Parcel ID: 2737- 30 -3 -00 -002 Application Date: 8/20/10 Case No: P067 -10
Description: Pitkin County Minor Amendment to Aspen Mountain Master Plan to set height Planner: Mike Kraemer
limit for County Communication Tower # Copies: 10
Fees due by Journal Entry.
Allocated Hours: 3
Project Address: 0 ASPEN HIGHLANDS SUMMER RD, ASPEN, CO 81611 % Over Hours: 4
Property Owner: ASPEN SKIING COMPANY
Address: PO BOX 1248
ASPEN, CO 81612
Owner Phone: (970) 923 -0555
Owner's REP: MARK GAMRAT
REP's Email: mark @co.pitkin.co.us
Address: 485 RIO GRANDE PL
ASPEN, CO 81611
REP's Phone: (970) 920 -5317
Referrals: FIRE DEPT - ASPEN Other Referrals: Aspen Ski CO None
ALL OTHER REFERRALS USFS None
Comments Due Date: 09/1012010
Meetings: Iat Meeting: 2nd Meeting: 3rd Meeting:
Meeting Date: 09/14/2010 09/22/2010
Review Body: p & bocc
Public Hearing? no no
Notice Date:
Meeting Notes:
Approvals:
BOCC Resolution #: 121 -2010 #574111 P &Z Determination #:
BOCC Ordinance #: HO Determination #:
Admin Determination #:
Other Information:
VR Approval Date: Plat Recorded Date:
VR Expires Date: Plat (Bk, PG):
Remarks: no vesting
Application Type: MinorAmendment to a Development Permit
UPDATE ADDRESS NOTIFICATION
Date:May 11,2023 Assignment Number:2023 -18 (C)
Updated Addresses:
4773 Aspen Mountain Rd (Ajax Tower Site)
Aspen,CO 81611
Former Address:4773 ASPEN SUMMER RD (to be retired)
Parcel:N/A
●Longitude -106.820859
●Latitude 39.153268
Property Owner Name:United States Forest Service
Voter Split:1.1.072.0
Reason for Assignment:Update the road name for existing addresses identified as “Aspen
Summer Rd.”
Note:This Notification will update the addresses formally assigned to “Aspen Summer Road.”
See map for exact location of addresses.
Please contact me for any questions or further clarification.
Thank You,
Michelle Steinberg
Addressing Coordinator,Pitkin County Government |IT
Work Phone:970-429-6132
Email:michelle.steinberg@pitkincounty.com
Address:530 E Main St #203,Aspen,CO 81611
Updated Address Assignment
4773 Aspen Mountain Road
May 11, 2023
4550
4805
4705
4755
4773
A
S
P
E
N
M
T
N
R
D
pitkin county
¯
Scale: 1:4,214
Updated Address:
4773 Aspen Mountain Rd
Ajax Tower Site
Legend
Existing Road
Driveway
Updated Address
Existing Structures
Federal Land
Retiring Address:
4773 Aspen Summer Rd
Non-Conforming Address
RECEPTION #: 574111,10/06/2010 at
11:19:22 AM,
1 OF 3, R $0.00 Doc Code RESOLUTION
Janice K. Vos Caudill, Pitkin County, CO
RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY,
COLORADO, APPROVING THE MINOR AMENDMENT TO A DEVELOPMENT PERMIT
FOR THE PITKIN COUNTY COMMUNICATION TOWER AND ACCESSORY FACILITIES
ON ASPEN MOUNTAIN
Resolution No.41 -2010
RECITALS
1. Pitkin County (hereafter referred to as the "Applicant') has applied to the Board of County
Commissioners (`BOCC ") to obtain approval for a Minor Amendment to replace an existing 58 foot
Pitkin County radio tower with a 60 foot three - legged free standing lattice radio tower, replace a 250
gallon propane tank with a 500 gallon tank, add a generator, add Colorado State DTRS radio equipment,
and bring the existing building up to date with a new metallic roof.
2. The building site is located on USFS land and is within the Aspen Skiing Company ski operations
boundary. The site is generally located at the top of Buckhorn Run. Legal Description, Attachment A.
3. Pursuant to C.R.S 30- 28- 110(1), the Planning Commission heard this request under a "Location and
Extent Review" on September 14, 2010 and found that the proposed improvements are not identified
in the Castle /Maroon Creek Master Plan and that the plan does not prohibit such development.
Therefore, the Planning Commission found the proposed improvements in conformance with this
Master Plan.
4. The BOCC finds that an early snow fall may occur and, therefore, an acceptable construction
management plan must be developed prior to work commencing.
5. The BOCC reviewed the application at a public meeting on September 22, 2010, at which time
evidence and testimony were presented with respect to this application.
NOW, THEREFORE, BE IT RESOLVED by the BOCC that it hereby grants approval of the
Minor Amendment to Development Permit for the redevelopment of the Pitkin County Communication
Tower and accessory development mentioned above subject to the following conditions:
The Applicant shall adhere to all material representations made during the application process or in
public meetings or hearings and shall consider those representations to be conditions of approval.
2. The Applicant shall submit for building and zoning permits for the above mentioned development
activities. With submittal of these permits, the Applicant shall provide a tree mitigation plan for
review and approval by the Community Development Director.
3. The Aspen Mountain Master Plan shall be amended to allow the maximum height of the Pitkin
County Radio Tower at the top of Buckhorn run to increase from 58' to 60'.
4. The Applicant shall comply with the following conditions regarding access to the construction site
within the ski area boundary
A. No access across the top of the mountain at anytime, without permission and/or assistance from
ASC when there is 12" or more snow on the ground.
B. After November 1, no access across the top of the mountain, without permission and/or assistance
from ASC when there is 6" or more snow on the ground.
5. At building/zoning permit submittal, the Applicant shall submit to the Community Development
Director, for review and approval, a construction management plan that outlines an early snow
contingency plan. This plan shall not allow plowing of Midnight Mine or Little Annie Roads or other
areas within the ski operation boundary. If an acceptable plan cannot be approved, the tower shall be
constructed next spring after ski operations terminate and limited service roads are no longer needed
to be plowed to gain access to the building site.
6. Construction activity for the communication tower may occur on Sunday only if necessary.
Failure to comply with these conditions of approval may result in revocation of this permit or any
subsequent permits related to this property or vested rights associated with this property.
APPROVED AND ADOPTED on the 22 "" day of September, 2010.
BOARD OF COUNTY COMMISSIONERS,
PITKIN COUNTY, COLORADO
George Newma#, Chair
APPROVED AS TO CONTENT: APPROVED AS TO FORM:
Cindy Houben John Ely
Community Development Director Cou orney
P067 -10
PID 2737- 303 -00 -002
BOCC Resolution No. /)/ -2010
Page 2
Attachment A
Legal Description
THE FOLLOWING DESCRIBED LAND SITUATE, LYING AND BEING IN THE COUNTY
OF PITKIN AND STATE OF COLORADO, TawrrH:
IN PORTIONS OF SECTION 30, T. 10 S., R 84 W., 6 P.M.; LATITUDE 39 DEGREES 09
MINUTES 13 SECONDS. LONGITUDE 106 DEGREES 49 MINUTES 14 SECTIONS WEST.
L '
MEMORANDUM
TO: Pitkin County Board of County Commissioners
6Q Z,cW
THRU: Cindy Houben, Community Development Director
FROM: Mike Kraemer, Planner A' '
RE: Pitkin County Communications Facility — Minor Amendment to a Development Permit
DATE: September 22, 2010
SUMMARY OF REQUEST: The Applicant is requesting an amendment to the Aspen Mountain Master
Plan through a minor amendment to a development permit to replace an existing 58' Pitkin County radio
tower with a 60 foot three - legged free standing lattice radio tower, replace a 250 gallon propane tank with a
500 gallon tank, add a generator, add Colorado State DTRS radio equipment, and bring the existing building
up to date with a new metallic roof.
The Applicant is stating that a 75' x 75' staging area is needed during construction and approximately 30
round trips of traffic would occur to the site. The Applicant's disturbance areas and site plan are located
within the submittal packet. It is the Applicant's intention to begin construction immediately after BOCC
approval and after appropriate building and zoning permits are issued.
APPLICANT: Pitkin County
REPRESENTATIVE: Mark Gamrat, Communications Director
LOCATION: Aspen Mountain, top of Buckhom Run within the ski area operations boundary on USFS
property.
ZONING: SKI -REC
EXISTING CONDITIONS/BACKGROUND: The site is located near the top of the Ajax Express lift at
the top of Buckhorn Run and is developed with a number of towers and antennas. The Applicant's
submittal packet shows pictures of the existing area. The area and development operates under a USFS
permit and under the Aspen Mountain Master Plan. A new USFS permit will need to be obtained for this
work.
