HomeMy WebLinkAboutpitkin.planning.273514200020 (3)DOCUMENT LAYOUT
THIS FILE MAY OR MAY NOT CONTAIN ALL OF THE INFORMATION
LISTED BELOW IN THE FOLLOWING ORDER
Summary Sheet
Resolution for the BOCC and/or P&Z
Ordinance for the BOCC and/or P&Z
Determination for the Hearing Officer
Administrative Determination
Staff Memo
Application
Public Notice, Acceptance Letter, Referral(s) Letter
Site Plan
Miscellaneous
Plat copies (11x17)
PARCEL IDi 2735-142-00-020 DATE RCVD: ~- # COPIES:- CASE NO 1986
CASE NAME: Aspen Highlands Resort 1986 Commercial GMP/Gen Subm Planners
PROJ ADDR:.
OWN/APP: Aspen Highlands Ski ADR~- CISIZ:.~- PHN:~-
REP: ,. ADR;~- GSIZ>~- PHN:~-
Email Addr:.. ALLOCATED HOURS:-
FEES DUE;- FEES RCVD:~r % OVER: ~-
REFERRALS
REF:- BY~- DUE:-
MTG DATE REV BODY PH NOTICED DATE OF FINAL ACTION: , ~--
~- ~- No ~- BOCC Reso: ~--
~- No ~- BOCC Ord: ~-
REMARKS PZ.
HRG OFF.
CLOSED:- BY: ~-- HO INDEX: ~-
ADMIN: ~-
PLAT RECORDED~~ PLAT (BK,PG):~- ADMIN INDEX:
VR APPROVAL DATE:.- VR EXPIRES:-.
CASE TYP:-' Commercial GMP CASE TYP5:
CASE TYP21-. Gen Subm CASE TYPE:
CASE TYP3: CASETYP7:
CASE TYP4: DateScanned: . 9/4/09
File Location: IBoz 175
T0: Pitkin County Planning and Zoning Commission
FROM: Francis Rrizmanich, Planning Office
RE: Aspen Highlands Resort - Commercial GMP/General
Submi ssion
DATE: October 7, 1986
APPLICANT: Aspen Highlands Skiing Corporation (Aspen Highlands)
RSQOSST: Aspen Highlands is requesting Commercial GMP and
General Submission approval for the commercial portions of the
Highlands Resort Development that represent "additional" square
footage not ancillary to the base lodge. This commercial square
footage is associated with the reconstruction of the base lodge,
ski shop and administrative offices. The requested commercial
square footage is calculated to result in a total net increase of
9.94 employees (see attached application).
BACRGROIIND: On May 19, 1986, the Board of County Commissioners
granted General Submission approval to Aspen Highlands for
redevelopment of the base area. On June 23,1986 the Board
awarded a Lodge GMP allotment of 80 units to Aspen Highlands (see
attached resolutions). Condition 5 of Resolution 86-39 states
"any increase of commercial square footage not accessory to the
hotel may require a commercial GMP application. The Board
directs the staff to work with the applicant to make a determin-
ation on the project's need for commercial development allotments
and to report back to the Planning Commission within 60 days."
This commercial GMP allotment application for 10 employment
generation units has been submitted pursuant to the above
condition.
NAJOR ISSDES AND CONCERNS:
A. Referral Agency Comments:
1. Housing Authority: In a memo dated September 16, 1986,
(attached) Ann Bowman submitted the following comments:
o The Aspen Highlands Resort would generate a peak
projected employment of 260.81 full time equivalent
persons.
o The applicant will provide on-site housing for a
portion of the project and will utilize one or
more of the options available to provide for 1008
of the remaining employees to be housed off-site.
o The commercial GMP proposal is essentially the
same as the original proposal. The applicant is
proposing to house 1008 of the new employees
generated by the commercial portions of this
project.
o The Housing Authority Board recommends approval of
this application with deed restrictions to be
placed on the employee units (see attached memo) .
B. Staff Comments: The Aspen Highlands Resort has been granted
80 units through the lodge quota system, general submission
PUD approval for the project including variances to height,
floor area and parking patios, rezoning to exchange 2.1
acres of AF-1 zoned land with 2.1 acres of AR-1 zoned land,
and approval for restaurants, banquet facilities and other
uses ancillary to the lodge development request (see
attached resolutions).
Due to the requirements of the Land Use Code's Commercial
Growth Management Allotment system, Highlands Resort was
required to meet with the Planning Office to determine the
number of employees which would be generated by additional
commercial square footage that is not ancillary to the
lodge.
The applicant's analysis of additional commercial space
indicates that 9.94 Employee Generation Units (EGU) will be
required. The applicant is requesting 10 EGU°s under the
County's Commercial Growth Management Allocation System.
This request for 10 EGU's equates to approximately 3,000
square feet of square footage in a project which includes a
total of approximately 350,000 gross square feet. The
Planning Office opinion is that the 10 EGU's and the
associated square footage being requested is reasonable.
Even if the total 300 lodge units that were originally
requested are not constructed or are constructed in phases,
the Planning Office believes that this request for 10 EGU's
can be supported at the base area under existing conditions.
The Housing Authority has reviewed this proposal and agrees
with the 10 EGU figure calculated by the applicant. The
Planning Office agrees with the Housing Authority recommend-
ation for approval of this subject to the deed restrictions
contained in their attached m emo.
RBCOMMBNDATION: The Planning Office recommends that the Planning
Commission recommend that the Board of County Commissioners grant
Commercial GMP/General Submission approval to the applicant for
10 EGU's subject to the conditions imposed by Resolution 86-39
which granted general submission approval to the PUD and rezoning
applications of the Aspen Highlands Resort, and the following
deed restrictions recommended by the Housing Authority:
1. The owner hereby covenants that the employee rental units
shall remain as rental units and shall not be condomin-
iumized. Use and occupancy of the employee rental units
shall be limited to housing for qualified employees in
accordance with the low income rental guidelines established
by the Housing Authority of the City of Aspen and Pitkin
County or a successor thereto. The owner of the units shall
have the right to lease the units to qualified by the owner,
or employed in Aspen/Pitkin County, provided such persons
fulfill the requirements of a qualified employee. "Quali-
fied employee" as used herein shall mean any person current-
ly for a minimum average of 30 hours per week, nine months
out or any twelve-month period, who shall meet low income
and occupancy eligibility requirements established and
applied by the Housing Authority with respect to employee
housing.
2. Verification of employment of person(s) living in the
employee rental units shall be completed and filed with the
Housing Authority Office by the Owner of the unit prior to
occupancy thereof, and must be acceptable to the Housing
Authority. If the owner does not rent the employee unit to
a qualified employee the unit shall be made available for
occupancy in accordance with the Housing Authority guide-
lines, provided the Owner shall have the right to approve
any prospective tenant, which approval shall not be un-
reasonably delayed or withheld.
3. These covenants shall be deemed to run with the land as a
burden thereof for the benefit of, and shall be specifically
enforceable by, the Board of County Commissioners of Pitkin
County, the Housing Authority of the City of Aspen and
Pitkin County, or the duly authorized designee of the Board
of County Commissioners of Pitkin County, by any appropriate
legal action including but not limited to injunction,
abatement, or eviction of non-complying tenants during the
period of the life of the last surviving member of the
presently existing Board of County Commissioners of Pitkin
County, Colorado, plus twenty-one years, or for a period of
fifty years from the date of recording hereof in the Pitkin
County real property records, whichever period shall be
less.
4. When a lease is signed with a tenant, a copy shall be sent
to the Housing Office so that a current file may be main-
tained on each unit.
5. The Housing Authority will review the payroll for the Aspen
Highlands at the end of the first year and each year for
five years to determine if additional employees have been
generated by the Mountain Master Plan changes.
FR.102
PITRIN COQNTY COMAERCIAL GMP COMPETITION
SCORE SHEETS
Name of Project: Aspen Highlands Resort Date: 10/7/86
AVAILABILITY OF PDBLIC AND PRIVATE FACILITIES AND SERVICBS (maximum
18 points). The Commission shall consider whether each application
has provided a commitment as to the availability of the necessary
public and private facilities and services or an agreement to provide
these facilities and services and shall rate each development by
assigning points account to the following formula:
0 -- Indicates total impracticality of providing service.
1 -- Project requires the provision of new services at increased
public expense or proposed services do not meet the standards of
the Land Use Code.
2 -- Project can be handled by the existing level of service in the
area or any service improvement by the applicant benefits the
project only and not the area in general, or service improve-
ments simply meet the standards of the Land Use Code.
3 -- Project in and of itself improves the quality of service in a
given ar ea or service improvements go beyond the standards of
the Land Use Code.
The following facilities and services shall be rated accordingly:
(i) WATER (maximum 3 points) considering the ability of the water
system to serve the development, and if a public system, the
applicant's commitment to finance any system extensions or
treatment plant upgrading required to serve the development, if
a private system, considering the capacity and reliability of
the system being proposed.
(Multiplier - 1) ~_
COMMENT:_~gH 79 of the aDOlicaticn cratPC• "Tf he applicant finds
*hat additiona~ capacity or a loop system will be reg,n~ *Pd or des red
iL
(ii) SSWSR (maximum 3 points) considering the ability of the sewer
system to serve the development and if a public system, the
applicant's commitment to finance any system extensions or
treatment plant upgrading required to serve the development. If
a private system, considering the capacity and reliability of
the system being proposed.
(Multiplier - 1) ~-
COMMENT: The Ar,nlicant has committed to ggv on- and off-site coGts
(iii) STORM DRAINAGE (maximum 3 points) considering the degree to
which the applicant proposes to retain surface runoff on the
development site. if the development requires use of the
County's drainage system, considering the commitment of the
applicant to install the necessary drainage control facil ities
and to maintain the system over the long term.
(iv) FIRE PROTECTION (maximum 3 points) considering the ability of
the appropriate Fire Protection District to provide fire
protection according to the established response standards of
the appropriate district without the necessity of establishing a
new station, or requiring the addition of equipment, personnel
or capital improvements. Considering the adequacy of available
water pressure and capacity for providing fire fighting flows.
Considering the commitment of the applicant to provide fire
protection facilities which may be necessitated by the project,
including, but not limited to, fire hydrants and water storage
tanks.
(Multiplier - 1) ~
2
(Multiplier - 1) ~-
(v) ROAD SYSTElI (maximum 3 points) considering the ability of the
public road network to provide for the needs of the proposed
development within acceptable levels of safety, as defined in
the 1985 Pitkin County Road Standards and Specifications.
Considering the applicant's commitment to finance necessary road
system improvements attributable to the proposed development.
(vi) POBLIC AND PRIVATE TRANSIT SYSTEMS (maximum 3 points) consider-
ing the proximity of the proposed development to existing
transit routes and trail systems. Considering the ability of
the transit system to accommodate the proposed development
without the need for additional facilities or route shifts.
