Loading...
HomeMy WebLinkAboutpitkin.planning.273730300002 (2010)i DOCUMENT LAYOUT THIS FILE MAY OR MAY NOT CONTAIN ALL OF THE INFORMATION LISTED BELOW IN THE FOLLOWING ORDER Summary Sheet Resolution for the BOCC and /or P &Z Ordinance for the BOCC and /or P &Z Determination for the Hearing Officer Administrative Determination Staff Memo Application Public Notice, Acceptance Letter, Referral(s) Letter Site Plan Miscellaneous Plat(s) Parcel ID: 2737- 30 -3 -00 -002 Application Date: 8/20/10 Case No: P067 -10 Description: Pitkin County Minor Amendment to Aspen Mountain Master Plan to set height Planner: Mike Kraemer limit for County Communication Tower # Copies: 10 Fees due by Journal Entry. Allocated Hours: 3 Project Address: 0 ASPEN HIGHLANDS SUMMER RD, ASPEN, CO 81611 % Over Hours: 4 Property Owner: ASPEN SKIING COMPANY Address: PO BOX 1248 ASPEN, CO 81612 Owner Phone: (970) 923 -0555 Owner's REP: MARK GAMRAT REP's Email: mark @co.pitkin.co.us Address: 485 RIO GRANDE PL ASPEN, CO 81611 REP's Phone: (970) 920 -5317 Referrals: FIRE DEPT - ASPEN Other Referrals: Aspen Ski CO None ALL OTHER REFERRALS USFS None Comments Due Date: 09/1012010 Meetings: Iat Meeting: 2nd Meeting: 3rd Meeting: Meeting Date: 09/14/2010 09/22/2010 Review Body: p & bocc Public Hearing? no no Notice Date: Meeting Notes: Approvals: BOCC Resolution #: 121 -2010 #574111 P &Z Determination #: BOCC Ordinance #: HO Determination #: Admin Determination #: Other Information: VR Approval Date: Plat Recorded Date: VR Expires Date: Plat (Bk, PG): Remarks: no vesting Application Type: MinorAmendment to a Development Permit UPDATE ADDRESS NOTIFICATION Date:May 11,2023 Assignment Number:2023 -18 (C) Updated Addresses: 4773 Aspen Mountain Rd (Ajax Tower Site) Aspen,CO 81611 Former Address:4773 ASPEN SUMMER RD (to be retired) Parcel:N/A ●Longitude -106.820859 ●Latitude 39.153268 Property Owner Name:United States Forest Service Voter Split:1.1.072.0 Reason for Assignment:Update the road name for existing addresses identified as “Aspen Summer Rd.” Note:This Notification will update the addresses formally assigned to “Aspen Summer Road.” See map for exact location of addresses. Please contact me for any questions or further clarification. Thank You, Michelle Steinberg Addressing Coordinator,Pitkin County Government |IT Work Phone:970-429-6132 Email:michelle.steinberg@pitkincounty.com Address:530 E Main St #203,Aspen,CO 81611 Updated Address Assignment 4773 Aspen Mountain Road May 11, 2023 4550 4805 4705 4755 4773 A S P E N M T N R D pitkin county ¯ Scale: 1:4,214 Updated Address: 4773 Aspen Mountain Rd Ajax Tower Site Legend Existing Road Driveway Updated Address Existing Structures Federal Land Retiring Address: 4773 Aspen Summer Rd Non-Conforming Address RECEPTION #: 574111,10/06/2010 at 11:19:22 AM, 1 OF 3, R $0.00 Doc Code RESOLUTION Janice K. Vos Caudill, Pitkin County, CO RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO, APPROVING THE MINOR AMENDMENT TO A DEVELOPMENT PERMIT FOR THE PITKIN COUNTY COMMUNICATION TOWER AND ACCESSORY FACILITIES ON ASPEN MOUNTAIN Resolution No.41 -2010 RECITALS 1. Pitkin County (hereafter referred to as the "Applicant') has applied to the Board of County Commissioners (`BOCC ") to obtain approval for a Minor Amendment to replace an existing 58 foot Pitkin County radio tower with a 60 foot three - legged free standing lattice radio tower, replace a 250 gallon propane tank with a 500 gallon tank, add a generator, add Colorado State DTRS radio equipment, and bring the existing building up to date with a new metallic roof. 2. The building site is located on USFS land and is within the Aspen Skiing Company ski operations boundary. The site is generally located at the top of Buckhorn Run. Legal Description, Attachment A. 3. Pursuant to C.R.S 30- 28- 110(1), the Planning Commission heard this request under a "Location and Extent Review" on September 14, 2010 and found that the proposed improvements are not identified in the Castle /Maroon Creek Master Plan and that the plan does not prohibit such development. Therefore, the Planning Commission found the proposed improvements in conformance with this Master Plan. 4. The BOCC finds that an early snow fall may occur and, therefore, an acceptable construction management plan must be developed prior to work commencing. 5. The BOCC reviewed the application at a public meeting on September 22, 2010, at which time evidence and testimony were presented with respect to this application. NOW, THEREFORE, BE IT RESOLVED by the BOCC that it hereby grants approval of the Minor Amendment to Development Permit for the redevelopment of the Pitkin County Communication Tower and accessory development mentioned above subject to the following conditions: The Applicant shall adhere to all material representations made during the application process or in public meetings or hearings and shall consider those representations to be conditions of approval. 2. The Applicant shall submit for building and zoning permits for the above mentioned development activities. With submittal of these permits, the Applicant shall provide a tree mitigation plan for review and approval by the Community Development Director. 3. The Aspen Mountain Master Plan shall be amended to allow the maximum height of the Pitkin County Radio Tower at the top of Buckhorn run to increase from 58' to 60'. 4. The Applicant shall comply with the following conditions regarding access to the construction site within the ski area boundary A. No access across the top of the mountain at anytime, without permission and/or assistance from ASC when there is 12" or more snow on the ground. B. After November 1, no access across the top of the mountain, without permission and/or assistance from ASC when there is 6" or more snow on the ground. 5. At building/zoning permit submittal, the Applicant shall submit to the Community Development Director, for review and approval, a construction management plan that outlines an early snow contingency plan. This plan shall not allow plowing of Midnight Mine or Little Annie Roads or other areas within the ski operation boundary. If an acceptable plan cannot be approved, the tower shall be constructed next spring after ski operations terminate and limited service roads are no longer needed to be plowed to gain access to the building site. 6. Construction activity for the communication tower may occur on Sunday only if necessary. Failure to comply with these conditions of approval may result in revocation of this permit or any subsequent permits related to this property or vested rights associated with this property. APPROVED AND ADOPTED on the 22 "" day of September, 2010. BOARD OF COUNTY COMMISSIONERS, PITKIN COUNTY, COLORADO George Newma#, Chair APPROVED AS TO CONTENT: APPROVED AS TO FORM: Cindy Houben John Ely Community Development Director Cou orney P067 -10 PID 2737- 303 -00 -002 BOCC Resolution No. /)/ -2010 Page 2 Attachment A Legal Description THE FOLLOWING DESCRIBED LAND SITUATE, LYING AND BEING IN THE COUNTY OF PITKIN AND STATE OF COLORADO, TawrrH: IN PORTIONS OF SECTION 30, T. 10 S., R 84 W., 6 P.M.; LATITUDE 39 DEGREES 09 MINUTES 13 SECONDS. LONGITUDE 106 DEGREES 49 MINUTES 14 SECTIONS WEST. L ' MEMORANDUM TO: Pitkin County Board of County Commissioners 6Q Z,cW THRU: Cindy Houben, Community Development Director FROM: Mike Kraemer, Planner A' ' RE: Pitkin County Communications Facility — Minor Amendment to a Development Permit DATE: September 22, 2010 SUMMARY OF REQUEST: The Applicant is requesting an amendment to the Aspen Mountain Master Plan through a minor amendment to a development permit to replace an existing 58' Pitkin County radio tower with a 60 foot three - legged free standing lattice radio tower, replace a 250 gallon propane tank with a 500 gallon tank, add a generator, add Colorado State DTRS radio equipment, and bring the existing building up to date with a new metallic roof. The Applicant is stating that a 75' x 75' staging area is needed during construction and approximately 30 round trips of traffic would occur to the site. The Applicant's disturbance areas and site plan are located within the submittal packet. It is the Applicant's intention to begin construction immediately after BOCC approval and after appropriate building and zoning permits are issued. APPLICANT: Pitkin County REPRESENTATIVE: Mark Gamrat, Communications Director LOCATION: Aspen Mountain, top of Buckhom Run within the ski area operations boundary on USFS property. ZONING: SKI -REC EXISTING CONDITIONS/BACKGROUND: The site is located near the top of the Ajax Express lift at the top of Buckhorn Run and is developed with a number of towers and antennas. The Applicant's submittal packet shows pictures of the existing area. The area and development operates under a USFS permit and under the Aspen Mountain Master Plan. A new USFS permit will need to be obtained for this work. PROCEDURE/PROCESS: On September 14, 2010, the P & Z reviewed this request under a Location and Extent Review. C.R.S 30- 28- 110(1) provides that the Planning Commission shall review the location and extent of public projects proposed by a governmental entity in the unincorporated area of the County for conformance with the applicable comprehensive plan or master plan. The Planning Commission's action on a Location and Extent proposal is essentially "advisory", as disapproval may be overruled by the governmental jurisdiction making