HomeMy WebLinkAboutpitkin.bldg.273501403006 (2)DOCUMENT
LAYOUT
Certificate of Occupancy or Letter of Completion
(most recent project)
Permits
Final Inspections
Any Supporting Documents
Site Plans
(no architectural plans)
If there are previous projects they will follow in the same order.
SFR
0002 2011.PRBU
87 MAGNIFICO ROAD
ASPEN CO 81611
FREDERIC V & MARLENE MALEK
1259 CREST LANE
MC LEAN VA 22101
IM]
VB
R -30
This certficate Is issued pursuant to the requirements of the 2003 edition, section 110 of the International
Residential Code.
This certificate is accepted with the understanding that the inspection and inspection report do not In any way
constitute a guarantee, warranty of merchantability or fitness for a particular purpose, express or implied
warranty of habitability, or assurance in any way of the safety of the structure and its appurtenances
Additionally, neither the inspection nor inspection report are substitutes for any real estate transfer disclosures
which may be required by law or 'a complete inspection by the owner or subsequent buyer or occupant
Pursuant to state law the owner is responsible for inspection and maintenance of the structure and systems.
r
Signature of Applicant Dated
r
/ �� /_ %L. /ii.
t� Offi D : - -
Note: In all occupancies, except R, this certificate must be posted in a conspicuous place near the main exit on the premises for which
it is issued. Any alteration muse of these described premises or portion thereof without the written appmvat of the Building Official shall negate
this letter and subject it to nwocation.
if
Use Classification:
Building Permit:
Building Address:
Owner of Building:
Owner Address:
Group:
Type of Construction:
Use Zone:
Description:
Parcel ID 273501403006
Interior remodel of kitchen and laundry room.
Comments & Restrictions:
SFR
0002 2011.PRBU
87 MAGNIFICO ROAD
ASPEN CO 81611
FREDERIC V & MARLENE MALEK
1259 CREST LANE
MC LEAN VA 22101
IM]
VB
R -30
This certficate Is issued pursuant to the requirements of the 2003 edition, section 110 of the International
Residential Code.
This certificate is accepted with the understanding that the inspection and inspection report do not In any way
constitute a guarantee, warranty of merchantability or fitness for a particular purpose, express or implied
warranty of habitability, or assurance in any way of the safety of the structure and its appurtenances
Additionally, neither the inspection nor inspection report are substitutes for any real estate transfer disclosures
which may be required by law or 'a complete inspection by the owner or subsequent buyer or occupant
Pursuant to state law the owner is responsible for inspection and maintenance of the structure and systems.
r
Signature of Applicant Dated
r
/ �� /_ %L. /ii.
t� Offi D : - -
Note: In all occupancies, except R, this certificate must be posted in a conspicuous place near the main exit on the premises for which
it is issued. Any alteration muse of these described premises or portion thereof without the written appmvat of the Building Official shall negate
this letter and subject it to nwocation.
if
q1
UUU
Cry 1/
PITKIN COUNTY BUILDING PERMIT APPLICATION +
130 S GALENA ST ASPEN, CO 81611
OFFICE PHONE 970 -920 -5526 FAX: 970 -920-5439
INSPECTION LINE: 970 - 920 -5532 httD: / /www.ascenoitkin.com
Appliont to complete numbered spaces only. Permit Number (Office Use Only)
1
1
Permit
1. JO D dress
imint if n
Y,
.x.na
BBD
2.
xu � m.w
FD
����������, '
3.0 1 CFO VIK/V r Lrl ('vV
/
l
f$ S
4. ARCHITECT OR ENGINEER OF RECORD Nuld'rwere.+ mane
MH
MS
SN
S. PERMIT CONTACT enraAadr.:t vw,,. //
�O� �r�`fj
6. Parcel ID # (call 920 5160) D O 0
ZG
7. CLASS OF WORK
ENERGY CODE .
FEE' PUVSCHECK FE 7ANING csonsm GK FEE
\
' / l
_
NEW ADDITI ALTERATION REPAIR
S. Use o f Building
U TA PERMR FEE ZONING FEE DIMPACT RE
5L
Residential Commerc ial Agriwkurel Other
9.1s LP Gas used] Myes No
Deed Ilesurfictic.
AH IMPACT FEE REMP RE OTHER IMPACT FEE Rq'd?
Customer's Tool so Footage
10. valuation New Sit Footage Existing Sq Fontag. for this permit
s oD o
"peO'
Total SF a/ Bldg Actual Valuation No. of storm Construetbn
11. Description of work (Include'Miq Bldg Pemsit I# this Is a ange order)
_n5 V
° o
, -`
I No. of Bedrooms No. of
ExnHng Added Dwalling units Cernus Code
p
AM,WkA rLi
O¢ Group Oa Load Lot She Use Zone
P,
�r . n
l.' v<-n��
APPROVALS AUTHORREDBY DA
— -2,
v
IAnd U. V
'�
H.P.C.
'>
EH /NR
Separate permits are required for Electrical, Plumbing, Heating. Ventilating or Air
E L
ZS
I i
Conditioning.
This permit becomes null and void H work or construction authorUed is not commenced
rare wnhu
Fir. Spnnu.r Reewred? y/N 00 Nmn R"t.mid?
within 12 months or H construction or work is suspended or abandoned for a period of 180
days at any time after work is commenced.
I hereby certify that I have read and examined this application and know, the same to be
I �
PFV1d W4
true and correct. All provisions of laws and ordinances governing this type of work will be
compiled with whether spetlfled herein or not The granting of a permit does not presume
to ghre authority to violate or antis the provisions of any other stab or local law
�I ?d1
Other
regulating construction or the performance of construction. It b my responsibility to
review thfiappraved plans and any comments that are contained thereon and see that the
structure /or projel b bu8it M compliance with all applicable codes.
PAYMENT OF PITKIN COUNTY USE TAX
NOTE: This en vagdaad. work sarlad wNhom will to doubh fa.'d.
The General Contractor or Owner Builder is required to pay a Use Tax
Deposit b Pltkin County (.51) on the building Perin at time of
('�
X yV
Issuance. All sub- permits pulled under a building permit are paid by
this deposit payment and should not pay Use Tax.
Contra IF v om
X
Deposit .S% of 50% of project valuation.
Exempt: Exempt Organization
Property Item may M osier's placed an the o ant the contractors property
when caw Tas b net pail.
signature of Owner (N Owner gWld.rl Oahe
A TIaN APPRC w
suwwr rA FI ANS Is
caw T I ( 1 1 3l- 1 2 w F t
Sulam FM - � _ . ) -
fw
ran flmarA
t ,
NF..
Isrwnce ipled: 1 �
i U
Pw " F$F$s-
1 0 S( 2, 75_1
Pi Aenm.Mleardre
F«
J
lirwact F..