Considering the commitment of the applicant to provide capital
improv ements (i. e., bus shelter, trail connection spur) which
enhance the service of the public and private transit systems to
the proposed development.
(Multiplier - 1 ~-
COMMENT: T_he ave~i^ant h-s made the fo>>owina *ransit re~ated commit-
pagQ 3 8
(Multiplier - 1) _2-
°'' ' ona~ tr affi c - this addi ti ona~ tea ~ aoeG not aooear Lo [,avc
- __ ._ _.. ____~ il~ .~......... 4_
T_he Rrivate bus system will be ex8anded to meet the
~~ ~ ~*+d suoolement the overall community tran-
~nortati on ~y~tam•
Ashen Highl nn'a will 1 ink they r nrojP~* 4,rh the nord~ c and
- --- --~-
pages 57• The hotel will own and Qperate a courtesy van shuttle
gys~^•^ F^~ its_gues s• ---
Page 61: The hotel will offer direct bus service to Maroon Lake and
the USFS trailhead• -
The As~gn Highlands Resort wily contribute the use of their
Page 65•
A separate pickup. dre~ off zone will be provided for
private automobiles and courtesy vans•
Page 86: mhP full cost of transpprtation svstem improvements new
fac+:l ~t~ Ps and trail connections will hP jai d by th_e apF1~-
cant and will result in no direct p~~b1 ; ~ costs
Page 90:
PLANhT1~G OFFTGS ANALYSIS The applicant is committing to provide
The_ apQ~ icant will pJ-ovide a ,paved and lands caned trail
SOBTOTAL: 14
2. QIIALITY OF DESIGN (maximum 33 points). The Commission shall consider
each application with respect to the quality of its exterior and site
design and shall rate each development by assigning points according
to the following formula:
0 -- Indicates a totally deficient design.
1 -- indicates a major design flaw.
2 -- indicates an acceptable (but standard) design.
3 -- indicates an excellent design.
The f ollowing features shall be rate accordingly:
(i) SITE DESIGN (maximum 3 points) considering the quality and
character of the proposed landscaping and open space areas, the
degree to w hich natural vegetation is preserved, and the
provision of pedestrian amenities (paths, benches, and bicycle
storage facilities) which enhance the design of the development
and provide for the safety and privacy of the users of the
development.
(Multiplier - 4) ~-
5
~-' - - ^^" ^^~ asgect of the groj Pct
(Y)MMENT: Because Of_rhP linear design of the~~4ject build~,~g mass
(ii) RESODRCE CONSERVATION (maximum 3 points) considering the extent
to which the applicant proposes to employ passive and/or active
solar heating and cooling and thermal insulation measures beyond
those required by the building code and the extent to which the
applicant proposes to employ water conservation and wastewater
reuse devices and techniques rather than standard plumbing
facilities within the development.
(Multiplier - 1) _~_
CnMMF.NT_ Hotel R-valsze is 18 percent greater than Code regnires
(Multiplier - 2) ~-
COMMENT: The_.p~ject~ropgses one main entrance to the site based on
(iv) SNVIRONMSNTAL IMPACT (maximum 3 points) considering the degree
to which the design minimizes adverse impacts upon the environ-
ment, including impacts on air and water quality, visual
vulnerability, and natural and man-made hazards (geologic
hazards, floodplains, steep slopes, unstable soils, snow
avalanche, wildfire hazard, wildlife habitat and airport flight
hazard areas).
(Multiplier - 3) ~_
COMMENT: Bec ~ se of the location and site design the resort
hoot d h~ve m~ n~mat v; coat impacts uy~on adiacent gronert~ es.
(iii) PARKING AND CIRCDLATION (maximum 3 points) considering the
quality and efficiency of the internal circulation and parking
system for the project, including the quality and efficiency of
proposed trash and service vehicle access and loading areas and
design features to screen parking from public views.
~~Pnt stacking diGtances are provided and the entrance is mov to
}equality will be affected by the increased ncP of the recort
mhe ~....; rnnmant~l r;ea~ th D~nartment has commented that the
~$1;ranr~s Drotosal to l;m;t fireplaces to four in the^hotel
_ „ ~__~ ..L ... ..4• .. me
(v)
(Multiplier - 1) ~_
3. EMPLOYEE HOUSING PROVISION (maximum 10 points). The Commission shall
assign points to each applicant who agrees to provide low-, moderate-
or middle-income housing for employees generated by the proposed
development as such housing has been annually defined by the Board of
County Commissioners. Applicants shall be awarded one (1) point for
each ten (10) percent of the employees of the project who are
provided with employees housing by any method specified in Section 5-
300.4. The standards of Section 5-300.1 shall be used as the
guideline for establishing the employee housing generation of
commercial development, although the ~ Commission may accept an
VISOAL VULNERABILITY (maximum 3 points). The Commission shall
consider the extent to which the applicant uses mitigating
techniques such as siting, buffering, natural topography and
vegetation and setbacks to offset the visibility of the project
(man-made berms are not encouraged).
SUB40TAL: 17
alternative standard proposed by the applicant, if said standard is
found to be appropriate for the particular development by the Housing
Authority.
(Multiplier - 1) _].~-
COMMENT: The ~olicant has calculated that 9 94 employees will be
TOTAL POINTS (with multiplier)
1. AVAILABILITY OF PDBLIC AND PRIVATE FACILITIES AND SERVICES 14
2. QQALITY OF DESIGN
3. EMPLOYEE HOOSING PROVISION
TOTAL: 47
(608 threshold = 36.6 points)
Name of Planning and Zoning Member: ~gyien/Pitkin Planning office
8
MEMORANDUM
TO: FRANCIS KRIZMANICH, PLANNING OFFICE
FROM: ANN BOWMAN, PROPERTY MANAGER
DATE: SEPTEMBER 16, 1986
RE: ASPEN HIGHLANDS RESORT COMMERCIAL GMP/GENERAL SUB.
ISSUE: Do the representations of the applicatn still meet the
requirements for the employee housing generation?
BACKGROUND: The applicant represents that the provision of
employee housing is a requirement of the Pitkin County Code to
mitigate the shorfall of affordable housing available for low,
moderate, and middle income residents. based on the requirements
of 5-300, the Aspen Highlands Resort would generate a peak
projected employement of 260.81 full time equivalent persons.
The applicatn will provide on-site employee hosuign pursuant to
5-300 for a portion of its employees and will utilizeone or more
of the options available to the applicatn for satisfying the
requirements of 5-300 for providing 1008 of the employees
generated who wil not be hosued on site.
The attached documents are identical to the proposal Aspen
Highlands Resort presented earlier this year and the Housing
Authority approved with minor variations at that time.
STAFF RECOMMENDATION: Attached is the approved modification.
Staff recommendations approval of previous modified generation
figures as shown below:
BACKGROUND: This proposal consist of the redevelopment of the
base of Aspen Highlands Ski Area including a 300 room lodge
incorporating 200 lodge rooms, 50 suites and 50 self-contained
units, restaurants, dining rooms, lounges, banquet/meeting rooms,
cocktail bar/lounge, administrative offices and support areas; a
separate base lodge containing ski operation areas, a 400 seat
dining area, cocktail/bar, public lockers/ski check, rental space
and other support functions.
The applicant proposes that based on the requirements of Section
5-300 .1 (c) of the Pitkin County Land Use Code, the Aspen Highland
Resort will generate a peak projected employment of 266 persons.
On-site employee housing pursuant to 5-300.4(a)(2) will be
provided and the off-site employee housing obligation will be met
by a payment-in-lieu as identified in Section 5-300.4(a)(5).
LOCATION: The proposed development is located east of Maroon
Creek Road, South of Highway 82, at the base of the Aspen
Highlands ski-area, southwest of Aspen, Colorado.
GENERAL FEATURES INCLUDE:
1. 300 guest units composed of 200 basic units, 50 suites,
and 50 cottage type units.
2. Restaurants, dining rooms, lounges, banquet/meeting
rooms, cocktail bar/lounge, administrative spaces, and
support spaces.
3. A base lodge to accommodate the ski operation, a main
dining area seating 400, a cocktail/bar, public
lockers/ski check, retail space (ski-rental, etc.
4. Parking primarily concealed in underground structures
for approximately 875 cars for both hotel guests and
the ski-operation.
5. A "village square" with campanile, retail shops, tennis
courts, recreational facilities, swimming pool,
detention/lake water feature, and boardwalk.
EMPLOYEE HOUSING GENERATION: Because of the complexity of this
application each area will be calculated by type of activity with
a summary recommendation to the Planning Office at the end of the
document.
i. Hotel - Guest Rooms
The Pitkin County Land Use Code for Hotel/Lodge/Hotel/Tourist
Dormitory has a range from .22 - .54 employee per room based on
review of the Housing Authority.
Full Time Equivalent
Emp oyees Generated
Base Unit
Suites
Separate Cottage/units
200 units x .22 = 44 (1008)
50 units x .40 = 20 (1000
50 units x .30 = 15 (1000
Subtotal Employees (1008) of net gen.) = 79 (1000
II. SUPPORT AREAS
Retail - 5,000 s.f.
3.9/1,000 = 3.9 x 5 = 19.5 (1000
Spec. Restaurant - 100 seats 2,000 s.f.
5.0/1,000 = 5 x 2 = 10.0 (1008)
Cocktail Lounge - 100 seats/1,800 s.f.
6.0/1,000 = 6 x 1.8 = 10.8 (1008)
Coffee Shop - 150 seats/2,700 s.f.
6.0/1,000 = 6 x 2.7 = 16.2 (1008)
Lobby Bar - 60 seats/960 s.f.
7.0/1,000 = 7 x .96 = 6.72 (1008)
Ballroom - 500 seats/5,000 s.f.
1.5/1,000 = 1.5 x 3 = 7.5 = 2.25 (308)
Function Rooms - 300 seats/3,000 s.f.
1.5/1,000 = 1.5 x 3 = 4.5 = 1.36 (308)
Meeting Rooms - 100 seats/1,000 s.f.
1.5/1000 = 1.5 x 1 = 1.5 = .45 (308)
Seminar Room - 30 seats/300 s.f.
1.5/1,000 = 1.5 x 3 = .45 = .14 (308)
Ballroom - 900 seats/3,000 s.f.
1.5/1,000 = 1.5 x 3 = 4.5 = 1.35 (308)
Administration - 5,590 s.f.
3 9/1 000 = 3 9 x 5 59 = 21.80 (1000
Subtotal Employees = 90.56
IIT. SRI OPERATIONAL FACILITY - Base Lodge
Full Time Equivalent
Employy_pes generated
Main Dining Area - 400 seats/8,000 s.f.
5/1,000 = 5 x 8 = 40 (1008)
Cocktail Bar/Lounge - 1,400 s.f.
6/1,000 = 6 x 1.4 = 8.4 (1000
Retail (Ski-rental) - 1,500 s.f.
