HomeMy WebLinkAboutbocc.con.186.2010ACLERK'S CHECK LIST
FOR CONTRACTS SUBMTTTED TO CLERK AND RECORDER FOR SCANNING/ARCHIVING
CONTRACT #: 186-20101�
ORIGINATING DEPARTMENT/DIVISION: OST
CONTACT PERSON: Lindsey Utter PHONE #: 920-5224
PROJECT NAME: Rio Grande Trail Engineering
❑ BOCC AGENDA ITEM
�STAFF AUTHORIZED SIGNA'I'URE
(Requires BOCC Signature) (per Revised Procurement Code 7/2005)
❑ Over $50,000 (Requires County Manager's Signature)
✓ CHECK PROCUREMENT TYPE:
❑None �Infomial ❑Formal ❑Sole Source ❑Emergency ❑State Bid ❑
❑Compliance with House Bills 06-1343 and 07-1073 — Hiuiugration Form (Under $10,00Q Letteis of Engagement, e
�DOLLAR AMOLJNT: 21,878.00
✓ CHECK CONTRACT 'I'YPE:
❑Services/Maintenance
❑License/IJse
❑Lease
❑Construction
❑Goods, Equipment, Supplies
❑Other (e.g. revenue)
BUDGET LINE ITEM/LEDGER NUMBER: 118.58.02523.86121
❑Employment (for county employees)
❑Intergovemmental Agreement (Requires BOCC Action)
❑Non-Profit
❑Quasi-Public
❑Grant Agreements (Requires BOCC Action)
�Change Order/Contract Amendment # J
CONTRACTOR: SGM COMPLETE LEGAL OF NAME OF BUSINESS (if different from contractor)
Schmueser Gordon Meyer
Contract Execution Date:Aug. 9 2010 Contract End Date: Oct l 20ll
Automatic Renewal: ❑Yes �No Term of Contract:
��,�� �
°�' � All Contracts should be proofed for the following: �� ,(k �
✓ �No Pages Missing /� �'
✓�If a Page is Left Intentionally Blank —Note on Page �
✓ �Page numbered consecutively
✓ �All Signatures Affixed
✓ �All Dates Filled In
✓ �All Other Blanks Filled In
✓ �All Elchibits Attached
✓�HB 06-1343 and 07-1073 (Immigation Legislation) Included in RFP and/or Contract
✓ �All Legal Descriptions Attached (if applicable)
✓�Notice of Awud/Notice to Proceed Attached (if applicable)
✓ �Warranty (if applicable)
✓ ❑Special Instructions for Finance Department:
✓ �Sentto Clerk and Recorderfor Scanning/Archiving
✓�Authorized Staff Person's Name: Lindsey Utter
BY CHECKING ABOVE AND ENTERING NAME, THE AUTHORIZED STAFF PERSON INDICATES THAT
THE ATTACHED DOCUMENT HA5 BEEN PROOFED AND READY FOR SCANNING.
NOTE: CLERK'S OFFICE WII,L KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE
ARCHIVES RETAINAGE SCHEDULE.
Project Coding: 118.58.02523.86121 Original Contract # 186-2010
CHANGE ORDER/CONTRACT AMENDMENT
Change Order Number. O1
[�]�.�1�I71.i1
CONTRACTOR:
Pitkin County
Aspen CO 81611
Rev 12/10/09�s
The Contract #186-2010 (the "AgreemenY') dated August 9�' between the Board of County
Commissioners of Pitkin County (the "County") and Schmueser Gordon Meyer (SGM) (the
"Contractor"), is hereby amended as follows:
Descriotion of Chanee:
Change and additions to original scope of services. Please see attached.
Reason for Chanae
Pitkin County Open Space and Trails received a Congestion Mitigation and Air Quality (CMAQ) grant
administered by the Colorado Depaitment of Transportation. 'Chis required an expansion of SGM services
in order to meet the requirements associated with the CMAQ grant.
Original Contract Price
Net Increase/Decrease in Contract Price (this change order)
Total Adjusted Contract Price (including this change order)
This change order extends the time to complete work by 1-year.
$ 20.276.00
$ 21.878.00
$ 42,154.00
[n all other respects the Agreement is in full force and effect and remains unchanged by this
Amendment.
I--� �
/-.�.�-_ �_ , _
Sc u`'G rd n Meyer
�� ��
ale Will
// ;'�: �-� i"%
Date
� ��
ate
� ' �-+ � v�i't✓lG.l
�� i ���
�.✓�. �v�.�.
1
October 29, 2010
Lindsey Utter, Recreation Planner
Pitkin County
76 Service Center Road
Aspen, CO 81611
RE: Woody Creek Trail Bridge
Dear Lindsey,
SGM is pleased to provide you with a quote for the additional services as per our meeting on Thursday
September 12�". I have revised our proposal to design the Woody Creek Pedestrian Bridge and the
addition of the mixed use Trail to Raceway Drive. I have also accounted for the fact that this is now a
CDOT funded project and all plans and specifications need to conform to the CDOT requirements. The
proposal inciudes some funds we already spent on survey and preliminary design.
