HomeMy WebLinkAboutbocc.con.014.2010ACLERK'S CHECK LIST
FOR CONTRACTS SUBMITTED TO CLERK AND RECORDER FOR SCANNING/ARCHIVING,
CONTRACT #: 014.2010 P1
ORIGINATING DEPARTMENT/DIVISION: Facilities
CONTACT PERSON: Jodi Smith PHONE #: 5396
PROJECT NAME: Data Center Constuction project
❑ BOCC AGENDA ITEM �STAFF AUTHORIZED SIGNATURE
(Requires BOCC Signature) (per Revised Procurement Code 7/2005)
❑ Over $50,000 (Requires County Manager's Signature)
✓ CHECK PROCUREMENT TYPE:
�None �Informal ❑Forrnal OSole Source DEmergency ❑State Bid ❑
OCompliance with House Bills 06-1343 and 07-1073 – Immigration Form (Under $10,000, Letters of Engagement, etc
�DOLLAR AMOUNT: 17,474.00
✓ CHECK CONTRACT TYPE:
BUDGET LINE ITEM/LEDGER NUMBER: 001.28.00495.86000
(for county employees)
ental Agreement (Requires BOCC Action)
�, Equipment, Supplies
(e.g. revenue)
Agreements (Requires BOCC Action) �/
;e OrdedContract Amendment — /���(.N r (
CONTRACTOR: Northway Construction Inc COMPLETE LEGAL OF NAME OF BUSINESS (if different from
contractor)
Contract Execution Date:S/19/2010 orginal Contract End Date: new 11/20/2010
Automatic Renewal: �Yes �No Term of Contract: 30 days
� n�_
�� All Contracts should be proofed for the following: � �N ��
✓ �No Pages Missing
✓❑If a Page is Left Intentionally Blank –Note on Page
✓ �Page numbered consecutively �
✓ �AII Signatures Affixed
✓ �All Dates Filled In
✓ �AII Other Blanks Filled In
✓ �All Exhibits Attached
✓❑HB 06-1343 and 07-1073 (Immigration Legislation) Included in RFP and/or Contract
✓ DAll Legal Descriptions Attached (if applicable)
✓ �Notice of Awazd/Notice to Proceed Attached (if applicable)
✓ ❑Warranty(ifapplicable)
✓ ❑Special Instructions for Finance Department:
✓�Sent to Clerk and Recorder for Scanning/Archiving
✓�Authorized Staff Person's Name: Jodi Smith
BY CHECHING ABOVE AND ENTERING NAME, THE AUTHORIZED STAFF PERSON IIVDICATES THAT
THE ATTACHED DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING.
NOTE: CLERK'S OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE
ARCHNES RETAINAGE SCHEDULE.
Project Coding 001.28.00495.86000 Original Contract # 014.2010
� I ''
r�.
��� �
In"`
z "��-
CHANGE ORDER/CONTRACT AMENDMENT
Change Order Number: 014.2010 A
Rev 12/10/09js
OWNER: Pitkin County, 485 Rio Cnande Place #101, Aspen CO 81611
CONTRACTOR: Northway Conshvction, Inc
The Data Center Proiect # 014.2010 (the "AgreemenP') dated 5/19/2010 between the Boazd of County
Commissioners of Pitkin County (the "County") and Northwav Conshuction, Ina (the "Contractor"), is
hereby amended as follows:
Descrintion of Chanae BXHIBIT A includes Chanee Order #1, #2 and Landscane nlansl:
a) Enlarged building footprint added brick and roofing materials which were not part of the original
scope of work. Additional cost associated with the building supplier providing a lazger structure
than originally planned for. Modulaz Connections is providing the lazger structure for no additional
cost; however the associated foundation, roof over framing, brick, etc, all require some additional
work, and materials. 3 000.
b) Additional mechanical ventilation was recommended by the Engineer for safety reasons. A wall
intake and output vent was installed with a mechanical fan that is thermostatically controlled and
tied to the alazm system if the fire suppression system is activated. $2.600
c) Relocated the sewer. During excavation it was discovered that the sewer line runs through the
construction which required relocation to meet building code. 1824.
