HomeMy WebLinkAboutbocc.con.080.2011A CLERK'S CHECK LIST
FOR CONTRACTS SUBMITTED TO CLERK AND RECORDER FOR SCANNING /ARCHIVING
CONTRACT #: 080 -2011A 1 J lr
ORIGINATING DEPARTMENT/DIVISION: Resource Recovery ✓ /`1/// ✓��
CONTACT PERSON: Hilary Burgess PHONE #: 429 -2883
PROJECT NAME: Final Cover Design & Liquid Waste Processing Recommendation
❑ BOCC AGENDA ITEM STAFF AUTHORIZED SIGNATURE
(Requires BOCC Signature) (per Revised Procurement Code 7/2005)
® Over $50,000 (Requires County Manager's Signature)
✓ CHECK PROCUREMENT TYPE:
❑None [Informal ®Formal ['Sole Source ❑Emergency ['State Bid ❑
['Compliance with House Bills 06 -1343 and 07 -1073 — Immigration Form (Under $10,000, Letters of Engagement, e
DOLLAR AMOUNT: $58,949 BUDGET LINE ITEM/LEDGER NUMBER: 416.64.00000.82722
1
✓ CHECK CONTRACT TYPE:
®Services/Maintenance ❑Employment (for county employees)
❑License/Use ❑Intergovernmental Agreement (Requires BOCC Action)
['Lease ❑Non - Profit
❑Construction ❑ uasi- Public
['Goods, Equipment, Supplies rant Agreements (Requires BOCC Action)
['Other (e.g. revenue) Change Order /Contract Amendment
CONTRACTOR: Weaver Boos Consultants COMPLETE LEGAL OF NAME OF BUSINESS (if different from
contractor)
Contract Execution Date:6 /1/2011 Contract End Date: 12/31/2011
Automatic Renewal: [Wes No Term of Contract: 7 months i ,
o All Contracts should be proofed for the following:
✓ No Pages Missing
✓ ® If a Page is Left Intentionally Blank —Note on Page
✓ Pa numbered consecutively
✓
All Signatures Affixed
✓
All Dates Filled In
✓ ®All Other Blanks Filled In
✓ ®All Exhibits Attached
✓ ®HB 06 -1343 and 07 -1073 (Immigration Legislation) Included in RFP and/or Contract
✓ ❑All Legal Descriptions Attached (if applicable)
✓
['Notice of Award/Notice to Proceed Attached (if applicable)
✓ ❑Warranty (if applicable)
✓ ❑Special Instructions for Finance Department:
✓ Sent to Clerk and Recorder for Scanning/Archiving
✓ Authorized Staff Person's Name: Chris Hoofnagle
BY CHECKING ABOVE AND ENTERING NAME, THE AUTHORIZED STAFF PERSON INDICATES THAT
THE ATTACHED DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING.
Contract # 080 -2011 Rev. 8.31.11 jaa/js
Budget Line Item # TASK (1) 416.64.00000.82722: TASK (2) 416.68.82664.82843
'
-1)
0 q
C
1
CHANGE ORDER/CONTRACT AMENDMENT
Change Order Number: 080 -2011 A
OWNER: Pitkin County
Aspen, Colorado 81611
CONTRACTOR:
The Agreement dated June 1, 2011 between the Board of County Commissioners of Pitkin County (the
"County ") and Weaver Boos Consultants. LLC. (the "Contractor"), is hereby amended as follows:
Description of Change: revised scope of work is attached.
Reason for Change: Further understanding of the Landfill engineering needs has been developed with the
contractor through discussions since date of contract. The procurement process leading up to this point has
included a Formal Request for Qualifications from which this contractor was chosen as a qualified bidder
along with one other firm. Following the qualifications step, and RFP was issued to the two qualifying
firms.
Original Contract Price $ 39328
Net Increase/Decrease in Contract Price (this change order) $ 19,621
*Total Adjusted Contract Price (including this change order) $ 58,949
This change order extends the time to complete work until June 31 2012.
In all other respects the Agreement is in full force and effect and remains unchanged by this
Ame dment.
C, tkfti /aot`
Contractor Date
1, it 1 la 1, /i
Proc = ' ent Officer Date
, , ,,<T , „
- :2 . _____
1 I // ) /1
County Merger Date
*Increases over $25,000 and/or 10 %sin a increase or accumulative) f
( o o 'nal contract must h
� � have
County Manager signature.
