HomeMy WebLinkAboutpitkin.bldg.264316106050DOCUMENT
LAYOUT
Certificate of Occupancy or Letter of Completion
(most recent project)
permits
Final Inspections
Any Supporting Documents
Site Plans
(no architectural plans)
If there are previous projects they will follow in the same order.
Certificate of Occupancy:.
Pitkin County Community Development Department` "�"
x -:
-, -. -
Use Classification: SFR
Building Permit: 0027.2007.PRBU
Building Address: 219 WOODY CREEK PLAZA
WOODY CREEK CO 81656
owner of Building: ELDON P. ORTEGA
Owner Address: PO BOX 222
WOODY CREEK CO 81656
Group: IRC
Type of Construction: VB, MH
Use Zone:
Description:
Parcel ID 264316106050
Lot 50, Woody Creek PUD. 1,669 square foot two -story SFR. This Certificate of Occupancy is for the
1,006 square foot site -built portion which includes two bedrooms, two 314 baths, entry, recreation room,
utility room, and crawl space.
Comments & Restrictions:
This C.O., excludes the HUD portion of the residence; a separate Letter of Completion is issued for
the HUD portion.
This certificate is issued pursuant to the requirements of the 2003 edition, section 110 of the -
International Residential Code.
This certificate is accepted with the understanding that the inspection and inspection report do not in
any way constitute a guarantee, warranty of merchantability or fitness for a particular purpose, express
or implied warranty of habitability, or assurance in any way of the safety of the structure and its
appurtenances. Additionally, neither the inspection nor inspection report are substitutes for any real
estate transfer disclosures which may be required by law or a complete inspection by the owner or
subsequent buyer or occupant. Pursuant to state law the owner is responsible for inspection and
maintenanc
Signature of
thloq B uilding Official D to
_ Note: In all occupancies, except R this certificate must be posted In a conspicuous place near the main exit on the premises for which it is
_ Issued. Any alteration or use of these described premises or portion thereof without the written approval of the Building Official shall negate this C O
and subject it to revocation
LETTER OF COMPLETION
Pitkin County Community Development Department
Use Classification: -
SFR
Building Permit:
0027.2007.PRBU
Building Address:
219 WOODY CREEK PLAZA
WOODY CREEK CO 81656
Owner of Building:
ELDON P. ORTEGA
Owner Address:
PO BOX 222
WOODY CREEK C081656
Group: HUD
Type of Construction: MH
Use Zone:
Description:
Parcel ID 264316106050
Lot 50, Woody Creek PUD. 1,669 square foot two -story SFR. This Letter of Completion is for the 663
square foot HUD home which includes one bedroom, one full bath, one kitchen, living room, and
storage room. Division of Housing Installation Certification Insignia No. 20835.
Comments & Restrictions::
This LOC excludes the site -built portions of the residence; a separate Certificate of Occupancy is
issued for the site -built home portion.
This certificate is issued pursuant to the requirements of the 2003 edition, section 110 of the International
Residential Code.
This certificate is accepted with the understanding that the inspection and inspection report do not In any way
constitute a guarantee, warranty of merchantability or fitness for a particular purpose, express or Implied
warranty of habitability, or assurance in any way of the safety of the structure and its appurtenances.
Additionally, neither the inspection nor inspection report are substitutes for any real estate transfer disclosures
which may be required by law or a complete Inspection by the owner or subsequent buyer or occupant.
Pursuant to state law the owner is responsible for inspe5tkn and ontenance of the structure and systems.
Signature of
thief Building Official
Date
`
Note: In all occupancies, except R, this ceruncate must be posted in a conspicuous place near the main exit on the premises for which
It is Issued. Any alienation or use of these described premises or portion thereof without the written approval of the Building OffCial shall negate
this letter and subject It to revocation.
"
ASPEN * PITKIN COMM U ITY DEVELOPMENT DEPARTMENT
PITKIN COUNTY CITY OF ASPEN ❑
130 South Galena 970 / 920 -55 6 970 / 920 -5090
Aspen, CO 81611 970 / 920 -5532 Inspection Line 970 / 920 -5448 Inspection Line
Ap Ircant to comp numbered sp aces onl .
PERMIT APPLICATION
0 0277 n
PERMIT NO.
doB ADDRESS ( r
Permit
OWNE!]N D
FD
MH
CONTRACTOR MAIL ADDRESS A
MS
ARCHITECT OR ENGINEER OF RE ORD P
ADDRESS P
RF c
CLASS OF WOR E
ENERGY CO EE a
m
VALUATION OF WORK E
EXISTING SO FOOTAGE S
SQUARE FOOTAGE 7
Type of Cons on on O
Occupancy Group L
Lot Area O
O
11. Is there food service In this building ❑ YES No R
Roiai f B�alre N
No olsto O
Ocn Load
12. Is LPG used? ❑ YES No !
13. Parcel ID# all 920 -5160 3 6 0t; E
NO OF BEDROOMS U
Use Zone F
Flre Spnnklea Regmred? ❑Yes ON.
EXISC A
ADDED
14. Description of Work N
No of Dwelling Units O
OFFSTREET PARKING SPACES
Covered U
Uncovered Q
LJ I { D
SPECIAL APPROVALS R
REQUIRED A
AUTHORIZED BY }
DATE
7
H PC
PARK DEDICATION
PRESUBMITTAL p
pPpLICATI0 AC PTED P
PLANSOH C
CKED E
APPROVE F RISS ANCE .
ENVIED HEALTH
BNG d
.r 1 /
/,
DATE D
N
B / P
PARKS
N
FIRE MARSHAL
NOTICE W
S
WATER TAP S
ASPEN CONSUL SAN DIST
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS O
U_
OTHER U
I.I 9 M rMHRHH I ONLY WHEN VALIDATED WORK STARTED WITHOUT PERMIT WILL BE DOUBLE FEE
Ener y C fW ' - Plan C L ¢ j Zo ' GM Permit Fee Use Tax Deposit Fee Other Fees Op
1 7/40 �F i v u WHITE -FILE COPY CANARY- APPLICANT
ASPEN * PITKIN COMMLI DEVELOPMENT DEPARTMENT PERMIT APPLI
PITKIN COUNTY I CITY OF ASPEN ❑
130 South Galena 970 / 920 -55 970 / 920 -5090 O MO - CATIO , General
Aspen, CO 81611 970 / 920 -5532 Inspection Line 970 / 920 -5448 Inspection Line PERMIT NO.
m ob
... �, 1„ Permit
JOB ADDRESS
C
d
I
LEGAL DESCRI 10
2. �
O
OWNER MAILADDRE55-.� D ZIP PHON
3. -
FD
FN
OWNE U RIZEDAG MAIL ADD ESS ^ PH N� LICENSE NO
4 .630
MH
CTO MAIL ADDRESS PHONE LICENSE NO
�l
MS
MS
ARCHITECT OR EN EER OF RECORD MAIL ADDRESS PHONE LICENSE NO
6.
C
SN i
CLASS OF WORK
7. ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑
ENERGY DE FEE
USE TAX OENSU
E
G I S p E
/ `,I JA
IT
USE OF BUILDING L1 SINGLE FAMILY 11 MULTI-FAMILY
8 • ❑ COMMERCIAURESIDENTIAL ❑ COMMERCIAL El OTHER
PLAN CHECK FEE
PER MTFE
ZONINGFEE r
r
_ S
VALUATION OF WORK
9
EXISTING SO FOOTAGE
1
SQUARE FOOTAGE
THIS PERMIT
Type of Construction
Occupancy Gmup Lot
Area
Z
IT
11. Is there food service in this building ❑ YES ❑ No
Size of Beal e� A
No of Stones Dee
Load
12. S LPG used? ❑ YES ❑ No
NO OF BEDROOMS
Use Zone
Fre Spnnklers Requeetlo Dyes ❑Np
13. Parcel ID# call 920 -516
FaISTimG
gyaap
v
Alarm Systemlegpred? ❑Yes ❑No
,,��.." ���� '
14. Description of Work Cray
No of D.velling Units
/I
OFFSTREET PARKING SPACES
Covered
Uncovered
SP CIALAP REQUIRED
AUTHORIZED BY
DATE
ZON
NBC
O D_
PARK DEDICATION
I V O-1 �� v
ENVIRO HEALTH
PFESUBMITTAL
gPPLICAiION ACCEPTED
PLANS CKEO
gPPR
VEO FOR ISSUANCE
ENGINEERING
PARKS
BV
BY
BY
B
DATE
DATE
DATE / O
NATURAL RESOURCES
(T/ O
ATP
FIRE MARSHAL
t
OTICE
SEPARATE PERMITS ARE REQUIRED F ELECTRICAL, PLUMBING, HEATING, VENTILATING
OR AIR CONDITIONING
WATER TAP
C
ASPEN CONSOL. SAN DIST
OTHER
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS
NOT COMMENCED WITHIN 12 MONTHS, OR IF CONSTRUCTION OR WORK IS SUSPENDED
OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED
PAYMENT OF PITKIN COUNTY USE TAX ^
I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE
SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOV-
❑ MONTHLY OR QUARTERLY RETURNS WILL BE SUBMITTED.
ERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR
❑ DEPOSIT METHOD 5% OF 25% OF THE PERMIT VALUATION PAID
NOT THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE
OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON-
AT ISSUANCE. A FINAL REPORT ON TOTAL ACTUAL COST MUST C,
BE FILED WITH IN 90 DAYS OF SUBSTANTIAL COMPLETION OF
STRUCTION OR THE PERFORMANCE OF CONSTRUCTION IT IS MY RESPONSIBILITY TO
REVIEW THE APPROVED PLANS AND ANY COMMENTS THAT ARE CONTAINED THEREON
WORK AND / OR ISSUANCE OF THE CERTIFICATE OF OCCUPANCY.
AND SEE THAT THE STRUCTURE AND /O ROJECT IS BUILT IN COMPLIANCE WITH ALL
❑ EXEMPT. EXEMPT ORGANIZATION
APPLICABLE CODES.
E] RESALE STATE 8 PITKIN COUNTRY RESALE NO
'
THE DEPOSIT METHOD WILL BE ASSUMED UNLESS OTHERWISE NOTED
SIGNATU 0 �1< IDATEI
ANYONE WHO USES AND / OR CONSUMES BUILDING MATERIALS AND FIXTURES IN
PITKIN COUNTY IS SUBJECT TO THE 5% USE TAX.
PRINT NAME
PROPERTY LIENS MAY BE PLACED ON THE OWNER'S AND /OR THE
CONTRACTOR'S PROPERTY WHEN USE TAX IS NOT PAID
SIGNATURE OF OWNER (IF OWNER BUILDER) (DATE)
THIS FORM IS A PERMIT ONLY WHEN VALIDATED
Energy Code Fee Plan Check F& Zoning Fee
(o r5"'it
J
IL
WORK STARTED WITHOUT PERMIT WILL BE DOUBLE FEE
Permit Fe" o Use Tax Deposit Fee Other Fees
U 1 116
WHITE -FILE COPY
ASPEN * PITKIN COMMUNITY DEVELOPMENT DEPARTMENT PERMIT APPLICATION
PITKIN COUNTY CITY OF ASPEN ❑
Z
130 South Galena 970 / 920 -552 970 / 920 -5090 OOCI�• eneral
Aspen, CO 81611 970 / 920 -5532 Inspection Line 970 / 920 -5448 Inspection Line PERMIT NO. ermit
Applicant to complete numbered sp aces onl
JOB ADDRESS O
I SPECIAL APPROVALS I REQUIRED I AUTHORIZED BY I Di _I (I
H PC
i 0 ^ . c3 2 - PARK DED IC A TION HELTH
`/ � ENVIRO HEALTH
PRESUBMITfAL APPLICATyrN ACCEPTED PIANS ECKED APPROVED FOR ISSUANCE
ENGINEERING
PARKS
.7 //(1 NATURAL RESOURCES
0T DATE A k
TE PATE 1 2 4
FIRE MARSHAL
NOTICE WATER TAP
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING gSPEN CONSOL SAN DIST
OR AIR CONDITIONING
NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS OTHER
THIS PERMIT BECOMES
N
NOT COMMENCED WITHIN 12 MONTHS, OR IF CONSTRUCTION OR WORK IS SUSPENDED
OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANYTIME AFTER WORK IS COMMENCED
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE
SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOV-
ERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR
NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE
OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON-
STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. IT IS MY RESPONSIBILITY TO
REVIEW THE APPROVED PLANS AND ANY COMMENTS THAT ARE CONTAINED THEREON
AND SEE THAT THE STRUCTURE AIJD/OR PROJECT IS BUILT IN COMPLIANCE WITH ALL
APPI ICARI F nL1DFS� i /
_ 0 1 1i
(DATE)
THIS FORM IS A PERMIT ONLY WHEN VALIDATED
Energy Code Fee Plan Check Fee , ZoningtFay
, III 1'; Pic;
PAYMENT OF PITKIN COUNTY USE TAX
❑ MONTHLY OR QUARTERLY RETURNS WILL BE SUBMITTED.
