HomeMy WebLinkAboutbocc.res.010.2012 RESOLUTION OF THE
BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO
AUTHORIZING THE FILING OF A NEW PASSENGER FACILITY CHARGE
APPLICATION WITH THE FEDERAL AVIATION ADMINISTRATION (FAA)
Resolution # D/ Series 2012
1. Pitkin County, a Colorado home- rule County, is the owner, sponsor and operator
of the Aspen /Pitkin County Airport (Sardy Field), located in the vicinity of
Aspen, Colorado, and has the authority to regulate commercial activities and to
lease and license space at the Airport, pursuant to, inter alia, 1973 C.R.S. 41 -4-
101 et. Seq., 30 -35 -202, Title 10 of the Pitkin County Code, and Section 8.7.2 of
the Pitkin County Home Charter.
2. Pitkin County owns, operates maintains and develops the Airport, in Part, with
Federal grants, state funds, Passenger Facility Charges (PFC), and user fees; and
3. In April 2002, Pitkin County first adopted a $4.50 PFC to fund certain capital
projects; and
4. The Airport intends to continue to collect the $4.50 PFC to accomplish additional
projects designed to enhance capacity, safety and improvement of the
Aspen/Pitkin County Airport.
NOW THEREFORE BE IT RESOLVED by the Board of County Commissioners of
Pitkin County, Colorado that:
Section 1
The Board of County Commissioners hereby designates the Director of Aviation as the
authorized official to file a new application with the Federal Aviation Administration
(FAA) and upon FAA approval authorizes the imposition of a PFC at the $4.50 level on
each eligible passenger enplaned at the Aspen /Pitkin County Airport, as defined by FAA
in 14CFR Part 158.9.
Section 2
It is the intent of Pitkin County that such revenues from the PFC at Aspen/Pitkin County.
Airport, shall be used in accordance with the capital development program, and the
assurances and understandings contained in the application.
� l
INTRODUCED, FIRST READ, AND SET FOR PUBLIC HEARING ON JANUARY
25, 2012.
NOTICE OF PUBLIC HEARING PUBLISHED IN THE ASPEN TIMES WEEKLY ON
JANUARY 26, 2012.
FULL TEXT OF THE RESOLUTION POSTED IN FULL ON THE ASPEN PITKIN
COUNTY WEBSITE ON JANUARY 27, 2012.
ADOPTED AFTER FINAL READING AND PUBLIC HEARING ON THE 8 DAY
OF FEBRUARY, 2012.
PUBLISHED BY TITLE AND SHORT SUMMARY, AFTER ADOPTION, IN THE
ASPEN TIMES WEEKLY ON THE 16 DAY OF FEBRUARY, 2012.
ATTEST: BOARD OF COUNTY
COMMISSIONERS OF PITKIN
% COUNTY, COLORADO
L A. ki Li /6
�•
Je.� ette Jones Michael M. Owsley
D- •uty Clerk and ecorder Chair
Date: APPROVED AS AS TO FORM: APPROVED AS TO CONTENT:
John ) . y, • „ , P. Elwood, A. .E.
Ct. • • ney Director of Aviation
COUNTY MANAGER:
Jon Peacock
G/ e - 207.2—
U.S. Department Northwest Mountain Region 16011.,ind Avenue, S. W.
of Transportation Colorado, Idaho, Montana Renton, Washington 98057
p Oregon, Utah, Washington,
Wyoming
•
Federal Aviation
Administration
February 17, 2012
Mr. James P. Elwood, AAE •
Director of Aviation
Aspen /Pitkin County Airport
0233 East Airport Road
Aspen, CO 81611
RE: PFC Application: 12- 08 -C -00 -ASE
Dear Mr. Elwood:
In accordance with 49 United States Code (U.S.C.) 40117 and Section 205(a) of the Surface
and Air Transportation Programs Extension Act of 2011, Part II, Public Law 112 -30, enacted
September 16, 2011, the Federal Aviation Administration (FAA) acknowledges your notice of
intent to impose a Passenger Facility Charge (PFC) at Aspen /Pitkin County Airport (ASE) and to
use PFC revenue at ASE.