PROCEDURE/PROCESS:
On September 14, 2010, the P & Z reviewed this request under a Location and Extent Review. C.R.S 30-
28- 110(1) provides that the Planning Commission shall review the location and extent of public projects
proposed by a governmental entity in the unincorporated area of the County for conformance with the
applicable comprehensive plan or master plan. The Planning Commission's action on a Location and
Extent proposal is essentially "advisory", as disapproval may be overruled by the governmental
jurisdiction making the proposal. The applicable Master Plan for review of this work is the
Castle/Maroon Master Plan.
Page 1 of 3
1 1 b
The P & Z made a finding that the request was in conformance with the applicable master plan and
approved a resolution for this request.
On page I1 of 185 of the Aspen Mountain Master Plan, structures are restricted to a 28' height limit
unless a variance is granted by the appropriate process. Changing the height limit for the communication
tower from 58' to 60' will require an amendment to the Aspen Mountain Master Plan. This amendment
request will be reviewed under a Minor Amendment to a Development Permit.
REFERRAL COMMENTS: Comments were received from the Aspen Skiing Company and the USFS.
A number of referral comments were received from the Ski Company via email. In summary, the emails
stated that the Ski Company is concerned about construction access to the communication tower building
site if construction occurs in late September, October, and/or November. Specifically, the Ski Company
is concerned that there is no contingency plan if there is an early, heavy snowfall and categorically does
not want snow removed to access the building site. The Ski Company has asked that the application be
postponed until it can be demonstrated that construction of the tower will not have impact on the ski
operation that results from snow removal.
The USFS has stated that they will be issuing a permit for the tower and has proposed that plowing the
backside of Aspen Mountain Roads may be a way to gain access to the building site if an early snow fall
occurs. The County Engineer was consulted on this idea and it was stated that Midnight Mine Road and
Little Annie Road are both limited service area roads that the County does not typically plow or allow
others to plow. The USFS has indicated that use of a helicopter and/or snowcat would be acceptable
alternative to access the site.
STAFF COMMENTS:
Minor Amendment to a Development Permit
Pursuant to Section 2- 20- 150(b) of the Land Use Code, a minor amendment to any development application
or permit is one that meets the following criteria:
1. Is consistent with actions) taken during previous development approvals for the property; and
Response: Increasing the height of the tower from 58' to 60' is inconsequential and is consistent with
previous actions taken during the master plan process.
2. Does not change the use of the proposed development between residential, commercial, and tourist
accommodation uses; and
Response: The request does not change the use of the proposed development.
3. Does not change the basic character of the approved use of land on which the activity occurs,
including basic visual appearance and method of operation, and
Response: Approval of this request would not change the basic character or method of operation of the
approved use of the land which is an approved radio tower site. The Applicant has stated that the tower
will be of a non - reflective material as will the new metal roof that is being placed on the adjacent shed.
Page 2 of 3
02
4. Does not constitute a new land development activity; and
Response: The request does not constitute a new land development activity.
5. Does not increase off-site impacts in the surrounding neighborhood, and
Response: If the request were approved, an acceptable construction management plan will be required
that shows adequate access to the construction site that does not include the plowing of snow on the ski
area, Little Annie Road, or Midnight Mine Road. An acceptable construction access plan will mitigate
off -site impacts.
6 Does not endanger the public health, safety or welfare, and
Response: The request does not endanger the public health, safety or welfare
7. Does not violate any Land Use Code standard, and
Response: The Applicant has indicated that 5 trees of 6" d.b.h. or greater will be removed during
construction of the new tower. The Applicant will be required to mitigate for the removed trees unless
the trees are dead or diseased pursuant to Section 7 -20 -10 of the Code.
The request does not violate any Land Use Code standard if conditions off approval in the draft
resolution are fulfilled.
8. Does not substantially increase the need for on -site parking or utilities, or affect affordable housing
generation; and
Response: N/A
9. Does not increase the floor area of the use by more than five (5) percent or decrease the open space
on the site by more the five (5) percent.
Response: N/A
RECOMMENDATION: Staff feels that an acceptable construction management plan should be
developed prior to construction of the tower that does not include the plowing of Little Annie and/or
Midnight Mine Roads and/or any area within the ski area operations boundary. If an acceptable plan cannot
be developed to address a potential early snowfall, Staff recommends the tower be constructed next spring.
Staff recommends that the BOCC adopt a resolution approving the Pitkin County Communication Tower
Minor Amendment to a Development Permit subject to the attached draft resolution.
Application provided separately
Page 3 of 3
RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PTTKIN COUNTY,
COLORADO, APPROVING THE MINOR AMENDMENT TO A DEVELOPMENT PERMIT
FOR THE PITKIN COUNTY COMMUNICATION TOWER AND ACCESSORY FACILITIES
ON ASPEN MOUNTAIN
Resolution No.- -2010
RECITALS
1. Pitkin County (hereafter referred to as the "Applicant ") has applied to the Board of County
Commissioners (`BOCC ") to obtain approval for a Minor Amendment to replace an existing 58 foot
Pitkin County radio tower with a 60 foot three - legged free standing lattice radio tower, replace a 250
gallon propane tank with a 500 gallon tank, add a generator, add Colorado State DTRS radio equipment,
and bring the existing building up to date with a new metallic roof.
2. The building site is located on USFS land and is within the Aspen Skiing Company ski operations
boundary. The site is generally located at the top of Buckhom Run. Legal Description, Attachment A.
3. Pursuant to C.R.S 30 -28- 110(1), the Planning Commission heard this request under a "Location and
Extent Review" on September 14, 2010 and found that the proposed improvements are not identified
in the Castle/Maroon Creek Master Plan and that the plan does not prohibit such development.
Therefore, the Planning Commission found the proposed improvements in conformance with this
Master Plan.
4. The BOCC finds that an early snow fall may occur and, therefore, an acceptable construction
management plan must be developed prior to work commencing.
5. The Planning Commission reviewed the application at a public meeting on September 14, 2010, at
which time evidence and testimony were presented with respect to this application.
NOW, THEREFORE, BE IT RESOLVED by the BOCC that it hereby grants approval of the
Minor Amendment to Development Permit for the redevelopment of the Pitkin County Communication
Tower and accessory development mentioned above subject to the following conditions:
1. The Applicant shall adhere to all material representations made during the application process or in
public meetings or hearings and shall consider those representations to be conditions of approval.
2. The Applicant shall submit for building and zoning permits for the above mentioned development
activities. With submittal of these permits, the Applicant shall provide a tree mitigation plan for
review and approval by the Community Development Director.
3. The Aspen Mountain Master Plan shall be amended to allow the maximum height of the Pitkin
County Radio Tower at the top of Buckhorn run to increase from 58' to 60'.
4. At building/zoning permit submittal, the Applicant shall submit to the Community Development
Director, for review and approval, a construction management plan that outlines an early snow
contingency plan. This plan shall not plow Midnight Mine or Little Annie Roads or other areas
within the ski operation boundary. If an acceptable plan cannot be approved, the tower shall be
constructed next spring after ski operations terminate and limited service roads are no longer needed
to be plowed to gain access to the building site.
Failure to comply with these conditions of approval may result in revocation of this permit or any
subsequent permits related to this property or vested rights associated with this property.
APPROVED AND ADOPTED on the 22 day of September, 2010.
BOARD OF COUNTY COMMISSIONERS,
PITKIN COUNTY, COLORADO
By
George Newman, Chair
APPROVED AS TO CONTENT:
Cindy Houben
Community Development Director
P067 -10
PID 2737 - 303 -00 -002
BOCC Resolution No. -2010
Page 2
ATTEST:
Jeanette Jones, Clerk to the BOCC
APPROVED AS TO FORM:
John Ely
County Attorney
ul u_6' 1
TO: Pitkin County Planning and Zoning Commission
FROM: Mike Kraemer, PlannerAl",
RE: Pitkin County Communications Facility - Location and Extent Review
DATE: September 14, 2010
SUMMARY OF REQUEST: The Applicant is requesting location and extent review approval to replace
an existing 58' Pitkin County radio tower with a 60 foot three- legged free standing lattice radio tower,
replace a 250 gallon propane tank with a 500 gallon tank, add a generator, add Colorado State DTRS radio
equipment, and bring the existing building up to date with a new metallic roof.
The Applicant is stating that a 75' x 75' staging area is needed during construction and approximately 30
round trips of traffic would occur to the site. Disturbance areas and site plan are located within the
Applicants' submittal packet.
APPLICANT: Pitkin County
REPRESENTATIVE: Mark Gamrat
LOCATION: Aspen Mountain, top of Buckhorn Run within the ski operations boundary and on USFS
Property.