-
REMPFes,
r„
1 ffA71+
PLUMBING PERMIT APPLICATION 2
PITION COUNTY COMMUNITY DEVELOPMENT
130 S GALENA THIRD FLOOR ASPEN CO 81811
INSPECTION LINE: 970-920.5532 OFFICE: 970420.5528 FAX: 9704920.5439
\\ PlumbinglMechanicai Permit is being Issued on the condition that all Items requested are on the approved. plans. Any deviation *hail require a
change orderfor removal at Uro applicanP* expense. ALL PLUMBING & MECHANICAL PERMIT'S ARE REQUIRED TO BE ON THE JOB SITE. If till
equipment Is being Installed on an historic property or within an historic district, you must submit plans and/or ellvations Indicating the location of
the equipment, as well as the exact dimensions of the unit being Installed.
n
U��UtJJ
— PERMIT NO. bee Only)
JOB ADDRESS'
e
n
I'
OWNER: LING DRESS: PHONE:
Z
reJ
_
D
PLUMBING CONTRA MAILIN ADDRESS:
CJ _ PHONE:
n
60 �
1
USE OF BUILDI
D COMME SIDENTIAL BUILDING PERMIT NO.
Z
fZ� 0607—' 201 1, 4 d
m
CLASS OF WORK: D NEW ❑ ADDITION ALTERATION IS THERE A RESTAURANT IN THIS BUILDING? OYES O
g
WILL PENETRATIONS MADE IN FIRE RESISTIVjrCONSTRUCTION?:
7ypE OF FUEL: 13 OIL ❑NATURAL GAS ❑ LPG
T
❑ YES, WILL REQUIRE A PLAN REVIEW �f NO
r
DESCRIBE WORK:
NO. TYPE OF FIXTURE OR ITEM FEE
r
i ► M
Water Closet
=
O
Balhtub
Z
m
ash Basin
shower
q—
(�
Kitchen Sink a
ADDITIONAL PLUMBING PERMIT MA BE REQUIRED
DfeFrwaher
SPECLLL CONDITIONS:
Ber. Utility Sinks
CksMs Washer
NOTICE
This permit becomes null and void if work or construction authorized is
Floor Sick
rE-
Flair Draln
not commenced within 12 months or H construction or work is Suspended
or abandoned for a period of 180 days at any time after work is
1
Water Hester ater
Ges System # of outlets
I hereby certify that I have read and examined this application and know
Water Pi 9 Treatirm E
the same to be true and conect. All provisions of laws and ordinances
Bowers includes vat B.T.U.:
governing #cis type of work will be complied with whether specified herein
I Dow
or rat. The grunting of a permit does not presume to give authority to
violate or cancel the provisions of any other state or local law regulating
constrt n 4th retraction
Fixture Fa
Permit Fa
/ perform
7
SIGN A T URE OR DATE
t COt
PRINT NAME
SIGNATURE OF OWNER (IF OWNER BUILDER) DATE
SUBTOTAL
PERMIT VALIDATION
U$e Tax
APPLICATION
HPC:
PLANS
APPROVED FOR
Date
Receipt #
y�., TOTAL FEE
CCEPTE :
CHECKED:
ISSUANCE:
4� /'1
B
BY
BY
BY
_
1:71 I , ►
(,t 1 011!) -
_ I L
DA
DATE:
DATE:
PAYNE PITIGN COUNTY USE TAX
The Contractor or Owner Buller Is required to pay a Use Tax lo PNdn County (.5 %) on the building Penns valuation at time of ksuance. Al sub"mdls
Pulled under a building penntt ans paid by tide deposit payment and should not pry Use Tax. Stand alone sub1xvrn is are required to pay a Use Tax Deposit to Prddn County
(.5 %) Deposit .5% of 50% of project valuation.
Project Valuation (includes labor) $ Exempt Orgenizallon Exempt ID #
Ilene WAY be placed on the owner's and/or the amtbsctors property when use Tax is not paid.
\\ PlumbinglMechanicai Permit is being Issued on the condition that all Items requested are on the approved. plans. Any deviation *hail require a
change orderfor removal at Uro applicanP* expense. ALL PLUMBING & MECHANICAL PERMIT'S ARE REQUIRED TO BE ON THE JOB SITE. If till
equipment Is being Installed on an historic property or within an historic district, you must submit plans and/or ellvations Indicating the location of
the equipment, as well as the exact dimensions of the unit being Installed.
n
U��UtJJ
8:39:25AM
Inspection Check List
PITKIN COUNTY
Inspection Llne:920 -8832
Page: 5
Inspection Schedule for brianpa
Scheduled for March 14, 2011
Permit No: 0002.2011.PRBU
Type: 133 FINAL BUILDING INSPECTION
Notes:
Time: 08:00
DESCRIPTION:# Stories_Garage:Attached_Detached Carport Bedrooms Full Bath_3/4
Baths 1/2 Baths_ Kitchen ACCESSORY UNIT:Living Kitchen Bath
Bedroom Other. Fireplace:Maker: Gas
Appliance:Maker. Gas Log:
Inspection Results:
1 - Accepted _ / 2 - Accepted as Noted _x 3 - Rejected 4 - Partial/Not Complete
Reinspection Fee $
C • ii ,�3T7'� MMS
7,y //r
This inspection report is accepted with the understanding that the Inspection does not in any way constitute a guarantee, warranty
of merchantability or fitness for a particular purpose, express or Implied warranty of habitability, or assurance In any way of the
safety of the structure(s) and system(s) inspected, nor shall this inspection be construed to relieve or lessen the responsibility of
the person(s) responsible for performing the work. Additionally, neither this inspection nor this inspection report is a substitute for s
complete inspection by the owner or subsequent buyer or occupant. Pursuant to state law the owner is responsible for inspection
and maintenance of the structure and systems. M NII TX
3
Date tt Signature of Applicant Print Name' L
Date Signature of Inspector Print Name
Addres Contact Name: James Contact # (970 948-9823
87 MAGNIFICO RD
. Contractor. MINEO FHB INC Owner: MALEK Page: 5
UL4JO5
ASPEN *PITKIN COMMUNITY DEVELOPMENT DEPARTMENT
130 South Galena Street a Aspen, Colorado 81611
City of Aspen a 970/920 -5090
Pitkin County a 970/920 -5526
BUILDING INSPECTION CHECK LIST dodq je a)) 1 pPc nM
Inspection Reinspection Partial Complete Permit No.