3.9/1,000 = 3.9 x 1.5 = 5.85 (1008)
Subtotal Employees (1008 of net generated ) 54.25
IV. ADDITIONAL: Retail/Commercial space/10,000 s.f.
3 5/1 000 = 3 5 x 10 = 35 (1008)
Subtotal Employees (1008 of net generated) = 35
THE TOTAL EMPLOYEES (1008 OF NET GENERATED) is 267 (1008).
IV. ON-SITE EXISTING FACILITIES/EMPLOYEES (TO be credited):
Full Time Equivalent
.mD~oyees Generated
Maroon Creek Lodge (Existing)
12 Guest Units x .3 = 3.6
Aspen Highlands Ski-Shop (Existing)
8,090 s.f. + Gross
3.9 x 8.09 = 28.32
Aspen Highlands Base Lodge (Existing)
14,800 s.f. + Retail/Dining
3.5 x 14.80 = 51.80
TOTAL EMPLOYEES EXISTING ON-SITE = 83.72
V. PROPOSED ON-SITE HOUSING
2 level dorm building @ 5000 s.f. = 30 emp.
_5000 so ft Total on-site Low income EmB~y Hoi:Bina
(5,000 s.f.) = 30 employees
VI. Employee Recap:
New Project requirements 267
Existing on-site facility employees 84 employees
Build on-site dorm 30 employees
TOTAL NEW ADDITIONAL EMPLOYEE REQUIRING HOUSING = 184
VII. PROPOSED OFF-SITE HOUSING
The Off-site Employee Housing obligation will be met with a
payment-in-lieu:
Proposed Employee Housing Mix - Required Employees
ome Level On-Site Off-Site Total Percentage
Low 30 86 116 568
Moderate - 45 45 29~
Middle - 23 23 15~
30 154 184 1008
Inc
Proposed Off-Site payment-in-lieu
Income Leve
Low 86 520,000 51,720.000
Moderate 44 13,300 585,200
Middle 23 9 000 207.000
52,512,200
The applicant proposes to provide a payment-in-lieu for satisfy-
ing the off-site housing based upon a present value calculation
to be determined.
The Housing Authority will review the application and respond to
the proposed present value scenario.
The Housing Authority will review with the applicant at the end
of the first year of operation the exact employees generated in
each category and would accept the applicants proposal of a
review each year thereafter for five years. As the Mountain
Master Plan represents no additional employees, the Housing
Authority would review the payroll of the employees after the
first year of operation for this calculation.
The Housing Authority compliments the applicant on the well
thought-out presentation and places the following conditions to
be incorporated in the deed restrictions for the rental units
with the understanding that we would look at other alternatives
prior to Detailed Submission:
1. The Owner hereby covenants that the employee rental
units shall remain as rental units and shall not be condo-
miniumized. Use and occupancy of the employee rental units
shall be limited to housing for qualified employees in
accordance with the low income rental guidelines established
by the Housing Authority of the City of Aspen and Pitkin
County or a successor thereto. The Owner of the units shall
have the right to lease the units to qualified employees of
his own selection. Such individual may be employed by the
Owner, or employed in Aspen/Pitkin County, provided such
persons f ulfill the requirements of a qualified employee.
"Qualified employee" as used herein shall mean any person
currently residing in and employed in the City of Aspen or
Pitkin County for a minimum average of 30 hours per week,
nine months out of any twelve-month period, who shall meet
low income and occupancy eligibility requirements esta-
blished and applied by the Housing Authority with respect to
employee housing.
2. Verification of employment of person(s) living in the
employee rental units shall be completed and filed with the
Housing Authority Office by the Owner of the unit prior to
occupancy thereof, and must be acceptable to the Housing
Authority. If the Owner does not rent the employee unit to
a qualified employee the unit shall be made available for
occupancy in accordance with the Housing Authority guide-
lines, provided the Owner shall have the right to approve
any prospective tenant, which approval shall not be unrea-
sonably delayed or withheld.
3. These covenants shall be deemed to run with the land as
a burden thereof for the benefit of, and shall be specifi-
cally enforceable by, the Board of County Commissioners of
Pitkin County, the Housing Authority of the City of Aspen
and Pitkin County, or the duly authorized designee of the
Board of County Commissioners of Pitkin County, by any
appropriate legal action including but not limited to
injunction, abatement, or eviction of non-complying tenants
during the period of the life of the last surviving member
of the presently existing Board of County Commissioners of
Pitkin County, Colorado, plus twenty-one years, or for a
period of fifty years from the date of recording hereof in
the Pitkin County real property records, whichever period
shall be less.
4. When a lease is signed with a tenant, a copy shall be
sent to the Housing Office so that a current file may be
maintained on each unit.
5. The Housing Authority will review the payroll for the
Aspen Highlands at the end of the first year and each year
for five years to determine if additional employees have
been generated by the Mountain Master Plan changes..
The commission shall use the following standards in calcula-
ting the number of full-time equivalent employees generated
by the project:
CC/C-1: 3.50 to 5.25 employees/1,000 square feet (net
leasable), based on review of the city council's housing
designee;
NC/SCI: 2.30 employees/1000 square feet (net leasable);
OFFICE: 3.00 employees/1,000 square feet (net leasable);
CL and other 3.50 employees/1,000 square feet (net leas-
able);
The Guidelines:
Commercial Professional/Office 3.9 em./1000 sq ft net
leasable
Retail/wholesale/services 3.5 em. 1000 sq ft
net leasable
Restaurant/bar - 5.0 to 10.0 em/1000 sq ft
net leasable
The two areas where the conflict has come up is in the CC/C-1 and
the OFFICE. In speaking with Alan Richman, he indicated that the
reason for the code's generation figures was once a building was
approved if there was a change in use the original calculations
are still used, e.g., if an office area became a restaurant etc.
Because of the complications regarding points for the application
presently under review the staff is suggesting that we use the
code calculations and present a code amendment next year.
. D L~ C~ L___ pd~;r`,
«~-~~
ME MORAN DU M
T0: FRANCIS KRIZMANICH, PLANNING OFFICE
FROM: ANN BOWMAN, PROPERTY MANAGER
DATE: SEPTEMBER 16, 1986
RE: ASPEN HIGHLANDS RESORT COMMERCIAL GMP/GENERAL SUB.
ISSUE: Have the employee generation figures for the Commercial
GMP/General Submission still meet the requirements for the
employee housing generation?
BACKGROUND: The applicant represents that the provision of
employee housing is a requirement of the Pitkin County Code to
mitigate the shortfall of afrordable housing available for low,
moderate, and middle income residents. Based on the requirements
of 5-300, the Aspen Highlands Resort would generate a peak
projected employment of 260.81 full time equivalent persons. The
applicant will provide on-site employee housing pursuant to 5-300
for a portion of its employees and will utilize one or more of
the options available to the applicant for satisfying the
requirements of 5-300 for providing 1008 of the employees
generated who will not be housed on site.
The attached documents are identical to the proposal Aspen
Highlands Resort presented earlier this year and the Housing
Authority approved with minor variations at that time.
STAFF RECOMMENDATION: Attached is the approved modification.
Staff recommendations approval of previous modified generation
figures as shown below:
The proposal consists of the redevelopment of the base of Aspen
Highlands Ski Area including a 300 room lodge incorporating 200
lodge rooms, 50 suites and 50 self-contained units, restaurants,
dining rooms, lounges, banquet/meeting rooms, cocktail bar/-
lounge, administrative offices and support areas; a separate base
lodge containing ski operation areas, a 400 seat dining area,
cocktail/bar, public lockers/ski checK, rental space and other
support functions.
The applicant proposes that based on the requirements of Section
5-300.1 (c) of the Pitkin County Land Use Code, the Aspen Highland
Resort will generate a peak projected employment of 266 persons.
On-site employee housing pursuant to 5-300 .4(a)(2) will be
provided and the off-site employee housing obligation will be met
by a payment-in-lieu as identified in Section 5-300.4(a)(5).
LOCATION: The proposed development is located east of Maroon
Creek Road, South of Highway 82, at the base of the Aspen
Highlands ski-area, southwest of Aspen, Colorado.
GENERAL FEATURES INCLUDE:
1. 300 guest units composed of 200 basic units, 50 suites,
and 50 cottage type units.
2. Restaurants, dining rooms, lounges, banquet/meeting
rooms, cocktail bar/lounge, administrative spaces, and
support spaces.
3. A base lodge to accommodate the ski operation, a main
dining area seating 400, a cocktail/bar, public
lockers/ski check, retail space (ski-rental, etc.
4. Parking primarily concealed in underground structures
for approximately 875 cars for both hotel guests and
the ski-operation.
5. A "village square" with campanile, retail shops, tennis
courts, recreational facilities, swimming pool,
detention/lake water feature, and boardwalk.
EMPLOYEE HOUSING GENERATION: Because of the complexity of this
application each area will be calculated by type of activity with
a summary recommendation to the Planning Office at the end of the
document. The original application is as follows:
I. Hotel - Guest Rooms
The Pitkin County Land Use Code for Hotel/Lodge/Hotel/Tourist
Dormitory has a range from .22 - .54 employee per room based on
review of the Housing Authority.
Full Time Equivalent
Employees Generated
Base Unit
Suites
Separate Cottage/units
200 units x .22 = 44 (1008)
50 units x .40 = 20 (10081
50 units x .30 = 15 (1008)
Subtotal Employees (1008) of net gen.) = 79 (1008)
II. SUPPORT AREAS
Retail - 5,000 s.f.
3.9/1,000 = 3.9 x 5 = 19.5 (1008)
Spec. Restauran t - 100 seats 2,000 s.f.
5.0/1,000 = 5 x 2 = 10.0 (1008)
Cocktail Lounge - 100 seats/1,800 s.f.
6.0/1,000 = 6 x 1.8 = 10.8 (1008)
Coffee Shop - 1 50 seats/2,700 s.f.
6.0/1,000 = 6 x 2.7 = 16.2 (1008)
Lobby Bar - 60 seats/960 s.f.
7.0/1,000 = 7 x .96 = 6.72 (1008)
Ballroom - 500 seats/5,000 s.f.
1.5/1,000 = 1.5 x 3 = 7.5 = 2.25 (30$)
Function Rooms - 300 seats/3,000 s.f.
1.5/1,000 = 1.5 x 3 = 4.5 = 1.36 (30$)
Meeting Rooms - 100 seats/1,000 s.f.
1.5/1000 = 1.5 x 1 = 1.5 = .45 (30$)
Seminar Room - 30 seats/300 s.f.
1.5/1,000 = 1.5 x 3 = .45 = .14 (30$)
Ballroom - 900 seats/3,000 s.f.
1.5/1,000 = 1.5 x 3 = 4.5 = 1.35 (30$)
Administration - 5,590 s.f.