the proposal. The applicable Master Plan for review of this work is the Castle/Maroon Master Plan. Page 1 of 3 1 1 b The P & Z made a finding that the request was in conformance with the applicable master plan and approved a resolution for this request. On page I1 of 185 of the Aspen Mountain Master Plan, structures are restricted to a 28' height limit unless a variance is granted by the appropriate process. Changing the height limit for the communication tower from 58' to 60' will require an amendment to the Aspen Mountain Master Plan. This amendment request will be reviewed under a Minor Amendment to a Development Permit. REFERRAL COMMENTS: Comments were received from the Aspen Skiing Company and the USFS. A number of referral comments were received from the Ski Company via email. In summary, the emails stated that the Ski Company is concerned about construction access to the communication tower building site if construction occurs in late September, October, and/or November. Specifically, the Ski Company is concerned that there is no contingency plan if there is an early, heavy snowfall and categorically does not want snow removed to access the building site. The Ski Company has asked that the application be postponed until it can be demonstrated that construction of the tower will not have impact on the ski operation that results from snow removal. The USFS has stated that they will be issuing a permit for the tower and has proposed that plowing the backside of Aspen Mountain Roads may be a way to gain access to the building site if an early snow fall occurs. The County Engineer was consulted on this idea and it was stated that Midnight Mine Road and Little Annie Road are both limited service area roads that the County does not typically plow or allow others to plow. The USFS has indicated that use of a helicopter and/or snowcat would be acceptable alternative to access the site. STAFF COMMENTS: Minor Amendment to a Development Permit Pursuant to Section 2- 20- 150(b) of the Land Use Code, a minor amendment to any development application or permit is one that meets the following criteria: 1. Is consistent with actions) taken during previous development approvals for the property; and Response: Increasing the height of the tower from 58' to 60' is inconsequential and is consistent with previous actions taken during the master plan process. 2. Does not change the use of the proposed development between residential, commercial, and tourist accommodation uses; and Response: The request does not change the use of the proposed development. 3. Does not change the basic character of the approved use of land on which the activity occurs, including basic visual appearance and method of operation, and Response: Approval of this request would not change the basic character or method of operation of the approved use of the land which is an approved radio tower site. The Applicant has stated that the tower will be of a non - reflective material as will the new metal roof that is being placed on the adjacent shed. Page 2 of 3 02 4. Does not constitute a new land development activity; and Response: The request does not constitute a new land development activity. 5. Does not increase off-site impacts in the surrounding neighborhood, and Response: If the request were approved, an acceptable construction management plan will be required that shows adequate access to the construction site that does not include the plowing of snow on the ski area, Little Annie Road, or Midnight Mine Road. An acceptable construction access plan will mitigate off -site impacts. 6 Does not endanger the public health, safety or welfare, and Response: The request does not endanger the public health, safety or welfare 7. Does not violate any Land Use Code standard, and Response: The Applicant has indicated that 5 trees of 6" d.b.h. or greater will be removed during construction of the new tower. The Applicant will be required to mitigate for the removed trees unless the trees are dead or diseased pursuant to Section 7 -20 -10 of the Code. The request does not violate any Land Use Code standard if conditions off approval in the draft resolution are fulfilled. 8. Does not substantially increase the need for on -site parking or utilities, or affect affordable housing generation; and Response: N/A 9. Does not increase the floor area of the use by more than five (5) percent or decrease the open space on the site by more the five (5) percent. Response: N/A RECOMMENDATION: Staff feels that an acceptable construction management plan should be developed prior to construction of the tower that does not include the plowing of Little Annie and/or Midnight Mine Roads and/or any area within the ski area operations boundary. If an acceptable plan cannot be developed to address a potential early snowfall, Staff recommends the tower be constructed next spring. Staff recommends that the BOCC adopt a resolution approving the Pitkin County Communication Tower Minor Amendment to a Development Permit subject to the attached draft resolution. Application provided separately Page 3 of 3 RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PTTKIN COUNTY, COLORADO, APPROVING THE MINOR AMENDMENT TO A DEVELOPMENT PERMIT FOR THE PITKIN COUNTY COMMUNICATION TOWER AND ACCESSORY FACILITIES ON ASPEN MOUNTAIN Resolution No.- -2010 RECITALS 1. Pitkin County (hereafter referred to as the "Applicant ") has applied to the Board of County Commissioners (`BOCC ") to obtain approval for a Minor Amendment to replace an existing 58 foot Pitkin County radio tower with a 60 foot three - legged free standing lattice radio tower, replace a 250 gallon propane tank with a 500 gallon tank, add a generator, add Colorado State DTRS radio equipment, and bring the existing building up to date with a new metallic roof. 2. The building site is located on USFS land and is within the Aspen Skiing Company ski operations boundary. The site is generally located at the top of Buckhom Run. Legal Description, Attachment A. 3. Pursuant to C.R.S 30 -28- 110(1), the Planning Commission heard this request under a "Location and Extent Review" on September 14, 2010 and found that the proposed improvements are not identified in the Castle/Maroon Creek Master Plan and that the plan does not prohibit such development. Therefore, the Planning Commission found the proposed improvements in conformance with this Master Plan. 4. The BOCC finds that an early snow fall may occur and, therefore, an acceptable construction management plan must be developed prior to work commencing. 5. The Planning Commission reviewed the application at a public meeting on September 14, 2010, at which time evidence and testimony were presented with respect to this application. NOW, THEREFORE, BE IT RESOLVED by the BOCC that it hereby grants approval of the Minor Amendment to Development Permit for the redevelopment of the Pitkin County Communication Tower and accessory development mentioned above subject to the following conditions: 1. The Applicant shall adhere to all material representations made during the application process or in public meetings or hearings and shall consider those representations to be conditions of approval. 2. The Applicant shall submit for building and zoning permits for the above mentioned development activities. With submittal of these permits, the Applicant shall provide a tree mitigation plan for review and approval by the Community Development Director. 3. The Aspen Mountain Master Plan shall be amended to allow the maximum height of the Pitkin County Radio Tower at the top of Buckhorn run to increase from 58' to 60'. 4. At building/zoning permit submittal, the Applicant shall submit to the Community Development Director, for review and approval, a construction management plan that outlines an early snow contingency plan. This plan shall not plow Midnight Mine or Little Annie Roads or other areas within the ski operation boundary. If an acceptable plan cannot be approved, the tower shall be constructed next spring after ski operations terminate and limited service roads are no longer needed to be plowed to gain access to the building site. Failure to comply with these conditions of approval may result in revocation of this permit or any subsequent permits related to this property or vested rights associated with this property. APPROVED AND ADOPTED on the 22 day of September, 2010. BOARD OF COUNTY COMMISSIONERS, PITKIN COUNTY, COLORADO By George Newman, Chair APPROVED AS TO CONTENT: Cindy Houben Community Development Director P067 -10 PID 2737 - 303 -00 -002 BOCC Resolution No. -2010 Page 2 ATTEST: Jeanette Jones, Clerk to the BOCC APPROVED AS TO FORM: John Ely County Attorney ul u_6' 1 TO: Pitkin County Planning and Zoning Commission FROM: Mike Kraemer, PlannerAl", RE: Pitkin County Communications Facility - Location and Extent Review DATE: September 14, 2010 SUMMARY OF REQUEST: The Applicant is requesting location and extent review approval to replace an existing 58' Pitkin County radio tower with a 60 foot three- legged free standing lattice radio tower, replace a 250 gallon propane tank with a 500 gallon tank, add a generator, add Colorado State DTRS radio equipment, and bring the existing building up to date with a new metallic roof. The Applicant is stating that a 75' x 75' staging area is needed during construction and approximately 30 round trips of traffic would occur to the site. Disturbance