Below is a list of the tasks included in the first proposal - some of which have been completed. The
underlined items are the additional tasks that we believe will be required for the expanded scope of work.
Survey
• Perform field topographical survey.
• Use already established ROW map and field points to generate base map.
• Corridor survev from Bridae to Racewav D rive
Civil and Trail
• Propose at least three potential trail alignments with horizontal and vertical information.
• Work with Pitkin County Open Space staff to identify the preferred solution.
• Design approach trail segments to transition smoothly from the existing alignment into the new
bridge.
• Analyze floodplain information and communicate with Army Corps of Engineers to gain approval.
• Create erosion and storm water management plan to mitigate any impact on the Creek through and
post construction.
• Five additional olan and orofile sheets conformina to CDOT desian and drafti na standards
• CDOT detail sheets. CDOT Summarv of Aooroximate Quantitv sheet and Control Sheet
• CDOT Scecifications and Biddina documents
• Three meetinas with CDOT for the start of the oroiect. Field Insoection Review IFIRI and Final
Office Review 1FOR) submittal
• Environmental Reoort which we will sub-contract. unless vou have oreference for a oarticular firm
and want to work with directiv.
Structural Design
• Provide a bridge layout that best fits the topography and balances the need for fills with the cost of
additional bridge length. Based on a preliminary layout we anticipate a single span bridge of
approximately 120-feet will accommodate an improved trail alignment and profile; will avoid the
1.
large trees; and will limit required fill heights to less than 6 feet. The approach trail fills can easily be
retained by boulder walls or can be graded out.
Design the abutments to support the bridge. Assuming a prefabricated truss bridge will be the
desired superstructure, the abutment design will be very simple and similar to many other
pedestrian bridges we have designed. It is anticipated that the abutments can be founded on
spread footings.
Additional bridae lavout submittals to comolv with FIR and FOR reauirements
A detailed breakdown of cost is attached. This breakdown assign hours to each task to ensure we are
supplying the County with a complete bid for services.
SGM is providing this bid assuming the following:
Public information, permitting and coordination with other County agencies will be performed by
Pitkin County Open Space Staff
This bid is to provide construction documents ready for bidding. Pitkin County staff will coordinate
the bidding process. SGM will help on as-needed basis depending on the County's needs. CDOT
may require the Engineer of Record to perform certain tasks through this process but this is
separate to the design.
Resolving ROW issues with adjacent property owners is not included in this quote
We look forward to another opportunity to further demonstrate our expertise and commitment to Pitkin
County's planning and engineering needs.
Sincerely,
SCHMUESER GORDON MEYER, INC.
; �
Richard Goulding, P.E.
Project Manger
P�2010\Rtkin Caunt/fWOOdyCreekBntlge�PilCO Cover Lette� tlac
3
WOODY CREEK BRIDGE
Company
Schmueser Gordon Meyer
Task Descnption
Bridge and Trail Design
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Code
PC
PM
SSE
SDE
CAD
QC
QC2
SM
SF
ST
ADM
Printed:
October 28, 2010
Shl of
1 3
Engineering Estimate Summary Form
Estimaletl By Dale Rev
Richard Goulding 8/3/10 0
Hours and Labor Charges
Personnel Calegory Rate
Principal in Charqe - Bill Swiqert $155.00
Prolect Manaper- Richard Gouldinp $110.00
Senior Structural Engineer- Mike Fowler $130.00
Structural Design Engc - Nate Torres $110.00
CADD Design - Matt Cudmore $75.00
Quality Control Manaper - Ken Wilson $120.00
Quality Control Dean Gordon $155.00
Survey Manager-Steve Ehlers $140.00
Survey Field $150.00
Survey Tech- Tina Clark $85.00
Administrative - Jan Caudel $65.00
Transportation & Strucutural Team
Hours Salary Labor
5
70
16
14
61
0
0
0
8
8
0
0
0
0
182I
Overhead
subtotal (Labor Cost)
Composite Rate
$101.92
ODC Rate
$0.00
Doc Count
40
Hours / Document
5
Comments
SGM Confidential
Travel and Living
Communications and Shipping
Project Office / Supplies
CAD EquipmenUComputers/Software
Reproduction
Other ( see Form C )
subtotal (ODC Cost)
subtotal (Vendor Cost)
$775
$7,700
$2,080
$1,540
$4,575
$0
$0
$0
$1,200
$680
$0
$0
$0
$0
$18,550
0.00%
0.0%
$18,550
$0
$0
$0
$0
$0
$0
bo
$3,328
TOTALCOST�
521,878
File: WoodyCreekDesign Budget3.xls ...Form A
`.
� r
WOODV CREEK BRIDGE
�
I TmkCeenryipn
Brn�e anE Trall Desiqn
A
ooc
Row WB$NU�rber CquM ore�w�o�namorwon-rma.