d) Additional outlets were installed in the ceiling per request of IT Department 300.
e) Spray foam insulation; add 4" of spray foam insulation between roof systems to increase R Value
for added energy saving. 2$ •100•
� The landscape portion of the project sent out to Twisted Tree, Planted Earth and Northway
Construction. Northway Construcrion was the most completive bid and was selected to do the
work and included in this contract amendment in the amount of 7 650 rather than create a new
contract. Scope of work is attached as Exhibit A along with Clauson & Associates landscape
drawings and specifications dated 4/15/2009.
Original Contract Price $ 184.001.00
Net Increase in Contract Price (this change order) $ 17.474.00
Total Adjusted Contract Price (including this change order) $ 201.475.00
This change order extends the time to complete work by 20-days, new completion date is 11/20/2010.
In all other respects the Agreement is in full force and effect and remains unchanged by this
Amendm nt.
/ �/%Ci /d/8�2 D /�
'ck Koehler, Northway Construction, Inc Date
�
�_�—� l� I �3 I2�1�
o i mith, Facilities Manager � ISate
1
�✓
NORTH WAY
Construction
Northway Construction, Inc.
0394 Black Bear Trail
Carbondale CO 87623
Phone: 970-963�418
Fax: 970-963�419
To: Pitkin County
530 East Main Street Suite 201
Aspen CO 81611
The contrador agrees to perform and the owner agrees to
pay for the following changes to this contract.
OMered By:
Description of Work
Cost Code
Amount
Venting 233700 2,600.00
Add mechanical ventilation. Materials and Labor to install mechanical ventilation for building. System is an in wall
intake and output with mechanical fan. System is thermostatically controlled and tied to the alarm system to close if
the fire suppression system is adivated.
Additional outlets 260200 300.00
Add additional outlets in ceiling.
Sewer clean out
1,824.00
Change Order
Order#: 1
Order Date: 09/13/2010
Project: 717
Pitkin County Data Center
485 Rio Grande Place #101
Aspen CO 81611
333113
Relocated sewer clean out. During excavation it was discovered the sewer line runs through the construction. Cost is
for labor and materials to re-lacate the clean out to meet all required codes.
Additional materials 19500 3,000.00
Additional cost associated with the building supplier providing a larger strudure than originally planned for. Modular
Connections is providing the larger structure for no additional cost; however the associated foundation, roof over
framing, brick, ect, all require some additional work, and materials.
Spray foam insulation 72129 2,100.00
Add 4" of spray foam insulation to exterior roof area to increase R Value.
Notes
Change order to labor and materials for additional work requested by client, or necessary due to site conditions.
Negahve changes will lower the overall contract
price requiring no adddional payment by owner.
The original Contract Sum was .
CusWmer Order:
Requested Amount of Change I
Net change by previous Change Orders ......................
The Contract Sum prior to this Change Order
The Contract Sum will be changed by this Change Order ..
The new Contract Sum including this Change Order wiil be
The Contract Time will be changed by ,
Owner:
Contractor:
9,824.00 I
1 11
0.00
0.00
9, 824.00
9,824.00
10 Days
Date:
Date:
By signing, you are authorizing the cost of the work to be added to the Construction Budget. This is not a fixed
price Change Order. The actual Cost of the work will be billed as outlined in our contract.
Plans Attached �
Specifications Attached ❑
�
Jodi Smith
From: Rick Koehler [rickk@northwayconstruction.com]
Sent: Wednesday, October 06, 2010 3:19 PM
To: Jodi Smith
Subject: change orders
Attachments: 2010-09-28 rev.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Jodi,
Attached find the revised information for the landscaping.
The request for additional time is based on several fadors. The approval process to get the building ordered took about
2-3 weeks longer than we had planned for. In the last few weeks of July I had the unit set for production; however that is
when the decision to add an electrical outlet in the ceiling was requested, plus the vent fans, there were some block
outs we were working through as well. This delayed production about two weeks.
