HomeMy WebLinkAboutbocc.con.014.2010BCLERK'S CHECK LIST FOR CONTRACTS SUBMITTED TO CLERK AND RECORDER FOR SCANNING/ARCHNING, CONTRACT #: 014.2010g ORIGINATING DEPARTMENT/DIVISION: Faciliti #: x5396 CONTACT PERSON: Jodi Smith PROJECT NAME: Data Center Contract Amendment B ❑ BOCC AGENDA ITEM �STAFF AUTHORIZED SIGNATURE (Requires BOCC 5ignature) (per Revised Procurement Code 7/2005) ❑ Over $50,000 (Requires County Manager's Siguature) ✓ CHECK PROCUREMENT TYPE:, �None �Informal ❑Formal OSole Source �Emergency �State Bid ❑ OCompliance with House Bills 06-1343 and 07-1073 — Immigration Form (Under $10,000, Letters of Engagement, etc �DOLLAR AMOUNT: 0 BUDGET LINE ITENULEDGER NUMBER: 001.28.00495.8600 ✓ CHECK CONTRACT TYPE:, (for county employees) ental Agreement (Requires BOCC Action) LLMLIVli - --- , Equipment, Supplies �Grant Agreements (Requires BOCC Action) (e.g. revenue) �Change Order/Contract Amendment � � � CONTRACTOR: Norhtway Cosntruction COMPLETE LEGAL OF NAME OF BUSINESS (if different from contractor) Contract Execution Date:S/19/2010 Automatic Renewal: �Yes �No Contract End Date: 12/17/2010 Term of Contract: 30 days �IR�!f pll Contracts should be proofed for the following: ✓ �No Pages Missing ✓ �If a Page is Left Intentionally Blank —Note on Page ✓ �Page numbered consecutively ✓ �All Signatures Affixed ✓ �All Dates Filled In ✓ DAII Other Blanks Filled In ✓ �All Exhibits Attached ✓ OHB 06-1343 and 07-1073 (Immigration Legislation) Included in RFP and/or Contract ✓ DAII Legal Descriptions Attached (if applicable) ✓�Notice of Award/Notice to Proceed Attached (if applicable) ✓ QWarranty (if applicable) ✓�Special Instructions for Finance Department: No budget increase; time extension only ✓ �Sentto Clerk and Recorderfor Scanning/Archiving ✓ �Authorized StaffPerson's Name: Jodi THE ATTACHED DOCUMENT HAS BEE P OOF D AND RE DY OR SCANN NG N�ICATES THAT NOTE: CLERK'S OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHNES RETAINAGE SCHEDULE. Rev I2/10/09�s Project Coding 001.28.00495.86000 Original Contract # 014.2010 CHANGE ORDER/CONTRACT AMENDMENT ChangeOrderNumber:014.2� B OWNER: Pitkin County, 485 Rio Grande Place #]Ol, Aspen CO 81611 CONTRACTOR: Northway Construction, Inc ����� The Data Center Proiect # 014.2010 (the `AgreemenY') dated 5/19/2010 between the Boazd of County Commissioners of Pitkin County (the "County") and Northwav Construction. Inc. (the "Conuactor"), is hereby amended as follows: Descriotion of ChanQe: This change order extends the contract deadline for the project completion to no later than 12/17/2010 for punch list items, contract scope, site clean-up and final inspections. The contractor shall be given an additiona120 days for final deliverables (manuals etc). There aze no added costs to the contract for this work as described below anNor for time extension. 1. Work includes the completion of the landscape work per specifications and contract price as described in contract amendment A. Scope includes snow removal, set-up and use of a ground thaw machine, installation of irrigation system �� II and all connections to the . jei�} tinierr, new` �e�e� sprinkler heads, line repairs and ve�ve� In addition, the contractors shall be planting trees, shrubs, spreading top soil and placing the gravel bed per specifications provided by Clauson & Associates. Testing and start-up of the new irrigation system will occur in the spring by the Contractor. The County will provide one pazking spot for the thaw machine, and attempt to keep county vehicles and equipment 3' away from the edge of asphalt during the landscaping project. Delays may occur for weather dependent conditions only; i.e.; if the roads are not safe for work crews, or unable to tow the equipment to the site. A 1-year warrantee remains in place for all materials and workmanship as provided by Good Earth. �t1S �� ified irrigation system from existing zones to accommodate new plantings. � 2. Contract scope of work removed the connection of the buil �dng e UPS system when installed. The allowance of $2000 for the UPS connection will be replaced with the addition of a fabricated metal awing over the data center doorway for safety from falling ice. The awing design shall match the existing awning that is carrently located above the door to the facilities shop. Roofing sheet metal shall match the e�cisting roof color for the data centec There aze no additional costs or credit to the Contractor or the County for this work. 3. The extension of this conuact date allows the contractor to complete the contract tasks. The contractor agees to have all vehicles and equipment out of the pazking lot and surrounding azea no later than 8am on December 16, 2010 to allow for delivery of UPS equipment provided by others. In the event of added resowces for the removal of vehicles, materials aod equipment is required is shall be at no added cost to the County. Original Contract Price with Amendment A $ 201,475.00 Net Increase in Contract Price (this change order B) $ N�A Total Adjusted Contract Price (including this change order) $ 201,475.00 In all� respect� �greement is in full force and effect and remains unchanged by this Amendment. Cl � /z-/-/D RiC�c Koe ler, Northway Construction, Inc Date �vS— � � Z' � � — /� Jodi Smith, Facilities Manager Date �iT'KIN COiT N T