HomeMy WebLinkAboutpitkin.planning.273514207001 (2)DOCUMENT LAYOUT
THIS FILE MAY OR MAY NOT CONTAIN ALL OF THE INFORMATION
LISTED BELOW IN THE FOLLOWING ORDER
Summary Sheet
Resolution for the BOCC and/or P&Z
Ordinance for the BOCC and/or P&Z
Determination for the Hearing Officer
Administrative Determination
Staff Memo
Application
Public Notice, Acceptance Letter, Referral(s) Letter
Site Plan
Miscellaneous
Plat copies (11217)
~.. ~.~
rnnctLw:~usn-wz-ui-uuuuu ~
CASE NAME: Aspen Highlands Subd, Filii
PROJ ADDij:~ p tiRIQ DO.U (~ ~-
OWNIAPP: Aspen Highlands Ski ADR~
REP: ADR:r
FEES DUE:~~ FE
REMARKS
TE RCVD: ~l #COPIES;~ CASE NO 1978
2, Gen 3ubm (1978) Planners
i°
C/S2:~- PHN:~-
C/S/Z:~~ PHNi~
ALLOCATED HOURS:r-
RCVD:~- %OVER: I
CLOSEDi~~BY: ~~
PLAT RECORDEDr~ ~, PLAT,
s,~
CASE TYP.: ':~ Gen Subm
CASE,TYP2: ~-~
File Locatipn:.~
RESOLUTION OF THE {'ITKIN COUNI~Y PLANNIf1G
AND ZOh1ING COMMISSION RECOMMENDING
DENIAL OF THE ASPEN HIGHLAfJDS SUBDIVISION,
FILING 2, GEfJERAL SUBMISSION
Resolution No. 78 -
WIlEREAS, the Aspen Highlands Skiing Corporation is the owner of record
of W.V.N. Jones residence located on a 11.64 acre parcel within the Aspen
Highlands Subdivision, and
41HEREAS, the owner has applied for General Submission approval for the
further subdivision of said parcel into a total of nine lots, and
LJHEREAS, the Commission has awarded the application 69.6 points out of
a total 160 possible points under Resolution flo. 77-57 with no points awarded
for housing, and
WHEREAS, Section 5.30 of the Land Use Code requires that the Planning
Commission and the Board determine that a land use proposal either is not
an exclusionary development or will help to alleviate the shortage of low
and moderately priced ownership and rental housing units in the County, and
LJHEREAS, this application did not make specific commitments with regard
to Section 5.30, and
WHEREAS, the opinion of the Commission is that specific commitment or
other changes in the application to comply directly with Section 5.30 would
at this point be a substantial modification in violation of Section 5.90.04.a.7,
and
LJHEREAS, the Commission has heard the evidence and testimony related
to this application.
NOW, THEREFORE BE IT RESOLVED by the Pitkin County Planning and Zoning
Commission that it finds the proposal to be exclusionary and hereby recommends
denial of the General Submission application for the reason of non-compliance
with Section 5.30 of the Land Use Code everi though it scored above the minimum
of 64 points in the Growth Mananement Reviews.
Recommended for denial by the Pitkin County Planning and Zoning Commission
of Pitkin County, Colorado at its regular meeting on September.20,.19.78.
M E M O R A N D U M
T0: Board of County Commissioners
FR0~4: Richard Grice, Planning Office
RE: Highlands Subdivision - General Submission
DATE: November 7, 1978
This application requests general submission approval of the Aspen Highlands
Subdivision, Filing 2. The 11.64 acre site is currently occupied by the
W.V.N. Jones residence. Mr. Jones desires to further subdivide his hamesite
in order to create eight additional single family sites. The site is zoned
R-30 and is surrounded on three sides by the previously approved Aspen High-
lands Subdivision, Filing 1.
The following is a summary of Planning Office and referral comments:
1. Geologist, Nick Lampiris, states that, "there are essentially no geo-
logic hazards associated with this tract. The lot layout is excellent
from a geologic point of view, even to the point of allowing for green
space in the southwestern most corner of the property below the dam
for the large pond there; this is the only spot on the acreage that I
recommend leaving undeveloped because of the chance of dam failure
under certain combinations of adverse conditions. I recommend that
soils testing be performed for purposes of foundation design. This
is an excellent site for additional development with little or no
impact on the environment."
2. Visual impact of development of the eight homesites would be minimal.
The development would not be visable from anywhere except within the
subdivision and from the Highlands lifts.
3. Water for the proposed development is to be supplied by the Aspen
Highlands water and Sanitation district. At the present time, in
addition to supplying the water needs of Asoen Highlands Subdivision,
Filing 1, the district also supplies water for the Highlands Inn,
Maroon Creek Lodge, Chamonix Condominiums, Heatherbed Lodge, and the
Highlands Base facility. The application indicates that in order to
supply the necessary water for Filing 2, it will be necessary to in-
crease the storage and treatment facilities of the system to a capacity
of approximately 282,000 gallons. Adequate water rights to meet these
expected needs are indicated as being available, however, no evidence
has been presented that these water rights exist and we do not .know
if they are dedicated to agriculture or domestic uses. We have received
comment from the Highlands 6Jater and Sanitation District. The Board of
Directors state in their letter of June 29, 1978, that "the District
would be unable to extend service to the proposed lots at this. It
appears that the tiWSD does not have sufficient capacity to meet the
water requirements which would be needed in the event the District's
size was increased by eight homes." Furthermore, they note signi-
ficant errors in estimates of the daily demand of the district in
the report of Sterling Associates.
4. Aspen Metro has commented as follows ,+"there will be no problem in
providing sanitation services to the subdivision as the existing trunk
lines that are already there have sufficient capacity to handle this
proposed development and substantial excess capacity exists at the
sewage treatment plant."
5. As of the time of this writing, we have no comment from the County
Engineer regarding the proposed road design and layout. The appli-.
cation indicates that construction will be in accordance with County
standards.
Memo to County P&Z
Highlands Subdivision
September 14, 1978
Page Two
The County Trails Master Plan calls for a trail through the Aspen
Highlands subdivision which would connect existing trails. A con-
dition of approval should be the dedication of a trails easement to
the satisfaction of the County Engineer.
6. All utilities are available. Mountain Bell has requested specific
phraseology which should be used on any future submissions. They would
have all access roads as well as those portions of real property which
are labeled as utility easements dedicated to the public utilities.
7. The proposed subdivision is located on an existing mass transit route.
8. With regard to the Housing requirements of the Land Use Code, the appli-
cation indicates a willingness on the part of hir. Jones to purchase
existing units, construct new units, or make payments to the County in
lieu thereof. These offers are based on the assumption of eight free-
market units and four additional PMH units. No specific committments
are made within the application. Without specific committments we
must conclude that Section 5.30 of the code has not been complied with.
In summary, the site is nearly perfect for development. There are no geologic
constraints, no visual problems, and the proposed density is only slightly
more than half of what the R-30 zoning would allow. The location is within
walking distance to schools, skiing, parks and mass transit. However, with-
out specific compliance with Section 5.30 we expect that the application will
not score well. Due to the non-compliance with the housing section, the
Commission should reject the application based upon Section 5.90.03 b, unless
you find the subdivision to be non-exclusionary. The Planning Office does
not support this argument.
The Planning and Zoning Commission reviewed the proposal at their regular
meeting on September 20, 1978, at which time they recommended denial of the
application. Their reasons for denial are outlined in the attached reso-
lution.
sr
STERLING ASSOCIATES ARCHITECTS WOODY .:REEK, COLORADO
MEMBERB AIA~PO. BO%B7Z~P COOS Bt656PHONE 303 923-4SB
May 31, 1978
Pitkin County Planning and Zoning Commission
Board of County Commissioners
Pitkin County, Colorado
Gentlemen:
Enclosed herewith is information describing an application for re-subdivision
of a parcel of land containing approximately 11.64 + acres. This parcel is
presently in the ownership of the Aspen Highlands Skiing Corporation and is
located within the existing Aspen Highlands Subdivisior. adjacent to the Aspen
Highlands Ski Area.
The general character of the parcel is wooded meadowland containing a 1.18
acre pond which is presently used for water supply to the Aspen Highlands
Ski Area snovrtnaking equipment. The parcel is wooded with scattered areas
of immature aspen and spruce. The site is totally surrounded by lots and
built residences comprising the existing subdivision.
The parcel is well protected visually and is not visible from Maroon Creek
Road. The major outward views from the site are toward the Aspen Highlands
Ski Area. There are also good views up Maroon Creek from several of the
proposed sites.
The total parcel is presently under one ownership and does not represent a
conflict in terms of view or quality with surrounding residences. These
residences are of high quality and currently are subject to covenants and
restrictions. In order to maintain the present quality, these restrictions
will also be imposed on the proposed subdivision.
It is the intent of the owner to re-subdivide the parcel into nine lots,
each lot containing a minimum of 30,000 square feet of area in conformance
with present zoning requirements. One lot will contain an already existing
residence presently occupied by lJhipple Van Ness Jones and the other eight
will be offered for sale.
As partial ;ulfillment of the application, there follows comment on various
aspects of the subdivision's impact on public services as required by the
pre-application conference with Ms. Karen Smith on October 25, 1977.
SECTION 2 - POLICIES
2.01. COfdFORMANCE WITH ASPEN AREA GENERAL PLAN
The parcel and surrounding lots are presently zoned in the R-30 category.
No exception to that category or use is requested. Each lot will contain
30,000 square feet of area minimum. This zoning classification is presently
recommended by the General Area hlaster Plan.
Aspen Highlands Skiing Corporation Subdivision Application
Page 2
2.02. CONFORMANCE WITH OTHER LAWS
The development of this parcel of land does not violate any known laws of
Pitkin County, the State of Colorado or the United States of America.
2.03. NATURAL AND MANMADE HAZARD AND RESOURCE AREAS
A. The Colorado State University Resource maps indicate the possible exis-
tence of a fault adjacent to the property. Enclosed with the application is
a report prepared by Nicholas Lampiris, geologist, which addresses this
problem.