❑ STEEL (Rebar)
❑ ELECTRIC
IWPLUMBING
❑ MECHANICAL
❑ APECC
❑ BUILDING
❑ Footings
❑ Constr. Service
❑ Underground
❑ Rough
❑ Foundation Insulation
❑ R -Frame
• Caissons
❑ Underground
❑ Waste & Vent
❑ Flue(s)
❑ Slab Edge Insulation
❑ Roof Ventilation
• Wall
❑ Rough
❑ Water Pipe
❑ Gas Log
❑ Insulation
❑ Drywall
• Wall Cores
❑ Perm. Service
❑ Gas Pipe
❑ Combust. Air
❑ Glazing
❑ Special
• Struc. Slabs
❑ Bonding
❑ Gas Tag
❑ Ventilation
❑ Pool
❑ Mobile Home
• Pads
❑ Special
❑ Fire Penetrations
❑ KRch. Hood
❑ Spa
❑ Fire Resistive
• Piers
❑ Final
f Final
❑ In -Floor
❑ Snowmen
Roof Coverings
• Bond Beam
❑ Final
❑ Final
❑ Zoning
❑ Radon
❑ Fin
Accepted ❑ Accepted as Noted A Rejected ❑ Reinspection Fee $
❑ You are required to make the following corrections on the construction which is now In progress,
Contact Fire Marshal for sprinkler inspection.
'Reber of footing to be made available for grounding.
'No occupancy or use allowed before certificate of occupancy is issued. UBC '97 Sec 109.1
Note:
w
lv i
ri'�J 7
Instructi .
DESCRIPTION: # Stories Garage: Attached Detached: Carport
Bedrooms _ Full Bath
ACCESSORY UNIT: Living
Fireplace: Make:
3 14 Baths _ 1 h Baths _ Kitchen
Kitchen Bath Bedroom
Gas Appliance: Make: Gas Log:
Address: �? I�/l�fiAl / /!�l> Contact Phone
Subdivision Request Received
Contractor A 0hf"'i PGVM7 (li..rin Request for M T W Th F m pm TIME:
Owner j (�`^ Date Insp. 4
w an,
Inaepend R loo. MUGS � U GM ' ' - em 1M
W Inspection Check List Page: 10
8:39:25M PITKIN COUNTY Inspection Llne:920 -W32
Inspection Schedule for mitehm
Scheduled for March 14, 2011
Permit No: 0011.2011.PELE
Type: 226 FINAL ELECTRICAL
Notes: Mitch 618 2782
91 KI111 , 15 1
Inspection Results::
1 - Accepted r LXI 2 - Accepted as Noted _ 3 - Rejected
Reinspection Fee $
Comments:
4 - PartialMot Complete
This inspection report is accepted with the understanding that the inspection does not in any way constitute a guarantee, warranty
of merchantability or fitness for a particular purpose, express or implied warranty of habitability, or assurance in any way of the
safety of the structure(s) and system(s) inspected, nor shall this inspection be construed to relieve or lessen the responsibility of
the person(s) responsible for performing the work. Additionally, neither this inspection nor this inspection report is a substitute for
complete inspection by the owner or subsequent buyer or occupant Pursuant to state law the owner is responsible for inspection
and maintenance of the structure and systems.
Date Signature of Applicant Print Name
Date Signature of Ins Print Name
Contact Name: Mitch
87 MAGNIFICO RD n - c 11
Contractor: ELECTRICAL 964ARS INC. Owner:
Contact # (970) 618 -2782
MALEK Page: 10
hpVCListrot
HII) 11 8:43:09AM
Permit No: 0002.2011.PRBU
Type: 501
Notes:
Inspection Check List
PITKIN COUNTY
mpection Schedule for Joann:
Scheduled for March 10, 2011
ZONING INSPECTION
Inspection LIne:820 -5532
Pape: 8
0
Time: 12:00
Inspection Results:
1 - Accepted X_ 2 - Accepted as Noted _ 3 - Rejected 4 - Partial/Not Complete
Reinspection ae
Comments:
C: 5�� AM �\
The applicant acknowledges that he/she has been Informed by PiIkin County of environmental hazard areas that might affect the
property any improvements and the use and occupancy thereof. The provisions of the Min County regulations do not in any way
assure or imply that the property will be free from hazards or that approved mitigation will guarantee the safety of anyone using the
property.
This inspection report is accepted with the understanding that the inspection does not, in any way, constitute a guarantee, warrants
of merchantability or fitness for a particular purpose, express or Implied warranty of habitability, or assurance in any way of the
safety of the structures and appurtenances inspected, nor shall this inspection be construed to relieve or lessen the responsibility
of the person(s) responsible for performing the work. Additionally, neither this Inspection nor this inspection report is a substitute
for a complete inspection by the owner or subsequent buyer or occupant. Pursuant to state law the owner Is responsible for
inspection and maintenance of the structuni and system . _ r
Date �`� f� Signature of Applicant ` — w Print Name
Date 3 Signature of Inspector Print Name n - QD — C.4'1�(
Address Co Name: Jim Contact 9 (970) 948 -9823
87 MAGNIFICO RD r. Q
Contractor: MINEO FHB INC ` � � Owner. MALEK Page: 8
L �
9:14:55AM
Inspection Cheek List
PITKIN COUNTY
Inspection Llne:920 -5532
Pane: 6
Inspection Schedule for mitchm
Scheduled for February 07, 2011
Permk No: 0011.2011.PELE
Type: 222 INSPECT ROUGH ELECTRICAL
Notes:
Time: 08:00
Inspection Resukr
1 - Accepted 2 - Accepted as Noted _ 3 - Rejected 4 - Partial/Not Complete
Reinspectlon Fee $
Comments:
Date Signature of Applicant Print Name
Date Signature of Inspector Print Name
Address Contact Name: Mitch Contact 9 (970) 618 -2782
87 MAGNIFICO RD O JC Qq
Contractor: ELECTRICAL OUTFITTERS INC. Owner: MALEK Page: 6
InspGLI aLrpt
wi 81 1 9:02:04AM
Inspection Check List
PITKIN COUNTY
Inspection LIne:920 -5532
Page: 3
Permit No: 0009.2011.PPLM
Type: 321
Notes:
Comments:
for February 08, 2011
INSPECT ROUGH PLUMAING - WASTE & VENT Time: 12:00
2 - Accepted as Noted _ 3 - Rejected
S
4 - Partial/Not Complete
4T" tr l�
• �ND iit'f
Date 1 l Signature of Applicant Print Name
Date Signature of Inspector Print Name gr3gZAy✓
A ddress Contact Name: Contact 0 (970) 618 -0408
87 MAGNIFICO RD r
Contractor: MERTZ PL � HEATING Owner: MALEK Page: 3
InsoCList.rot
Inspection Check List
PITKIN COUNTY
Inspection LIne:920.6552
Page: 2
Permit No: 0002.2011.PRBU
Type: 128
Notes:
1 - Accepted
Comments:
Scheduled for February 08, 2011
INSPECT ROUGH FRAMING
2 - Accepted as Noted _ 3 - Rejected
Time: 08:00
4 - Partial/Not Complete
Date " Signature of Applicant Print Name J (
Date 1� Signature of Inspector _Print Name
Address Conte Name: 1 Contact 0 (970) 948 -9823
87 MAGNIFICO RD r
Contractor. MINEO FHB INC 1 Owner: MALEK Page: 2
." !
z z'
�mo�
G� x o
I O
5 ;a
zrn
wduo
dz °;ti
0 CD
m r
A R7
m
yp
n
„s
�. M
e a.
