HomeMy WebLinkAboutbocc.con.011.2010tiwr....�
CLERK'S CHECK LIST
FOR CONTRACTS SUBNIITTED TO CLERK AND RECORDER FOR SCANNING/ARCHiVING,
CONTRACT #: G!/- �t0/o
ORIGINATING DEPARTMENT IVISION:
CONTACT PER50N: p�Af� y��l axd,�ir PHONE # a y A���[� C�vYot�� � 1'U/��t S
P R O J E C T N A M E: P r r i-� � k C� l. t r i r� E r I�� ti r y S l' y r�` tK
❑ BOCC AGENDA ITEM �STAFF AUTHORIZED SIGNATURE
(Requires BOCC Signature) (per Revised Procurement Code 7/2005)
� Over $50,000 (Requires County Manager's SignaCure)
✓ CHECK PROCUREMENT TYPE:
ONone DInformal �Formal �Sole Source DEmergency []State Bid ❑
❑Compliance with House Bills 06-1343 and 07-1073 — Immigration Form (Under $10,000, Letters of Engagement, e�
DOLLAR AMUUNT:�S'2� N �$UDGET L1NE ITEM/LED(�ER NUM.BER /G G . G 3• g� sa g' �'��
✓ CHECK CONTRACT TYPE:
.�Services/Maintenance
❑License/Use
❑Lease
❑Construction
❑Goods, Equipment, Supplies
❑Other (e.g. revenue)
❑Employment (for county employees)
�Intergovernmentai Agreement (Requires BOCC Action)
❑Non-Profit
❑Quasi-Public
❑Grant Agreements (Requires BOCC Action)
❑Change Order/Contract Amendment
CONTRACTOR: COMPLETE LEGAL OF NAME OF BUSINESS (if different fro con ractor / �
Contract Execution Date:lo-f� �� Contract End Date: /�- 3/� /O C�////� S�s?t,�ts� rG�/t.lt�s
Automatic Renewal: ❑Yes (�No Term of Contract: y�y/�o
.
� All Contracts should be proofed for the following: �
✓ [�No Pages Missing h� g �/
✓ �If a Page is Left Intentionally Blank Note on Page I w ��i'
✓ Page numbered consecutively
� All Signatures Affixed
✓ All Dates Filled In
•/ All Other Blanks Filled In
✓ All Exhibits Attached
✓ HB 06-1343 and 07-1073 (Immigration Legislation) Included in RFP and/or Contract
✓ �All Legal Descriptions Attached (if applicable)
✓ �Notice of Award/Notice to Proceed Attached (if applicable)
✓ ❑Warranty (if applicable)
✓ ❑Special Instructions for Finance Department:
✓[�Sent to Clerk and Recorder for Scanning/Archiving /
✓[�]Authorized Staff Person's Name: C�G,�l1 Ck����/ ������
BY CHECHING ABOVE AND ENTERllYG NAME, THE AUTHORIZED STAFF PERSON INDICATES THAT
THE ATTACHED DUCUMENT NAS BEEN PROOFED AND READY FOR SCANNING.
NOTE: CLERK'S OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE
ARCHNES RETAINAGE SCHEDULE.
AMENDED 04/23/08
Contract # 011.2010
Ledger #166.63.95508.82000
Rev.12/10/09 jls
� _ ��
T` K I N �AC"r ���
� �
�OUNT�
C }� ''� �
LIBRARY
CONTRACT FOR PROVISION OF 5ERVICES
THIS CONTRACT is made and entered by and between the Pitkin County Board of County
Commissioners ("County") and Willis Pember Architects,, Inc. 412 North Mill Street, Aspeq
Colorado 81611 (970� 920-1727 (hereinafter "Contractor").
1. Term. The term of this contract is from June 10. 2010 to October 31, 2010,. At the
expiration of the initial term, the contract may be extended for an additional term of One (1) year by
the express written consent of both parties.
2. Contractor's Obli�ations,. Contractor shall provide Architectural Services for the Pitkin
County Library Study, Project Contract #Ol 1-2010 per the below attachments:
Attachment A- Willis Pember Architects Inc. Proposal; dated Apri121, 2010
Attachment B— Willis Pember Architects, Inc, Revised Section B— Team Proposal 6 pgs.,
dated May 28, 2010.
Scone of Services,
The project will be divided into three phases. Please submit a cost and time proposal for phase one.
The County wishes to enter into a contract with the chosen firm for the first phase with an option to
renew that contract for the second and the third phases.
PHASE ONE
• Preparation of a building program to meet the community's need for the next ten to
fifteen years
• Analysis of existing building to meet the defined building program
• Presentation of alternatives for existing use and/or expansion including renderings
aT1C� eStIlTlateC� COStS �• The main objective of Phase One is to
EaCl'1 C�OSIgri pY'OpOSaI 1T1USt aC1C�I'eSS t110 f011OWlrig: provide information to the Boazd so that
they can decide if and when an
o Cost of operation in staffing requirements expansion will be needed, or if it will be
o Cost of utilities to operate the building possible to address the library's needs
inside the present building.
o Environmental impact . The Board does not feel that it is
o Adherence to the Americans with Disabilities Act necessary during Phase One to solicit
additional public input, because an
o Snow load and ice concerns extensive community engagement
o Local permitting requirements strategy was completed last summer. If
PHASE TWO the library moves on to Phase Two then
additional community engagement will
• Design including architecture and engineering be an important component of the work.
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc n co.pitkin.co.us
Contract # 011.2010
Ledger #166.63.95508.82000
, • Assistance in procuring funding, if required
• Coordination with governmental bodies and the community
PHASE THREE
• Assistance in selection of a contractor
• Construction administration
Rev.12/10/09 jls
Other Information:
First: Clarification on the specific environmental impacts the Library Board would expect to
be addressed in the development of design alternatives during Phase One: The Library
Board will expect architects to present rationale along with the various design alternatives
that will take into account such factors as long term energy requirements to heat and cool
space, the amount of debris generated by demolition, and so on. Although Leeds
Certification is not required, there is interest in complying with this portion of Pitkin
County's Strategic Plan:
Cate�orv: Protection of Air Oualitv: Promotion of Ener�v Efficiencies
l. Through our own actions, including procurements, as well as in County policies and
regulations, make the control, prevention, and abatement of air pollution a priority.
2. Through our own actions, including procurements, as well as in County policies and
regulations, promote the use of renewable and efficient energy, recycling, and solid and
hazardous waste reduction, whenever feasible.
Second: Clarification of the fee assessment: Fees for the subsequent phases will be
negotiated at the end of the first phase if both parties choose to continue working together.
Thirdly: Clarification on the design objectives for the project: The RFP states the Library's
objective, and the Library Board is relying on the architectural firm to make a determination
from that scope to provide their professional expertise.
Third: The introduction to the Pitkin County Library's Request for Proposals for an Architectural
Firm stated, "The firm will work closely with the library staff and Library Consultant Susan Kent
to develop conceptual solutions and designs for provision of library service areas that will meet
the requirements of the library's long range space needs." Susan Kent has agreed to work with
the Library Board and staff to complete the strategic plan. Work is also underway by staff to
complete a collection management plan. Both documents will be finished by the time an
architectural firm is selected.
Susan Kent is also willing to continue working with the library and with the selected firm to
write the building program. Some firms have asked if they might work with library consultants
they already have on staff. One suggestion would be to make a case far use of a different
consultant for creation of the building program and to define that as a separate cost for the
selection committee to consider.
This is an example of showing the selection committee how the actual set fee was determined for
the proposal for Phase One.
2
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc(c�co.pitkin.co.us
Contract # 011.2010
Ledger #166.63.95508.82000
Rev.l2/10/09 jls
The library would like options for a drive up book drop and traffic considerations for its location
to be considered as part of Phase One, but formal traffic studies and acceptance by local agencies
would be addressed in Phase Two.
The parking garage structure adjacent to the library was not designed to handle live weight loads
required by a library. The library has already paid for some engineering studies to determine the
number and location of support pillars that would need to be added to the parking garage where
the library to expand onto the roof of the garage. The expense of the added supports would need
to be factored into price considerations for that design alternative in Phase One.
The selection committee would like to know each firm's experience in working in an
environment where snow and ice are a design concern. It is expected if an addition is
recommended for this building that careful thought will need to be given to the roof design.
3. Comnensation and Exnenses, Invoicins. Pavment and Offset. The County shall compensate
Contractor for its services in accordance with the Project Budget and Schedule set out in Paragraph 2.
It is expressly understood and agreed that in no event will the total compensation and reimbursement
to be paid hereunder exceed the sum of Fifty Two Thousand Four Hundred Dollars and Zero
Cents (�52,400.001 for all services rendered. By contract or amendment, the County and Contractor
may reallocate the budget among project tasks if the total budget amount remains unchanged.
Contractor shall invoice for the project monthly based on percentage of completion, with payment
expected within thirty (30) days of invoice, but any payment by the County may be offset by any
amount the Contractor owes the County for any reason.
4. Countv's Exclusive Ownershin of Work Product.. Drawings, specifications, guidelines and
other documents prepared by Contractor in connection with this contract shall be the property of the
County. However, Contractor shall have the right to utilize such documents in the course of its
marketing, professional presentations, and for other business purposes. Contractor assigns to County
the copyrights to all work prepared, developed, or created pursuant to this contract, including the
right to: 1) reproduce the work; 2) prepare derivative works; 3) distribute copies to the public; 4)
perform the works publicly; and 5) to display the work publicly. Contractor shall have right to use
materials produced in the course of this contract for marketing purposes and professional
presentations, articles, speeches and other business purposes.
5. Pitkin Countv's Obli�ations. Pitkin County shall administer this contract through a County
Representative. Kathleen Chandler, Librarian will manage the project as the County's
Representative. In the event that Kathy Chandler is not available, Jodi Smith, Facilities Mana�er
shall assume the County Representative's duties. The services provided and products delivered by
the Contractor under this contract will be subject to review by the County's Representatives, or a
designee, for compliance with Contractor's obligations prior to final payment.
6. Termination Prior to Exniration of Contract Term. The County has the right to terminate
this contract, with or without cause, by giving written notice to the Contractor of such termination
and specifying the effective date thereof. Such notice shall be given at least ten (10) days before the
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc cr co.pitkin.co.us
Contract # 011.2010
Ledger #166.63.95508.82000
Rev.12/10/09 jls
effective date of such termination. In such event all finished or unfinished documents, data, studies
and reports prepared by the Contractor pursuant to this contract shall become the County's property.
Contractor shall be entitled to receive compensation in accordance with the contract for any
satisfactory work completed pursuant to the terms of this contract prior to the date of termination.
Not withstanding the above, Contractor shall not be relieved of liability to the County for damages
sustained by the County by virtue of any breach of the contract by the Contractor.
7. Indenendent Contractor Status,.
A. The parties to this contract intend that the relationship between them contemplated by
the contract is that of independent Contractor. Contractor, and any agent, employee, or servant of
Contractor shall not be deemed to be an employee, agent, or servant of Pitkin County.
B. Contractor is not required to offer his services exclusively to Pitkin County under this
contract. Contractor may choose to work for other individuals or entities during the term of this
contract, provided that the basic services and deliverable products required under this contract are
submitted in the manner and on the schedule defined under this contract.
C. Contractor warrants that all work produced will conform to all applicable industry
standard of care, skill and diligence in the performance of Contractor's obligations under this contract.
D. Contractor shall not attempt to oversee or supervise the work or actions of any Pitkin
County employee, servant or agent in the course of completing work under this contract.
E. Contractor is not entitled to any Workers' Compensation benefits through Pitkin
County and is responsible for payment of any federal, state, FICA and other income taxes.
8 Assi�nabilitv. This contract is not assignable by either party. Any use of subcontractors by
the Contractor for performance of this contract must be accepted in writing by the County.
9. Bindin� Arbitration. Any disputes arising out of this contract shall be subject to binding
arbitration. The parties agree that any disputes concerning the terms and conditions of this contract
shall be submitted and finally settled by arbitration. Arbitration shall be conducted pursuant to the
rules of the American Arbitration Association and shall be presided over by the Pitkin County
Hearing Officer appointed to arbitrate Pitkin County contract disputes. Costs of the arbitration shall
be awarded to the substantially prevailing party.
10. Severabilitv. In the event that any provision of this contract shall be held to be invalid or
unenforceable, the remaining provisions of this contract shall remain valid and binding upon the
parties hereto
11. Inte�ration and Modification.
4
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc�co.aitkin.co.us
Contract # 011.2010 Rev.12/10/09 jls
Ledger #166.63.95508.82000
A. This contract represents the entire and integrated contract between the County and the
Contractor and supersedes all prior negotiations, representations, or contract, either written or oral. This
contract may be amended only by written contract signed by both the County and the Contractor.
B. The County may, from time to time, request changes in the scope of services of the
Contractor to be performed hereunder. Such changes, including the increase or decrease in the
amount of the Contractor's compensation, which are mutually agreed upon between the County and
the Contractor, shall be in writing and upon execution shall become part of this contract.
12. Indemnitv.
The Contractor (including, by definition here and hereinafter, its officials, employees, agents and
representatives, subcontractors and suppliers), shall and hereby does release, discharge, indemnify and
hold harmless the County of Pitkin and its officials, employees, agents and representatives from and
against liability for any claim, demand, loss, damages, penalty, judgment, expenses, costs (including
costs of investigation and defense), fees (including reasonable attorney and expert witness fees) or
compensation in any form or kind whatsoever for any bodily injury, death, personal injury or property
damage arising out of or in connection with any negligent act, intentional act, error or omission by the
Contractor, and for any consequential liability alleged to accrue against the County on account of the
Contractor's acts, errors or omissions; provided, however, that such indemnity shall not be construed as
an indemnity for bodily injury or property damage arising from the sole negligence of the County or its
employees.
The Contractor further shall investigate, process, respond to, adjust, provide defense for and defend, pay
or settle all claims, demands, or lawsuits related hereto at its sole expense and shall bear all other costs
and expenses related thereto, even if the claim, demand or lawsuit is groundless, false or fraudulent.
13. Insurance.
A. In whole or in part, the Contractor shall secure and maintain for the term of its
contractual relationship with the County such insurance policies, from companies licensed in the
State of Colorado, as will protect itself, the County and others as specified from claims for bodily
injuries, death, personal injury or property damage, which may arise out of or result from the
Contractor's acts, errors or omissions. The following insurance coverage, at or above the limits
indicated and including such endorsements as are indicated by an "X", are required:
Statutory Workers' Compensation: Colorado statutory minimums
2. Commercial General Liability — ISO 1998 Form or equivalent
(With County named additional insured)
Each Occurrence Limit $1,000,000.00
General Aggregate Limit $2,000,000.00
Products/Completed Operations Aggregate Limit $2.000,000.00
Comprehensive Form (All risks) to include:
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc cr co.nitkin.co.us
Contract # 011.2010
Ledger #166.63.95508.82000
X Premises/Operations
Underground, Explosion & Collapse Hazard
X Products/Completed Operations
X Contractual Liability
X Independent Contractors and Subcontractors
X Broad Form Property Damage
X PersonalInjury
Rev.l2/10/09 jis
3. Business Auto Coverage:
Combined Single Limit Liability (each accident) $1,000.000.00
4. Special Coverages (check as appropriate and insert amount):
, (1) Performance Bond
Labor and Material
Payment Bond
X(2) Professional Errors and Omissions
_ (3) Aircraft Liability
_ (4) Owner's Protective
_ (5) Builder's Risk
_ (6) Boiler and Machinery
_ (7) Loss of Use Insurance
_ (8) Pollution Liability
_(9) Crime, including Employee Dishonesty Coverage, or Fidelity Bond
B. Proof of Insurance:
1. To provide evidence of the required insurance coverage, copies of Certificates
of Insurance in a form acceptable to the County shall be filed with the County through the
representative identified in Paragraph 5, no later than ten (10) calendar days prior to com-
mencement of operations affecting the County. Failure to file or maintain acceptable
Certificates of Insurance with the County is agreed to be a material breach of any contract.
These Certificates of Insurance shall contain a provision that coverage afforded under the
policies will not be canceled or materially altered unless at least thirty (30) calendar days
prior written notice by certified mail, return receipt requested (effective upon proper
mailing), has been sent to the County (through the County's Risk Department). (For
purposes of this provision, "materially altered" shall mean a change affecting the coverage's
required herein, including a change to policy limits as set out in the then-current policy
declarations page).
Simultaneously with the Certificates of Insurance, the Contractor shall file with the
County's Risk Department (and promptly update, as necessary) a certified statement as to
claims pending against the required coverages, reserves established on account of such claims,
defense costs expended and amounts remaining on policy limits.
6
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc�co.pitkin.co.us
Contract # 011.2010
Ledger #166.63.95508.82000
Rev.12/]0/09 jls
2. In addition, these Certificates of Insurance shall contain the following clauses:
a. The clause "other insurance provisions," in a policy in which the County
of Pitkin holds a Certificate, shall not apply to the County of Pitkin.
b. The insurance companies issuing the policy or policies hereunder shall
have no recourse against the County of Pitkin for payment of any premiums or for
assessments under any form of policy.
c. Any and all deductibles in the above-described insurance policies shall be
assumed by and be for the amount of, and at the sole expense of the Contractor.
d. Location of operations shall be: "all operations and locations at which
work for the referenced Project is being done."
3. Certificates of Insurance for all renewal policies shall be delivered to the
County's Representative at least fifteen (15) days prior to a policy's expiration date except for
any policy expiring on the expiration date of this contract or thereafter.
4. The County reserves the right to request and receive a copy of any policy and
any policy endorsement at any time during the term of this contract.
14. Exemntions and Preferences,. All purchases of construction or building or any other materials
for this contract shall not include Federal Excise Taxes or Colorado State or local sales or use taxes.
Pitkin County is exempt from such taxes under registration numbers 98-02624 and 84-78000-SK.
15. Records. The Contractor shall maintain comprehensive, complete and accurate books,
records, and documents concerning its performance relating to this contract for a period of three (3)
years after final payment under the contract and the County shall have the right within the three (3)
year period to inspect and audit these books, records and documents, upon demand, in a reasonable
manner and at reasonable times, for the purpose of determining, by accepted accounting and auditing
standards, compliance with all provisions of the contract and applicable law.