❑ DEPOSIT METHOD 5% OF 25% OF THE PERMIT VALUATION PAID
AT ISSUANCE. A FINAL REPORT ON TOTAL ACTUAL COST MUST
BE FILED WITH IN 90 DAYS OF SUBSTANTIAL COMPLETION OF
WORK AND / OR ISSUANCE OF THE CERTIFICATE OF OCCUPANCY
❑ EXEMPT EXEMPT ORGANIZATION
❑ RESALE STATE & PITKIN COUNTRY RESALE NO
THE DEPOSIT METHOD WILL BE ASSUMED UNLESS OTHERWISE NOTED
ANYONE WHO USES AND / OR CONSUMES BUILDING MATERIALS AND FIXTURES IN
PITKIN COUNTY IS SUBJECT TO THE .5% USE TAX
PROPERTY LIENS MAY BE PLACED ON THE OWNER'S AND /OR THE
CONTRACTOR'S PROPERTY WHEN USE TAX IS NOT PAID
WORK STARTED WITHOUT PERMIT WILL BE DOUBLE FEE
Permit FeC � Use Tax Deppy Fee Other Fees
A/1 P o
LEGAL DESCRIPTION. V
��
2.
�G )
D
0 NER
/ MAILADDR
PHO .��
FD
3.
' /
/
,/'
;
i� C
` p
FN
OWNER'S AUTH )ZED AGENT MAIL ADDRESS
PHONE
LICENSE NO
4.
MH
CONTRACT MAIL ADDRESS
PHONE
LICENSE NO
MS
5.',
RF
ARCHITECT OR ENGINEER FRECORD MAILADDRESS
PHONE
LICENSE NO
SN
h
GLASS OF WORK
TERATION
ENERGY,CODE FEE
\I
USE TAX �E L
CENSUS CODE
G S F E
7•
El ❑ ADDITION IFA 11 REPAIR ❑
IP�V
USE OF BUILDING WEINGLE FAMILY ❑MULTI- FAMILY
PLAN OPEC
PERMIT FEE
Q
ZONING FE
Q
8 '
❑ COMMERCIAURESIDENTIAL ❑ COMMERCIAL ❑ OTHER
b
2
VALUATION OF WORK
EXISTING SO FOOTAGE
SQUARE FOOTAGE
Type of Construction
Occupancy Group
Lot Area
9
$ (
10.
THIS PERMIT
11.
Is there food service in this building YES 13
Size of Bulldm
No of Stool
0. Load
9
(Total Square -l1
12.
Is LPG used? ❑ YES f3'
NO OF BEDROOMS
Use Zane
Fire SprmHere Required? ❑Yes
ONO
EXISTING
ADDED
13. Parcel ID# call 920 -5160
I
Alarm S)Stem Regmretl4 ❑Yas
[IN.
14.
` /
Description of Work 2 .", r1 t/i�..f� /7
No of Dwelling Umts
OFFSTREET PARKING SPACES
I SPECIAL APPROVALS I REQUIRED I AUTHORIZED BY I Di _I (I
H PC
i 0 ^ . c3 2 - PARK DED IC A TION HELTH
`/ � ENVIRO HEALTH
PRESUBMITfAL APPLICATyrN ACCEPTED PIANS ECKED APPROVED FOR ISSUANCE
ENGINEERING
PARKS
.7 //(1 NATURAL RESOURCES
0T DATE A k
TE PATE 1 2 4
FIRE MARSHAL
NOTICE WATER TAP
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING gSPEN CONSOL SAN DIST
OR AIR CONDITIONING
NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS OTHER
THIS PERMIT BECOMES
N
NOT COMMENCED WITHIN 12 MONTHS, OR IF CONSTRUCTION OR WORK IS SUSPENDED
OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANYTIME AFTER WORK IS COMMENCED
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE
SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOV-
ERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR
NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE
OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON-
STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. IT IS MY RESPONSIBILITY TO
REVIEW THE APPROVED PLANS AND ANY COMMENTS THAT ARE CONTAINED THEREON
AND SEE THAT THE STRUCTURE AIJD/OR PROJECT IS BUILT IN COMPLIANCE WITH ALL
APPI ICARI F nL1DFS� i /
_ 0 1 1i
(DATE)
THIS FORM IS A PERMIT ONLY WHEN VALIDATED
Energy Code Fee Plan Check Fee , ZoningtFay
, III 1'; Pic;
PAYMENT OF PITKIN COUNTY USE TAX
❑ MONTHLY OR QUARTERLY RETURNS WILL BE SUBMITTED.
❑ DEPOSIT METHOD 5% OF 25% OF THE PERMIT VALUATION PAID
AT ISSUANCE. A FINAL REPORT ON TOTAL ACTUAL COST MUST
BE FILED WITH IN 90 DAYS OF SUBSTANTIAL COMPLETION OF
WORK AND / OR ISSUANCE OF THE CERTIFICATE OF OCCUPANCY
❑ EXEMPT EXEMPT ORGANIZATION
❑ RESALE STATE & PITKIN COUNTRY RESALE NO
THE DEPOSIT METHOD WILL BE ASSUMED UNLESS OTHERWISE NOTED
ANYONE WHO USES AND / OR CONSUMES BUILDING MATERIALS AND FIXTURES IN
PITKIN COUNTY IS SUBJECT TO THE .5% USE TAX
PROPERTY LIENS MAY BE PLACED ON THE OWNER'S AND /OR THE
CONTRACTOR'S PROPERTY WHEN USE TAX IS NOT PAID
WORK STARTED WITHOUT PERMIT WILL BE DOUBLE FEE
Permit FeC � Use Tax Deppy Fee Other Fees
A/1 P o
PLUMBING PERMIT APPLICATION 2
PITKIN COUNTY ❑ COMMUNITY DEVELOPMENT DEPARTMENT CITY OF ASPEN ❑
970/920 -5526 130 S. Galena 970 / 920 -5090
970 / 920 -5532 Inspection Line Aspen, CO 81611 970- 920 -5448 Ins tion Line
lip 67 ; fPP0fP NO.
JOB ADDRESS
I ype of Fuel: UII O Natural Gas P LPG fT WILL PENETRATIONS BE MADE IN FIRE RESISTIVE CONSTRUCTION' Yes 11 No i]
If yes, a plan review is required.
Describe work: n T
l
OWNER
MAIL ADDRESS
O
ZIP P ONE
CONTRACTOR
MAILADDRESS
P ONE CITY LICENSE NO
STATE LICENSE NO
USE OF BUILDING
COMMERCIAL ❑ RESIDENTIAL 4Fr
BUILDING PERMIT NO
oo 7-:7. o0
CLASS of WORK
EW DDITION 71 ALTERATION ❑ REPAIR
Is there a restaurant in this building?
Yes ❑ No
I ype of Fuel: UII O Natural Gas P LPG fT WILL PENETRATIONS BE MADE IN FIRE RESISTIVE CONSTRUCTION' Yes 11 No i]
If yes, a plan review is required.
Describe work: n T
PERMIT FEES
NO
TYPE OF FIXTURE OR ITEM
FEE
Water Closet (Toilet), Bidet
Bathtub
Lavatory (Wash Basin)
Shower
Kitchen Sink & Drsp
Dishwasher
Laundry Bar, Utility Sinks
Clothes Washer
Floor Sink
Floor Drain
SPECIAL CONDITIONS
Water Heater M /BTU ea.
Gas Systems If Outlets
//�� ,�.
L/L/
Water Piping & Treating Equip
Other
APPLICATION CEPTED
PLAN CHECKED
APPROVED FOR ISSUANCE
f
G
By _ _ —
By _
By
/
Da✓/ 7- e b
Date
Deal L l
Plan Review $
NOTICE I I
Facture Fee $
Permit $
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT
COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR
SUBTOTAL $
ABANDONED FOR A PERIODOF 180 DAYSATANY TIME AFTER WORK IS COMMENCED IFTHIS
PERMIT IS ISSUEDTOA PROPERTY WITHINTHEASPEN CONSOLIDATEDSANITATION DISTRICT
THE PROPERTY OWNER IS RESPONSIBLE FOR ADDITIONAL SEWER USE FEES
Use Tax $
TOTAL DUE $
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE
SAMETOBETRUEANDCORRECT ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING
THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE
GRANTING OFAPERMITDOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL
THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR
THE P ORMA O ONS TI
U` /G
SELECTION OF METHOD FOR PAYMENT OF USE TAX
O MONTHLY OR QUARTERLY RETURNS WILL BE SUBMITTED.
fT DEPOSIT METHOD.' /, aft %OF THE MATERIALS VALUATION PAID NOW
S DNATUR of corvT RA HoRlz Em (DATE)
AT ISSUANCE. FINAL REPORT ON TOTAL ACTUAL MATERIALS COST
MUST BE FILED WITHIN 90 DAYS AFTER COMPLETION OF WORK.
GENERAL CONTRACTORS CHOOSING THIS METHOD MUST REPORT
PRINT NAME
x
SlUNAIUHEOFOWNf:HdI D 1/ UILDE (DATE)
/
AND REMIT TAX FOR ALL SUBCONTRACTORS THAT DO NOT OBTAIN
he demp Con TM1e untlerngnetl appl¢ personally petlorm plumbing work on the described property or
residence hereby edmes, as a cenddwn ala aceorepohpermn, that above described property or residence
THEIR OWN PERMIT MATERIALS VALUATION'
owned by the appLcard that the applicant is nor engaged in the business of constmctron or remodeling, and such
properly Is not intended for sale or mrsh , nor is R rental property (occupied or to be occupied by tenants, whether
tmnsie torpermanent ),norwlrbtbegerreralycmntothepubllo wsundamtoodthamompllapcewnhtbeseaeanra ncee
O EXEMPT STATE & PITKIN COUNTY RESALE NO
is a condlbon pride issuance pia plumbing permutothe applicant pursuantto the provisions of C R S Section 1238 -
na( z) ( as amended), and that ailure to comply herewith wel be grounds for revocation of plumbing hands or any
EXEMPT ORGANIZATION
cednmate of occupancy Issued with respect to the property or residence described
Apphcaa Data
L 1 y - -1
(1 [ Permit Validation t/z o 1- 7 is R sit afro U
COPIES: WHITE —FILE COPY YELLOW —APPLI�T �'
Plumbing /Mechanical Permit is being Issued on the condition that all Items requested are on the approved pl evlat)on shah qechange
order /removal at the applicant's expense. ALL PLUMBING AND MECHANICAL PERMITS ARE REQUIRED THE JOB SIT
n
0
z
D
1
Z
D
m
x
Ed
Z
M
Z
C
W
m
x
r
1
J
°C
MECHANICAL PERMIT APPLICATION 4
PITKIN COUNTY ❑ COMMUNITY DEVELOPMENT DEPARTMENT CITY OF ASPEN ❑
970/920 -5526 130 South Galena 970/920 -5090
970/920 -5532 Inspection Line Aspen, CO 81611 970/920 -5448 Inspection Line
_ _
O 3 5�. �t� `b _ T 1v_k_c�
rermit #
JOB ADDRESS -ti l/. /" V� / —
S
OWNER MAIL ADDRESS ZIP PHONE
P
OWNER'S REPRESEN IVE MAIL ADDRESS HON LICENSE NO
M HANICAL CONTRACTOR MAIL ADDRESS PHONE LICENSE NO
USE OF BUILDING GENERAL CONTRACTOR BUILDING PERMIT NO
U U a_'� . 2-0 0 `7
CLASS OF WORK NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR IS THERE A RESTAURANT IN THIS BUILDING? YES ❑ NO
WILL PENETRATIONS BE MADE IN FIRE RESISTIVE CONSTRUCTION? DOES THIS BUILDING REQUIRE HPC REVIEW? YES ❑ NO
E] YES, WILL REQUIRE A PLAN REVIEW J NO
DESCRIBE WORK
Type of Fuel: Oil ❑ Natural Gas ❑ LPG ❑
PERMIT FEES
NO. TYPE OF EQUIPMENT FEE
<
Forced Air Systems — Gravity Systems —B TU
Wall, Suspended or Unit Heaters
Dryer Vent
Appliance Vent
ADDITIONAL MECHANICAL PERMIT MAV BE REQUIRED
Mg., Refri ., Coolin , Absorption Unit
Repair, Alteration or Addition to Existing System
SPECIAL CONDITIONS
Boilers (Includes vent) B.T.U. AFLIE %
Air Handling Unit O.F.M.