V I
U
y 1
a'
E b
�I
c �
G I
Project: 8 MMagnifico
o Builder: Bob Mineo
g, Se Architect: Contemporary Design
m
Approved:
0OU012
N A
V I
A �
m
.a
N
d
N
o �
a
� J
. N
N_
m N
I `aorta
;
�N
V �
N
W
Date: LM
J
W
00022013
T
O
O
0
^ m
0
O
v
r
m
Pitkin ` "Y
JAN 2. 121
Community Development
1326 Duff Dr.
Fort Collins, CO. 80524
PH. 970.416.6458
Fax 970.416.6485
wes @benchcraft.net
www.be
,1
�I I
'I
R
R
N
Y� N
_ 1
m r
Date: LM
J
W
00022013
T
O
O
0
^ m
0
O
v
r
m
Pitkin ` "Y
JAN 2. 121
Community Development
1326 Duff Dr.
Fort Collins, CO. 80524
PH. 970.416.6458
Fax 970.416.6485
wes @benchcraft.net
www.be
,1
�I I
'I
R
R
N
Y� N
_ 1
Mineo & Associates
0155 Sabin Rd Labor Costs
01/02109 through 01/30/09
Date
Memo
Item
Item Description
Amount
Service
01.00
01.01
2/5/2009
Mineo, R
01.00:01.01
Contractor Labor
21512009
Mineo, R
01.00:01.01
Contractor Labor
2/5/2009
Mineo
01.00:01.01
Contractor Labor
2/5/2009
Mineo
01.00:01.01
Contractor Labor
2/5/2009
Mineo
01.00:01.01
Contractor Labor
2/5/2009
Mineo, R
01.00:01.01
Contractor Labor
2/5/2009
Mineo, R
01.00:01.01
Contractor Labor
2/5/2009
Mineo, R
01.00:01.01
Contractor Labor
21512009
Mineo, R
01.00:01.01
Contractor Labor
Total 01.01
_
01.02
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
88.35
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/512009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
412.30
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
441.75
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
500.65
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
215/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
88.35
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
44.18
215 /2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
44.18
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
132.53
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/512009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5/2009
Keefe
01.00:01.02
Supervisor Labor
471.20
2/5 /2009
Keefe
01.00:01.02
Supervisor Labor
471.20
Total 01.02
9,291.49
01.03
2/5/2009
Waltner
01.00:01.03
Field Office
217.36
2/5/2009
Waltner
01.00:01.03
Field Office
217.36
215/2009
Waltner
01.00:01.03
Field Office
217.36
2/5/2009
Waltner
01.00:01.03
Field Office
380.38
2/5/2009
Watner
01.00:01.03
Field Office
326.04
215 /2009
Waltner
01.00:01.03
Field Office
163.02
2/5/2009
Waltner
01.00:01.03
Field Office
163.02
2/5/2009
Waltner
01.00:01.03
Field Office
217.36
2/5/2009
Waltner
01.00:01.03
Field Office
108.68
2/512009
Waltner
01.00:01.03
Field Office
380.38
2/5/2009
Waltner
01.00:01.03
Field Office
108.68
2/5/2009
Waltner
01.00:01.03
Field Office
217.36
2/5/2009
Waltner
01.00:01.03
Field Office
326.04
2/5/2009
Waltner
01.00:01.03
Field Office
217.36
2/5/2009
Waltner
01.00:01.03
Field Office
54.34
2/5/2009
Waltner
01.00:01.03
Field Office
217.36
215/2009
Waltner
01.00:01.03
Field Office
434.72
2/5/2009
Waltner
01.00:01.03
Field Office
163.02
2/5/2009
Waltner
01.00:01.03
Field Office
108.68
Total 01.03
4,238.52
01.04
2/512009
Waltner
01.00:01.04
Project Meetings
81.51
2/5/2009
Mineo, R
01.00:01.04
Project Meetings
184.50
2/5/2009
Mineo, R
01.00:01.04
Project Meetings
246.00
2/5/2009
Mineo, R
01.00:01.04
Project Meetings
246.00
4. `1 `s
7l - A 6
Page 1
U UU13
w � 0
°r
S � w
m
.n
•d e
� � o
y _
n y
�G t
g•�
N e
w m
as
Oo 3
w
=� 3
90 o
m p
o w a 9:Y m' m So 0
m
S B B rs E w On i A 1
S m rn 0 u O p a z
= H m
09
m
0. 0.
�y r ' A 'b �w ° •m y O
_
5 m' �, °• ° m ° ' m
n � m o'E o oUan.� 3 <
S A y 2 H
o ° - z
�gt z;y z
o 5 : v ro sl 0
O
°� =
Oo D a
o o
09 -�
I
N
d
N
I
O
P
nl
a
W
I
N
N
U
Project: 89 Magnifico
Builder: Bob Mineo
N ; -
°, SQ Architect: Contemporary Design
� J
J
Approved: Date:
0 002 Q O.I�I)I
n
0
0
M
C
0
M
m
_r
M
M
N 0�
A
m
D ` l , u
Z
1 1 n!
Y � Y
1326 Duff Dr.
Fort Collins, CO. 80524
PH. 970.416.6458
Fax 970.416.6485
wes ®benchcraft.net
1. -- benchcraft. net
-- AT.i1.=-7 'ntsr
JAN 2 1 2011
u:;u; 1 4
Community Develop
A
N �
MINED & ASSOCIATES
F i n e H o m e b u i l d e r s
INVOICE FOR CONSTRUCTION
0155 Sabin Rd. Residence
TO: Duer Wagner, III Date: 2/5/2009
Attention: Roy Guinnup Invoice #: 41
Suite 1830 City Center Tower II Time Period: 1/6/2009
301 Commerce Street Through: 2/5/2009
Fort Worth, TX 76102
Labor
48,958.96
Materials
20,613.38
Subcontractors
589,901.64
Miscellaneous
31,081.00
Reimbursements
427.90
Sub Total
690,982.88
Profit/Overhead 9%
62,188.46
SUB TOTAL THIS BILLING
Less Mineo 5% retainage
Less Advanced Payment for hardware
TOTAL AMOUNT DUE
$753,171.34
(3,109.42)
(20,615.25)
$729
307 F ASPEN AIRPORT BUSINESS CENTER • ASPEN, COLORADO .81611 •970- 920 -4045 • FAX 970 - 920 -9905
G "jud15 1.
N
8
w
�rn
'V
s
0
N
� b �
?x
� r �
C
O O. a
N � 7
O
3
m'
i7
�'I
Tt
T
d Project: 89 Magnifico
u
i�. Builder: Bob Mineo
$, Architect. Contemporary Design
f. Approved:
a
N
Z
N
—
AL
n
N
N
V
- - -
f7 a
� � f'�7
o
- - - u U
Z 1326g .