B. There will be no improvements made which will create dangerous conditions
for surrounding property.
C. Refer to A.
D. No identifiable natural resources of the county will be disturbed.
E. No nuisance or potentially dangerous activities will take place in the
subdivision (covenants).
F. No significant wildlife habitats exist on the parcel.
2.04. SOIL, SURFICIAL GEOLOGIC CHARACTERISTICS AND RADIATION
Adequate historical evidence exists from prior construction experiences to
show that no unusual structural problems will arise for improvements on the
parcel. The CSU resource maps show no identified hazard areas.
2.05. DRAINAGE
The parcel is naturally drained, both to h1aroon Creek and to the pond which
is then drained to Maroon Creek via the Lyeth-Jones pipeline. Please refer
to map.
2.06. ADEQUATE PROVISIONS FOR 4JATER NEEDS
The site is presently served by an underground water distribution system and
storage facility. Further analysis and comment is included under Section
5.25. Fire protection is available from this system as well as from the pond
on the property.
2.07. SEWAGE TREATh1ENT AND COLLECTION
The site is presently served by an adequate sewage collection system under
the jurisdiction of the aspen Metro Sewer District and is presently monitored
by the Pitkin County Board of Health. Connections to the present system are
available from each site.
Aspen Highlands Skiing Corporation Subdivision Application
Page 3
2.08. IMPACTS ON ROAD SYSTEMS
The road and access system to the parcel is in place. Extensions of private
easements to sites are indicated on the map. f!o additional impact on county
road services will be required.
2.09. ROAD DESIGN AND CONSTRUCTION
The existing road system presently conforms to county standards and is pre-
sently maintained privately.
2.10. LOGICAL EXTENSION OF UTILITIES
See 2.07.
2.11. EROSION
Adequate landscaping of each residential area will assure that no accelerated
erosion takes place (covenants).
2.12. COMPATIBILITY 41ITH HISTORICAL AND ARCHEOLOGICAL RESOURCES
No historical or archeological sites exist on the parcel.
2.13. COMPATIBILITY WITH AGRICULTURAL LANDS AND OPERATIONS
No agricultural land exists on the parcel.
2.14. IMPACTS ON TAXES AND MANAGEMENT OF NECESSARY SERVICES AND FACILITIES
Public services are already available to the parcel and surrounding residences,
therefore the quality of such services is not compromised. The taxing and
revenue impacts should be positive for the county sinepublic service ex-
tensions and capital costs are not necessary. e~ ~„!- ~
2.15. HOUSING oa~~\SC~e~"~\O~`\ ~-~°~9~`~~,u~~~ ~a•~~e ~~`t"',\
The owner agrees to satisfy9the requirements for moderate income housing as
specified by Resolution 74-87 (1974) by either the outright purchase of exist-
ing housing stocks, a cash payment to Pitkin County or the construction of
housing at a location adjacent to the development at Aspen Highlands. Dedi-
cation of housing within the development itself would be out of character
with present surrounding development and the type of development anticipated
on the subdivision sites.
2.16. SCENIC QUALITY
The nature of the site topography, location and present roads and facilities
precludes additional scenic impact.
Aspen Highlands Skiing Corporation Subdivision Application
Page 4
2.17. AIR QUALITY
No significant air quality impacts are anticipated. Conformance with existing
fireplace regulations will be practiced.
2.18. ENERGY CONSERVATION
All efforts will be made to conform or exceed the present county requirements
for energy conservation. The nature of the site precludes the use of active
or passive solar heating except, perhaps, for domestic hot water. There are
numerous opportunities on the sites to take advantage of slope conditions
to increase insulation values. The building areas on the sites are so arranged
as to prevent blocking sun exposures or views from other sites.
2.19. .TRANSPORTATION
The site is locabed such that Aspen Highlands ski buses and City buses can
be used for town trips. The parcel is also close to existing and proposed
bicycle paths, cross country skiing and bridle paths. The net impact on
daily automobile trips should be negligible given the already heavy impact
of automobile traffic on Maroon Creek Road during the winter and summer.
Estimated additio~ial average trips per day will be between 15 and 30 for
eight additional sites. Skiers from the proposed subdivision are within
easy walking distance of the lifts, negating automobile impact in that respect
for Aspen Highlands.
2.20. DEVELOPMENT OR EXPAPJSION OF SKI AREAS
Not applicable.
2.21. COMPATIBILITY WITH EXISTING ADJACENT NEIGHBORHOODS
The proposal is compatible with adjacent neighborhood areas and will adopt
covenants and restrictions already exercised in the surrounding neighborhood.
2.22. WATER RESOURCES IMPACT
Water resources are not impacted by this proposal.
2_23. NOISE
No noise impacts are anticipated by this proposal.
2.24. COMPATIBILITY WITH ADJACENT OR NEARBY PUBLIC LANDS
Public lands are not impacted by this proposal.
2.25. GROWTH RATE, PHASING OR PUBLIC SERVICES AND FACILITIES
This proposal is minimum in nature and represents minimum addition of population
~.
Aspen Highlands Skiing Corporation Subdivision Application
Page 5
to the planning area. Therefore, it is in general conformance to growth
rate policies. The anticipated rate of build-out in the development is two
units per year which is in line with recommended growth rates identified in
the Growth Management Plan.
SECTION 5 - GENERAL REGULATIONS
1. CONSISTENCY 41ITH MASTER PLAN RATE OF GROWTH
The proposal is consistent with Master Plan policies which indicate R-30
residential zoning. A projected build-out of two units per year is also
consistent with Growth Management Policy in the Aspen Highlands Water and
Sanitation District.
2. HAZARD AND RESOURCE AREAS
A. Geologic Hazards
Geologic hazard areas and underlying soils analyses are enclosed in the report
submitted by Nicholas Lampiris.
B. Soils, Erosion
Refer to geologic analysis.
5. SCENIC QUALITY
A. Project Location
Refer to enclosed map entitled "Project Location."
B. Uisual Vulnerability
1. Reveqetation: Damaged areas adjacent to building will be repaired by
landscaping and replanting.
2. Topsoil: Topsoil will be saved and respread.
3. Weed Prevention: Not applicable.
4. Utilities: Utilities will be in roadway easements where possible.
here not possible, vegatation will be reclaimed through planting.
5. Scenic Views: Building areas will be designated which take advantage
o scenic views and preserve views of existing structures.
6. Road Impact on Scenic Quality: The impact of the road system on
scenic quality is negative. Existing roads are already located such
that they do not interfere with any views from construction sites.
6. WATER SUPPLY, DSITRIBUTION AND TREATMENT
A. General Description: Distribution System
The existing watei° distribution system is through 8" and 6 steel pipe. One
Aspen Highlands Skiing Corporation Subdivision Application
Page 6
6 main is located in Gleneagle Drive and will serve the upper tier of lots
in the proposal--Lots 4, 5, 6, 7 and 9. Another 6" main exists along the
Westerly edge of the parcel and will serve Lots 1, 2, 3, and 8. Three street
cuts (Lots 4, 5, and 6) will be required. All other lots have access to water
mains on easements. At present streets are not paved, making cuts easily
accomplished.
B. Storage and Treatment System
The present system is capable of processing and storing 150,000 gallons of
water per day. In order to relate that capacity to present requirements
of the Land Use Code the following analysis is included:
USERS OF ASPEN HIGHLANDS WATER AND SANITATION SYSTEM INCLUDItVG PROPOSED LOTS
Domestic In-House Demands (Maximum Daily Demand)
Highlands Inn
150 persons @ 75 gallons per day
Maroon Creek Lodge
50 persons @ 75 gallons per day
Chamonix Condominiums
60 persons @ 75 gallons per day
Heatherbed Ledge
46 persons @ 75 gallons per day
Highlands Base Facility
Guests - 175 persons average x 6 hours per day x
5 gallons per day
Employees - 25 persons @ 75 gallons per day
39 Residences @ 300 gallons per day
TOTAL ESTIMATED DAILY DEMAND
Irrigation Demands
Assume each resident irrigates 5,000 square feet
39 x 5,000 x 7.48 = daily demand re: 5.25.O1.e.2
365 x 2
d.d = 2000 gallons per day
Fire Demand
Re: 5.25.O1,e,4,ii - assume population on system = 251-1000
11,250 gallons
3,750 "
4,500 "
3,450 "
5,250 "
1,875 "
9,300
39,375 gallons
Storage Demand = 1000 gpm x 60 x 4 = 240,000 gallons
.. ,
Aspen Highlands Skiing Corporation Subdivision Application
Page 7
Therefore, the to tat daily demand for all water uses is 281,375 gallons
Less existing capacity 150,000 gallons
Residual 131,375 gallons
Based on this analysis it will be necessary to increase the storage and treat-
ment facilities of the system to a capacity of approximately 282,000 gallons.
The applicant therefore proposes to construct additional storage and treatment
facilities such that the total system is capable of handling 300,000 gallons
of water. Existing water rights and inlet capacities from Maroon Creek to
the system assure the ability of the applicant to accomplish this increase
in capacity of the system.
7. SEWAGE COLLECTION AND TREATMENT
The proposed parcel and surrounding sites are presently connected to and
served by the Aspen-Metro Sanitation District. There is an 8" collector
trunk located in Glen Eagle Drive which connects to a 10" main in the Maroon
Creek Road. This collector .will serve Lots 4, 5 and 6 in the proposal.
Another 8" collector is located on the Northwest proposed site in an easement
provided for same. This trunk connects to an 8" main in Glen Garry Drive
and thence to the 10" main in Maroon Creek Road. This trunk will service
Lots 1, 2 and 3 in the proposal. Another 8" main exists on the Southerly
edge of the proposal in road easement and will serve Lots 7 and 8. This main
also presently serves Lot 9.