Evaporative Coolers
Ventilation Fan
APP PTEO
ev
DATE �
HK
By
PIANS CHECKEn
ev
APPROVED FOR ISSUANCE
a
Range Hood
Gas "piping"
DATE
DATE
OpTB
1 11
Gas L o A Nance
� pp
Other
NOTICE
This permit becomes null and void if work or construction authorized is not com-
menced within 180 days, or if construction or work is suspended or abandoned
for a period of 180 days at any time after work is commenced. If this permit is
issued to a property within the Aspen Consolidated Sanitation District, the prop-
erty owner is responsible for additional sewer use fees.
I hereby certify that I have read and examined this application and know the same
to be true and correct. All provisions of laws and ordinances governing this type
of work will be complied with whether specified herein or not. The granting of a
permit does not presurr� Nve; 0rity t0 vio late Or cancel the provisions Of
any other stateor JOltal I constmction or the performance Df Con-
traction.
r _
Plan Review $
Fixture Fee $
Permit $
_
SUBTOTAL $
Use Tax $
TOTAL FEE $
PAYMENT OF CITY OF ASPEN AND PITKIN COUNTY USE TAX
The General Contractor or Owner Builder is required to pay a Use Tax Deposit to
both City of Aspen (2.1 %) antl Pltkln County (.5 %) on the building permit at time
of issuance. All sub - permits pulled under a building permit are paid by this deposit
payment and should not pay Use Tax.
Stand -alone Permits are required to pay the Use Tax Deposit to both City of
Aspen (2.1 %) and Pltkin County (.5 %) at time of permit Issuance since they are not
covered under a building permit.
Stand -alone Use Tax Payment
❑ Deposit: City of Aspen: 2.1 % of 50% of project valuation (first $100,000 Is
exempt)
Pitkin county: .5 %of 50% of project valuation
❑ Exempt: Exempt organization
SIGN RE OFC DR 0 IZED E )ATE
PRINT nA �/- .. �,/
i' -r'/` �. -s ✓ -' ^— �/' �_
SIGNATURE OF OWNER (IF OWNER e DER DATE
Permit Validation 0.5 L 15 L
tJ fG
Plumbing/Mechanical Permit is being issued on the condition that all items requested are on the approved la deviati f shall require a
or removal at the applicant's expense. ALL PLUMBING AND MECHANICAL PERMITS ARE REQUIRED T E ON
IS BEING INSTALLED ON AN HISTORIC PROPERTY OR WITHIN AN HISTORIC DISTRICT, YOU MUS BMIT P A R E
CATING THE LOCATION OF THE EQUIPMENT, AS WELL AS THE EXACT DIMENSIONS OF THE UNIT BEING IN LEp
COPIES WHITE —FILE COPY VELLOW— APPLICANT
Z/
O
Z
D
1
Z
D
3
n
m
r
r
v
Z
FI
m
0
6�
MECHANICAL PERMIT APPLICATION
PITKIN COUNTY COMMUNITY DEVELOPMENT
130 S GALENA THIRD FLOOR ASPEN CO 81611
INSPECTION LINE: 970 - 920 -5532 OFFICE: 970- 920 -5526 FAX: 970 - 920.5439
le� t, C� I k 0000 P L7(A
IP
CX� g -_aaoI0 ��sc
PERMIT NO. (Offic Use Only)
JOB ADDR S
� I q
OWNER. MAILI D SS�,_ PH ONE - I
n
M17CFJANIUAL C RACTOR MAILING ADDRESS PHONE
USE OF BUILDING ❑ COMMERCIAL WGIDENTIAL BUILDING P RMI NO
b 2vv . r
IS THERE A
CLASS OF WORK NEW ❑ADDITION ❑ALTERATION ❑ SOLAR RESTAURANT IN THIS
BUILDING?
❑ YES ❑ NO
WILL PENETRATIONS MADE IN FIRE RESISTIVE CONSTRUCTION?
❑ YES, WILL REQUIRE A PLAN REVIEW ❑ NO
TYPE OF FUEL ❑ OIL ❑ NATURAL GAS ❑ LPG
DESCRIBE WORK.
NO TYPE OF EQUIPMENT FEE
ti
Forced Air Systems — Gravity Systems — B T U.
Wall, Suspended Or Unit Heaters
Dryer Vent
App liance Vent
Heating, Refrigeration, Cooling, Absorption Unit
ADDITIONAL MECHANICAL PERMIT MAY BE REQUIRED
Repair, Alteration or Addition to Existing System
SPECIAL CONDITIONS:
Boilers (includes vent B T U
Air Handlina Unit C F M
NOTICE
This permit becomes null and void ff work or construction authorized is not
Evaporative Coolers
commenced within 12 months or if construction or work is suspended or abandoned
Ventilation Fan
for a period of 180 days at any time after work is commenced.
Range Hood
Gas "Piping"
I hereby certify that I have read and examined this application and know the same
to be true and correct. All provisions of lam and ordinances governing this type of
work will be complied with whether specified herein or not. The granting of a permit
Gas Log or Appliance
does not presume to give authority to violate or cancel the provisions of any other
state or local law regulating construction or the performance of construction
Other
Fixture Fee
SI NAT F CON RA TO DATE
Permit Fee
r ` _
PRINT NAME
®
r [ �/y
00
S IGNATURE OF OW ER (IF OWNER BUIL E )
DATE
SUBTOTAL
PERMIT VALIDATIO
Use Tax
-
APPLICATION
HPC:
PLANS
APPROVED FOR
Date
Receipt #
TOTAL FEE
ACCEPTED:
CHECKED
I SU N CE
BY
BY
B/I
Z�I a
��
/ C/ OO
e!/
DA1 .
DATE:
DATE.
DI O
I
•
PAY NT dF PITKIN COUNTY USE TAX
The General Contractor or Owner Builder is required to pay a Use Tax Deposit to Pitkin County (.5 %) on the building permit valuation at time of issuance. All sub - permits
pulled under a building permit are paid by this deposit payment and should not pay Use Tax Stand alone sub - permits are required to pay a Use Tax Deposit to Pitkin County
(.5 %) Deposit 5% of 50% of project valuation
Project Valuation (includes labor $ o 5 Exempt: Exempt Organization Exempt ID #
Propert liens may be placed on the owner's and/or the contractor's property when Use Tax is not paid.
Plumbing /Mechanical Permit is being issued on the condition that all items requested are on the approved plans. Any deviation shall require a
change order /or removal at the applicant's expense. ALL PLUMBING & MECHANICAL PERMITS ARE REQUIRED TO BE ON THE JOB SITE. If the
equipment is being installed on an historic property or within an historic district, you must submit plans and /or elevations indicating the location of
the equipment, as well as the exact dimensions of the unit being installed.
CJ U' ;A18
ELECTRICAL PERMIT APPLICATION 3
PITKIN COUNTY ❑ COMMUNITY DEVELOPMENT DEPARTMENT CITY OF ASPEN ❑
970 /920-5526 130 South Galena 970 / 920 -5090
970 / 920 -5532 Inspection Line Aspen, CO 81611 rte/ 970 / 920 -5448 Inspection Line
D�J T%o�OO r T �'
JOB ADDRESS (# AND STREEM
OWNE P
ELECTRICAL O TRA OR MA NG ADDRESS IP PHO E SOLO LIC #
� PERMIT #
007 aoo7..P
O CUPANCY GROUP
$ E CTRICAL VALUATION
a DOO
QUAR OTAGE
D
TTS OF BUILDING L COMMERCIAL ❑ SIDENTIAL —
CLASS OF WORK FE ADDITION ❑ ALTERATION NEW ❑ CONSTRUCTION SERVICE ❑ OTHER
DESCRIBE WORK IN DETAIL (FOR ADDITIONS, ALT RATIONS, INDICATE TYPE, NUMBER AND LOCATION OF SOURCE OF CIRCUITS
C
OWNER/APPLICANT. The undersigned applicant to personally perform electrical work on the described property or residence hereby certifies, as a condition of
issuance of such permit, that the above described property or residence is owned by the applicant: that the applicant is not engaged in the business of construction or
remodeling: and such property is not Intended for sale or resale, nor is It rental property (occupied or to be occupied by tenants, whether transient or permanent), nor
will It be generally open to the public. It is understood that compliance with these assurances is a condition of the issuance of an electrical permit to the applicant pur-
suant to the provisions of C.R S. Section 12 -23 -111 (2) (as amended), and that failure to comply herewith will be grounds for revocation of the electrical permit or any
certificate of occupancy su wit s ect t he property or residence described.
Applicant: Date —�
PAYMENT OF PITKIN COUNTY USE TAX
❑ MONTHLY OR QUARTERLY RETURNS WILL BE SUBMITTED
USE TAX PERMIT FEE DOUBLE
,/ 0
DEPOSIT METHOD ' /.of 1% OF MATERIALS VALUATION PAID NOW AT ISSUANCE A FINAL REPORT ON
F TOTAL ACTUAL MATERIALS COST MUST BE FILED WITHIN 90 DAYS OF SUBSTANTIAL COMPLETION
$ $
APPROVED BY FIRE MARSHAL DATE
OF WORK AND /OR ISSUANCE OF CERTIFICATE OF OCCUPANCY,
MATERIALS VALUATION $
EXEMPT EXEMPTORGANIZATION
❑
RESALE STATE AND PITKIN
THE DEPOSIT METHOD WILL BE ASSUMED ULESS OTHERWISE NOTED
ANYONE WHO USES AND /OR CONSUMES MATERIALS AND FOCTURES IN PITKIN COUNTY IS SUBJECT TO
APPROVED BY HPC DATE
THE 5% USE TAX,
PROPERTY LIENS MAY BE PLACED ON THE OWNER'S AND /OR THE CONTRACTOR'S PROPERTY WHEN
71
THE USE TAX IS NOT PAID
NOTICE
For all work done under this penult, the permittee accepts full responsibility for compliance with
BU DING PARTMENT ACCEPTANCE
A ev
the National Electric Code, the City of Aspen ordinances, and all other county resolutions, city ordl-
nances, state laws, whichever applies Permit subject to revocation or suspension for violation of
any laws governing same An accepted final electrical inspection shall be obtained prior to using
0
z
the electrical system. A fin electrical Inspection shall be requested within 48 hours after complet-
MIT VALIDATIO
I an electir II On
SIGNATU O! P CANT Q DATE
DAT !!! T E
/���
CEIPT#
TOTAL
INT NAME
O
O
z
D
Z
D
m �
O
z
m
z
C
3
W
m
C r . I WHITE —FILE COPY YELLOW— APPLICANT RavO6dTM9]0
CR ( l o " �4
d l ea
Ll�
AFFIDAVIT OF OWNER- BUILDER
r
Property Address:
ZD 66 so
The owner must sign this affidavit. The undersigned owner - builder as or will satisfactorily
complete the examination for owner - builder.
City of Aspen Ordinance No. 55, Series of 1999. Section 8.12.030. Pitkin County Ordinance No.
61, Series of 1999. Section 10 -4. Issuance of permits only to license holders or agents, and
owner - builders.
(a) On any work requiring a building permit(s), the permit(s) shall be issued only to licensed
contractors, authorized representatives of licensed contractors, and owner - builders.
(b) For purposes of this article, an "owner- builder" is an individual personally engaged in the
construction (new or remodel) of a single - family residence or accessory building for his or
her own use. The following requirements shall apply to owner - builders seeking permits for
construction:
(1) The owner- builder shall not be issued more than one building permit for new home
construction in any two year period and not more than one building permit at a time;
(2) The owner- builder has read applicable regulations and provisions of this article and
applicable state law and affirmed in writing that the proposed project will comply with
all such requirements;
(3) It is the responsibility of the owner - builder to see that all paid personnel shall be covered
by worker's compensation insurance as required by state law;
(4) The owner - builder must be present at the worksite during all inspections and conferences
with the Building Division, unless prior arrangements have been made with the building
officials.
In the event that any of the requirements listed above are not met at any time during the course of
a permitted project, the Chief Building Official may suspend or revoke the owner- builder's
permit. In the case of a suspended building permit the owner - builder shall have a reasonable time
to correct the problem. If not corrected within the time period, the permit may be revoked. In the
case of either a suspended or revoked building permit, the owner - builder may ask for a review at
the next scheduled building code Board of Appeals meeting.