16. Contract Made in Colorado. The parties agree that this contract was made in accordance with
the laws of the State of Colorado and shall be so construed. Venue is agreed to be exclusively in the
courts of Pitkin County, Colorado.
17. Attornev's Fees. In the event that legal action is necessary to enforce any of the provisions of
this contract beyond the arbitration described in Paragraph 9, the substantially prevailing party shall be
entitled to its costs and reasonable attorney's fees.
18. Governmental Immunitv. Contractor agrees and understands that Pitkin County is relying on
and does not waive, by any provision of this contract, the monetary limitations or terms (presently
$150,000.00 per person and $600,000 per occurrence) or any other rights, immunities, and
protections provided by the Colorado Governmental Immunity Act, 24-10-101, et. Seq., C.R.S., as
from time to time amended, or otherwise available to Pitkin County or any of its officers, agents or
employees. Further, nothing in this contract shall be construed or interpreted to require or provide for
7
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc(c�co.nitkin.co.us
Contract # Ol 1.2010
Ledger #166.63.95508.82000
Rev.12/10/09 jls
indemnification of the Contractor by the County for any injury to any person or any property damage
whatsoever which is caused by the negligence or other misconduct of the County or its agent or
employees.
19. Current Year Oblisations. The parties acknowledge and agree that any payments provided
for hereunder or requirements for future appropriations shall constitute only currently budgeted
expenditures of Pitkin County. Pitkin County's obligations under this contract are subject to Pitkin
County's annual right to budget and appropriate the sums necessary to provide the services set forth
herein. No provisions of the contract shall constitute a mandatory charge or requirement in any
ensuing fiscal year beyond the then current fiscal year of Pitkin County. No provision of the
contract shall be construed or interpreted as creating a multiple-fiscal year direct or indirect debt or
other financial obligation of Pitkin County within the meaning of any constitutional or statutory debt
limitation. This contract shall not directly or indirectly obligate Pitkin County to make any
payments beyond those appropriated for Pitkin County's then current fiscal year. No provisions of
this contract shall be construed to pledge or create a lien on any class or source of Pitkin County's
moneys, nor shall any provision of this contract restrict the future issuance of Pitkin County's bonds
or any obligations payable from any class or source of Pitkin County's money.
20. Notice. Any written notice required by this contract shall be deemed delivered through any
of the following: (1) hand delivery to the person at the address below; (2) delivery by facsimile with
confirmation of receipt to the fax number below; or (3) within three (3) days of being sent certified
first class mail, postage prepaid, return receipt requested addressed as follows:
A. To Pitkin County with conies to:
Kathleen Chandler, Librarian Pitkin County Attorney's Office
120 N. Mill Street 530 E. Main Street, #302
Aspen, Colorado 81611 Aspen, Colorado 81611
Fax: (970)925-3935 Fax: (970) 920-5198
B. To Contractor:
Willis Pember Architects, Inc.
412 North Mill Street
Aspen Colorado 81611
Fax: (970) 920- 4461
21. XXI. Comnliance with House Bi1106-1343 and House Bill 07-1073
A. In compliance with House Bi1106-1343 and House Bi1107-1073 amending Title 8 of
the Colorado Revised Statutes by the addition of Article 17.5, Illegal Aliens-Public Contract for
Services, enacted by the General Assembly of the State of Colorado, the Contractor shall not:
Knowingly employ or contract with an illegal alien to perform work under
this contract or;
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc a co.nitkin.co.us
Contract # 011.2010 Rev.12/]0/09j1s
Ledger #166.63.95508.82000
2. Enter into a contract with a subcontractor that fails to certify to the Contractor
that the subcontractor shall not knowingly employ or contract with an illegal
alien to perform work under this contract.
B. In compliance with House Bill 06-1343 and House Bill 07-1073 enacted by the General
Assembly of the State of Colorado: .
., � .
. .,. .,.. . ,
1. The Contractor has confirmed or attempted to confirm the employment
eligibility of all employees who are newly hired for employment in the United States through
participation in the Basic Pilot Program [created in Public Law 208, 104th Congress, or its
successor and expanded in Public Law 156, 108 Congress, or its successor, that is
administered by the United States Department of Homeland Security] and, if the Contractor
is not accepted into the Basic Pilot Program prior to entering into this contract, the
Contractor shall apply to participate in the Basic Pilot Program every three months until the
Contractor is accepted or this contract has been completed, whichever is earlier. This
provision shall not be required or effective if the Basic Pilot Program is discontinued.
2. The Contractor shall be prohibited from using Basic Pilot Program procedures
to undertake pre-employment screening of job applicants while this contract is being
performed.
3. If the Contractor obtains actual knowledge that a subcontractor performing
work under this contract knowingly employs or contracts with an illegal alien, the Contractor
shall be required to:
a. Notify the subcontractor and the County within three days that the
Contractor has actual knowledge that the subcontractor is employing or contracting
with an illegal alien; and
b. Terminate the subcontract with the subcontractor if within three days
of receiving the notice required pursuant to subparagraph (a) of this paragraph (3) the
subcontractor does not stop employing or contracting with the illegal aliens; except
that the Contractor shall not terminate the contract with the subcontractor if during
such three days the subcontractor provides information to establish that the
subcontractor has not knowingly employed or contracted with an illegal alien.
4. The Contractor shall comply with any reasonable request by the Department
of Labor and Employment made in the course of an investigation that the Department of Labor
and Employment is undertaking pursuant to the authority established in Subsection (5) of
C.R.S. § 8-17.5-102.
9
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc(c�co.nithin.co.us
Contract # 011.2010
Ledger #166.63.95508.82000
Rev.12/10/09 jls
IN WITNESS WHEREOF, the parties have executed this contract as of the date first set out herein
above.
CONTRACTOR:
WILLIS EMBER ARCTITECTS, INC.
By: � . 3 .1 0
Willis O. Pember, AIA Principal Date
BOARD of . TY COMMISIONERS OF PITKIN COLJNTY, COLORADO:
By • f �;� � oL ��c'
� .- /
athy Chandler, Librarian Date
B �t � w-�-� ��� (� I z �lr �
Hil Fletcher, Co Manager D�te
10
Pitkin County Library120 North Mill Street, Aspen Colorado 81611
Kathleen Chandler, County Librarian 970.429.1910 kathvc a co.pitkin.co.us
�Attachment A
PITKI N
COU NTY
L I B RA RY
� :.�
����„�t�� ta:
Ms. Kathleen Chandler
Caunty Librarian
Pitkin Caunty L�brary
120 Narth Mi(1 Street
Aspen, CtJ 81611
April 21, 2014
Wiliis Pember Architects, Inc
Willis Pember A(A, Principal
412 North MiIE Street r Aspsn Cq 81611
{p} 97Q.920.1727 {f) 970.920.4461
e-mail: willispa�a cc�mcast.net
web: www.aspenarchitecture.com
Humphriss Poli Architects
[Jennis Humphries AIA, Princfpal
21 DO Dawning Street I Denver, CO 80205
(�} �a�.so7.oa�� {f� �os.sa7.00a �
e-nnail: dhurrrphries@hparch.com
tnreb: www.hparch.com
l(
Kathleen Chandler
County Librarian
Pitkin County Library
120 North Mill Street
Aspen, CO 81611
Re: Pitkin County Library Architectural Design Services RFP
Dear Ms. Chandler,
April 21, 2010
It is a pleasure to submit to you our team qualifications and proposal for the Pitkin County Library RFP.
We believe we have assembled a group of design professionals whose individual strengths are
complimentary and well suited to the task ahead. This group of professionals has been widely
recognized as leaders in their fields. We bring a broad base of expertise, imagination and past successes
to the table.
Started in 1997, Willis Pember Architects is a full service architectural practice focused on projects for
civic and not-for-profit organizations. Believing that architecture should derive from sustainable
environmental ethics and agreement with natural processes, WPA has created a track record of
innovation with sensitivity to site-specific relationships. This includes new construction as well as
multipte adaptive reuse and renovation projects providing WPA with a diverse portfolio of public
projects with specific knowledge of not-for-profit organizational dynamics and local public process
experience.
The Public Library consulting services of Humphries Poli Architects of Denver brings a wealth of
specialized experience in the planning and design of public libraries. Their firm represents award
winning work for large and small public libraries in a variety of urban, suburban and rural settings.
Named the Western Mountain Region Firm of the Year in 2008, HPA has amassed a portfolio of over
fifty libraries throughout the Western U.S. since their inception in 1994.
We look forward to working with you on this exciting project. Thank you for your consideration.
Sincerely,
Willis O. Pember, AIA
ll�illis Pember !\rchitects. !n:
�112 N. Mill Street
As�en, CQ 81b11
Vc. 970.9?�.l?'_?
lv�vW.dSPerldrCY!!tECtur _�oil!
Architect of Record
.,
x'`
t �"
��� . .:..�tt":!; , . .'rta�:E,lY#t��#,t���
Dennis R. Humphries, AIA
1-i�,�mphriE Pol� �rcfittf:ct�. F'.0
210Q Downin�5 Sti�:-�t
t�F�r�vc�r, Colo� ado S:Q2r)�;
Vc. 30s. bv7.Ol��1(�
ti�v�v�N.hDa; _h.c,�r�
Associate Architect
����������
� Z
TEAM QUALIFICATIONS
Team Composition
General Background
profil��s
1"�:SUt11�S
r�WaYCIS
references
Similar Projects
H PA
W PA
Consultants
profiles
resumes
references
���
�� ��;.
�;�
y.
:a'',��::,� �v.
,�;" ����
�!5 �-.�.i:
�
A. WPA + HPA TEAM QUALIFICATIONS
TEAM COMPOSITION
ARCHITECT OF RECORD
Willis Pember Architects, Inc
412 N. Mill Street � Aspen, CO 81611
Willis 0. Pember ( 970.920.1727� willispa@comcast.net
www.aspenarchitecture.com
ASSOCIATE ARCHITECT
Humphries Poli Architects, P.0
2100 Downing Street � Denver, CO 80205
Dennis R. Humphries � 303.607.0040� dhumphries@hparch.com
www.hparch.com
STRUCTURAL ENGINEER
KL&A Inc.
129 Emma Rd � Unit A � Basalt, CO 81621
Brett McElvian � 970.927.5174 � bmcelvain@klaa.com
www.klaa.com
MECHANICAL & ELECTRICAL ENGINEER
Beaudin-Ganze Consulting Engineers
PO Box 9650 � Avon, CO 81620
Dan Koelliker � 970.949.6108 � djk@bece.com
www.bece.com
CIVIL ENGINEER
Schmueser Gordon Meyer, Inc.
118 W. Sixth Street � Glenwood Springs, CO 81601
Jay W. Hammond, P.E. � 970.945.1004 � JayH@sgm-inc.com
www.sgm-inc.com
LAND PLANNER
Design Workshop
120 E. Main St. � Aspen, CO 81611
Suzanne Richman � 970.925.8354 � srichman@designworkshop.com
www.designworkshop.com
LANDSCAPE ARCHITECT
Design Workshop
120 E. Main St. � Aspen, CO 81611
Suzanne Richman � 970.925.8354 � srichman@designworkshop.com
www.designworkshop.com
COST ESTIMATING CONSULTANT
Parametrix, Inc.
7186 S. Highland Drive � Salt Lake City, UT 84121
J. R. Anzer � 415.397.0442 � parametrix@aol.com
www.parametrix-cost.com
�y
A. TEAM QUALIFICATIONS
LIST OF OPTIONAL CONSULTANTS
WATERPROOFING CONSULTANT
Building Consultants & Engineers, Inc
1520 West Canal Court, Suite 240 � Littleton, Colorado 80120
Linda McGowan � 303 350 1000 � linda@buiiding-c-e.com
www.building-c-e.com
ACOUSTICS CONSULTANT
D. L. Adams Associates
1701 Boulder Street � Denver, CO 94104
Jeffrey P. Kwolkoski � 303 455 1900 � jkwolkoski@dlaa.com
www.dlaa.com
LIBRARY FURNITURE CONSULTANT
Group 3 Pianners, LLC
8235 W. 71st Ave. � Arvada, CO 80004
Sharon Rowlen, CFM � 303-456-4824 � srowlen@group3planners.com
www.group3planners.com
LIBRARY TECHNOLOGY CONSULTANT
LMA Techwork
839 North Madison � Rockford, IL 61107
Linda K. Miller � 815-229-8215 � linda@Imatechwork.com
www.lmatechwork.com
�S
WPA is an award winning and nationally published architecture firm
noted for its innovative design and planning services. Founded in 1992, the firm
is comprised of four professionais and is located in downtown Aspen, Colorado.
Projects include the design of new buildings, renovations and reuse of existing
structures, interiors, and planning and feasibility analysis. Clients include private
residential clients, arts and civic organizations, businesses, and developers.
The investigation of three issues supports the design process in all WPA projects.
A beliefthat the intentions of the client's program can be translated into
meaningful places that resonate to and from their occupants.
A beliefthat new or renovated structures have an obligation to acknowledge
and complete circumstances created by history, landscapes, adjacent
buildings or existing interiors.
A belief that architectural expression derive from sound construction,
sustainable environmental ethics and agreement with natura) processes
over time.
These principals have given rise to over twenty design awards, including two
national design competitions and publication of the firm's work in Architectural
Record, the Wall Street Journal, an interview on National Public Radio, and
numerous professional publications. Past and present clients include the
�ity of Aspen, Red Brick Center for the Arts, Sun Microsystems, Gardner
Investments, Cathers Home, and numerous private clients. Projects are located
in Colorado, Utah, New York, Pennsylvania, Illinois and Wisconsin.
� �,o
WI�LIS PEMBER ARCHITECTS INC
4 1 2 N O R T H M I � � S T R E E T A S P E N C O 8 1 6 1 1
WILLIS PEMBER began his private practice in 1992 following a six year association
with RobertVenturi and Denise Scott-Brown where he was a project architect and
involved with several internationally recognized projects: the Sainsbury Wing to
the National Gallery of Art in London, England, Fan Pier High Rise Apartments in
Boston, Massachusetts, Laguna Gloria Art Museum in Austin,Texas, the
Philadelphia Museum of Art, the Seattle Art Museum and private residential
projects throughout the United States.
He graduated Magna Cum Laude from Brown University as an undergraduate and
pursued a two year graduate program of Fine Arts at the University of Wisconsin,
and received a Masters of Architecture from the University of Pennsylvania in
1985. A Dales traveling Scholarship in 1984 was awarded to study traditional and
modern housing in India and Nepal.
Willis Pember has been a guest studio critic at the University of Pennsylvania,
Temple University, and the University of Colorado. He is a registered architect in
Colorado and Pennsylvania, a member of the American institute of Architects,
and NCARB certified.
Past and Present Board and Committee membership includes, Red Brick Arts
Center - Building Committee Member, COWOP Board member - Obermeyer Place,
COWOP Lead Designer- Aspen Center for Environmental Studies City Employee
Housing, Residential Design Standards - Ord. 33 Participant and Volunteer.
t ,;
' �
MEGHAN NEMECHEK began work with Willis Pember Architects, Inc in
2004 following work experiences with Theodore K. Guy Associates in
Basalt, CO and Allenbrook, Benic, Czajka Architects in New York City.
Meghan has been a project manager on residential, commercial and
multi-family housing projects in Basalt, Snowmass, and
Aspen, Colorado.
In addition to her experience with nonprofit and civic groups at
WPA, (ABC Eco-Lofts and the Red BrickArts Center) Meghan has worked
as Project Architect on the Pitkin County Courthouse - Garden Level
Remodel for the Pitkin County Sheriff's Office and the Aspen Police
Department. Meghan is also a proud resident of affordable housing in
Aspen.
She graduated from Kansas State University with a professional
five-year undergraduate degree in Architecture in 2001 and studied for
a semester in Castiglion Fiorentino, Italy. Meghan brings marketing of
Architecurai offices as an additional talent.
��
Robert Camp
Red Brick Arts Center Board
110 E. Hallam Street, Ste 118
Aspen, CO 81611
Vc: 970 925 5049
Stephen W. Bossart
Capital Asset Management � City of Aspen
130 S. Galena St.
Aspen, CO 81611
Vc: 970 429 1790
Thomas A. Russo
Gardner Russo Gardner Investments
310 Lexington Ave, 9C
New York, NY 10016
Vc: 212 203 6126
Melanie Muss
Muss Development Organization
1691 Michigan Ave, Ste 250
Miami, FL 33139
Vc: 305 790 8012
John Master5, Executive Director
Grassroots Community TV
110 E. Hallam Street, Ste. 132A
Aspen, CO 81611
Vc: 970 925 8000
��
�� "� � � � �� ��_ �, � �` " ` � �'
��� ' � ��� � �t � ��
� w� �;
�°
Approach to Excellence
Excellence in library design is achieved through a
focused response to a wide array of
considerations: demographics, community
interests, site and context, proximity to other
facilities or co-location, ownership and user
groups, budget, functionality, and aesthetics.
Humphries Poli Architects is committed to a
design process that establishes a relationship with
the community as an extension of our
responsibility to the owners. Our extensive public
engagement processes gather input from diverse
groups to understand the specific needs of the
people the library will serve. Community
participation informs our designs and results in
greater civic pride in the finished buildings.
Beyond the community, experience has taught us
that there is no better resource to shape efficient,
functional library design than the librarians
themselves. Their passion, attention to detail, and
dedication is contagious, often driving us to do
more with less. Functionality, adaptability,
navigational ease, service, security, integration of
technology, and community specific programs are
individualized components that uniquely influence
a library's design. By forming close working
relationships with librarians, our design team is
able produce exceptional solutions that amplify
operational efficiency. Challenges in library
design can be plentiful. Project resources must
be maximized to meet public
expectations.
A library is a long-term community asset that must
stand the test of time yet be adaptable to future
innovations and needs. Materials and equipment
choices impact building sustainability,
maintenance and operational costs. Ergonomics,
daylighting, acoustics, division of use, and design
for a human scale affect usability and comfort.