3 9/1 000 = 3 9 x 5 59 = 21.80 (100$)
Subtotal Employees = 90.56
IIi. SRI OPERATIONAL FACILITY - Base Lodge
Full Time Equivalent
Employees generated
Main Dining Area - 400 seats/8,000 s.f.
5/1,000 = 5 x 8 = 40 (100$)
Cocktail Bar/Lounge - 1,400 s.f.
6/1,000 = 6 x 1.4 = 8.4 (100$)
Retail (Ski-rental) - 1,500 s.f.
3.9/1,000 = 3.9 x 1.5 = 5.85 (100$)
Subtotal Employees (100$ of net generated ) 54.25
I~7. ADDITIONAL: Retail/Commercial space/10,000 s.f.
3 5/1 000 = 3 5 x 10 = 35 (100$)
Subtotal Employees (100$ of net generated) = 35
THE TOTAL EMPLOYEES (100$ OF NET GENERATED) is 267 (100$).
IV. ON-SITE EXISTING FACILITIES/EMPLOYEES (TO be credited):
Full Time Equivalent
Emg~oyees Generated
Maroon Creek Lodge (Existing)
12 Guest Units x .3 = 3.6
Aspen Highlands Ski-Shop (Existing)
8,090 s.f. + Gross
3.9 x 8.09 = 28.32
Aspen Highlands Base Lodge (Existing)
14,800 s.f. + Retail/Dining
3.5 x 14.80 = 51.80
TOTAL EMPLOYEES EXISTING ON-SITE = 83.72
V. PROPOSED ON-SITE HOUSING
2 level dorm building @ 5000 s.f. = 30 emp.
5000 sq ft Total on-site Low Income Employee Housing
(5,000 s.f.) = 30 employees
VI. Employee Recap:
New Project requirements 267
Existing on-site facility employees 84 employees
Build on-site dorm 30 employees
TOTAL NEW ADDITIONAL EMPLOYEE REQUIRING HOUSING = 18~'
VII. PROPOSED OFF-SITE HOUSTNG
The Off-site Employee Housing obligation will be met with a
payment-in-lieu:
Proposed Employee Housing Mix - Required Employees
Income Level On-Site Off-Sit e Total Percentage
Low 30 86 116 56$
Moderate - 45 45 298
Middle - 23 23 15~
30 154 184 1008
Proposed Off-Site payment-in-lieu
Incom
Low 86 320,000 51,720.000
Moderate 44 13,300 585,200
Middle 23 9.000 20/.000
52,512,200
The applicant proposes to provide a payment-in-lieu for satisfy-
ing the ofr-site housing based upon a present value calculation
to be determined.
The Housing Authority will review the application and respond to
the proposed present value scenario.
The Housing Authority will review with the applicant at the end
of the first year of operation the exact employees generated in
each category and would accept the applicants proposal of a
review each year thereafter for five years. As the Mountain
Master Plan represents no additional employees, the Housing
Authority would review the payroll of the employees after the
first year of operation for this calculation.
THE NEW PROPOSAL is essentially the same as follows:
I. Ski Operation Facility:
Base Lodoe
Main Dining ARea
Bar & Lounge
Ski Shop
400 seats/8000 sf
@ 5 emp/1000 sf =40
2400 sf
@ 6 emp/1000 sf = 8.4
1500 sf
@ 3.9 emp/1000 sf = 5
Subtotal Employees (1008 of Net) 54.25
Existing Employees Aspen Highlands Base
Lodge 14,800 sf @ 3.5 emp/1000 sf = 51.8
Total Net Increase 2.45
II. Retail/Commercial Space: 10,000 sf
@3.9 emp/1000 sf = ~.2
Subtotal Employees (1008 of Net 39
Existing Employees Aspen Highlands Ski Shop
2 3 .9 emp/ 80 80 sf =x.51
Total Net Increase 7.49
TOTAL NST INCREASE RETAIL COM!lSRCIAL & BASS LODGE = 9.94
(The applicant represents that no net increase in the number of
employees will result from the expansion of the administrative
office area.)
HOUSING AUTHORITY BOARD RECOMMENDATION: Approval of applicants
calculations with the following deed restrictions to be placed on
the employee units.
1. The Owner hereby covenants that the employee rental units
shall remain as rental units and shall not be condominiumized.
Use and occupancy of the employee rental units shall be limited
to housing for qualified employees in accordance with the low
income rental guidelines established by the Housing Authority of
the City of Aspen and Pitkin County or a successor thereto. The
Owner of the units shall have the right to lease the units to
qualified employees of his own selection. Such individual may be
employed by the Owner, or employed in Aspen/Pitkin County,
provided such persons fulfill the requirements of a qualified
employee. "Qualified employee" as used herein shall mean any
person currently residing in and employed in the City of Aspen or
Pitkin County for a minimum average of 30 hours per week, nine
months out of any twelve-month period, who shall meet low income
and occupancy eligibility requirements established and applied by
the Housing Authority with respect to employee housing.
2. Verification of employment of person(s) living in the
employee rental units shall be completed and filed with the
Housing Authority Office by the Owner of the unit prior to
occupancy thereof, and must be acceptable to the Housing Auth-
ority. If the Owner does not rent the employee unit to a
qualified employee the unit shall be made available for occupancy
in accordance with the Housing Authority guidelines, provided the
Owner shall have the right to approve any prospective tenant,
which approval shall not be unreasonably delayed or withheld.
3. These covenants shall be deemed to run with the land as a
burden thereof for the benefit of, and shall be specifically
enforceable by, the Board of County Commissioners of Pitkin
County, the Housing Authority of the City of Aspen and Pitkin
County, or the duly authorized designee of the Board of County
Commissioners of Pitkin County, by any appropriate legal action
including but not limited to injunction, abatement, or eviction
of non-complying tenants during the period of the life of the
last surviving member of the presently existing Board of County
Commissioners of Pitkin County, Colorado, plus twenty-one years,
or for a period of fifty years from the date of recording hereof
in the Pitkin County real property records, whichever period
shall be less.
4. When a lease is signed with a tenant, a copy shall be sent
to the Housing Office so that a current file may be maintained on
each unit.
5. The Housing Authority will review the payroll for the Aspen
Highlands at the end of the first year and each year for five
years to determine if additional employees have been generated by
the Mountain Master Plan changes..
~`
~\\\~\
ASPEN HIGHLANDS SKIING CORPORATION
June 30, 1986
Pitkin County Board of County Commissioners
Planning and Zoning Commission
506 East Main Street
Aspen, Colorado 81611
To Whom It May Concern:
Aspen Highlands is pleased to submit this application for
approval of the commercial portion of our base area resort
redevelopment plan, which represents the culmination of over
three years of joint effort between ourselves, as developer, and
the County staff and Boards. We believe this process is
working, and the application which follows represents development
which is well planned, workable and desirable.
Aspen Highlands Skiing base area has evolved little over its
twenty-eight year history. While Aspen Highlands provides for
excellent skiing opportunities and experiences, we, like much of
Aspen, have not been able to keep abreast of other competing
facilities which have become destination resorts with quality
support facilities. It is our sincere intent to create a quality
year-round resort at the base of Aspen Highlands providing the
amenities expected by guests to the Aspen area, which will
enhance not only the accomodations at the base area, but also
complement the needs of the Aspen/Pitkin County area.
Throughout the on-going planning process, the impacts of our base
area proposal have been carefully reviewed. Our commitment has
been to mitigate these impacts, while bringing necessary public
and private improvements to the Maroon Creek Valley. We believe,
with the help of the County staff, the Planning and Zoning
Commission, and the Board of County Commissioners, this
application reflects the best possible effort to meet the high
standards for development in Pitkin County.
The attached document was submitted pursuant to the Lodge
Development requirements of the Land Use Code and has received
General Submission Approval and a Growth Management Plan
allotment for 80 units. We want you to view this application in
the context of our diligent effort to master plan the base area
redevelopment in a way to produce the best final outcome.
Specifically, this commercial development application is
Post Office Ro: T, Rspen, Colmodo 81614 U.S.R. 1-303-945-5300
Page Two
submitted to secure approval of the commercial portions of the
development for any additional square footage not ancillary to
the base lodge. The base development plan includes a 300 unit
hotel, a new base lodge, ski shops, administrative offices, a
parking structure and employee housing.
The elements of the plan which fall within the preview of the
commercial regulations of the Land Use Code are the additional
square footage associated with the reconstruction of the base
lodge, ski shop and administrative offices. All other commercial
and retail space included in the program is ancillary to the
hotel and exempt by definition.
A detailed summary of the proposal is found on pages 9 through 17
of the Lodge Development Application.
A calculation of the Employee Generation Units generated by this
additional space is contained in the appendix C entitled "Housing
Report". This calculation was reviewed and approved by the
Housing Authority as part of the previous submission. A summary
follows:
PROPOSED DEVELOPMENT
I. Ski Operation Facility:
Base Lodge
Main Dining Area
Bar & Lounge
Ski Shop
400 seats/8000 sf
@ 5 emp/1000 sf
1400 sf
@ 6 emp/1000 sf
= 40
= 8.4
= 5.85
54.25
1500 sf
@ 3.9 emp/1000 sf
Subtotal Employees (1008 of Net)
Existing Employees Aspen Highlands Base
Lodge 14,800 sf @ 3.5 emp/1000 sf
Total Net Increase
II. Retail/Commercial Space: 10,000 sf
@ 3.9 emp/1000 sf
Subtotal Employees (1008 of Net)
Existing Employees Aspen Highlands Ski Shop
@ 3.9 emp/8080 sf
Total Net Increase
TOTAL NET INCREASE RETAIL COMMERCIAL & BASE LODGE
_ ~.$_
2.45' ~°~1b a7 ~~,~.)n%'n
= 39
39
= 1 51
7.49
9 .94
No net increase in the number of employees will result from the
expansion of the administrative office area.
Page Tnree
We are asking for 10 EGU's under the County's Lodge Growth
Management allocation program.
Approval for commercial development proposed in this application
is necessary for Aspen Highlands and is viewed as a prerequisite
for implementing master plan improvements to the base area. We
urge the Board to recognize that improvements to the Aspen
Highlands Base Area are not only important to the Aspen Highlands
Skiing Corporation, but also to the Aspen community, which is
anxious to enjoy the added benefits of new and better base area
facilities.
This application does not include with it the submission of a
check for the required application fees. Pursuant to our
understanding with the planning department, the required fees
will be compiled using the hourly approach currently in place of
our lodge application.
,1111,' ~~ n I ` ~~,~',~ ~ ~?,G
,~ +~,
WVN Jones \
President
PITI~1 aDUtaiy o0• Gds ~
TAi/ZY SHEET
Nane of Project:~~~~~~ 'p¢~crY' -~-~m,vm.~~'h~ Date: ~O 6
4 5 A\7E. MILT. ZO~~i.