All of the foregoing representations are true and correct. The owner - builder acknowledges and
intends reliance on the representations in this affidavit as a basis for the issuance of a building
permit for the project 1
t -f
Owner-builder's signature ` Print Name
OY j w
Date
jo 1 ' ! _ 10
InspCList.rpt
917/2010 g:06:04AM
Inspection Check List
PITKIN COUNTY
Inspection Line:920 -5532
Page: 5
Inspection Schedule for brianpa
Scheduled for September 07, 2010
Permit No: 0027.2007.PRBU
Type: 133 FINAL BUILDING INSPECTION
Notes:
Time: 12:00
DESCRIPTION:# StoriesGarage:Attached_Detached Carport Bedrooms Full Bath 3/4
Baths 1/2 Baths_ Kitchen_ ACCESSORY UNIT:Living Kitchen Bath
Bedroom Other: Fireplace: Maker: Gas
Appliance: Maker: Gas Log:
Inspection Resu s
1 -Accepted 2 - Accepted as Not4w 3 - Rejected 4 - Partial /Not Complete
Reinspection Fee $$$
Comments:
CQVIf ID>% l N 51 U 01 p Vrc av I t�p-�
This inspection report is accepted with the understanding that the inspection does not in any way constitute a guarantee, warranty
of merchantability or fitness for a particular purpose, express or implied warranty of habitability, or assurance in any way of the
safety of the structure(s) and system(s) inspected, nor shall this inspection be construed to relieve or lessen the responsibility of
the person(s) responsible for performing the work. Additionally, neither this inspection nor this inspection report is a substitute for
complete inspection by the owner or subsequent buyer or occupant. Pursuant to state law the owner is responsible for inspection
and maintenance of the structure and systems.
Date{ Signature ofApplican�
Dateg r Signature of Inspector
Address Contact Name:
219 WOODY CREEK PLZ
Print
Print Name rQ+.�
Contact # (970) 948 -7887
Contractor: OWNER/ BUILDER u, ]' l 1 Owner: ORTEGA Page: 5
InsPCList.rvt Inspection Check List Page: 2
17."1'2010 8:32:52AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule for brianpa
P
Scheduled for July 13, 2010
ermrt#
0027.2007. PRB U
Type: 133 FINAL BUILDING INSPECTION
Notes:
DESCRIPTION:# Stories _Garage:Attached_Detached Carport
Bedrooms Full Bath_3 /4 Baths 1/2 Baths Kitchen ACCESSORY
UNIT:Livina KitrhPn P.th ova...,....
ace:Maker: Gas
Log:
Comments:
1 - Accepted 2 -Accepted as Noted _ 3 - Rejected
Reinspection Fee $
Time: 1200
4 - Partial /Not Complete
6 6 ,� L,- 7/13/0
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA
00 j012
Page:2
Ins - +rpt Inspection Check List Page: 10
5112/2010 8:36:48AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule for tomp
Scheduled for May 12, 2010
Permit#
0154.2008 PELE
Type: 226 FINAL ELECTRICAL
Notes:
-TV6--77?U'J P+YS'�
Time: 12:00
Comments:
1 - Accepted 2 - Accepted as Noted
Reinspection Fee $
3 - Rejected
15 116
4 - Partial /Not Complete
Add ress Contact Name: buddy Contact #
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA
FI`,
(( la q ; 1 -`
Page: 10
InsPCList.rpt
4/712010 8:45:02AM
Inspection Check List
COUNTY OF PITKIN
Inspection Line:920 -5532
Page: 4
Inspection Schedule for tomp
Scheduled for April 07, 2010
Permit#
0154.2008. PELE
Type: 226
Notes:
FINAL ELECTRICAL
Comments:
1
Time: 12:00
1 -Accepted
Rf
2 - Accepted as Noted 3 - Rejected
411-711 1?
4 - Partial /Not Complete
Add Contact Name: buddy Contact # (970) 948-7887
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA Page: 4
30 ;;14
Insi3CList.n3t Inspection Check List Page: 12
112.412009 7:45:31AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule for tomp
Scheduled for November 24, 2009
Permit#
0154.2008. PELE
Type: 226 FINAL ELECTRICAL Time: 12:00
Notes: please call ahead and make arrangements
Comments:
1 - Accepted 2 - Accepted as Noted 3 - Rejected /\ 4 - Partial /Not Complete
Reinspection Fee $
Address Contact Name: Buddy Contact # (970) 948-7887
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA Page 12
70, 1 `:1 1
InspCList.rpt
613 'zn10 8:33:10AM
Inspection Check List
COUNTY OF PITKIN
Inspection Line:920 -5532
Page:1
Inspection Schedule for joannas
Scheduled for June 03, 2010
Permit#
0027.2007. PRBU
Type: 501
Comments:
Notes:
Time: 12:00
ZONING INSPECTION
1 -Accepted 2-
Reinspection Fee $
Accepted as Noted _ 3 - Rejected 4 - Partial /Not Complete
� U
Address Contact Name: Buddy Contact
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA Page: 1
InspCList.rpt
0/2/2010 8:44:12AM
Inspection Check List
COUNTY OF PITKIN
Inspection Line:920 -5532
Page: 13
Inspection Schedule for catherin
Scheduled for June 02, 2010
Permit#
0027.2007. PR B U
Type: 502
Notes:
Comments:
PLANNING ENGINEER INSPECTION
Time: 12:00
1 - Accepted 2 -Accepted as Noted 3-Rejected 4 - Partial /Not Complete
Reinspection Fee $
3/-
11
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER
Owner: ORTEGA
Page: 13
RURAL AREA RESIDENTIAL GMQS TRACKING WORKSHEE
y�
Parcel I D g -?�q -3 - 1 �[� if C0 050 Perr 3712007•
Vested as of June 19, 2000 and Still Vested? Rural Area Sub -Area
❑ Yes ❑ Roaring Fork
No ❑ Crystal River
FryiCg Pan
Legal Status W
:1 Pre -1978 Legally Created, Not Merged Parcel or Subdivision Lot
❑ Post -1978 35 acre Roaring Fork or UGB parcel
❑ Pre -June, 2000 BOCC Approved Subdivision
❑ Pre - January, 2000 Crystal or Frying Pan 35 acre Parcel
Post -June, 2000 Subdivision Lot or 35 acre Parcel
Exemption from Competition
❑ 5750 Exemption ❑ Agricultural Building
:1 1000 sq ft. Addition ❑ TDR
❑ Remodel ❑ Historic Preser aticn
❑ Reolacement —ems AH Zone Distn,as
❑ Category 1-4 Not in AH Zone (Density Bonus only) ❑ R O
❑ CDU (Density Bonus only) ❑ Large Lot (500 ac & RS'
Existing Floor Area 70 sq. ft.
+ Proposed Floor Areasq, ft
= Resultant Floor Area sq, ft.
Exempt Ag Floor Area n sq. ft.
Exempt Sub -grade
or Garage Floor Area 0 sq. ft
of Units Approved by Permit
Amount of 5750 Exemption Used by All Development on Property sq, ft.
Amount of 1000 s Exemption Used by Permit sq
otai Floor Area Exempt b R(s) sq. ft
Floor Area Exempted by TDR Used by mit sq ft
TDR Certificate
GMQS Approval»
Additional Floor Area
Allocated for Additional Floor Area Used sq. ft.
F oor Area for New Developmen
Allocated Floor Area Allocation for New Development Used sq ft
6
d 62c i��cxk { dklk
0 A� f jD"-' �
1 -Z -"
-J w 4AO
�I cn cam, k fa A _'
X Z(D = U7
-----
2C, 3W
Prescriptive Package Worksheet
Energy Conservation Code (IECC)
Builder Name fit/
Builder Address
1
Building Address
Proposed
comments R -Value
e�ra�
Zone Number Pack Number L- IECC Edition A 7
Submitted By �,' - Phone Number c f ✓
Glazing Area
loo I (5.5 = 175
Glazing Area Gross Wall Area
R -Value
D) ffintinn
Ceiling
y
R- 32
Wall
R-
Floor Over Unconditioned Space
R-
Floor Over Outside Air
R-
Basement Wall�
R- -2-
Slab Floor
R- 4
CrawiSpaceWall
�V�` } o IGt
R-
U- Factor
Description
Proposed
Comments U -Factor
Glazing
y
U-
Opaque Door
U-
Equipment EfficienCY (This section may be left blank if Normal is selected on the right.)
Heating AFUE/HSPF
Cooling SEER
& Model Number
Enforcement Agency:
Permit #
Checked By
Date
I - Z %
Maximum Glazing Area
Minimum
R -Value
R- 3
R 4
R- 1C'
R- 38
M
Maximum
U -Factor
U- .3:�
u- 0.35
Check One
Normal
• High Heating
• High Cooling
• High Heating & Cooling
Statement of Compliance: The proposed building design represented in these documents is consistent with the building plans, specifications,
and other calculations submitted with the permit application. The proposed building has been designed to meet the requirements of the
International Energy Conservation Code..
L %
Proposed Glazing Area
City ofAspen /
Pitkin County Pitkin County
T� Cm of Asr¢x
Efficient Building Prozram
OWNER:
PROJECTADDRESS:
PARCEL ID #.' qtr'
r't
CONTACT NAME:
CONTACT NUMBER:
V
CONTACT E -MAIL ADDRESS:
PERMIT #: 7 4 %., ' Y, n ', 4
P,�U t t
(circle all that apply)
TYPE OF PROJECT. NE SCRAPE -OFF ADDITION
New constructionsquare footage: ; 1, ! Points required:
Interior remodel square footage: Points required:
Additionsquare footage: :; i!� Points required:
Detached garag sq uare footage: Points required:
TOTAL POINTS REQUIRED
I
ITOTAL POINTS ACHIEVED
i
X °
i P lease
o
City ofAspen/Pitkin County Efficient Building Program Checklist
W
c
o
read the EB Guidelines prior to completing the Checklist. The
EB Guidelines serve as the official code document for this program.
LEGEND
o
21
= Shaded box indicates mandatory compliance for all projects (14 for new houses 121 for additions /remodels)
z
C7
70
= Dark outline indicates mandatory measures for publicly- funded affordable housing projects (PFAH)
N
z
S
= Self - certified (Applicant's signature on this checklist serves as certification.)
0
U
1 -5
= Inspected (PC: Plan Check, 1 Foundation, 2. Framing; 3 Insulation, 4. Rough -in; 5: Final)
a
Co
P
= Prerequisite (These measures must be achieved for the subsequent points to be earned.)
z
Quantity Levels
= QL 1 = 10% - 25 %; QL 2 = 26% - 50 %; QL 3 = 51% - 75 %; QL 4 = 76% - 100%
2.0 DECONSTRUCTION / DEMOLITION & CONSTRUCTION DEBRIS RECYCLING
PC_
1
3,
4 -37
3
21 Deconstruction Plan submitted with permit application (remodels and /or scrape -offs only)
22 IDemolition debris reduced (4 points required of remodels and /or scrape -offs; select from 2.2.1 - 2.2 6)
2.2.1 Wood recycled / composted ( >- 75% of all wood)
1
3
2.2.2 Metal recycled ( z 90% of all metals)
1
3
22.3 Concrete recycled ( x 75% of all concrete)
1
2
22.4 Carpet pad recycled (90% of all carpet pad)
1
2
2.2.5 Compaction (grinding, shredding, crushing, etc.)
1
6.24
22.6 Material salvaged for reuse (6 points per level)
S 1
S
1 3
4-10
14
12.3 Deconstruction materials donated to a non -profit organization
2.4 Construction debris recycled (4 points required of all new construction & PFAH projects, select from 2 4 1 - 2.4 3)
241 Wood scrap recycled / composted (1 point per Quantity Level)
S 1
2
1 24.2 Metal scrap recycled ( 2 90% of all unused metals)
S 1
14
1 24.3 Cardboard recycled It point per Quantity Level)
(( 2 Edition 9/03 City of Aspen / Pitkin County Efficient Building Program Page 1
.