Flexible configuration of internal building
components increases the community's ability to
provide space for training, civic discourse,
supplemental education, arts and culture, access
to technology, and a home for local knowledge
and history.
Humphries Poli meets the challenges of library
design by maximizing the projecYs budget to
elevate the quality of our design. We utilize
Building Information Modeling (BIM) software to
build project consensus from inception to
comp4etion. By demonstrating to our clients how
we intend to integrate community characteristics,
sustainability, flexibility, and technology into their
projects, we engender support and increase
participation in the design process.
HPA is committed to excellence in library design.
We are committed to proactively working with
communities to provide unbiased, accurate needs
assessment services that afford an informed
position about the realities of their resources and
opportunities. HPA is passionate about the
design of these special places; built for the public,
full of magic and wonder, information and activity,
knowledge, comfo►t, pursuit and truth. The
libraries we design are of the communities we
serve and no place else. Humphries Poli
Architects welcomes the embrace of your
community and the challenge of designing your
ne� great public place.
�
Highlands Ranch Library
PhiffiF� S. Milter f_ihrary
Mamie Doud Eiser�hower Library
_ ..�,�, _.--�- �
Diverse Library Planning and Design
Expertise
Humphries Poli Architects brings to this
commission a wealth of specialized experience
in the planning and design of libraries. Notably,
our firm has been responsible for more than 50
library commissions ranging from renovation and
expansion efforts, design for new construction
and facility and needs assessments for public
facilities across Colorado and as far away as
Illinois and Texas.
We have participated in the vital front end
planning utili2ed to understand needs and
opportunities for clients such as the Boulder
Public Library and Garfield County Library
District.
We have completed similar library renovation
and expansion projects for the Pueblo Library
District and the Pikes Peak Library District in
Colorado Springs and understand the
challenges associated with maintaining an active
library presence during construction.
In the area of adaptive reuse we have
transformed a grocery store, a bowling alley and
a historic church into community enhancing
libraries.
In all of these facilities, profound respect for the
needs of the community and the contextual
influences surrounding the property have always
been the driving forces that shape our efforts
and result in appropriate solutions that are built
on-time and on-budget.
2�
Normal Library - Long Range Planning
Huron Sfreei Library - New Construction
Sand Creek Library - Renovation
Parker Library - Adaptive Reuse
Complete List of Humphries Poli Architects
Library Experience with Size and Completion
Rocky Ford Library - 5,600 sq. ft. - Renovation:
2011, Colorado
College Station Library - 15,000 sq. ft. - Renovation
/ 15,000 sq. ft. Addition: 2011, Texas
Jackson Library - 22,000 sq. ft. Renovation / 11,000
sq. ft. - Addition: 2011 , Wyoming
Elizabeth Public Library - 14,000 sq. ft. - Adaptive
Reuse: 2011, Colorado
Perl Mack Library - 6,500 sq. ft. - Renovation / 1,500
sq. ft.- Addition: 2010, Colorado
Commerce City Library - 9,400 sq. ft. - Renovation:
2010, Colorado
Fruita Library - 7,000 sq. ft. - New Construction:
2010, Colorado
Wright Farms Library - 45,000 sq. ft. - New
Construction, : 2010, Colorado
Green Vailey Ranch Branch Library - 26,000 sq. ft.
New Construction, :
2010, Colorado
High Prairie Branch Library - 6,000 sq. ft. - New
Construction: 2010, Colorado
Sterling Public Library - 11,000 sq. ft. Renovation /
6,000 sq. ft- Addition: 2010, Colorado
Alta Branch Library - 2,400 sq. ft. - New
Construction: 2009, Wyoming
Hampden Branch Library - 12,000 sq. ft. -
Renovation: 2009, Colorado
Woodbury Branch Library - 8,000 sq. ft. -
Renovation: 2009, Colorado
Montbello Branch Library - 12,000 sq. ft. -
Renovation: 2009, Colorado
Albany County Library - 40,000 sq. ft. - Facility
Assessment: 2009, Wyoming
Huron Street Library - 25,000 sq. ft. - New
Construction, : 2009, Colorado
Brighton Library - 20,000 sq. ft. - New Construction
: 2009, Colorado
Bennett Library - 6,000 sq. ft. - New Construction:
2009, Colorado
Mancos Library -7,500 sq. ft. - New Construction
: 2009, Colorado
Paonia Library - 8,000 sq. ft- New Construction:
2009, Colorado
Pueblo West Branch Library - 28,000 sq. ft. -
Renovation and Expansion, : 2009,
Colorado
Normal Library - Long Range Strategic Plan: 2009,
Illinois
Sand Creek Library -14,000 sq. ft. - Renovation:
2009, Colorado
Boulder Public Library - Facilities Master Plan:
2008, Colorado
New Parker Library - 45,000 sq. ft. - Master
Planning: 2008, Colorado
Garfield County Library District - Strategic
Pianning: 2008, Colorado
Rangeview Library District - Strategic Pianning:
2007, Colorado
Granby Library - 10,800 sq. ft. - New Construction:
2006, Colorado
Louisville Public Library - 31,000 sq. ft. - New
Construction: 2006, Colorado
Ruby M. Sisson Memorial Library - 8,000 sq. ft.
New Construction: 2005, Colorado
Kiowa Library - 2,000 sq. ft. - Adaptive Reuse: 2005,
Colorado
Elizabeth Public Library - 12,000 - Adaptive Reuse:
2004, Colorado
Dolores Library - 6,000 sq. ft. - New Construction:
2004, Colorado
Elbert County Library District - Strategic Plan /
Feasibility Study: 2004, Colorado
Louisvilie Public Library - Space Needs
Assessment and Site Selection: 2004, Colorado
P.S. Miller Library - 45,000 sq. ft. - Adaptive Reuse:
2003, Colorado
Highlands Ranch Library - 42,000 sq. ft. - New
Construction: 2000, Colorado
Mamie Doud Eisenhower Public Library - 36,000
sq. ft. New Construction: 2001, Colorado
Mamie Doud Eisenhower Library - Programming
Study, 2000, Colorado
Highlands Ranch Library - Programming Study:
1998, Colorado
Lone Tree Library - 10,000 sq. ft. - New
Construction: 1997, Colorado
Parker Library - 22,000 sq. ft. - Adaptive Reuse:
1996, Colorado
2�
Energy Efficiency / Green Buildings:
Humphries Poli Architects is fully committed to
application of design and building techniques
that promote reduced energy consumption and
decreased environmental footprints for all
buildings. We make it a point to recommend
appropriate sustainable design solutions to our
clients regardless of whether LEED Certification
is a project goal. We see these solutions as
more than just environmentally conscious. In
almost every case, the sustainable design
applications we propose enable our clients to
realize immediate and long-term economic
benefits.
HPA currently has on staff nine USGBC LEED
Accredited Professionals. Each project
undertaken by the firm includes a review of
applicable sustainable design strategies at the
outset of the design process. We then further
evaluate the strategy with respect to immediate
and long-term cost savings to the project.
The following Humphries Poli library design
projects have all been designed to achieve
measurable sustainability:
■ Brighton Library LEED-Gold/Carbon Positive
■ Huron Street Library LEED-Silver
■ Wright Farms Library LEED-Gold
■ Pueblo West White Branch Library LEED-
Gold
■ Mancos Library LEED-Gold
■ Green Valley Ranch Library LEED-
Gold/Architecture 2030
■ Jackson Library LEED-Silver
�� .
�¢ .
����
�
s
t *
s
�- �
Dennis Humphries, AIA
Principal
Project Role
Principal
Experience
32 Years Total
16 Years With HPA
Education
Master of Architecture, University of
Illinois at Urbana-Champaign
Bachelor of Architecture, University of
Illinois at Urbana-Champaign (w/high
honors)
Registration
Colorado, Indiana, New Mexico,
Arizona, Wyoming
National Council of Architectural
Registration Board Certificate
(NCARB)
Awards
AIA Western Mountain Region Firm of
the Year, 2008
AIA WMR Silver Medal Award, 2007
Firm of the Year, American Institute of
Architects / Colorado, 2006
Firm of the Year, American Institute of
Architects / Denver, 2005
Architect of the Year, AIA Denver,
2006
Architect of the Year, AIA Colorado,
2005
Architect of the Year, American
Subcontractors Association / Colorado
Chapter, 2003
AIA Denver Leadership Award, 1998
Sudler Leadership Award, 1994
Overview
HPA Principal Dennis Humphries has been actively
engaged in the design and execution of some of
Colorado's most dynamic libraries for more than 20 years.
Since co-founding Humphries Poli Architects, Dennis has
made libraries a focus of our practice and has authored
dozens of contextually integrated designs in communities
across the state. He is personally invested in the
successful design, execution and sustained efficient
operations of numerous public libraries including our on-
going work for facilities in mountain communities like
Jackson and Alta Wyoming and rural communities like
Sterling, Rocky Ford and Fruita, Colorado.
Known as a passionate and dynamic leader of the
profession, Mr. Humphries has been honored as the 2007
AIA Western Mountain Region Silver Medalist, 2006
Architect of the Year by AIA Denver, 2005 Architect of the
Year by AIA Colorado and as 2003 Architect of the Year
by the Colorado chapter of the American Subcontractors
Association. He co-founded Humphries Poli Architects,
with Joe Poli in 1994. Since then the firm has been the
recipient of more than 50 awards including AIA Western
Mountain Region Firm of the Year in 2008.
Select Project Experience
■ Pueblo West White Branch Library, Pueblo, CO
■ Sand Creek Branch, Colorado Springs, CO
■ Sterling Public Library, Sterling, CO
■ Philip S. Miller Library, Castle Rock, CO
■ Jackson Library, Jackson, WY
■ Perl Mack Library, Adams County, CO
■ Commerce City Library, Commerce City, CO
■ Brighton Library, Brighton, CO
■ Green Valley Ranch Library Denver, CO
■ Alta Library, Alta, WY
■ Louisville Public Library, Louisville, CO
■ Granby Library, Granby, CO
■ Ruby M. Sisson Memorial Library, Pagosa Springs, CO
■ Dolores Public Library, Dolores, CO
■ Mancos Library, Mancos, CO
■ Rangeview Library District Needs Assessments and
Design, Adams County, CO
■ Highlands Ranch Library, Highlands Ranch, CO
■ Mamie Doud Eisenhower Library, Broomfield, CO
■ Elizabeth Library, Elizabeth, CO
■ Lone Tree Library, Lone Tree, CO
■ Parker Library, Parker, CO
■ P.S. Miller Library Addition, Castle Rock, CO
■ High Prairie Library, Pikes Peak Library District,
Colorado Springs, CO
���i.J�4'i��1�5 PC.79,!
, �, , , , _ ��
Brrghton Library - 9` Carbon Pasitive
Library in the U.S.
Ryan Wallace, AIA, LEED-AP
Architect
Education
Project Role
Project Architect
Experience
8 Years Total
6 Years With HPA
Masters of Architecture, University of
Colorado at Denver, 2004 (Dean's List)
Bachelor of Science in Environmental
Design: Emphasis on Architecture,
University of Colorado at Boulder, 2002
(Dean's List)
Awards
Gold Hart Hat Award, Paonia Library
2009
UCB Pauline and Edna Hellstern
Foundation Scholarship (1999)
UCB John R. Garone Foundation
Scholarship (1999)
UCD Robert K Fuller Scholarship
(2003)
Professional Memberships
Member, U.S. Green Building Council
Sustainable Design Initiative Organizer
(firm-wide)
Overview
In more than six years with HPA, Ryan Wallace has
gained extensive experience in designing community
focused, cost-conscious library facilities. Recent project
experience includes the 28,000 sq. ft LEED-Silver
addition/renovation to the Pueblo West White Branch
Library and the renovation of a 14,000 sq. ft. library for the
Pikes Peak Library District. He is also a leading
participant in the on-going design and construction
administration effort for the Jackson Library, which entails
the renovation and expansion of a community facility very
much like the Pitkin County project.
Mr. Wallace currently heads the firm's Green Building
Committee and is a strong and active leader in the firm's
efforts to incorporate sustainable building technologies
into all of our projects. He is skilled in applying technology
and organizational strategies to projects, and his
proficiencies in AutoCAD, Revit Building, Sketch-up,
Photoshop and Illustrator are invaluable in creating
realistic visual depictions of our work.
Select Project Experience
■ Sand Creek Branch, Colorado Springs, CO
■ Pueblo White Branch Library, Pueblo West, CO
■ Jackson Library, Jackson, WY
■ Alta Branch Library, Atla, WY
■ Green Valley Ranch Library, Denver, CO
■ Paonia Library, Paonia, CO
■ High Prairie Library, Falcon, CO
■ Rangeview Library District, Adams County, CO
■ Garfield County Justice Center, Riffle, CO
■ Bayfield Town Hall, Bayfield, CO
■ Lone Tree Municipal Facility, Lone Tree, CO
■ Elbert County Justice Center, Kiowa, CO
■ Fort Collins Police Services Facility, Fort Collins, CO
■ Pueblo White Branch Library, Pueblo West, CO
■ NorthCreek Residential and Retail Project, Denver, CO
■ DTC Block D, Denver, CO
■ The Brownstones at Riverfront Park, Denver, CO
y
� . .�. , ,.. „ r, ,�
/
�S
Pao►iia Li�rary - Moc�ntain Experience
. ,��.,a.�, ���.�..�. .w� �., ...
Ozi Friedrich, LEED-AP
Library Science Specialist
Project Role
Library Specialist
Experience
6.5 Years Total
3 Years With HPA
Education
Master of Architecture, University of
Colorado at Denver
Master of Library and �nformation
Science, Pratt Institute, Brooklyn, NY
Bachelor in Religion, Reed College
Accreditation
LEED Accredited Professional
Awards
Gold Hart Hat Award, Bennett Library
2009
AIA Colorado Young Architects Awards
—Honorable Mention Built, Carriage
House, 2008
Overview
Ozi Friedrich is a highly specialized member of HPA's
library team who has contributed significantly to the
planning, design and implementation of many of our
recent library commissions. Ozi currently leads firm efforts
on the renovation of the Commerce City Library and
completed the design and implementation of a small
community library with a strong emphasis on sustainability
in Bennett, Colorado in 2009.
Prior to his pursuing his interest in architecture, Mr.
Friedrich spent three years as a librarian and five years
working as a library services staff member. In 2004 he
earned a Master of Library and Information Science
degree from Pratt Institute while serving as the Fine Arts
Librarian at the Queensborough Central Library in
Queens, NY from 2001 - 2004. He also served as the
Night Supervisor at the Reed College Library in Portland,
OR from 1999 - 2001.
Mr. Friedrich's past experience and in-depth
understanding of library science will benefit our project
team by internally affording us the expertise of a
professional librarian.
Select Project Experience
■ Sand Creek Branch, Colorado Springs, CO
■ Perl Mack Library, Adams County, CO
■ Commerce City Library, Commerce City, CO
■ Bennett Library, Bennett, CO
■ Paonia Library, Paonia, CO
■ Wright Farms Library, Thornton, CO
■ Fruita Library, Fruita, CO
■ Hampden Branch Renovation, Denver, CO
■ Woodbury Branch Renovation, Denver, CO
■ Montebello Branch Renovation, Denver, CO
■ Mancos Library, Mancos, CO
■ Boulder Library Facility Planning Study, Boulder, CO
■ Normal Public Library Long Range Planning, Normal, IL
■ High Prairie Library, Falcon, CO
��ll���-��:3E� �'�".3L1
�. �. �.,
2�
Bennett Library - The Greenesi Littfe
Library or� tiie Plains
Humphries Poli Architects Library References:
Client: Rangeview Library District
Portcullises different Adams County Libraries -
Bennett, Brighton, Wright Farms and Huron Street, Commerce City and Perl Mack
Contact: Pam Sandlin-Smith, Library Director,
Rangeview Library District
11658 N. Huron
Northglenn, CO 80234
303.288.2001
psmith@rangeviewld.org
Client: Douglas County Libraries
Projects: Six Different Douglas County Libraries including Highlands Ranch, Castle Rock, Parker and Lone Tree
Contact: Jamie LaRue, Director
Douglas County Library District
100 Wilcox Street
Castle Rock, CO 80104 •
720.733.8624
jlarue@jlarue.com
Client: Dolores Public Library
Projects: Dolores Public Library
Contact: Carole Arnold, Director, Dolores Public Library, 1002 Railroad Avenue, P.O. Box 847, Dolores, Colorado
81323-0847, 970.882.4127, carole@fone.net
Client: Delta County Library District
Projects: Paonia Public Library
Contact: Annette Choszcyk, Delta County Library District Director, 149 E. Main St. Hotchkiss, CO 81419,
970.872.4153, achoszczyk@sopris.net
Client: Pikes Peak Library District
Projects: Sand Creek Branch (Renovation) and High Prairie Branch (New Construction)
Contact: Paula Miller, Director,
Pikes Peak Library District
P.O. Box 1579
Colorado Springs, CO 80901
719.531.6333
pmiller@ppld.org
Client: Pueblo Library District
Project: Pueblo West White Branch Library
Contact: Jon Walker, Executive Director,
Pueblo Library District
100 East Abriendo Avenue
Pueblo, CO 81004
719.562.5600
jwalker@pueblolibrary.org
Client: Mancos Public Library
Project: Mancos Public Library
Contact: Patsy Smith, Director
111 N. Main Street
Mancos, CO 81328
970.533.7569
pddksmith@mancos.lib.co.us
" �
2�
WPA EXPERIENCE
• Both WPA and HPA have long experience in roof and envetope design in high altitude,
mountainous snow and ice environments.
• Willis Pember Architects have built numerous public projects for Roaring Fork Valley
municipalities and non-profits, all typically requiring intense public process, scrutiny and review.
• The WPA Project team has a track record of environmentally ethical and sustainable design.
• The WPA Project team has a track record of on-time and on-budget projects.
• WPA warrants that there are no lawsuits, liens or pending arbitrations arising from claims made
against WPA, past or present arising from WPA, inc. providing architectural services.
