Loading...
HomeMy WebLinkAboutpitkin.eh.246523101008 (2003)/ 20 0 GRAPHIC SCALE / \ 20 40 810 / \ ( IN FEET) / / F 1 inch = 20 fL / DISTRIBYITION PIPE TO BE INSTALLED WITH A/ MAXIMUAM/SEPARATION OF 6' BETWEEN PDIS E TI /THE OUTSIDEI EDGE3OF BED. / GRADE ADJAC,ENT UPGFRADIENT - SLOPE TO DIVERT POTENTIAL DRAINAGE -AWAY FROM FIELD / EXISTING TREES YOO, HEADER, PIPE i ��TRI Eg (TYP. / SEWAGE UNE FROM HOU �- /TWA-yvAY // EXIST. GARAGE Q- i C/L/E 0vt / (ISTING SEPTI T TO BE i REMOVED i II PROPOSED 200 GAI SEPTIC TAN ' W/ EFFLUENT Fl TER (PROOSEDDIl7 / \I EXISTING PARKING / / J EXIST. HOUSE \ / / I \ \ 1 I I\ GROUND SURFACE DRAINAGE SWA I TO KEEP RUNG FROM THE FIELD 24' OVERALL WIDTH OF NEW ABSORPTON 3UON UNE NSPECTION PORT (TYP.) lo'ADD ADDITIONAL SOLID �4" PVC HEADER PIPE \ ADD AN ADDITONAL 426 SF OF ABSORPTION AREA TO EXISTING FIELD. PLACE NEW 6' WIDE BY 71' LONG ROW OF GRAVEL AND APPROX. 65' OF PERFORATED / DISTRIBUTION PIPE TO PROVIDE A TOTAL OF 1704 SQ. FT. OF ABSORPTION BED AREA. INSTALL NEW GRAVEL AND PIPE LEVEL TO AND ADJACENT TO / EXISTING BED. THE EXPANDED BED MUST MEET ALL COUNTY SETBACK REQUIREMENTS. THE EXISTING HEADER PIPE TO BE MODIFIED TO PROVIDE FOR NEW DISTRIBUTION PIPES FROM A NEW DISTRIBUTION BOX. / XI�T. DGE LOCATION OF EXISTING ABSORPTION FIELD IS STING OF GRA EL APPROXIMATE. ACTUAL LOCATION WILL BE ABSO 10 XIST. PERF. DETERMINED DURING CONSTUC)16N AND WILL BE 24' F x71' DIST. PIPET\ DELINEATED ON RECORD DRAWING. SOIL 1 / \ / CONDITIONS WILL BE VERIFIED DURING CONSRUCTION OF ADDITIONAL ABSORPTION AREA. \ WIDTH AND LENGTH/ OF ADDITIONAL BED / EXISTING TREES AREA MAY BFyADJUSTED IN SYMETRIC i � \ RELATION Tff THE EXISTING FIELD AS LONG AS A MINIMUM OF 1704 SQ. FT. \ OF ARjX IS PROVIDED. / EXISTING DRIVEWAY FLOW SPUTTER r i DISTRIBUTION BOX / �72 / / AS REQUIRED SLOPE TO D REVEGATATION TOPSOIL LAYER -2„ DIAM. PERF. PV SCHEDULE 40 (TYP.) SCREENED BACKFILL LAYER FILTER FABRIC NATURAL ONSITE SOILS FREE MIRAFI N-140 BOTTOM OF BED 12" GRAVEL BED OF GRAVEL AND ROCKS IN (OR APPROVED EQUAL) EXCESS OF 2 1/2" DIAMETER UNDISTURBED SOIL CROSS SECTION ABSORPTION BED DETAIL N. T. S. DISTRIBUTION BOX LID AT GROUND SURFACE 110/1111 Y:N 1 a 4" DISTRIBUTION GRAVITY LINE "SOLID PVC GRAVITY FROM SEPTIC TANK NVERT IN DISTRIBUTION LATERALS (TYP.) TO ABSORPTION TRENCHES FLOW SPLITTER BASIN DETAIL N.T.S. TWO WAY CLEAN OUT PROPOSED GRADE— EXISTING GRADE EFFLUENT FILTER �\ OU=ET TEE \ EFFLUENT DISCHARGE LINE AT MINIMUM 2% SLOPE FLOW SPITTER BASIN DISTRIBUTION LINES AT MINIMUM 27 SLOPE PROPOSED HOUSE -EFFLUENT DRAIN LINE AT MINIMUM 2% SLOPE TANK CROSS SECTION SLOPE DETAIL N.T.S. GENERAL NOTES: 1. THE OWS SYSTEM AS SHOWN ON THE PLAN AND THE DETAILS WERE DESIGNED BY SOPRIS ENGINEERING. THE EXISTING LOT CONDITIONS AND SURVEY INFORMATION WAS PROVIDED FROM A SURVEY BY ASPEN SURVERY ENGINNERS. 