1. Selecting the different roof required additional freming and engineering which has added a day or two to
the freming schedule.
2. Roofers need one additional day for the larger roof. Original was two hips off the existing building. New roof
is a complete structure with a ridge and two hips.
3. Additional brick work up to one additional day.
4. Sewer line extension and having to work around with the concrete forms and excavation added'/:-1 day.
Between the crews.
5. Extending the conduits from the street and data center added up to one day.
6. Additional coring and meeting with Durgin Electric added F. day to the trades and supervision.
7. Insulating the roof will require us to leave the framing open to access the areas to accomplish an even spray
application. This will require one additional trip to button up the roof framing. Possibly one additional
inspection.
8. Project management for all the changes and additional work added one week to accomplish the multiple
request with the various tredes.
9. Truck breaking down on our delivery, this added 1'/: days. We had additional logistics involved with the
trades and traffic control.
All of this and more is why we have requested time added to the schedule. Please understand it is still our goal to
complete things by October 31. However l do not want us to be put in a bind trying to squeeze additional work into the
same time freme, it is just a little breathing room.
Thank you ,
Respectfully,
Rick Koehler, Project Manager
Northway Construction, Inc
0394 Black BearTrail
Carbondale, CO 81623
970/963-4418 phone
970/963-4419fax
970/948-0211 cell
RI
�✓
NORTH WAY
Construction
Northway Construction, Inc.
0394 Black Bear Trail
Carbondale CO 81623
Phone:970-963-4418
Fax:970-963-4419
Change Order
Order#: 2
Order Date: 09/28/2010
��►�HI�BITA
To: Pitkin County
530 East Main Street Suite 201
Aspen CO 81611
The contrador agrees to pertorm and the owner agrees to
pay for the following changes to this contract.
Ordered By: 1 Rick Koehler Customer Order:
Description of Work
Project: 717
Pitkin County Data Center
485 Rio Grande Place #101
Aspen CO 81611
Cost Code
Existing Boulders 323200
Install boulders currently on site per landscaping plan.
Additional Boulders 323200
Provide and install additional boulders required to meet landscaping plan.
Based on the landscape plan five additional 3' boulders are required.
Plans Attached [�
Specifications Attached �
Amount
1,000.00
975.00
Irrigation 328000 675.00
Install new irrigation system, using existing controllers.
Top soil 312216 900.00
Supply and install approximately 800 SF of 80/20 topsoil/compost mix to a depth of 4" under all wildflower/grass areas.
9.87 CY of topsoil.
Trees
Schrubs
329300
Supply and install 5 Aspen trees (2.00"), 1 Spruce tree, Colorado (8.0').
329300
Supply and install 7 Currant, Yellow Flowering (#5).
Seeding 329300
Supply and install Pitkin County Revegatation grass seed mixture to 800 SF area per plan.
Cobbles 312500
Supply and install weed barrier and 2" river cobble, to 300 SF area per plan.
Negative changes will lower the overall contrad I
price requiring no additional payment by owner. Requested Amount of Change
The original Contract Sum was ...............
Net change by previous Change Orders ............... .................
The Contract Sum prior to this Change Order ................................
The Contract Sum will be changed by this Change Order ,,,,,,
The new Contract Sum including this Change Order will be .
The Contract Time will be changed by
Ow�er:
Contractor:
Date:
Date:
2,925.00
290.00
200.00
685.00
7,650.00 I
0.00
0.00
0.00
7,650.00
7,650.00
10 Days
By signing, you are authorizing the cost of the work to be added to the Construction Budget. This is not a fixed
price Change Order. The actual Cost of the work will be billed as outlined in our contract. 1
1i�
GOOD �ARTN
LA'r�SCI�P:NG MAINiENfNCt
9TO.OBJ.S900
� '
.