• The table below provides a summary of recent relevant projects. Detailed project information
can be found in the following pages.
Project Name / Description
Year
Completed
2001
Data
Wagner Park Edge
Aspen, CO
City of Aspen Park Improvements involving
extensive local gov't and community input.
Willis Pember Architects, Inc
Red Brick Center for the Arts 1995
Aspen, CO
Renovation and reuse of an abandoned
Middle School purchase by COA.. 30,OOOsf
Willis Pember Architects, Inc
Red Brick West End Addition 2007
Red Brick Center for the Arts
Aspen, CO
West End addition and outdoor plaza to the
historic Red Brick Center for the Arts.
Willis Pember Architects, Inc
Pitkin County Courthouse
Pitkin County Sheriff's Office
Aspen Police Department
Aspen, CO
Needs assessment and schematic redesign of
the Garden Level for Pitkin County Sheriff's
Office and Aspen Police Department.
Willis Pember Architects, Inc +
Roth Sheppard Architects
The City of Aspen
Scott Chism, Aspen Parks Planner
970.920.5120
Construction Cost: 1.1 M
Robert Camp, Board Member
Red Brick Center for the Arts
970.925.3371
Construction Cost: 1.2 M
Robert Camp, Board Member
Red Brick Center for the Arts
970.925.3371
Steve Bossart, Project Manager
The City of Aspen Asset Management
970.544.3143
Construction Cost: 800 K
Schematic Jerry Morris, Project Manager
2009 Pitkin County Facilities Manager
970 .920.5763
Schematic Design Fee 29k
Construction Cost Est: 2.1 M
��
.;
�'�� , �k AA ATIO� ;:;�
..z` E> -- �< �.
� �I � , ��
�� ��_�� �, .�.�
�� . � � „�;. �
�;� � ,„•��
�.� # �� �
:� �`"� A'' s
�g � �
�
DWELL Downtown Master Plan and Improvements
Information Pavilion and Wheeler sign kiosks resulting from a public
downtown master planning process.
Completed: 2006
Contact: Steve Bossart, Capital Asset Manager
Red Brick Arts and Recreation Center
Repurposing of a neglected middle school and conversion to a local
serving, non-profit Arts Center.
Completed: 1994
Contact: Bob Camp, RBCA Board
Truscott Buildings 200 300
Public Space Planning and Courtyard Improvements
Completed: 2007
�� Contact: Kai Ramsey, APCHA Property Manager
� �" ..
GrassRoots Community Television
Broadcast Studios, Studio expansion and Set design; a multi-phase and
ongoing involvement for a major Red Brick tenant.
Completed: ongoing
Contact: John Masters, Executive Director
KAJX - Aspen Public Radio
Tenant improvements including offices, production rooms and
broadcast suites.
Com pleted: 1995
Contact: Cy Coleman, past executive director
ACES - City Employee Housing
Lead COWOP architects for a multi-family affordable housing
development within the Aspen Center for Environmental Studies, ACES.
Completed: 2006 (schematic design)
Contact: Steve Bossart, Capital Asset Manager
' ., ; ,
�1°I
DESIGNWUHKSHt�P
I)esi�,ni Warkshop helps clicnts to address campleh challcnges and decisions to arrivc at e�ertive and
satisfying outcomes. AS a recreatian ai�d lancl planning, landscape architecture, urban desi�� and �trategic
serviccs firm, we }iave beeti providing thrsc serviccs for almost four decades to developers, proE�erty
owncrs, govcrcimrnt agcncics and othcr clicnts enga�;cd in improvcmcnts to thc land. In our ycars af
practice we have evolved a�t approach to rcconriliiig tlie needs of pi�blic and private stakehoidcrs tc�
achieve a mutually satisfyitig result.
Our Services
Our range ot services is
comprehensive, embrac-
ing all of the key disciplines
necessary for our pianning
and tlesign assignments. We
also offer capabilities in areas
of specialization that provide
expanded ease and value far
our clientele.
Public �acilitation
Recreation and Open Space
Planning
Environmental Analysis and
Planning
Community Planning
Land Planning
Landscape Architecture
Urban Design
Design Warkshop is a tirni tiorn i�i nc� ptu•suit of idea�, titartcrl in Aspen in 1�17�1.
Frcnn its founciin�;, thc finn c3uickly rarned a reputation for sc71vit7�; the romplr�
prohlents fann�i in ti•a�;ile ecu�ysteitt� and c�evelop�t�ent c•hallz�t�e. c�ti tlte �ti�c�t�ri�
land5cape. C�ver d�e past 311 yrars �ve've had t}ie c�pp�>rtunit�• to e�}�ar�d the breadtli
and sophistir.ition of ot�r finn tichi�h iniludcs Rb rntployccti i;� G ot�'icrs nation-
�4�ide. ()ur experience ran�;cs trom inast�r pl<ir�s for countics, recreation desi�;r� aiid
plai�i�ir��; ne�� c��i»cininitir�, rrcort�, recreatio» de,i�;il .i��ti plan»iri�; anci e��virunmrn-
tal at�alysis to �ietailed d�.i�;ii for puhlic parks, recreativnal farilities and ro�td�4�ays.
We have co3�tit�uously honed the rollabarative d}'namics uf tl�r «�arkshops and the
pursuit uf thc idcas .�nd i�jral. th re� sult irti tl�e brst �c�lutions ti�r cvery <YSSi�;nmcnt.
Prajeets: We e��.�luatr the curre�u ronclitio��s, ide�itify� ���a}s tc> in�prove ���,tain-
al�ilit}�, an�i incor�orate thetn into ottr procrssr� ar�d pl�uls ���}�ile me�tin�; the clirut�,
tivanrial ubjecti�rs. We detennine clear and mrasurable �oals carly in the �r�ject.
d�finin�; succcs� nicasures, scttit��; accountability f'or tbis succcss and leavin�; hchind
a I�e�ary For �;enrritions to co�i�e. 1)ecign W�rk,hop has dcvelopcd output thmus;h
thr usc c�f 5rrie� of prc�prictary t<>«is inrludin� mctri:s hraiti�tz>rminc;, SMAIZT �;c�als,
strate�;ies �i�ith .u•ticulatrd responsibilities aud accon�pantirii�� ro.t-be»efit ai�aly�is.
This fc�r�n.it allo�� tlir fin:il output t� hc h3r�ible to grc�«� «�ith a rotn�uui�ity yet .till
tet c:lc�ar at�d arhicvablc outcon�rs.
Planning Management Qur Organization: We are a inediun� sizc firni, lar;;e c�nuu�;h ta affard excep-
Environmental Assessment tioiial talent a»d ttie stihstaiitial technoln�;ica1 and marza�;eilient resc�urces to accoi3�-
r�ic>date tl7e l,it�t;ctt ot projrcts �vitlt th� t3exihility to �tirc>rk tvitli tlie niosC iiiti�nat�ly
Strategic Services
ycaleci assinnntet�t,.
Development Strategies
Process: W� arr connnittrd to thc "dc5igtl �vorksho}>" mo4icl. ()ur a} is
Graphie Communieation, iterative, ei�};a�;iu�; .ill sis�iiiEirat�t c�iistiturFicie, - �ur �lieiits ;is �vcll a� ��ublir a�;eii-
Design and Doeumentation ��es, ronrenied rrrixent a�id special intere�t�. \XJe'��e }�c°rferted our c�inmunicatie7ns
IEED Camplianee :kill, tc� a.sure succcs� in public- ac;ce}�tanrr anci apprcavals. 1)elivet thc hi�;lie5t
yi�alit}' is huilt int�� uur ,trurture.
il4", 1.. v i'j %.�:t: i,.=i
�.
Being, Recognized: ()nc �►�cisurr of our rt�c�tivc�it5s is rcco�;nitior� hs' th�
ii��iustrir� tie•r tierve ane� fi our peers. VC�e have received scvreti of .i�v.ir�ir tor
c>w eiesi�r» and planniti�; arca�nplishmentti fremt or�*anizati�ns inclu��in� th� Urban
Land It�stitut�, thr C:on�;rrss ot N�«� Urhanism, thr Am�rican Sorirty of I.a�id�;capc
Architccts an�j thc Amcriran 1'laiitiin�� Associatioii, «ur ti�ust rct:ent a�coladc h�i�i�
eeco�;nireei a, t}�e ?U(��+ ASl_A Firtn e�f'the Year. Wr :ire �Ise> ciedicate�i to �,riviii�;
back and ciur }��aplc contribut� si�;niftcantly to tcachin�;, protestiio»al associations
an�� uthcr prcifcssic>nal activitie,, <�s ���rll as uuuicrr�us c�unuYiuniry organizatic>ns.
���1Pf7 c'Iti'1POHittPttt, CCc�HO/titC�, �lt'f �Illl� i0tPt1t1N+tN}' ctYC co��rf>irte Itt �It2f'tlic�l!}' �+'���1 t�r�' f�t(tQlt:+
uf thr land �r�i�I nr��d� oJ socict�r, iir��tiral plac•rs rc�<�itt. 1'l�r«�s tlr��t li�t tlre >�drit. tiustvi�rvt�lc
p(�a�c�s nf tiruclt�s± b<��itity. inc/ilrinL qir�r(ity aiict irr�tnlcl n�zl�re - ff�r o�ir �1(r1rt;, 1or cocrc�y �irt�l
Jor tlr<� ���cld (�c�ir{� <�f our F�l�ta��t.
�V
REFERENCES
Aspen Music School Campus: Aspen, CO
Jennifer B. Elliot, Director of Finance and Administration
Aspen Music Festival & School
Music School Road,
Aspen, CO 816ll
970.205.5040
Gondola Plaza: Aspen, CO
Dave Corbin, Aspen Skiing Company
970.923.8751
Aspen Area Community Plan: Aspen, CO
Cindy Houben, Pitkin County Community Development Director
Community Development Department
130 South Galena Street
Aspen, CO 81611
970.920.5090
DESIGNl� ()I� � ti� 1t )1'
3!
FIRM PROFILE
Celebratirrg 10 YE>ars r�f LEEC7 C�ertijiec� Clesigra
Beaudin Ganze Consulting Engineers Inc. brings over eighteen years of sustainable and custom-tailored
designs to each individual project we undertake. For us, sustainable design is not an added service - it's
our core business.
We see sustainability as a fundamental of good design, helping clients reduce operating and
maintenance costs, while protecting and conserving natural environments. We are experts in LEED
design, employing state-of-the-art technology and tools to optimize energy-efficient building systems
and improve the owner's bottom tine.
We educate our clients with all aspects of sustainable building practices including how it will affect their
project, budget, operation and building maintenance; ultimately helping them make better choices on
their projects.
Market Sectors:
■ Commercial / Retail / Light Industrial
■ Facility Energy Services
■ Government
■ Health Care
■ High-End Residential
■ Hospitality
■ Institutional (K-12 and Higher Ed)
From optimizing energy-efficient building systems to turn-key solutions -
we are committed to meeting the needs of our clients.
1-866-MEP-BGCE I www.bece.com
■ LEED Championing / Consulting
■ Construction Management
■ Energy Modeling ( � ^: „' ' � )
■ M/E/P Design
■ Commissioning(�,�.: .;�� i: .., :,i�J�r; i�)
■ Lighting Design
■ Technology Design
■ Integrated Project Delivery (IPD)
■ Test Adjust & Balance (TAB)
ALBUQUERQUE I DENVER I FORTCOLLINS I LAKETAHOE i SriCRAMFNT� I VAIL
��
ASPEN, COLORADO
`h:�i':_�. _��,.".15��
Wheeler Stallard Museum
3 Sphere Residence
3 Trees Residence
7th Street Residence
935 Gibson Avenue
946 Willoughby Way L.L.C.
AGH Group Residence
Akesson�Cholas Residence
American National Bank
Aspcol
Aspen Club
Aspen Elementary School
Aspen Golf�Tennis�Nordic Facility
Aspen Highlands Affordable Housing
Aspen Middle Schooi
Aspen Middle School LEED Commissioning
Aspen Mountain Lodge
Aspen Mt. Condo
Aspen Music Festival and School Campus
Aspen Pitkin County Airport - Aircraft Rescue and Fire Fighting Facility
Aspen Recycle Center
Aspen Skiing Company T.I.
Aspen Square Construction Management
Aspen Valley Hospital
Bell Cottage
Blechman Residence
Bowden Residence
Brink Residence
Burlingame Employee Housing
Castle Creek Campus
Castle Creek Residence
Chart House
Christian Dior Retail Space
Christiana in Aspen
Cole Barn Renovation
Dancing Bear Lodge
Darwin Residence
Demos Residence
Dr. Ferrar Res Fire Protection�Aspen
Eagle Pines - Lot #5
Elden Residence
Fanny Hill Townhomes Design
Fullerton Residence Design
Gaines Residence
Galena Lofts
Gary Lauder Residence
Graham House
Grand Aspen Hotel
Gross Residence Review
Hannph Dustin Building Addition
�E�u��i�v �
GAN7_F j
consulting engineers, inc.
Wagner Park Edge Pavilion
Aspen, Colorado
� II
#
W�;;��'=`� �
Aspen Middle School
Aspen, Colorado
:�..... ,,,.�..
Little Ajax Affordable Housing
Aspen, Colorado
Christiania
Aspen, Colorado
3'
ASPEN, COLORADO
� . �.��� .. .. . �
Highlands Pond House
Hill Residence
Hirsh Residence
Hotel Jerome Renovation
Iverson Residence
Kobey Bvilding Design
Lampert Residence
Lauder Residence Design
Lehrmpn Residence
Light Residence
Little Aiax Affordable Housing
Little Nell Bpr
Little Nell Hotel Retail
Lost Basin Ranch Swim Camp
Maroon Greens Townhomes
Maroon Ranch
Maroon Townhomes at Aspen Highlands Village
Mazza Residence
Murdock Residence
Obermeyer Place
Obermeyer Place Commissioning
Och Residence
P + T Ranch House
Paley Residence
Potpmkin Residence
Quasha + Nemeth Residence
Rivers Residence�Pitkin County
Rosen Ranch
Ryckman Residence
Silver Lining Ranch
Skoks Residence Rooftop Terrace Renovation
Smithburg Residence
Snadon Residence
South Aspen Street Townhomes and Affordable Housing
St. Regis Hotel Conversion & Renovation
Stafford Residence
Steel Residence - Main House
Stryker Residence Addition Energy Calcs
Stuart Residence Swimming Pool Energy Re
Sugar Mountain Trust Historic Residence Remode)
Sundeck Restaurpnt
Toscana Residence
Wagner Park Edge Pavilion
Wyly Rpnch
Zegna Retail
EiFJJ'�I.�DIN �
F
Cif1N7.E
consulting engincers, inc.
Hotel Jerome
Aspen, Colorodo
Sundeck Restaurant
Aspen, Colorado
Obermeyer Place
Aspen, Colorado
Little Nell Hotel
Aspen, Colorado
!�
��.ACIC}I�J �
DANIEL J. KOELLIKER, P.E., HBDP, LEED� AP ���E �
`�� y�! 3`a `.l �'r"x i. cansuitlity eng9n�e!s. inc.
BACKGROUND
Dan Koelliker joined BGCE in 1996 with a fundamental, overall knowledge of building systems applications and
design, including snowmelt systems, boiler plants, heating/chilled water distribution and evaporative cooling.
As Managing Principal of the firm's Vail office, he has mentored many of the firm's engineers and served as
Principal-In-Charge of a variety of commercial, institutional, and resort projects.
Dan's specialty has been designing high performance mechanical systems for civic, community projects,
boutique hospitality projects, educational facilifies, and custom homes. Dan's cross-disciplinary integration
combined with his careful and thoughtFul consideration of all parties' needs and innovative energy mindful
solutions on a given project make him the team leader that BGCE's complex projects demand.
Dan has spearheaded the firm's sustainable design movement, lending his expertise and innovative ideas to
numerous projects seeking LEED Certification and becoming one of the first engineers in North America to
gain ASHRAE certification as a High-Performance Building Design Professional. In the course of his work with
sustainable design, Dan has also gained certificatinn as an Energy Design Professional in Pitkin County, where
he assisted in developing the County's energy code.
SELECT PROJECTS
• Aspen Elementary School Theatre Renovation — Aspen, Colorado
• Aspen Middle School LEED Design and Certification Consulting — Aspen, Colorado
• Aspen Music Festival and School Campus — Aspen, Colorado
• Basalt Library— Basalt, Colorado
• Beaver Creek Snowcat Maintenance Facility — Eagle County, Colorado
• Burning Mountain Fire Protection District — New Castle, Colorado
• Christiania Building Geothermal Heath Pump & Snowmelt System — Ketchum, Idaho
• Eagle County Criminal Justice Center Remodel — Eagle, Colorado
• Eagle County Landfill Maintenance Building — Wolcott, Colorado
• GR Ford Amphitheater Renovation — Vail, Colorado
• Glenwood Springs Municipal Building & Civic Plaza — Glenwood Springs, Colorado
• Hotel Jerome Renovations — Aspen, Colorado
• Little Nell Hotel & Restaurant, Bar, & Gondola Remodels—Aspen, Colorado
• Mountaineer Square — Crested Butte, Colorado
• Red Lady Lodge — Crested eutte, Colorado
• Riverview Housing — Eagle County, Colorado
• Silverthorne Town Pavilion — Silverthorne, Colorado
• Solara Child Care Center — Basalt, Colorado
• Sublette County Library — Pinedale, Wyoming
• Town of Vail Streetscape — Vail, Colorado
• Wagner Park Edge Photovoltaic Pavilion — Aspen, Colorado
• West Vail Fire Station No. 3— Vail, Colorado
PROFESSIONAL REGISTRATIONS
• Colorado, PE #35218
• Maryland, PE #0035647
• Certified Energy Design Professional in Pitkin County, Colorado
• USGBC Leadership in Energy & Environmental Design Accredited Professional (IEED� AP)
• ASHRAE Certified High-Performance Building Design Professional (HBDP)
PROFESSIONAL AFFILIATIONS
• American Society of Heating, Refrigerating, and Air-Conditioning Engineers, Inc. (ASHRAE)
/
` �
PETER S. BOND, LEED� AP
;�;,� ,..,.�,�. ..�.,�,�r, s�,. . . , � �
E���1C1[31�V �
.�
+l�A€��E:
canSUltiny engirr�e^s. inc.