1 Pro�aclMena�ame�l0�tlC00/UInBtlOn
H WA 1 OetO CdIKVOn 8 Ana1V515
12 WA 1 PmjeclMeetl�s
13 WA 1 Pmiect Manaiemmt (2 h�/wk x 10 wksl
14 WA
15 WA SchamaticlDniqn OmloomanVCO's
I6 WA 1 TitleSM1eet
I] WA 1 Ca�ceoWalNipnmmis
IB WA 1 Ge�reral Notm
19 WA 1 Tyoiral5wlions 8 Dete�ls
HO WA 12 CDOTOeplls
111 NIA 1 SummarYofApomxlmate�uanWes
112 NIA 5 T�ail %an stl Rofila
113 WA 1 FlwEOlain Malvs�s 8 Let�x �o Amrv Coros
I10 WA 1 Stormwater Manaiement Plan
I15 WA i CanstruNOnP�asintF/TrofficCmtrd Fen
116 WA i NpproachRetainrtipWallDesgn
11] WA 2 Uf1iillLanCSWdnaWallS
118 WA 1 CostESLmate
119 WA 1 FdtlSUrvey
12(1 WA 1 SurveyBaseMao
@t WA 1 �ualttyCOnVdReWew
122 WA 1 PmiectSOecificatlms
123 Britlpe Ueslan
124 NIA 1 AbuMenlDespn
125 NIA 1 BrlOqe Layout Dasiqn
@6 NIA 1 StruIXUrolOetails
12➢ NIA 1 Bntlqe SOlwita00n Suooat
128
129
I�
131
I�
133
I�
I%
I�
40 t Totel numberof ooamen6 H m a � o e e m m o o e e e
Tolal Hours �
TotalcmtlinGUEesmahuosntlescalaLOn1 ,,, $ � � .,, � o 0 8 � � e o 0 0
�„ .
�5+ �
Estimate Defa'I Sheet
CamPM Eavre�etl 9y ocipirc
SfimueserGOMOnMarr R¢h��'tlGOUltlinq� TranspoRa0on8StruwWralTeam
B C D E F G H I J K L M N 0 P
u f ,,, ° 4 X X ,F,. „� „� � ' ' ' '
15� 14 -0
18
I
1
II 2
1 6I ]
6
C
1 5
2
�I 2 6
6 2 9
�
o.�.
3I3I2010
R=a'A
Talal
B
8
SGM Co�Eentlal
File' WoaEyCreekDesign BuEgetd.xls. Fortn B
5
Y '
IWOODY CREEK BRIDGE
I
Company
Schmueser Gordon MeVer
Task Description
Bridpe and Trail Desipn
Descnp[ion
Mileaqe (d Desiqn
Mileage (aZ CM
Hotel (�
Meals
Tolls and Parkinq
Per diem
Temo Housinq
RelocaGon
Rental Car
ane�
TelephOne
Ezoress mail
Poslaqe/Freiaht
Other
Soace RenWl
Utilrties
Suoolies
Fumiture
�EOUioment Rental
�MObilization/Demobilization
�Main[enance
Other
CADDtime
Personal Comouters
�CAD Soflware
Other Soflware
Pnnters
O[her
�
�Plottinp
�Reorotludions, 81/2x11 (�
� Reprotluc6on5. 11x17 [cp
Newsletter - Tn-foltl Color
Aspen Times 3x5 2 weeks total
Other - Color Utl Plans
Miscellaneous Excenses
"ADD 10% TO ALL DIRECTS"
Printed: 10/28/2010 9:50
Estimate ODC/Vendor Detail Sheet
EsOmatad By Date Rev SM1t ol
Richard Goulding 8/3/2010 0 3 3
utner uirect txpenses
Unit cost �uantiN
$0.550 cer mile miles
$0.55 cer Mile Vios
$75 00 oer niqht niGhts
$50.00 cer dav davs
Per Week
Per Month
Each
Per Week
Weaks
Mon[hs
Discipline
TransOOrtatian E StrucuWral Team
�
Addi6onal LumD Sum Cost Subtotals
0
0
0
0
Lump Sum 0
0
0
0
Weeks 0
New Road ?lan/Proile 0
SubtotalTravel 0
IPer Month I IMOn�hs 0
Per Month
Per Month
Per MH
Per Month
Per Month
Subtotal Communications/Shipping 0
Months 0
Months
Per Hour Hours
Each
Each
Each
Each
Each
$4.00 oersheet
$0.15 cer copV
$0 15 per Copy
$0 71 p2f COpV
$400.00 cerweek
�
COpi85
copie5
copie5
Coples
0
0
0
0
0
0
0
SubtoWlProjectOffica 0
0
0
0
0
0
0
Subtotal CAD /COmputer 0
4 sets x 6 sheets 0
4 sets z 30 copies 0
4 sets x 30 capies 0
sets 0
0
0
Subtotal Oublde Reproduction 0
0
0
0
0
Sub Total Other
�t4� "! ;�`�9*i",'n'i`„'k�;^'.";: .-o: r�T�fO'ire8t`E�t'ia63I
Vendon I Prohssional Services
Name Descnption of work
ERO Environmental Report
"ADD 10% TO ALL SUBS"
�5�M6dfiq3r kFtlxnv� a, ..
SGM Conidenhal
r�
Total for Ventlors�
0
So
Amount
$3,025
$303
$3,328
File: WoodyCreekDesign Budget3.x15 .FOrtn C