areas and site plan are located within the Applicants' submittal packet. APPLICANT: Pitkin County REPRESENTATIVE: Mark Gamrat LOCATION: Aspen Mountain, top of Buckhorn Run within the ski operations boundary and on USFS Property. ZONING: SKI -REC EXISTING CONDITIONSBACKGROUND: The site is located near the top of the Ajax Express lift at the top of Buckhom Run and is developed with a number of towers and antennas. The Applicant's submittal packet shows pictures of the existing area. The area and development operates under a USFS permit and under the Aspen Mountain Master Plan. A new USFS permit will need to be obtained for this work. PROCEDURE/PROCESS: C.R.S 30- 28- 110(1) provides that the Planning Commission shall review the location and extent of public projects proposed by a governmental entity in the unincorporated area of the County for conformance with the applicable comprehensive plan or master plan. The Planning Commission's action on a Location and Extent proposal is essentially "advisory", as disapproval may be overruled by the governmental jurisdiction making the proposal. The applicable Master Plan for review of this work is the Castle/Maroon Master Plan. Also, page 11 of 185 of the Aspen Mountain Master Plan identifies structures as having a 28' height limit unless a variance is granted by the appropriate process. Changing the height limit for the communication tower from 58' to 60' will require an amendment to the Aspen Mountain Master Plan. This amendment request will be reviewed by the BOCC on September 22, 2010. Page 7 of 2 I0�9 STAFF COMMENTS: For the purpose of the P & Z review, the Castle/Maroon Caucus Master Plan is the applicable master plan. The Maroon/Castle Creek Caucus Master Plan is silent to the development of radio /communication towers on Aspen Mountain or anywhere else in the Master Plan area. RECOMMENDATION: Staff recommends that the Planning Commission approve the location and extent review for the Pitkin County Communication Tower subject to the attached draft resolution. Application provided separately Page 2 of 2 Z RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF PTTKIN COUNTY, COLORADO, APPROVING THE PTTKIN COUNTY LOCATION AND EXTENT REVIEW FOR REDEVELOPMENT OF A COMMUNICATION TOWER AND ACCESSORY FACILITIES Resolution No. PZ- -2010 RECITALS Pitkin County (hereafter referred to as the "Applicant ") has applied to the Planning and Zoning Commission of Pitkin County ( "Planning Commission ") to obtain approval for Location and Extent Review to replace an existing 58' Pitkin County communication tower with a 60' three- legged free standing lattice radio tower, replace a 250 gallon propane tank with a 500 gallon tank, add a generator, add Colorado State DTRS radio equipment, and bring the existing building up to date with a new metallic roof. 2. The building site is located on USFS land and is within the Aspen Skiing Company ski operations boundary. The site is generally located at the top of Buckhom Run. Legal Description, Attachment A. Pursuant to C.R.S 30 -28- 110(1), the Planning Commission finds that the proposed improvements are not identified in the Castle /Maroon Creek Master Plan and that the plan does not prohibit such development. Therefore, the Planning Commission finds the proposed improvements in conformance with this Master Plan. 4. The Planning Commission reviewed the application at a public meeting on September 14, 2010, at which time evidence and testimony were presented with respect to this application. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission that it hereby grants approval of the Pitkin County Location and Extent Review for redevelopment of the Communication Tower subject to the following conditions: The Applicant shall adhere to all material representations made during the application process or in public meetings or hearings and shall consider those representations to be conditions of approval. 2. The Applicant shall submit for the appropriate building/zoning permits for the above mentioned development activities prior to construction. APPROVED by the Planning Commission this 14"' day of September, 2010. 3 PLANNING AND ZONING COMMISSION OF PITKIN COUNTY, COLORADO ATTEST: Bonnie Waechtler, Administrative Assistant Joe Krabacher, Chair Date APPROVED AS TO FORM: APPROVED AS TO CONTENT: John Ely, County Attorney f � C Mdy Houben, Community Development Director P067 -10 P1D 2737- 303 -00 -002 Resolution No. PZ- _ -2010 Page 2 PITKIN COUNTY PRE - APPLICATION CONFERENCE SUMMARY LOCATION: Top of Aspen Mtn. next to Ajax Express lift PID4: ' ? ?? (USFS) OWNER: U.S. Forest Service 0'339 -a).3 -00 -t0Z APPLICANT: Pitkin County Communications REPRESENTATIVE: Mark Gamrat DATE: January 29, 2010 ZONE: Ski -Rec PHONE and EMAIL: 920 -5317 Tr)arkgL&o.pjtkin.co.us PLANNER: Mike Kraemer, 920 -5482 Type of Application: Minor Amendment to Aspen Mountain Master Plan to set height limit for County communication tower. Description of Project/Development: The Applicant is requesting approval to renovate the County's communication site on Aspen Mountain. This will involve renovating the building, dismantling existing towers and constructing a new higher tower. Communications sites are allowed by the Master Plan, but height limits are set by the Master Plan. As the new tower will be higher than the existing towers the height should be set by a formal Master Plan amendment. Land Use Code Sections to be addressed in letter of request (application): Sec. 2-20-150 (b) (1 -9): Minor Amendments Staff will refer the application to the following agencies: Aspen Fire Protection District, Ski Co, USFS Review by: Community Development Director— forwarded to BOCC. Public Hearing: No. FEES: $1,091.00 (make check payable to " Pitkin County Treasurer ") Planning Office flat fee: $936 (non - refundable; based on 3 hours of staff time); if staff review time exceeds 4 hours, the Applicant will be charged for additional time above 3 hours at a rate of $312/hour). • Clerk Fee: $130 • Web technology Fee: $25 To apply, submit 10 copies of the following information, unless noted otherwise: 1. Summary letter explaining the request, providing background on prior approvals and permits, and addressing compliance with the Code sections listed above; 2. Previous Land Use Approvals (if applicable); 3. Scenic View Exhibits to demonstrate visibility of proposed tower from County rights of way; 4. Proof of ownership of subject property; 5. Parcel description, including legal description and vicinity map; 6. Total fee for review of the application; 7. Signed fee agreement (I copy); 8. Consent from owner(s) to process application and authorizing the representative (1 copy) 9. Copy of this preapp form (I copy) 00j001 O T 3(p NOTES PLEASE SUBMIT ONE UNBOUND AND ONE -SIDED COPY OF YOUR COMPLETE APPLICATION PLEASE SUBMIT TWO -SIDED COPIES OF ALL REMAINING COPIES OF YOUR APPLICATION (IF POSSIBLE). THE PARCEL IDs SHOULD BE INC'L UDED ON ALL DOCUMENTS INC'L UDED IN YOUR APPLICATION. i ALL MAPS SHALL BE FOLDED. At least one copy of application shall have all pages at no larger than 8112 "x11 ". r This pre - application conference summary is advisory in nature and not binding on the County. The information provided in this suunary is based on current zoning standards and staff's interpretations based upon representations of the applicant Additional information may be required upon a complete review of the application. 00 1002 PITKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT AGREEMENT FOR PAYMENT OF LAND USE APPLICATION FEES PITKIN COUNTY (hereinafter "COUNTY ") and _ (hereinafter "APPLICANT ") AGREE AS FOLLOWS: APPLICANT has submitted to COUNTY an application for , the "PROJECT "). 2. APPLICANT understands and agrees that Pitkin County Ordinance No. 30 -2009 establishes a fee structure for land use applications and the payment of all processing fees is a condition precedent to a determination of application completeness. The fee structure is based on the COUNTY'S policy that development shall pay, in full, the cost of development review in the COUNTY. Fees have been set to be consistent and fair to the public and to reflect the expense incurred in providing such services to the public. 3. APPLICANT and COUNTY agree that because of the size, nature or scope of the proposed PROJECT, it may not be possible at the time of application to ascertain the full extent of the costs involved in processing the application. 4. APPLICANT and COUNTY agree that fees charged for the processing of land use applications shall accumulate if an application includes more than one type of land use review. 5. COUNTY and APPLICANT further agree that it is impracticable for COUNTY staff to complete processing or present sufficient information to the Planning Commission and /or Board of County Commissioners to enable the Planning Commission and /or Board of County Commissioners to make legally required findings for project approval, unless current billings are paid in full prior to decision. 