1 2 3
~,k~y ~A'a K~~Wi ~e5~ ~.>~y
1. Availatxlity of
Public and Pri-
vate Facilities
and Services
(i) water Z ~ ~~ ~ ~
(ii) Sewer -~ ~- Z ~ -~
(iii) Storm Drain- ~ ~ ~ ~
age
(iv) Fire Proter 3 3 3 ~ 3
(v) tion
Road Systen
._L-
~
~
~~
~-
(vi) Public and
Private
Transit
~_ 3 y 3 3
93stem
2. Qual i.ty of Design
(i) Site Design
(ii) Resource
Wnserva- ~
ti on
(iii) Parking and
/ Z
~- -3 ~ -3
a., 2
)~ _O
oC ,
3.d
/. g
~,8
/. a-
a. g
l a.~
1 ~•~
l a~
1 3.0
1-~
1 ~'$
4 ~~
l °2' S
Circula- / ~ ~ ~ / ~ _ t,~ 2
-~- a, O
tion
(iv) EIBlirorunen-
~ ~
°~~ ~ ~ ~~ 6 3 ~8
tal Ih~g3ct
c~, Visual Vul- ~_ -
~ ~ ~
a~ a. 0 1
~, o
nerability __ -
S
3. F]nplayee Housing /~ /d ~ 1 ~ ~d / ~ 1
Provision
`iC7PAL: -- l
`P
• Z
PITRIN COUNTY COMMERCIAL GMP COMPETITION
SCORE SHEETS
Name of Proj ect •~ ,P~ ~~ ~ Date _-~~~
I
1. AVAILABILITY OF PDBLIC AND PRIVATE FACILITIES AND SERVICES (maximum
18 points). The Commission shall consider whether each application
has provided a commitment as to the availability of the necessary
public and private facilities and services or an agreement to provide
these facilities anal services and shall rate each development by
assigning points account to the foil owing formula:
0 -- Indicates total impracticality of providing service.
1 -- Froject requires the provision of new services at increased
public e>:pense or gropesed services do not meet the standards of
the Lane Use Code.
2 -- Froject can be handled by the existing level of service in the
area or any service improvement by the applicant benefits the
project only and not the area in general, or service improve-
r,:ents simply meet the standards of the Land Use Code.
3 -- Project in and of itself improves the quality of service in a
given area or service improvements go beyond the standards of
the Land Use Code.
The following facilities and services shall be rated accordingly:
(i) WATER (r.,aximum 3 points) considering the ability of the water
system tc serve the development, and if a public system, the
applicant's commitment to finance any system extensions or
treatment plant upgrading required tc serve the development. If
a private system, considering the capacity and reliability of
the system beine proposed.
(t^7ultiplier - 1)
COMMEt.'i'
(ii) SEWER (maximum 3 points) considering the ability of the sewer
system tc serve the development anc if a public system, the
applicant's commitment to finance any system extensions or
treatment plant upgrading reacired tc serve the development. If
a pr ivote system, considering the capacity and reliability of
the system being proposed.
(Multiplier - 1)
CO MP1E N T
(iii) STORM DRAINAGE (maximum 3 points) considering the degree to
which the applicant proposes to retain surface runoff on the
development site. If the development requires use of the
County's drainage system, considering the commitment of the
applicant to install the necessary drainage control facilities
and to maintain the system ever the long term.
(?'ultiplier - 1) ~~
COMP9EN T
(iv) FIRE PROTECTION (maximum 3 points) considering the ability of
the appropriate Fire Protection District to provide fire
protection according to tY:e established response standards of
the appropriate district without the necessity of establishing a
new station, or requiring the addition of equipment, personnel
or capital improvements. Considering the adequacy of available
water pressure and capacity for providing fire fighting flows.
Considering the commitment of the applicant to provide fire
protection facilities which may be .necessitated by the project,
including, but not limited to, fire hydrants and water storage
tanks. ,~
(Multiplier - 1)
CO MP1E N T
(v) ROAD SYSTSM (maximum 3 points) considering the ability of the
public road network to provide for the needs of the proposed
development within acceptable levels of safety, as defined in
the 1982 Pit kin County Road Standards and Specifications.
Considering the applicant's commitment to finance necessary road
system improvements attributable to the proposed development.
(Multiplier - 1) 7~
COMT9ENT
(vi) PUBLIC AND PRIVATE TRANSIT SYSTEMS (maximum 3 points) consider-
ing the proximity of the proposed development to existing
transit routes and trail systems. Considering the ability of
the transit system to accommodate the proposed development
without the need for additional facilities or route shifts.
Considering the commitment of the applicant to provide capital
improvements (i. e., bus shelter, trail connection spur) which
enhance the service of the public and private transit systems to
the proposed development.
(Multiplier - 1)
COMN[ENT:
SUBTOTAL: ~
QUALITY OF DESIGN (maximum 33 points). The Commission shall consider
each application with respect to the quality of its exterior and site
design and shall rate each development by assigning points according
to the following formula:
0 -- Indicates a totally deficient_ design.
1 -- Indicates a major design flaw.
'~
2 -- Indicates an acceptable (but standard) design.
3 -- Indicates an excellent design.
The following features shall be rate accordingly:
(i) SITE DESIGN (maximum 3 points) considering the quality and
character of the proposed landscaping and open space areas, the
degree to which natural vegetation is preserved, and the
provision of pedestrian amenities (paths, benches, and bicy cle
storage facilities) which enhance the design of the development
and provide for the safety and privacy of the users of the
development.
(Multiplier - 4)
COMMENT:
(ii) RESOORCE CONSERVATION (maximum 3 points) considering the extent
to which the applicant proposes to employ passive and/or active
solar heating and cooling and thermal insulation measures beyond
those required by the building code and the extent to which the
applicant proposes to employ water conservation and wastewater
reuse devices and techniques rather than standard plumbing
facilities within the development.
(Multiplier - 1)
COMMENT
(iii) PARRING AND CIRCULATION (maximum 3 points) considering the
quality and efficiency of the internal circulation and parking
system for the project, including the quality and efficiency of
proposed trash and service vehicle access an c', loading areas and
design features to screen parking from public views.
(Dultiplier - 2)
COMMENT•
(iv) ENVIRONMENTAL IMPACT (maximum 3 points) considering the degree
to which the design minimizes adverse impacts upon the environ-
mental, including impacts on air and water quality, visual
vulnerability, and natural and man-made hazards (geologic
hazards, floodplains, steep slopes, unstable soils, snow
avalanche, wildfire hazard, wildlife habitat and airport flight
hazard areas).
(Multiplier - 3) ?~
COMh1EN T
(v) VISIIAL VULNERABILITY (maximum 3 points). The Commission shall
consider the extent to which the applicant uses mitigating
techniques such as siting, buffering, natural topography and
vegetation and setbacks to off set the visibility of the project
(man-made berms are not encouraged). ~ /
(Multiplier - 1) y
COMr]E N T -
SUBTOTAL:
3. EMPLOYEE HW SING PROVISION (maximum 10 points). The Commission shall
assign points to each applicant who agrees to provide low-, moderate-
or middle-income housing for employees generated by the proposed
development as such housing has been annually defined by the Board of
County Commissioners. Applicants shall be awarded one (1) point for
each ten (10) percent of the employees of the project who are
provided with employees housing by any method specified in Section 5-
300.4. The standards of Section 5-300.1 shall be used as the
guideline for establishing the employee housing generation of
commercial dev elopment, although the Commission may accept an
alternative standard proposed by the applicant, if said standard is
found to be appropriate for the particular development by the Housing
Authority.
(Multiplier - 1)
COMP7EP? T
TOTAL POINTS (with multiplier)
1. AVAILABILITY OF PUBLIC AND PRIVATE FACILITIES AND SSRVICSS
2. QOALITY OF DESIGN
3. EMPLOYEE HOUSING PROVISION
TOTAL: I'
~~~jG~-Cl~.~
Name of Planning and Zoning Member:
~~~
~:
f
PITRIN COUNTY COMMERCIAL GMP COMPETITION
SCORE SHEETS ~ ~ ,r~
blame of Froj ect : ~`~'~~ t~~h (/t]~~~ ~1~~~'' ""'; Date
1. AVAILABILITY OF PUBLIC AND PRIVATE FACILITIES AND SERV CES (maxim~un
18 points). The Commissior. shall consider whether each application
ha.s provided a commitment as to the availability of the necessary
public and private facilities and services or an agreement to provide
ti,ese facilities and services and shall rate each development by
a:,::.ioning points account to the following formula:
0 --- Indicates total impracticality of providing service.
1 -- Froject requires the provision of new services at increased
public expense or proposed services do not meet the standards cf
the Lard Use Code.
2 -- Froject can be handled by the existing level of service in the
area or any service improvement by the applicant benefits tl;e
project only and not the area in general, or service improve-
ments simply meet the _aandards of the Land Use Code.
3 -- Froject in and of itself improves the quality of service ir, a
given area or service improvements go beyond the standards of
the Land Use Code.
The following facilities and services shall be rated accordingly:
(i; WATER (maximum 3 points) considering the ability of the water
system to serve the development, and if a public system, the
applicant's commitment to finance any system extensions or
treatment plant upgrading required to serve the development. Zf
a private system, considering the capacity anfi reliability of
the system being proposed.
(Multiplier - 1)
CO t;: I• f] r: 7 :
(~ i) SEWER (maximum 3 points) considering the ability of the sewer
system tc serve the development and if a public system, the
applicant's commitment to finance any system extensions or
treatment plant. upgrading required to serve the development. rf
a pri.v~ to system, considering the capacity and reliability of
the system being proposed.
(Multiplier - 1) Z
CO MP7EN T
(iii) STORM DRAINAGE (maximum 3 points) considering the degree to
which the applicant proposes to retain surface runoff on the
development site. If the develcpment requires use of the
County's drainage system, considering the commitment of the
applicant to install the necessary drainage control facilities
and to maintain the system over the long term. ~
(Multiplier - 1)
CO MP'IEN T
(iv) FIRE PROTECTION (maximum 3 points) considering the ability of
the appropriate Fire Protection District to provide fire
protection according to the established response standards of
the appropriate district without the necessity of establishing a
new station, or requiring the addition of equipment, personnel
or capital improvements. Considering the adequacy of available
water pressure and capacity for providing fire fighting flows.
Considering the commitment of the applicant to provide fire
protection facilities whict, may be necessitated by the project,
including, but not limited to, fire hydrants and water storage
tanks.
(Multiplier - 1) .~
CO MP1EN T
(v) ROAD SYSTEM (maximum 3 points) considering the ability of the
public road network to provide for the needs of the proposed
development within acceptable levels of safety, as defined in
the 1982 Pit kin County Road Standards and Specifications.
Considering the applicant's commitment to finance necessary road
system improvements attributable to the proposed development.