The authority to impose a PFC is contingent on your continued compliance with the terms of 49
U.S.C. 40117, 14 Code of Federal Regulations (CFR) Part 158 and any conditions included in
this letter. Your notice of intent, submitted on February 10, 2012 has been assigned the
following PFC number: 12- 08 -C -00 -ASE.
The FAA does not have any particular objections to your proposed projects, or your notice of
intent, in total. Therefore, the FAA acknowledges that you will begin collecting a PFC for ASE at
a $4.50 level on August 1, 2012 and complete your collections on February 1, 2016.
Furthermore, the FAA acknowledges that you will collect the following amounts for the following
projects identified below.
PFC Approved
Num. Protect Title Level Type Protect Status PFC
001 Acquire Snow Removal Equipment (Plow). $4.50 Concurrent Acknowledged $500,000
002 Extend Runway 15/33. $4.50 Concurrent Acknowledged $2,416,632
003 Construct Connector Taxiway. $4.50 Concurrent Acknowledged $47,087
004 Construct South De -ice Pad Apron. $4.50 Concurrent Acknowledged $113,231
005 Improve Runway Safety Area. $4.50 Concurrent Acknowledged $104,642
006 PFC Application and Administration Fees. $4.50 Concurrent Acknowledged $30,000
Total $3,211,592
All projects are pay -as- you -go financed. The public agency did not receive any disagreement
as a result of their public notice and air carrier consultation meeting.
•
3
2
The public agency requests that the following class of air carrier be excluded from the requirement to
collect PFC's: Nonscheduled /On- Demand Carriers — ATCO filing FAA Form 1800 -31.
All public agencies collecting PFC's are sdbject to reporting, recordkeeping, and auditing
requirements as described in Part 158, Subpart D (section 158.61 et. seq.).
The charge- effective date must be the first day of the month and must be at least 30 days from
the date of this letter. We request that you provide a copy of your notice to the FAA when you
notify the domestic and foreign air carriers to begin collecting PFC's. Also, you are responsible
for coordinating any construction with the appropriate federal offices, as you would with any
non- federally funded construction.
Be advised, section 158.33(a)(1) requires you to implement your concurrent impose and use
projects, that the FAA has not objected to, within 2 years of the date of this letter. Section
158.33(a)(1) requires the public agency to begin implementation of a project no later than 2
years after receiving clearance to use PFC revenue on that project.
Also be advised, that the ability to collect on this application is governed by either the charge -
expiration date, noted above, or when full collection authority (PFC collections plus interest) is
reached - whichever comes first. Therefore, it is important to monitor your rate of collection.
A decision summary table showing the cumulative history of PFC decisions for ASE is enclosed
for your use. We have also enclosed the list of advisory circulars with which you must comply in
accordance with your certification of assurance number 9, Standards and Specifications. Also,
you may wish to check out our website to confirm whether this action has been recorded on the
'PFC Approved Locations, Collections, and Expiration Dates' report. It is generated each
month, and is located at: www.faa.gov /airports /pfc /monthly_reports.
If you have any questions pertaining to this application, please contact Mr. Jesse Lyman of the
Denver Airports District Office, at: (303) 342 -1262. .
Sincerely,
... riegiti2se.
Carolyn T. Read
Manager, Planning, Environmental and Financial Programs Branch
Northwest Mountain Region
Enclosures
•
4/
3
Decision Summary Report
Approved for Approved for
Application Collection Use
93- 01 -C -00 -ASE* $1,533,541 $1,533,541
93- 01 -C -01 -ASE* 81,445 81,445
98-02-C-00-AS E* 1,020,000 1,020,000
98- 02 -C -01 -ASE* (145,883) (145,883)
99- 03 -C -00 -ASE* 1,354,000 1,354,000
99- 03 -C -01 -ASE* 26,097 26,097
02-04-C-00-AS E* 986,381 986,381
02- 04- C -01 -AS E* (273, 235) (273, 235)
04-05-C-00-AS E* 2,274,162 2,274,162
04-05-C-01-AS E* 11,999 11,999
07- 06 -C -00 -ASE 2,078,000 2,078,000
10- 07 -C -00 -ASE 1,640,955 1,640,955
12- 08 -C -00 -ASE 3, 211, 592 3,211,592
Report Total $13,799,054 $13,799,054
*Application is closed.