2 Edition 9/03 City of Aspen / Pltkin County Efficient Building Program Page 2
J f12
USE OF RESOURCE EFFICIENT MATERIALS Part Il of section 2.0
S
5 -20
2.5 Reclaimed lumber (5 points per Quantity Level)
S
5 -20
26 Reclaimed exterior trim / siding / interior trim / flooring (5 points per Quantity Level)
S
1-4
2.7 Recycled- content carpet (1 point per Quantity Level)
S
1-4
2.8 Recycled- content in decking materials (1 point per Quantity Level)
S
1-4
29 Recycled- content sheathing (1 point per Quantity Level)
S
1-4
2.1 Recycled- content or fiber cement siding (1 point per Quantity Level)
S
1-4
2.11 Recycled - content ceramic tile (1 point per Quantity Level)
S
1.4
2.12 Recycled - content roofing (1 point per Quantity Level)
S
2 -8
2.13 Rapidly
renewable content flooring used (2 points per Quantity Level)
S
2
2.14 Built
-in kitchen recycling center to include two or more bins
Sub Total
1
1 -3
3
3.0 LAND USE AND WATER CONSERVATION
3.1 Simple Footprint
3.1.1 5 4 exterior corners (no points for 3 1 2 or 3 1.3) -
1
2
31.2 5 6 exterior corners (no points for 3 1.1 or 3 1.3)
1
S
1
1 -5
1
31.3 `- 8 exterior corners no points for 3.1.1 or .
3.2 Xeriscape Landscaping (2 points required of all PFAH projects; select from 3.2.1 - 3.2 5))
3.21 Addition of organic material to and aeration of soil
S
1
3.2.2 Reduction of turf areas ( 5 25% of landscaped area or 3000 sq. ft. whichever Is smaller)
S
1
3.2.3 All planting beds mulched with wood chips at least 2" deep
S
,•,'
1
3.2.4 Appropriate use of low- water - demand plants
S
5
1
1 -13
1
3.2.5 Zoned irrigation system
3.3 Water conservation by performance (2 points required of all PFAH protects, select from 3.31 - 3 34)
3.3.1 One point for each gallon per minute savings over code requirements
5
1-4
3.3.2 _! -flush toilet - (1 point for each Toilet, no credit for toilet under 3.3.1)
5
2 -8
3.33 Composting toilet (2 points for each toilet, no credit for toilet under 3.3.1)
5
a
1
3.34 Only one showerhead in all showers
5
,.y
5
14 Drip Irrigation or no irrigation
5
1 1.4 13.5
Engineered /vegetated swales to filter stormwater runoff (1 point per Quantity Level of filtered run -off)
5
1
1 1.10
3.8
j
3
3.6 Planting trees beyond required trees (1 point for every tree over requirement)
3.7 Save and reuse all topsoil and /or excavated fill on site
17.1 Topsoil reused on site (Indicate storage location on site plan )
1
'�
5
372 100% of excavated fill reused on site (Indicate storage location on site plan )
S
`?
2.8
3 8 Site -rock reclaimed on site (2 points for per level, Indicate storage location on site plan.)
S
4
3.9 Non - potable water used for irrigation
S
2 -8 1
3 1 Pervious materials in "hardscape" areas (2 points per Quantity Level)
Sub Total
2
242141
3-121
4.0 FRAMING & MATERIALS
Incorporate optimal value engineering (OVE) framing techniques (6 points required of all PFAH projects)
41.1 24" O.C. studs (3 points per Quantity Level for all framing)
2
I
2.8
41.2 Two -stud corners (2 points per Quantity Level for all framing)
2
2 -8
4.1 3 Efficient headers (2 points per Quantity Level for all framing)
2
2 -8
41 4 Stacking joists /studs - eliminating double top plate (2 points per Quantity Level)
2
3
4.1.5 Building with 2' increments ( ? 75% of footprint)
PC
3
4.1 6 All framing members shown on drawings in plan and elevation
2
14
1-4 14.2
Oriented Strand Board in subfloors (1 point per Quantity Level)
2
1.4 143
Oriented Strand Board in wall sheathing (1 point per Quantity Level)
2
2 -8 144
Low -toxic Oriented Strand Board (OSB) (2 points per Quantity Level)
2
2 -8 14.5
Finger- jointed studs or engineered studs for wall framing (1 point per Quantity Level)
S
2
1-4 14.6
2 -88
4.16
Finger- jointed interior trim (1 point per Quantity Level)
4.7 FSC certified material
4.7.1 FSC certified sustainably harvested lumber (4 points per Quantity Level)
5
4 -16
4.7.2 FSC certified cedar shakes and /or shingles (4 points per Quantity Level)
5
4-161
4.7.3 FSC certified trim and flooring (4 points per Quantity Level)
FRAMING & MATERIALS continued on next page
.
2 Edition 9/03 City of Aspen / Pltkin County Efficient Building Program Page 2
J f12
2 nd Edition 9/03 City of Aspen / Pitkin County Efficient Building Program Page 3
r;,j , f 0
J 11 J ._.
4.0 FRAMING & MATERIALS continued
5
4 -16
4.74 FSC certified cabinets (4 points per Quantity Level)
5
4 -16
47.5 FSC certified windows and /or doors (4 points per Quantity Level)
5
2 -8
4.7.6 FSC certified outdoor structures, decking and landscaping forms (2 points per Quantity Level)
2 -68
48 SFI certified material
2
3.12
4.8 1 SFI certified sustainably harvested lumber (3 points per Quantity Level)
5
3 -12
48.2 SFI certified cedar shakes and /or shingles (3 points per Quantity Level)
5
3 -12
4.8.3 SFI certified trim and flooring (3 points per Quantity Level)
5 1
1
3-121
484 SFI certified cabinets (3 points per Quantity Level)
5
3 -12
485 SFI certified windows and /or doors (3 points per Quantity Level)
5
2 -8
4.86 SFI certified outdoor structures, decking and landscaping forms (2 points per Quantity Level)
2
1-4
4.9 Engineered Lumber used in floors and roofs (1 point per Quantity Level) (3 points required of all PFAH projects)
2
2
41 Engineered lumber used to replace 2x10s or 2xl2s for structural applications (z 75% structural material)
2
5 -20
4.11 Structural alternatives to wood -frame construction (5 points per Quantity Level)
2
2 -8
4.12 Structural Insulated Panels (SIP's) used for exterior walls and /or roof (2 points per Quantity Level)
2
1-4
4.13 Factory-built or panelized construction (1 point per Quantity Level)
1
2
4.14 Recycled- content Insulated Concrete Forms (ICF's) used ( 2 75% of all insulated concrete forms)
1
1-0
14.15 Insulated Concrete Forms (ICF's) (1 point per Quantity Level)
S
1
2
416 Non - solvent based foundation waterproofing (100% of foundation wall)
1
3.12
4.17 Frost - protected shallow foundation (3 points per Quantity Level)
1
1 1-4
1 418 20% or more flyash content (1 point per Quantity Level)
Sub Total
5.0 ENERGY MEASURES
PC
1 1.10
5.1 Performance exceeding the Model Energy Code 98 2 standard for APECC (1 pt for every 5% better) (4 pts for PFAH)
S
1 1
15.2 Window quilts or insulated window shades installed (z 75% of all exterior windows)
PC
f
1
153 Mechanical equipment centrally located
5
5
15A Energy Star® house ( 5 star rating on an E- StarTM)
PC
1 3
15.5 Energy 10 analysis
3
1 1
5.6 All ductwork sealed with mastic
3
'f -
5.7 Insulate all hot water pipes to all locations to R -2 5
3
3
58 Unvented crawlspace (conditioned, insulated walls, continuous vapor barrier, no vents, etc.)
5
5
2
5 -10
5
5.9 Side -arm hot water heater
5.1 Energy - efficient boiler or furnace
5.10.1 87% (min ) efficient boiler or 94% (min ) efficient furnace
5
5
5.10.2 Modulating or sequentially staged boilers
5
3
5.11 Outdoor reset thermostat control
5
4
5.12 High - efficiency gas hot water heater (stand alone units only)
PC
3
5.13 Manual J calculations used for sizing mechanical equipment
Sub Total
6.0 PLUMBING
5
2
6.1 Tankless water heater
5
3
6.2 "On- demand" hot water system
Sub Total
7.0 ELECTRICAL
5
1 -10
71 Energy Star® appliances (1 point for each appliance) (2 points required of all PFAH projects)
S
f
1
7.2 Clothesline (indoor or outdoor)
5
3
7.3 Energy - efficient clothes washer (selected from list on www.ceel.org -Tier 2 or higher)
5
'A
1 -10
7.4 Compact fluorescent bulbs (1 point for every 4 bulbs) (1 point required of all PFAH projects)
5
2
7.5 Efficient light controls ( ? 2 interior spaces controlled)
Sub Total
2 nd Edition 9/03 City of Aspen / Pitkin County Efficient Building Program Page 3
r;,j , f 0
J 11 J ._.
2 tf n 9/03 City of Aspen / Pitkin County Efficient Building Program Page 4
8.0 INSULATION
3
1
1 2
181 Wall insulation is 70% recycled material (2:75% of all wall insulation)
3
2
8.2 Roof insulation is 70% recycled material ( >_ 75% of all roof insulation)
3
4
8.3 Blown / sprayed insulation ( 2 50% of all insulation)
3
,�,
2
8.4 Formaldehyde -free or low -toxic insulation (2 50% of all insulation)
1 -10
8.5 Single -pane windows upgraded (additions and remodels only)
5
0.5
1 8.5.1 Double- glazed (no points for 8.5.2 or 8.5.3)
)
1
852 Double- glazed with low -e coating (no points for 8 5 1 or 8.5.3)
0.5
8.5.3 Spectrally - selective film applied to historic windows (no points for 8.5.1 or 8.5 2)
L5 3
7
8.6 Existing ceiling insulated to R -38 or to capacity (additions & remodels only)
5
8.7 Existing walls insulated to capacity or rigid insulation added to exterior (additions & remodels only)
Sub Total
9.0 HEATING VENTILATING AND AIR CONDITIONING HVAC
5
1
19.1 Air destratification system
1 -5
9.2 Natural cooling (1 point required of all PFAH projects)
5
1
1 9.21 Vertical shading devices for east and west- facing glass
5
1
9.2.2 Reflective films on east and west - facing glass or use windows with a SHGC of less than 0.45
3
1
9.23 Radiant heat - reflective barriers installed on roof applications
S
1
9.2.4 Landscaping that shades east and west facing glazing during the summer season (June- August)
5
1
9.2.5 Properly sized overhangs for south facing glazing area
5
5
9.3 No mechanical air conditioning
5
1
9.4 Evaporative cooling (no points for 9.3 or 9.6)
4 -14
9.5 Air infiltration rate below specified levels (Blower Door Test required) (4 points required of all PFAH projects)
5
4
9.5.1 0.40 NACH (Natural Air Changes per Hour)
5
6 -14
95.2 5 0.35 NACH (2 additional points for every .05 NACH reduction)
5
2
96 Whole -House Fan cooling (no points for 9.3 or 9.4)
5
10
9.7 Convert electric resistance heat to gas (additions & remodels only)
5
4
9.8 Replace electric water heater with a gas water heater (additions & remodels only)
5
3
9.9 Hydronic heat ( z 50% of heating system; no points for 9.7)
5
8
9.1 Air to air heat exchanger
Sub Total
10.0 SOLAR
10 -20
10.1 Passive solar space heating
PC
P
10.1.1 South facing glazing is oriented within 30 degrees of east or west of true south.
PC
P
10.1.2 Properly sized overhangs (see Section 9.25 for sizing calculation).
PC
P
10.1.3 Solar access is unimpeded under easements, covenants, or other private agreements
PC
10
10.1 4 Suntempered design
PC
20
10.1.5 Passive solar design
5
1
10 110.2
Solar heating system for domestic hot water (no points for 10.3 or 10.4)
5
1
2 110.3
Active solar pre - plumbing (no points for 10 2 or 10.4)
5
1
15 110.4
Active solar space heating combined with solar domestic hot water system (no points for 10.2 or 10.3)
10 -80
10.5 Solar - generated electricity
5
10
10.5.1 System size of 1 kW
5
15 -80
10 5.2 System size of 2 1 5 kW (5 additional points for every 5 kW supplied, with a 8 kW maximum)
Sub Total
11.0 INDOOR AIR QUALITY
S
1-4
11. 1 Low VOC and /or low -toxic interior paint (1 point per Quantity Level) (2 points required of all PFAH projects)
S
1 1112
Solvent -free and /or low-toxic construction adhesives
2 -5
11.3 High efficiency air filter
5
2
11.3 1 High efficiency pleated (electrostatically - charged) air filter
5
5
11.3.2 High Efficiency Particulate Air (HEPA) filter
5
3 11.4
Rough -in for radon mitigation (no points for 11.5)
5
5 Ill
5 Radon mitigation system completed (no points for 11 4)
S
1-4 Ill
6 Solvent -free andlor low -toxic wood finishes (1 point per Quantity Level)
INDOOR AIR QUALITY continued on next page
2 tf n 9/03 City of Aspen / Pitkin County Efficient Building Program Page 4
2 Edition 9/03 City of Aspen / Pitkin County Efficient Building Program Page 5
11.0 INDOOR AIR QUALITY continued
S
'; t� fj
1-4 111.7
Low toxic floor coverings (1 point per Quantity Level)
5
-? - 1
3 1118
Carbon monoxide detector
5
1 1
5-10111.9
Non - atmospherically vented (sealed combustion) gas furnace, boiler, or water heater (5 pis required for PFAH)
3
2 Ill
1 Sealed mechanical room
5
5 1
11.1 Exhaust fan in attached garage or no attached garage
S
n
5 Ill
12 Elimination of all particleboard inside envelope of house
S
11
3 111.13
Elimination of all mdf made with urea - formaldehyde used inside envelope of house
S
2
11.14 All exposed particleboard sealed
5
5
11.15 America, Lung Association "Health House"
5
i'
4
11.16 Mechanical Ventilation
Sub Total
12.0 INNOVATION POINTS
PC
12.1 Innovative product or design points
5
12.2 Alternative fuel infrastructure for vehicle use
PC
415
12.3 Location - efficient project
5
12.4 Ground source heat pump - wind power fee
Sub Total
TOTAL POINTS
APPLICANT'S
SIGNATURE:
PRINT NAME:
TITLE:
NOTE: Signature indicates the applicant will con. ply with stated requirements.