(Multiplier - 1) ~_
COMMENT:
(vi) PUBLIC AND PRIVATE TRANSIT SYSTEMS (maximum 3 points) consider-
ing the proximity of the proposed development to existing
transit routes and trail syster.~s. Cor.siderino the ability of
the transit system to accommodate the propcsed development
without the need for additional facilities cr route shifts.
Considering the commitment of the applicant to provide capital
improvements (i. e., bus shelter, trail connection spur) which
enhance the service of the public and private transit systems to
the proposed development.
(Multiplier - 1) 7i
COMMENT
SUBTOTAL:
2. QUALITY OF DESIGN (maximum 33 points). The Commission shall consider
each application with respect to the quality of its exterior and site
design and shall rate each development_ by assigning points according
to the following formula:
0 -- Indicates a totally deficient design.
1 -- Indicates a major design flaw.
2 -- Indicates an acceptable (but standard) design.
3 -- Indicates an excellent design.
The f ollowing features shall be rate accordingly:
(i) SITE DESIGN (maximum 3 points) considering the quality and
character of the proposed landscaping and open space areas, the
degree to which natural vegetation is preserved, and the
provision of pedestrian amenities (paths, benches, and bicy cle
storage facilities) which enhance the design of the development
and provide for the safety and privacy of the u_:ers of the
development.
(Multiplier - 4) 1
CO PiP7EN T
(ii) RESOIIRCE CONSERVATION (maximum 3 points) considering the extent
to which the applicant proposes to employ passive and/or active
solar heating and cooling and thermal insulation measures be~~ond
those required by the building code and the extent to which the
applicant proposes to employ water conservation and wastewater
reuse devices and techniques rather than standard plumbing
facilities within the development.
(Multiplier - 1) 2
COPIP7ENT:
(iii) PARRING AND CIRCDLATION (maximum 3 points) considering the
quality and efficiency of the internal circulation and parking
system for the project, including the quality and efficiency of
proposed trash and service vehicle access and loading areas and
design features to screen parking from public views.
(Pultiplier - 2)
COMMENT•
(iv) ENVIRONMENTAL IMPACT (maximum 3 points) considering the decree
to which the design minimizes adverse impacts upon the environ-
mental, including impacts on air and water quality, visual
vulnerability, and natural and man-made hazards (geologic
hazards, floodplains, steep slopes, unstable soils, snow
avalanche, wildfire hazard, wildlife habitat and airport flight
hazard areas).
(Miultiplier - 3)
COMPIEN T
(v) VISOAL VULNERABILITY (maximum 3 points). The Commission shall
consider the extent to which the applicant uses mitigating
techniques such as siting, buffering, natural topography and
vegetation and setbacks to offset the visibility of the project
(man-made berms are rot encouraged).
(N,ultiplier - 1) Z
COMMENT
SUBTOTAL:
EMPLOYEE HOUSING PROVISION (maximum 10 points). The Commission shall
assign points to each applicant who agrees to prcvide low-, moderate-
or middle-income housing for employees generated by the proposed
development as such housing has been annually defined by the Board of
County Commissioners. Applicants shall be awarded one (1) point for
--
r
each ten (10) percent of the employees of the project who are
provided with employees housing by any method specified in Section 5-
300.4. The standards of Section 5-300.1 shall be used as the
guideline for establishing the employee housing generation of
commercial development, although the Commission may accept an
alternative standard proposed by the applicant, if said standard is
found to be appropriate for the particular development by the Housing
Authority.
(Multiplier - 1)_~_
CO D1! iEN T
TOTAL POINTS (with multiplier)
1. AVAILABILITY OF PDBLIC AND PRIVATE FACILITIES AND SERVICES
2. QUALITY OF DESIGN
3. EMPLOYEE HOUSING PROVISION
TOTAL:
~,,~ ,, c / , ,~ 1
Name of Planning and Zoning Member: ll~~/~"~~~ ~ ~N"l~'~L~~C-~
6
PITRIN COUNTY COMMERCIAL GMP COMPETITION
( (SCORE SHEETS ~y
Nano of Project : ~fap n vsy`_^~~~-~~6^^'^^e-irc~~ Date : ~ C 1 6
1. AVAILABILITY OF PUBLIC AND PRIVATE FACILITIES AND SERVICES (maximum
18 points). The Commission shall consider whether each application
has ;,rovided a commitment as to the availability of the necessary
public and private facilities and services or an agreement to provide
these facil sties and services and shall rate each development by
assi<,ning points account to the following formula:
0 -- Indicates total impracticality of providing service.
1 -- Project requires the provision of new services at increased
public expense or proposed services do not meet the standaro:= of
the Lard Use Code.
2 -- Froject can be handled by the e~~isting level of service in the
"rea o~ any service improvement by the applicant benefits the
project only and pct the area in general, or service imprcve-
ments simply meet the standards of the Land L'se Code.
3 -- Froject in ar.d of itself improves the quality of service ir. a
given area or service improvements go beyond the standards of
the Land Use Code.
The following facilities and services shall be rated accordingly:
(i) WATER (maximum 3 points) considering the ability of the water
system to serve the development, and if a public system, the
applicant's commitment to finance any system extensions or
treatment plant upgrading required to serve the develo~nent. If
a private system, considering the capacity and reliability of
*_he system being proposed.
(Multiplier - 1) 2"
COMrL ~.T:
(ii) SEWER (maximum 3 points) considering the ability of the sewer
system to serve the development and if a public system, the
applicant's commitment tc finance any system extensions or
treatrca~t plant upgrading required to serve the develoL~ment. If
a private s; stem, considering ti:~= capacity and reliability of
l
<_
the system being proposed.
Z
(Multiplier - 1)
COMMENT:
(iii) STORM DRAINAGE (maximum 3 points) considering the degree to
which the applicant proposes to retain surface runoff on the
development site. If the development recuires use of the
County's drainage system, considering the commitment of the
applicant to install the necessary drainaoe control facilities
and to maintain the system over she long term.
2
(Multiplier - 1)
COMMENT :
(iv) FIRE PROTECTION (maximum 3 points) considering the ability of
the appropriate Fire Protection District to provide fire
protection according to the established response standards of
the appropriate district without the necessity of establishing a
new station, or requiring the addition of equipment, personnel
or capital improvements. Considering the adequacy of available
water pressure and capacity for providing fire fighting flows.
Considering the commitment of the applicant to provide fire
protection facilities which may be necessitated by the project,
including, but not limited to, fire hydrants and water storage
tanks.
(Multiplier - 1) 3
COMMENT:
2
(v) ROAD SYSTEM (maximum 3 points) considering the ability of the
public road network to provide for the needs of the proposed
development within acceptable levels of safety, as defined in
the 1982 Pit kin County Road Standards and Specifications.
Considering the applicant`s commitment to finance necessary road
system improvements attributable to the proposed development.
(Multiplier - 1) _~_
COMMENT
(vi) PUBLIC AND PRIVATE TRANSIT SYSTEMS (maximum 3 points) consider-
ing the proximity of the proposed development to existing
transit rcutes and trail systeris. Considering the ability of
the transit system to accommodate the proposed development
without the need for additional facilities or route shifts.
Considering the commitment of the applicant to provide capital
improvements (i. e., bus shelter, trail connection spur) which
enhance the service of the public and private transit systems to
the proposed development.
(Multiplier - 1) 3
COMMENT:
SUBTOTAL:
2. QQALITY OF DESIGN (maximum 33 points). The Commission shall consider
each application with respect to the quality of its exterior and site
design and shall rate each development by assigning points according
to the following formula:
0 -- Indicates a totally deficient design.
1 -- Indicates a major design flaw.
3
r
2 -- Indicates an acceptable (but standard) design.
3 -- Indicates an excellent design.
The following features shall be rate accordingly:
(i) SITE DESIGN (maximum 3 points) considering the quality and
character of the proposed landscaping and open space areas, the
degree to which natural vegetation is preserved, and the
provision of pedestrian amenities (paths, benches, and bicycle
storage facilities) which enhance the design of the development
and provide for the safety and privacy of the users of the
development.
(Multiplier - 4)
CO Mho 2J T
(ii) RESOIIRCE CONSERVATION (maximum 3 points) considering the extent
to which the applicant proposes to employ passive and/or active
solar heating and cooling and thermal insulation measures beyond
those required by the building code and the extent to which the
applicant proposes to employ water conservation and wastewater
reuse devices and techniques rather than standard plumbing
facilities within the development.
(N,ultiplier - 1)
CO MP:E N T
(iii) PARKING AND CIRCDLATION (maximum 3 points) considering the
quality and efficiency of the internal circulation and parking
system for the project, including the quality and efficiency of
proposed trash and service vehicle access and loading areas and
design features to screen parking from public views.
(Pultiplier - 2)
COMMENT:
(iv) ENVIRONMENTAL IMPACT (maximum 3 points) considering the degree
to which the design minimizes adverse impacts upon the environ-
mental, including impacts on air_ and water quality, visual
vulnerability, and natural and man-made hazards (geologic
hazards, floodplains, steep slopes, unstable soils, snow
avalanche, wildfire hazard, wildlife habitat and airport flight
hazard areas).
(Multiplier - 3) 1
COMMENT:
(v) VISIIAL VULNERABILITY (maximum 3 points). The Commission shall
consider the extent to which tree applicant uses mitigating
techniques such as siting, buffering, natural topography and
vegetation and setbacks to offset the visibility of the project
(man-made berms axe not er:couraged).
(Multiplier - 1) 2-
COMMENT:
SUBTOTAL:
3. EMPLOYEE HORSING PROVISION (maximum 10 points). The Commission shall
assign points to each applicant who agrees to provide low-, moderate-
or middle-income housing for employees generated by the proposed
development as such housing has been annaally defined by the Board of
County Commissioners. Applicants shall be awarded one (1) point for
each ten (10) percent of the employees of the project who are
provided with employees housing by any method specified in Section 5-
300.4. The standards of Section 5-300.1 shall be used as the
guideline for establishing the employee housing generation of
commercial development, although the Commission may accept an
alternative standard proposed by the applicant, if said standard is
found to be appropriate for the particular development by the Housing
Authority.
(Multiplier - 1) ~~
CO MP7E
TOTAL POINTS (with multiplier)
1. AVAILABILITY OF PDBLIC AND PRIVATE FACILITIES AND SERVICES
2. QUALITY OF DESIGN
3. EMPLOYEE HOUSING PROVISION
TOTAL:
Name of Planning and Zoning Member: ~~~~-- ` , 5~~~
6
PITRIN COIINTY COMMERCIAL GMP COMPETITION
SCORE SHEETS
'• i
~ % ,(~Q~
.~ }'
Name of Proj ect : ~i~, ~ (_j„~,i G__ ~~1,~t t-~ `iCRi,'~, /~_I ~; l i'U Date :~LLl~.~
1. AVAILABILITY OF PUBLIC AND PRIVATE FACILITIES ANDS~/ER~,V//ICES (maximum
18 points). The Commission shall consider whether each application
has provided a commitment as to the availability of i-he necessary
public and private facilities and services or an agreemer_t to provide
these facilities and services and shall rate each development by
assigning points account to the following f<nn~ula:
0 -- Indicates total impracticality of providing service.