5
A p1.A
��° � ;11 \ FAA
�$�, a � Airports
ii_s_' RPM`
Current FAA Advisory Circulars Required for Use in AIP
Funded and PFC Approved Projects
Updated: 1/25/2012
View the most current versions of these ACs and any associated changes at:
http: / /www.faa.gov /airports /resources /advisory circulars
NUMBER TITLE
70/7460-1K Obstruction Marking and Lighting
150/5000 -13A Announcement of Availability —RTCA Inc., Document RTCA -221, Guidance
and Recommended Requirements for Airports Surface Movement Sensors
150/5020 -1 Noise Control and Compatibility Planning for Airports
150/5070 -6B Airport Master Plans
Change 1
150/5070 -7 The Airport System Planning Process
150/5100 -13B Development of State Standards for Non Primary Airports
150/5200 -28D Notices to Airmen (NOTAMS) for Airport Operators
150/5200 -30C Airport Winter Safety and Operations
150/5200 -33B Hazardous Wildlife Attractants On or Near Airports
150/5210 -5D Painting, Marking and Lighting of Vehicles Used on an Airport
150/5210 -7D Aircraft Rescue and Fire Fighting Communications
150/5210 -13C Airport Water Rescue Plans and Equipment
150/5210 -14B Aircraft Rescue Fire Fighting Equipment, Tools, and Clothing
150/5210 -15A Airport Rescue & Firefighting Station Building Design
150/5210 -18A Systems for Interactive Training of Airport Personnel
FAA Advisory Circulars Required for Use in Updated 1/25/2012 Page 1 of 5
AIP Funded and PFC Approved Projects ARP
NUMBER TITLE
150/5210 -19A Driver's Enhanced Vision System (DEVS)
150/5220 -10E Guide Specification for Aircraft Rescue and Firefighting Vehicles
150/5220 -16D Automated Weather Observing Systems for Non - Federal Applications
150/5220 -17B Aircraft Rescue and Firefighting (ARFF) Training Facilities
150/5220 -18A Buildings for Storage and Maintenance of Airport Snow and Ice Control
Equipment and Materials
150/5220 -20 Airport Snow and Ice Control Equipment
Change 1
150/5220 -21B Guide Specification for Lifts Used to Board Airline Passengers With Mobility
Impairments
150/5220 -22A Engineered Materials Arresting System (EMAS) for Aircraft Overruns
150/5220 -23 Frangible Connections
150/5220 -24 Foreign Object Debris Detection Equipment
150/5300 -7B FAA Policy on Facility Relocations Occasioned by Airport Improvements or
Changes
150/5300 -13 Airport Design
Changes 1 - 18
150/5300 -14B Design of Aircraft Deicing Facilities
150/5300 -16A General Guidance and Specifications for Aeronautical Surveys: Establishment
of Geodetic Control and Submission to the National Geodetic Survey
150/5300 -17C General Guidance and Specifications for Aeronautical Survey Airport Imagery
Acquisition and Submission to the National Geodetic Survey
150/5300 -18B General Guidance and Specifications for Submission of Aeronautical Surveys
to NGS: Field Data Collection and Geographic Information System (GIS)
Standards
150/5320 -5C Surface Drainage Design
Change 1
150/5320 -6E Airport Pavement Design and Evaluation
150/5320 -12C Measurement, Construction, and Maintenance of Skid Resistant Airport
Change 8 Pavement Surfaces
150/5320 -15A Management of Airport Industrial Waste
FAA Advisory Circulars Required for Use in Updated 1/25/2012 Page 2 of 5
AIP Funded and PFC Approved Projects ARP
NUMBER _ :'. TITLE
150/5325 -4B Runway Length Requirements for Airport Design
150/5335 -5B Standardized Method of Reporting Airport Pavement Strength PCN
150/5340 -1 K Standards for Airport Markings
150/5340 -5C Segmented Circle Airport Marker System
150/5340 -18F Standards for Airport Sign Systems
150/5340 -30F Design and Installation Details for Airport Visual Aids
150/5345 -3G Specification for L821 Panels for the Control of Airport Lighting
150/5345 -5B Circuit Selector Switch