5675 DTC BOULEVARD, SUITE 210
DENVER, COLORADO 80111
NSCIWOMIll PHONE: 720.529.0132
cwr a V zir FAX: 720.529.0137
LL:
MEMORANDUM
TO: Chris Hoofnagle DATE: July 27, 2011
Pitkin County
FROM: John Briest, PE a PROJECT: 2796495- 11 -00 -01
Jeremy Welch, PE's/
Weaver Boos Consultants, LLC
RE: Revised Statement of Work for Pitkin County Landfill 2011
Please find attached the proposal for the revised scope of work at the Pitkin County
Landfill. This proposal contains the anticipated labor and supplies to complete the given
project and provide necessary correspondence with regulatory agencies.
Weaver Boos Consultants, LLC appreciates the opportunity to assist Pitkin County with
these projects. If you have any questions or comments, please contact myself.
Thank you again for the opportunity.
F.•\PITK/N000N7NPROPOS 9LS12011 LANDFILL PROJECTSICOVERMEb1O REVISED PROPOS4L.DOC
PROPOSAL / STATEMENT OF WORK
REVISED
2011 LANDFILL ENGINEERING PROJECTS
PITKIN COUNTY LANDFILL
Prepared for
Pitkin County
April2011
July 2011 - Revised
Prepared by
Weaver Boos Consultants, LLC
5675 DTC Boulevard, Suite 210
Greenwood Village, CO 80111
720.529.0132
CONTENTS
STATEMENT OF WORK 1
Project Understanding 1
Scope of Work 1
Budget Summary 5
Assumptions 6
Weaver Boos Consultants, LLC
F:IPITKIN COU7V7YIPROPOSALS12011 LANDFILL PROJECTSIPROPOSAL REVISED.DOC 7/27/11
11
STATEMENT OF WORK
PROJECT UNDERSTANDING
Based on recent discussions with Pitkin County (PC), PC is requesting that Weaver Boos
Consultants, LLC (Weaver Boos) complete six separate 2011 landfill engineering
projects at the Pitkin County Landfill. The contents of this proposal were derived, in part,
from a conversation with Chris Hoofnagle during a July 15, 2011 site visit.
Weaver Boos has divided this effort into seven tasks to assist PC, in no particular order,
as follows:
Task 1 Work Area Maximization
Task 2 Final Cover Expansion
Task 3 Landfill Access Road Assessment
Task 4 Landfill Final Cover Design
Task 5 Landfill Soils Balance
Task 6 Liquid Waste Processing
The tasks listed above are discussed in detail within the following paragraphs.
SCOPE OF WORK
Task 1 — Work Area Maximization
Currently the facility has an existing composting operations area located on the west side
of the landfill. PC desires to expand the area to include a proposed compost/liquid
processing area and aggregate recovery operations area. The proposed location for the
proposed compost/liquid processing area and aggregate recovery area resides in a portion
of the landfill that, when filled to the currently approved fmal grade, will have steep
slopes that, at a minimum, will adversely affect their operations.
PC has asked Weaver Boos to review the existing fmal cover design and determine if
modifications can be made to increase the size of the work areas, as well as reduce the
slope of the final cover in these areas. If possible, PC would like there to be no loss in
airspace of the landfill due to any modifications made. Additionally, any modifications
need to tie into the existing composting work area (contour elevation 7650 mean sea
level).
Weaver Boos Consultants, LLC
F:IPITKIN COUNlYIPROPOSALSI2011 LANDFILL PROJECTS\PROPOSAL REVISED.DOC 7/27/11
1
To complete this task, Weaver Boos anticipates that the following modifications will
require an update of the following sections and/or drawings to the currently approved
Engineering, Design and Operations Plan (EDOP):
• Section 3.1 — Final Cover (and related subsections)
• Drawing 2 — Final Cover Plan View
• Drawing 3 — Composting Facility Plan
• Appendix A -1 — Airspace and Landfill Life
Task 2 — Final Cover Expansion
Currently the limits of final cover at the facility do not extend to the limits of the waste
footprint in the area around the existing scalehouse and materials recovery facility. PC
would like to extend the limits of final cover in this area to encompass the area of
uncovered waste. This will allow the facility to cover all of the waste in place, as well as
hopefully gain additional airspace in this area.
To complete this task, Weaver Boos anticipates that the following modifications will
require an update of the following sections and /or drawings to the currently approved
EDOP:
• Section 3.1 — Final Cover (and related subsections)
• Drawing 1 — Existing Conditions and Closure Phases
• Drawing 2 — Final Cover Plan View
• Drawing 3 — Composting Facility Plan
• Appendix A -1 — Airspace and landfill Life
Task 3 — Landfill Access Road Assessment
The current proposed access road for the landfill at closure is routed around the southern
edge of the landfill and is not wide enough to accommodate two tractor trailers at the
same time.