The total anticipated demo
1120 and 1760 gallons per
morning and early evening
sewage system requires no
construction shall consist
11. ROADS AND TRAILS
General Comment
nd additional to the existing uses will be between
day. The peak demand periods will occur in the
in conformance with normal residential use. The
extension or construction by Aspen-Metro. All
of tap-ons and connecting sewers to the residences.
In terms of overall impact on the road system, the addition of 8 residences
to the existing extreme use experienced on (~1aroon Creek Road is negligible.
Although earmarked for consideration on the application form by the Planning
Department, ;he applicant requests that, if found necessary, more extensive
analysis be deferred to the Detailed Submission phase of the review process.
Given the extreme impact on Maroon Creek Road by present recreational, tour
and school uses, analysis of the traffic contribution of the proposal does
not appear necessary at this time. The reasons for this are:
1. The pro pc sal will not generate enough additional traffic to change
the characteristics of the existing situation on Maroon Creek or other
County roads.
The levels of service and safety are not affected by the proposal.
No capital costs are generated by the proposal.
Aspen Highlands Skiing Corporation Subdivision Application
Page 8
B. Road Design and Construction
Inasmuch as all access roads and streets presently in use conform to county
standards and are maintained by the county, Section 5.22, Road Design and
Construction, is omitted.
C. Trails
The proposed parcel is in the near vicinity of proposed bike and pedestrian
trails from Aspen through Meadowood to the Highlands as identified on the
CSU resource maps. Although the proposal is not directly involved with these
proposed trails, they will be easily accessible to the residents of the sites.
12. DRAINAGE
The proposed site has at present a well developed drainage system. All of the
lots in the proposal are naturally drained through a system of ponds and out-
flow pipes from the site to Maroon Creek and along well established barrow
ditch and culvert systems along the roads. The pond on the proposed site
collects runoff and drains it to a series of ponds on adjoining lower pro-
perties and eventually empties into Maroon Creek. All pipes in the system are
12" diameter minimum. Please refer to preliminary plan. The proposed develop-
ment of this site will not affect this drainage pattern negatively. For this
reason the applicant requests that more specific analysis, if found to be
necessary, be deferred to the Detailed Submission phase.
13. IMPACT ON TRANSPORTATION
See 2.19.
14. IMPACT ON PUBLIC FACILITIES/SERVICES
A. General Comment
The proposal lies within already well established service areas for all public
facilities, service, solid waste disposal and fire and police protection.
Therefore, no re-scheduling or additional accomodations are necessary for
these services.
B. Extensions of Utilities, Water and Sewer
Water and sewer extensions are discussed under Articles 6 and 7.
C. Gas and Electrical Service
The proposed site is presently served with both high pressure natural gas and
electrical service adequate to serve the requested density.
1. flatural Gas: Proposed Lots 1 and 2 are served by a 3/4 h.p. gas lin=_
existing in the private access easement for• these lots. Lots 3 through
9 inclusive are served by an existing 3/4" h. p. gas line on the East and
South edges of the aroperty. Please refer to preliminary plan.
2. Electrical: At present there is underground electrical service located
on the East, South and North-edges of the property. It will be necessary
to extend service from the equipment to each lot in conformance with Holy
Cross Electric Association requirements.
Aspen Highlands Skiing Corporation Subdivision Application
Page 9
D. Parks Dedication
To be determined.
E. General Tax Cost/Benefit
On the basis of discussions relating
negligible impacts on public service
effect on the tax structure should be
improvements on the proposed sites ar
X8,000 to X10,000 per year added rove
revenue condition to the county since
are not commensurately increased.
15. CONTRIBUTION TO HOUSING STOCK
to Articles 6, 7, 11 and 13 which indicate
and utility extensions, the overall
beneficial for Pitkin County. The
e capable of producing on the order of
nue. This figure constitutes a surplus
capital improvement costs and services
A. General Comment
There are 8 dwelling units proposed for the property under this application.
Therefore according to Code requirements it is required to furnish 4 additional
employee housing units to the housing stock or remunerate Pitkin County far
this housing. It is assumed that development of this project will have little
effect on current demand for low or moderate cost housing since the only
development taking place is residential construction which can easily be
absorbed by the existing contracting firms available in Pitkin County.
Additionally it is estimated that minimum increased demand is generated be-
cause of operational problems inherent in the proposal. However, in con-
formance with Growth ~danagement policy the addition of four housing units
is indicated. It is contemplated that these housing units will be purchased
or contracted under the Code provisions for PMH housing at such times as to
conform to the development schedule contained in the proposal or payment to
the County will be made. Housing, if required, will be sold or managed under
those provisions.
16. MAN-MADE HAZARDS
A. General Comment
The existing pond on the
made hazard. However, th
Bible to the public and t
Western edge of the pond
difficult. Accesses from
readily visible from four
visual control of the are
the site, but is an aesth
bates outweigh any hazard
18. ENERGY CONSERVATION
See comments for 2.18.
proposed site has been identified as a possible man-
e pond is located in such a way as to be inaccess-
o the majority of the sites on the proposal. The
is heavily vegetated Waking access from that side
the other three sides are gentle slopes and are
of the proposed structure locations which give
a. The pond not only serves as a drainage basin for
etic focal point for the development. These attri-
ous aspects that appear to exist.
19. WATER RESOURCES IMPACT
A. General Comment
The proposal as applied for has no anticipated effect on groundwater resources,
neither adding or subtracting groundwater volumes nor altering the character
of such water resources.
Nicholas Lampiris, PhD
CONSULTING GEDLOGBT
PO 60% 10935
AS PE N, COLORADO 81611
(303) 925-6020 OFF. 923-2126 RES
May 23, 1978
Robert Sterling Jr.
Box 97
Woody Creek,. Colorado 81656
Re: Whip Jones Subdivision
Dear Mr. Sterling:
I have completed my investigation of the proposed subdivision of the
11.64 acres surrounding the Whip Jones home north of the Highlands
Ski Area. The acreage lies i_n the E1z, NW w, Section 14 (projected),
T. 10 S., R. 85 W., within the Aspen 71s minute quadrangle, Pitkin
County, Colorado.
The property consists of rolling meadow interspersed with groves of
aspen trees and some conifers. There are several moderate sized ponds
in and around the property including the one just west of the Jones
home which is more than an acre in area.
Poorly sorted material ranging in size from clay to boulders covers
the property. This is morainal material of the Quaternary age glacier
"b" which moved down the Maroon Creek Valley thousands of years ago.
The underlying bedrock cannot be seen on the property, but the geologic
map of Bryant (1971) indicates that the Triassic age State Bridge and
Chime Formations, mostly red shales, siltstones, and sandstones, under-
lie the area. Bryant also infers a north-south trending faul*_ near
the eastern boundary of the property but there was no surface indica-
tion of any faulting and at any rate the fault has been inactive for
millions of years. The general dip of the bedrock in this area is
20 degrees to the north.
There are essentially no geologic hazards associated with this tract.
Morainal deposits are quite suitable for developmental purposes,
especially if slopes are not allowed to become supersaturated. The
few slopes within this property are not high enough to cause any
significant problem.
The preliminary lot layout was excellent from a geologic point of view,
even to the point of allowing for greenspace in the southwesternmost
corner of the property below the dam for the large pond there; this
is the only spot on the acreage which I recommend leaving undeveloped
Robert Sterling Jr.
May 23, 1978
Page Two
because of the chance of dam failure under certain combinations of
adverse conditions. Access, domestic water, and waste disposal
systems are already available for all the proposed lots. I re-
commend that soils testing be performed at a later date at the site
of each proposed home for purposes of foundation design.
This is an excellent site for additional development with little
or no impact on the environment. If there are further questions
please do not hesitate to contact me.
Sincerely;
Nicholampir~~t
Consulting Geologist
REFERENCE
Bryant, Bruce, 1971, Geologic map of the Aspen quadrangle, Pitkin
County, Colorado: U.S. Geol. Survey, Map GQ-933.
~ A t9 ,.
~ lai
i -~ ~
~~
I ,; ~" a
i - i- l
~ ~ ~ `~~ Is t .,ri v e
I 4/~ ~, , : ~ \~ ~,;
~~ .~ j .
k r. i ~. .~ `; mil' 4, ~~.. , ~ ,
I /~
t ~ ~ I' ~ Jn ~ ~ ~~• ~ ~ ._... ~' i _ 4' j
/ /
%~~~~~~ _ ,t ~cS~ ; /~':a'~ 3,o- t'y iaj ~~ i ~ ~~
~ ~_~
cl„ v< ~~ / ~ti ~t a u / ~ .. ~ ~ ~ i /
~~~ ~~~ ~ a ~ ~ j /
ri.~ ~ t ~ ~ ~ r 1'~
1
(~ ~ • ~ ;
i ,
I
~ ti ~~~~ ~:~ ,+-..y7 ~~i~
//
,~ ,~~ ~ ,~
< ~'~ ~ /
-; ~~
„' I ii' \ r, ,,1 i ~ i:~ ' Ir
:. ~~~ ~ / ~ t ~.~ ~ / ila 3
,~ yr .v ~~ ~ ~ / ii~~
~~. ~ 1 ~ A ~/ '~" ~ ~ I ~ ~C
~ /~. i I ~ yy
, ~ A d~ ~ ,.~ S '
iii I II{ ~~~. ;~~' %~ i ~ ~X /',~)
~ ti' ~!i ~ 1 i
9 ek p f/ - I I
i "~'~ ,n r~~/ a i i ( ~ I jll~ I~~
"b %~~ ~)) ~. I.. < III
q '1 1 I
~~ ~ ~
' I!II
i% ~ ~ i ~ I .
~ ,; <,A <
~ \,
~ ~ 1~~ ~,
u
; ~ ,.
_ / j 3
~~ 3 ~ i
j ~ .i ti ,~'
i i~ ;
~ ~ / ~ 'j
,. ;
~
,
r
~c1Ni ~u~G~~
"1 a j ;.;a
Name of Subdivision:
ilability of Public and Private Facilities and Services (max. 27. points)
Consider each application with respect to its impact upon public facil-
itites and services and rate each development by assigning points according
to the following formula:
0 - Indicates total impracticality of providing service.