ZONING: SKI -REC
EXISTING CONDITIONSBACKGROUND: The site is located near the top of the Ajax Express lift at
the top of Buckhom Run and is developed with a number of towers and antennas. The Applicant's
submittal packet shows pictures of the existing area. The area and development operates under a USFS
permit and under the Aspen Mountain Master Plan. A new USFS permit will need to be obtained for this
work.
PROCEDURE/PROCESS: C.R.S 30- 28- 110(1) provides that the Planning Commission shall review
the location and extent of public projects proposed by a governmental entity in the unincorporated area of
the County for conformance with the applicable comprehensive plan or master plan. The Planning
Commission's action on a Location and Extent proposal is essentially "advisory", as disapproval may be
overruled by the governmental jurisdiction making the proposal. The applicable Master Plan for review
of this work is the Castle/Maroon Master Plan.
Also, page 11 of 185 of the Aspen Mountain Master Plan identifies structures as having a 28' height limit
unless a variance is granted by the appropriate process. Changing the height limit for the communication
tower from 58' to 60' will require an amendment to the Aspen Mountain Master Plan. This amendment
request will be reviewed by the BOCC on September 22, 2010.
Page 7 of 2
I0�9
STAFF COMMENTS: For the purpose of the P & Z review, the Castle/Maroon Caucus Master Plan is the
applicable master plan.
The Maroon/Castle Creek Caucus Master Plan is silent to the development of radio /communication towers
on Aspen Mountain or anywhere else in the Master Plan area.
RECOMMENDATION:
Staff recommends that the Planning Commission approve the location and extent review for the Pitkin
County Communication Tower subject to the attached draft resolution.
Application provided separately
Page 2 of 2
Z
RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF PTTKIN COUNTY,
COLORADO, APPROVING THE PTTKIN COUNTY LOCATION AND EXTENT REVIEW FOR
REDEVELOPMENT OF A COMMUNICATION TOWER AND ACCESSORY FACILITIES
Resolution No. PZ- -2010
RECITALS
Pitkin County (hereafter referred to as the "Applicant ") has applied to the Planning and Zoning
Commission of Pitkin County ( "Planning Commission ") to obtain approval for Location and Extent
Review to replace an existing 58' Pitkin County communication tower with a 60' three- legged free
standing lattice radio tower, replace a 250 gallon propane tank with a 500 gallon tank, add a generator,
add Colorado State DTRS radio equipment, and bring the existing building up to date with a new
metallic roof.
2. The building site is located on USFS land and is within the Aspen Skiing Company ski operations
boundary. The site is generally located at the top of Buckhom Run. Legal Description, Attachment A.
Pursuant to C.R.S 30 -28- 110(1), the Planning Commission finds that the proposed improvements are
not identified in the Castle /Maroon Creek Master Plan and that the plan does not prohibit such
development. Therefore, the Planning Commission finds the proposed improvements in conformance
with this Master Plan.
4. The Planning Commission reviewed the application at a public meeting on September 14, 2010, at
which time evidence and testimony were presented with respect to this application.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission that it hereby grants
approval of the Pitkin County Location and Extent Review for redevelopment of the Communication
Tower subject to the following conditions:
The Applicant shall adhere to all material representations made during the application process or in
public meetings or hearings and shall consider those representations to be conditions of approval.
2. The Applicant shall submit for the appropriate building/zoning permits for the above mentioned
development activities prior to construction.
APPROVED by the Planning Commission this 14"' day of September, 2010.
3
PLANNING AND ZONING COMMISSION
OF PITKIN COUNTY, COLORADO
ATTEST:
Bonnie Waechtler, Administrative Assistant
Joe Krabacher, Chair
Date
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
John Ely, County Attorney
f �
C
Mdy Houben, Community Development Director
P067 -10
P1D 2737- 303 -00 -002
Resolution No. PZ- _ -2010
Page 2
PITKIN COUNTY PRE - APPLICATION CONFERENCE SUMMARY
LOCATION: Top of Aspen Mtn. next to Ajax Express lift PID4: ' ? ?? (USFS)
OWNER: U.S. Forest Service 0'339 -a).3 -00 -t0Z
APPLICANT: Pitkin County Communications
REPRESENTATIVE: Mark Gamrat
DATE: January 29, 2010
ZONE: Ski -Rec
PHONE and EMAIL: 920 -5317
Tr)arkgL&o.pjtkin.co.us
PLANNER: Mike Kraemer, 920 -5482
Type of Application: Minor Amendment to Aspen Mountain Master Plan to set height limit for County communication
tower.
Description of Project/Development: The Applicant is requesting approval to renovate the County's communication site
on Aspen Mountain. This will involve renovating the building, dismantling existing towers and constructing a new higher
tower. Communications sites are allowed by the Master Plan, but height limits are set by the Master Plan. As the new tower
will be higher than the existing towers the height should be set by a formal Master Plan amendment.
Land Use Code Sections to be addressed in letter of request (application):
Sec. 2-20-150 (b) (1 -9): Minor Amendments
Staff will refer the application to the following agencies: Aspen Fire Protection District, Ski Co, USFS
Review by: Community Development Director— forwarded to BOCC.
Public Hearing: No.
FEES: $1,091.00 (make check payable to " Pitkin County Treasurer ")
Planning Office flat fee: $936 (non - refundable; based on 3 hours of staff time); if staff review time exceeds 4 hours, the Applicant
will be charged for additional time above 3 hours at a rate of $312/hour).
• Clerk Fee: $130
• Web technology Fee: $25
To apply, submit 10 copies of the following information, unless noted otherwise:
1. Summary letter explaining the request, providing background on prior approvals and permits, and addressing
compliance with the Code sections listed above;
2. Previous Land Use Approvals (if applicable);
3. Scenic View Exhibits to demonstrate visibility of proposed tower from County rights of way;
4. Proof of ownership of subject property;
5. Parcel description, including legal description and vicinity map;
6. Total fee for review of the application;
7. Signed fee agreement (I copy);
8. Consent from owner(s) to process application and authorizing the representative (1 copy)
9. Copy of this preapp form (I copy)
00j001 O T 3(p
NOTES
PLEASE SUBMIT ONE UNBOUND AND ONE -SIDED COPY OF YOUR COMPLETE APPLICATION PLEASE
SUBMIT TWO -SIDED COPIES OF ALL REMAINING COPIES OF YOUR APPLICATION (IF POSSIBLE). THE
PARCEL IDs SHOULD BE INC'L UDED ON ALL DOCUMENTS INC'L UDED IN YOUR APPLICATION.
i ALL MAPS SHALL BE FOLDED. At least one copy of application shall have all pages at no larger than 8112 "x11 ".
r This pre - application conference summary is advisory in nature and not binding on the County. The information
provided in this suunary is based on current zoning standards and staff's interpretations based upon
representations of the applicant Additional information may be required upon a complete review of the application.
00 1002
PITKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT
AGREEMENT FOR PAYMENT OF LAND USE APPLICATION FEES
PITKIN COUNTY (hereinafter "COUNTY ") and _
(hereinafter "APPLICANT ") AGREE AS FOLLOWS:
APPLICANT has submitted to COUNTY an application for
, the "PROJECT ").
2. APPLICANT understands and agrees that Pitkin County Ordinance No. 30 -2009 establishes a fee
structure for land use applications and the payment of all processing fees is a condition precedent to a determination of
application completeness. The fee structure is based on the COUNTY'S policy that development shall pay, in full, the
cost of development review in the COUNTY. Fees have been set to be consistent and fair to the public and to reflect the
expense incurred in providing such services to the public.
3. APPLICANT and COUNTY agree that because of the size, nature or scope of the proposed PROJECT, it
may not be possible at the time of application to ascertain the full extent of the costs involved in processing the
application.
4. APPLICANT and COUNTY agree that fees charged for the processing of land use applications shall
accumulate if an application includes more than one type of land use review.
5. COUNTY and APPLICANT further agree that it is impracticable for COUNTY staff to complete
processing or present sufficient information to the Planning Commission and /or Board of County Commissioners to
enable the Planning Commission and /or Board of County Commissioners to make legally required findings for project
approval, unless current billings are paid in full prior to decision.
6. Therefore, APPLICANT agrees that in consideration of the COUNTY'S waiver of its right to collect full
fees prior to a determination of application completeness, APPLICANT shall pay a base fee in the amount of $
which is based on — hours of staff time, and if actual time spent by staff to process the application exceeds the average
m
number of hours by ore than 20 %, then the COUNTY will bill the APPLICANT quarterly for the additional time spent.
Such periodic payments shall be made within 30 days of the billing date. APPLICANT further agrees that failure to pay
such accrued costs shall be grounds for suspension of processing.
PITKIN COUNTY
( "APPLICANT ")
Cindy Houben
Community Development Director
By: n.