150/5345 -7E Specification for L824 Underground Electrical Cable for Airport Lighting Circuits
150/5345-1OG Specification for Constant Current Regulators Regulator Monitors
150/5345 -12F Specification for Airport and Heliport Beacon
150/5345 -13B Specification for L841 Auxiliary Relay Cabinet Assembly for Pilot Control of
Airport Lighting Circuits
150/5345 -26D Specification for L823 Plug and Receptacle, Cable Connectors
150/5345 -27D Specification for Wind Cone Assemblies
150/5345 -28G Precision Approach Path Indicator (PAPI) Systems
150/5345 -39D FAA Specification L853, Runway and Taxiway Retroreflective Markers
150/5345 -42F Specification for Airport Light Bases, Transformer Housings, Junction Boxes
and Accessories
150/5345 -43F Specification for Obstruction Lighting Equipment
150/5345 -44J Specification for Taxiway and Runway Signs
150/5345 -45C Low - Impact Resistant (LIR) Structures
150/5345 -46D Specification for Runway and Taxiway Light Fixtures
150/5345 -47C Specifications for Series to Series Isolation Transformers for Airport Lighting
System
150/5345 -49C Specification L854, Radio Control Equipment
FAA Advisory Circulars Required for Use In Updated 1/25/2012 Page 3 of 5
AIP Funded and PFC Approved Projects ARP
NUMBER . TITLE
150/5345 -50B Specification for Portable Runway and Taxiway Lights
150/5345 -51 B Specification for Discharge -Type Flasher Equipment
150/5345 -52A Generic Visual Glideslope Indicators (GVGI)
150/5345 -53C Airport Lighting Equipment Certification Program
150/5345 -54B Specification for L -1884, Power and Control Unit for Land and Hold Short
150/5345 -55A Specification for L893, Lighted Visual Aid to Indicate Temporary Runway
Closure
150/5345 -56B Specification for L -890 Airport Lighting Control and Monitoring System
(ALCMS)
150/5360 -9 Planning and Design of Airport Terminal Facilities at Non -Hub Locations
150/5360 -12E Airport Signing and Graphics
150/5360 -13 Planning and Design Guidance for Airport Terminal Facilities
Change 1
150/5360 -14 Access to Airports By Individuals With Disabilities
150/5370 -2F Operational Safety on Airports During Construction
150/5370 -10F Standards for Specifying Construction of Airports
150/5370 -11 B Use of Nondestructive Testing Devices in the Evaluation of Airport Pavement
150/5380 -6B Guidelines and Procedures for Maintenance of Airport Pavements
150/5390 -2B Heliport Design
150/5395 -1 Seaplane Bases
FAA Advisory Circulars Required for Use in Updated 1/25/2012 Page 4 of 5
AIP Funded and PFC Approved Projects ARP
THE FOLLOWING ADDITIONAL APPLY TO AIP PROJECTS ONLY
DATED: 1/25/2012
NUMBER TITL "E
150/5100 -14D Architectural, Engineering, and Planning Consultant Services for Airport Grant
Projects
150/5100 -15A Civil Rights Requirements for the Airport Improvement Program
150/5100 -17 Land Acquisition and Relocation Assistance for Airport Improvement Program
Changes 1 - 6 Assisted Projects
150/5200 -37 Introduction to Safety Management Systems (SMS) for Airport Operators
150/5300 -15A Use of Value Engineering for Engineering Design of Airports Grant Projects
150/5320 -17 Airfield Pavement Surface Evaluation and Rating (PASER) Manuals
150/5370 -6D Construction Progress and Inspection Report — Airport Grant Program
Changes 1 - 4
150/5370 -12A Quality Control of Construction for Airport Grant Projects
150/5370 -13A Offpeak Construction of Airport Pavements Using Hot -Mix Asphalt
150/5380 -7A Airport Pavement Management Program
THE FOLLOWING ADDITIONAL APPLY TO PFC PROJECTS ONLY
DATED: 1/25/2012
NUMBER TITLE
150/5000 -12 Announcement of Availability — Passenger Facility Charge (PFC) Application
(FAA Form 5500 -1)
FAA Advisory Circulars Required for Use in Updated 1/25/2012 Page 5 of 5
AIP Funded and PFC Approved Projects ARP