ISSUE STATEMENT
:
The airport’s current Passenger Facility Charge (PFC) collection authoritywill expire later this year.
To ensure continuingcollection of this significant source of capital improvement revenue,
submission of anew PFC application to the Federal Aviation Administration (FAA) is necessary at
this time.
BACKGROUND
:
In June of 2010the Board ofCounty Commissioners approved a resolution to continue a $4.50
Passenger Facility Charge (PFC) on each enplaned passenger, which is added to airline tickets,
collected by our airlines, and thenremitted to us for use for capital improvement projects at the
airport. With our existing level of passenger enplanements, the PFC application approved in
2010(PFC number seven), is expected to expire late in the second quarter of 2012, so
submissionof a new PFC application (number eight) isnow necessary.
PFC application number eightwill provide $3,211,592of revenue for the six projects.
1. Snow RemovalEquipment-Runway Plow
This project will entail replacement of the airportsmid 1990s Plow. This olderhigh speed
runway plow with 12’ plow blade and 12’ wing blade will be replaced with a new high speed
plow, 22’ plow blade and attachments for runway deicing operations. The current equipment
is almost 20 years old, becoming unreliable and replacement parts are hard to find. The total
cost of this project is estimated at $500,000. PFCs are anticipated to fund 100% of this
project. This project will begin in May 2012 and is anticipated forcompletionin May of 2013.
Runway Extension
2.
This project was for the construction of an additional 1,000foot runway and taxiway
extensiondesignatedfor takeoff only. Included in this extensive project were relocation of an
existing domestic water system, paved shoulders, a full parallel taxiway, a teacup taxiway
system to improve landing/takeoff efficiency, and improved drainage along a small portion of
the safety area. The total cost of this project is $15,575,100. Of this amount, FAA AIP Grants
provided $12,710,779. The State of Colorado provided a grant for $447,689. PFCs are
anticipated to fund the remaining $2,416,632.
3. Construct Connector Taxiway "A-3"
This project consists of construction of Taxiway A-3 between the existing connector
Taxiways “A2” and “A4”. Lighting, signage, and paved shoulders areincluded in the project.
The total cost of this project is $941,731. AIP Grant 3-08-0003-46 provided $894,644. PFCs
are anticipated to fund the local match of $47,087. This project started in December, 2011 and
will be complete by December, 2012.
4. Construct South De-Ice Pad Apron
This project consists of construction of a De-Ice Pad Apron, associated facilities and drainage
on the north side of the existing holding apron at Taxiways “A7” and “A8”. This area was
originally planned and developed to accommodate this development when the East Side
Infrastructure Development (ESID) project was constructed. The project will design and
construct a De-Ice apron that will allow for aircraft de-icing operations in an environmentally
sound manner. The new de-icing area will be able to accommodate at least two commercial
aircraft. The total cost of this project is $2,664,611. AIP Grant3-08-0003-46 provided
$1,007,754, also 2012AIP funds are anticipated to providean additional $1,143,626. The
State of Colorado will provide $400,000 and PFCs are anticipated to fund the local match of
$113,231. This project started in December 2011 and will be complete in December, 2012.
Runway Safety Area Improvements
5.
This project consists of improvements to the Runway Safety Area including West Side
Drainage improvements. This will complete the west side safety area improvements for
Runway 15/33 contemplated in the 2007 runway rehabilitation project. A subsurface drainage
system will be installed to collect water from safety area runoff primarily during spring runoff
and heavy rain events. This project will reduce ponding and erosion that currently requires
aggressive maintenance to maintain Part 139 grading criteria. The total cost of this project is
$1,611,016. AIP 2012Grant Funds providingan additional$506,374 are anticipated, along
with $1,000,000 in State of Colorado grants. PFCs are anticipated to fund the remaining
$104,642. This project is anticipated to start in March, 2012 and will be complete in
December, 2012.
6. PFC Application & Administration Fees
This project includes PFC-eligible general formation costs necessary to prepare the PFC
application, develop and implement the capital plan, related financial plan, and the determination
of the required PFCamount. The total cost of this project is estimated to be $30,000 to be funded
100% with PFCs. This project started in November, 2011 and will be complete by July, 2012.
LINK TO STRATEGIC PLAN:
PFC revenue is an important source of airport capital
improvement funds, which helps the airport meet all of our strategic plan goals, includingthat of
financial self-sufficiency.
KEY DISCUSSION ITEMS:
Resolution authorizing PFC application number eight.