BACKGROUND
Peter Bond has more than 20 years experience in the HVAC profession, specializing in the commissioning of
central plants, healthcare facilities, commercial office space, resorts and high performance LEED projects. His
areas of expertise cover the administration, organization and experience required to inspect start-up, test,
troubleshoot, train and furn over facilities to an owner on time. Peter understands the owner's goal to have the
facility operators trained with documentarion in hand to operate and maintain the facility as designed.
Peter started in 1986, operating and maintaining large systems for a 13-story high rise. The building included
a large built up chilled water system automated with DDC. The building also encompassed state-of-the-art
security, fire life safety and high performance elevators. Peter went on to become Chief Engineer for Tishman
West Companies after years of service in controls and refrigeration.
Prior to joining BGCE, Peter provided office and field engineering support for Marshall Erdman & Associates
for a 10-state region. This included field inspections, start-up and commissioning of inechanical and temperature
control systems. Day-to-day written and verbal communications provided key technical support and diplomacy
between client contacts, design engineers, equipment suppliers, project managers, superintendents, estimators,
skilled trades and control contractors. Company representative responsibilities included project management,
warranty service, design changes, writing specifications, estimating, contract negotiations, temperature control
programming, air & water balancing, coordinating red line drawings, completing commissioning reports and
trpining facility pnd maintenance staff.
SELECT PROJECT EXPERIENCE
• Aspen Middle School LEED Commissioning — Aspen, Colorado
• Basalt Library — Basalt, Colorado
• Burr Oak Commissioning - Fort Collins, Colorado
• Commerce City Civic and Justice Center Extended Commissioning Services - Commerce City, Colorado
• Deer Valley Montage - Deer Valley, Utah
• Empire Pass - Park City, Utah
• Goldberg Residence - Avon, Colorado
• Grand Sandestin Resort - Destin, Florida
• Hotel Terra LEED NC 2.2 Fundamental Commissioning - Teton Village, Wyoming
• Hummingbird Lodge - Bachelor Gulch, Avon, Colorado
• Ritz Carlton Highlands Hotel Lake Tahoe LEED Commissioning - Lake Tahoe, California
• Schaffer's Camp LEED Commissioning -Truckee, California
• St Anthony Medical Office Building-LEED Fundamental Commissioning - Westminster, Colorpdo
• St. Mary's Hospital - The Century Project Commissioning - Grand Junction, Colorado
• Village @ Northstar Phase I Commissioning — Truckee, California
EDUCATION & TRAINING
Colorado State University - 2yr Construction Management/Engineering — Fort Collins, Colorado
University of Wisconsin - Retro-Commissioning — Denver, Colorado
Ferris State College - Refrigerant Handling Universal CFC Certificate — Denver, Colorado
PROFESSIONAL REGISTRATIONS
• USGBC Leadership in Energy & Environmental Design Accredited Professionpl (LEED� AP)
* Staff inember's previous experience
�4
B�uai�v �
GAI�ZE
consulting engineers, inc.
�t� ": !'� i. Vd 9'.: �''i'i. ;: `.'�
Mr. Paul Wember, Owner's Representative
Wember Inc.
7525 South Jasmine Court
Centennial, CO 801 12
720.382.3795
Projects: Basalt Library
Ms. Diana Skirko, Superintendant
Aspen Schools
0235 High School Road
Aspen, CO 8161 1
970.925.3760
Projects: Aspen Middle School, Aspen Elementary School
Mr. Scott Chism
City of Aspen Parks Department
970.920.5120
Projects: Wagner Park Edge Pavilion
��
t � KL �A, Inc.
.��� `�;z.��.l;,=t�! _.�i�,;,tt�,�i;ts- <irici r°3�:;i.,..;�,
Firm Expertise
• Complex and Design-Driven Architecture
• Commercial and Residential Cost-Driven
Construction
• Unusual Structures and Structural
Challenges
Firm Description
• Established in 1994
• Over 35 employees in four offices in
Colorado, including an office in the
Roaring Fork Valley
• In the top ten of structural engineering firms
to work for in the United States since 2006-
top three in 2009.
• Have been working on public projects in
Colorado for many years and are currently
designing the new Stapleton Library in
Denver, Colorado.
• Have worked successfully with nearly all the
major contractors in the region.
• Advocates of the sustainable movement. Have
designed numerous LEED certified buildings
including several LEED-Platinum. Have
LEED Accredited Professionals on staff.
• Historic Restoration/Rehabilitation
• Design/Build of Steel Structures
• Seismic Design
• Peer Review Services
• Experts in Integrated Project Delivery (IPD). We have been performing design-build steel construction as a
subcontractor for over 10 years.
• Experts in Building Information Modeling (BIM). All design and steel shop drawing preparation is
completed in 3D.
Firm Reputation
KL&A is known for our creativity, responsiveness, and thoroughness of coordination. We understand market
forces and produce economical designs from apparent complexity. We are tireless collaborators. We work
closely with the entire ownership/design/construction team to make sure everyone's needs are met. We like to
make everyone on the team look good.
Principals
Gre�orv R. Kin�slev. P.E., Ph.D., C.C.E. , CEO, has 25 years experience in structural research, experimental
testing and design, with a special emphasis on seismic design and masonry structures.
Brant J. Lahnert, P.E. , CFO, has 25 years experience, coming from a background in the investigation of
structural failures, and now focusing on the design of architecturally significant buildings.
M. Dou�las Rutled�e , Director of Construction Services, has 38 years of experience owning and managing
steel fabrication companies, consulting with the steel construction industry and managing steel construction.
3457 Ringsby Court, # 212 421 E. 4`� Street 1717 Washington Avenue, # 100 129 Emma Road, Unit A
Denver, Colorado 80216 Loveland, Colorado 80537 Golden, Colorado 80401 Basalt, Colorado 81621
Ph:(303)384-9910 Ph:(970)667-2426 Ph:(303)384-9910 Ph:(970)927-5174 �
Fa�c: (303) 531-6857 Fax: (970) 667-2493 Fa�c: (303) 384-9915 Fax: (970) 927-5194 �
Basalt Regional Library
.� KL�'A, Tnc.
�_�" Stiuc:tu a! E:n�i�rers anci Ei.,�ices:
1°'I I 1Ne�;n6 sv,� . �uuc IUC� t,�: irti r"i; 8C::tii
pl' iL�? z<d.1.ia,a ��"7 fx .?tl:s ;:£t 1.q i�>
TEC�INICAL SPECIALTIES
�h+�^.u�.v.l..c: rair�
Brant J. Lahnert, P.E. LEED Green Associate
Chief Financial Officer
Principal Engineer
Analysis and design of structures using all building materials. Design, analysis, assessment and retrofit of
structures in seismic wnes, with a special emphasis on reinforced masonry, concrete and steel structures.
Investigation, analysis and design of retrofit solutions for e�sting structures. Investigation and analysis of
engineering failures.
EDUCATION
Bachelor of Science, Architectural Engineering (Structures)
University of Colorado, Boulder, Colorado, 1982
Master of Science, Civil Engineering (Structures)
University of Colorado, Boulder, Colorado 1984
PROFESSIONAL REGISI'RATIONS
FIRST REGISTRATION IN 1989
*Colorado *California *Montana *Nebraska *Nevada *Wyoming *Texas *SouthDakota
*LEED Green Associate
AWARDS
American Concrete Institute Fellow Award for Concrete Research Outstanding Paper of 1993, Journal of the
Performance of Constructed Facilities, American Society of Civil Engineers
EXPERIENCE
2003-present Chief Financial Officer, KL&A, Inc., Golden, Colorado.
1994-present Principal Engineer, KL&A of Colorado, Golden, Colorado. Design and construction review of
new buildings of a11 material types; evaluation and retrofit of existing structures; office
1987-1994
1985-1987
manager,
Senior Engineer, Failure Analysis Associates, Menlo Park, Califomia. Structural evaluation of
existing buildings and investigation of failures of engineering structures including building
collapses, settlements, earthquake damage and performance problems (i.e. leakage, cracking,
deflections, etc.).
Engineer, Atkinson-Noland & Associates, Boulder, Colorado. Designed simple wood and steel
structures, and complex high pressure testing equipment.
RECENT REPRESENTATIVE PROJECTS
Engineer of Record Denver School of Science and Technology, Denver, Colorado; 45,000 sf steel and
light-gage framed middle school building addition to existing high school-
anticipated LEED Gold, $7M.
Engineer of Record Basalt Regional Library, Basalt, Colorado; new construction, 21,000 sf public
library and community center — anticipated LEED Silver, $7.2M.
Engineer of Record
Engineer of Record
Engineer of Record
National Renewable Energies Laboratory Research Support Facilities Building,
Golden, Colorado; A 220,000 sf, LEED Platinum steel framed office building.
Doerr-Hosier Center, Aspen, Colorado; new construction, 22,000 sf conference
center at The Aspen Institute designed to enable people from all over the world to
unite for open-minded discussion and problem solving - LEED Gold status,
$14M.
TAXI 2, Denver, Colorado; 134,000 sf, mixed-use project featuring 28 residential units
over two floors of business and commercial space, $12M.
Engineer of Record Cherry Creek North Redevelopment, Denver, Colorado; new consiruction, office
building, retail space, 11-story hotel, multi-family residential and below-grade
parking $150M.
Engineer of Record Benedict Music Tent, Aspen, Colorado; new construction, legacy facility creating a
permanent venue for the Aspen Music Festival, containing the main tent canopy, a
stage canopy, back house facilities and an underground link to the existing Harris
Concert Hall, $ l OM.
��
�' , KLF,�'A, Ittc.
Stri�.^tu<<,I t - �;��t�.=.cis <3rul E3u�lc+:=��
t�� F rnm<a R�� . U�i;t !t. F��t�;Jli C;C.1 `t'Ei�1
E�h !�r't7 9li .. ''� f>. `-17f} Y?7 . 1�:t �,Yr.v.hi�ttl �:,u:
TECHMCAL SPECIALTIES
Brett McElvain. P.E.
Vice PresidentlEngineering Manager
Analysis and design of structures involving conventional and alternative building materials. Supervision of
production and coordination of construction documents and construction administration. Construction management
services for detailing, fabrication and erection of steel structures.
EDUCATION
Bachelor of Science, Civil Engineering (Structural Emphasis)
University of Colorado, Boulder, Colorado, 1999.
Master of Science, Civil Engineering (Structural Emphasis)
Purdue University, West Lafayette, Indiana, 2003.
PROFESSIONAL REGISI'RATIONS
Colorado
EXPERIENCE
2007-present
2001-2007
1999-present
Engineering Manager, KL&A, Inc., Basalt, Colorado. Supervision of production and
coordination of construction documents and construction administration. Constn�ction
management services for detailing, fabrication and erection of steel structures.
Project Manager/Construction Manager, KL&A, Inc., Golden, Colorado. Production and
coordination of construction documents. Construction management services for
detailing, fabrication and erection of steel structures.
Design Engineer/Project Manager, KL&A, Inc., Golden, Colorado. Design of wood,
masonry, concrete, and steel structures. Investigation and analysis of existing structures.
Production and coordination of construction documents.
RECENT REPRESENTATIVE PROJECI'S
Engineer of Record
Engineer of Record
Engineer of Record/
Project Manager
Engineer of Record/
Project Manager
Engineer of Record/
Project Manager
Design/Project Engineer
Design Engineer
Design Engineer
Carbondale Recreation Center, Carbondale, Colorado; $2M , 11,000 sf
recreation facility -achieved LEED Platinum Status, the only LEED Platinum
Recreation Center in the world.
Little Aja�c Affordable Housing, Aspen, Colorado; $SM , 16,500 sf a 14-unit
affordable housing project designed to exceed Aspen's sustainability code and winner
of 2007 Architectural Merit Award by AIA New York.
Aspen Music Festival and Country Day School Campus, Aspen, Colorado;
$60 M„ school campus consisting of classroom buildings, rehearsal
halls, administration buildings, practice rooms, and two bridges.
Willits Bend, Basalt, Colorado; $SM per building, 9 building mixed
use project creating a community of artists, craftspeople, and
professionals utilizing an exposed and versatile steel structure.
Snowmass Town Hall, Snowmass, Colorado; $8M, 30,000 sf composite
steel framed civic building with offices, a courtroom and parking.
Wagner Park Edge, Aspen, Colorado; $1.2M, performance space,
e�chibition pavilion, clock tower, sports overlook, public restroom, mall
phone kiosks, and parks storage.
Robert Hoag Rawlings Public Library, Pueblo, Colorado; $18M, 100,000
sy. ft., steel-framed library with 2-story pedestrian bridge incorporating
concrete- framed main stack of existing structure.
Basalt River Walk II, Basalt, Cobrado; $SM, new construction, mixed-
use development consisting of a parking garage, retail space and multi-
family housing.
"l�
a- , �� : : KL,�A, Inc.
� Str«cturaE Fr7gineers rtnrl E�da�IcSers
Project Name:
Project Scope:
Date:
Location:
Architect:
Contractor:
Construction Cost:
Basalt Regional Library
21,000 sf public library featuring exposed
structural steel, clerestories, and a 28 ft tall
curtain wall —anticipated LEED Silver
2010
Basalt, Colorado
A4 Architects and Oz Architecture
B & H General Contractor
$7.2 million
Project Name:
Project Scope:
Date:
Location:
Architect:
Contractor:
Construction cost:
Project Name:
Project Scope:
Date:
Location:
Architect:
Contractor:
Construction Cost:
Project Name:
Project Scope:
Date:
Location:
Architect:
Contractor:
Construction cost:
Sublette County Library — Phase II
8000 sf addition to existing library. Highlights of
project include rammed earth, high seismic, exposed
heavy timber trusses
2009
Sublette County, Wyoming
Carney Architects
Fixter Construction Co.
$2.8 million
Omar D. Blair School
79,000 sf 1-story
K-8 facility with recreation center and library
that is shared with the community
2004
Denver, Colorado
Anderson Mason Dale
Skanska USA
$10.5 million
Robert Hoag Rawlings Public Library
100,000 sf library and public meeting space
incorporating the main stack area of the
existing building
2003
Pueblo, Colorado
Antoine Predock Architect and Anderson
Mason Dale
H.W. Houston Construction Company
$18 million
Project Name: Sublette County Library — Phase I
Project Scope: 14,500 sf log and timber framed library in a high
seismic region.
Date: 1997
Location: Sublette County, Wyoming
Architect: Carney Architects
Contractor: Pacific West Construction
Construction cost: $2.5 million
Pitkin County Library
t ..
i ��`x� �- ,� ����' _'
� ,.�
� �� �
` . ,. ..
Omar D. Blair School
�.� � �
„
�rr�rr_ �
Sublette County Library
- 1�
Basalt Regional Library
Sublette County Library Addition
Robert Hoag Rawlings Public Library
� KL,�A, Inc.
Str��c;#��ral Er�ganeers ancl [3��ilci�r,;
Project Name:
Project Scope:
Date:
Location:
Architect:
Contractor:
Construction cost:
Red Brick Center for the Arts
Addition of a media room and reception/gallery
space to the historic forrr►er schoolhouse that
houses the Center
2007
Aspen, Colorado
Willis Pember Architects
Gateway Construction & Design
$1 million
Project Name: Snowmass Town Hall
Project Scope: 30,000 sf composite steel framed civic building
with offices, a courtroom and parking
Date: 2008
Location: Snowmass, Colorado
Architect: Z Group Architects
Contractor: R.A. Nelson Construction Company
Construction cost: $8 million
Expanded Services: Steel Detailing/Design Builder
Project Name: Littleton Historical Museum
Project Scope: Addition to (11,000 sfl and renovation of
existing museum
Date: 2004
Location: Littleton, Colorado
Architect: Andrews & Anderson, P.C.
Contractor: Pinkard Construction Company
Construction cost: $10 million
Project Name:
Project Scope:
Date:
Location:
Architect:
Contractor:
Construction Cost:
Carbondale Recreation Center
11,000 sf Recreation facility for the Town of
Carbondale, Colorado -achieved LEED Platinum
Status, the only LEED Platinum Recreation
Center in the world.
2007
Carbondale, Colorado
J.R. Baker Architects
B&H General Contractors, Inc.
$2 million
Project Name:
Project Scope:
Date:
Location:
Architect:
Contractor:
Construction cost:
Doerr-Hosier Center
22,000 sf conference center at The Aspen
Institute designed to enable people from all over
the world to unite for open-minded discussion
and problem solving - achieved LEED Gold
status
2007
Aspen, Colorado
Jeffrey Berkus Architects
Shaw Construction Company
$14 million
Pitkin County Library
�
Red Brick Center for the Arts
Snowmass Town Hall
Littleton Historical Museum
Carbondale Recreation Center
Doerr-Hosier Center
� _ KL,�A, Ine.
� Structur�I Eng�ne�rs ancl �3uilder�
References
Antoine Predock Architect
300 12` Street NW
Albuquerque, New Mexico 87102
Ph:(505)843-7390
Contact: Graham Hogan
Reference Projects: Pueblo Public Library
B&H General Contractors
5317 CR 154 Suite 206
Glenwood Springs, Colorado 81601
Ph:(970)945-0102
Contact: Casey Wilkins
Reference Projects: Basalt Regional Library
Carney Logan Burke Architects
25 South King Street
Jackson, Wyoming 83001
Ph: (307) 733-4000
Contacts: John Carney, Eric Logan, & Kevin Burke
Reference Projects: Sublette County Library Phases I& II
�3
PQRAMETRiX, lnc.
t�ri [>' ..i ' ii)' :tl'. �' ..
� . ('l%� i. r .� .t�,,:.7., .
��
JOACHIM R. ANZER, CPE
Cost Estimating Specialist: Parametrix, Inc.