1 -- Project requires the provision of new services at increased
public expense or proposed services do not meet the standards of
the Land Use Code.
2 -- Project can be handled by the ei-istiny level of service in the
area or any service improvement by the applicant benefits the
project only and not the area in general, or service improve-
ments simply meet the standards of the Land Gse Cody.
3 -- Project ir. and of itself improves the quality of :=ervice in a
given area or service improvements go beyond the ~~tandards. of
the Land Use Code.
The following facilities and services shall be rated accordingly:
(i) WATER (maximum 3 points) considering the ability of the water
system to serve the development, and if a public system, the
applicant's commitment to finance e.ry system e_;tensions or
treatment plant upgrading required to serve the development. If
a private system, considering the capacity and reliability of
the system being proposed.
(Multiplier - 1) -~'
COMMENT
(ii) SEWER (maximum 3 points) considering the ability of the sewer
system to serve the development and if a public syste~!, the
applicant's commitment to finance any system e;.tensions or
treatment plant up;rading required to s roe the do-• _.'..opment. If
a private system, considering the ca cacitp and r~_'..iabil~ty cf
the system being proposed.
(Multiplier - 1) ~_
CAMME N T
(iii) STORM DRAINAGE (maximum 3 points) considering the degree to
which the applicant proposes to retain surface runoff on the
Development site. If the develcpment requires use of the
County's drainage system, considering the commitment of the
applicant to install the necessary drainage control facilities
and to maintain? the system over the long term.
(Multiplier - 1) `'
CO MP'IE p T
(iv) FIRE PROTECTION (maximum 3 points) considering the ability of
the appropriate Fire Protection District to provide fire
Lu-otection according to the established response standards of
the appropriate district without the necessity of establishing a
new station, or requiring the addition of equipment, personnel
or capital improvements. Considering the adequacy of available
water pressure and capacity for providing fire fi;hting flows.
Considering the commitment of the applicant to provide fire
z~rotection facilities which may be necessitated by the project,
including, but not limited to, fire hydrants and water storage
,...mks.
(Multiplier - 1) -.i'
COMF'IE p„ T .
2
(v) ROAD SYSTEM (maximum 3 points) considering the ability of the
public road network to provide for the needs of the proposed
development within acceptable levels of safety, as defined in
the 1982 Pit kin County Road Standards and Specifications.
Considering the applicant's commitment to finance necessary road
system improvements attributable to the proposed development.
(Multiplier - 1)
COMMENT.
(vi) PUBLIC AND PRIVATE TRANSIT SYSTEMS (maximum 3 points) consider-
ing the proximity of the proposed development to existing
transit routes and trail systems. Considering the ability of
the transit system to accommodate the proposed development
without the need for additional facilities or route shifts.
Considering the commitment of the applicant to provide capital
improvements (i. e., bus shelter, trail connection spur) which
enhance the service of the public and private transit systems to
the proposed development.
(Multiplier - 1)
COMMENT^:
SUBTOTAL:
2. QDALITY OF DESIGN (maximum 33 points). The Commission shall consider
each application with respect to the quality of its exterior and site
design and shall rate each development by assigning points according
to the following formula:
0 -- Indicates a totally deficient design.
1 -- Indicates a major design flaw.
3
2 -- Indicates an acceptable (but standard) design.
3 -- Indicates an excellent design.
The f ollowing features shall be rate accordingly:
(i) SITE DESIGN (maximum 3 points) considering the quality and
character of the proposed landscaping and open space areas, the
degree to which natural vegetation is preserved, and the
provision of pedestrian amenities {paths, benches, and bicy cl e
storage facilities) which enhance the design of the development
and provide for the safety and privacy of the users of the
development.
(Multiplier - 4) .~_
COMMENT:
(ii) RESOURCE CONSERVATION (maximum 3 points) considering the extent
to which the applicant proposes to employ passive and/or active
solar heating and cooling and thermal insulation measures beyond
those required by the building code and the extent to which the
applicant proposes to employ water conservation and wastewater
reuse devices and techniques rather than standard plumbing
facilities within the development.
(Multiplier - 1)
COMMENT-
(iii) PARRING AND CIRCULATION (maximum 3 points) considering the
quality and efficiency of the internal circulation and parking
system for the project, including the quality and efficiency of
proposed trash and service vehicle access and loading areas and
design features to screen parking from public views.
{Multiplier - 2) ~_
f
COMMENT
(iv) ENVIRONMENTAL IMPACT (maximum 3 points) considering the decree
to which the design minimizes adverse impacts upon the environ-
mental, including impacts on air and water quality, visual
vulnerability, and natural and man-made hazards (geologic
hazards, floodplains, steep slopes, unstable soils, snow
avalanche, wildfire 1-~azard, wildlife habitat and airport fli5ht
hazard areas).
(Multiplier - 3) -
COMMENT:
(v) VISUAL VULNERABILITY (maximum 3 points). The Commission shall
consider the extent to which the applicant uses mitigating
techniques such as siting, buffering, natural topography and
vegetation and setbacks to offset the visibility of the project
(man-made berms are rot encouraged).
(Multiplier - 1) ~-
COMD9ENT
SUBTOTAL:
3. EMPLOYEE NOOSING PROVISION (maximum 10 points). The Commission shall
assign points to each applicant who agrees to provide low-, moderate-
or middle-income housing for employees generated by the proposed
development as such housing has been annually defined by the Board of
County Commissioners. Applicants shall he awarded one (1) point for
each ten (10) percent of the employees of the project who are
provided with employees housing by any method specified in Section 5-
300.4. The standards of Section 5-300.1 shall be used as the
guideline for establishing the employee housing generation of
commercial development, although the Commission may accept an
alternative standard groposed by the applicant, if said standard is
found to be appropriate for the particular development by the Housing
Authority.
:~
(Multiplier - 1) ;
COMMENT
TOTAL POINTS (with multiplier}
1. AVAILABILITY OF POBLIC AND PRIVATE FACILITIES AND SERVICES
2. QIIALITY OF DESIGN
3. EMPLOYEE HOIISING PROVISION
TOTAL:
/~
~~
Name of Planning and Zoning Member: ~c/'~ " ,:: ~ ~ ~~ {~;..~
6
PITRIN COUNTY COMMERCIAL GNP COMPETITION
SCORE SAEETS
Name of Project: ~j/~~ E~Cafc-d/J~S ~-E~c'+~~ Date: 0~7 0~^
1. AVAILABILITY OF PUBLIC AND PRIVATE FACILITIES AND SERVICES (maximum
18 points). The Commission shall consider whether each application
has provided a commitment as to the availability of the necessary
put,lic and private facilities and services or an agreement to provide
these facilities ar_d services and shall rate each development by
assigning points account to the following formula:
0 -- Indicates total impracticality of ~iroviding service.
1 -- Project requires the provision of ne~a services at increased
public expense or proposed services do not meet the standards of
the Laird Use Code.
2 -- Project can be handled by the existing level of service in the
area or any service improvement by the applicant benefits the
proj ect only and not the area in general, or service improve-
ments simply meet the standards of the Lane Use Code.
3 -- Project ir. and of itself improves the gcality of service in a
given area or service imprc~ ements go be~,~ond the standards of
the Land Use Code.
The following facilities and services shall be rated accordingly:
(i) WATER (maximum 3 points) considering the ability of the water
system to serve the developr,~ent, and if a public system, the
applicant's commitment to finance any system extensions or
treatment plant upgrading required to serve the development. If
a private system, considering the ca paci.ty and reliability of
the system beinc_ proposed.
(Multir..' ier - 1) ~
C0; '.,r N T
(ii) SEWER (maximum 3 points) considering the ability of the sewer
system to serve the develop-~ment and if a public system, the
applicant's co:~ mitment to finance any system exaensions or
treatr`~ent plant upgrading r~-quires to serve the development. If
a private syst ~r,;, considering thr capacity and reliability of
r
the system being proposed.
(Multiplier - 1) ~
COMMENT:
(iii) STORM DRAINAGE (maximum 3 points) considering the degree to
which the applicant proposes to retain surface runoff or. the
development site. If the development requires use of the
County's drainage system, considering the commitment of the
applicant to install the necessary drainage control facilities
and to maintain the system over the long term.
2
(Multiplier - 1)
CO MP7E N T
(iv) FIRE PROTECTION (maximum 3 points) considering the ability of
the appropriate Fire Protection District to provide fire
protection according to the established response standards of
the appropriate district without the necessity of establishing a
new station, or requiring the addition of equipment, personnel
or capital improvements. Considering the adequacy of available
water pressure and capacity for providing fire fighting flows.
Considering the commitment of the applicant to provide fire
protection facilities which may be necessitated by the project,
including, but not limited te, fire hydrants and water storage
'.anks.
(Multiplier - 1) 3
COMPIEN T
2
(v) ROAD SYSTEM (maximum 3 points) considering the ability of the
public road networ4; to provide for the needs of the proposed
development within acceptable levels of safety, as defined in
the 1982 Pit kin County Road Standards and Specifications.
Considering the applicant's commitment to finance necessary road
system improvements attributable to the proposed development.
(Multiplier - 1) Z
COMMENT:
(vi) POBLIC AND PRIVATE TRANSIT SYSTEMS (maximum 3 points) consider-
ing the proximity of the proposed development to existinc
transit routes and trail systems. Considering the ability of
the transit system to accommodate the proposed development
without the need for additional facilities or route shifts.
Considering the commitment of the applicant to provide capital
improvements (i. e., bus shelter, trail connection spur) which
enhance the service of the public and private transit systems to
the proposed development.
(Multiplier - 1) 3
COMMENT:
SOBTOTAL:
2. QDALITY OF DESIGN (maximum 33 points). The Commission shall consider
each application with respect to the quality of its exterior and site
design and shall rate each development by assigning points according
to the following formula:
0 -- Indicates a totally deficient design.
1 -- Indicates a major design flaw.
r
2 -- Indicates an acceptable (but standard) design.
3 -- Indicates an excellent design.
The f ollowing features shall be rate accordingly:
(i) SITE DESIGN (maximum 3 points) considering the quality and
character of the proposed landscaping and open space areas, the
degree to which natural vegetation is preserved, and the
provision of pedestrian amenities (paths, benches, and bicy cl e
storage facilities) which enhance the design of the development
and provide for the safety and privacy of the users of the
development.
(Multiplier - 4) ~
COMMENT•
(ii) RESOIIRCE CONSERVATION (maxim~un 3 points) considering the extent
to which the applicant proposes to employ passive and/or active
solar heating and cooling ar.d thermal insulation measures beyond
those required by the building code and the extent to which the
applicant proposes to employ water conservation and wastewater
reuse devices and techniques rather than standard plumbing
facilities within the development.