6. Therefore, APPLICANT agrees that in consideration of the COUNTY'S waiver of its right to collect full fees prior to a determination of application completeness, APPLICANT shall pay a base fee in the amount of $ which is based on — hours of staff time, and if actual time spent by staff to process the application exceeds the average m number of hours by ore than 20 %, then the COUNTY will bill the APPLICANT quarterly for the additional time spent. Such periodic payments shall be made within 30 days of the billing date. APPLICANT further agrees that failure to pay such accrued costs shall be grounds for suspension of processing. PITKIN COUNTY ( "APPLICANT ") Cindy Houben Community Development Director By: n. A A2tl (IAMIM4i , I aMML4AJiL -t')JuS Print t N ame and Title (if applicable) Date: luhvSLI Mailing Address• — jjacA�) Co F/6// 30 )0103 Aspen - Pitkin County Communications Center TO: Pitkin County Community Development Department FROM: Mark Gamrat, Communications Director DATE: August 19, 2010 RE: Pitkin County Radio Site — Ajax Mountain P" County Sberil Am Police on* Poke Steno ess vow Police Aspen fh Aspen A nbulenee Basalt Fire a ENS &muntus Widest Fn & EMS Cabondeb We 6 EMS This application is for the modification of Pitkin County's Radio Site on Ajax Mountain. Pitkin County received a $489,848 Colorado Wireless Interoperability Network grant to improve this radio site and install State of Colorado 800 MHz Digital Trunked Radio System equipment. The grant is expiring at the end of this year. Attached to this application is the application that was submitted to the United States Forest Service (USFS), Exhibit A. The USFS application explains, in detail, this project. USFS approval is also needed because the radio site resides on their land. The major point to the application is I am asking for a variance to their established maximum radio tower height according to the USFS Aspen Mountain Communications Site Plan (Plan). The current radio tower is 58 feet, the maximum height in the Plan is 40 feet, and what I am asking for is a radio tower that is 60 feet, essentially replacing the existing radio tower. In the original USFS application, I asked for a 70 foot tower. I have since then modified my application to a 60 foot tower and placing the generator next to the tower behind the building, out of sight. This allows for a smaller foot print of 5ft x 5ft x 5ft at the base instead of 13ft x 13ft x 13ft base. Please see Exhibit B & C for specifications. This is the smallest base three- legged tower allowed without guying according to OSHA standards. The radio tower is located in the pine trees behind the Pitkin County building next to a 35 foot tall FCC building and the object is to get above the FCC building for proper radio propagation while cutting down as few trees as possible. A total of 3 - 4 live trees and two dead trees need to be removed. Please see Exhibit D for ridge line photos from the valley floor and Exhibit E for before and after visuals. This site is not visible from the major roads in Pitkin County. Exhibit D was taken at the Airport and I zoomed the camera in and you still cannot see the site or tower. Exhibits B through E are not included in the USFS application. This radio site is managed by the Aspen/Pitkin County Communications Center and operates Public Safety radio equipment only. This radio site has always been vital to Public Safety communications and the opportunity to improve radio interoperability with the State and plan for the future of Public Safety communications in Pitkin County should not be missed. The costs to Pitkin County are application fees, Communications Department in -kind administration and labor, and previously budgeted materials and supplies. 506 East Main Street, Dept C Aspen, Colorado 81611 970.920.5310 FAX 970.920.5339 30 000 2 E Txh 17h Mi 3 O ;115' Page 1 of 4 STANDARD FORM 299 (6199) Prescribed by DOIIUSDAIDOT P.L. 96487 and Federal APPLICATION FOR TRANSPORTATION AND Register Notice 5 -22 -95 UTILITY SYSTEMS AND FACILITIES ON FEDERAL LANDS FORM APPROVED OMB NO 0596-0082 NOTE: Before completing and filing the application, the applicant should completely review this package and schedule a Application Number preapplication meeting with representatives of the agency responsible for processing the application Each agency may have specific and unique requirements to be met in preparing and processing the application. Many times, with the help of the agency representative, the application can be completed at the preapplicatron Date Filed meefino Pitkin County 506 E. Main St. Dept. C Aspen, CO 81611 As applicant are you? (check one) a. ❑ Individual b ❑ Corporation" c ❑ PartnershiplAssociation' d ❑ State Government/Slate Agency e. ® Local Government f ❑ Federal Agency Name, title, and address of authorized agent if different from item 1 (include zip code) Mark Gamrat, Communications Director Same address specuy what application is tor. (check onel a. ❑ New authorization b ❑ Renewing existing authorization No c. ❑ Amend existing authorization No d ❑ Assign existing authorization No. e. ❑ Existing use for which no authorization has been received f ® Other' n do niumuuai, or pannemnlp are you a Cnlzenls) or me United States? lal Yes U No Project description (describe in detail) (a) Type of system or facility, (e.g., canal, pipeline, road); (b) related structures and facilities; (c) physical specifications (Length, width, grading, etc ); (d) tern of years needed (e) time of year of use or operation; (f) Volume or amount of product to be transported; (g) duration and timing of construction; and (h) temporary work areas needed for construction (Attach additional sheets, ifaddRtonal space is needed) This request is for the modification of the Pitkin County Communications Building and Radio Tower at the Aspen Mountain Communications Site (Exhibit 1). Pitkin County was awarded a Colorado Wireless Interoperability Network (CWIN) grant to construct and /or modifylmprove this site in order to install Colorado State Digital Trunked Radio System (DTRS) equipment. The ultimate goal of this grant is to improve DTRS radio coverage in Pitkin County This grant is due to expire m October 2010. The DTRS is a statewide 800 MHz trunked public safety radio system that has been instrumental for radio interoperability among public safety agencies across the State. Users of this radio system include, but not limited to, State and local public safety agencies, State and local government agencies, hospitals, public health, mass transit, utilities, schools, courts and USFS law enforcement. Currently, there Is one operational DTRS radio site that covers Pitkin County and the Highway 82 corridor and that site is on Sunlight Mountain in Garfield County. The radio coverage is woefully inadequate for the upper end of the Roaring Fork Valley (Exhibit 2). This site along with Homeland Security grant monies I have received for Crown Mountain, located between Basalt and El Jebef across Highway 82, for DTRS radio equipment will greatty Improve radio coverage in Pitkin County and the Roaring Fork Valley (Exhibit 3). A Letter of Interest was submitted to Bill Johnson on July 18, 2007 which describes the project (Exhibit 4). Un Ucroner b, zuob, Atkin county was awarded a Colorado Wireless Interoperability Network grant in the amount of $489,848 to upgrade the Pitkin County radio site located on Aspen Mountain. This money awarded was to replace the existing radio tower and raised wooded platform with a new three - legged free standing lattice radio tower (Exhibit 5,5a), replace an existing 250 gallon propane tank with a 500 gallon propane tank (Exhibit 6), add HVAC, add a generator, add Colorado State DTRS radio equipment and bring the building up to standards which included a new metallic roof (Exhibit 7) and bracing for the the floor. All labor, in -kind, equipment, demolition and removal costs are included in the grant. Motorola, Inc. is the project lead and will handle all coordination and technical needs. The entire project is budgeted through the grant and Pitkin County. The general Pitkin County site plan for this upgrade is shown in Exhibit 8. Regular maintenance and replacement costs will be the responsibility of Pitkin County and will need to be budgeted appropriately for the years to come. Pitkin County has several radio sites that require the same kind of maintenance and is included in the yearly budget. Pitkin County's site on Aspen Mountain has always had a maintenance budget since it was constructed and will continue to do so. 00 )�' Verson 9.0.2720 Microsoft Word 2000 Page 2 of 4 13a. Describe other reasonable alternative routes and modes considered Knowing that Aspen Mountain is a difficult radio site to be considered for this project for a number of reasons. A few reasons are proliferation unchecked radio equipment that has been installed there over the years and eventually leading to a Communications Site Plan, the high profile ski area the radio site is on top of and the height of the tower I am proposing. There were two other options that were considered mostly because of the tower height 1) a different location all togther. 