A A2tl (IAMIM4i , I aMML4AJiL -t')JuS
Print t N ame and Title (if applicable)
Date: luhvSLI
Mailing Address•
— jjacA�) Co F/6//
30 )0103
Aspen - Pitkin County Communications Center
TO: Pitkin County Community Development Department
FROM: Mark Gamrat, Communications Director
DATE: August 19, 2010
RE: Pitkin County Radio Site — Ajax Mountain
P" County Sberil
Am Police
on* Poke
Steno ess vow Police
Aspen fh
Aspen A nbulenee
Basalt Fire a ENS
&muntus Widest Fn & EMS
Cabondeb We 6 EMS
This application is for the modification of Pitkin County's Radio Site on Ajax Mountain. Pitkin County
received a $489,848 Colorado Wireless Interoperability Network grant to improve this radio site and install
State of Colorado 800 MHz Digital Trunked Radio System equipment. The grant is expiring at the end of this
year.
Attached to this application is the application that was submitted to the United States Forest Service (USFS),
Exhibit A. The USFS application explains, in detail, this project. USFS approval is also needed because the
radio site resides on their land. The major point to the application is I am asking for a variance to their
established maximum radio tower height according to the USFS Aspen Mountain Communications Site Plan
(Plan). The current radio tower is 58 feet, the maximum height in the Plan is 40 feet, and what I am asking for
is a radio tower that is 60 feet, essentially replacing the existing radio tower. In the original USFS application, I
asked for a 70 foot tower. I have since then modified my application to a 60 foot tower and placing the
generator next to the tower behind the building, out of sight. This allows for a smaller foot print of 5ft x 5ft x
5ft at the base instead of 13ft x 13ft x 13ft base. Please see Exhibit B & C for specifications. This is the
smallest base three- legged tower allowed without guying according to OSHA standards.
The radio tower is located in the pine trees behind the Pitkin County building next to a 35 foot tall FCC building
and the object is to get above the FCC building for proper radio propagation while cutting down as few trees as
possible. A total of 3 - 4 live trees and two dead trees need to be removed. Please see Exhibit D for ridge line
photos from the valley floor and Exhibit E for before and after visuals. This site is not visible from the major
roads in Pitkin County. Exhibit D was taken at the Airport and I zoomed the camera in and you still cannot see
the site or tower. Exhibits B through E are not included in the USFS application.
This radio site is managed by the Aspen/Pitkin County Communications Center and operates Public Safety
radio equipment only. This radio site has always been vital to Public Safety communications and the
opportunity to improve radio interoperability with the State and plan for the future of Public Safety
communications in Pitkin County should not be missed. The costs to Pitkin County are application fees,
Communications Department in -kind administration and labor, and previously budgeted materials and supplies.
506 East Main Street, Dept C Aspen, Colorado 81611 970.920.5310 FAX 970.920.5339
30 000 2
E Txh 17h Mi
3 O ;115'
Page 1 of 4
STANDARD FORM 299 (6199)
Prescribed by DOIIUSDAIDOT
P.L. 96487 and Federal APPLICATION FOR TRANSPORTATION AND
Register Notice 5 -22 -95 UTILITY SYSTEMS AND FACILITIES
ON FEDERAL LANDS
FORM APPROVED
OMB NO 0596-0082
NOTE: Before completing and filing the application, the applicant should completely review this package and schedule a Application Number
preapplication meeting with representatives of the agency responsible for processing the application Each
agency may have specific and unique requirements to be met in preparing and processing the application.
Many times, with the help of the agency representative, the application can be completed at the preapplicatron Date Filed
meefino
Pitkin County
506 E. Main St. Dept. C
Aspen, CO 81611
As applicant are you? (check one)
a. ❑
Individual
b ❑
Corporation"
c ❑
PartnershiplAssociation'
d ❑
State Government/Slate Agency
e. ®
Local Government
f ❑
Federal Agency
Name, title, and address of authorized agent if
different from item 1 (include zip code)
Mark Gamrat, Communications Director
Same address
specuy what application is tor. (check onel
a. ❑
New authorization
b ❑
Renewing existing authorization No
c. ❑
Amend existing authorization No
d ❑
Assign existing authorization No.
e. ❑
Existing use for which no authorization has been received
f ®
Other'
n do niumuuai, or pannemnlp are you a Cnlzenls) or me United States? lal Yes U No
Project description (describe in detail) (a) Type of system or facility, (e.g., canal, pipeline, road); (b) related structures and facilities; (c) physical specifications
(Length, width, grading, etc ); (d) tern of years needed (e) time of year of use or operation; (f) Volume or amount of product to be transported; (g) duration and
timing of construction; and (h) temporary work areas needed for construction (Attach additional sheets, ifaddRtonal space is needed) This request is for the
modification of the Pitkin County Communications Building and Radio Tower at the Aspen Mountain Communications Site (Exhibit 1).
Pitkin County was awarded a Colorado Wireless Interoperability Network (CWIN) grant to construct and /or modifylmprove this site in
order to install Colorado State Digital Trunked Radio System (DTRS) equipment. The ultimate goal of this grant is to improve DTRS
radio coverage in Pitkin County This grant is due to expire m October 2010. The DTRS is a statewide 800 MHz trunked public safety
radio system that has been instrumental for radio interoperability among public safety agencies across the State. Users of this radio
system include, but not limited to, State and local public safety agencies, State and local government agencies, hospitals, public
health, mass transit, utilities, schools, courts and USFS law enforcement. Currently, there Is one operational DTRS radio site that
covers Pitkin County and the Highway 82 corridor and that site is on Sunlight Mountain in Garfield County. The radio coverage is
woefully inadequate for the upper end of the Roaring Fork Valley (Exhibit 2). This site along with Homeland Security grant monies I
have received for Crown Mountain, located between Basalt and El Jebef across Highway 82, for DTRS radio equipment will greatty
Improve radio coverage in Pitkin County and the Roaring Fork Valley (Exhibit 3). A Letter of Interest was submitted to Bill Johnson on
July 18, 2007 which describes the project (Exhibit 4).
Un Ucroner b, zuob, Atkin county was awarded a Colorado Wireless Interoperability Network grant in the amount of $489,848 to
upgrade the Pitkin County radio site located on Aspen Mountain. This money awarded was to replace the existing radio tower and raised
wooded platform with a new three - legged free standing lattice radio tower (Exhibit 5,5a), replace an existing 250 gallon propane tank with
a 500 gallon propane tank (Exhibit 6), add HVAC, add a generator, add Colorado State DTRS radio equipment and bring the building up
to standards which included a new metallic roof (Exhibit 7) and bracing for the the floor. All labor, in -kind, equipment, demolition and
removal costs are included in the grant. Motorola, Inc. is the project lead and will handle all coordination and technical needs. The entire
project is budgeted through the grant and Pitkin County. The general Pitkin County site plan for this upgrade is shown in Exhibit 8.
Regular maintenance and replacement costs will be the responsibility of Pitkin County and will need to be budgeted appropriately for the
years to come. Pitkin County has several radio sites that require the same kind of maintenance and is included in the yearly budget.
Pitkin County's site on Aspen Mountain has always had a maintenance budget since it was constructed and will continue to do so.
00 )�'
Verson 9.0.2720 Microsoft Word 2000
Page 2 of 4
13a. Describe other reasonable alternative routes and modes considered
Knowing that Aspen Mountain is a difficult radio site to be considered for this project for a number of reasons. A few reasons are
proliferation unchecked radio equipment that has been installed there over the years and eventually leading to a Communications Site
Plan, the high profile ski area the radio site is on top of and the height of the tower I am proposing. There were two other options that
were considered mostly because of the tower height 1) a different location all togther. 2) two towers at the current maximum hieght of
40 feet instead of one at 70 feet
b Why were these alternatives not selected?
For a different locatior,the only other viable radio site considered was Upper Red Mountain (URM). Exhibit 9 shows the radio
coverage off of Aspen Mountain and Exhibit 10 shows the radio coverage off of URM. These two coverage maps only show coverage off
those locations without any other locations included for descriptive purposes only unlike Exhibit 3 which shows the entire coverage area.
Ideally, both sites are needed but the priority is to cover as much of Highway 82 and major county roads as possible. Both radio sites
have their good and bad coverage areas but the major disqualification of URM is there is no electical power to the site. URM is a solar
powered site. I have received quotes from Holy Cross over the years that run from $250,000 to $400,000 to run power to URM. This
quote is for running a powerline above ground Finding funds and approval from the USFS are large hurdles to overcome. It is my
assumption that the USFS would like power ran underground which put the project financially out of reach Power would need to be run
from Stanwood orLenado through densely forested areas. Exhibit 11 shows the current solar array. In order to power the existing radio
equipment and the proposed radio equipment, a solar array would need to be a least three times this size and look like Exhibit 12 located
in Hinsdale County. Also the State has, in a very few exceptions, allowed solar power only radio sites and the CWIN grant does not cover
the cost of solar power. The State nor Pitkin County has the money for this type of application. Solar power arrangements are extremely
expensive and require constant attention and maintenance. I know this Pitkin County's URM radio site that I maintain.