2. THE CONTOUR INTERVAL ON THIS MAP IS 2 FEET. 23046.01 23048-OW,.MVC 15/12/03 ISDS SYSTEM NOTES 1. ADD A TWO-WAY CLEAN OUT ON THE SERVICE LINE FROM THE HOUSE. 2. ALL MATERIALS AND INSTALLATION SHALL CONFORM TO PITKIN COUNTY INDIVIDUAL SEWAGE DISPOSAL SYSTEM (ISDS) REGULATIONS. 3. ALL SEWER LINES TO BE SDR -35 OR SCHEDULE 40 P.V.C. PIPE UNLESS NOTED OTHERWISE. 4. THE CONTRACTOR SHALL ENSURE ALL SEWER LINES AND SEPTIC TANKS ARE WATERTIGHT. ANY POTENTIAL PLUMBING LEAKS SHALL BE REPAIRED TO AVOID EXCESSIVE WATER ENTERING THE SEPTIC SYSTEM. 5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATIONS OF UTILITIES PRIOR TO CONSTRUCTION AND EXCAVATION. 6, THE ABSORPTION FIELD MUST BE MARKED AND PROTECTED TO PREVENT DAMAGE FROM VEHICULAR AND LIVESTOCK TRAFFIC. 7. THE TANK SHALL BE INSTALLED LEVEL ON COMPACTED EARTH. INSTALL WATERTIGHT RISERS AS NECESSARY TO BRING ALL REQUIRED ACCESS POINTS TO THE FINISHED SURFACE GRADE. INSTALL THE INLET AND OUTLET TEES TO BE EASILY INSPECTED AND MAINTAINED FROM THE TANK RISERS AND ACCESS LIDS. 8. THE ENTIRE ABSORPTION FIELD SURFACE MUST BE SODDED OR RE -VEGETATED WITH GROUND COVER, 9. THE ABSORPTION FIELD SURFACE MUST BE GRADED TO DIVERT SURFACE DRAINAGE AWAY FROM THE FIELD. 10. THE DIMENSIONS SHOWN ON THE PLAN INDICATE MINIMUM AREA AND SEPARATION DISTANCES FOR THE ABSORPTION FIELD. 11. THE FIELD SHALL BE LEVEL AND PLUMBED FOR EQUAL DISTRIBUTION. THE ADDITIONAL ABSORPTION FIELD AREA TO BE INSTALLED ADJACENT TO THE EXISTING FIELD AT THE SAME LEVEL. 12. THE MINIMUM DEPTH OF GRAVEL TO BE 12" OR MATCH EXISTING FIELD IF GREATER. THE UPGRADIENT SLOPE ADJACENT TO THE FIELD TO BE GRADED TO DIVERT POTENTIAL RUNOFF AWAY FROM THE FIELD. 13. THE PIPE AND GRAVEL BED WILL BE BACKFILLED WITH EXCAVATED MATERIAL VOID OF ROCKS, THE BACKFILL MATERIAL SHALL NOT EXCEED 2 1/2" DIAMETER AND SHALL BE PLACED TO AT LEAST 6 INCHES ABOVE THE TOP OF THE GRAVEL. THE TOP OF THE PLACED GRAVEL DISTRIBUTION LAYER SHALL BE COVERED WITH A LAYER OF FILTER FABRIC. A MINIMUM 4" DEPTH OF TOPSOIL IS TO BE PLACED ABOVE THE BACKFILL TO THE SURFACE. THE EXISTING FIELD GRAVEL SHALL BE REPLACED AS NEEDED IF CONTAMINATION BY EXCAVATED BACKFILL OCCURS. 