BUDGETARY IMPACT:
This next PFC applicationwill provide over $3.2million of capital
improvementfunds for the airportover the next three and 1/2years.For2012,PFC’s are
forecast to provide more than$1,115,110of capital improvement funds to the airport.
RECOMMENDED BOCC ACTION:
Motion to pass on first reading and set for second
reading and public hearing on February 8, 2012, a Resolution authorizing the filing of a new
Passenger Facility Charge application with the FAA
ATTACHMENTS:
PFC Application Resolution
AGENDA ITEM SUMMARY
REGULAR MEETING DATE:
January 18, 2012
AGENDA ITEM TITLE
:A Resolution of the Board of County Commissioners
of Pitkin County, Colorado Authorizing the Filing
of a New Passenger Facility Charge Application
With the Federal Aviation Administration (FAA)
1st Reading
STAFF RESPONSIBLE: Jim Elwood, A.A.E., Airport Director
ISSUE STATEMENT
:
The airport’s current Passenger Facility Charge (PFC) collection authoritywill expire later this year.
To ensure continuingcollection of this significant source of capital improvement revenue,
submission of anew PFC application to the Federal Aviation Administration (FAA) is necessary at
this time.
BACKGROUND
:
In June of 2010the Board ofCounty Commissioners approved a resolution to continue a $4.50
Passenger Facility Charge (PFC) on each enplaned passenger, which is added to airline tickets,
collected by our airlines, and thenremitted to us for use for capital improvement projects at the
airport. With our existing level of passenger enplanements, the PFC application approved in
2010(PFC number seven), is expected to expire late in the second quarter of 2012, so
submissionof a new PFC application (number eight) isnow necessary.
PFC application number eightwill provide $3,211,592of revenue for the six projects.
1. Snow RemovalEquipment-Runway Plow
This project will entail replacement of the airportsmid 1990s Plow. This olderhigh speed
runway plow with 12’ plow blade and 12’ wing blade will be replaced with a new high speed
plow, 22’ plow blade and attachments for runway deicing operations. The current equipment
is almost 20 years old, becoming unreliable and replacement parts are hard to find. The total
cost of this project is estimated at $500,000. PFCs are anticipated to fund 100% of this
project. This project will begin in May 2012 and is anticipatedforcompletionin May of 2013.
Runway Extension
2.
This project was for the construction of an additional 1,000foot runway and taxiway
extensiondesignatedfor takeoff only. Included in this extensive projectwere relocation of an
existing domestic water system, paved shoulders, a full parallel taxiway, a teacup taxiway
system to improve landing/takeoff efficiency, and improved drainage along a small portion of
the safety area. The total cost of this project is $15,575,100. Of this amount, FAA AIP Grants
provided $12,710,779. The State of Colorado provided a grant for $447,689. PFCs are
anticipated to fund the remaining $2,416,632.
3. Construct Connector Taxiway "A-3"
This project consists of construction of Taxiway A-3 between the existing connector
Taxiways “A2” and “A4”. Lighting, signage, and paved shoulders are included in the project.
The total cost of this project is $941,731. AIP Grant 3-08-0003-46 provided $894,644. PFCs
are anticipated to fund the local match of $47,087. This project started in December, 2011 and
will be complete by December, 2012.
4. Construct South De-Ice Pad Apron
This project consists of construction of a De-Ice Pad Apron, associated facilities and drainage
on the north side of the existing holding apron at Taxiways “A7” and “A8”. This area was
originally planned and developed to accommodate this development when the East Side
Infrastructure Development (ESID) project was constructed. The project will design and
construct a De-Ice apron that will allow for aircraft de-icing operations in an environmentally
sound manner. The new de-icing area will be able to accommodate at least two commercial
aircraft. The total cost of this project is $2,664,611. AIP Grant3-08-0003-46 provided
$1,007,754, also 2012AIP fundsare anticipated to providean additional $1,143,626. The
State of Colorado will provide $400,000 and PFCs are anticipated to fund the local match of
$113,231. This project started in December 2011 and will be complete in December, 2012.
Runway SafetyArea Improvements
5.
This project consists of improvements to the Runway Safety Area including West Side
Drainage improvements. This will complete the west side safety area improvements for
Runway 15/33 contemplated in the 2007 runway rehabilitation project. A subsurface drainage
system will be installed to collect water from safety area runoff primarily during spring runoff
and heavy rain events. This project will reduce ponding and erosion that currently requires
aggressive maintenance to maintain Part 139 grading criteria. The total cost of this project is
$1,611,016. AIP 2012 Grant Funds providingan additional$506,374 are anticipated, along
with $1,000,000 in State of Colorado grants. PFCs are anticipated to fund the remaining
$104,642. This projectis anticipated to start in March, 2012 and will be complete in
December, 2012.