Fort Collins, C
PH. 970.416.6458
Fax 970.416.6485
Date: 1 1 wes@benchcraft.net
www.be
- - �itkin C' t_, -.
JAN 2 1 2Gil
GULL16
Community Deveiopmer
1.
Page 2 of 2
Watson Mills: not sure what you're asking?
Talked to Buzz on handrails and guardrails today. He talked to Myers and Upfront glass and will give me synopsis tomorrow
morning and I will e-mail to you.
Will need some materials from time to time to keep misc. carpentry list going. Can you give me some parameters on this?
omit any travel: Does this mean my trip to Costa Rica rafting on the company credit card is cancelled?
Jeff
No virus found in this incoming message.
Checked by AVG - www.avg.com
Version: 8.0.233 / Virus Database: 270.10.18/1935 - Release Date: 02/04/09 16:35:00
o .Iich�n
- 0" q
(( S_t4
J
t.J 0 CJJ. T
F) 7 03
�Z
WO
2/12/2009
00 0220:x.),
- - - - -X
r
v
s=
CL
rn
m
v
o'
J
N
N
4
Project: 89 Magnifico
Builder. Bob Mineo
A �
$ Architect: Contemporary Design
m
Approved:
ul. ijU18
1"
f.
3> iI
Z - - tea
CIO ,= t
~ '
o
C�
1326 Duff Dr.
Fort Collins, CO. 80524
' PH. 970.416.6458
Fax 970.416.6485
Date: ,,, wes @benchcraft.net
w
Pitkin Coui—; ;
JAN 2 1 2011
Community Development
N N � N
Page 1 of 2
Bob Mineo
From: Wagner Project
Sent: Wednesday, February 11, 2009 5:25 PM
To: Bob Mineo
Subject: Info.relating to costs e-mail
M
Alltec not doing anything right now. Will price for us anything they do.
Upfront glass is 80 -90% finished on exterior handrails and 80 -90% paid on this.
Allstate is pricing a small amount of extra work to get us to a 99.9% on project so when ready to do work numbers are in place.
No work now.
Aspen drywall will price patching when we get closer to complete list. No work now.
Insulation is 99% done. No work now.
Rarely using plumber. Has been plumbing fan coils lately. As needed works.
Levey is almost out of work: N. wall of bar -den and bar -den cabinetry almost finished- delivering this week.
Mstr. bath cabs 70% done - finalizing burl color (inset panels) w / Philip now.
Powder 121 vanity 50 %- sapele (inset panels) color approved yesterday.
Mstr. bath cabs and 121 vanity will deliver in 10 -12 days, pilot kitchen will finish
in 5 -7 days.
Brown Dog is just starting production on mstr. closets and guest closets 1 & 2. Delivery in 2 -3 weeks.
(As an aside these were approved 1 month ago and have barely started.)
J & J is done. Craig is working on my list of miscellaneous.
Fireplace surrounds (stonecarver) approved, not ordered. Reminder - -4 month lead time.
Mstr. shower pan templated today.
Discussion today on hood with Welfelt and Philip. Slight hood height problem w/ Duer's ht. -- working on it. Probably not finalized
until next mtg. Welfelt says he will need the hood liner ($1600.) sent to him to even start shop dwgs. but will begin on metal
samples and colors with Philip now.
Joey Bloomer met with Philip today and figured out the wallpaper order. Philip will price the order and give to us before ordering.
Joey will price his work and give to us before any work.
Skutley says he is paid almost 100% on materials, and says he talked with you on continuing to work at a reasonable level with
him creatively financing his own work. He said Coco is also onboard with this.
Elevator: waiting on 3rd interior gate sample — should be able to fully approve their shops at next mtg. Not ordered.
Electricians as needed works but in some areas we will need him to rework electrical for installation for cabs that are already in
system. Also some contract clean -up to do to keep us working in some areas. Couldn't we have him price the extra work for
cabinetry and also the contract work, and then decide what to pull the trigger on?
Bill Heiss was here today and asked about door hardware next month -- told him to call you.
ESC has been working on cleaning up some of their wiring problems. Not sure how this affects you monetarily?
Appliances: haven't ordered any.
2/12/2009 L; '
;>
w
ET
C
Q
m
I
0
0
0
w
0
N
M
Project: 89 Magnifico
S�. o Builder Bob Mined
N �
@, �1 Architect: Contemporary Design
N
Approved: Date:
1326 Duff Dr.
Fort Collins, CO. 80524
PH. 970.416.6458
Fax 970.416.6485
r wes ®benchcraft.net
www.bertchc
Pitkin County
JAN 21 2011
Community Development
`—
O
O
z
M
0
O
r _
c l�
r0
�m
1326 Duff Dr.
Fort Collins, CO. 80524
PH. 970.416.6458
Fax 970.416.6485
r wes ®benchcraft.net
www.bertchc
Pitkin County
JAN 21 2011
Community Development
Page 1 of 1
aob Mineo
From: Wagner Project
Sent: Tuesday, February 17, 2009 7:54 AM
To: Bob Mineo
Subject: Wagner e-mail 2/16
:..
This seems like a J & J thing
Without the carpenter's notes or Chris here, it is a little tougher to decipher exactly but:
1. Not sure where the extra framing is.
2. Started to sheetrock clg. Noticed framing from s. wall to middle of clg. from east to west way out of plane.
(1/2 ") Justin came over to look at ( thought if it was their mistake they could fix for free) and told me the
Mineo carpenters had filled in where skylights used to go. Mike agreed. Fill -in framing was down 1/2" from
rest of clg. Had to stop sht. rock, take a couple pieces down and feather out clg. from s. wall to middle of
clg. so wouldn't see. South 3 flourescent lites still need to be dropped to clg. level.
3. Wing walls? were not framed out of square. Corner bead process at face of cabinets decreased the interior
dimensions 1/2" which would make the cabinets not fit. I picked up on cabinet approval measuring and Scott
Ryan and I adjusted. Approx. 8 -10 wing walls in his and her closets.
4. 1 think Don Fettig's guys did most of the string lining after Don showed me some visual problems. I did in
many cases offer Chris to help with sub's work to make things right. Don't have a handle on how much he did
here.
5. Asked him to inspect the plywood screw -off yo sound channel before sht. rock in club rm. There was a fair
amount of different planes and light coves, but 3 is a bit much. 1 -2 hrs. max.
On my( Mineo list
1. Cabinet production priority list
2. Hvac extra in mstr. bed rm. on fireplace wall to further drawings
3. Hood liner to Welfelt to further hood drawings
No virus found in this incoming message.