« a a FOR OFFICIAL USE,ONLY » » »
PC
Plan Check approval by: Date:
1
Foundation Inspection Approval by: Date:
2
Framing Inspection Approval by: Date:
3
Insulation Inspection Approval by: Date:
4
Rough -in Inspection Approval by: Date:
5
Final Inspection Approval by: Date.
Efficient Building Prozram
Deconstruction Plan
2.1 Required for additions, remodels, or scrape -offs only.
Project Address:
Submittal Date:
Contractor:
Phone:
Property Owner:
Date of Demo:
Project Description:
Project Size (sq ft)
Deconstruction Contact:
Phone:
DECONSTRUCTION PLAN continued on next page
2 Edition 9/03 City of Aspen / Pitkin County Efficient Building Program Page 5
1. Is the project a partial or complete demolition /deconstruction?
Partial Complete
2. How much of the structure will be demolished /deconstructed?
s 1000 sq ft s 2000 sq ft s 3000 sq ft >_ 3000 sq ft
3. Lumber, metal, doors, windows, concrete, cabinets and some appliances can be recycled or donated for re -use. Do
you intend to deconstruct project for materials recovery?
Yes No (If No, go to question 5)
Refer to the Efficient Building Program Resource Guide for a list of local deconstruction resources or for a list of
deconstruction materials accepted locally
4. If you intend to deconstruct, who will be performing the work?
Contractor Name & Phone Number:
Method of disposition: Donatation? Recipient:
5. Will demolition waste be recycled?
Yes No
6. What types and amounts of reusable or recyclable materials will this project generate? (Please complete table.)
Deconstruction Material Table
Material
Estimated
volume (sq yd)
Reuse by
contractor
Available
to others
Recycled
Landfill*
(compacted)
Other
Ex lain
( p )
Dirt Debis
Lumber
Structural Members
Wood Trim
Misc. Wood
Metal
Drywall
Concrete
Asphalt
Brick
Other Masonry
Cabinets
Appliances
Tile
Windows
Doors
Carpet
Carpet Pad
* If you choose not to deconstruct or recycle your demolition debris, it must be compacted prior to
leaving the site.
The city of Aspen and Pitkin County are interested in increasing reuse of deconstruction waste and
reducing the amount of all construction and demolition waste sent to the landfill. By completing this
form you provid usef i and qualify for this program
2nd Edition 9/03
City of Aspen / Pitkin County Efficient Building Program
Page 6
f,
GVr /��
Hepworth- Pawl
5020 County Roak ad Geotechmcal, inc.
Glenwood Springs, Colorado 81601
Phone 970 - 945 -7988 8
�O
2 $20
HEPWORTH- PAWLAK GEOTECHN[CAL
Fax: 970. 945 -8454
email- hpgeo @hpgeotech.com
�^
GEOTECHNICAL ENGINEERING STUDY
PROPOSED RESIDENTIAL DEVELOPMENT
WOODY CREEK MOBILE HOME PARK
UPPER RIVER ROAD
PITKIN COUNTY, COLORADO
JOB NO. 106 0640
AUGUS i'23, '
PREPARED FOR:
WOODY CREEK MOBILE HOA
ATTN: LANNY CURTIS
P.O. BOX 95
WOODY CREEK, COLORADO 81656
Parker 303 -841 -7119 • Colorado Springs 719 - 633 -5562 • Silverthome 970 - 468 -1989
'Ju ,' 27
TABLE OF CONTENTS
PURPOSEAND SCOPE OF STUDY .............................................. ..............................
- 1 -
PROPOSED CONSTRUCTION .................... ............................... ... ...............................
- i
SITECONDITIONS ......................................................................... ..............................-
2-
FIELDEXPLORATION ................................................................... ..............................
- 2-
SUBSURFACECONDITIONS ........................................................ ..............................
- 2-
DESIGNRECOMMENDATIONS ..........................................................
I ...................... - 3-
FOUNDATIONS ........................................................................... ..............................
- -
FOUNDATION AND RETAINING WALLS .............................................................
4-
FLOOR SLABS AND TANK SUBGRADE ................................ ...............................
5-
UNDERDRAIN SY STEM ............................................................ ..............................
- 6-
PAVEMENT SECTION ............................................................... ...............................
6 -
SURFACEDRAINAGE ............................................................... ..............................
- 7-
LIMITATIONS ................................................................................. ...............................
8-
iUURE I - LOCATION OF EXPLORATOi:' PEI
_ FIGURE 2 - LOGS OF EXPLORATORY_ PITS__ ..
FIGURE 3 - LEGEND AND NOTES
FIGURES 4 AND 5 - GRADATION TEST RESULTS
0
PURPOSE AND SCOPE OF STUDY
This report presents the results of a subsoil study for a proposed residential subdivision to
be located south of the existing Woody Creek Mobile Home Park, Woody Creek, Pitkin
County, Colorado. The project site is shown on Figure 1. The purpose of the study was
to develop recommendations for the foundation design. The study was conducted in
accordance with our proposal for geotechnical engineering services to Woody Creek
Mobile HOA dated May 30, 2006.
A field exploration program consisting of exploratory pits was conducted to obtain
information on the subsurface conditions. Samples of the subsoils obtained during the
field exploration were tested in the laboratory to determine their classification,
compressibility or swell and other engineering characteristics. The results of the field
exploration and laboratory testing were analyzed to develop recommendations for
foundation types, depths and allowable pressures for the proposed building foundation.
This report sm-mr arizes the data obtained during this study and presents oui wnclusions,
desi _recommendations and othergeotechnical engineering_considerations based on the
proposed construction and the subsurface conditions encountered.
PROPOSED CONSTRUCTION
The proposed residential development will consists of 14 home sites accessed by a
circular roadway. A 200,000 gallon water tank will be located uphill and east of the home
sites. The residences may be above crawlspace or basements. Basement and garage floors
would be slab -on- grade. Grading for the structures is assumed to be relatively minor with
cut depths between about 3 to 9 feet. We assume relatively light foundation loadings,
typical of the proposed type of construction. The water tank will be an above ground steel
structure and located on a ridge east of the home sites and across upper River Road. The
home sites and water tank site are shown on Figure 1.
}� Sob No. 106 0640 C4�9tech
�iS iF
-2-
If building loadings, location or grading plans change significantly from those described
above, we should be notified to re- evaluate the recommendations contained in this report.
SITE CONDITIONS
The home sites are located in a vacant field south of the existing mobile home park.
Vegetation consists of grass and weeds. The ground surface is relatively flat with a slight
slope down to the south. There has been some minor surface disturbance and there are
rumors of extensive fill and trash burial in the western part of the property. A fill berm is
located along the south and west property lines. The water tank is located on a broad
ridge east of the home sites at an elevation of about 7410 feet.
FIELD EXPLORATION
KK
The ;_eld exploration for the prat .i�t ;rss conducted on July 2 !, 1 006, Thirteen
exploratory pits were excavated at the locations shown on Figure 1 to evaluate the
- ui bsurfacE conziitia�: Th"its �erezlugwith a Juhn Deero -t
72OCaclth - pity
were logged by a representative of Hepworth - Pawlak Geotechnical, Inc.
Samples of the subsoils were taken with disturbed sampling methods. Depths at which
the samples were taken are shown on the Logs of Exploratory Pits, Figure 2. The samples
were returned to our laboratory for review by the project engineer and testing.
SUBSURFACE CONDITIONS
Graphic logs of the subsurface conditions encountered at the site are shown on Figure 2.
The subsoils typically consist of about one foot of topsoil overlying slightly silty sandy
gravel with cobbles and small boulders. Up to 3' /z feet of apparent fill was encountered at
the water tank site overlying the sandy gravel with cobbles and small boulders. Trash
was encountered in the fill at Pit 9.
a 6 ;'
'31j Job Na 106 0640 G<R�U�—
- 3 -
Laboratory testing performed on samples obtained from the pits consisted of gradation
analyses. Results of gradation analyses performed on samples (minus 5 inch fraction) of
the coarse granular subsoils are shown on Figures 4 and 5.
No free water was encountered in the pits at the time of excavating and the subsoils were
slightly moist.
DESIGN RECOMMENDATIONS
FOUNDATIONS
Considering the subsurface conditions encountered in the exploratory pits and the nature
of the proposed construction, we recommend the buildings be founded with spread
footings bearing on the natural granular soils. The tank can be supported on a prepared
Z. !:6"ndr. �;pic. ;l of steel tailk construction.
The desi and ��str�i �ti t�ri�a p�eserted below shouhi be observed - for - a spread -
footing foundation system.
1) Footings placed on the undisturbed natural granular soils should be
designed for an allowable bearing pressure of 3,000 psf. Based on
experience, we expect settlement of footings designed and constructed as
discussed in this section will be about 1 inch or less.
2) The footings should have a minim width of 16 inches for continuous
walls and 2 feet for isolated pads.
3) Exterior footings and footings beneath unheated areas should be provided
with adequate soil cover above their bearing elevation for frost protection.
Placement of foundations at least 42 inches below exterior grade is
typically used in this area.
4) Continuous foundation walls should be reinforced top and bottom to span
local anomalies such as by assuming an unsupported length of at least 10
Sob No. 106 0640
31
e�
feet. Foundation walls acting as retaining structures should also be
designed to resist a lateral earth pressure corresponding to an equivalent
fluid unit weight of at least 45 pcf for granular soils as backfill.
5) All existing fill, topsoil and any loose or disturbed soils should be removed
and the footing bearing level extended down to the relatively dense natural
granular soils. The exposed soils in footing area should then be moistened
and compacted.
6) A representative of the geotechnical engineer should observe all footing
excavations prior to concrete placement to evaluate bearing conditions.
FOUNDATION AND RETAINING WALLS
Foundation walls and retaining structures which are laterally supported and can be
expected to undergo only a slight amount of deflection should be designed for a lateral
earth pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcf
V11 ^, backfill consisting of the on -site granular so ls. "-a.::; k vei retaining 4 uctures
wch are separate from the residences and can be expected to deflect sufficiently to
_ — mobilize active - earthpressureF - canzlitian should be designed - fora lateral eur
pressure computed on the basis of an equivalent fluid unit weight of at least 40 pcf for
backfill consisting of the on -site granular soils.
All foundation and retaining structures should be designed for appropriate hydrostatic and
surcharge pressures such as adjacent footings, traffic, construction materials and
equipment. The pressures recommended above assume drained conditions behind the
walls and a horizontal backfill surface. The buildup of water behind a wall or an upward
sloping backfill surface will increase the lateral pressure imposed on a foundation wall or
retaining structure. An underdrain should be provided to prevent hydrostatic pressure
buildup behind walls.
Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum
standard Proctor density at a moisture content near optimum. Backfill in pavement and
Job No. 106 0640
C�c3tech
;�32
-5-
walkway areas should be compacted to at least 95% of the maximum standard Proctor
density. Care should be taken not to overcompact the backfill or use large equipment
near the wall, since this could cause excessive lateral pressure on the wall. Some
settlement of deep foundation wall backfill should be expected, even if the material is
placed correctly, and could result in distress to facilities constructed on the backfill.