2) two towers at the current maximum hieght of 40 feet instead of one at 70 feet b Why were these alternatives not selected? For a different locatior,the only other viable radio site considered was Upper Red Mountain (URM). Exhibit 9 shows the radio coverage off of Aspen Mountain and Exhibit 10 shows the radio coverage off of URM. These two coverage maps only show coverage off those locations without any other locations included for descriptive purposes only unlike Exhibit 3 which shows the entire coverage area. Ideally, both sites are needed but the priority is to cover as much of Highway 82 and major county roads as possible. Both radio sites have their good and bad coverage areas but the major disqualification of URM is there is no electical power to the site. URM is a solar powered site. I have received quotes from Holy Cross over the years that run from $250,000 to $400,000 to run power to URM. This quote is for running a powerline above ground Finding funds and approval from the USFS are large hurdles to overcome. It is my assumption that the USFS would like power ran underground which put the project financially out of reach Power would need to be run from Stanwood orLenado through densely forested areas. Exhibit 11 shows the current solar array. In order to power the existing radio equipment and the proposed radio equipment, a solar array would need to be a least three times this size and look like Exhibit 12 located in Hinsdale County. Also the State has, in a very few exceptions, allowed solar power only radio sites and the CWIN grant does not cover the cost of solar power. The State nor Pitkin County has the money for this type of application. Solar power arrangements are extremely expensive and require constant attention and maintenance. I know this Pitkin County's URM radio site that I maintain. The other consideration is erecting two 40 foot towers on Aspen Mountain instead of one 70 foot tower. There is very little room around the Pitkin County building to erect two towers. The existing tower is in between many trees at the rear of the building. In front of the building is a road, to the west is the FAA building, and to the east is a rock knoll. The rear of the building would be the area to try and fit the two towers. Unfortunately, the tower hieght is very limiting and many trees would need to be cut down to fit the two towers and even more trees would need to be cut down to allow for proper radio propagation of the microwave dishes (see Exhibit 13). c Give explanation as to why it is necessary to cross Federal Lands The Aspen Mountain Communications Site is located on Federal Lands. During the winter, snowmobile or the Gondola are the two viable ways to access the site. During the summer, vehicle or helicopter are ways to access the site. 14. List authorizations and pending applications filed for similar projects which may provide information to the authorizing agency (Specify number, date, code, orname) N/A 15. Provide statement of need for pro)ect, including the economic feasibility and items such as, (a) cost of proposal (construction, operation, and maintenance); (b) estimated cost of next best alternative; and (c) expected public benefits. Many items of this question are answered in the previous questions above. This site is critical for radio interoperabiltiy for Pitkin County public safety agencies, Roaring Fork Transit Authority and the State of Colorado. Radio communications for the upper end of the Roaring Fork Valley for the Colorado State DTRS is mostly non - existent (Exhibit 2). Portable radios have next to no coverage and mobile radios are a little better. It is very difficult for Pitkin County public safety agencies to communicate with State agencies because of the lack of radio coverage. Pitkin County needs radio interoperability with the State and patching the two radio systems together at the upper end of the Roaring Fork Valley via Aspen Mountain is critical. In addition, the Roaring Fork Transit Authority wants to use this system to replace their inadequate radio system. Providing for the safety of the public and responders through communications is critical and adding this site to the system is crucial in achieving this goal. 16. Describe probable effects on the population in the area, including the social and economic aspects, and the rural lifestyles. Adding public safety radio equipment to the upper end of the Roaring Fork valley would be a great benefit to the community. First responders will have more reliable radio coverage to help them do their job more effectively. The public would also benefit by having the Roaring Fork Transit Authority on a more reliable radio system. Once the project is complete, there would be no adverse effects on the community and how it functions. 00 -u , 07 Verison 9.0.2720 Microsoft Word 2000 Page 3 of 4 17. Descdbe likely environmental effects that the proposed project will have on. (a) air quality; (b) visual impact, (c) surface and ground water quality and quantity; (d) the control or structural charge on any stream or other body of water, (e) existing noise levels, and (Q the surface of the land, including vegetation, permafrost, soil, and soil stability (a)This project would have an extremely limited impact on air quality. The impact to air quality would happen when the generator runs during testing or a power outage from exhaust. (b) The existing tower Is approximately 55 feet high. The proposed tower is 70 feet. Adding an additional 15 feet will have a visual impact to those accessing the top of the Aspen Mountain. The visual impact from major roads will be almost non - existant. The way the site is situated on Aspen Mountain, it is almost Impossible to see with the naked eye from major roads. The tower is located behind our building and the view of the tower is partially obstructed by the trees. The tower that is proposed will have less of a footprint than the current tower and wooden platform. The current tower is guyed (c) The only water at the site is melting snow. No streams or lakes are in the vicinity of the site. (d) NIA. (e) Raised noise levels would be during construction and when the generator runs during testing or electrical outage. The generator will be behind the builiding, mounted in the radio tower. It is also sheltered by the FAA building and a small rock hill. (f) Disturbance of the ground will take place. 3 holes will need to be dug for the concrete foundation of the radio tower. This will all take place behind the building. One or two pine trees will need to be removed to fit in the new radio tower. The radio site sits on level ground. 18. Describe the probable effects that the proposed project will have on (a) populations of fish, planthfe, wildlife, and manne life, including threatened and endangered species; and (b) marine mammals, including hunting, capturing, collecting, or killing these animals Any impact to wildlife should be at a minimum. This is a well established radio site where the entire footprint of Pitkin County's section will be reduced. There will be ground disturbance to erect a new radio tower. There is no water in the area, such as takes, streams, rivers to disturb any marine life. If Pitkin County was instructed to erect two radio towers at 40 feet instead of one radio tower at 70 feet, numerous trees would need to be cut down to allow microwave radios to be used and for other radio propagation concerns. Microwave radios that are being proposed and that currently exist need line of site operation. We are currently aiming through the trees and it is a matter of time before the radio path will be blocked by the growing trees. Approximately 7 years ago I received permission to top two trees that were obstructing the microwave path. Cutting down the necessary amount of trees to allow for two 40 foot towers could leave this area very unattractive and an public outcry could be likely. In my estimation, approximately 15 to 25 trees would need to be cut down for two towers. 19. State whether any hazardous material, as defined in this paragraph, will be used, produced, transported or stored on or within the right -of -way or any of the nght-of- way facilities, or used in the construction, operation, maintenance or termination of the right -of -way or any of Its facilities "Hazardous material" means any substance, pollutant or contaminant that is listed as hazardous under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended, 42 U.S.0 9601 at seq, and Its regulations. The defimbon of hazardous substances under CERCLA includes any "hazardous waste" as defined in the Resource Conservation and Recovery Act of 1976 (RCRA), as amended, 42 U S C. 6901 et seq., and its regulations The term hazardous matenals also includes any nuclear or byproduct material as defined by the Atomic Energy Act of 1954, as amended, 42 U.S C 2011 at seq The term does not include petroleum, including crude oil or any fraction thereof that is not otherwise specifically listed or designated as a hazardous substance under CERCIA Section 101(14), 42 U. S, C, 9601(14), nor does the term include natural gas None. 20 Name all the Department(#Age icy(ies) where this application is being filed. Pitkin County, I HEREBY CERTIFY, That I am of legal age and authorized to do business in the State and that I have personally examined the information contained In the application and believe that the information submitted is correct to the best of my knowledae _Mark Gamrat Title 18, U.S.C. Section 1001, makes it a come for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious, or fraudulent statements or representations as to any matter within its jurisdiction 313 t 08 Neilson 9 0 2720 Microsoft Word 2000 Page 4 of 4 GENERAL INFORMATION ALASKA NATIONAL INTEREST LANDS This application will be used when applying for a nghl -of -way, permit, license, lease, or certificate for the use of Federal lands which lie within conservation system units and Nabonal Recreation or Conservation Areas as defined in the Alaska National Interest lands Conservation Act Conservation system units include the National Park System, National Wildlife Refuge System, National Wild and Scenic Rivers System, National Trails System, National Wilderness Preservabon System, and National Forest Monuments Transportation and ubtity systems and facility uses for which the application may be used are 1 Canals, ditches, flumes, laterals, pipes, pipelines, tunnels, and other systems for the transportation of water 2 Pipelines and other systems for the transportation of liquids other than water, including oil, natural gas, synthetic liquid and gaseous fuels, and any refined product produced therefrom. 