14. VERTICAL INSPECTION PORTS SHALL BE INSTALLED FROM THE ENDS OF THE PERFORATED DISTRIBUTION PIPE INSTALLED IN THE NEW ABSORPTION AREA. (TYP. EACH END). AN ADDITIONAL INSPECTION PORT TO BE INSTALLED AT THE HEAD OF THE OPPOSITE SIDE OF THE FIELD. 15, THE CONDITION OF THE EXISTING FIELD TO BE INSPECTED DURING INSTALLATION OF NEW DISTRIBUTION LINES TO THE HEAD OF EACH EXISTING PERFORATED DISTRIBUTION PIPE. DISTRIBUTION SYSTEM NOTES: 1. AN EFFLUENT FILTER SHALL BE INSTALLED,QAI- THE...DISCHARE TEE IN THE SECONDARY COMPARTMENT OF THE.,1000 GAL+ SEPTIC TANK. FILTERED EFFLUENT WILL DISCHARGE TO A DISTRIBUTION BOX. EFFLUENT WILL BE EQUALLY DISTRIBUTED TO THE ABSORPTION BED'S PERFORATED DISTRIBUTION PIPES VIA INDIVIDUAL 4" DISTRIBUTION LINES. 2. WE RECOMMEND THE INSTALLATION OF AN ORENCO SYSTEMS 4" EFFLUENT FILTER CONTAINED IN A 4" BAFFLE OUTLET TEE. THE FILTER SHOULD BE INSPECTED EVERY SIX MONTHS. MAINTENANCE SHALL INCLUDE CLEANING THE FILTER EVERY SIX MONTHS MINIMUM AND AFTER PERIODIC PUMPING OF THE TANK. 3. THE DISTRIBUTION SYSTEM SHALL DISTRIBUTE FLOW EVENLY TO EACH BED ROW. THE MINIMUM SLOPE OF THE DISCHARGE LINE FROM THE TANK TO THE DISTRIBUTION BOX SHALL SHALL BE INSTALLED AT A MINIMUM 2% SLOPE. THE INDIVIDUAL DISTRIBUTION LINES SHALL BE INSTALLED AT A MINIMUM OF 2% SLOPE. 4. ALL DISTRIBUTION PIPING, CONNECTIONS AND FITTINGS SHALL BE TIGHT AND INSTALLED TO INSURE EQUAL DISTRIBUTION THROUGH THE SYSTEM. ADDITIONAL NOTES: 1. THE PERFORATED DISTRIBUTION LINES IN THE MOUND NEED TO BE LAID IN A 12" LAYER OF WASHED GRAVEL WITH DIAMETERS BETWEEN 0.75" AND 1.5". 2. THE PERFORATED PIPES NEED TO BE LAID WITH THE TOP OF PIPE 2" BELOW THE TOP OF THE GRAVEL LAYER AND WITH AT LEAST 6" OF GRAVEL BELOW THE BOTTOM OF THE PIPES. 3. A MINIMUM OF 2' OF SUITABLE ONSITE MATERIAL, NEEDS TO BE PLACED BELOW THE GRAVEL DISTRIBUTION LAYER IF LARGE BOULDERS ARE ENCOUNTERED THAT NEED TO BE REMOVED.. 4 THE DISTRIBUTION BOX WILL BE INSTALLED TO INSURE EQUAL DISTRIBUTION TO THE BED'S PERFORATED DISTIBUTION PIPES. WE RECOMMEND THE INSTALLATION OF AN ORNECO SYSTEMS FLOW SPLITTER BASIN WITH THE RISER EXTENDING TO THE SURFACE. 5. GRAVEL AND FILL MATERIALS TO BE APPROVED BY THE ENGINEER. OPRIS ENGINEERING, LLC. 502 MAIN STREET, SUITE A3 CARBONDALE, CO 81623 (970) 704-0311 NO.1 DATE I REVISION BY LOTS 2 & 3 NYSTROM SUBDIVISION 909 W. SOPRIS CREEK ROAD PITKIN COUNTY, COLORADO KELLY OWS SYSTEM ONSITE WASTEWATER SYSTEM SITE PLAN AND SYSTEM DETAILS DES. PER CK. YTN I FILE NO. 1OF SHEET 1 DR. PER DATE 5/12/03 23046.01 1