HomeMy WebLinkAboutpitkin.bldg.247318200002If there are
OCUMENT
LAYOUT
of occupancy or Letter of Completion
(most recent project)
Permits
Final Inspections
Any Supporting Documents
Site Plans
(no architectural plans)
projects they will follow in the same order.
ak(w 6/0041 1 i --
ELECTRICAL PERMIT APPLICATION 3
PITKIN COUNTY COMMUNITY DEVELOPMENT
130 S Galena St Third Floor Aspen CO 81611
INSPECTION LINE 970. 9205532 PH: 970 - 920 -5526 FX: 970 - 920 -5439
PERMIT NO. (Office Us Only)
JOB ADDRESS
6 a5' L�
OWNER ��- 1 p L }, mGrl I (1 A PHONE
H
E CONTRACT _ MAILING ADDRESS # PHONE
- w %,k lr�. ��k Ate- //0 9127-�9�a
BUILDING PERMIT # OCCUPANCY GROUP
ELEC CAL VALUATION
SQUARE FOOTAGE
00, CIO,
USE OF BUILDING
❑ COMMERCIAL
iff RESIDENTIAL
CLASS OF WORK
❑ ADDITION
❑ ALTERATION
❑ NEW
❑ NSTRUCTION
13 SOLAR
PLOTHER
1
SERVICO
CE
DESCRIBE WORK IN DETAIL (For additions, auerations, Indicate type, number and location of source of circuits)
!R,gJace
A&zL S e%v {cam..
e-k-�- I
Z - - f'Z14 3y
OWNER/APPLICANT: The undersigned applicant to personally perform electrical work on the described property or residence hereby certifies, as a condition of issuance
of such permit that the above described property or residence is owned by the applicant that the applicant is not engaged in the business of construction or remodeling; and
such property is not intended for sale or resale, nor is it rental property (occupied or to be occupied by tenants, whether transient or permanent), nor will it be generally open
to the public. It is understood that compliance with these assurances is a condition of the issuance of an electrical permit to the applicant pursuant to the provisions of C.R.S.
Section 12- 23-111 (2) (as amended), and that failure to comply herein will be grounds for revocation of the electrical permit or any certificate of occupancy issued with respect
to the property or residence described.
Owner /Applicant Date:
PAYMENT OF PITKIN COUNTY USE TAX
Use Tax
Permit Fee
Double
The General Contractor or Owner Builder is required to pay a Use Tax Deposit to Pilkin County
(.5 %) on the building permit valuation at time of issuance. All sub-permits pulled under a building
permit are paid by this deposit payment and should not pay Use Tax. Stand alone sub - pennits are
required to pay a Use Tax Deposit to Pitkin County (.5 %) Deposit .5% or 50% or project
valuation. -
Approved by Fire Marshall ❑
Exempt: Exempt Organization
Date:
Materials Valuation $
Approved by HPC ❑
Resale: Stab & Pill
Property liens may be placed on the is and/or the contractor's property
Date:
when Use Tax Is not paid.
ELECTRIC
For all work done under this permit the perm'
CONTRACTOR
accepts full responsibility for compliance with the
Building De art n Ac to
National Electric Code and County resol ,
andlor stale laws, whichever applies. Permit
subject to ' or suspension
el shall obtai to
of any governing same. An accepted final
g the electrical system. A final electrical
Approved By:
in req urs
rcompleting an alectrice installation.
Date:
Permit Val dation.
,{
,z ,/4
pate
ei,,A�
S nature of Applicant
a� o
Date
5�25I10
Receipt #
29 3oz
Total
$
Print Name
i 4 f?
InspCLisLrpt
5I26I2010- 8:26:44AM
Permit#
0066.2010.PELE
Type: 223
Comments:
Inspection Check List
COUNTY OF PITKIN
Scheduled for May 26, 2010
Inspection Line:920 -5532
INSPECT PERMANENT SERVICE Time: 12:00
Notes:
1 - Accepted 2-
Reinspection Fee $
24605 FRYING PAN RD
Cpptractor: TPE -TWIN F
as Noted � 3 - Rejected
ELECTRIC, INC. Owner: LEE
4 - PartiaVNot Complete
Pape: 5
Page: 5