Under this task, Weaver Boos would assess the placement of the access road at closure to
determine if a different alignment would be preferable. Weaver Boos will take into
consideration that the scalehouse and materials recovery facility will eventually be
moved north of the current location. Additionally, PC has requested that Weaver Boos
widen the road to allow for a driving surface having an overall width of 34 feet.
To complete this task, Weaver Boos anticipates that the following modifications will
require an update of the following sections and/or drawings to the currently approved
EDOP:
• Section 3.1 — Final Cover (and related subsections)
Weaver Boos Consultants, LLC
F: SP1TKIN COUNTfPROPOSALSI2011 LANDFILL PROJECTSIPROPOSAL REVISED.DOC 7/27/11
2
•
• Drawing 2 — Final Cover Plan View
• Drawing 3 — Composting Facility Plan
• Drawing 6 — Final Cover and Surface Water Details (Sheet 2 of 2)
• Appendix A -1 — Airspace and Landfill Life
Task 4 — Landfill Final Cover Design
Under this task, Weaver Boos will enter discussions with Colorado Department of Public
Health and Environment (CDPHE) on the site's ability to utilize an evapotranspirative
cover (ET cover). Weaver Boos believes an ET cover would serve PC in the following
beneficial manner:
1. The types of soils which may be used as part of the fmal cap will provide greater
flexibility to the site and ultimately reduce costs.
2. The ET cover will be more compatible with the vegetation used/specified in the
Land Use Master Plan.
3. ET covers are compatible with incorporating other site features, such as access
roads.
Permitting an ET cover will involve the following:
Weaver Boos will provide material and construction specifications, as well as developing
testing requirements for the ET components. For the purpose of this proposal, Weaver
Boos has assumed that CDPHE will not require testing for the site specific soils, or on-
site processed soils for suitability of an ET cover. In general, a wide range of soils can be
utilized for ET cover construction when certain construction and vegetation establishment
procedures are followed. The alternative cover system will consist of the following, in
general with thickness assumed (top to bottom):
• 12 -inch (minimum) vegetation layer;
• 24 -inch (minimum) vegetation support layer;
• 12- inch -thick (minimum) foundation layer; and
• Top of trash.
The demonstrations will include the use of UNSAT -H (computer model) to make the
alternative fmal cover demonstration based on available guidance information.
Weaver Boos will develop a permit modification for submittal to CDPHE, which will
include the alternative final cover demonstration. One draft copy will be sent to PC for
review and comment. Weaver Boos will then discuss with PC, via teleconference, any
comments or questions regarding the permit modification. Once a mutually agreed upon
permit modification has been developed, Weaver Boos will submit same to the CDPHE.
Weaver Boos will provide one copy of the final document to CDPHE and two copies to
PC.
Weaver Boos Consultants, LLC
F: IPITKIN COUNTYIPROPOSALS12011 LANDFILL PROJECTSIPROPOSAL REVISED.DOC 7/27/11
3
Additionally, under this task, Weaver Boos will prepare a comment response and any
required revisions to the permit modification or provide additional information requested
by the CDPHE. PC should understand that there will likely be technical comments on this
document from CDPHE, given that there have been few, if any, ET covers submitted in
recent years. Weaver Boos has not incorporated the cost of a response to such comments,
but a response would be provided at an additional cost on a time and materials basis.
Weaver Boos expects to have a draft submittal for PC to review within 60 days.
To complete this task, Weaver Boos anticipates that the following modifications will
require an update of the following sections and/or drawings to the currently approved
EDOP:
• Section 3.1 — Final Cover (and related subsections)
• Drawing 5 — Final Cover and Surface Water Details (Sheet 1 of 2)
• Drawing 6 — Final Cover and Surface Water Details (Sheet 2 of 2)
Task 5 — Landfill Soils Balance
Under this task, Weaver Boos would assess the soil balance at the facility to determine if
enough soil is available to complete the approved final cover or proposed ET cover,
depending on the results of Task 4, and any other projects PC desires to pursue.
Should the soils balance analysis determine that the facility does not have sufficient
quantities of soil to complete the approved final cover or proposed ET cover, Weaver
Boos will analyze the approved limits of earthwork moving activity boundary to
determine if relocating this boundary can provide an adequate amount of soil to complete
the approved final cover or proposed ET cover. A maximum slope of 2:1 will be assumed
for areas of excavation within the earthwork moving activity boundary.