The other consideration is erecting two 40 foot towers on Aspen Mountain instead of one 70 foot tower. There is very little room around
the Pitkin County building to erect two towers. The existing tower is in between many trees at the rear of the building. In front of the
building is a road, to the west is the FAA building, and to the east is a rock knoll. The rear of the building would be the area to try and fit
the two towers. Unfortunately, the tower hieght is very limiting and many trees would need to be cut down to fit the two towers and even
more trees would need to be cut down to allow for proper radio propagation of the microwave dishes (see Exhibit 13).
c Give explanation as to why it is necessary to cross Federal Lands
The Aspen Mountain Communications Site is located on Federal Lands. During the winter, snowmobile or the Gondola are the two
viable ways to access the site. During the summer, vehicle or helicopter are ways to access the site.
14. List authorizations and pending applications filed for similar projects which may provide information to the authorizing agency (Specify number, date, code, orname)
N/A
15. Provide statement of need for pro)ect, including the economic feasibility and items such as, (a) cost of proposal (construction, operation, and maintenance); (b)
estimated cost of next best alternative; and (c) expected public benefits.
Many items of this question are answered in the previous questions above. This site is critical for radio interoperabiltiy for Pitkin
County public safety agencies, Roaring Fork Transit Authority and the State of Colorado. Radio communications for the upper end of the
Roaring Fork Valley for the Colorado State DTRS is mostly non - existent (Exhibit 2). Portable radios have next to no coverage and
mobile radios are a little better. It is very difficult for Pitkin County public safety agencies to communicate with State agencies because of
the lack of radio coverage. Pitkin County needs radio interoperability with the State and patching the two radio systems together at the
upper end of the Roaring Fork Valley via Aspen Mountain is critical. In addition, the Roaring Fork Transit Authority wants to use this
system to replace their inadequate radio system. Providing for the safety of the public and responders through communications is critical
and adding this site to the system is crucial in achieving this goal.
16. Describe probable effects on the population in the area, including the social and economic aspects, and the rural lifestyles. Adding public safety radio
equipment to the upper end of the Roaring Fork valley would be a great benefit to the community. First responders will have more
reliable radio coverage to help them do their job more effectively. The public would also benefit by having the Roaring Fork Transit
Authority on a more reliable radio system. Once the project is complete, there would be no adverse effects on the community and how it
functions.
00 -u , 07
Verison 9.0.2720 Microsoft Word 2000
Page 3 of 4
17. Descdbe likely environmental effects that the proposed project will have on. (a) air quality; (b) visual impact, (c) surface and ground water quality and quantity; (d)
the control or structural charge on any stream or other body of water, (e) existing noise levels, and (Q the surface of the land, including vegetation, permafrost, soil,
and soil stability (a)This project would have an extremely limited impact on air quality. The impact to air quality would happen
when the generator runs during testing or a power outage from exhaust. (b) The existing tower Is approximately 55 feet high. The
proposed tower is 70 feet. Adding an additional 15 feet will have a visual impact to those accessing the top of the Aspen Mountain.
The visual impact from major roads will be almost non - existant. The way the site is situated on Aspen Mountain, it is almost
Impossible to see with the naked eye from major roads. The tower is located behind our building and the view of the tower is
partially obstructed by the trees. The tower that is proposed will have less of a footprint than the current tower and wooden platform.
The current tower is guyed (c) The only water at the site is melting snow. No streams or lakes are in the vicinity of the site. (d)
NIA. (e) Raised noise levels would be during construction and when the generator runs during testing or electrical outage. The
generator will be behind the builiding, mounted in the radio tower. It is also sheltered by the FAA building and a small rock hill. (f)
Disturbance of the ground will take place. 3 holes will need to be dug for the concrete foundation of the radio tower. This will all
take place behind the building. One or two pine trees will need to be removed to fit in the new radio tower. The radio site sits on
level ground.
18. Describe the probable effects that the proposed project will have on (a) populations of fish, planthfe, wildlife, and manne life, including threatened and endangered
species; and (b) marine mammals, including hunting, capturing, collecting, or killing these animals Any impact to wildlife should be at a
minimum. This is a well established radio site where the entire footprint of Pitkin County's section will be reduced. There will be
ground disturbance to erect a new radio tower. There is no water in the area, such as takes, streams, rivers to disturb any marine
life. If Pitkin County was instructed to erect two radio towers at 40 feet instead of one radio tower at 70 feet, numerous trees would
need to be cut down to allow microwave radios to be used and for other radio propagation concerns. Microwave radios that are
being proposed and that currently exist need line of site operation. We are currently aiming through the trees and it is a matter of
time before the radio path will be blocked by the growing trees. Approximately 7 years ago I received permission to top two trees
that were obstructing the microwave path. Cutting down the necessary amount of trees to allow for two 40 foot towers could leave
this area very unattractive and an public outcry could be likely. In my estimation, approximately 15 to 25 trees would need to be cut
down for two towers.
19. State whether any hazardous material, as defined in this paragraph, will be used, produced, transported or stored on or within the right -of -way or any of the nght-of-
way facilities, or used in the construction, operation, maintenance or termination of the right -of -way or any of Its facilities "Hazardous material" means any substance,
pollutant or contaminant that is listed as hazardous under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended, 42 U.S.0
9601 at seq, and Its regulations. The defimbon of hazardous substances under CERCLA includes any "hazardous waste" as defined in the Resource Conservation and
Recovery Act of 1976 (RCRA), as amended, 42 U S C. 6901 et seq., and its regulations The term hazardous matenals also includes any nuclear or byproduct material as
defined by the Atomic Energy Act of 1954, as amended, 42 U.S C 2011 at seq The term does not include petroleum, including crude oil or any fraction thereof that is not
otherwise specifically listed or designated as a hazardous substance under CERCIA Section 101(14), 42 U. S, C, 9601(14), nor does the term include natural gas
None.
20 Name all the Department(#Age icy(ies) where this application is being filed.
Pitkin County,
I HEREBY CERTIFY, That I am of legal age and authorized to do business in the State and that I have personally examined the information contained In the application
and believe that the information submitted is correct to the best of my knowledae
_Mark Gamrat
Title 18, U.S.C. Section 1001, makes it a come for any person knowingly and willfully to make to any department or agency of the United States any false, fictitious, or
fraudulent statements or representations as to any matter within its jurisdiction
313 t 08
Neilson 9 0 2720 Microsoft Word 2000
Page 4 of 4
GENERAL INFORMATION
ALASKA NATIONAL INTEREST LANDS
This application will be used when applying for a nghl -of -way, permit, license, lease, or
certificate for the use of Federal lands which lie within conservation system units and
Nabonal Recreation or Conservation Areas as defined in the Alaska National Interest lands
Conservation Act Conservation system units include the National Park System, National
Wildlife Refuge System, National Wild and Scenic Rivers System, National Trails System,
National Wilderness Preservabon System, and National Forest Monuments
Transportation and ubtity systems and facility uses for which the application may be used
are
1 Canals, ditches, flumes, laterals, pipes, pipelines, tunnels, and other systems for the
transportation of water
2 Pipelines and other systems for the transportation of liquids other than water, including
oil, natural gas, synthetic liquid and gaseous fuels, and any refined product produced
therefrom.