The lateral resistance of foundation or retaining wall footings will be a combination of the
sliding resistance of the footing on the foundation materials and passive earth pressure
against the side of the footing. Resistance to sliding at the bottoms of the footings can be
calculated based on a coefficient of friction of 0.50. Passive pressure of compacted
backfill against the sides of the footings can be calculated using an equivalent fluid unit
weight of 400 pef. The coefficient of friction and passive pressure values recommended
above assume ultimate soil strength. Suitable factors of safety should be included in the
design to limit the strain which will occur at the ultimate strength, particularly in the case
of passive resistance. Fill placed against the sides of the footings to resist lateral loads
should be coir::ducd io. al least 95% of ih:: maximum standard Procto- 1, - ..sily r'
moisture content near optimum.
FLOOR SLABS AND TANK SUBGRADE
The natural on -site soils, exclusive of topsoil, are suitable to support lightly loaded slab-
on -grade construction and the tank floor and bearing plate. To reduce the effects of some
differential movement, floor slabs should be separated from all bearing walls and
columns with expansion joints which allow unrestrained vertical movement. Floor slab
control joints should be used to reduce damage due to shrinkage cracking. The
requirements for joint spacing and slab reinforcement should be established by the
designer based on experience and the intended slab use. A minimum 4 inch layer of free -
draining gravel should be placed beneath basement level slabs to facilitate drainage. This
material should consist of minus 2 inch aggregate with at least 50% retained on the No. 4
sieve and less than 2% passing the No. 200 sieve. A minimum 8 inch layer of CDOT
Class 6 aggregate base course should be placed below the tank floor.
1 i �� Job No 106 0640 C - E�&eCh
�s
Any existing fill below building and tank areas should be removed. Required fill
materials for support of floor slabs, the tank subgrade and base course placed below the
tank should be compacted to at least 95% of maximum standard Proctor density at a
moisture content near optimum. Required fill can consist of the on -site granular soils
devoid of vegetation, topsoil and oversized rock.
UNDERDRAIN SYSTEM
Although free water was not encountered during our exploration, it has been our
experience in mountainous areas that local perched groundwater can develop during times
of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create
a perched condition. We recommend below -grade construction, such as retaining walls,
crawlspace and basement areas, be protected from wetting and hydrostatic pressure
buildup by an underdrain system.
The drains should consist of drainpipe placed in the bottem of the wall backfill
surround - e"bov the imvcrt level - with free- drmnmggranular material the drain should
be placed at each level of excavation and at least 1 foot below lowest adjacent finish
grade and sloped at a minim 1% to a suitable gravity outlet. Free - draining granular
material used in the underdrain system should contain less than 2% passing the No. 200
sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The
drain gravel backfill should be at least 1 %2 feet deep.
PAVEMENT SECTION
We understand that asphalt pavement is proposed for the on -site roads. Traffic loadings
for the roads have not been provided and are assumed to consist mainly of automobiles.
The subgrade soils encountered at the site are generally low to non - plastic silty sandy
gravel and cobbles which are considered a relatively good support for pavement sections.
Imported fill needed for the roadway construction should be a sand and gravel soil with a
I ) Job No. 106 0640 G�Lr tach
-7-
minimum Hveem stabilometer `R' value of 50. Based on our experience, an 18 kip
EDLA of 5, a Regional Factor of 2.0 and a serviceability index of 2.0, we recommend the
minim pavement section thickness consist or " D inches of asphalt on 8 inches of base
course.
The asphalt should be a batched hot mix, approved by the engineer and placed and
compacted to the project specifications. The base course should meet CDDT Class 6
specifications. All base course and required subgrade fill should be compacted to at least
95% of the maximum standard Proctor density at a moisture content within 2% of
optimum.
Required fill to establish design subgrade level can consist of the on -site sand and gravel
soils or suitable imported granular soils approved by the geotechnical engineer. Prior to
RE placement the subgrade should be stripped of topsoil, adjusted to near optimum
moisture and compacted to at least 95% of standard Proctor density. The subgrade should
*; b,;1u , ,ofro1k 1 Areas that &i'-a excessively should be uor- ;cte(? . , ofe placing
pavement materials. The subgrade improvements and placement and compaction of base
and as halt materials should ls�mzsm - tDrud (jri a regulurbasi�
p a byazepresentattve uf - - - -
geotechnical engineer. If traffic loadings differ from that assumed, we should be
contacted to reevaluate our pavement recommendations.
The following drainage precautions should be observed during construction and
maintained at all times after the residences have been completed:
1) Inundation of the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95% of the maximum standard Proctor density in
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas.
Job No. 106 D640
-8-
3) The ground surface surrounding the exterior of the buildings and tank
should be sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 6 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in paved areas.
Free - draining wall back-fill should be capped with about 2 feet of the on-
site finer grained soils to reduce surface water infiltration.
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
L=ATIONS
This study has been conducted in accordance with generally accepted geotechnical
engineering principles and practices in this area at this time. We make no warranty either
express or implied. The conclusions and recommendations submitted in this report are
based upon the data obtained from the exploratory pits excavated at the locations
»z dicated on Figure 1, th< Y1 opus a f ye of construction and our experience in
Our services do not include dete finin the presence, prevention or possibility ofmold or
-- - - other biul ogic al contaminants - MOBC - del* eloping the Ifthe chent
concerned about MOBC, then a professional in this special field of practice should be
consulted. Our findings include interpolation and extrapolation of the subsurface
conditions identified at the exploratory pits and variations in the subsurface conditions
may not become evident until excavation is performed. If conditions encountered during
construction appear different from those described in this report, we should be notified so
that re- evaluation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We
are not responsible for technical interpretations by others of our information. As the
project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
Job No. 106 0640 C(�'Stech
-9-
presented herein. We recommend on -site observation of excavations and foundation
bearing strata and testing of structural fill by a representative of the geotechnical,
engmeer.
Respectfully Submitted,
HEPWORTH - PAWLAK GEOTECHNICAL, INC.
Louis E. Eller
Reviewed by:
Steven
LEEIk
,� lob No 1060640
G89tech
G aan6ld I Slid.,dOiVa0 d0 N0UVOO
L9101 991 9910
9 01 lid
9910 — 11 6 A
L lid
L9
\ £9 101 09
b9 101 Z9 9 10
101 lid 101 lid
9b
\ 64 Eb lO- 94
\ 10� 10 Lb £ 101
101 lid
lid
\ Z Ild■
\ 1 lid
1
Of
30H=10 iSOd l
ONIISIX3
3NI 831VM/
a3 SOdOdd
/
Z1 lid
{ ^\
>NNHld3iVM / ;�llld
43SOdOdd
11 lid \ /
>idtld
301O1-1 31190W
>133d0 AGOOM
EWISIX3
N01V1S 3did
ONIISIX3
Ob90 90l
001 = A
TIVOS 31VNIXOHddV
O�
O�
as
a�
r
10
PIT 2 PIT 3 PIT 4
0
iu
L�
5 r
a
0
10
PIT 1
PIT 5
0
PIT 6
PIT 7
PIT 8
q,
i +4 =78
0
- J -200 =5
0
:o
6
LL
5
dr
-
r
a0.0�
d
; +4 =69
a
- J -200 =6
J.,
O
10
PIT 2 PIT 3 PIT 4
0
iu
L�
5 r
a
0
10
PIT 5
PIT 6
PIT 7
PIT 8
0
0
a0.0�
ao-
J.,
LL
13••y.
L
'•,•
e•
G
10
10
PIT 9
PIT 10
PIT 11 PIT 12
PIT
13
0
0
•�'
•;:
+4 =63
- 200=12
w
'8:1
_ J
�:d
•+%
t•d
•; :•
° a
ti
L
5
r
r
o.:4
i o•
- J -200 =6
.'dr
a
m
6
D
1
WATER TANK
10
10
Note: Explanation of symbols is shown on Figure 3.
LOGS OF EXPLORATORY PITS
Figure
2
1060640
C}"1
HErwomx•PwwuK GEd[ECHMCaI.
LEGEND:
®
POSSIBLE FILL; silty clayey sand and gravel with cobbles, medium dense, slightly moist, brown and
red - brown. Construction debris encountered in Pit 9.
TOPSOIL; organic sandy clayey silt with gravel, firm, slightly moist, dark brown.
a, GRAVEL, COBBLES AND BOULDERS (GM -GP); sandy, slightly silty, dense, slightly moist, brown to light
4 brown, subrounded rocks.
Disturbed bulk sample.
_J
NOTES:
1. Exploratory pits were excavated on July 20, 2006 with a trackhoe.
2. Locations of exploratory pits were measured approximately by pacing from features shown on the site plan
provided.
3. Elevations of exploratory borings were not measured and the logs of exploratory borings are drawn to depth.
4. The exploratory pit locations and elevations should be considered accurate only to the degree implied by the method
used.
5. The lines between materials shown on the exploratory pit logs represent the approximate boundaries between
material tvr)ss and transitions may be gradual.
6. No tree water was encountered in the pits at the time of excavating. Fluctuation in water level may occur with time.
7. Laboratory Testing Results:
+4—Percent No-4- sieve– -
-200 = Percent passing No. 200 sieve
1060640
LEGEND AND NOTES
Figure 3
r-) °' °t
ZONING CHECKLIST
Permit # 0027.2007.prbu
Lot 50 Woody Creek Plaza
219 Woody Creek Plaza
Woody Creek, CO 81656
2643 - 161 -06 -050
Woody Creek
Approvals:
Woody Creek PUD
Height
100 = 195
Building Height is OK
Impact Fees
Road Impact fee: 0
Floor Area
Existing:
720
Proposed:
Main: 480
728
Lower: 676
9 -f- I
Crawl space: 364
Total:
1884
TM INSIGNIA IS THE PROPERTY OF Tr.c
nivis
STATE A DO
THE INSTALLER OF THIS UNIT CERTIFIES THAT TO THE BEST OF THE INSTALLER'S
KNOWLEDGE THIS UNIT HAS BEEN INSTALLED IN ACCORDANCE NRlH STATE OF COLORADO
DIVISION OF HOUSING REQUIREMENTS IN EFFECT AT THE TINE OF INSTALLATION.
LOCATION
INST ^.LLcR(f JUihE INSTALLER(S) N0. v
tr `.OU;K S INSTALLER'S)' PHR - --
omm
INSIGNIA N0.
wNY INFOPPMiATION IS ALTEQED
\ \_ E OF C0'.ORA GC
;9J OF ar
_ -du
08- 22 -07; 05: 18ANd;
;970?2E1731 # 7i 8
ASPEN *PITKIN COMMUNITY DEVELOPMENT DEPARTMENT
130 South Galena Street • Aspen, Colorado 81611
Cityof Aspen 970/820 -5090
Ritkln County - 970/920 -5525
BUILDING INSPECTION CHECK LIST pip 2�7,
Inspection Reinspection Partial Complete Permit No. - WOF-1 .f
STEEL (Reber)
❑ ELECTRIC
❑ PLUMBING
❑ MECHANICAL
❑ APECC
❑ BUILDING
Footings
❑ Constr. Service
❑ Underground
❑ Rough
❑ Foundation Insulation
❑ R -Frame
❑ Caissons
❑ Underground
❑ Waste & Vent
❑ Flue(s)
❑ Slab Edge Insulation
❑ Roof Ventilation
• Wall
❑ Rough
❑ Water Pipe
❑ Gas Log
❑ Insulation
❑ Drywall
• Wall Cores
❑ Perm, Service
❑ Gas Pipe
❑ Combust. Air
❑ Glazing
❑ Special
❑ Struc. Slabs
❑ Bonding
❑ Gas Tag
❑ Ventilation
❑ Pool
❑ Mobile Home
❑ Pads
❑ Special
❑ Fire Penetrations
❑ Kitch. Hood
❑ Spa
0 Fire Resistive
❑ Piers
❑ Final
❑ Final
❑ In -Floor
❑ Snowmelt
Roof Coverings
❑ Bond Beam
❑ Final
❑ Final
❑ Zoning
❑ Radon
❑ Final
Accepted Accepted as Noted Rejected ❑ Reinspection Fee $
F-1 You artrequired to make the fol ng corrections on the construction which is now in progress:
C ontact Fire Marshal for sprinkler inspection,
'Reber of footing to be made available for grounding.