EDUCATION:
Utah Technical College - Cost Estimating - 1976
`. ,-, :r. _�r,r �.. ' l �y` ...�J(,�
k:�[..'tii. '.5'�..i .,.°.'f
f ;I` i i � I1 �- '
PROFESSIONAL REGISTRATION:
American Society of Professional Estimators
Certified Professional Estimator - Certificate No. 619 - Certified 1983 to Present
PROFESSIONAL ASSOCIATIONS:
American Society of Professional Estimators
American Society of Cost Engineers
Society of American Value Engineers
Mr. Anzer has over 34 years experi�nce in the field of Construction Cost Consulting. He
was employed by the firm in 1975 as an Estimator and has served as President since 1979.
As the lead of the firm, he is responsible for over-all coordination and quality control for
each project. He oversees the computer systems used for Estimating and Man-Hour
Analysis. Mr. Anzer reviews all quantities and costs, as well as the scheduling constraints
on all projects. He has experience on a wide range Commercial, Civil and Municipal
Facilities. His combined experience amounts to a Construction Value of over $21 billion
with over 5,600 projects to date. Selected project experience on Libraries is as follows:
Phillip S. Miller Public Library, Douglas County, Colorado (w/HPA)
Louisville Library, �ouisville, Colorado (w/HPA)
Sterling Public Library, Sterling, Colorado (w/HPA)
University of Utah Marriott Library Renovation, SLC, Utah
Logan City Library, Logan, Utah
University of Utah Marriott Library Expansion, SLC, Utah
Robert Hoag Rawlings Public Library, Pueblo, Colorado
Mesa County Public Library, Grand Junction, Colorado
Provo City Library at Academy Square, Utah
State Library Dept of Visually Handicapped, SLC, Utah
Utah State University Science & Technology Library, Utah
Brigham City Library New City Center, Utah
Sublette County Library, Pinedale, Wyoming
Madison County District Library Addition & Remodel, Rexburg, Idaho
Sterling Public Library, Sterling, Colorado
Library Addition & Remodel, Twin Falls, Idaho
Jerome Library Remodel & Addition Jerome, Idaho
Crawford Public Library, Crawford Colorado
4,800,000
7,800,000
2,600,00
56,800,000
36,500,000
24,600,000
20,400,000
15, 700, 000
15,600,000
11,200,000
9,600,000
6,900,000
4,100,000
3,300,000
2,600,000
1,800,000
1,100,000
1,000,000
�U
'°-+INMWYBiW� .... w�,..-wr..-.,...u«.wx _
PARAMETRIX, Inc.
' �?3�? 5'.�.:�tt �tliati't',ti:.� �.'r ...
.`�',i' l � lki> i��. . (,t'.:f S !S.� �I _ �
REFERENCES
Humphries Poli Architects
2100 Downing Street
Denver, Colorado 80205
Dennis Humphries, AIA, Principal
P 303-607-0040
F 303-607-0041
Louisville Public Library
City of Louisville
749 Main Street
Louisville, Colorado 80027
Julie Boyd- Deputy City Manager
P 303-335-4800
F 303-335-4833
��
Santa Clara Public Library
Washington County Commission Recorders Office
197 East Tabernacle Street
St. George, Utah 84770-3443
Larry Hortin Director
P 435.634.5700
it�!`,'�.I 1 ..�'�i
f:l' 5���.��F' �.3'.; .'.� �':.'l�t�
E -�i�t; �'.r:r ;i� r �r�, . !�
L( �
Company Profile
Schmueser Gordon Meyer, Inc. (SGM) is a civil engineering and surveying firm
headquartered in Glenwood Springs with additional offices in Aspen, Gunnison, Meeker,
and Grand Junction. Since 1986 SGM has served the engineering needs of
municipalities, counties, utility districts, and private enterprises throughout the Western
Slope. SGM has built a solid reputation by providing comprehensive and reliable
solutions for government and business to overcome the difficult challenges posed by
land, water and the built environment.
SGM serves as the town/city engineer responsible for water and wastewater facilities,
transportation infrastructure, and drainage and storm water planning and mitigation for
12 Western Slope municipalities, as well as the full-time engineer of record for seven
local utility districts.
SGM has developed and maintained these long-term relationships through staff
longevity, commitment to clients, dedication to quality work, and sensitivity to the values
and needs of the citizens of the region. A large part of our success can also be attributed
to the development of relationships with local subcontractors such as mechanical,
electrical and geotechnical engineers, local and state regulatory personnel, and local
contractors, resulting in a trust and familiarity that is irreplaceable when it comes to
efficiency and quality.
��
Jay W. Hammond, PE
Principal, Civii Engineer
Sector Leader for the
Remote Offices of SGM,
Inc. including theAspen /
Pitkin, Crested Butte and
Grand Junction Teams
Education
BSCE Civil Engineering,
Tufts University, Medford,
Massachusetts 1975
Professional Affiliations
Professional Engineer, CO
General Background
Jay, a General Civil Engineer, Principal and Sector Leader, has worked for SGM since
1989. He has been involved in the design, construction, and project management of a
wide range of civil infrastructure projects and private development projects from the land
use approval process through construction. Prior to joining SGM, Jay worked for the City
of Aspen from 1977 to 1989, ultimately as the City Engineer and Public Works Director
with responsibility for the City's Engineering, Streets and Electric Departments and over
40 employees. That experience provided a strong background in municipal land use
regulation and growth impact issues as well as design and long-term operation of a wide
range of Public Works projects and improvements.
Since joining SGM, Jay has undertaken numerous private and public projects for various
development and municipal clients in the Roaring Fork River Valley and beyond. He is
currently a Principal of the firm with responsibility for satellite offices in Aspen, Crested
Butte and Grand Junction.
Summary of Experience
Land Use Process. Based, in part, on his experience as a City Engineer and Public
Works Director, Jay has worked on many projects beginning at the land use approval
stage. Most Colorado jurisdictions require that land use approvals for subdivisions and
individual private commercial and residential projects demonstrate the ability, early in the
process, to solve engineering-related constraints including adequate access, grading,
drainage and utility infrastructure. In over 20 years at SGM, Jay has provided engineering
support for a large number of projects in western Colorado jurisdictions beginning at the
conceptual application stage.
Residential Subdivisions. Jay has worked on civil design of many subdivision projects
in Aspen and Pitkin County including coordination of the platting effort as well as design
of roads, utilities and drainage improvements. Subdivision projects in the upper Roaring
Fork Valley are typically characterized by high land value and tight constraints on access
and infrastructure corridors. Jay has worked with the developers and architects to
generate creative solutions to efficient infrastructure placement in limited corridors.
Lodge / Commercial Projects. Jay has worked on most of the larger lodge building
projects in Aspen over the last 20 years. These projects have been focused on the
lodging district at the Base of Aspen Mountain Ski Area and have typically entailed a
number of common design challenges. Projects of this nature have generally required
deep excavations and complex foundation structures requiring elaborate foundation
drainage and radon collection systems. Jay has worked extensively with environmental
and mechanical system consultants on innovative solutions to solve sub-slab drainage
and radon collection requirements with a combined piping and discharge / venting
system.
Affordable Housing Projects. Although no longer unique to resort communities,
affordable housing design and construction has been a significant market in the upper
Roaring Fork area for many years. From his involvement in affordable housing projects
developed by the City of Aspen to over 15 projects completed on behalf of SGM, Jay has
been heavily involved in employee housing development for well over 20 years.
Affordable housing projects invariably seek to provide the maximum number of beds on
a given site as efficiently and economically as possible. By definition, affordable housing
projects allow very little room for access, drainage and infrastructure needs. Jay has been
involved in designing projects of this nature long before he came to work for SGM.
��.
....�� .__.. __ _ _
Jay W. Hammond, PE
,, , „ . � , , , „. . ,� , , � , ,� , �� ,„ ,. , , , � � .., , � .. . , ,,,. � „ � , , � . , �
Surnmary of Experience � (cont.)
Residential Projects. Jay provided civil engineering design and coordination assistance
on individual residential projects ranging from typical single-family homes up to a 55,000
square foot private residence nearAspen. Many of the higher-end residential projects in
the Aspen area have the utility service and site design requirements of a mid-sized lodge
structure including commercial kitchens and sub-grade parking. Residential projects on
many rural sites include significant design of individual water supply systems with storage
as well as on-site sewage disposal systems subject to County and, occasionally, State of
Colorado regulations.
Utility Design and Construction. Jay has worked on numerous projects for the
design and construction of water lines, sewer lines, water tanks, pressure-reduction
(PRV) vaults, pump stations, complete private water systems, private sewer collection
and treatment systems, and electric undergrounding projects. Several of these designs
have incorporated upgraded material specifications to allow water and sewer mains to be
placed in closer proximity than would typically be permitted due to corridor constraints.
���
SGM Client References — Spring 2010
David Blair, Grand Valley Fire Protection District Fire Chief
0124 Stone Quarry Road
Parachute, CO 81635
970.285.9119
GR Fielding, Pitkin County Engineer
76 Service Center Road
Aspen, Co 81611
970-920-5206
John Krueger, City of Aspen Transportation Director
130 S Galena
Aspen, CO 81612
970-920-5042
John Weniel, Town of New Castle Public Works Director
PO Box 90
New Castle, CO 81647
970.984.0669
��
TEAM PROPOSAL
Team Coordination
roles
ess{�ntial ir�farmation
pra�r�r�t7ming cansultant
Phase One - Programming and Schematic Design
��roject i��itiation
��rograrnming
mind breakii��
canceF�tual design process
schematic design process
outstamiding cfiarr�ct�:eistics ir� librar�y dcsi�ri
•tl�er conside,•atiorrs
Professional Fees and Schedule
phase on�
��hases two -+ tfiree
ac�ditional services
rc�irnb�.irsable expense�
scheclule
Respondents Certification
Certificates of Insurance
: �� � �
� >. - �:�.
�� £.�.
;�,�� `¢�;
.� �'���.
"1
B. TEAM PROPOSAL
TEAM COORDINATION — PHASE ONE
Willis Pember Architects wili act as Architect of Record, local contact and 'hub' for the two-way flow of
communication between the client and the design team. WPA will manage, store and distribute all
documentation, provide scheduling coordination and establish a local presence for meetings,
clarifications and requests for information arising during Phase One. The client will have immediate and
'on demand' access to all aspects of the project via local presence of WPA, as well as electronically, via a
dedicated project FTP site. Electronic oversight by all stakeholders will be maintained on this site
created specifically for this purpose and continuously updated.
Humphries Poli Architects (Associate Architects) and Willis Pember Architects (Architects of Record)
will be engaged in a full and true collaboration throughout the entire project, including Phase One, each
bringing their specific skill sets and experiences to the table. Humphries Poli Architects will provide
early and immediate direction to the Phase One design process. WPA has specific nonprofit client
experience and direct experience in the history of previous planning studies and will be instrumental in
guiding efforts within the parameters of what the history of the site may offer.
As necessary background, we will involve ourselves in essential information gathering including the
following completed and soon-to-be-completed studies, prior to formal schematic design and in
preparation of our project kick-off meeting:
• Civic Master Plan - City of Aspen
• ZG Master Plan - City of Aspen
• Art Museum expansion at Galena Plaza - City of Aspen �AAM
• Engineering studies of the parking garage - Carl Walker, Inc
• Galena Plaza Design Project - City of Aspen, John Laatch, Capital Asset Manager
• Susan Kent's Strategic Plan - soon-to-be-completed with Library Board and Staff
• Pitkin County Library Staff Collection Management Plan - soon-to-be-completed
HPA and WPA believe there is no better consultant than Susan Kent to fully develop the final program
based on her prior experience, understanding and analysis of the Pitkin County Library to date, and
recommend that she continue in this role with the Architectural Team. A key staff member from
Humphries Poli Architects, Ozi Friedrich, has a Masters Degree in Library Science and Architecture, and
will act as a liaison between Susan Kent's programming work and the architectural design team.
b. l
1�
Project Initiation:
Humphries Poli Architects will support Willis
Pember Architects from kick-off to construction
administration on this project. The project will be
initiated with a kick-off meeting to include the
Pitkin County Library DistricYs project leadership
and designated representatives from the Library
and design team members.
This meeting will establish project relationships,
budget, contacts, and client focused goals. The
team and the Library's leadership personnel will
identify all project stakeholders and prepare an
o�cial project schedule. The schedule will show
individual tasks and identify key milestones. Ryan
Wallace, AIA, LEED-AP, Project Manager, will
maintain this schedule in conjunction with the
Library's leadership personnel.
A regular schedule of client and project
management meetings will be developed so
participants can fully anticipate the planning and
design process.
We intend to build project consensus through
design charrettes, group presentations and
meetings, information gathering sessions,
communication of design alternatives and test
solutions, and by a continual reiteration of the
established project ambitions to the design team,
the identified stakeholders, and the public as
needed.
��
Phase I Programming and Schematic Design
Programming
Through effective information gathering and
analysis, Willis Pember Architects and
Humphries Poli will lead an effective program
development process designed to determine the
optimal space needs for current and future
operations of the library and staff. Work for this
process typically includes the following types of
services.
Data Collection:
Conducting interviews to determine current and
future needs. Assessing existing facilities and
site conditions for current suitability of space and
operational needs. Compiling the results of the
questionnaires, interviews, information gathering
sessions and facility assessments.
Service Demand Analvsis / Proiections:
Review and analysis of the current needs
forecast to determine the demand for future
services and define effective resource allocation.
Green Valley Range Library Adjacency Diagram
Sludp
° I�ca�h
� `....
R. Rewm ;
St+xtf+ ;'
� � �
�.
!�
�
� CoMIYb�t�dhtat �. �� Ya4 !
$tudy ' � ,�
R�aan a ��-
�
_"' _ . r' �.�--,a,�
A,�kkk d 3
YA NF
3tnG
. P � ; .
� a�lRl �1�
�� .
�� e
j �.
�.
. ..
Qnprational and FunctiQ�l Proaramminq;,
Consensus based programming including the
possibilities of combining like efforts to reduce
redundancy, the benefits of centralization or
decentralization of services and the
reorganization of assets, resources and staff.
Buildina Program Develooment:
Work sessions to address collection size and
circulation, special use areas and services
required to support the library's vision and role.
Adjacency diagrams to describe physical
relationships of library functions and divisions
based on library objectives including security
concept, operational requirements, and sta�ng.
Collection size, shelving types and circulation
goals are incorporated into space needs
calculations.
Buildina Proaram Statement:
Comprehensive quantification of the spaces
needed to support the library's vision and roles
will be presented.
� �
���
� p S
�d �
�, � � ^""'� � � ".�-
# : � a ,�� � �� drA � � . � -
� E � . � � � �
" � � � 1 ", """"� -"a ��.a •� �a` ��� .
RnIRY'Yl64f/lF � ` � .
�� i �
, `�,..
o ,�.- °
��'
P�
QhPMYt . t
, ' � � Ct� MA�
' Naw . Putpaat Rvaan
L
_ p►s. °�
Fur�on ,
�
��
�
�"3
�- .
• �,
K
PI , �
Mind Breaking
While many involved in the design process
consider the most important moment in a project
to be the ground breaking, Humphries Poli
believes that the most critical component of
project discovery is a process referred to as
"Mind Breaking". HPA Principal, Dennis
Humphries challenges clients to get out of their
comfort zone very early in the design process.
By showing the client and user team a series of
images and ideas from some of the best and
worst libraries ever built around the world, he
asks clients to free themselves of preconceived
project limitations and start thinking about what
they would want if they could have anything at
all. A few moments of quiet reflection by
everyone in the room and a wish list quickly
develops - ideas as radical as an escalator in a
small town library or as practical as a community
garden are all put on the table. Collectively the
group must balance the wish list with program,
budget and schedule to create something more
akin to a shopping list.
�
W��`_aY.i�
��
�
�
+�A ,
,:.d... 3:
� w � � . ��r�� � r -. . ,. ......�
* - i
' �:�:.°�. ; • � a
f , �
�.�. � ff
* � � �. � � �: ° ��
,.�..
�. �'' Q C ""'.� , �........ r-. � i
�a .-a 4�� . � -
�' � `W� �..�.....,.Y, 1
t ju
�—r�ua�w�aes� i._ ��'r, i ."` . • f 'w`c I
�� , 1 � � �....c_..._._3
Otrtdoor Performance Space and Xeriscape
Qernor�stration G�rden - Wright Farms
� �
�
Community Ga!lery Space - Louisvitle
� �1
3
■i
���
�
�
� � A..
>_.., �i��it
� �
R � � ;
�� v�wrur
�$ E t`
�a � f � �; .�i
�
t4r'?c1a.��.� '.a�sre:Kw+��.
� ",�6�s '�-'.�=�;.�.�'
'�'ia2': � hcwx�nsa*
� � € s.:.� '�`+
u�z� �x",,�y. ��..
:,« "" � � �..� �' �. , '�
I II
� -�►;�,� _
..._ _. - � --'
�� .
� �'
.�-�--
.. :��;`.
``"� . I. t -
i� � —, �
a �=W -�
a. e.i1 "`'
� '.....=.,...»......r
The result of this process is a list of community
specific library amenities that will allow the end
result to be a building of the people, for the
people, and essentially by the people.
Examples of specific amenities that have been
incorporated into HPA libraries include:
A student art gallery to meet the needs of
children in a community with a large home
school population. Since they don't go to a
traditional school, children need a place to
showcase their talent and the library is ideal.
Tree houses in a library serving a suburban
community that has grown so fast that green
space and imagination have somehow been
under nourished.
Coffee shops in small town libraries that not
only serve as welcoming social centers but also
revenue generators for the facility.
r�
��
Cyber Gafe - Puebfo West
. �� � {
.
I ' � ..
, . `��
e,
� , ;
.
� � .,. . .
.
.•
,
,�
' i.
__°...�.._ �.r_ .,_:_...�_.�, t � � . ._._. � -
, _ _._._..... �_ • 6 }� ' .
_ --' _ .... . �. :;:.;- , � , i { ] �' i � E � m � . —
- �. w§ .A:.. �• 9FjE'��Ri'P.��(8I �i.:ff V♦ � ��e �-Y.A�_�� ��•�„ae„ZA , h. �, "h.� < .
