Loading...
HomeMy WebLinkAboutbocc.con.amended.193.2010C CLERK'S CHECK LIST FOR CONTRACTS SUBMITTED TO CLERK AND RECORDER FOR SCANNING / ARCHIVING CONTRACT #: 193 -2010 L (AAA, ° �� 1 ORIGINATING DEPARTMENT/DIVISION: OST CONTACT PERSON: Lindsey Utter PHONE #: 970.920.5224 PROJECT NAME: Rio Grande Trail Improvements Phase I ❑ BOCC AGENDA ITEM STAFF AUTHORIZED SIGNATURE (Requires BOCC Signature) (per Revised Procurement Code 7/2005) ❑ Over $50,000 (Requires County Manager's Signature) ✓ CHECK PROCUREMENT TYPE: None ❑Informal ®Formal ❑Sole Source ❑Emergency ❑State Bid ❑ ['Compliance with House Bills 06 -1343 and 07 -1073 — Immigration Form (Under $10,000, Letters of Engagement, etc •DOLLAR AMOUNT: $28060 BUDGET LINE ITEM/LEDGER NUMBER: 118.58.02523.86121 ✓ CHECK CONTRACT TYPE: ❑Services/Maintenance ❑Employment (for county employees) ❑License/Use ❑Intergovernmental Agreement (Requires BOCC Action) ['Lease ❑Non -Profit Construction ❑Quasi- Public ['Goods, Equipment, Supplies EGrant Agreements (Requires BOCC Acj ;on) ("Other (e.g. revenue) Change Order /Contract Amendment �� 3 CONTRACTOR: Aspen Earthmoving COMPLETE LEGAL OF NAME OF BUSINESS (if different from contractor) Roaring Fork Earthmoving LLC, dba Aspen Earthmoving Contract Execution Date:Sept 29, 2010 Contract End Date: Nov 1 2011 Automatic Renewal: ❑Yes No Term of Contract: 41 tale All Contracts should be proofed for the following: 1 ✓ No Pages Missing 4 ✓ ®If a Page is Left Intentionally Blank —Note on Page ✓ Page numbered consecutively ✓ Alt Signatures Affixed ✓ ®All Dates Filled In ✓ ®All Other Blanks Filled In ✓ ®All Exhibits Attached ✓ ®HB 06 -1343 and 07 -1073 (Immigration Legislation) Included in RFP and/or Contract ✓ ®All Legal Descriptions Attached (if applicable) ✓ Notice of Award/Notice to Proceed Attached (if applicable) ✓ Warranty (if applicable) ✓ ®Special Instructions for Finance Department: ✓ Sent to Clerk and Recorder for Scanning/Archiving ✓ Authorized Staff Person's Name: Lindsey Utter BY CHECKING ABOVE AND ENTERING NAME, THE AUTHORIZED STAFF PERSON INDICATES THAT THE ATTACHED DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING. NOTE: CLERK'S OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE. 1 Rev 12/10/09 js Project Coding 118,58.02523.86121 Original Contract # 193 -2010 Cto-t, I� `I - R: • CHANGE ORDER/CONTRACT AMENDMENT • Change Order Number: 03 OWNER: Pitkin County Aspen CO 81611 CONTRACTOR: Aspen Earthmoving The Contract # 193 -2010 (the "Agreement ") dated September 29 2010 between the Board of County Commissioners of - Pitkin County (the "County ") and Roaring Fork Earthmoving LLC, dba Aspen Earthmoving, (the "Contractor "), is hereby amended as follows: Description of Change: Topsoil, Repairs to the Basalt/Old Snowmass trail and Cox driveway intersection, Arbaney Kittle Road repairs, and the project Bonus for limited disturbance during construction in Section 3 and 4. Reason for Change Items were not included in original contract price. Original Contract Price $ 610,705.00 Net Increase/Decrease in Contract Price (this change order) $ 28,060.00 Total Adjusted Contract Price (including this change order) $ 638,765.00 This change order extends the contract to November 1st, 2011. In all other respects the Agreement is in full force and effect and remains unchanged by this Amendment. 7 /0 / e- Owner Date oq 02' unI,, Rep Date gor 1 . t 8/25/11 TO: Lindsey Utter — Pitco Trails — Backup - 1. Topsoil section 1 reshape drainage, shoulder both sides of trail, and parallel to road. 28 Toads delivered @ $150.00 per Toad $4200.00 Grader, loader, labor to spread for 3 days- $5500.00 Total 1. $9700.00 2. Cox Driveway- remove asphalt trail and regrade transition, trial crossing 23 Jun: 12 Hrs 426 backhoe- $1500.00 6 hrs dumptruck - $510.00 24 Jun: 1 Toad 3/4" rb, $300.00 1 load recycled asphalt- $300.00 Labor 12 hrs - $480.00 Total 2. $3090.00 3. Arbaney Kittle Trailhead — 28 Jun 8 hours 426- $1000.00 3 loads %" rb - $900.00 29 Jun 8 hrs grader- $1200.00 4 hrs roller - $480.00 4 hrs water truck - $440.00 Total 3. $4020.00 4. Topsoil section 6- 3 loads topsoil @$150.00= $450.00 Labor /equipt $800.00 Total: 4 $1250.00 Total 1 -4: $18,060.00 Rick Stevens 2