Checked by AVG - www.avg.com
Version: 8.0.233 / Virus Database: 270.10.18/1935 - Release Date: 02/04/09 16:35:00
, WAAEt J6 I"
, U , Ji s21
r
2/17/2009
003 220 1
w -
M k
v
fND N
F3 i N
W N
O
3
n
O
N
fD
00
M
(D
d
N
b
OD
N
X
X -
—0) _
O
CD
0
fO
W
..A
N
Project: 89 Magnifico
Builder. Bob Mineo
0
o m Architect: Contemporary Design
Approved. Date
C1UTJ22
��.)
T
O
.Z7
O
o
Z
M
(-)
O
�
-
N
Q
(D
-I
O
(D
w
Project: 89 Magnifico
Builder. Bob Mineo
0
o m Architect: Contemporary Design
Approved. Date
C1UTJ22
1326 Duff Dr.
Fort Collins, CO. 80524
PH. 970.416.6458
Fax 970.416,6485
wes@benchcraft.net
www.benchcraft.net
Pitkin County
JAN 2 1 2011
Community DetYetopment
��.)
T
O
.Z7
O
o
Z
M
(-)
O
�
-
1326 Duff Dr.
Fort Collins, CO. 80524
PH. 970.416.6458
Fax 970.416,6485
wes@benchcraft.net
www.benchcraft.net
Pitkin County
JAN 2 1 2011
Community DetYetopment
MINEU & ASSOCIATES 0155 SABIN RD ESTIMATE /BUDGET
WAGNER RESIDENCE vs TOTAL COSTS
Than! Iola rnros/ng
_
ITEM DESCRIPTION
ESTIMATE/
BUDGET
OVERAGES
ESTIMATED
ADDITIONAL
PROPOSED
BAL
NOTES
& CHANGE
REVISED
_T OTAL
COSTS
TO FINISH
_
AS
O RDERS
COSTS
THROUGH
ESTIMATE
THROUGH
_ AS
OF
___A_S_
OF
_ Es timated additional_
costs for 13 months
OF
THROUGH_
0515/07
10/5/08
OCT 2009
OCT 2009
2/5109
215109
October 2008 -2009
15.08 Whirlpool & Specialties
Inc. above
Inc. above
0
0.00
0.00
15.03 Plumbing fixtures
15.07 Sprinkler Systems- Interior
15.10 HVAV - Heat and AC
15.11 HVAC - Venting _
15.12 HVAC -Other controls _ -
15.13 Sno _
1 Septic
15.15 Water Softening
15.17 Humidifiers _
15.18 Wine Room
_. SUBTOTAL
16.0 ELECTRICAL
16.01 Electric Utility Hookup_ _
16.02 Service Boxes
16.03 Switches & Ou tlets
16.04 Electrical Fixtures _
16.05 Fans /Smoke De_ te_ ctors
16.06 Electric Heat _ _
16.07 Other Electrical
16.08 Audiovisual /pre wire
16.09 Telephone /pre wire _
16.10 Heat Tape
16.11 Lightning Protection
20.01 - Finance Charges
SUB TOTAL _
- Other Reimb./Truck Usage
_ SUB TOTAL COST
Profit & Overhead 9%
TOTAL WITH C.O.'s
5 % Retainage Mineo P &O
NET LESS RETAINAGE
45,000
59,724
65,900
12,875
17 0,624
128,260
170,826.01
90,045.21
(202.01)
38,214.79
1,13
Jim Houg Pl umbin g _
All Stat Fire Protect
Pacific Sheet Metal
Pacifi Sheet Meta
Pacific She Metal
Jim Hou Plumb ing/Pacific Sheet Metal
- - -- - -- -. _ _.
Waterwise / expanded system approved $5,000
Electrical Outfi C.O. 9124/08 & $30_00
ES - per o _rig_in_al_c_on_t ra ct 12107 & allowance
Mineo tabor & materials
Mr. Lightn
3 trucks $6 X 1 mo. & allowance
115,385
389,775
203,500
27,282
_ 5,000
620,557
_ 11,199
239,727
619,424.36
_ 8,308.90
248,208.33
22,344.46
-- --
4,2 00.00
_ 0.00
0.00
1,776,109.29
1,159_,4
0 .00
0.00
0.00
_ _ 0.00
_ 0.00
_ _ 0.00
_ _ 80,373.49_
_ _0.00
8,817.64
1_1,110.00
_ 2.0
1,259,704.64
35,070.65
_ _ 0
7 27
_ 6,199
239,000
2,8
(8,481.33)
80,783
80,783
- 0
58,438.54
0
-
- -0.0
12, 507
-
732,987
304,545
43.711
15,0
_ _
363,258
0
6,000
17,607
13,3W.00
0.00
0.00
144,940.71
0
_ 0
0
_ _
0
191,057
997,006
1, 921,06 0
1,1 02,900
42, 0_25
1,449,470
Inc abov
mc abov
inc. above
inc. above
inc. above
inc. above
26,543
0
14,426
_
_
0
_2
0.00
0
0
_ _ 0.00
0.00
0.00
_
_
_1
_
_
190,555
0
0
_
_ _ _ _ _0.00
0.00
1_3
_ 0.00
5,608.36
_ 3,892.00
437, 977.36
_ _
0
_2
0
14,426
15,0 0 . 2
_ _ 0
1,697,682
_ 0
1,1 43,869
61,538
(17,000)
44,538
9,467.3b
4,135,010
372,151
3,489,053
17,190,166.14
1,547,115.84
5,310,493.86
477,943.16
14
1,340,694
22,500,660
2,025,059
311,193
$16,237,291.00
$4,507,161.00
$3,780,246.00
1 $24,525,719.00
$18,737,281.98
$5,788,437.02
(67,035)
(18,607)
(15,415)
(101,253)
(77,354.86)
(26,956.56);
$16,170,256 1
$4,488,55411
$3,764,83111
$24,424,466 11
$18,659,927.12
$5,761,480.46
Page 8 of 8
f
MECHANICAL PERMIT APPLICATION 4
PitIdn County Community Development Department City of Aspen
970/920.5526 F�9 130 S. Galena 920/920 -5090
970/920 -5532 Inspection Line Aspen, CO. 81611 970/920.5448 Inspection Line
bN q-Q0 t D.
PERMIT NO.
JOB ADDRESS: 87 Ma nifico Aspen, CO
OWNER MAILING ADDRESS 21P PHONE
Brad Malek 87 Ma nifico Aspen, CO 81611
OWNER'S REPRESENTATIVE MAILING ADDRESS PHONE CITYISTATE
MECHAMCALCONTRACYOR MAILING ADDRESS PHONE CITYISTATE LICENSE CO
Young Services PO Box 944 GWS 970 3842271
USE OF BUILDING BUILDING PERMIT NO.