Y ; LL,- } ,._ ' �t ' �P°i-""rr
,:.t.+.;ti, _-�� .:.;��":.r , i�p•,..... , -� ,�.-+ _ �.�-' „-
' " -�`::�',��`'.'°,:,} ..�--'"�.��. �� �`"� 7{;"�� �l.c �...
., �t� >r:: _ a1 �. •� _ � � � �� S.. � "� �� } '4... � „ �
k, s. ��, i, :" i 4 , m'.,. ., . �.,�.-�''•i? . � �].—_ � _� � , y 5 ( } Y f t� -
�� ��'�� � � �����«4�"ic � :y,�, .�" ��'�.r�� � ' �„" �� , .1 � ..Y i .. � �
;���` , : .' , --� 4.�.._.. 4..
( ; p € � ` * . 'rv ._. ...;� �"�� �k�;�.,�j... . �
!} � °� 1 }�� C�'. 4 ,
� ;' :i ,� _ �.,�
: � t,� • �
Conceptual Design Process
Conceptual design takes into the consideration
the developed building program, the capacity and
attributes of the existing library and site and the
ambitions of the Pitkin County Library. We will
develop a series of conceptual alte�natives that
meet the requirements of this project for review by
the entire team.
In addition to meeting the programming needs of
the Library and responding to the conte� and
constrains of the existing site, our conceptual
designs will take into consideration the specific
functional requirements of the facility as identified
by your leadership, input from the public, and the
established image of the existing library.
This component of project development consists
of the following:
Site Proarammina:
Site programming begins with a focus on the
physical attributes of the Library's context. The
process will consider projected square footage of
the library, the advantageous orientation of
building entrances and amenities from a
circulation and sustainability perspective,
setbacks and easements, as well as on-site and
adjacent street parking and pedestrian
accessibility.
��
(�Itprnativp Soluti�ns:
We will develop and present multiple alternatives
that comprehensively address the facility's needs
with respect to salient factors including:
■ Projected needs compared to the condition,
and remaining life-span of existing facilities;
■ Location of the expansion of the library on the
site and the structural integrity of the parking
garage solution
■ Capacity for advantageous phasing that
accommodates the City's desire to maintain a
high level of library services during
construction
■ Overall required time frame for construction.
Solutions will be evaluated in terms of their overall
compatibility with the established goals of the
County, capacity within financial resources,
implementation schedule, and compatibility with
the County's desired identity. We will also present
and evaluate each alternative from a sustainability
perspective to illustrate the maximization of the
long-term environmental and fiscal impacts.
�' T ' � ` �"�
� `/ / +II' r r
,,:;� E .,,- . , r
' �.. � A �
._�.....1 , , . . , . �� i r t: � r-.
__.__..J.-a .l� .�. _r�'��:.. ..1 i7 ri � tK�. rt �'
... .K,::�:
Alternatives will be presented in the following
minimum level of detail:
■ Site Plan / Site Modifications
■ Floor Plans / Elevations
■ Base Building Modifications, Entries and
Exterior Building Modifications
■ Interior Design Features and Materials
■ Site Access / Parking Areas
■ Vehicle and Pedestrian Circulation
• Location and Character of Public Open
Space, Including Right of Way
■ Utility Layout
■ Identification and resolution of signage and
lighting needs and issues
■ Cost Estimates
■ Graphic Materials to Support Fundraising and
Community Relations
Through a workshop / charette process, we will
present each alternative in su�cient detail for
District leaders to make informed decisions. We
will facilitate an effective discussion on the
positive and negative attributes of each
alternative. The work session will conclude with
the selection of a preferred alternative. The
preferred alternative will be refined and presented
to the Library for final approval to complete the
task.
Louisville Library,
Conceptc�al Sketch, Schematic Design
and Finished Facilrty
�'1 �
�,__„,... _ . 4. . .,, _
h.,_.
. �, ' r .
Schematic Design Process
Schematic design is the process of exploring
project alternatives based on the approved
concept. We will meet with you on a regular basis
to discuss the development of this phase. The
schematic design will be developed into a specific
site and building design that responds to all
established criteria and can be achieved within
the project budget. The building's structural,
HVAC, plumbing, and electrical systems will be
studied and design recommendations advanced.
Sustainable principles will be incorporated into the
project where feasible and every effort will be
made to achieve arr environmentally conscious
building. Opportunities to increase e�ciency and
extend resources will be sought including the
analysis of alternate energy sources. Proposed
operational procedures will be analyzed and
documented as part of the design and review
�:,
a� N�,�
������
��,
� .�.'wt�a��
�'
�c�tivoe+
� - � �: � � _. � ��.� � `� ,,�.,.��. � I �a
.; - r
` �� ir F_ _ . - p
mae�nrt ' t-a- { �
oa�wnrvot►+ M0w �
_ � ' �� � I
-~-�-""� --� ��.--�1 ( � ►
� �
� �
� ,. _
^ �� �� ��� �
1 °- � �;;�- ,�- .� : ; � .
�� � �
j � 16�ON6 a OC.MM�/!Bl{a..,.� �� * + ,. � � � � U
L_ f�UO'� � �' , GlE �� E_; t�TNG h
i_ 1 _ a
1� '� �°" , --I �
lrrferior Rendering Floor Plan and Landscape F'lar�
- Wright Fanns Library
��
��
��
�
�
�
Outstanding Characteristics in Library
Design
There are a great number of characteristics in
library design that are very important to the
success of a facility. Experience has taught us
that two primary characteristics are most critical.
The first is ensuring that the library responds to
the specific needs of the community; the second
is that it is flexible in its response to the
functional requirements of the staff and
programming.
Resnondina to (;ommunitv Needs:
The challenge of designing public libraries
requires a unique combination of architectural
knowledge, programmatic understanding, a
consensus oriented design process, and an
ability to be truly receptive to the subtle
nuisances of each community and site. Ideally a
library should be designed to embrace the
community's population as a whole, serving the
needs of every age group and represented
interest. Spaces should be designed specifically
to accommodate the needs of young children
and the elderly alike. Both should feel that their
needs are catered to without a creating a feeling
of compromise.
A library must also respond to the utilization
needs of the population. If people rely heavily
on the library as the place to use computers,
access the internet and gain valued
technological training then the library must
accommodate that need. If the library is a place
where school children and teenagers are
encouraged to spend time there must be a
designated space that is welcoming.
As a firm, we are committed to a design process
that establishes a relationship with the
community. Our public engagement process is
designed to gather input from diverse groups to
understand the specific needs of the community
the library will serve. This type of participation
greatly informs our designs and is something
that we feel results in a strong sense of civic
pride when the library is complete.
� �
Quiet Reading - Sand Creek Library
General lnterest - Huron Street Library
Chitctrer� s Library - LouisviNe Library
Sand Creek 8ranch Library - A gtass garage door allows the computer /ab anci the pu�lic urceess con�puter
statfons to became a srrxyte space v��her� needed
Flpxiblp and Functional Snacps:
Flexible use space is always important in library
design. During day-to-day operations, most
libraries may not have much need for a large
community gathering space. By carefully
designing spaces that can become contiguous
through moveable wall partitions or overhead
doors (much like garage doors) that open out
into community plazas, spatial volumes can be
increased significantly for limited use situations
such as town meetings, public training and
education or celebrations.
It is important to develop a strong on-going
relationship with the librarians and library staff.
Functionality, easy navigation, staff connectivity
and support and community focused programs
are all areas that benefit from this relationship in
the final product. Making a library that is a joy to
use and maximizes staff efficiencies is
paramount to success.
Af the Dolores Library (Right} Flexible
configuration and moveab/e partitians increase
spatial capacity when needed.
�
Other Considerations
Natural L.iaht:
The incorporation of natural light is an important
aspect of HPA's design solutions. Natural light
is especially important because it is widely �
regarded as a necessity of an environmentally
healthier facility. By carefully siting the building
and optimizing window placement, the windows
used to draw in natural light make external views
an e�ension of the building's interior.
The Granby Library is an excellent example of
our ability to bring naturat daylight into a building
year round. Energy efficiency and effective
lighting were important to the client from a stand
point of economics and usability. The shed like
structures were designed to allow an abundance
of daylight and take advantage of the majestic
scenery surrounding the site. External views
became an extension of the interior.
IL':Ii
Granby Library - An excellcrat exam�l� of effective
daylighting fechniques.
Staff Work S�ace:
One of the most important components of
successful library design is enabling the staff to
operate the building as efficiently as possible.
We have learned from library directors and staff
that in times of economic hardship, reducing
staff is an unfortunate but inevitable reality
libraries might face. It is essential that the
library be designed in such a way as to be able
to maintain a very high level of customer
service, security and continual operations with
minimal staff. In addition to appropriate
adjacencies within the facility, we have found
that creating transparencies within the structure
optimizes staffing.
At the Granby Public Library, for instance, the
central circulation desk is divided from a secure
staff area by a glass wall. This allows the staff
to monitor the circulation desk when use is not
high from a somewhat remote position affording
the ability to work on other tasks.
�. �. . � _ �
7.
. .�,i '
_' _ . . «-,y �
$
!'
� /'JJUK ��'"CLIW1i �
F
e �hl�l'EnS�CfVKNS ,
1
. /�Uh �R.`NIClS ,
� lobby 1 C rcilat� Desk
� YtSti{XA@
� Stixiy Rooms
� Sta?f WwkAtca
� Storage 1 Meclv�nKal
� Com�nuroty Room
` �_�':._.aa... .:.s. .. � � .. t ti
,_ . . ..:+� - � .. ..
.�� :� : ... . . ~� b
` . 7 w : . � : ' �_ �.� _.
::...i1 J . _ .. ., ' „ ». � '
. : b' ::.... U .. .. ... .. _ .a � �f . ,. . .,
��
� S IT ..S'1{' ..l"V� sc A- . .. .. � �G...
' i� �� . � � � �~` .�
�{ , � .' ,�� ' C' � y I t V' �-, � .� �
� , .. . � . . . � �-
i
..: � e,� 5 r , � s
^ r . .� .. ,„r
''`,,'....._�`.'--- .
- --- --- ?�� �� .
�. .
r�
�k ., ��
54. �� ; �-..,F. ��
r �. ... ����" ',,.
i �
�1
t
� r.
.. 1 rp�rnR� .� .
n ry n�,
!i An . '
' n ^n 1
�n�rtr,n0 �,,.
.,z�ynne '�`
�'� : � - ._. �,. _.,.�.,...,. ...,�.
��
!n the Granby Library the circulatic�n desk and staff
4vark space are divided by a g/ass curtain wall
rncre��sing lirtes af sight while maa;inrizing sfaff
productivity.
y �P.If-SP.NICP.:
We incorporate conveniences that make the
experience of using the library as personal as
the libraries themselves. A drive-up book drop
allows patrons to return and pick-up materials
without leaving their vehicles. This is especially
important for mothers with small children and the
elderly on difficult weather days.
Computerized mobile self-check carts, designed
to blend with the established interiors pallet can
be wheeled around and plugged in to any outlet
for full service use by patrons who don't require
personal attention.
Noise AbatPment:
Controlling noise in heavily trafficked areas in
libraries is the result of a careful analysis and
the incorporation of area specific building
materials such as wall treatments, ceiling
textures and strategically designed recesses.
We engage the support of specialized acoustical
engineers during the design development phase
to review our plans and improve upon them from
an acoustical standpoint. One common practice
we employ is to locate the children's area near
the front entrance of the library so that the
jubilant sounds of learning and discovery don't
permeate quieter areas.
Eraonomics:
Limiting repetitive motion injuries is important in
staff work areas. Unders#anding the mechanics
of material returns and sort processes allows our
designers to conceive of solutions that limit
unnecessary twisting, turning, bending, lifting,
pushing, and pulling motions while processing
materials. Our data collection process includes
group and one-on-one interviews with staff to
understand both the frequency and impacts of
the various physical tasks associated with their
work.
Securitv:
Library security encompasses everything from
the physical layout of the building to
computerized door locks, video monitoring of
secure spaces, book security and sophisticated
intercommunication equipment to alert users to
potential danger. We have the expertise to
employ a variety of cost effective systems that
ensure safety and security.
� 7
5elf-Check -ouf Station
E3righton Library � Drive-thru Servrce Window
,.w..4..�.,.,,,...,���. .,� .aM.... _. .. �.�....�. . .
W
J
�
�
W
2
U
c/�
�
c
c�
cn
w
w
�
J
Q
z
�
(/'I
t/')
W
L.L
�
�
�
U �
B. PROFESSIONAL FEES and SCHEDULE
PHASE ONE
FEE
LAND PLANNER and LANDSCAPE ARCHITECT - Design Workshop $6,000
Scope of work: Adherence to ADA for exterior spaces, Local Permitting Requirements vis-a-vis
development alternatives, Employee mitigation and AH requirements, Design considerations for
connecting interior and exterior spaces and coordination with Galena Plaza and Mill Street.
MECHANICAL & ELECTRICAL ENGINEER - Beaudin Ganze Consulting Engineers $2,300
Scope of work: Assess existing building mechanical systems, review historic energy bills. Provide Energy-
Star evaluation to benchmark utility consumption with other similar facilities. Provide qualitative and
comparative analysis of utility costs for development alternatives. Identify opportunities to reduce utility
consumption, existing and proposed. Include findings in a Final Report.
ARCHITECT OF RECORD and ASSOCIATE ARCHITECT - WPA and HPA $42,000
Scope of work: Information collection, Pre-design, Analysis of existing building to meet defined program,
Conceptual Design through Schematic Design. Regular stakeholder meetings. Design charrettes.
Presentation of alternative design solutions with renderings at large format - plans, sections and
elevations.
COST ESTIMATING CONSULTANT - Parametrix, Inc $5,400
Scope of Work: Cost estimates for proposed alternative solutions in C51 format. Draft and Final reports.
STRUCTURAL ENGINEERING - KL&A, Inc $1,300
Scope of Work: Review past engineering studies of parking garage. Review prior conclusions regarding
loading of new construction over Galena Plaza easement. Make recommendations regarding structural
design based on design alternatives involving new or existing structure.
REIMBURSIBLE EXPENSES estimate $4,500
TOTAL FEE $66,900
b.2
/
�. �
B. PROFESSIONAL FEES and SCHEDULE
PHASE TWO and THREE - BASIC SERVICES FEE WORKSHEET
Listed below are typical fee structures. Compensation is typically a'not to exceed' amount based on a
percentage of the total hard cost of construction.
Total Hard Construction Costs
$ 900,000 - $ 2,000,000
S Z,000,000 - S a,000,000
>$4M
Architecture Fees
i3.oi = Slv,000 - 5z6o,000
ioi = S2oo,o00 - Saoo,000
negotiated
Notes:
Fees include the cost of the following consultants: Structural Engineering and MEP engineering. Other
consultants hired on an as needed basis as a separate fee based on project scope.
Fees do not include the ordering or purchasing of equipment, fabrics, or furnishings. Interior design
services provided as a separate service.
Total Construction Costs include'hard' construction costs as well as site features designed as part of the
project.
Standard Phases of the Contract -
Breakdown of Fee
15% Schematic Design
20% Design Development
40% Construction Documents
05% Bidding and Negotiation
20% Construction Administration
100� of Fee
b..� �
�
B. PROFESSIONAL FEES and SCHEDULE
ADDITIONAL SERVICES and REIMBURABLE EXPENSES
Additional Services
The following items shall be considered additional services and shall not be undertaken without the
prior consent of the Owner:
•Additions to the work, as requested by the Owner, and not included in the original Scope.
•Presentation models.
•Ordering of furnishings, fabrics, equipment, or materials.
•3D animation.
•Providing planning surveys, site evaluations or comparative studies of prospective sites.
Compensation for Additional Architectural Services shall be billed on an hourly basis, (or as agreed) at
the following rates as of January 1, 2009:
Principal
Principal
Architect III
Project Manager
Architect II
Architect I
Senior Designer
CAD Technician
Clerical Staff
$180.00/h r
$145.00/h r
$115.00/h r
$100.00/h r
$100.00/h r
$95.00/hr
$90.00/hr
$55.00/hr
$50.00/hr
Reimbursable Expenses
Dennis Humphries
Willis Pember
Senior Architect
Ryan Wallace
Meghan Nemechek
Intern Architect
Ozi Friedrich
Intern Architect
Sarah Pember
Reimbursable Expenses, as defined below, are in addition to compensation for Basic and Additional
Services.
• Direct expenses for the reproduction of drawings, documents, specifications, etc.
• Postage, Federal Express and other mail services at cost.
• Photo and print developing, and other documentation expenses.
• Travel expenses including airfare, auto and bus for travel requested by the Owner.
• Fees paid to authorities having jurisdiction over the construction of the project.
• Other fees paid to consultants beyond those listed above and as requested by the
Owner. These fees will be billed at a multiple of 1.1 times their billing to the Architect.
• Site Survey by Colorado Licensed surveyor.
Printing Costs:
8.Sx11 B+W
8.5x11 Color
11x17 B+W
11x17 Color
Plots / B+W
Plots/ Color
$0.40/ ea
$1.50/ ea
$3.00/ ea
$4.00/ ea
$1.10/SF
$10.00/SF
$6.60/ea (24x36)
$60.00/ea (24x36)
Travel:
Auto .52/mi
b�
��
B. SCHEDULE
WORKSHEET
TASK
Pre Design
1. Kick-Off Meeting
2. PCL Staff Collections
Management Plan Compieted
3. PCL Strategic Plan Completed
4. Final Statement of Building Program
Data Collection
5. Existing building documentation
6. Survey drawings, site survey
7. Previous Planning and
Engineering Reports
Site Investigation
8. Existing Site and Facility Analysis
9. Coordination Meeting(s)
10. Structural analysis of garage ( PCL adjacency
Conceptual Design
11. Project Team Charrette(s)
'Mind Breaking'
12. Architectural Design and Site Design
13. Presentation(s) of Conceptual Design
Schematic Design
14. Development of Alternatives
15. Presentation(s) of Schematic Alternatives
Architecture and Landscape
16. Cost Estimating of Alternatives
17. Report of Utility and Maintenance Costs
18. Report on Entitlement processes
Employee generation, Permitting requirements,
AH requirements, GMQS.