3 Pipelines, slurry and emulsion systems, and conveyor belts for transportation of solid matenals 4 Systems for the transmission and distribubon of electric energy 5 Systems for transmission or recephon of radio, television, telephone, telegraph, and other electronic signals, and other means of communications 6 Improved nght -of -way for snow machines, air cushion vehicles, and all- terrain vehicles 7 Roads, highways, railroads, tunnels, tramways, airports, landing strips, docks, and other systems of general transportation This application must be fled simultaneously with each Federal department or agency requiring authorization to establish and operate your proposal In Alaska, the following agencies will help the applicant file an application and identify the other agencies the applicant should contact and possibly file with Department of Agriculture Regional Forester, Forest Service (USFS) Federal Office Building, P 0 Box 21628 Juneau, Alaska 99802 -1628 Telephone, (907) 586 -7847 (or a local Forest Service Office) Department of the Interior Bureau of Indian Affairs (BIA) Juneau Area Office Federal Building Annex 9109 Mendenhall Mall Road, Suite 5 Juneau, Alaska 99802 Telephone. (907) 586 -7177 Department of the Interior Bureau of Land Management 222 West 7th Avenue P 0 Box 13 Anchorage, Alaska 99513 -7599 Telephone (907) 271 -5477 (or a local BUM Office) U S Fish 8 Wildlife Service (FWS) National Park Service (NPA) Office of the Regional Director Alaska Regional Office, 1011 East Tudor Road 2225 Gambell St, Rm 107 Anchorage, Alaska 99503 Anchorage, Alaska 99502 -2892 Telephone (907) 786 -3440 Telephone (907) 786 -3440 Note - Filings with any Interior agency may be filed with any office noted above or with the Office of the Secretary of the Interior, Regional Environmental Officer P 0 Box 120, 1675 C Street, Anchorage, Alaska 9513 j U Venson 9 0.2720 Department of Transportation Federal Aviation Administration Alaska Region AAL-4, 222 West 7th Ave , Box 14 Anchorage, Alaska 99513 -7587 Telephone (907) 271 -5285 NOTE - The Department of Transportation has established the above central filing point for agencies within that Department Affected agencies are Federal Aviation Administration (FAA), Coast Guard (USCG), Federal Highway Administration (FHWA), Federal Railroad Administration (FRA) OTHER THAN ALASKA NATIONAL INTEREST LANDS Use of this fan is not limited to National Interest Conservation Lands of Alaska Individual departmentlagencies may authorize the use of this form by applicants for transportation and utility systems and facilibes on other Federal lands outside those areas described above For proposals located outside of Alaska, applications will be filed at the local agency office or at a location specified by the responsible Federal agency SPECIFIC INSTRUCTIONS (Items not listed are sef- explanatory) 7 Attach preliminary site and facility construction plans. The responsible agency will provide instructions whenever specific plans are required 8 Generally, the map must show the secUOn(s), township(s), and ranges) within which the project is to be located Show the proposed location of the project on the map as accurately as possible. Some agencies require detailed survey maps The responsible agency will provide additional instructions 9 , 10, and 12 The responsible agency will provide additional instructions. 13 Providing information on alternate routes and modes in as much detail as possible, discussing why certain routes or modes were rejected and why it is necessary to cross Federal lands will assist the agency0es) in processing your application and reaching a final decision. Include only reasonable alternate routes and modes as related to current technology and economics 14The responsible agency will provide instructions 15 Generally, a simple statement of the purpose of the proposal will be sufficient However, major proposals located in critical or sensitive areas may require a full analysis with additional specific information. The responsible agency will provide additional instructions. 16through 19 Providing this information is as much detail as possible will assist the Federal agency(ies) in processing the application and reaching a decision When completing these items, you should use a sound judgment in furnishing relevant information Fore example, if the project is not near a stream or other body of water, do not address this subject. The responsible agency will provide additional InsWctions Application must be signed by the applicant or applicants authorized representative EFFECT OF NOT PROVIDING INFORMATION Disclosure of the information is voluntary If all the information is not provided, the application may be rejected DATA COLLECTION STATEMENT The Federal agencies collect this information from applicants requesting nght -of -way, permit, license, lease, or cerlificabon for the use of Federal lands The Federal agencies use this information to evaluate the applicant's proposal The public is obligated to submit this form it they wish to obtain permission to use Federal lands Microsoft Word 2000 Page 5 of 4 The _14TWU I- PRIVATE CORPORATIONS ATTACHED FILED` a. Articles of Incorporation b Corporation Bylaws ❑ C. A certifcebon from the State showing the corporation is in good standing and is entitled to operate within the State c. Copy of resolution authorizing fif ng ❑ e The name and address of each shareholder owning 3 percent or more of the shares, together with the number and percentage of any class of voting shares of the entity which such shareholder is authonzed to vote and the name and address of each affiliate of the entity together with, in the case of an affiliate controlled by the entity, the number of shares and the percentage of any class of voting stock of that affil ate owned, directly or indirectly, by that entity, and in the case of an affiliate which controls that entity the number of shares and the percentage of any class of voting stock of that entity owned, directly or indirectly, by the affiliate. I. If application is for an oil or gas pipeline, describe any related rig IiWf-way or temporary use permit applications, and identify previous applications ❑ ❑ g. If application is for an oil and gas pipeline, identify all Federal lands by agency impacted by proposal II - PUBLIC CORPORATIONS a. Copy of law forming corporation ❑ b Proof of organization ❑ C. Copy of Bylaws ❑ d. Copy of resolution authorizing fling Lj L-1 e. If application is for an oil or gas pipeline, provide intonation required by item "I -f" and "I-g' above. III - PARTNERSHIP OR OTHER UNINCORPORATED ENTITY a Articles of association, if any ❑ ❑ b If one partner is authorized to sign, resolution authorizing action is c. Name and address of each participant, partner, association, or other d. If application is for an oil or gas pipeline, provide information required by item "I -P' and "I-g' above. IT me required m ormanon is already filed with the agency processing this application and is current, check block entitled "Filed! Provide the file identification information (e.g., number, date, code, name), If not on file or current, attach the requested information Under the Paperwork Reduction Act of 1995, no persons are required to respond to a collection of information unless it displays a valid OMB control number The valid OMB control number for this information collection is 0596 -0082. This information is needed by the Forest Service to evaluate the requests to use National Forest System lands and manage those lands to protect natural resources, administer the use, and ensure public health and safety. This information is required to obtain or retain a benefit The authority for that requirement is provided by the Organic Ad of 1897 and the Federal Land Policy and Management Act of 1976, which authorize the secretary of Agriculture to promulgate rules and regulations for authorizing and managing National Forest System lands These statutes, along with the Term Permit Act, National Forest Ski Area Permit Act, Granger -Thye Act, Mineral Leasing Act. Alaska Tern Permit Act, Act of September 3, 1954, Wilderness Act, National Forest Roads and Trails Act, Act of November 16, 1973, Archeological Resources Protection Act, and Alaska National Interest Lands Conservation Act, authorize the Secretary of Agriculture to issue authorizations or the use and occupancy of National Forest System lands The Secretary of Agriculture's regulations at 36 CFR Part 251, Subpart B, establish procedures for issuing those authorizations The Privacy Act of 1974 (5 U.S.0 552a) and the Freedom of Information Act (5 U S.C. 552) govern the confidentiality to be provided for information received by the Forest Service. Public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information ?0 tv10 Microsoft Word 2000 Verson 9.0 2720 Exhibit 1 cN)iiT p (1lgltt 910 c0.) \\ �T]I k ExPANDED BY MTA. CONI CAKWO TO LOA AN)ENNA ` IN l-D' PVC - CONCRETE ENCASED -2' -E' BELOW GNADE NOTE EA OI O S ANA SKI AR dsPOAE AIRA I � I i 1 t EXISTNC (U.S fAND H (1 �ENSTXC (F AA) \. C (RIMIN COMM o \ ,$ IF Cw 112pp / 1 1 • i 11 ./ • 1 1 CHAININ'i 1 rErom+u 1 0 El 11 1 11 0 /200 (1 /2Y BEOAR) LAYOUT PLAN S I° a CO' Do )u 11 USFS Page 4 Exhibit 2 r M � - r f s . _ x L tot s x. W .: rx � A n - .. r r• ,� L. b R _ T I r rn r Y � r N R � T 00 1012 � H 'r � x 4 � . ��= t '.. Exhibit 4 Aspen - Pitkin County Communications Center TO: Bill Johnson, United States Forest Service FROM: Mark Gamrat, Communications Director DATE: July 18, 2007 RE: Ajax Mountain Communications Site Improvement LETTER OF INTEREST Pift County Sherdl Aspen Police Bola Police Snormaes Wells Police Aspen Fire Aspen Ambulance Baeall Ere & EMS Snorsnus Wildcat Fn & EMS Cerbnndsle Bra 6 EMS This letter is a follow up to our phone conversation on July 17, 2007. Pitkin County was awarded a grant for $489,848 through the Colorado Wireless Interoperability Network (CWIN) and administered by the Department of Local Affairs (DOLA). This grant is for radio site improvements on Aspen Mountain in Aspen, CO. This radio site has the FAA. Holy Cross, Aspen Skiing Company; just to list a few, as tenants. Each has their own structure that houses radio equipment. The monies for this grant will be used to improve /renovate the existing structure, replace a guyed radio tower with a freestanding one, replace an old generator and propane tank and add an HVAC system. Once this is done, the State will add equipment for their 800 MHz Digital Trunked Radio System (DTRS). This will aid in the interoperability quest that public safety constantly pursues. This will allow the Aspen/Pitkin County Communications Center to tie their VHF radio system into the State's DTRS more seamlessly and will improve radio coverage for the State's personnel and vehicles. The existing structure is a wood cabin that is shaped like an 'A' frame with a flat peak. The plan for the structure is to replace the existing floor supports with stronger ones, replace the shake- shingle roof with a metal one that matches the scenery for color, insulate the inside and add a small HVAC system, The footprint of the building is approximately 10 x 14. This footprint will not change. The existing radio tower is guyed tower approximately 55 feet tall. The plan is to replace the guyed tower with a freestanding 3 leg tower that is between 70 feet tall. There is also a wooden platform behind the building and next to the tower that is approximately 25 feet off the ground. This will be removed and not replaced. The existing tower is completely full and we will need to add the State's radio and microwave antennas to the new tower. This is the reason we may need to go higher. The footprint will be reduced because the new tower will not be guyed. 506 East Main Street, Dept C Aspen, Colorado 81611 970.920.5310 FAX 970.920.5339 16_j �� g Pi&M County Sheri) Aspm Police Sept Police Seownw Vwge Polios Amm Fire Arym Ambulance Boom Fire & EMS Snomms Wicket Fire & EMS Cerboe ide Fire & EMS Aspen - Pitkin County Communications Center The new generator will be placed in the radio tower behind the building. It will be placed in such a way that it will not be visible from the ski area. The generator will be covered and insulated to protect and reduce noise. The only time the generator will run is during a power outage or during scheduled run tests. This can be done at night after the mountain is closed. The old generator was inside the building and removed a few years ago because of numerous difficulties. The new propane tank will go where the existing one is now located. If possible. we will place it behind the building and out of sight as much as possible. The propane tank will be above ground as the existing one is now. The grant has been approved by my Board of County Commissioners. I am currently working with my Community Development department to get the proper approvals and in contract negotiations with Motorola and the State. I am hoping to have all this wrapped up soon and start construction by the end of August or beginning of September. Please call me with any questions or concerns. You can reach me at 970 920 5317. Thank you for taking the time to review my request. 506 East Main Street, Dept C Aspen, Colorado 81611 970.920.5310 FAX 970.920.5339 JO 115 s,` y v i y� At )i• I.3 .. mix•.. r as. ,K �1 .. ♦�. ♦f ' Yom. 6 ". 1 ' i - �11� ' ..'IIIIY in f il t Exhibit 6 oo is 0 G N Exhibit 8 Reconstruct Existing Structure Install additional floor supports wl Steel I- Beams. Repair floor to meet Motorola R -56 Standards. Install a new roof that is aesthetically pleasing. Insatll a new WG entrance panel and new MGB. Ground building to Motoorla R -56 Standards. Insatll a new 3 -ton HVAC. Install a new ice bridge for cable runs. Install new transfer switch. \ Install new ground ring. New Propane Tank 0 Pour concrete pads for propane tank. F . Existing Structure Steps Existing Structure I North New Ice bridge for cable runs. � Existing Pole Tower Structure V New 80' Self Supporting Tower New Platform Remove all old Pole Tower Stucture for New Generator @ 20' level within new tower Transfer old antennas to new tower once completed. AJAX Site Plan SITE SKETC DRAWN BY F7� Exhibit 9 i 1 _ r Pnkwlk Td Place La Potter nPlau 7 Mrbk cp,rt3 Hxry Packet lace !! � • PkVAOSS EMM Samrset t l P.q �„ I Pa�or4 \ ue i McMilh • y. yy � � hbrk T5 _ 4 leaOWi 1 Hagerman I ?' t �amglon MJl K T. Lames 1. Book YmY.sWig S r •r. 00 1;;2, 1 Exhibit 10 00 jU212 Exhibit 11 30 102. 3 �a Exhibit 13 009025' mxlf m J u V le 0 OOA27 mHxl IU OYWY, a mw�w YW4{011l vN Wmi YtY 40 W� YWnlq 11 wAlp wWb P9M J �VL 0 f,J North Reconstruct Existing Structure Install additional floor supports wl Steel l- Beams. Repair floor to meet Motorola R -56 Standards. Install a new roof that is aesthetically pleasing. Insatll a new WG entrance panel and new MGB. Ground building to Motoorla R -56 Standards. Insatll a new 3 -ton HVAC. Install a new ice bridge for cable runs. Install new transfer switch. Install new ground ring. New Propane Tank Pour concrete pads for propane tank. New Platform for New Generator @ 3' Above Ground Existing Structure Steps Existing Structure New Ice bridge for cable runs. New 60' Self Supporting Tower 5' Base Remove all old Pole Tower Stucture 5' Foot Minimum Face width to meet OSHA Requirements AJAX Site Plan SITE SKETCH 1 OF sm 30 CID O O F : 1 1 i WIE .E- 11. . w , r P4 1 I � i i PA ks l eta I. i ®I FI &L; I I_ I I/' W L y \ r Dear Honorable County Commissioners Aspen Mountain Communications site is located on the Aspen Ranger District of the White River National Forest, Pitkin County, Colorado in portions of Section 30, T. 10 S., R. 84 W., 6th Principal Meridian; Latitude 39 09' 13" North, Longitude 106 49' 14" West. The site elevation is 11,187 feet and covers approximately 2 acres. The site is located on National Forest System Land, and Pitkin County has a permit for this use issued by the U.S. Forest Service. Their permit is in good standing. The proposed improvements for the communication site are presently under review, and are expected to be formally improved in the near future. We have been working with the PitCo's communication department for a couple of years on this project, and we don't see any reason this will not be approved on short notice. We request that you honor their proposal to improve the communications site for the safety of the local community, as well as to refine the scenic values of the site. Please contact me if you have any questions. Thanks - /S/ James A. Kirschvink Realty Specialist, Aspen - Sopris Ranger Districts. White River National Forest C: Scott Snelson, District Ranger, Aspen - Sopris Ranger District PS - MARK - I will include your new location for the generator in the upcoming decision document. This should not be an issue, since it makes sense. I have the draft document 90% completed. Jim -Jim Kirschvink/ Aspen - Sopris Ranger District Realty Specialist 806 W. Hallam, Aspen, Cc 81611 Work: 970 945 -3313 Cell: 970 580 9366 Ikirschvink(a)fs.fed us Fight the current. Even a dead fish can go with the flow PITKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 130 S. Galena Street Aspen, Colorado 81611 PHONE# (970) 920- 5526/FAX# (970) 920 -5439 August 26, 2010 Mark Gamrat 485 Rio Grande Place Aspen, CO 81611 Re: Pitkin County Minor Amendment to Aspen Mountain Master Plan to set height limit for County Communication Tower (PID#2737 - 303 -00 -002; CASE# P067 -10) Dear Mr. Gamrat The Planning Office has completed its preliminary review of the captioned application. We have determined that this application is complete. After a more detailed review of the submittal information, additional information specific to the application may be requested in order to adequately review and process the application. The planner in charge of the review will request the information from you directly. We have scheduled this application for review by the Board of County Commissioners on Wednesday, September 22, 2010, at a meeting to begin at 12:00 P.M. in the Plaza One Meeting Room at 530 East Main St., Aspen. Should this date be inconvenient for you, please contact me within 3 working days of the date of this letter. After that the agenda date will be considered final and changes to the schedule