1 - Indicates a major deficiency in service
2 - Indicates an acceptable (but standard) service level.
3 - Indicates an excellent service level (that is, one that improves
the overall quality of service).
The following facilities and services shall be rated accordingly:
Number of points
~~ ) ~_ I. Nater (maximum 3 points) considering the reliability and capacity
of the water supply system to provide for the needs of the pro-
posed development and, if a public system, its ability to supply
water to the development without system extensions beyond those
normally installed by the developer, and without treatment plant
or other facility upgrading. ~. ~~
e
- Comments: _ ~`r`,~ "~ ~ ~~~~~ l ~ ~~, A N .(.U1 `i~-~-'~~
_' l V
-~`) 2. Sewer (maximum points) considering the capacity of the sewer
system to dispose of the wastes of the proposed development and
if a public sewage disposal system is to be used, the capacity
of the system to serve the development without system extensions
beyond those normally installed by the developer, and without
treatment plant or other facility upgrading.
J
,~ -~
fi) - 3
JAL`
SCORE SHEETS FOR ASPEN METRO
SUBDIVISION APPLICATIONS
Storm Drainage (maximum 3 points) considering the cap-
acity of the drainage facilities to adequately dispose
of the surface runoff of the proposed development with-
out system extensions beyond those normally installed
by the developer.
-Z-
s
C Z ) ~ 4. Fire Protection (maximum 3 points) considering the
ability of the appropriate Fire Protection District
to provide fire protection according to the estab-
lished response standards of the appropriate district
without the necessity of establishing a new station
or requiring the addition of equipment or personnel
or capital improvement.
Comments:
~~~ ~ 5.
2) ~. b .
CAL
~~) 2
_ ~.
~~~.' ~ _.
7
8.
~~
Police Protection (maximum 3 points
-ability of the Sheriff's Department
tection within reasonable response
necessity of additional facilities,
equipment
Comments:
Road System (maximum 3 points) considering the abil-
ity of the public road networks *_o safely provide
for the needs of the proposed development (without
the need for improvements or capital expenditures)
at a "c" service level (at a minimum) as such servi+ee
level is defined in the Briscoe/Maphis Pitkin County
Road Network Analysis.
,:
_:
1
V _ ~.
School System (maximum 3 points) considering the
ability of the school system to accomodate addi-
tional students without extensive busing and addi-
tional r_aoital improvements.
Recreational facilities (maximum 3 points) consider-
ing the availability and location of parks and other
recreational facilities (on and off site) and the
ability of public facilities to accommodate addi-
tional users without acquisition of lands or making
considering the
to provide pro-
times without the
personnel or
-3-
1. ~~ ~ 9
Affect on the Environment (Maximum 24 points)
Consider each application with respect to energy conservation and enviro-
mental impacts, and rate each development by assigning points according
to the following schedule:
0 - Indicates no conservation features and adverse enviromental impacts.
1 - Indicates minimal conservation features and minimal enviromental
impacts.
2 - Indicates standard conservation features and no adverse environ-
mental impacts.
3 - Indicates outstanding conservation features and environmental
improvment.
The following features shall be rated accordingly:
Number of Points
~z~ -s-
1. Air Pollution (maximum 3 points) considering the elimination of
fireplaces and unpaved surfaces, use of Hass transportation,
and other tec tques to reduce air pollution. fiit1
Comments : ~~ ~:~ Q ~ A~ { ~~~~. ~_+~ . C~~. X t~1lQ ~~~
{ ~r ~ 2. Water Resources (maximum 3 points) considering the extent to
`~ which the project will reduce and/or pollute surface and ground
water supplied.
n
Comments: ~ jr b ~.)U ~ Soe~+ ~ ~ ~ ~7~~' ~''~'~"-~i-~
p ~ /~
h ~ ~ 0 I' k.1 ~ e-. !~ ^~ ~. ~~~ n i ~f -~ ~~ LLi7 ~ t-A_ ~_F t, '~"~I
l_1
( ~l 1 3.
q _ _ ~ .
_ - ~ ..
.. r.LL ~~...
'~/' 1 r
- ~~
Energy Conservation (maximum 3 points) considering the extent
to which solar heating and thermal insulation measures are taken
(beyond the r uirements fo the Building Co \). ?
.~
Comments: r-: ~~ Ca \ .~..1~-- .~y'~~. Q ~al~ `~ ~_-
~~:
,..
., t
- • .. _ ..
Public and Private Transit Systems (maximum 3 points) consid -
ering the ability of the public and private trail and trans-
portation systems to provide for the needs of the proposed
development without the need for public improvements or capital
expenditures.
-4-
,r ~ { ' 4. Open Space (maximum 3 points) considering the extent to which the
~ / project preserves usable and desirable public and private open
space. (,
Comments: ~~` rr "~1i~~ 'i;~Sx ~0~-~kCX JC~I~~,W~
i,
~~p> L 5.
~~ .~ 6.
c~
~ ~~ 7. Wildlife Habitat (maximum 3 points) considering the extent to
which (including dog control) the project accommodates wildlife
habitat including game winter range, migration routes, calving
areas, water fowl habit~~.a~ft~ (winter and sunnier)/sand fisheries.
Comments: ~~ C~t'>~~ ~ ~1. "~'
~i ~ ~ 8. Natural Vegetation (maximum 3 points) considering the extent
to which the development will preserve unique natural vegeta-
tion (expecially trees) on the development site.
Comments: X1_(1.-11201? ____
~~ ,
,~
Natural and Man-made Hazards (ma~fimuw 3 points) considering the
extent to which the proposed development is free from airport
hazards and natural hazards (including geologic hazards, flood-
plains, steep slopes, unstable soils, snow avalanche and wild-
F:~e 4.»~..1 ~rmc1
Visual Vulnerability (maximum 3 points) considering the extent
to which the proposal will leave unaltered the highly visual
SU1o3b,lt ~.._ gc,6oo - l1o,gG
9.a~ = 1~.9c = ,53
;~-~ >+ {~1,~15 f2ouuc(ec( ~,o (I,VG
Provisien_of I__ow/I~icd~rate_/i•i_i_ddle ir.eom;; Housinq (mor.imem 30 poini:s)
Total Number or Points
Consider to what extent each development proposal will satisfy local need
for low, moderate and middle income housing and rate each proposal and
assign points according to the follovainy schedules:
Number of points
(a) Middle Income Housing Points
15-291 of project 2
30-44 of project 6
45-5y% cf project ~ 8
60% (or more) of project 10
`~ (b) Moderate Income Housir.y Points
15-2g°i, cf project 4
30~44~ of project 6
45-59 of project 8
60% (or more) of project 10
',:~ (c) Low Income Housing Points
15-29% of project 6
30-44% of project 9
45-59% of project 12
60-79G of project 15
80-89 of project 20
90-1u^U~ of project 30
In order to determine what percent of the project is devoted to middle,
moderate and low income housing, t he following formule shall apply (+vith
no credit for any wait not meeting the minir„um square footage require-
ments):
Type of Dwelling Unit
(minimum sq. footage)
Number of kesidents
Per Dwelling Ur;it
Studio (40U sq. ft.)
One Bedroom (600 sq. ft.)
Two Bedroom (800 sq. ft.)
Three Bedroom (or larger)
(1.000 so. ft.)
Total Number of Points _ ~ L
1.0
1.3
2.7
4.0
Ti+e Commission may a~.aard as many as 25 additional points to any
project which proposes to develop below the (net) allovable density
in the applicable zone district. If it shall elect to do sc, the
Commission shah award 1 point for each full 4o reduction in net
allowable density. "Net allocable density" shall mean tP;at density
allcree~l in the appropriate zone district reducer; by any off-set.
otherwise provided for in th. Fitkin County Land Use Code {e.g. Section
3.08.OH).
~_
Comment 1 I~ ~ t~r~~L1~~.Cf~ i..~,il ~ s~~.9-~ ~ I C.~.l' C~L~Q _ __~1~~i?~^_QJ~"~1~''
1~_J`4 _~~~~ _."_ ,~, _"1.GiL.~C~ ~ti .~CJJ'~~~.~C'N~'~ G...~.5.__a'~"lz`~..
~' ~.4~ ~ C
( ~ ` i~ !~S' ~c~t~C ., ~i~~e j.~r.:-~%- ~~<_~~'u`t,~ r~"_ _~~~r-fix
<_
,_. _ -
\1 1 VMA / C1
~'S[,-1~,. V ~1 ~ I. ~~~ 1 ~ ~ Sc ~L ~Ji~. ~~Y\.~'L~ ~~ /" / 4,' 7 / ~-~ pt~~..~,/ L
-.. {' ..r '' ' '~'~ ~~ ~ "l i ~ ~', lr Y { ,'y. ~~o N t ~: '. ,~. i '~ l''J„R..7\ (';..o~P 1 W i ~~ ~ ~"~-'~-..
_tti it `#\:. ~ M.t N:, :^)C 3! "~ {~.D- i;04vi`r .~-G tYl,.2. ~~
Develoement Below Allowable ensitw (maximum 25 Points)
APPLICATIOPa:
Total Points
without multiplier
i. Public and private facilities
ii. Environment
iii, Housing
iv. Density
-~a dal
with multipliers
i. Public and private facilities
ii. Environment
iii. Housing
iv. .Density
ig
_~
~~
1~- O
~'
~~
P }-~ "~ G.
a_
. ~ -~
J. ~• ~; : A
C ~ G~ O
~ ~ m
• N
p
x
D
w G
C n
--1
m 0 '^
~ n N o
(~
~I Q w c
V1
Sl0 ~ (~
Q. n Q w
~ J. Sl0 yl ~ d n Q w
• J. J.