'No occupancy or use allowed before certificate of occupancy is issued. UBC'97 Sec 109.1
Note:
Oq
Instructions to Ins
DESCRIPTION: # Stories Garage: Attached Detached: Carport
Bedrooms Full Bath _ 9 /s Baths Yz Baths
ACCESSORY UNIT: Living — Kitchen
Fireplace: Make:
Ni'R�T:7i
Bath
Kitchen _
Bedroom
Gas Appliance: Make:
Gas Log: �p
Contact Phone
�uK� �� 0
Request Received
DATE 11M NAME
Request for M T W Th F am pm TIME:
Date Insp. Inspector
im@Dado a Pre .Inc. nark
InspCList.rpt Inspection Check List Page: 8
9/4/2007 -8:10:55AM COUNTY OF PITKIN Inspection Line:920 -5448
Inspection Schedule for brianpa
Scheduled for September 04, 2007
Permit#
0027 2007.PRBU
Type: 124
Notes:
Comments:
INSPECT WALL
II
Time: 12:00
1 -Accepted_ 2 - Accepted as Noted 3 - Rejected 4 - Partial /Not Complete
Reinspection ee $
Add ontact Name: buaay
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA
Page 8
ASPEN *PITKIN COMMUNITY DEVELOPMENT DEPARTMENT
130 South Galena Street • Aspen, Colorado 81611
City of Aspen 970/920 -5090
Pitkin County 970/920 -5528
BUILDING INSPECTION CHECK LIST
Inspection �( _ Reinspection Partial Complete
Permit No. 427 _ _ 2 0 - 7
STEEL (Rebar)
❑ ELECTRIC
❑ PLUMBING
❑ MECHANICAL
❑ APECC
❑ BUILDING
x Footings
❑ Constr. Service
❑ Underground
❑ Rough
❑ Foundation Insulation
❑ R -Frame
❑ Caissons
❑ Underground
❑ Waste & Vent
❑ Flue(s)
❑ Slab Edge Insulation
❑ Roof Ventilation
❑ Wall
❑ Rough
❑ Water Pipe
❑ Gas Log
❑ Insulation
❑ Drywall
❑ Wall Cores
❑ Perm. Service
❑ Gas Pipe
❑ Combust. Air
❑ Glazing
❑ Special
❑ Struc. Slabs
❑ Bonding
❑ Gas Tag
❑ Ventilation
❑ Pool
❑ Mobile Home
❑ Pads
❑ Special
❑ Fire Penetrations
❑ Kitch. Hood
❑ Spa
❑ Fire Resistive
❑ Piers
❑ Final
❑ Final
❑ In -Floor
❑ Snowmelt
Roof Coverings
❑ Bond Beam
❑ Final
❑ Final
❑ Zoning
❑ Radon
❑ Final
Accepted ❑ Accepted as Noted ❑ Rejected Reinspection Fee $
El You are required to make the following correctio son the construction which is now in progress:
* Contact Fire Marshal for sprinkler inspection.
*Rebar of footing to be made available for grounding.
*No occupancy or use allowed before certificate of occupancy is issued. UBC'97 Sec 109.1
Note:
Instructions to Inspector:
DESCRIPTION: #Stories Garage: Attached Detached: Carport
Bedrooms _ Full Bath _
ACCESSORY UNIT: Living
Fireplace: Make:
Owner 0
Irdeperidence Press.lz. �) ; t / 7
3 /a Baths Yz Baths Kitchen _
Kitchen Bath Bedroom
Gas Appliance: Make:
Gas Log:
ContactPhoneL" 7 F"7
Request Received O _//,> _C) /
GATE TIME NAME
Request to T W Th F m pm T
Date In Inspector t
avos
InspCList.rpt Inspection Check List Page: 1
V912 W11:48:51AM COUNTY OF PITKIN Inspection Line:920 -5448
Inspection Schedule for brianpa
Scheduled for January 09, 2008
Permit#
0027.2007.PRBU
Type: 128 INSPECT ROUGH FRAMING
Notes:
Time: 12:00
Comments:
1 -Accepted 2 - Accepted as Noted 3 - Rejected 4 - Partial /Not Complete
Reinspection Fee $
219 WOODY CREEK PLZ
M �uP A-f coq_
N
Cont for 8 OWNER/ BUILDER Owner: ORTEGA Page: 1
`� 1 <c
InspCList.rpt Inspection Check List Pape: 2
5/2/x&°$ :13:46AM COUNTY OF PITKIN Inspection Line:920 -5448
Inspection Schedule for brianpa
Scheduled for May 02, 2008
Permit#
0027.2007.PRBU
Type: 128 INSPECT ROUGH FRAMING Time: 12'00
Notes: Please call ahead so he can meet your
Comments:
1 -Accepted 2 - Accepted as Noted 3 - Rejected
Reinspection Fee $
d, OT �cv
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER
4 - Partial /Not Complete
F+_I
Owner: ORTEGA
Page: 2
?tist.rt t Inspection Check List Page: 5
20/2008 8:41:35AM COUNTY OF PITKIN Inspection Line:920 -5448
Inspection Schedule for brianpa
Scheduled for May 20, 2008
Permit#
0027.2007. PRBU
Type: 128 INSPECT ROUGH FRAMING Time: 12:00
Notes:
Comments:
1 - Accepted 2 - Accepted as Noted 3 - Rejected 4 - Partial /Not Complete
Reinspection Fee $
�v U�
Add ress Contact Name: bu dy ontact #
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER n J Owner: ORTEGA Page: 5
Insi)CList.rpt Inspection Check List Page: 19
113 8:24:13AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule for tomp
Scheduled for September 30, 2008
Permit#
0154.2008 PELE
Type: 222 INSPECT ROUGH ELECTRICAL Time: 12:00
Notes:
Comments:
1 -Accepted
Reinspection Fee
2 - Accepted as Noted 3 - Rejected
3a o
4 - Partial /Not Complete
51
Add Contact Name: buddy Contact # (970) 948-7887
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA Page: 19
InspCList.rpt Inspection Check List Page: 4
10/27/2908 8:18:12AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule for brianpa
Scheduled for October 27, 2008
Permit#
0067.2008. PPLM
Type: 321 INSPECT ROUGH PLUMBING - WASTE & VENT Time: 12'00
Notes: Req Brian Pawl please
Comments:
1 -Accepted X 2 - Accepted as Noted 3 - Rejected 4 - Partial /Not Complete
Reinspection Fee $
Zt
Add Contact Name: Buddy Contact #
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER
Owner: ORTEGA
Page:4
Insi3CList.rpt Inspection Check List Page: 1
11-pi27/2008 8:18:12AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule for brianpa
Scheduled for October 27, 2008
Permit#
0027.2007. P RBU
Type: 128 INSPECT ROUGH FRAMING Time: 12:00
Notes:
Comments:
1 - Accepted �< — 2 - Accepted as Noted
Reinspection Fee $
3 - Rejected 4 - Partial /Not Complete
, ; _;53 /6 7 7��
.e.. . __.__. a
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER
Owner: ORTEGA
Page '1
1nspCL'ist.rpt Inspection Check List Page: 3
11/19/2008 8:27:03AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule for brianpa
Scheduled for November 19, 2008
Permit#
0027.2007.PRBU
Type: 523 INSPECT INSULATION
Notes:
Comments:
All
1 - Accepted 2 - Accepted as Noted X� 3 - Rejected
Reinspection Fee $
4 - Partial /Not Complete
- ATCT r - e - s ontact ame: u Idly Contact
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA Page: 3
E'd 8Eh5028 :01 t•852- L28 -0:.8
•
Time: 12:00
113110113d *10dd dt�T :b0 8002 -6T -)011
Insp. List.rpt Inspection Check List Page: 3
z!27!2909 8:29:01AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule for brianpa
Scheduled for March 27, 2009
Permit#
0027.2007.PRBU
Type: 1z8 t�o I NG 1�14Wq -L3 _ Time: 12:00
Notes:
Comments:
1 -Accepted 2 - Accepted as Noted 3 - Rejected 4 Partial /Not Complete
Reinspection Fee
U55
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER
(LL-
Owner:
27//9?
ORTEGA
Page: 3
InsvCList.rpt Inspection Check List Page: 11
8/10/19 8:46:48AM COUNTY OF PITKIN Inspection Line:920 -5532
Inspection Schedule forjoannas
Scheduled for August 10, 2009
Permit#
0027.2007 PRBU
Type: 501 ZONING INSPECTION Time: 12.00
Notes:
6g-tw.Q -a-w
c oh cD C"I
b T—U -" "k—A I1-O C) Iti
Z c{�30
Comments:
1 - Accepted
2 - Accepted as Noted
Reinspection Fee $
3 - Rejected 4 - Partial /Not Complete
�rLO, t
ME
ME
a-p- 'vd` 6x
11-6
Add ress Contact Name: Buddy Contact # 4 -
219 WOODY CREEK PLZ
Contractor: OWNER/ BUILDER Owner: ORTEGA Page 11
ju JU57
Stree
Ortega Residence
- Site Plan Scale 3/32 " =1'
#50 Woody Creek Plaza Woody Creek, CO
I ` �
`�
_
i
81656 Buddy Ortega, Owner /Builder
■ 0J
o�
Ground Plane
Ortega Residence #50 Woody Creek Plaza Woody Creek, CO
See not -as 41 PlAns
81656 Buddy Ortega, Owner /Builder
l0 1:.
4 { ' \ ��
l
*GO �,? a 7.BcA-
I. F /�'
w/
Ortega Residence #50 Woody Creek Plaza Woody Creek, CO 81656 Buddy Ortega, Owner /Builder
00 J060
Soo notes #1 plans
South
n
n
North
n �
Fmiiiliiiiiliii EM
118'6"
117'
115'6"
105'
100
96' 96'6 ".
Elevations Scale 1/ ° =1'
East
West
113'
Ground Plane
Ground Plane�S
Ortega Residence #50 Woody Creek Plaza Woody Creek, CO 81656 Buddy Ortega, Owner /Builder
00ILF)l
e C 1
South
F
D
6
H II
® 'I[ n
I
j-1,6' //6
3
J,
East
-G�
Ground Plane
`�tNN,11�Q Qlte�2
Ground Plane
V << Tyk
ju iN 16 4 North Elevations scale 1/ 8 11 I west
pon
Ortega Residence #50 Woody Creek Plaza Woody Creek, CO 81656 Buddy Ortega, Owner /Builder
NJ062
Section scale 1 /4" =1'
2x10 rafte
Finished Grade
Ortega Residence #50 Woody Creek Plaza Woody Creek, CO
See notes #j pans
2x4 stem wall supporting
edge of trailer
- — Existing Frame Rails
supported b
2(2x10 bea
6" BuildBlo6
reinforced tc
specification:
18 "x 10" foc
2) #5 rebar
81656 Buddy Ortega,
40' - 0 "
1-
6' - 0 "
8 ' - 7 "
N
J
G
5 ' - 0 "
o Deck
LO
W -MB2
w I�
13' - 0 "
WDLR s
Entry
Floor 104'6"
1IM
Floor 106'
aX6
3� GI,gDDC
M62 D -MB 1
Ind �
V
Bath
-3 /1
1
Bath
N XX
N
�0��
W
ONCE
W -E X1
C -Glop IL 2 S(
24' -7"
52' - 0 "
D -EX2
Master Bedroom R
WE
C IV\.
ti
t �rz�p-W pQ k �x G 13' -1 1
��cS/�FC� CsiL�l2 /1
230
Main Floor Plan sale 1/4 " =1 v - `%P� vr"'' -Az:ryi° I r- 3
Ortega Residence #50 Woody Creek Plaza Woody Creek, CO 81656 Buddy Ortega, Owner /Builder
7fl IL '64.
_o
N
r
r
sh
r
U
r
r
7
I: '11'1 •• ,1
fQ
Ortega Residence
#50 Woody Creek Plaza
Woody Creek, CO
UgT16NL
FOR CODE COMPLIANCE
Buddy Ortega, Owner /Builder
A
N
7 ' - 9 "
7' - 2 "
9' -2"
Crawl Space -- -- - - -- Basement
Floor 100
- '"
Floor 966 ,
4
- -- Recreation Room
' Double 12" LVL s ' -3"
'
header UP
kj� 1 1
6 X 1 2" 1
L
H eader
N
4' high ICF wall w/ 2x6
framed wall above 00
i
�r Utility Office
u
2 (4
�a
.
Ortega Residence #50 Woody Creek Plaza Woody Creek, CO 81656 Buddy Ortega, Owner /Builder
4 - 0 "
20' -3"
9
��-
— 13' - 2 "
f4EM
52' - JUL 19 2007
FOR CODE COMPLIANCE
Bas mPnt Floor Plan Sale 1/4 " =1'
,W -B1
00 JE 6G
Fixed Skylight 2 :12 Pitch
32 "x48"
3-1/2 :12 Pitch
3-1/2:12 Pitch
ROOF Plan scale 1/4 " =1'
Ortega Residence #50 Woody Creek Plaza Woody Creek, CO
81656 Buddy Ortega, Owner /Builder