(Multiplier - 1) 3
CO P~P9EN T -
(iii) PARKING AND CIRCDLATION (maximum 3 points) considering the
quality and efficiency of the internal circulation and parking
system for the project, including the quality and efficiency of
proposed trash and service vehicle access and loading areas and
design features to screen parking from public views.
(Pultiplier - 2) Zi
COMME
(iv) ENVIRONMENTAL IMPACT (maximum 3 points) considering the degree
to which the design minimizes adverse impacts upon the environ-
mental, including impacts on air and water quality, visual
vulnerability, and natural and man-made hazards (geologic
hazarca, floodplains, steep slopes, unstable soils, snow
avalanche, wilefire hazard, wildlife habitat and airport flight
hazard areas).
(Multiplier - 3) ~
COMPIENT
(v) VISOAL VULNERABILITY (maximum 3 points). The Commission shall
consider the extent to which the applicant uses mitigating
techniques such as siting, buffering, natural topography and
vegetation and setbacks to offset the visibility of the project
(man-made berms are rot encouraged).
(Pultiplier - 1) Z
COMPENT
SUBTOTAL:
3. EMPLOYBB HOUSING PROVISION (maximum 10 points). The Commission shall
assign points to each applicant who agrees to prcvide low-, moderate-
or middle-income housinc for employees generated by the proposed
development as such housing has been annually defined by the Board of
County Commissioners. Applicants shall be awarded one f, l) point for
5
• ~.
each ten (10) percent of the employees of the project who are
provided with employees housing by any method specified in Section 5-
300.4 . The standards of Section 5-300.1 shall be used as the
guideline for establishing the employee housing generation of
commercial develops~ent, although the Commission may accept an
alternative standard proposed by the applicant, if said standard is
found to be appropriate for the particular development by the Housing
Authority.
(Multiplier - 1) ~
COMMEN i
TOTAL POINTS (with multiplier)
1. AVAILABILITY OF POBLIC AND PRIVATE FACILITIES AND SERVICES
2. QRALITY OF DESIGN
3. EMPLOYEE HORSING PROVISION
TOTAL:
Name of Planning and Zoning Member: ~2c5`~-
6
t
""`
ASPEN HIGHLANDS SKIING CORPORATION
June 30, 1986
Pitkin County Board of County Commissioners
Planning and Zoning Commission
506 East Main Street
Aspen, Colorado 81611
To Whom It May Concern:
Aspen Highlands is pleased to submit this application for
approval of the commercial portion of our base area resort
redevelopment plan, which represents the culmination of over
three years of joint effort between ourselves, as developer, and
the County staff and Boards. We believe this process is
working, and the application which follows represents development
which is well planned, workable and desirable.
Aspen Highlands Skiing base area has evolved little over its
twenty-eight year history. While Aspen Highlands provides for
excellent skiing opportunities and experiences, we, like much of
Aspen, have not been able to keep abreast of other competing
facilities which have become destination resorts with quality
support facilities. It is our sincere intent to create a quality
year-round resort at the base of Aspen Highlands providing the
amenities expected by guests to the Aspen area, which will
enhance not only the accomodations at the base area, but also
complement the needs of the Aspen/Pitkin County area.
Throughout the on-going planning process, the impacts of our base
area proposal have been carefully reviewed. our commitment has
been to mitigate these impacts, while bringing necessary public
and private improvements to the Maroon Creek Valley. We believe,
with the help of the County staff, the Planning and Zoning
Commission, and the Board of County Commissioners, this
application reflects the best possible effort to meet the high
standards for development in Pitkin County.
The attached document was submitted pursuant to the Lodge
Development requirements of the Land Use Code and has received
General Submission Approval and a Growth Management Plan
allotment for 80 units. We want you to view this application in
the context of our diligent effort to master plan the base area
redevelopment in a way to produce the best final outcome.
Specifically, this commercial development application is
Pos[ Ofice Bos T, Rspen, Colocodo 87614 U.S.R. 1-303-945-5300
Page Two ~..
submitted to secure approval of the commercial portions of the
development for any additional square footage not ancillary to
the base lodge. The base development plan includes a 300 unit
hotel, a new base lodge, ski shops, administrative offices, a
parking structure and employee housing.
The elements of the plan which fall within the preview of the
commercial regulations of the Land Use Code are the additional
square footage associated with the reconstruction of the base
lodge, ski shop and administrative offices. All other commercial
and retail space included in the program is ancillary to the
hotel and exempt by definition.
A detailed summary of the proposal is found on pages 9 through 17
of the Lodge Development Application.
A calculation of the Employee Generation Units generated by this
additional space is contained in the appendix C entitled "Housing
Report". This calculation was reviewed and approved by the
follows;AUthority as part of the previous submission. A summary
PROPOGFD DFVFrnp ENT
I. Ski Operation Facility:
Base L•o~ge
Main Dining Area
Bar & Lounge
Ski Shop
400 seats/8000 sf
@ 5 emp/1000 sf
1400 sf
@ 6 emp/1000 sf
1500 sf
@ 3.9 emp/1000 sf
Subtotal Employees (1008 of Net)
Existing Employees Aspen Highlands Base
Lodge 14,800 sf @ 3.5 emp/1000 sf
Total Net Increase
= 40
= 8 .4
= 5 .85
54.25
_ ~..~
2 .45
II. Retail/Commercial Space: 10,000 sf
@ 3.9 emp/1000 sf = 39
Subtotal Employees (1008 of Net) 39
Existing Employees Aspen Highlands Ski Shop
@ 3.9 emp/8080 sf = 51
Total Net Increase 7.49
TOTAL NET INCREASE RETAIL COMMERCIAL & BASE LODGE 9.94
No net increase in the number of employees will result from the
expansion of the administrative office area.
Page Three
We are asking for 10 EGU's under the County's Lodge Growth
Management allocation program.
Approval for commercial development proposed in this application
is necessary for Aspen Highlands and is viewed as a prerequisite
for implementing master plan improvements to the base area. We
urge the Board to recognize that improvements to the Aspen
Highlands Base Area are not only important to the Aspen Highlands
Skiing Corporation, but also to the Aspen community, which is
anxious to enjoy the added benefits of new and better base area
facilities.
This application does not include with it the submission of a
check for the required application fees. Pursuant to our
understanding with the planning department, the required fees
will be compiled using the hourly approach currently in place of
our lodge application.
V ~~
~~~' ~ 7 ~~
WVN Jones ~
President
' ~ r
4 ., } _
~...;~ p^~ (~ 6
CRRTIFICnTS OF !L~-TL•ING U 'p~"7V~~1 ~yj~
I hereby certify that on this 7~` day of ~ ,
198 a true and correct copy of the attached Notice Public
Hearing was deposited in the United States mail, first-class
postage prepaid, to the adjacent property owners as indicated on
the attached list of adjacent property owners which was supplied
to the Planning Office by the applicant in regard to the case
named on the aforementioned public notice.
7 ~
Jan Lynn Ra .ak
PUBLIC NOTICE
RS: ASPEN HIGHLANDS RESORT COMMERCIAL GNP
Parcel ID #2735-142-00-020
NOTICE IS HEREBY GIVEN that a public hearing will be held on
October 7, 1986, at a meeting to begin at 9:00 A.M. before the
Aspen Planning and Zoning Commission in the Commissioners'
Meeting Room, 506 E. Main Street, Aspen, Colorado, to consider an
an application submitted by the Aspen Highlands Skiing Corpora-
tion, requesting 10 Employee Generation Units (EGUs) under the
current commercial grow th management competition. The entire
development on this site has previously received conceptual PUD
approval and an 80 unit lodge development allotment. The purpose
of this hearing is to consider the commercial portion of the
develoY_.~ent only.
For further information, contact the Aspen/Pitkin Planning
Office, 130 S.. Galena Street, Aspen, Colorado 81611 (303) 925-
2020, ext. 222.
s/Suzanne Caskey
Chairperson, Pitkin County
Planning and Zoning Commission
Published in the Aspen Times on August 7, 1986..
Pitkin County Invoice No. 34345.
N.3
r
- - ~ ~~;
<3~ '-
'~ ~
~
~
_ ~
A~-
~},-., -~
r
2
~- W W ~ 1 -=_ ,~
1
J
V
X
O
m
a~
V
_,
~ y r
D y~
-
~ }
,
. ~
~ C 4
L''
`
~
~
~ y N
~
I
_„
~~ I _J ~
~
to
1
~
~' O
d ~
O+
TUx
~~•>c r_ C!G
~ /tr J~~.
~/C./Z
i
Dear ~~,~-D-~%_, ,
This is to inform you that the Planning Office has completed its
preliminary review of your ~n2-~~'~c~~~Yl~ application for complete-
ness. We have determined that your application
_~ is complete.
is not complete.
The additional items we will require are as follows:
Disclosure of ownership (one copy only needed).
_ Adjacent property owners list (one copy only needed).
Additional copies of entire application.
_ Authorization by owner for representative to submit
application.
__ Response to the attached list of items demonstrat-
ing compliance with the applicable policies and
regulations of the. Code, or other specified materials.
A check in the amount of $ __ is due.
~._ A. Since your application is complete, we have ~hedule~l it
for review cby~ the (~-FUlofn~ -J Gk
We will be callin ~~I~ ~' ~ ~ ~~M~n''' ^+ ~;M-1: ..,-<-~,; ^
g you if we need any additional information
prior to that date. In any case, we will be calling you
several days prior to your hearing to make a copy of the
ew memorandum available to you. Please note that it
(is) is not) your responsibility to post your property with
gn, which we can provide you.
B. Since your application is incomplete, we have not
scheduled it for public review at this time. When we have
received the materials we have requested, we will be happy
to place you on the next available agenda.
Fl ea se feel free to call ~- ~.~ Ic'.mG1M.;(~i1 , who is the planner
assigned to this case, if you have any questions.
Sincerely,
ArIS,PE~,N/PI-TpRIN PLANNING OFF,I/CE r
l~'E' 71C1L,~-lk-~= ~°`" ~-`fl~.v~~C~l'I/Yl'U,V`~~
an Richman, Planning and
Development Director
AR:jlr
TO: County Attorney
Housing Director
FROM: Francis Krizmanich, Planning Office
RE: Aspen Highlands Resort Commercial GMP/General
Submission
Parcel ID#2735-142-00-020
DATE: August 5, 1986
Attached is an application submitted by the Aspen Highlands
Skiing Corporation, requesting 10 Employee Generation Units
(EGUs) under the current commercial growth management competi-
tion. This application has already gone through conceptual
subdivision and is now being reviewed with respect to the
commercial space requested.. The application, however, is
virtually identical to the lodge application reviewed earlier
this year.
Please review this material and return your referral comments to
the Planning Office no later than September 8th in order for this
office to have adequate time to prepare its presentation at a
public hearing on October 7th..
Thank you.