J J J~' Z
D
.J J. •
`* • J. w
- 7 1
0 3 <-r o ~ m
v
r 3~ t° >j
J Z
O m~ 7~ z v;nvACn J NNE
C O o N ~ • c+ N a -' _'•
fD j
3 ••
` U ~
7 < Q d
Q G d C c 7 'T fD ~ fD
Q J• ^5 O O Z f
' Ct
~
•? (D
Z ..S w -S t0 "5 'C
O
+ -~ Cl (D O ~ Z
S
f1 Vl (D N ~ ~ ~
`
w w ro ~ J
w -~• N~ c c~ ~r -s p n o 's
ro ~
'' m ~
w c~ ~ --.
m
w ~n v ~• cn o -s
-n
v~
O ~ c in n o ~n c ~ ~-r -s o~ c+w
mm N
my
~ mx~ ro~o J m
3 arno~
N~rn~
~ ff
-sc
t0 w~ S
m o-m w N C
ro -s o ~ v ~ -'3 ~~ ~
~
D ,-r .-zo zn ~ - ~ oo .
w ~-F N i
< m
s
~~ 3 mn
~ o~ Q n J N 3 ~ ~ J
J. N
Sp
v ~ J. N O fD ~ J. '9
~ Iy'
~G '~i
~
~ ~
J
J.
~ ~ 3 ~ ct
7 ~ ~. ~
J•
h N
c
1~-1(.I I'~I`IlJ ~~~Ii It~~l~l'?I~`~I~~h hJl ~ P r
I
...- "7I~, .. ~I
,
~ ~~'I'
I i JI.JIf.J
I~JI~I~II.~IJiIrI n N
/
I
I '
~
~ l ~
I
I-- r=l~ 1 -~ ~~I~vli~l,l:,~~~ ~~Is~;IN~~~~INl~l~i~ `~W
IY- `^I;.I..; I~~f,Jl;`~I-I5;1~•31~J hJh.;I(JI.JI`,'I?JINIIJI- ~a
=- I I` I~`' i I f~~Ij~ Y'I~I~L~~ . ~~'~INI'~I~'I~ ~I~I}~I_ ~v,
~~~l
~IN ~I
~~I
~~I
~ ~
~
il~tJlwl a
~l
f
~
v
~
G ~
3
--I c
O J
.--' ~ Z Z Z I~ ~.
+~- C O O O
r 7 X 3 3 r-+ N W W W N N N W W t-• 1-+ r+ N N W W X
fD ID CJ fD v -~
-v -'•
o m
a
N
.. ~ J t' -.~..I,~ t rt
_~ ~=~-~ I I I , ~'"~~v~~-l~a~~~~l-z t`~~ry~~~I~JI~~I~~ r-oIN °-'.
~~„ ~
~~
m ~o
~V
W
p
m ~
~ =io
l) H:L
r- r x
'-~
cn ~ D
x r z
R7' O D
m -i o
~ m 3
zm
-i z
N=-1
t MEMORANDUM
T0: Pitkin County Planning and Zoning Commission
FROPi:. Richard Grice, Planning Office
RE: Highlands Subdivision
DATE: September 14, 1978
This application requests general submission approval of the Aspen Highlands
Subdivision, Filing 2. The 11.64 acre site is currently occupied by the
W.V.N. Jones residence. Mr. Jones desires to further subdivide his homesite
in order to create eight additional single family sites. The site is zoned
R-30 and is surrounded on three sides by the previously approved Aspen High-
lands Subdivision, Filing 1.
The following is a summary of Planning Office and referral comments:
i. Geologist, Nick Lampiris, states that, "there are essentially no c;eo-
logic hazards associated with this tract. The lot layout is excellent
from a geologic point of view, even to the point of allowing for green
space in the southwestern most corner of the property below the dam
for the large pond there; this is the only spot on the acr°F~.ge that I
recommend leaving undeveloped because of the chance of dam failure
under certain combinations of adverse conditions. I recommend that
soils testing be performed for purposes of foundation design. This
is an excellent site for additional development with little or no
impact on the environment."
2. Visual impact of development of the eight homesites would be minimal.
The development would not be visable from anywhere except within the
subdivision and from the Highlands lifts.
3. IJater for the proposed development is to be supplied by the Aspen
Highlands water and Sanitation district. At the present time, in
addition to supplying the water needs of Asoen Highlands Subdivision,
Filing 1, the district also supplies water for the Highlands Inn,
Maroon Creek Lodge, Chamonix Condominiums, Heatherbed Lodge, and the
Highlands Base facility. The application indicates that in order to
supply the necessary vaater for Filing 2, it will be necessary to in-
crease the storage and treatment facilities of the system to a capacity
of approximately 282,000 gallons. Adequate water rights to meet these
expected needs are indicated as being available, however, no evidence
has been presented that these water rights exist and we do not know
if they are dedicated to agriculture or domestic uses. We have received
comment from the Highlands Water and Sanitation District. The Board of
Directors state in their letter of June 29, 1978, that the District
would be unable to extend service to the proposed lots at this. It
appears that the HWSD does not have sufficient capacity to meet the
water requirements which would be needed in the event the District's
size was increased by eight homes." Furthermore, they note signi-
ficant errors in estimates of the daily demand of the district in
the report of Sterling Associates.
4. Aspen Metro has commented as follows, "there will be no problem in
providing sanitation services to the subdivision as the existing trunk
lines that are already there have sufficient capacity to handle this
proposed development and substantial excess capacity exists at the
sewage treatment plant."
5. As of the time of this writing, we have no comment from the County
Engineer regarding the proposed road design and layout. The appli=.
cation indicates that construction will be in accordance with County
standards.
-,.. _ ~_
_ ,_ _ .
Memo to County P&'I. ..,.
' Highlands Subdivisior;
September 14, 1978
Page Two
The County Trails Master Plan calls for a trail through the Aspen
Highlands subdivision which would connect existing trails. A con-
dition of approval should be the dedication of a trails easement to
the satisfaction of the County Engineer.
6. All utilities are available. Mountain Bell has requested specific
phraseology which should be used on any future submissions. They would
have all access roads as well as those portions of real property which
are labeled as utility easements dedicated to the public utilities.
7. The proposed subdivision is located on an existing mass transit route.
8. With regard to the Housing requirements of the Land Use Code, the appli-
cation indicates a willingness on the part of P-1r. Jones to purchase
existing units, construct new units, or make payments to the County in
lieu thereof. These offers are based on the assumption of eight free-
market units and four additional PMH units. No specific committments
are made within the application. lJithout specific committments vae
must conclude that Section 5.30 of the code has not been complied with.
In summary, the site is nearly perfect for development. There are no geologic
constraints, no visual problems, and the proposed density is only slightly
more than half of what the R-30 zoning would allow. The location is within
walking distance to schools, skiing, parks and mass transit. Hov+ever, with-
out specific compliance with Section 5.30 we expect that the application will
not score well. Due to the non-compliance with the housing section, the
Comrnission should reject the application based upon Section 5.90.03 b, unless
you find the subdivision to be non-exclusionary. The Planning Office does
not support this argument.
sr
_ } _.
._.
_,_
=-~
-_ ~ ~ jo
~~
.~~ .
~:+~ i~:
c
ArPENDIx II
PITIi:IN COUNTY
LAND USEAPPLICATION FORM
TU BE COMPLETED IIY APPLICANT:
. C,1 i ~ t. c ~ _ ; ~tt;: r.
- .~ d_.-.~1.~ __?.8_.
_ ..
PROJECT P]UI9BL'~{Ni~Ff
Section/Parbel' ••.____„-
DnTE suBtar~TTED
NTL':tE ill///PR=E lii4rv NESS ~.y~ 71~~
ADDRESS ~D • BOX T ~ ~~~N ~~~~ B~~ /~
PHONE yzS ' 5300 =
NAME OP PROJECT _~F=/J ff'/lff'C/}il/DS ~UF>j~/y/~i/D>/ '~ F~~~ -
PROJECT LOCATION: (On attached sheet, locate on zoni_ny map, showiny boun:laries
of any natural hazard and resource areas, any other special
regulatory districts, Section 5, Land Use-Code; and locate
on appropriate CSU/ERA Maps any areas not covered by the
' above.)
. ;'
TOTAL AP.EA . //~ 64 ~GJ°~ ~ -
Ex1STING UsE (s) - 5/i~l6cE ~~'ni`y ~~ioF.~17~- .
PP.OPOSP.U USE(S) -S/~~ `~1/L~/ /~$'/,D~,q/TJ~ ,7~ :~
(appropiiate square
footage for each) ~ d~ s~ /t1/~1.'• _
PRESENT ZOtr'ING OF SIT.': ll`
DESCRIPTIGN OF LAUD USE PROPOS.~L ~P-8~5~ ~ G///dam ~X~ST/~ ~/TF
/Nr N/NE ~9) `~nrf~E ~fh'et~.y %lr~z~ /~e~~a~~ ~'r~ /uoa~ ouru~%~/i
W yni c-~n/~S /mss/~~•yc~
TO BE COMPLETED BY THE PLANNING OFFICE
TYPE OP APPLICATION:
REZONING SUBUIVISIO:d
~ / P_U.D. EXE::PTION
SFL'.CIAL KIiVIi.W 35-acre + SUBDIVISION
BUILDING PERMIT F.EVII3[J
. 7
tSVIE[1 FHASE: FRE-APPLICATION __~~'~~J ~=`"~~`. D.lTE CO>;PS1i'I'i'.D
GEN1iPvlL SUR^IISSION P.C_ nC`1'ION DA'79~
BOnRU AC'PION llATI:
DETnILED SUBMISSION F.C. ACTION D,'~'1'E
BOn1:D ACTION DATIi
FINAL FLAT IIOnl1) ACTION Un'1'i:
i ~~
r'
.< ~
l:p(+cndix F:
' I'1TKI:I COCNTY LANll USL APPLICATION FORPI
1.
~2.
$.'oz.oi 6
• /
g•a z ., I a
3.