Residential
CLASS OF WORK: ANEW Q ADDITION O ALTERATION +Q REPAIR
IS THERE A RESTAUARANT IN THIS BUILDING? YESO NOM
TYPE OP FUEL: OR. " NATURAL GAS I V I LPG LI
WILL PENETRATIONS BE MADE IN FIRE RESISTIVE CONSTRUCTION? YES ❑ NO Q
IF YES, A PLAN REVIEW IS REQUIRED.
spa
SPECIAL CONDITIONS: h b O h
Plan, Checked:
By:
neon:
I I NOTICE I 1
WE PEPMITBECDMES NUt]. AND VM W WORKOII COMURLIC: DDN AU-
WORILED ISNOTC% MMENCED W1THM 12 MON1115,OR6CONSTRUCnMIOR
WORK m SUSPITDED OR ABANDONED POR A PERIOD OF ISO DAYS AT ANY
T81E AFTOI WORK ES COkDdENCED,
1HEREBYCERiDY TIHAVEREADAND� WISAPPICATION
ANOPJiD\VTHESAME MTRDEANDCORRWr.ALLMMEI NSOFLAWS
ANDORDINANCES CAVFRNWO TMBTYPEOF WORKMUSECOWUED WITH
vi=TNMSMCIMH ORNOT, THE OPANTINO OPAPERMITDOES
A A M I 1 TE�CANCELTNEPROVI-
W OULATB 1M STR 1-
01 1N � OPCONSTRUCENIN, -
t AOBRr DATE
Mitt" L am 11/10110
NAME
Payments of rukhe County Use Tae
The Oeneol Consensus us OvnNr Builder is respond to pay a Use Tat Deposit to Pftldn
County Ls %) eve &a building pound at lime ofiv e, All sub-pemuN pulled under
building pemdt should be cabled by this depoal psymrnl
BIntA -Mom permlb ae required to pay the Use Tax Deposit M Pitkin County L5%1 a
Ume ofperhmt issuance time they arc not covered under a leading pehatk
SMSI -Alone Use Tax Paymesh
> 4 DEPOSIT
la nd. Commonly: 5 %of10%ofpmlecsvalueMm C
QEXEMPT- Eaxmpt Otgm'vnsionand Numher; \be,
E �
PWmbing /Mechanical Permit is being Issued on the IDndldon that all hums .
a change order/ mnmval at the applicant, eapenee. ALL PLUMBING AND
THE. fOBSRF
000001 Cw I V
N. I RROeraRx.e,RL I tR
to
U P hb
z
Y
3
m
C
CL
—i
A
a
s
z
C
3
Q
+n •i
n
01
tD
O
Call
F
N
V
i
�msu .
m
as
Rap
X7 Wig
�a
- .
t - -.
difrtonn
In "an
,hall Rg111R
DBE ON
: cno9`1
Patnd Ahsynmudrvlry
W n. B.T.U. l aw
$0.00
H � °°d "
$0.00
D'y°ven u,aa
$0.00
AppOenos Va*gg
$0.00
A�
$0.00
Repak AMmdonRAddi
desert wetgi$6e
$0.00
1
liaae.11oslMe ee,M
eru, AFyRp
$18.50
Ah1loWlea i i$`.u c?
$0.00
E "'° ° " dYe "g,
$0.00
vandbuie Fm___
$0,00
usage Nowak
p N
$0.00
onspo N725
$ - 0.00
On Later ApplWa
$1123
$0.00
case, tIk25
$0.00
n.e Ran, s
Fw.a F«
$16.50
$29.75 P °° "`
$29.75
SUBTOTAL$
sA
Ue, TU
TOTAL DUES
(� .
to
U P hb
z
Y
3
m
C
CL
—i
A
a
s
z
C
3
Q
+n •i
n
01
tD
O
Call
F
N
V
i
�msu .
m
as
Rap
X7 Wig
�a
- .
t - -.
difrtonn
In "an
,hall Rg111R
DBE ON
: cno9`1
40t tat
9.02:04AM
Inspection Check List
PITKIN COUNTY
Inspection Line:920 -6632
Page: 1
Inspection Schedule for brionpe
Permit No: 0164.2010.PMEC Schedule! for January 26, 2011
Type: 428 FINAL MECHANICAL
Notes:
Time: 08:00
1 - Accepted XJ_ 2 - Accepted as Noted
Reinspection ee $
Comments:
3 - Rejected 4 - Partial/Not Complete
This inspection report comes with the understanding that the inspection does not, in any way, constitute a guarantee, warranty of
merchantability or fitness for a particular purpose, express or implied warranty of habitability, or assurance in any way of the safety
of the system(s) inspected, nor shall this inspection be construed to relieve or lessen the responsibility of the person performing
the work. Additionally, neither this inspection nor this inspection report is a substitute for a complete inspection by the owner or
subsequent buyer or occupant.
Date I I Signature of
Date Signature of
Address
87 MAGNIFICO RD
I
Name L do
Name I�+J
Contact A (970) 618 -0386
Contractor. YOUNG SERVICES LLC U U � .:.Ul Owner. MALEK Page: 1
— %WWM
sL�
8:00:27AM
Inspection Check List
PITKIN COUNTY
Page: 5
Inspection Schedule for brlanpa
Permit No: 0164.2010.PMEC Scheduled for January 20, 2011
Type: 428 FINAL MECHANICAL
Notes:
1 - Accepted 2 - Accepted as Noted
Reinspecton Fee $
Comments:
3 - Rejected
Inspection LIns:820.5532
Time: 08:00
4 - Partial/Not Complete
This inspection report comes with the understanding that the inspection does not in any way, constitute a guarantee, warranty of
merchantability or fitness for a particular purpose, express or implied warranty of habitability, or assurance in any way of the safety
of the system(s) inspected, nor shall this inspection be construed to relieve or lessen the responsibility of the person performing
the work. Additionally, neither this inspection nor this inspection report is a substitute for a complete Inspection by the owner or
subsequent buyer or occupant.
Date q Signature of
Date Signature of
Address
87 MAGNIFICO RD
N' 0.5
Contact Name:
Name
Na l
Stan Contact # (970) 618 -0386
Contractor: YOUNG SERVICES LLO i, U O U3 � Owner: MALEK Page: 5
0
Z
v
ELECTRICAL PERMIT APPLICATION 3
PITKIN COUNTY COMMUNITY COMMUNITY DEV M D N
ELOPENT EPARTMET CITY OF ASPEN ❑
970 / 920 - 5526 130 South Galena 970 /920-5090
970 / 920 -5532 Inspection Line Aspen, CO 61611 h a 9 / 9 0 -5448 Inspection Lille
V PERMIT NONN 1
O
O
Z
D
D
3
v
x
O
Z
m
Z
C
3
03
m
x
JOB ADDRESS (I AND STREET) - 7 0 ' aQ C ). a-0 O
l .