19. Report on Staffing Requirements
20. Final Presentation(s) PCL Board and Staff
Total Estimate of Time
DU RATION
1 day
est. by PCL staff
est. by Susan Kent
est. by Susan Kent
2 days
5 days
3 days
10 days
2 days
5 days
2 days
10 days
2 days
12 days
5 days
7 days
7 days
7 days
3 days
1 day
+�- 4 months (84 days)
PREDECESSORS
2, 3
5-7
4
5-10
11-12
14-15
14-15
14-15
14-15
b. t, ��
z
0
�
a
U
�
H
�C
w
V
c/�
H
Z
w
�
Z
O
a
�
w
�
��
AT'l'ACHMEN'T A
K�;S4'C}NDL;N`I''S C'F:RT'1�1C'�lTi()N
For a Litarary Archit�ct for the I'itkin County Lihrarv
�'roject # 0 � 1-2410
! have carefully examined thc itcyuest fi7r Proposals.
1 hcreby �ropnsc to furnish thc services s�ccifiecl in the (ieyu�si For Propoyals. 1 a�;r�� that my
submitta! wi41 remain firrn For a peric�d t�f ai least 9t1 days in c�rder tc� atlow thc [.ibrary adcc�ua#c
time t� evaluate the submitt�is and determi�c a rar�king �f the most qualified architect.
I certify thal all inf'c�rrnatiUn contained in this suk�rnittal is truthful. I turther ccrtify that I am duly
authorized tsa }�ravic�c this �uF�mitt�i c�n behall�af thc firm as its act ant! decd antl ihat thc #irm is
rcady, witling and able tc� perl`arm if ati��arded thc contract.
I further ceriii'y UIiCICC t)dfll tl��t this subinittal is niadc without prior unc�erstanding, ��;reement,
conncctic�n, discuss'soi�, or cc�llusic�n �vith a�7y othcr �crs�n, (irm or corpc�ration tcnderin� a
submittal ['or thc samc service; that no �f�cer, employee c�r agcnt of !'itkin Couiity or any c�thcr
respnndent is interested in said sabmittal; and #hat the undcrsi�;n��ci executcd this ltespondent`s
Certification with full knowledge and understanding �f thc matters thercin c�nia'►ned an�i was
duly authc�rizc:cl to dc� sn.
NAMJ�, (}F F311S[N�SS
MAtI.IN{r AL7DI2E;�S:
NAME & '1'1`['LI ; (typed �r printcd)
E-MAIL
"f'�L�1'HQNC: NUMCiG[Z
SIGNATURF;
Willis Pernber Architects, Inc
412 narth mill street, aspen, C� 81611
Wi#lis Pember, AfA, Principal
wi�lispa�comcast.net
(97Q}924 1727
The Aro{�ser ackn+�tivlec��;es receipt �f Adc�enda's 1`3os. A a n d B
Uated this 21 day flF A p r i I . 202 0
St{ii�EA'1'UItES: If'the pr��msal is bein�; submitted by a C�rporation, the pra�r�ser shoulci be
si�,med by an c�tiicer, i.e. Prc:sident �r vic;e-president. The si�;nature c�f the officcr si�;ning shal! �e
artesteti ta by the secretary and praperIy sealed. If thc prczpe�sal is l�ein� submittecl by an
individual or a partnershi�, the prnpvsal shalE so indicate anc3 be properly �igned.
tkitkin Caun�y- Lit�r.irr�130 North Mi�l Street, Aspen Colarado 81b1 t
k.athleen Chandler, County Librarian 970 4?9-I�?10 3:�EiE��c ri c�c�.f,itt.iis.r�s.�a�
��
W
V
Z
a
�c
�
�
z
�
0
�
W
�
a
v
�
�
cc
W
V
�l
a�t�
.��e�� CERTtF1CATE OF LIABtL►TY INSURANC'E °P� � as ai io
� - Tt� CFRTiFiCATE IS � AS A MA
OI�Y AI� � NO � UPON '1't� �D OR
��,ga�noy of colorado, Znc tW1.DE1t. TM8 4.'�..r.,.J�1TE DOF� NOT AMEI�,
5�l45 Dz'C ��, ..1. ,, - Y�e�t]�aatse ; ALTERTHE CdifERA�E ll� - � r�, n� . �� � BY'THE POI.]t�ES BELOW
Q. .:. .,; ., � � 1 Villa�gie O� 80111
�'hvayo: 303—l88-3418 F'sz:303—�86-68�13 N�ISIR�i /�� CdVERA� �C �
Y18U1l� NSUiiHtl� �e]�rs ti�liT amd � ��.�.g4
.�g � �a..,�� � assss
� , ;s As"Chi.taets. Inc. •�,aERC :..b.ofa111..�a.o�ao_, ri 11000
� � ��� IIBUI�ti�c
� ��
C.�QE$
77�E P'OUClS OP � l.ls'T� OB.�MI lil►11P ��f LSSt7lD70 7tE f�SURCQ q11�RDPO0A2lOR 1TE POLlGY PO�Dl�ICA7m DI�IYY�117STMD/7Q�
/WY [2�71�8�[T,'FHiM ORaO1�fflON OFM/YOONiI�I1L'T OR OiilBt DOf�!'Nllili RESPBCTTOYM�IT1�6 CER?FIGTEM►1Y� �OR
MAYP�TAN.7tE/lS�ANICE� irr„ �,� e. BY7i�P0[JCES .���, ::� F6�li1SS1�GTTOALL'[t�E'IE�.E7�CtAA90FIS/WDOOF�[iIONBOFSUf�i
POL�ES� AIDOREQATE LYTS SFiG�WIi MI1Y HRVE �i RECt1C�81r PIIf�C!/IM6.
�rn � rn+Eaf�Ntw� r+n,ICV�1��t � '�13,�"�` �r�o�tw� Lprrts
�t�e�.mr
H Y �eacw.c�aw-u+�eam 8255L722
� a�ws.ane aQ ooa�
������.��
��n� n�
��
iwY�uro
�a�.aw��unas
BCF�li�11l1fOB
$ $ F��AUiOB
B a t�a�owr��rros
8155L?22
8155L?22
02/0�/�.0 oz/o�/i�
�aca�ce
�� �oaa�enoe�
r�F7��aas p..w�
PH�BONi1L 8 AdV NJURK
���
pnooucrs-c�a�roP�
s�1.000,000
i$300,000
:s1o
i$1,OQ0,000
S$2,000,000
s$2,000,000
���
i6+o�a�nq
eooaa �a�r
� P�
s$1,000,000
S
s
s
�2�Q?�1� �21�7�11 800LyNIURY
o2/a�/io oz/o�/az �'+•�a
�rta�w►c�
��
B/IIt116EY�6�JfY
� NiY N)Si)
EXt�Bb►UI�1lOJ.A LI�.RY
� OGCLIR � (].A�1511/1f]E
�F
�nori s
�
�ro e�.v+r�tes e�ea,rrr �
C MK +� - � i � RiNHilE7�lJi
� °s�uo�? L_t
�
OQl�t
351�CRC7659
Q6J�1/IO 06/01/11
J1t!lafllLT-EAAOC�BiT i
�AAOC i
�� � S
EA010� f
�ec�r►� s
s
s
s
hn r 'c�rs t 1"ei
r��wacoa�rr s$lOQ,OAo
�o�-cw�rw.or° � $100,000
EL�-POIX.YI#ifi s �'.SOO �DOQ
A Prafeasional Liab I05220279 02/fll/10 O1/O1J11 8a Cl� $500,000
a�rst. 81,000,000
. a:iM � � i OFOP6tA710118IlOCAl101181VB#CL56/E7�LUBIOMSAD0�61! u�.. �. e u i IaPBCW. �. �� .,a
CERi�ICATE HOtDER ����
• auouaDww,rQnE�ewene�ss�raer,�seec�imeQVRetneoa�s�not
`y.r ..���� M7E7l�l60F,7�IE168U�ISMS1�ItN�.�8od1110R7��1�1. 30 MYSrllllll'IHi
110710E7�71E �: „� , .+i � :MGCD[R/IIIM.717ID7lELfff�Bfi�RM.i�fE7�DD�DlfW.L
Piti�in Coanty L;�+*�� �+oe�MOas��►no�aR�aeamraRNntaouPOMn��rsi�nee.rra�rsaa
11ttri: MS. Eirtllleselt Chandler
120 i�. liill Stz+ast ��.� ��'.�: � �. '�.
Ai1ME
]lspen �D 81611
ACORD 25�(200�9) � t3��lMlAIKJN. AR � �Vbd_
Th� AC(�D �tne and bgo are I+e�d a18fkS a�f ACORD
��
�Attachment B
B. TEAM PROPOSAL 5.28.2010
TEAM COORDINATION — PHASE ONE
Willis Pember Architects will act as Architect of Record, local contact and 'hub' for the two-way flow of
communication between the client and the design team. WPA will manage, store and distribute all
documentation, provide scheduling coordination and establish a local presence for meetings,
clarifications and requests for information arising during Phase One. The client will have immediate and
'on demand' access to all aspects of the project via local presence of WPA, as well as electronically, via a
dedicated project FTP site. Electronic oversight by all stakeholders will be maintained on this site
created specifically for this purpose and continuously updated.
Humphries Poli Architects (Associate Architects) and Willis Pember Architects (Architects of Record)
will be engaged in a full and true collaboration throughout the entire project, including Phase One, each
bringing their specific skill sets and experiences to the table. Humphries Poli Architects will provide
early and immediate direction to the Phase One design process. WPA has specific nonprofit client
experience and direct experience in the history of previous planning studies and will be instrumental in
guiding efforts within the parameters of what the history of the site may offer.
As necessary background, we will involve ourselves in essential information gathering including the
following completed and soon-to-be-completed studies, prior to formal schematic design and in
preparation of our project kick-off meeting:
• Civic Master Plan - City of Aspen
• ZG Master Plan - City of Aspen
• Art Museum expansion at Galena Plaza - City of Aspen �AAM
• Engineering studies of the parking garage - Carl Walker, Inc
• Galena Plaza Design Project - City of Aspen, John Laatch, Capital Asset Manager
• Susan Kent's Strategic Plan - soon-to-be-completed with Library Board and Staff
• Pitkin County Library Staff Collection Management Plan - soon-to-be-completed
HPA and WPA believe there is no better consultant than Susan Kent to fully develop the final program
based on her prior experience, understanding and analysis of the Pitkin County Library to date, and
recommend that she continue in this role with the Architectural Team. A key staff member from
Humphries Poli Architects, Ozi Friedrich, has a Masters Degree in Library Science and Architecture, and
will act as a liaison between Susan Kent's programming work and the architectural design team.
b.1
��
B. PROFESSIONAL FEES and SCHEDULE
PHASE ONE - SCOPE AND FEE
5.28.2010
FEE
LAND PLANNER and LANDSCAPE ARCHITECT- Design Workshop $5,000
Scope of work: Adherence to ADA for exterior spaces, Local Permitting Requirements vis-a-vis
development alternatives, Employee mitigation and AH requirements, Design considerations for
connecting interior and exterior spaces and coordination with Galena Plaza and Mill Street.
MECHANICAL & ELECTRICAL ENGINEER - Beaudin Ganze Consulting Engineers $2,300
Scope of work: Assess existing building mechanical systems, review historic energy bilis. Provide Energy-
Star evaluation to benchmark utility consumption with other similar facilities. Provide qualitative and
comparative analysis of utility costs for development aiternatives. Identify opportunities to reduce utility
consumption, existing and proposed. Include findings in a Final Report.
ARCHITECT OF RECORD and ASSOCIATE ARCHITECT - WPA and HPA $37,500
Scope of work: Information coliection, Pre-design, Analysis of existing building to meet defined program,
Conceptual Design through Schematic Design. Regular stakeholder meetings. Design charrettes.
Presentation of alternative design solutions with renderings at large format - plans, sections and
elevations.
COST ESTIMATING CONSULTANT- Parametrix, Inc $1,800
Scope of Work: Cost estimates for proposed alternative solutions in CSI format. Draft and Final reports.
STRUCTURAL ENGINEERING - KL&A, Inc $1,300
Scope of Work: Review past engineering studies of parking garage. Review prior conclusions regarding
loading of new construction over Galena Plaza easement. Make recommendations regarding structural
design based on design alternatives involving new or existing structure.
REIMBURSIBLE EXPENSES estimate
TOTAL FEE
$4,500
552,400
b? �
�
C. PROFESSIONAL FEES and SCHEDULE
PHASE ONE - DELIVERABLES
• BUILDING PROGRAM
Design team will assist Susan Kent in the development of the final building
program. Ref. b1 Team Coordination and RFP Addendum 8, 4.18.10
• ANALYSIS of BUILDING MODIFICATIONS NEEDED to ACCOMODATE the
APPROVED PR06RAM
• INVENTORY of EXISTING and NEW FURNISHINGS
Not included in base proposal but could be done by Group3 Planners as an
additional service. (Group3 Planners is on our list of optional consultantsJ
• DESIGN ALTERNATIVES INDICATING ANY EXPANSION, KEY CHANGES to the EXISTING
LAYOUT, and NEW SERVICE POINTS
• CONCEPTUAL RENDERING
• COST ESTIMATE
• TIME LINE FOR IMPLEMENTATION
h3
��
�
,��.,��,. �,��,..�.
B. PROFESSIONAL FEES and SCHEDULE
PHASE TWO and THREE - BASIC SERVICES FEE WORKSHEET
Listed below are typical fee structures. Compensation is typically a'not to exceed' amount based on a
percentage of the total hard cost of construction.
Totat Hard Construction Costs,
$ 900,000 - $ 2,000,000
S 2,000,000 - $ 4,000,000
>$4M
Architecture Fees
13.0% _ $117,000 - $260,000
10% _ $200,000 - $400,000
negotiated
Notes:
Fees include the cost of the following consultants: Structural Engineering and MEP engineering. Other
consultants hired on an as needed basis as a separate fee based on project scope.
Fees do not include the ordering or purchasing of equipment, fabrics, or furnishings. Interior design
services provided as a separate service.
Total Construction Costs include'hard' construction costs as well as site features designed as part of the
project.
Standard Phases of the Contract -
Breakdown of Fee
15% Schematic Design
20% Design Development
40% Construction Documents
05% Bidding and Negotiation
20% Construction Administration
100% of Fee
b,��
��
B. PROFESSIONAL FEES and SCHEDULE
ADDITIONAL SERVICES and REIMBURABLE EXPENSES
Additional Services
The following items shall be considered additional services and shall not be undertaken without the
prior consent of the Owner:
•Additions to the work, as requested by the Owner, and not included in the original Scope.
•Presentation models.
•Ordering of furnishings, fabrics, equipment, or materials.
•3D animation.
•Providing planning surveys, site evaluations or comparative studies of prospective sites.
Compensation for Additional Architectural Services shall be billed on an hourly basis, (or as agreed) at
the following rates as of January 1, 2009:
Principal
Principal
Architect III
Project Manager
Architect II
Architect I
Senior Designer
CAD Technician
Clerical Staff
$180.00/h r
$145.00/h r
$115.00/hr
$100.00/hr
$100.00/h r
$95.00/hr
$90.00/hr
$55.00/hr
$50.00/hr
Reimbursable Expenses
Dennis Humphries
Willis Pember
Senior Architect
Ryan Wallace
Meghan Nemechek
Intern Architect
Ozi Friedrich
Intern Architect
Sarah Pember
Reimbursable Expenses, as defined below, are in addition to compensation for Basic and Additional
Services.
• Direct expenses for the reproduction of drawings, documents, specifications, etc.
• Postage, Federal Express and other mail services at cost.
• Photo and print developing, and other documentation expenses.
• Travel expenses including airfare, auto and bus for travel requested by the Owner.
• Fees paid to authorities having jurisdiction over the construction of the project.
• Other fees paid to consultants beyond those listed above and as requested by the
Owner. These fees will be billed at a multiple of 1.1 times their billing to the Architect.
• Site Survey by Colorado Licensed surveyor.
Printing Costs:
8.5x11 B+W
8.5x11 Color
11x17 B+W
11x17 Color
Plots / B+W
Plots/ Color
$0.40/ ea
$1.50/ ea
$3.00/ ea
$4.00/ ea
$1.10/SF
$10.00/SF
$6.60/ea (24x36)
$60.00/ea (24x36)
Travel:
Auto .52/mi
b.5
��
B. SCHEDULE
WORKSHEET
TASK
Pre Design
1. Kick-Off Meeting
2. PCL Staff Collections
Management Plan Completed
3. PCL Strategic Plan Compieted
4. Final Statement of Building Program
Data Collection
5. Existing building documentation
6. Survey drawings, site survey
7. Previous Planning and
Engineering Reports
Site Investigation
8. Existing Site and Facility Analysis
9. Coordination Meeting(s)
10. Structural analysis of garage � PCL adjacency
Conceptual Design
11. Project Team Charrette(s)
'Mind ereaking'
12. Architectural Design and Site Design
13. Presentation of Conceptual Design
Schematic Design - reduced and combined
14. Development of Alternatives
15. Presentation(s) of Schematic Alternatives
Architecture and Landscape
16. Cost Estimating of Alternatives
17. Memo of Utility and Maintenance Costs �
18. Memo on Entitlement processes
Employee generation, Permitting requirements,
AH requirements, GMQS.
19. Memo on Staffing Requirements
20. Final Presentation(s) PCL Board and Staff
21. Revisions based on Presentation feedback,
Coordination with COA Galena Plaza deadline,
8.14.10.
Total Estimate of Time
DU RATI ON
1 day
est. by PCL staff
est. by Susan Kent
est. by Susan Kent
2 days
5 days
3 days
8 days
2 days
2 days
2 days
7 days
1 days
7 days
1 day
1 day
1 day
1 day
1 day
1 day
2 days
2.4 months (48 days)
PREDECESSORS
2, 3
5-7
4
5-10
11-12
14-15
14-15
14-15
14-15
�
b.6 '