SUMMT+RY OF FItIDINGS ]t3?QUIRP:D P.Y RliVI1:47 PIIASF. '
Directi_on_s_: Any app].i.car.t for. a develcp:nent requiring a permit and^r
this code shall be responsible for showing conformance with any applicable
policies of Section 2 as listed below. The applicant shall submit those
requir.erne,-its necessary to show conformance with these policies and the
related general regulations of Section 5. Upon suhrnission of the applica-
tion and all submission contents, the Planning Office shall distribute
same to appropriate referral agencies which shall indicate its certifica-
tion or non-certification of the proposal as being i.n conformance with
policies and as satisfying submission requi.re¢+ents and revie.r guidelines
of relevant gcreral regulations. Referral agencies shall also indicate
whether further study in a ld*_er review phase is required a:.d any further
recorr~ enda*_ions or conditions, attac%t_ng ccr:,rnents and returning same to
the Planni,^.g Office.
OCAL REC1IiY1- CERTIPICATI0:Q ~CO::DITIG:'
STliDY P,EQCIRED POLICY FACTOR IhG STAFF YES NO AND
~ INITIALS DATE ~_y:,r.;f;_,;P
' / LIONS
PA GS D~ FP'< Not inconsistent: 1'12nning
/ with Piaster Plan t Office
- -~/- - - Rate of Groc.th ~
~
-
- - Hazard <( Resourc es Planning
Areas Office
Geo].o~ic /
~~ ~{~ 'i
~
!
i•l Jp `n-r~ ~
~ ~
hazards .
.
F].oodplains
Riparian
Areas
]cildlife
t;ildfire ~
Radiation
/ Soil.s/Lrosioa~ Countv Es-
• (2'~a'_t"_C~ Il,i;~~ (,,,~ 1~ tension
r r . ,._ ~
t
`
~ .Agent
,
~
' e r r j
5~ I I
t i
~ Extractable ~F`]anning
- - Resources i Of.ficc 11
Nincral
~
Vr;otable ~ I
~ O[hcr
* I'A = 1'ro-;lppliraci<+n US = Drt:+ilcd Sulnnission
GS = General Submission FP =Final 1'1nC
i ~~
~'
.. .
~/
J.D%
S.~.S
J . 2n ~
APpendir, li
PITKli~ COUNTY LAND USE Al'PhICATIO:I FORi4
,
STUDY REQUIRED POLICY FACTOR hOCAL REVIEW- CF.P.TIPICATIO:d CO:iUITlOWS
I}IG STAFI' YF•.S NO AiID
INITIALS DATE RLCO;4'QENUA-
TIONS
4. PA CGS DS FP Agricultural Planning
Conservation Office
i
5,
~ Scenic Planning
_
_ _ Quality Office
Elie{ ~ J i`.CrJ~, rr
I) ~l) h Cr (..}a~ (~ r`:
6. ~/ Water Supply Environ-
_ _ mental
!t t
I;.~'.1~~-; i~~~~/li i
Health
U
7,
~ Sewage Dis- Environ-
_
_ _ posal mental
k .,i~ Health
i
$, Noise Environ-
~- - - mental
Health
9. Air Quality Environ-
_ - - mental
Health
p, }listoric/ Historical
_ - Archaeolo;;ical Society
Resources
• r ~.._. ,
~,
~'
Appendix B
PITKIW COllid'Pf LAND USE APPLICATION FOIIhi
S~~
.~.03 -o/
w"\ +/
~L~l
STUDY REQUIRLU POLICY FACTOR LOCAL REVIIi4;- CERTIFICATION CONDITIONS
ING STAFF YES NO AND
~
' INITIALS DATE REC0:4`;ENDA-
T1oNs
PA GS DS FP
11. ~ Roads/T'rails De- County
sign & Construe- Engineer
tion Impact on -~,~~I~~ S~~
Road system
Maintenance pro- ~ tt
~. it
i~;f-'
~~='•i ~~
,~..E/ a c'i.:
w.:^"
visions ``
'Ji (CU~ -'," til/.~/. '.h-%-`. t`?i ~•titl~ r`a't
-t._E l
12~~
e
~ ~ Drai.nage County
Engineer
~
~
13. ~ Trans-
Impact on County
pprtation Engineer
f
E i
14. V Impact on Public Planning Office
Facilities/ -
Services
/ Solid k'aste County Engi.n--
~/ Disposal & eer
Collection
Fire & Police Sheriff/
Protection, Pire
Response DisCri.ct
' Service
Sanitary Land County Engin-
fills eer
i:ospital ilosptial
Capacity Board
Library Sub- Library
station Site Board
Post Office Postal
Substation Service
Site
~'
o~
-;
~. , ..
nPPcndir. II
PITKIN COU[~'LY LANU USE APPF.I:CATIGN FORM
8~3
~' ~
~~
S. ~o
t/
S., 9
STUDY REQUIRED POLICY FACTOR LOCH, REVIEW- CER'LIFI(:ATIOId Colu7lfrloNs
ING S1'AFP YES NO. AND
INITIAL DATE RECC::MEND7~-
• TIONS
PA • GS DS FP
~ Extension of Rocl:y Mtn.
_ _ utilities, Natural Gas
water and Aspen/Holy
sewer. Cross Electric
N,ountain Eell
Municipal Water
' & Sewer Uistric s
~
Public shops, County
Earages, yards Ifanager
7 ~
'
Recre~ign, Sites
' :c
+
i:
City Recreation
Di
p
,
,
~l rector
General Tax Cost/ County rr"finance
Eerefit Officer
~
15. _
_ _ _ Contribution to Housing
Housing Stocl: Coordinator
~ •
1G._ ~ _ _ ?far.-made Hazards Euildinr;
Safety Official
T7 ' f E~
17. _ _ _ F;ildlife Colorado Div.
Preservation of Nildlife
-y-
18. _ ~! _ __ Energy Ruil.ding
Conservation Official
19.__ ~_ _ Water Resources Uistict tdatcr.~ I 'J~~ ~~~~
Impact Court r~~7
~~ ^ 1' -- ''\ '
v y
20.
-_ --_ -
- Fin:7] flat County I:uginocr,
_ l:0^t Ci1tS e1tt07: I1Cy, I'l.lll-
171111 Of f1CC I
CI
~~
M E M O R A N D U M
T0: Planning Staff
FROM: Karen Smith
RE: Metro GMP and Subdivision Applications
DATE: September 25, 1978
The BOCC set public hearings on all the five Aspen Metro Subdivision appli-
cations. Shellie, you should write one hearing notice and list the five
applications (November 13, at 2:00 p.m.)
The rest of the staff should advise your applicants that the hearings have
been scheduled and that the appeals session will take place on November 13
just after the General Submission session. The reason for this is that the
GMP (Section 5.90) Quota System says that any development application that is
awarded development allotment shall be deemed to have received General Sub-
mission approval. That's why we're allo~~~ing the BOCC to consider the gen-
eral submission first.
I think tiie can keep the General Submission public hearing fairly brief -
concentrate on the three that are likely to be eligible for development allot-
ments and enter the Planning Office memos to the record on the others. The
Board of County Commissioners will need to include conditions of general
submission approval on those that are approved fpr development allotment and
probably should note in the public hearing that they intend to do so after
development allotments are awarded.
sr
~,. Nicholas Lampiris, PhD
CONSULTING GEOLOGIST
PO 80% 10935
ASPEN, COLORADO 61611
(303) 925-6020 OFF. 923-2126 RES.
May 23, 1978
Robert Sterling Jr.
Box 97
Woody Creek, Colorado 81656
Re: Whip Jones Subdivision
Dear Mr. Sterling:
I have completed my investigation of the proposed subdivision of the
11.64 acres surrounding the Whip Jones home north of the Highlands
Ski Area. The acreage lies in the E'z, NWT, Section 74 (projected),
T. 10 S., R. 85 W., within the Aspen 7~z minute quadrangle, Pitkin
County, Colorado.
The property consists of rolling meadow interspersed with groves of
aspen trees and some conifers. There are several moderate sized ponds
in and around the property including the ore just west of the Jones
home which is more than an acre in area.
Poorly sorted material ranging in size from clay to boulders covers
the property. This is morainal material of the Quaternary age glacier
"b" which moved down the Maroon Creek Valley thousands of years ago.
The underlying bedrock cannot be seen on the property, but the geologic
map of Bryant (1971) indicates that the Triassic age State Bridge and
Chinle Formations, mostly red shales, siltstones, and sandstones, under-
lie the area. Bryant also infers a north-south trending fault near
the eastern boundary of the property but there was no surface indica-
tion of any faulting and at any rate the fault has been inactive for
millions of years. The general dip of the bedrock in this area is
20 degrees to the north.
There are essentially no geologic hazards associated with this tract.
Morainal deposits are quite suitable fir developmental purposes,
especially if slopes are not allowed to become supersaturated. The
few slopes within this property are not high enough to cause any
significant problem.
The preliminary lot layout was excellent from a geologic point of view,
even to the point of allowing for greenspace in the southwesternmost
corner of the property below the dam for the large pond there; this
is the only snot on the acreage which I recommend leaving undeveloped
Robert Sterling Jr.
May 23, 1978
Page Two
because of the chance of dam failure under certain combinations of
adverse conditions. Access, domestic water, and waste disposal
systems are already available for all the proposed lots. I re-
commend that soils testing be performed at a later date at the site
of each proposed home for purposes of foundation design.
This is an excellent site for additional development with little
or no impact on the environment. If there are further questions
please do not hesitate to contact me.
Sincerely,
Nicholas Lampiris /
Consulting Geologist
REFERENCE
Bryant, Bruce, 1971, Geologic map of the Aspen quadrangle, Pitkin
County, Colorado: U.S. Geol. Survey, Map GQ-933.
r
~,
i`
i
I
1
AUC-sU`iT ~ ••~ •vl`I;8
., -T"'~'
,•~~~nr~E~. r_ K~.e.-ter`.