OWNER
r rcck
PHONE
ELECTRICAL CONTACTOR I I ^ MM , gODRESB 1 60 L E � �� COLA. LIC. ♦ I
C
S C IFD O INO I PERMIT If
OCCUPANCY GROUP
S ELEgTRI VALUATION
SQUARE FOOTAAGE
USE OF BUILDING IAL
COMMERCIAL ❑ RESIDENTIALCOMMERCIAL ❑ RO ESIDENT
CLASS OF WORK ❑ ADDITION ALTERATION ❑ NEW ❑ CONSTRUCTION SERVICE ❑ OTHER
DESCRIBE WORK IN DETAIL (FOR ADDITIONS, ALTERATIONS, INDICATE TYPE, NUMBER AND LOCATION OF SOURCE OF CIRCUrTS:
SIQ o' VI
OWNEFVAPPLM.ANr The andsrslgred ppNunt to peemor Wy perform sMetrlal wait on the described property or maiderce hereby cw#rm, m a wditim of
Insuerms, Of Such parmiL that the above described properly or reelderes Is owned by the applicant that the spplicwd Is not wWgW in the business of wmbuclbn or
remd*V: and such property is not Intended fa sale a resets, nth Is It rental property (occupied or to be occupied by terwde, whether trerebrlt or pertharlenq, w
will It be gerherslly open to the public. It is understood that co npkirce with these asSurancss Is a condition of the bSuanhcs of m electrical
Summit the PnovAbrre of C.R.S. Section 12- 23-111 p el to the applksm
Su any
Im aTrended), and det fable to comply herewith will be grounds for revocetlon of the ebcbical pemli[ a any
certificate of occupancy issued with respect to the property or reeldanee described.
Appliced: Date:
PAYMENT OF PITKIN COUNTY USE TAX
MONTHLY ETHOD:'h MATERIALS VALUATION
% OF MATER VALUATION PAID NOW AT ISSUANCE. A FINAL REPORT ON
U S E A X PERMIT FEE DOUBLE
Q $ I ISO 6
TOTAL ACTUAL MATERIALS COST MUST BLED E F WITHIN 90 DAYS OF SUBSTANTIAL COKIPLUM
gppapyEp BY FIRE MARSHAL DATE
OF WORK plgb $ gE OF CEIm(D O O
MA Wl8 V/LLUATON f / /
EXEMPT E70iM IUTION
RESALE: STATE AND PTION
THE DEPOSIT METHOD MLL BE ASSUMED ULESS OTHERWISE NOTED.
ANYONE WHO USES AND/OR CONSUMES MATERIALS AND FOTURES IN PTTICN COUNTY IS SUBJECT TO
APPROVED BY HPC DATE
THE .5% USE TAX
PROPERTY LENS MAY BE PLACED ON THE OWNER'S AND/OR THE CONTRACTOR'S PROPERTY WHEN
THE USE TAX IS NOr RAID.
NOTICE
For an wait dons under this permfl, the permiltm scoepts full resp"bll for comply with
tARnNOO�ARrNtaRJLOr�rANDa
APPROVED BY DATE
the Netlahal EW to Code, the City of Aspen odlnenXes, and all other county rasoMTtlorus, city odi-
rhSuCeS, state laws, whichever applies. Perrnft Subject to rsvOOSUM or sheperelon for violation
any laws govemtrhg earns. An accepted final electrical bepectim shall be obtained prior to using
ttwalseeical system. A Orel ere cal Irepectlon shall be requested within 48 hole after oompw-
ing an a ical inetalletbn.
Psi VALIDATION
DATE
�!-l� lD
RECEIPT.
?ivw
TOTAL }/J
�' `�
$ `� 7
/ 9
seNANRE Puf R PATE
�� cl'r. 1,AA0411eA
0000.94
bve1T.»Ts
°l
J
v.
s
d
v
Ins List.rot Inspection Check List Page: 9
112010 8:69:19AM PITKIN COUNTY Inspection Llne:920 -5532
Inspection Schedule for mkchm
Scheduled for December 21, 2010
Permit No: 0209.2010.PELE
Type: 226 FINAL ELECTRICAL
Notes:
Time: 12:00
1 - Accepted _X 2 - Accepted as Noted
Reinspection Fee $
Comments:
3 - Rejected 4 - PartiaVNot Complete
This inspection report is accepted with the understanding that the inspection does not in any way constitute a guarantee, warranty
of merchantability or fitness for a particular purpose, express or Implied warranty of habitability, or assurance in any way of the
safety of the structure(s) and system(s) inspected, nor shall this inspection be construed to relieve or lessen the responsibility of
the person(s) responsible for performing the work. Additionally, neither this inspection nor this inspection report is a substitute for
complete inspection by the owner or subsequent buyer or occupant Pursuant to state law the owner is responsible for inspection
and maintenance of the structure and systems.
/*Is* . t
Date Signature of Applicant _ Print Name
Date Signature of Inspector Print Name
Address Contact Name: Alex Contact # (970) 618.4548
87 MAGNIFICORD (J'.J',;;5
Contractor. CRAWFORD BROTHERS ELECTRIC IN Owner. MALEK Page: 9
Inspection Check List Page: 15
PITKIN COUNTY Inspection LIne:920 -5532
Permit No: 0209.2010.PELE
Type: 224
Notes:
Scheduled for November 15, 2010
INSPECT BONDING
Time: 08:00
Inspection Res
1 - Accepted 2 - Accepted as Noted _ 3 - Rejected
Reinspection Fee
Comments:
4 - Partial/Not Complete
C
5
Date Signature of Applicant Print Name
Date Signature of Inspector Print Name
Address Contact Name: Alex Contact # (970) 618.4548
87 MAGNIFICORD a �juUG6
Contractor: CRAWFORD BROTHERS ELECTRIC IN Owner: MALEK Page: 15
S? de-e-11c)
Adf-
dv-
a �
Y � f -
r
■
i L
"1
9
r
qT +' 1�✓ nom• ��''. .. ��
s
• 7
/ 44
w
r
' e
r'.
I
L.—I
-A '.4d
I
~7
�, Zi
0A
dp
I L
,l
! � 7
`D
•+ � f � < jam �' ..
X
�, t �a♦�" t1 F f � X� �`7F
- :, s� ..� .t , . • ' �` �•
VIM
IPG
prmp-"
bamm -.i
1 1
e� om
1
EIE 1�,
I
a
I -
L V N, "
"
30-
room
k
e4p
' i I
ow
Y\
7 4
- 7 w K
to
w .
R .` ♦ 'T } N y fYi J M 5
•,+ ( ,.r 1 L'r )w�y h 1 r' ♦rP Y �rt r�r �Qx,, 1+ 5 � � �'i �� /' j 1
- l � M • ♦ t •�• fiS, >.: fi t',^.. �': 4 — �,,p,f� c�.•.,..p 4 :-..i�
I yyy
• � ,ettlJ 'ti. �ti .
� 1 Air F . a +♦ ' r • w, 1 :
r
POI
A l
I pp
•`, .:x ,s` `�� } G� ����`• � � � ,mss
®r
,-1 ■
_ff 1 .9 t
.w 0, _Ot'' Alyln ITY, I
A. i
Tp