Weaver Boos anticipates that modifications could potentially be required to the landfill's
amended Public Zone District Master Plan, dated April 2010, including updating the text
and drawings. The cost to update this plan as part of this task is not included within the
stated budget.
Task 6 — Liquid Waste Processing
In discussions with PC, PC desires to evaluate the possibility of a septic waste processing
area at the landfill facility. PC is interested in options to process, at a minimum, 1.5
million gallons of septic waste with it potentially being scalable to 2 million gallons.
Based upon the Land Use Master Plan, the Aspen Consolidated Sanitation District
(ACSD) has stopped accepting wastes from pumping septic tanks at its sewage treatment
plant. Therefore, PC would like to evaluate the possibility of accepting septic wastes at
this facility.
Weaver Boos Consultants, LLC
F:\RITKINCOUNTYIPROPOSALS12O11 LANDFILL PROJECTSIPROPOSAL REVISED.DOC 7/27/11
4
As PC is aware, both Rio Blanco and Garfield Counties accept septic wastes. Weaver
Boos personnel did the design and permitting on Rio Blanco, which was approved by
CDPHE.
Aside from the designs at Rio Blanco and Garfield Counties, there are prepackage units
(Lakeside) available to treat septic waste. These units would process the incoming waste
and create two effluents; the first being "objectionable" wastes, which are typically
landfilled, and the second being liquid wastes. The liquid wastes could then be disposed
of at the ACSD, solidified through a solidification process or potentially treated further.
These options would all depend on PC input and external factors, such as the ACSD.
Weaver Boos will generate a pro forma for PC. The intent of the pro forma is for PC to
understand what the cost benefit will be for taking on such an operation. The pro forma is
seen as an important step due to the fact that this is a new waste stream and potential
revenue source for PC. As part of this task, Weaver Boos will evaluate potential options
with the assistance of PC. Weaver Boos will evaluate the current costs structure for each
option. Included in the proposal will be the cost of capital items and other miscellaneous
costs, including operational costs to maintain and operate such a facility.
BUDGET SUMMARY
The estimated cost to perform the proposed work is presented in the following table and
will be billed on a time and material basis as the project tasks are completed. The
estimated cost and proposed scope of work are based on information available to Weaver
Boos at this time. It is expected that work will begin as soon as PC approves the scope of
work.
2011 Landfill Engineering Projects
Pitkin County Landfill
Task Description Labor Direct Task
Costs Costs Total
Task 1 — Work Area Maximization $5,334 $300 $5,634
Task 2 — Final Cover Expansion $5,334 $300 $5,634
Task 3 — Landfill Access Road Assessment $3,855 $300 $4,155
Task 4 — Landfill Final Cover Design $22,986 $1,968 $24,954
Task 5 — Landfill Soils Balance $3,898 $300 $4,198
Task 6 — Liquid Waste Processing $12,369 $2,005 $14,374
Total 1 $58,949
Weaver Boos Consultants, LLC
F:IPITKIN COUN7YIPROPOSALSI20II LANDFILL PROJECTSPROPOSAL REVISED.DOC 7/27/11
5
ASSUMPTIONS
We have developed the preceding approach based on our understanding of the project.
The following is a list of assumptions:
• Weaver Boos personnel will have unfettered access to all areas of the site, as
necessary, to perform the required services.
• PC will provide all data (survey, analytical, AutoCAD files, etc.) in order for
Weaver Boos to complete the tasks.
• Field activities are not included.
• No survey is included, but PC may desire to have an aerial mapping service
contour the site for the EDOP update.
• No construction quality assurance (CQA) services or construction drawings for
installation of the ET cover are included.
• CDPHE is currently providing guidance documentation for ET covers. Weaver
Boos assumes that this guidance will not impact Task 4.
• Task 4 assumes that the CDPHE will be receptive to an ET cover at Pitkin County
Landfill. If CDPHE is not receptive, Weaver Boos will ask to re- evaluate this
proposed task.
• The proposed budget assumes that the entire scope of work will be approved by
PC. Should PC only approve certain tasks the budget for the approved tasks may
likely increase.
• Tasks 1 through 4 will be submitted to the CDPHE for review. It is likely that the
CDPHE may have comments regarding these items. This proposal does not
include the costs related to addressing these comments; however, this can be
provided at an additional cost.
• Weaver Boos anticipates providing one draft review document to PC for each
task. Upon receipt of PC comments, Weaver Boos will finalize said document.
• All work is scheduled to be completed and submitted to CDPHE by December 31,
2011.
• The costs do not include a full hard copy update to the EDOP or the Public Zone
District Master Plan, rather only the relevant sections, drawings, etc.