L.S. `~ 184 '
,5~ ,.~~ ...,
•~
~ 1 ~
I•
~ ~~ ~
NOTE U71L17Y ANA RCCE'i5 EASEM>=N'~°~ NOT
PAR~f OF -THIy SURVEY,
k ~
i
~i
4
. 3
i
A
1
t
( -~
VIGIN{T'f Mi~p
~~'li,.F: ~ =.~ ?'il:...:
_~_
M E M O R A N D U M
T0: Aspen Highlands Water and Sanitation
Colorado Geologic Survey
Bob Nelson, Environmental Health
Jeff Davis, County Engineer
Dick Kienast> Sheriff
George Newall, Fire Marshall
Rocky Mountain Natural Gas
Holy Cross Electric
Mountain Bell
Aspen Metro Sewer District
Marc Danielson, Housing Director
Mt. Sopris Soil Conservation District
FROM: Planning Office, Richard Grice
RE: Proposed Aspen Highlands Subdivision, Second Filing
DATE: June 7, 1978
Enclosed, please find the complete General Submission for the second
filing of the proposed Aspen Highlands Subdivision.
This application is tentatively scheduled for review by the County
P & Z on July 5, 1978. It would be most helpful if I could have your
comments by June 28, the Wednesday prior. Thank you
sr
STERLING ASSOCIATES~ ~ ARCHITECTS
MEMBERS AIAPO. BO% 97 ZIP CODE B"I656 PHONE 3C3 923-468
May 31, 1978
Pitkin County Planning and Zoning Commission
Board of County Commissioners
Pitkin County, Colorado
Gentlemen:
..~
.~.
WOOOV CREEK, COLORADO
Enclosed herewith is information describing an application for re-subdivision
of a parcel of land containing approximately 11.64 + acres. This parcel is
presently in the ownership of the Aspen Highlands Skiing Corporation and is
located within the existing Aspen Highlands Subdivision adjacent to the Aspen
Highlands Ski Area.
The general character of the parcel is wooded meadowland containing a 1.18
acre pond which is presently used for water supply to the Aspen Highlands
Ski Area snowmaking equipment. The parcel is wooded with scattered areas
of immature aspen and spruce. The site is totally surrounded by lots and
built residences comprising the existing subdivision.
The parcel is well protected visually and is not visible from Maroon Creek
Road. The major outward views from the site are toward the Aspen Highlands
Ski Area. There are also good views up Maroon Creek from several of the
proposed sites.
The total parcel is presently under one ownership and does not represent a
conflict in terms of view or quality with surrounding residences. These
residences are of high quality and currently are subject to covenants and
restrictions. In order to maintain the present quality, these restrictions
will also be imposed on the proposed subdivision.
It is the intent of the owner to re-subdivide the parcel into nine lots,
each lot containing a minimum of 30,000 square feet of area in conformance
with present zoning requirements. One lot will contain an already existing
residence p~°esently occupied by lJhipple Van Ness Jones and the other eight
will be offered for sale.
As partial fulfillment of the application, there follows comment on various
aspects of the subdivision's impact on public services as required by the
pre-application conference with Ms. Karen Smith on October 25, 1977.
SECTION 2 - POLICIES
2.01. CONFORMANCE WITH ASPEPi AREA GENERAL PLAN
The parcel and surrounding lots are presently zoned in the R-30 category.
No exception to that category or use is requested. Each lot will contain
30,000 square feet of area minimum. This zoning classification is presently
recommended by the General Area Master Plan.
~...,.
Aspen Highlands Skiing Corporation Subdivision Application
Page 2
2.02. CONFORMANCE WITH OTHER LAWS
The development of this parcel of land does not violate any known laws of
Pitkin County, the State of Colorado or the United States of America.
2.03. NATURAL AND MANMADE HAZARD AND RESOURCE AREAS
A. The Colorado State University Resource maps indicate the possible exis-
tence of a fault adjacent to the property. Enclosed with the application is
a report prepared by Nicholas Lampiris, geologist, which addresses this
problem.
B. There will be no improvements made which will create dangerous conditions
for surrounding property.
C. Refer to A.
D. No identifiable natural resources of the county will be disturbed.
E. No nuisance or potentially dangerous activities will take place in the
subdivision (covenants).
F. No significant wildlife habitats exist on the parcel.
2.04. SOIL, SURFICIAL GEOLOGIC CHARACTERISTICS AND RADIATION
Adequate historical evidence exists from prior construction experiences to
show that no unusual structural problems will arise for improvements on the
parcel. The CSU resource maps show no identified hazard areas.
2.05. DRAINAGE
The parcel is naturally drained, both to Plaroon Creek and to the pond which
is then drained to Maroon Creek via the Lyeth-Jones pipeline. Please rer"er
to map.
2 06. ADEQUATE PROVISIONS FOR I~JATER NEEDS
The site is presently served by an underground water distribution system and
storage facility. Further analysis and comment is included under Section
5.25. Fire protection is available from this system as well as from the pond
on the property.
2.07. SEWAGE TREATP1ENT AND COLLECTION
The site is presently served by an adequate sewage collection system under
the jurisdiction of the Aspen Metro Sewer District and is presently monitored
by the Pitkin County Board of Health. Connections to the present system are
available from each site.
~.
Aspen Highlands Skiing Corporation Subdivision Application
Page 3
2.08. IMPACTS ON ROAD SYSTEMS
The road and access system to the parcel is in place. Extensions of private
easements to sites are indicated on the map. No additional impact on county
road services. will be required.
2.09. ROAD DESIGN AND CONSTRUCTION
The existing road system presently conforms to county standards and is pre-
sently maintained privately.
2.10. LOGICAL EXTENSION OF UTILITIES
See 2.07.
2.11. EROSION
Adequate landscaping of each residential area will assure that no accelerated
erosion takes place (covenants).
2.12. COMPATIBILITY WITH HISTORICAL AND ARCHEOLOGICAL RESOURCES
No historical or archeological sites exist on the parcel.
2.13. COMPATIBILITY WITH AGRICULTURAL LAfJDS AND OPERATIONS
No agricultural land exists on the parcel.
2.14. IMPACTS ON TAXES AND MANAGEPIENT OF NECESSARY SERVICES AND FACILITIES
Public services are already available to the parcel and surrounding residences,
therefore the quality of such services is not compromised. The taxing and
revenue impacts should be positive for the county since public service ex-
tensions and capital costs are not necessary.
2.15. HOUSING
The owner agrees to satisfy the requirements for moderate income housing as
specified by Resolution 74-87 (1974) by either the outright purchase of exist-
ing housing stocks, a cash payment to Pitkin County or the construction of
housing at a location adjacent to the developn.~ent at Aspen Highlands. Dedi-
cation of housing within the development itself would be out of character
with present surrounding development and the type of development anticipated
on the subdivision sites.
2.16. SCENIC QUALITY
The nature of the site topography, location and present roads and facilities
precludes additional scenic impact.
~.
Aspen Highlands Skiing Corporation Subdivision Application
Page 4
2.17. AIR QUALITY
No significant air quality impacts are anticipated. Conformance with existing
fireplace regulations will be practiced.
2.18. ENERGY CONSERVATION
All efforts will be made to conform or exceed the present county requirements
for energy conservation. The nature of the site precludes the use of active
or passive solar heating except, perhaps, for domestic hot water. There are
numerous opportunities on the sites to take advantage of slope conditions
to increase insulation values. The building areas on the sites are so arranged
as to prevent blocking sun exposures or views from other sites.
2.19. .TRANSPORTATION
The site is locabed such that Aspen Highlands ski buses and City buses can-
be used for town trips. The parcel is also close to existing and proposed
bicycle paths, cross country skiing and bridle paths. The net impact on
daily automobile trips should be negligible given the already heavy impact
of automobile traffic on Maroon Creek Road during the winter and summer.
Estimated additional average trips per day will be between 15 and 30 for
eight additional sites. Skiers from the proposed subdivision are within
easy walking distance of the lifts, negating automobile impact in that respect
for Aspen Highlands.
2.20. DEVELOPMENT OR EXPANSION OF SKI AREAS
Not applicable.
7_.21. COMPATIBILITY 4JITH EXISTING ADJACENT NEIGHBORHOODS
The proposal is compatible with adjacent neighborhood areas and will adopt
covenants and restrictions already exercised in the surrounding neighborhood.
2.22. WATER RESOURCES IMPACT
Water resources are not impacted by this proposal.
2.23. NOISE
No noise impacts are anticipated by this proposal.
2.24. COMPATIBILITY WITH ADJACENT OR NEARBY PUBLIC LANDS
Public lands are not impacted by this proposal.
2.25. GROWTH RATE, PHASING OR PUBLIC SERVICES AND FACILITIES
This proposal is minimum in nature and represents minimum addition of population
Aspen Highlands Skiing Corporation Subdivision Application
Page 5
to the planning area. Therefore, it is in general conformance to growth
rate policies. The anticipated rate of build-out in the development is two
units per year which is in line with recommended growth rates identified in
the Growth Management Plan.
SECTION 5 - GENERAL REGULATIONS
1. CONSISTENCY WITH MASTER PLAN RATE OF GROWTH
The proposal is consistent with Master Plan policies which indicate R-30
residential zoning. A projected build-out of two units per year is also
consistent with Growth Management Policy in the Aspen Highlands Water and
Sanitation District.
2. HAZARD AND RESOURCE AREAS
A. Geologic Hazards
Geologic hazard areas and underlying soils analyses are enclosed in the report
submitted by Nicholas Lampiris.
B. Soils, Erosion
Refer to geologic analysis.
5. SCENIC QUALITI'
A. Project Location
Refer to enclosed map entitled "Project Location."
B. Visual Vulnerability
1. Revegetation: Damaged areas adjacent to building will be repaired by
landscaping and replanting.
2. Topsoil: Topsoil will be saved and respread.
3. Weed Prevention: Not applicable.
4. Utilities: Utilities will be in roadway easements where possible.
Where not possible, vegetation will be reclaimed through planting.
