HomeMy WebLinkAboutpitkin.eh.246115300005 (1995)_MEMODocument Layout
(From Most Recent to Oldest Permit)
Permit
Application
Log Sheet/Notes & Photos
Communications
As-built Design
Engineer Design
Soil Information
Floor Plans
Water Permit & Information
Land Use Approvals
Second System on property
Third System etc
(All relevant older documents in the same order as above)
(A red sticker will be placed on both sides of the file tab when doc. is scanned)
1~ 4l -! 53-vo -va ~
.~ ,
~_~
MEMORANDUM
To: Ellen Sassano, Planning Office
From: Nancy MacKenzie, Environmental Health Department ~'L~~
Through: Lee Cassin, Assistant Environmental Health Director
~r`,ec_
Date: April 20, 1995
Re: Balcomb/Stephenson 1041 Hazard Review & General Submission
Parce( ID # 2461-153-00-005
The Aspen/Pitkin Environmental Health Department has reviewed the details of the
Balcomb/Stephenson application under the authority of the Pitkin Countv Code Land
Use Code and has the following comments.
ADEQUATE PROVISIONS FOR WATER NEEDS: Sections 2-17 and 3-1104:
"It is the policy of the Comry to insure the availability of a water supply of adequate quality, quantity, pressure and dependabilityfor
fire protection and support of a proposed land use prior to approval of the use. The County shall require land uses to hook up to
e~dsting public systems if serviceis available."
The application states that the water source shall be from a well or the existing spring
and pond or hauled in. This Department needs adequate information on the quality of
water available. The applicant must ensure that the water quality is acceptable by having
it tested by a lab such as Snowmass Water and Sanitation. Before the Septic permit can
be issued the water source must be identified (and if this will be a well, the well must be
drilled) to assure that setback requirements from the well to the septic system can be
complied with.
A condition of approval for this application is receipt and approval by the
Environmental Health Department of information documenting that the water
source and quality of the water meet rnunty regulations.
1
,.
SEWAGE TREATMENT AND COLLECTION: Sections 2-18 and 3-1105:
"It is the policy of [he County to insure that adequate sewage treatment facilities are available to serve existing and new developments.
Public and private sewage disposal systems and connectionsto such systoms shall compty with the sewage disposal guidelinesof Pitldn
County Code Title X."
Lots in the Spring Gulch area are served by individual septic systems. All such systems
installed within Pitkin County require permits issued by the Environmental Health
Department, and must comply with the County regulations. To receive a Septic Permit,
the applicant will need to submit a Septic Permit Application and appropriate fee. A
completed Soil Data Form including pert test results and profile hole information
stamped by an engineer, is required. It must be possible to design an adequate
wastewater disposal system before a building permit can be issued. The septic system
must be located in area that is not an avalanche zone and within the building envelope.
"Outhouses"are not allowed, but vault privies or composting toilets are allowed. They
must be accessible for pumping.
The method of disposal of other waste water, "grey water", from the cabin must be by a
minimum 750 gallon septic tank with its own leach field.
The Aspen/Pitkin Environmental Health Department will design the system for the
applicant as part of the permit fee, unless an engineered system is required, which we
determine based on soil test results.
We believe it will be possible to install a septic system on this lot based on review of the
survey map. Such a system will not be able to serve any "stores"as mentioned in the
application but would only be sufficient for a cabin with minimum facilities and part-time
use.
A condition of approval for this application is the receipt and approval of the
septic permit by the Environmental Health Department before a building permit
can be issued.
WATER QUALITY TMPACTS: Sections 2-14 and 3-705 and 3-710:
"I[is [he policy of the County w hrccivc and protectits present water resources. To [his end it is the policy of [he County that no
land use be initiated which would adve rsc ly affect the quantity, quality, or accessibilityof [he County's water resocrccs;or which would
occurat the expense of establishedwarerdependentagriculturalactivities;or which would result in increasedsalinization of water
resources,loss of minimum stream flows, further destructionof wildlife habitat, or major expendituresto reacquireor redistribute
major water resources. I[ is also the policy of the County to maintain a natural vegetativehuffer along its surfacewaters suchthat the
surface and groundwa[ersof [he :r,~ea arc trot encroachedupon by land uses or other human activi[ieswhich could cause deterioration
of water quality or impair the nat. iral treatment processesprovided by meadows and wetlands."
The Environmental Health Department will be addressing impacts on down stream water
quality.
2
,~~
.,.,
A condition of approval for this application is: NONE
AIR QUALITY: Sections 2-13 and 3-602:
"Onlythat developmentis permitted whichwill not contributesignificantlyto degradationof air quality in )'itkin County.
Developmen[smay no[ consdtu[e an indirector direct air pollution scurceunder Federal, State or County regulations."
This project is not expected to contribute significantly to degradation of air quality in
Pitkin County.
The applicant must file a fireplace/woodstove permit with the Environmental Health
Department before the building permit will be issued. The less densely populated parts
of the county like Spring Gulch may have one wood burning fireplace and one
department certified device or two department certified devices per building. In addition,
unlimited numbers of decorative gas appliances are allowed. Coal may not be burned in
any device. No wood burning device may be installed in barns or agricultural buildings.
A condition of approval for this application is the receipt and approval of the
fireplace/woodstove permit by the Environmental Health Department before the
building permit can be issued.
CONFORMANCE WITH OTHER ENVIRONMENTAL HEALTH LAWS: Section 2-
Z
"[t is the policy of the County to ensure that no use or development of land is permitted which is in violation of the laws of the
County, [he Slate of Colorado, or the United States of America."
This Department is not aware of any issues of concern regarding other environmental
health laws.
.. E1dV:WP:[.AND USE:1A6115300005.balcomb
~-
3