3 Pipelines, slurry and emulsion systems, and conveyor belts for transportation of solid
matenals
4 Systems for the transmission and distribubon of electric energy
5 Systems for transmission or recephon of radio, television, telephone, telegraph, and
other electronic signals, and other means of communications
6 Improved nght -of -way for snow machines, air cushion vehicles, and all- terrain vehicles
7 Roads, highways, railroads, tunnels, tramways, airports, landing strips, docks, and
other systems of general transportation
This application must be fled simultaneously with each Federal department or agency
requiring authorization to establish and operate your proposal
In Alaska, the following agencies will help the applicant file an application and identify the
other agencies the applicant should contact and possibly file with
Department of Agriculture
Regional Forester, Forest Service (USFS)
Federal Office Building,
P 0 Box 21628
Juneau, Alaska 99802 -1628
Telephone, (907) 586 -7847 (or a local Forest Service Office)
Department of the Interior
Bureau of Indian Affairs (BIA)
Juneau Area Office
Federal Building Annex
9109 Mendenhall Mall Road, Suite 5
Juneau, Alaska 99802
Telephone. (907) 586 -7177
Department of the Interior
Bureau of Land Management
222 West 7th Avenue
P 0 Box 13
Anchorage, Alaska 99513 -7599
Telephone (907) 271 -5477 (or a local BUM Office)
U S Fish 8 Wildlife Service (FWS)
National Park Service (NPA)
Office of the Regional Director
Alaska Regional Office,
1011 East Tudor Road
2225 Gambell St, Rm 107
Anchorage, Alaska 99503
Anchorage, Alaska 99502 -2892
Telephone (907) 786 -3440
Telephone (907) 786 -3440
Note - Filings with any Interior agency may be filed with any office noted above or with the
Office of the Secretary of the Interior, Regional Environmental Officer P 0 Box 120, 1675 C
Street, Anchorage, Alaska 9513
j U
Venson 9 0.2720
Department of Transportation
Federal Aviation Administration
Alaska Region AAL-4, 222 West 7th Ave , Box 14
Anchorage, Alaska 99513 -7587
Telephone (907) 271 -5285
NOTE - The Department of Transportation has established the above central filing
point for agencies within that Department Affected agencies are Federal Aviation
Administration (FAA), Coast Guard (USCG), Federal Highway Administration (FHWA),
Federal Railroad Administration (FRA)
OTHER THAN ALASKA NATIONAL INTEREST LANDS
Use of this fan is not limited to National Interest Conservation Lands of Alaska
Individual departmentlagencies may authorize the use of this form by applicants for
transportation and utility systems and facilibes on other Federal lands outside those
areas described above
For proposals located outside of Alaska, applications will be filed at the local agency
office or at a location specified by the responsible Federal agency
SPECIFIC INSTRUCTIONS
(Items not listed are sef- explanatory)
7 Attach preliminary site and facility construction plans. The responsible agency
will provide instructions whenever specific plans are required
8 Generally, the map must show the secUOn(s), township(s), and ranges) within
which the project is to be located Show the proposed location of the project
on the map as accurately as possible. Some agencies require detailed survey
maps The responsible agency will provide additional instructions
9 , 10, and 12 The responsible agency will provide additional instructions.
13 Providing information on alternate routes and modes in as much detail as
possible, discussing why certain routes or modes were rejected and why it is
necessary to cross Federal lands will assist the agency0es) in processing
your application and reaching a final decision. Include only reasonable
alternate routes and modes as related to current technology and economics
14The responsible agency will provide instructions
15 Generally, a simple statement of the purpose of the proposal will be sufficient
However, major proposals located in critical or sensitive areas may require a
full analysis with additional specific information. The responsible agency will
provide additional instructions.
16through 19 Providing this information is as much detail as possible will assist
the Federal agency(ies) in processing the application and reaching a decision
When completing these items, you should use a sound judgment in furnishing
relevant information Fore example, if the project is not near a stream or other
body of water, do not address this subject. The responsible agency will
provide additional InsWctions
Application must be signed by the applicant or applicants authorized representative
EFFECT OF NOT PROVIDING INFORMATION Disclosure of the information is
voluntary If all the information is not provided, the application may be rejected
DATA COLLECTION STATEMENT
The Federal agencies collect this information from applicants requesting nght -of -way,
permit, license, lease, or cerlificabon for the use of Federal lands The Federal
agencies use this information to evaluate the applicant's proposal The public is
obligated to submit this form it they wish to obtain permission to use Federal lands
Microsoft Word 2000
Page 5 of 4
The
_14TWU
I- PRIVATE CORPORATIONS
ATTACHED
FILED`
a. Articles of Incorporation
b Corporation Bylaws
❑
C. A certifcebon from the State showing the corporation is in good standing and is entitled to operate within the State
c. Copy of resolution authorizing fif ng
❑
e The name and address of each shareholder owning 3 percent or more of the shares, together with the number and
percentage of any class of voting shares of the entity which such shareholder is authonzed to vote and the name and address of
each affiliate of the entity together with, in the case of an affiliate controlled by the entity, the number of shares and the
percentage of any class of voting stock of that affil ate owned, directly or indirectly, by that entity, and in the case of an affiliate
which controls that entity the number of shares and the percentage of any class of voting stock of that entity owned, directly or
indirectly, by the affiliate.
I. If application is for an oil or gas pipeline, describe any related rig IiWf-way or temporary use permit applications, and
identify previous applications
❑
❑
g. If application is for an oil and gas pipeline, identify all Federal lands by agency impacted by proposal
II - PUBLIC CORPORATIONS
a. Copy of law forming corporation
❑
b Proof of organization
❑
C. Copy of Bylaws
❑
d. Copy of resolution authorizing fling
Lj
L-1
e. If application is for an oil or gas pipeline, provide intonation required by item "I -f" and "I-g' above.
III - PARTNERSHIP OR OTHER UNINCORPORATED ENTITY
a Articles of association, if any
❑
❑
b If one partner is authorized to sign, resolution authorizing action is
c. Name and address of each participant, partner, association, or other
d. If application is for an oil or gas pipeline, provide information required by item "I -P' and "I-g' above.
IT me required m ormanon is already filed with the agency processing this application and is current, check block entitled "Filed! Provide the file identification
information (e.g., number, date, code, name), If not on file or current, attach the requested information
Under the Paperwork Reduction Act of 1995, no persons are required to respond to a collection of information unless it displays a valid OMB control number The
valid OMB control number for this information collection is 0596 -0082.
This information is needed by the Forest Service to evaluate the requests to use National Forest System lands and manage those lands to protect natural resources,
administer the use, and ensure public health and safety. This information is required to obtain or retain a benefit The authority for that requirement is provided by
the Organic Ad of 1897 and the Federal Land Policy and Management Act of 1976, which authorize the secretary of Agriculture to promulgate rules and regulations
for authorizing and managing National Forest System lands These statutes, along with the Term Permit Act, National Forest Ski Area Permit Act, Granger -Thye Act,
Mineral Leasing Act. Alaska Tern Permit Act, Act of September 3, 1954, Wilderness Act, National Forest Roads and Trails Act, Act of November 16, 1973,
Archeological Resources Protection Act, and Alaska National Interest Lands Conservation Act, authorize the Secretary of Agriculture to issue authorizations or the
use and occupancy of National Forest System lands The Secretary of Agriculture's regulations at 36 CFR Part 251, Subpart B, establish procedures for issuing
those authorizations
The Privacy Act of 1974 (5 U.S.0 552a) and the Freedom of Information Act (5 U S.C. 552) govern the confidentiality to be provided for information received by the
Forest Service.
Public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing
data sources, gathering and maintaining the data needed and completing and reviewing the collection of information
?0 tv10
Microsoft Word 2000
Verson 9.0 2720
Exhibit 1
cN)iiT p
(1lgltt 910 c0.)
\\
�T]I k
ExPANDED
BY MTA. CONI
CAKWO TO LOA AN)ENNA `
IN l-D' PVC - CONCRETE
ENCASED -2' -E' BELOW GNADE
NOTE EA OI O S ANA
SKI AR dsPOAE AIRA
I � I
i 1 t
EXISTNC (U.S
fAND H (1
�ENSTXC (F AA) \.
C
(RIMIN COMM
o \
,$
IF
Cw
112pp /
1 1
• i 11
./ • 1 1
CHAININ'i 1
rErom+u 1
0
El 11 1 11
0 /200 (1 /2Y BEOAR)
LAYOUT PLAN
S I° a CO'
Do )u 11
USFS Page 4
Exhibit 2
r
M � -
r
f s . _
x
L tot s
x.
W
.: rx
� A
n
- .. r r• ,�
L.
b
R _ T I
r rn r
Y � r
N R � T
00 1012
� H
'r
� x
4 � .
��= t '..
Exhibit 4
Aspen - Pitkin County Communications Center
TO: Bill Johnson, United States Forest Service
FROM: Mark Gamrat, Communications Director
DATE: July 18, 2007
RE: Ajax Mountain Communications Site Improvement
LETTER OF INTEREST
Pift County Sherdl
Aspen Police
Bola Police
Snormaes Wells Police
Aspen Fire
Aspen Ambulance
Baeall Ere & EMS
Snorsnus Wildcat Fn & EMS
Cerbnndsle Bra 6 EMS
This letter is a follow up to our phone conversation on July 17, 2007. Pitkin County was awarded a grant for
$489,848 through the Colorado Wireless Interoperability Network (CWIN) and administered by the Department
of Local Affairs (DOLA). This grant is for radio site improvements on Aspen Mountain in Aspen, CO. This
radio site has the FAA. Holy Cross, Aspen Skiing Company; just to list a few, as tenants. Each has their own
structure that houses radio equipment.