5. Scenic Views: Building areas will be designated which take advantage
of scenic vie~vs and preserve views of existing structures.
6. Road Impact on Scenic Quality: The impact of the road system on
scenic quality is negative. Existing roads are already located such
that they do not interfere with any views from construction sites.
6. WATER SUPPLY, DSITRIBUTION AND TREATMENT
A. General Description: Distribution System
The existing water distribution system is through 8" and 6 steel pipe. One
Aspen Highlands Skiing Corporation Subdivision Application
Page 6
6" main is located in Gleneagle Drive and will serve the upper tier of lots
in the proposal--Lots 4, 5, 6, 7 and 9. Another 6" main exists along the
Westerly edge of the parcel and will serve Lots 1, 2, 3, and 8. Three street
cuts (Lots 4, 5, and 6) will be required. All other lots have access to water
mains on easements. At present streets are not paved, making cuts easily
accomplished.
B. Storage and Treatment System
The present system is capable of processing and storing 150,000 gallons of
water per day. In order to relate that capacity to present requirements
of the Land Use Code the following analysis is included:
USERS OF ASPEN HIGHLANDS WATER AND SANITATION SYSTEM INCLUDING PROPOSED LOTS
Domestic In-House Demands (Maximum Daily Demand)
Highlands Inn
150 persons @ 75 gallons per day
Maroon Creek Lodge
50 persons @ 75 gallons per day
Chamonix Condominiums
60 persons @ 75 gallons per day
Heatherbed Lodge
46 persons @ 75 gallons per day
Highlands Base Facility
Guests - 175 persons average x 6 hours per day x
5 gallons per day
Employees - 25 persons @ 75 gallons per day
39 Residences @ 300 gallons per day
TOTAL ESTIMATED DAILY DEMAND
Irrigation Demands
Assume each resident irrigates 5,000 square feet
39 x 5,000 x 7.48 = daily demand re: 5.25.O1.e.2
365 x 2
d.d = 2000 gallons per day
Fire Demand
Re: 5.25.O1,e,4,ii - assume population on system = 251-1000
11,250 gallons
3,750 "
4,500 "
3,450 "
5,250
1 ,875 "
9,300 "
39,375 gallons
Storage Cemand = 1000 gpm x 60 x 4 = 240,000 gallons
Aspen Highlands Skiing Corporation Subdivision Application
Page 7
Therefore, the total daily demand for all water uses is 281,375 gallons
Less existing capacity 150,000 gallons
Residual 131,375 gallons
Based on this analysis it will be necessary to increase the storage and treat-
ment facilities of the system to a capacity of approximately 282.,000 gallons.
The applicant therefore proposes to construct additional storage and treatment
facilities such that the total system is capable of handling 300,000 gallons
of water. Existing water rights and inlet capacities from Maroon Creek to
the system assure the ability of the applicant to accomplish this increase
in capacity of the system.
7. SEWAGE COLLECTIOiJ AND TREATMENT
The proposed parcel and surrounding sites are presently connected to and
served by the Aspen-Metro Sanitation District. There is an 8" collector
trunk located in Glen Eagle Drive which connects to a 10" main in the Ptaroon
Creek Road. This collector will serve Lots 4, 5 and 6 in the proposal.
Another 8" collector is located on the Northwest proposed site in an easement
provided for same. This trunk connects to an 8" main in Glen Garry Drive
and thence to the 10" main in I~iaroon Creek Road. This trunk will service
Lots 1, 2 and 3 in the proposal. Another 8" main exists on the Southerly
edge of the proposal in road easement and will serve Lots 7 and 8. This main
also presently serves Lot 9.
The total anticipated demand additional to the existing uses will be between
1120 and 1760 gallons per day. The peak demand periods will occur in the
morning and early evening in conformance with normal residential use. The
sewage system requires no extension or construction by Aspen-Metro. All
construction shall consist of tap-ons and connecting sewers to the residences.
11. ROADS AND TRAILS
A. General Comment
In terms of overall impact on the road system, the addition of 8 residences
to the existing extreme use experienced on Maroon Creek Roac'. is negligible.
Although earmarked for consideration on the application form by the Planning
Department, the applicant requests that, if found necessary, more extensive
analysis be deferred to the Detailed Submission phase of the review process.
Given the extreme impact on Maroon Creek Road by present recreational, tour
and school uses, analysis of the traffic contribution of the proposal does
not appear necessary at this time. The reasons for this are;
1. The proposal will not generate
the characteristics of the existing
county roads.
enough additional traffic to change
situation on Maroon Creek or other
2. The levels of service and safety are not affected by the proposal.
3. Nn capital costs are generated by the proposal.
Aspen Highlands Skiing Corporation Subdivision Application
Page 8
B. Road Design and Construction
Inasmuch as all access roads and streets presently in use conform to county
standards and are maintained by the county, Section 5.22, Road Design and
Construction, is omitted.
C. Trails
The proposed parcel is in the near vicinity of proposed bike and pedestrian
trails from Aspen through Meadowood to the Highlands as identified on the
CSU resource maps. Although the proposal is not directly involved with these
proposed trails, they will be easily accessible to the residents of the sites.
12. DRAINAGE
The proposed site has at present a well developed drainage system. All of the
lots in the proposal are naturally drained through a system of ponds and out-
flow pipes from the site to Maroon Creek and along well established barrow
ditch and culvert systems along the roads. The pond on the proposed site
collects runoff and drains it to a series of ponds on adjoining lower pro-
perties and eventually empties into f4aroon Creek. All pipes in the system are
12" diameter minimum. Please refer to preliminary plan. The proposed develop-
ment of this site will not affect this drainage pattern negatively. For this
reason the applicant requests that more specific analysis, if found to be
necessary, be deferred to the Detailed Submission phase.
13. IMPACT ON TRANSPORTATION
See 2.19.
14. Ih1PACT ON PUBLIC FACILITIES/SERVICES
A. General Comment
The proposal lies within already well established service areas for all public
facilities, service, solid waste disposal and fire and police protection.
Therefore, no re-scheduling or additional accomodations are necessary for
these services.
B. Extensions of Utilities, Water and Sewer
Water and sewer extensions are discussed under Articles 6 and 7.
C. Gas and Electrical Service
The proposed site is presently served with both high pressure natural gas and
electrical service adequate to serve the requested density.
1. Natural C;as: Proposed Lots 1 and 2 are served by a 3/4 h.p. gas line
existing in the private access easement for these lots. Lots 3 through
9 inclusive are served by an existing 3/4" h.p. gas line on the East and
South edges of the property. Please refer to preliminary plan.
2. Electrical: At present there is underground electrical service located
on the East, South and North edges of the property. It will be necessary
to extend service from the equipment to each lot in conformance with Holy
Cross Electric Association requirements.
Aspen Highlands Skiing Corporation Subdivision Application
Page 9
D. Parks Dedication
To be determined.
E. General Tax Cost/Benefit
On the basis of discussions relating to Articles 6, 7, 11 and 13 which indicate
negligible impacts on public service and utility extensions, the overall
effect on the tax structure should be beneficial for Pitkin County. The
improvements on the proposed sites are capable of producing on the order of
$8,000 to $10,000 per year added revenue. This figure constitutes a surplus
revenue condition to the county since capital improvement costs and services
are not commensurately increased.
15. CONTRIBUTION TO HOUSING STOCK
A. General Comment
There are 8 dwelling units proposed for the property under this application.
Therefore according to Code requirements it is required to furnish 4 additional
employee housing units to the housing stock or remunerate Pitkin County for
this housing. It is assumed that development of this project will have little
effect on current demand for low or moderate cost housing since the only
development taking place is residential construction which can easily be
absorbed by the existing contracting firms available in Pitkin County.
Additionally it is estimated that minimum increased demand is generated be-
cause of operational problems inherent in the proposal. However, in con-
formance with Growth h-0anagement policy the addition of four housino units
is indicated. It is contemplated that these housing units will be purchased
or contructed under the Code provisions for PMH housing at such times as to
conform to the development schedule contained in the proposal or payment to
the County will be made. Housing, if required, will be sold or managed under
those provisions.
16. MAN-MADE HAZ,4RDS
A. General Comment
The existing pond on the proposed site has been identified as a possible man-
made hazard. However, the pond is located in such a way as to be inaccess-
sible to the public and to the majority of the sites on the proposal. The
4lestern edge of the pond is heavily vegetated making access from that side
difficult. Accesses from the other three sides are gentle slopes-and are
readily visible from four of the proposed structure locations which give
visual control of the area. The pond not only serves as a drainage basin for
the site, but is an aesthetic focal point for the development. These attri-
butes outweigh any hazardous aspects that appear to exist.
18. ENERGY CONSERVATION
See comments for 2.18.
19. WATER RESOURCES IMPACT
A. General Comment
The proposal as applied for has no anticipated effect on groundwater resources,
neither adding or subtracting groundwater volumes nor altering the character
of such water resources.
CITY OF ASPEN
MEMp PRlO/1M RICHq}tD GRICE
~~ ~~
tnAE'1vF r^, y ~~, _ „ ~ f' , A
~~ L~
..<~y~,i_,~.t , ,<. ~
rJ
-'~----- "~` ~"'~a °l ,-t .lac,. ~
-`
-~.._
,~ ~ ~ ~~ ~_
S~~,Q~
~~,F i ~ ~~ `~ ~ r a .~~~4..~
°fr - d.
//~~~
CI T Y OF ASPEN
MEMO FROM RICHARD GRICE
r'
f'f~.t
<'~}rt '> ~
_£_~.~.{ C<.r
g~~~~ .~~. ~~
r~~ ~ t `~ A
__
.54
~ ~:~ r~~
' f ,~
1 n ~ ,~nn~~ /
C.., t.,~t C~
MEMO FROM RICHARD GRICE
~1~-12~-
.. ,.e
~1 ~ i
~ ~
CITY OF ASPE~`1