6. PFC Application & Administration Fees
This project includes PFC-eligible general formation costs necessary to prepare the PFC
application, develop and implement the capital plan, related financial plan, and the determination
of the required PFC amount. The total cost of this project is estimated to be $30,000 to be funded
100% with PFCs. This project started in November, 2011 and will be complete by July, 2012.
LINK TO STRATEGIC PLAN:
PFC revenue is an important source of airport capital
improvement funds, which helps the airport meet all of our strategic plan goals, includingthat of
financial self-sufficiency.
KEY DISCUSSION ITEMS:
Resolution authorizing PFC application number eight.
BUDGETARY IMPACT:
This next PFC applicationwill provide over $3.2million of capital
improvementfunds for the airportover the next three and 1/2years.For2012,PFC’s are
forecast to provide more than$875,000 of capital improvement funds to the airport.
RECOMMENDED BOCC ACTION:
Motion to pass on first reading and set for second
reading and public hearing on February 8, 2012, a Resolution authorizing the filing of a new
Passenger Facility Charge application with the FAA
ATTACHMENTS:
PFC Application Resolution
RESOLUTION OF THE
BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO
AUTHORIZING THE FILING OFA NEW PASSENGER FACILITY CHARGE
APPLICATION WITHTHE FEDERAL AVIATION ADMINISTRATION (FAA)
Resolution # ______ Series 2012
1.Pitkin County, a Colorado home-rule County, is the owner, sponsor and operator
of the Aspen/Pitkin County Airport (Sardy Field), located in the vicinity of
Aspen, Colorado, and has the authority to regulate commercial activities and to
lease and license space at the Airport, pursuant to, inter alia, 1973 C.R.S. 41-4-
101et. Seq.,30-35-202, Title 10 of the Pitkin County Code, and Section 8.7.2 of
the Pitkin County Home Charter.
2.Pitkin County owns, operates maintains and develops the Airport, in Part, with
Federal grants, state funds, Passenger Facility Charges (PFC), and user fees; and
3.In April 2002, Pitkin County first adopted a $4.50 PFC to fund certain capital
projects; and
4.The Airport intends to continue to collect the $4.50 PFC to accomplish additional
projects designed to enhance capacity, safety and improvementof the
Aspen/Pitkin County Airport.
NOW THEREFORE BE IT RESOLVED by the Board of County Commissioners of
Pitkin County, Colorado that:
Section 1
The Board of County Commissioners hereby designates the Director of Aviation as the
authorized official to file a new application with the Federal Aviation Administration
(FAA) and upon FAA approval authorizes the imposition of a PFC at the $4.50 level on
each eligible passenger enplaned at the Aspen/Pitkin County Airport,as defined by FAA
in 14CFR Part 158.9.
Section 2
It is the intent of Pitkin County that such revenues from the PFC at Aspen/Pitkin County
Airport,shall be used in accordance with the capital development program, and the
assurances and understandings contained in the application.
INTRODUCED, FIRST READ, AND SET FOR PUBLIC HEARING ON JANUARY
25, 2012.
NOTICE OF PUBLIC HEARING PUBLISHED IN THE ASPEN TIMES WEEKLYON
JANUARY 26, 2012.
FULL TEXT OF THE RESOLUTION POSTED IN FULL ON THE ASPEN PITKIN
COUNTY WEBSITE ON JANUARY 27, 2012.
TH
ADOPTED AFTER FINAL READING AND PUBLIC HEARING ON THE 8DAY
OF FEBRUARY, 2012.
PUBLISHED BY TITLE AND SHORT SUMMARY, AFTER ADOPTION, IN THE
TH
ASPEN TIMES WEEKLYONTHE 16DAY OF FEBRUARY, 2012.
ATTEST:BOARD OF COUNTY
COMMISSIONERS OF PITKIN
COUNTY, COLORADO
___________________________________________________________
Jeanette JonesMichael M. Owsley
Deputy Clerk and RecorderChair
Date: _________________________
APPROVED AS TO FORM:APPROVED AS TO CONTENT:
__________________________________________________
John M. Ely,James P. Elwood, A.A.E.
County AttorneyDirector of Aviation