIGHTING Lights would be used as needed and turned off each evening by 9:30. The existing lights in the outfield would not be needed. The existing lighting system is currently inoperable, but we would offer to correct the problems at our own cost. Ms. Suzanne Konchan November 15, 1994 RE: Iselin ice rink Page 2 4. OCCUPANCY We would generally schedule three to four practices a day with thirteen to fifteen children practicing at any one time. The practices would run 1 - 134 hours each. 5. SUPERVISOR At least one adult would accompany the children at all practices. 6. INSTALLATION/REMOVAL The rink would be installed as soon as it is permitted and would be removed in the spring prior to baseball season. The baseball diamond would be restored to its original state. All costs would be paid for by the Aspen Youth Hockey Program. Please contact me at your earliest convenience as we would like to begin the installation as soon as possible if you find our request acceptable. Thank you for your consideration. Sincerely, Steve Hansen Hansen Construction, Inc. SH/kb cc: James Bond Aspen Jr. Hockey Board