or tabling of the application will only be allowed for unavoidable technical problems. The Friday before the meeting date, we will call to inform you that a copy of the memo pertaining to the application is available at the Community Development Department. If you have questions, please call Mike Kraemer, the planner assigned to your case, at 920 -5482 Sincerely, Bonnie Waechtler Administrative Assistant PTTKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado 81611 Phone (970) 920 -5526 FAX (970) 920 -5439 MEMORANDUM TO: Aspen Fire Protection Department Aspen Skiing Company United States Forest Service (USFS) FROM: Mike Kraemer, Community Development Department Michael.kraemergeo.pitkin.co.us RE: Pitkin County Minor Amendment to Aspen Mountain Master Plan to set height limit for County Communication Tower (CASE P067- 10;PID 2737- 303 -00 -002) DATE: August 26, 2010 Attached for your review are materials for an application submitted by Pitkin County Communications. The Board of County Commissioners will review the application on Wednesday, September 22, 2010. Please return your comments to me by Friday, September 10, 2010. http: / /www.aspenpitkin com/Portals /O /docs/ county /Com % /Planninp-/Land Use Applications/ P067 10 app.pdf If you require a paper copy of this application contact Bonnie Waechtler at bonnie.waechtler &co.pitkin.co us or 920 -5109. Thank you. Michael Kraemer From: GERDIN, VICTOR [VGERDIN @aspensnowmass.comj Sent: Friday, August 27, 2010 5:39 PM To: Michael Kraemer Cc: KING, PETER; Corbin, David Subject: FW: Pitkin County Land Use Pitkin County Application Hi Michael, We have reviewed the application referred to below. Small changes to the site foot print will have little affect to the ski circulation in this area. However, we are concerned that the construction project may interfere with our operations and /or preparations for the winter season. The application documents indicate construction will commence in late August or early September. This seems improbable since the BOOC will not address the request until September 22 nd . Conventional (driving) access to the Aspen Mountain could be problematic in October, especially for heavy trucks, even if Little Annie Road is considered as the primary access. On the front side's upper mountain, we have to preserve all the early season natural snow available (i.e. we will not allow plowing Summer Road) to ensure a Thanksgiving opening. The construction details are not addressed in the application. I suggest the applicant present a detailed Construction Management Plan with schedule, vehicle trips, staging needs, etc. This CMP should particularly address construction access and contingencies since site access, at 11,000 feet, in late October or early November may simply be impossible in the event of a heavy early season snowfall. Thanks for allowing ASC the opportunity to comment on the application Victor Victor Gerdin Mountain Planner Aspen Skiing Company P.O. Box 1248 Aspen, CO 81612 970- 923 -0555 Aspen Skiing Company was recently named one of Outside Magazine's "Best Places to Work" for 2010. Join us today by visiting www.asoensnowmassxomhobs From: Bonnie Waechtler [mailto: Bonnie .Waechtler @co.pitkin.co.us] Sent: Thursday, August 26, 2010 11:26 AM To: Ed Van Walraven; Dalla Betta, Dana; jkirschvink @fs.fed.us Cc: Davis, Donna Subject: Pitkin County Land Use Pitkin County Application PrrK]N COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado 81611 Phone (970) 920 -5526 FAX (970) 920 -5439 MEMORANDUM TO: Aspen Fire Protection Department 1 j q Mike, the FAA project managers are Bob Brown BOb.BrOwn(O7faa.gOy and Edith Bowdish Edith. Bowdish((Dfaa.gov Thanks, Victor From: GERDIN, VICTOR Sent: Monday, September 13, 2010 4:04 PM To: 'Michael Kraemer'; Jim Kirschvink; Gerald Fielding; Mark Gamrat Cc: Lance Clarke; KING, PETER Subject: RE: meet - radio tower Mike, I can meet on Wednesday between 10am and noon ... or anytime Friday. But I think reviewing a detailed CMP and /or project schedule prior to the meeting would be helpful and may even render a site visit unnecessary. The map 1 sent last week very clearly describes the area of concern and the negative affect this project could create for November ski operations, not to mention project delays, should we get abundant early season snow at that elevation. Thanks, Victor From: Michael Kraemer [mailto: Michael .Kraemer(alco.oitkin.co.us Sent: Monday, September 13, 2010 1:55 PM To: GERDIN, VICTOR; Jim Kirschvink; Gerald Fielding; Mark Gamrat Cc: Lance Clarke Subject: meet - radio tower Can you guys meet up here on Wednesday morning at 11:00 to talk about building this tower and access? Mike az Michael Kraemer From: Mark Gamrat [mark.gamrat @pitkin911.org] Sent: Tuesday, September 21, 2010 8:03 AM To: GERDIN, VICTOR Cc: Michael Kraemer; Lance Clarke; KING, PETER; Jim Kirschvink, Gerald Fielding; Dave Petty, Mark Young Subject: Re: meet - radio tower Attachments: Construction Schedule.docx Hello all. Attached you will find the schedule I submitted with the Building Permit. The start date has been pushed back until the beginning of next, pending BOCC approval. Victor, I have cc'd the Contractor and the project manager so, if possible, we can meet with you on the 28th. So ... Victor, Mark and Dove let me know if this will work. Let me know if you have any questions.. Mark Gamrat, Communications Director Aspen/Pitkin County Communications Center 506 E. Main St. Dept. C Aspen, CO 81611 (970) 315 -2181 markgga pitkin911.org On Mon, Sep 20, 2010 at 5:36 PM, GERDIN, VICTOR < VGERDINnaspensnowmass.com > wrote: Mike and Mark, Thanks for the clarification at the meeting last Friday. As we discussed, here are some guidelines in the event of early season snowfall: • No access across the top of the mountain at anytime, without permission and /or assistance from ASC when there is 12" or more snow on the ground • After November 1, no access across the top of the mountain, without permission and /or assistance from ASC when there is 6" or more snow on the ground • Snowcats to haul materials across the snow may be available, cost is $150 /hr., $150 minimum charge per haul • A revegetation bond should be available. We understand that the project is intended to start on Friday September 24`" and is scheduled to take 3 weeks. We look forward to meeting with the contractor before then on site to confirm the location and size of the staging area. 13 Aspen - Pitkin County Communications Center CONSTRUCTION SCHEDULE T"6104Y Construction will start on September 28, 2010 and is set to conclude on October 14, 2010. The Contractor will, work weekends if incoming weather or scheduling warrants an earlier completion date. Staging area needed is 75' x 75' at a predetermine area agree upon y e spen mg Company an itkin County. The road to access the site on the Ski Area will not be blocked. This is the road to Buckhom. All equipment staged will easily clear the lift line cables. A port-a -potty will be brought to the site and staged by the radio site. All small vehicle traffic (2 pick -up trucks) will travel on Summer Road via the Lift IA entrance. The Contractor will remove any equipment if heavy weather is eminent as to not to interfere with skiing operations. Please see the "Site Map" for detailed location. The gray box next to the letter B is the approximate location of staging. Work vehicles can park next to the Radio Site labeled as County Comm Tower. All trash, debris, etc. will be hauled off the mountain by the Contractor no later than end of construction date. Day 1 — Demolition of wooden platform and haul of mountain. Day 2 - Mobilization and begin staging of equipment. Day 3 — Excavate for tower foundation. A backhoe will be staged for the duration of the project starting on this day. The hole will be 8' x 8' and 4' deep. Day 4 — Install forms for the tower. Day 5 — Install rebar for tower. f (7� ay 6 Pour concrete. 6 yards of concrete will be needed. This will be the only day extended traffic will be on Little Annie Road. Cement trucks will use this road for this day only. Cement trucks will not be staged at the site. Up to 20 trips may be necessary. Day 7 — Backfill. Excavated dirt will be used for proper drainage for the tower. Dirt will be used for generator and propane foundation. All excavated dirt will be re -used. Day 8 — Assemble tower. Day 9 — Erect tower. A boom truck will be used and driven up Little Annie Road one time. The boom truck will be used on this day only and not staged at the site. Day 10 — Install Ice Bridge Day 11— Install Roofing. Day 12 — Install propane tank and generator 50,-J Day 13 Complete wiring. Demobilization. If weather permits, we will also deconstruct the old tower and haul it off the mountain. If not, the tower will be taken down the following year as soon as the top of the mountain is accessible by vehicle. 506 East Main Street, Dept C Aspen, Colorado 81611 970.920.5310 FAX 970.920.5339 iq JOURNAL ENTRY REF: SOURCE: JE DESCRIPTION: Month: CONTROL TOTALS: Pitkln County Minor Amendment to Aspen Mountain Master Plan to set height limit for County Communication Tows P067 -10 DEBITS 1,091.00 CREDITS 1,091.00 13,11 ^ ORE ACCOUNT # DESCRIPTION AMOUNT DR CR FUND DEPT I 002 001 001 021 101 101 00000 00000 00000 63342 63340 63130 Flat Fee BOCC Clerk Fee BOCC Web Fee 936.00 130.00 25.00 505 94 00390 82000 Purchase Service 1,091.00 BY Bonnie Weechtler DATE je form.xls