The monies for this grant will be used to improve /renovate the existing structure, replace a guyed radio tower
with a freestanding one, replace an old generator and propane tank and add an HVAC system. Once this is
done, the State will add equipment for their 800 MHz Digital Trunked Radio System (DTRS). This will aid in
the interoperability quest that public safety constantly pursues. This will allow the Aspen/Pitkin County
Communications Center to tie their VHF radio system into the State's DTRS more seamlessly and will improve
radio coverage for the State's personnel and vehicles.
The existing structure is a wood cabin that is shaped like an 'A' frame with a flat peak. The plan for the
structure is to replace the existing floor supports with stronger ones, replace the shake- shingle roof with a metal
one that matches the scenery for color, insulate the inside and add a small HVAC system, The footprint of the
building is approximately 10 x 14. This footprint will not change.
The existing radio tower is guyed tower approximately 55 feet tall. The plan is to replace the guyed tower with
a freestanding 3 leg tower that is between 70 feet tall. There is also a wooden platform behind the building and
next to the tower that is approximately 25 feet off the ground. This will be removed and not replaced. The
existing tower is completely full and we will need to add the State's radio and microwave antennas to the new
tower. This is the reason we may need to go higher. The footprint will be reduced because the new tower will
not be guyed.
506 East Main Street, Dept C
Aspen, Colorado 81611 970.920.5310 FAX 970.920.5339
16_j
�� g
Pi&M County Sheri)
Aspm Police
Sept Police
Seownw Vwge Polios
Amm Fire
Arym Ambulance
Boom Fire & EMS
Snomms Wicket Fire & EMS
Cerboe ide Fire & EMS
Aspen - Pitkin County Communications Center
The new generator will be placed in the radio tower behind the building. It will be placed in such a way that it
will not be visible from the ski area. The generator will be covered and insulated to protect and reduce noise.
The only time the generator will run is during a power outage or during scheduled run tests. This can be done at
night after the mountain is closed. The old generator was inside the building and removed a few years ago
because of numerous difficulties.
The new propane tank will go where the existing one is now located. If possible. we will place it behind the
building and out of sight as much as possible. The propane tank will be above ground as the existing one is
now.
The grant has been approved by my Board of County Commissioners. I am currently working with my
Community Development department to get the proper approvals and in contract negotiations with Motorola
and the State. I am hoping to have all this wrapped up soon and start construction by the end of August or
beginning of September.
Please call me with any questions or concerns. You can reach me at 970 920 5317. Thank you for taking the
time to review my request.
506 East Main Street, Dept C
Aspen, Colorado 81611 970.920.5310 FAX 970.920.5339
JO 115
s,` y
v i
y�
At
)i•
I.3 ..
mix•..
r
as.
,K
�1 .. ♦�. ♦f ' Yom.
6
".
1 '
i -
�11� '
..'IIIIY
in
f
il t
Exhibit 6
oo is
0
G
N
Exhibit 8
Reconstruct Existing Structure
Install additional floor supports wl Steel I- Beams.
Repair floor to meet Motorola R -56 Standards.
Install a new roof that is aesthetically pleasing.
Insatll a new WG entrance panel and new MGB.
Ground building to Motoorla R -56 Standards.
Insatll a new 3 -ton HVAC.
Install a new ice bridge for cable runs.
Install new transfer switch. \
Install new ground ring.
New Propane Tank 0
Pour concrete pads for propane tank.
F . Existing Structure Steps
Existing Structure
I
North
New Ice bridge for cable runs.
� Existing Pole Tower Structure
V New 80' Self Supporting Tower
New Platform Remove all old Pole Tower Stucture
for New Generator @ 20' level within new tower Transfer old antennas to new tower once completed.
AJAX Site Plan
SITE SKETC
DRAWN BY
F7� Exhibit 9
i
1 _ r Pnkwlk
Td Place La
Potter nPlau 7
Mrbk cp,rt3
Hxry Packet lace !! � •
PkVAOSS EMM
Samrset t l
P.q �„ I
Pa�or4 \
ue i McMilh • y. yy � �
hbrk T5
_ 4 leaOWi
1 Hagerman I
?' t
�amglon MJl K
T. Lames
1.
Book YmY.sWig
S
r
•r.
00 1;;2, 1
Exhibit 10
00 jU212
Exhibit 11
30 102. 3
�a
Exhibit 13
009025'
mxlf m
J u V le
0
OOA27
mHxl
IU OYWY,
a
mw�w
YW4{011l
vN
Wmi
YtY
40 W�
YWnlq 11
wAlp
wWb
P9M
J �VL
0
f,J
North
Reconstruct Existing Structure
Install additional floor supports wl Steel l- Beams.
Repair floor to meet Motorola R -56 Standards.
Install a new roof that is aesthetically pleasing.
Insatll a new WG entrance panel and new MGB.
Ground building to Motoorla R -56 Standards.
Insatll a new 3 -ton HVAC.
Install a new ice bridge for cable runs.
Install new transfer switch.
Install new ground ring.
New Propane Tank
Pour concrete pads for propane tank.
New Platform
for New Generator @ 3' Above Ground
Existing Structure Steps
Existing Structure
New Ice bridge for cable runs.
New 60' Self Supporting Tower 5' Base
Remove all old Pole Tower Stucture
5' Foot Minimum Face width to meet OSHA Requirements
AJAX Site Plan
SITE SKETCH
1 OF
sm
30
CID
O
O
F : 1 1 i WIE
.E- 11. .
w , r
P4 1
I �
i
i
PA
ks l
eta I.
i
®I FI &L; I
I_ I I/' W
L y \
r
Dear Honorable County Commissioners
Aspen Mountain Communications site is located on the Aspen Ranger District of the
White River National Forest, Pitkin County, Colorado in portions of Section 30, T. 10
S., R. 84 W., 6th Principal Meridian; Latitude 39 09' 13" North, Longitude 106 49'
14" West. The site elevation is 11,187 feet and covers approximately 2 acres. The site
is located on National Forest System Land, and Pitkin County has a permit for this use
issued by the U.S. Forest Service. Their permit is in good standing.
The proposed improvements for the communication site are presently under
review, and are expected to be formally improved in the near future. We have been
working with the PitCo's communication department for a couple of years on this
project, and we don't see any reason this will not be approved on short notice. We
request that you honor their proposal to improve the communications site for the
safety of the local community, as well as to refine the scenic values of the site.
Please contact me if you have any questions.
Thanks -
/S/ James A. Kirschvink
Realty Specialist,
Aspen - Sopris Ranger Districts.
White River National Forest
C: Scott Snelson, District Ranger, Aspen - Sopris Ranger District
PS - MARK - I will include your new location for the generator in the upcoming decision document.
This should not be an issue, since it makes sense. I have the draft document 90% completed.
Jim -Jim Kirschvink/ Aspen - Sopris Ranger District
Realty Specialist
806 W. Hallam, Aspen, Cc 81611
Work: 970 945 -3313
Cell: 970 580 9366
Ikirschvink(a)fs.fed us
Fight the current. Even a dead fish can go with the flow
PITKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT
130 S. Galena Street
Aspen, Colorado 81611
PHONE# (970) 920- 5526/FAX# (970) 920 -5439
August 26, 2010
Mark Gamrat
485 Rio Grande Place
Aspen, CO 81611
Re: Pitkin County Minor Amendment to Aspen Mountain Master Plan to set height limit
for County Communication Tower
(PID#2737 - 303 -00 -002; CASE# P067 -10)
Dear Mr. Gamrat
The Planning Office has completed its preliminary review of the captioned application. We have
determined that this application is complete. After a more detailed review of the submittal
information, additional information specific to the application may be requested in order to
adequately review and process the application. The planner in charge of the review will request
the information from you directly.
We have scheduled this application for review by the Board of County Commissioners on
Wednesday, September 22, 2010, at a meeting to begin at 12:00 P.M. in the Plaza One Meeting
Room at 530 East Main St., Aspen. Should this date be inconvenient for you, please contact me
within 3 working days of the date of this letter. After that the agenda date will be considered final
and changes to the schedule or tabling of the application will only be allowed for unavoidable
technical problems. The Friday before the meeting date, we will call to inform you that a copy of
the memo pertaining to the application is available at the Community Development Department.
If you have questions, please call Mike Kraemer, the planner assigned to your case, at 920 -5482
Sincerely,
Bonnie Waechtler
Administrative Assistant
PTTKIN COUNTY
COMMUNITY DEVELOPMENT DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
Phone (970) 920 -5526 FAX (970) 920 -5439
MEMORANDUM
TO: Aspen Fire Protection Department
Aspen Skiing Company
United States Forest Service (USFS)
FROM: Mike Kraemer, Community Development Department
Michael.kraemergeo.pitkin.co.us
RE: Pitkin County Minor Amendment to Aspen Mountain Master Plan to set height limit for
County Communication Tower
(CASE P067- 10;PID 2737- 303 -00 -002)
DATE: August 26, 2010
Attached for your review are materials for an application submitted by Pitkin County Communications. The
Board of County Commissioners will review the application on Wednesday, September 22, 2010.