Good Earth Landscaping
1053 Valley Road
Carbondale, Coloredo 81623
Warranty
Warrantv
Good Earth Landscaping & Maintenance hereby agrees to furnish the following warrenty for the
Pitkin County Data Center located at 530 East Main Street, Aspen Co.
Upon the final payment of sums due to Good Earth Landscaping & Maintenance pursuant to
this contract, Good Earth Landscaping & Maintenance warrants that the trees, shrubs, and
irrigation system installed pursuant to this contract will be free of defects in material and
workmanship and will provide satisfactory service for a period of 1(one) year from the date
installation is complete. Should the installation require repair within this warrenty period Good
Earth Landscaping & Maintenance would perform the necessary repairs at no cost to the
owner. This warrenty does not cover damage to the installation inflicted by accidents, man or
man-made causes, acts of God, acts of nature and the like, or wear through misuse or abuse.
This warranty is in lieu of all other warranties, express or implied. Good Earth Landscaping &
Maintenance's responsibility under this warranty shall be limited solely to the repair of the
installation and shall not extend beyond the warranty period. Good Earth Landscaping &
Maintenance's liability u�der this warranty or otherwise, shall not exceed the initial cost of
installation.
The owner's sole and exclusive remedy and Good Earth Landscaping & Maintenance's sole
obligation for any failure of the installatio� shall be provided under this warranty. This warranty
shall extend to the owner specified herein upon and only upon completion of all payments due
to Good Earth Landscaping & Maintenance.
�
Page 1 of 1 Good Earth Signature
m
x
=
Z �
= Z
�
O �
�
� �
m z
m n zoa
� O mgA
p Z �oA
Z � A��
II i�
� � .
� C
N r
W �
v z
�mm0 �ZA�
A�Sm'��'pAm^
��O-�Si�O
AT�yJC��f
AAm �Or = .inm
.. . o
m
Z
pT
m�
g o
z
I'
0
�
S
m
C
m
v
�
m
'�'�
:\/
9
O
° o
m
0
f
� A
i 4
�—
0
Il''S �
� d
a
a a f� r v(t �
5t
m
����om�g
� D � �( � O � l
m mpi m
Z �
poSmAC p Im
m��$�m m �
A � �'im�m� �,
m
HyAZymr GI
1_ TO�
S � yLI
Oy i�
Z �
00 yp
m c�
W
A
u �
B� g
$
�� �
A �_ � . \
� o � p �
�A y ,� a
7 v ! s�
m j i m �
r i ( n \
\$ A � � �
\C � �� /, z ♦
�
�
� �� S 9 Sl
o / / �
a /
i'Z i
ti
� 1A..�. �. N\y S\��
�� D�iF��yS
� j �� pr��m�
; i � �QiOS65
/ I �����
m
0
� , � �i
0
_ '£ i �
__
� ,. ,,
9 y� � /
� y �
�� y /
O
Z d � /
� 9
Z p F
� � �
A I
O m
� y
p� y q
�
�': ..
9X y \
A� � �
N
m? s f
-� C M .
��
M
saiavn
'1S
� C
�
� �° � � ����
�� ��� � * �� i
�� � � �'�i � � � � �
�� 3 F A " � � �� � F " S
� � � �!�{� �:; ' g � � �
ag � € � 4 'n C R � <
� � r � � �' /
e� � � � m � C
gg � � y g c G� a� c c
°d � S 4 a � � € � �
$� � ? � i z � � S 8
a z l7 �6 �3 ` €
� � ^: a a a
_ �� � � g s
- _ � � € } o
% : ' ^ �� a a j `
� ie i 3
F� � �
�
0
z
� S�ax N�nuSOwaSSOCiarES�ll pitk.in County Ilata Centerl
neqas �hmwae • •� • ASfJBYLs CQ
yi .n_m
onre �SHeer
i on zooe I+ v �
SPA Site Plan 1p 1
Drtwn BY MH
CTe3.ad 6'/ SC
• ` ,a
T% 1
�
�
�
l`_!