Please return your comments to me by Friday, September 10, 2010.
http: / /www.aspenpitkin com/Portals /O /docs/ county /Com % /Planninp-/Land Use Applications/
P067 10 app.pdf
If you require a paper copy of this application contact Bonnie Waechtler at
bonnie.waechtler &co.pitkin.co us or 920 -5109.
Thank you.
Michael Kraemer
From: GERDIN, VICTOR [VGERDIN @aspensnowmass.comj
Sent: Friday, August 27, 2010 5:39 PM
To: Michael Kraemer
Cc: KING, PETER; Corbin, David
Subject: FW: Pitkin County Land Use Pitkin County Application
Hi Michael,
We have reviewed the application referred to below. Small changes to the site foot print will have little affect to the ski
circulation in this area.
However, we are concerned that the construction project may interfere with our operations and /or preparations for the
winter season. The application documents indicate construction will commence in late August or early September. This
seems improbable since the BOOC will not address the request until September 22 nd .
Conventional (driving) access to the Aspen Mountain could be problematic in October, especially for heavy trucks, even if
Little Annie Road is considered as the primary access. On the front side's upper mountain, we have to preserve all the
early season natural snow available (i.e. we will not allow plowing Summer Road) to ensure a Thanksgiving opening.
The construction details are not addressed in the application. I suggest the applicant present a detailed Construction
Management Plan with schedule, vehicle trips, staging needs, etc. This CMP should particularly address construction
access and contingencies since site access, at 11,000 feet, in late October or early November may simply be impossible
in the event of a heavy early season snowfall.
Thanks for allowing ASC the opportunity to comment on the application
Victor
Victor Gerdin
Mountain Planner
Aspen Skiing Company
P.O. Box 1248 Aspen, CO 81612
970- 923 -0555
Aspen Skiing Company was recently named one of Outside Magazine's
"Best Places to Work" for 2010. Join us today by visiting www.asoensnowmassxomhobs
From: Bonnie Waechtler [mailto: Bonnie .Waechtler @co.pitkin.co.us]
Sent: Thursday, August 26, 2010 11:26 AM
To: Ed Van Walraven; Dalla Betta, Dana; jkirschvink @fs.fed.us
Cc: Davis, Donna
Subject: Pitkin County Land Use Pitkin County Application
PrrK]N COUNTY
COMMUNITY DEVELOPMENT DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
Phone (970) 920 -5526 FAX (970) 920 -5439
MEMORANDUM
TO: Aspen Fire Protection Department
1 j q
Mike, the FAA project managers are Bob Brown BOb.BrOwn(O7faa.gOy and Edith Bowdish Edith. Bowdish((Dfaa.gov
Thanks,
Victor
From: GERDIN, VICTOR
Sent: Monday, September 13, 2010 4:04 PM
To: 'Michael Kraemer'; Jim Kirschvink; Gerald Fielding; Mark Gamrat
Cc: Lance Clarke; KING, PETER
Subject: RE: meet - radio tower
Mike,
I can meet on Wednesday between 10am and noon ... or anytime Friday. But I think reviewing a detailed CMP and /or
project schedule prior to the meeting would be helpful and may even render a site visit unnecessary.
The map 1 sent last week very clearly describes the area of concern and the negative affect this project could create for
November ski operations, not to mention project delays, should we get abundant early season snow at that elevation.
Thanks,
Victor
From: Michael Kraemer [mailto: Michael .Kraemer(alco.oitkin.co.us
Sent: Monday, September 13, 2010 1:55 PM
To: GERDIN, VICTOR; Jim Kirschvink; Gerald Fielding; Mark Gamrat
Cc: Lance Clarke
Subject: meet - radio tower
Can you guys meet up here on Wednesday morning at 11:00 to talk about building this tower and access?
Mike
az
Michael Kraemer
From:
Mark Gamrat [mark.gamrat @pitkin911.org]
Sent:
Tuesday, September 21, 2010 8:03 AM
To:
GERDIN, VICTOR
Cc:
Michael Kraemer; Lance Clarke; KING, PETER; Jim Kirschvink, Gerald Fielding; Dave Petty,
Mark Young
Subject:
Re: meet - radio tower
Attachments:
Construction Schedule.docx
Hello all. Attached you will find the schedule I submitted with the Building Permit. The start
date has been pushed back until the beginning of next, pending BOCC approval.
Victor, I have cc'd the Contractor and the project manager so, if possible, we can meet with you
on the 28th. So ... Victor, Mark and Dove let me know if this will work. Let me know if you have
any questions..
Mark Gamrat, Communications Director
Aspen/Pitkin County Communications Center
506 E. Main St. Dept. C
Aspen, CO 81611
(970) 315 -2181
markgga pitkin911.org
On Mon, Sep 20, 2010 at 5:36 PM, GERDIN, VICTOR < VGERDINnaspensnowmass.com > wrote:
Mike and Mark,
Thanks for the clarification at the meeting last Friday.
As we discussed, here are some guidelines in the event of early season snowfall:
• No access across the top of the mountain at anytime, without permission and /or assistance from ASC when there
is 12" or more snow on the ground
• After November 1, no access across the top of the mountain, without permission and /or assistance from ASC
when there is 6" or more snow on the ground
• Snowcats to haul materials across the snow may be available, cost is $150 /hr., $150 minimum charge per haul
• A revegetation bond should be available.
We understand that the project is intended to start on Friday September 24`" and is scheduled to take 3 weeks. We look
forward to meeting with the contractor before then on site to confirm the location and size of the staging area.
13
Aspen - Pitkin County Communications Center
CONSTRUCTION SCHEDULE
T"6104Y
Construction will start on September 28, 2010 and is set to conclude on October 14, 2010. The Contractor will,
work weekends if incoming weather or scheduling warrants an earlier completion date. Staging area needed is
75' x 75' at a predetermine area agree upon y e spen mg Company an itkin County. The road to
access the site on the Ski Area will not be blocked. This is the road to Buckhom. All equipment staged will
easily clear the lift line cables. A port-a -potty will be brought to the site and staged by the radio site. All small
vehicle traffic (2 pick -up trucks) will travel on Summer Road via the Lift IA entrance. The Contractor will
remove any equipment if heavy weather is eminent as to not to interfere with skiing operations. Please see the
"Site Map" for detailed location. The gray box next to the letter B is the approximate location of staging. Work
vehicles can park next to the Radio Site labeled as County Comm Tower. All trash, debris, etc. will be hauled
off the mountain by the Contractor no later than end of construction date.
Day 1 — Demolition of wooden platform and haul of mountain.
Day 2 - Mobilization and begin staging of equipment.
Day 3 — Excavate for tower foundation. A backhoe will be staged for the duration of the project
starting on this day. The hole will be 8' x 8' and 4' deep.
Day 4 — Install forms for the tower.
Day 5 — Install rebar for tower.
f (7� ay 6 Pour concrete. 6 yards of concrete will be needed. This will be the only day extended
traffic will be on Little Annie Road. Cement trucks will use this road for this day only.
Cement trucks will not be staged at the site. Up to 20 trips may be necessary.
Day 7 — Backfill. Excavated dirt will be used for proper drainage for the tower. Dirt will be
used for generator and propane foundation. All excavated dirt will be re -used.
Day 8 — Assemble tower.
Day 9 — Erect tower. A boom truck will be used and driven up Little Annie Road one time.
The boom truck will be used on this day only and not staged at the site.
Day 10 — Install Ice Bridge
Day 11— Install Roofing.
Day 12 — Install propane tank and generator
50,-J Day 13 Complete wiring. Demobilization.
If weather permits, we will also deconstruct the old tower and haul it off the mountain. If not, the tower will be
taken down the following year as soon as the top of the mountain is accessible by vehicle.
506 East Main Street, Dept C Aspen, Colorado 81611 970.920.5310 FAX 970.920.5339
iq
JOURNAL ENTRY
REF:
SOURCE: JE
DESCRIPTION:
Month:
CONTROL TOTALS:
Pitkln County Minor Amendment to Aspen Mountain Master Plan to set height limit for County Communication Tows
P067 -10
DEBITS 1,091.00
CREDITS 1,091.00
13,11 ^
ORE
ACCOUNT #
DESCRIPTION
AMOUNT
DR
CR
FUND
DEPT I
002
001
001
021
101
101
00000
00000
00000
63342
63340
63130
Flat Fee
BOCC Clerk Fee
BOCC Web Fee
936.00
130.00
25.00
505
94
00390
82000
Purchase Service
1,091.00
BY Bonnie Weechtler DATE