Loading...
HomeMy WebLinkAboutbocc.res.010.2012 RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO AUTHORIZING THE FILING OF A NEW PASSENGER FACILITY CHARGE APPLICATION WITH THE FEDERAL AVIATION ADMINISTRATION (FAA) Resolution # D/ Series 2012 1. Pitkin County, a Colorado home- rule County, is the owner, sponsor and operator of the Aspen /Pitkin County Airport (Sardy Field), located in the vicinity of Aspen, Colorado, and has the authority to regulate commercial activities and to lease and license space at the Airport, pursuant to, inter alia, 1973 C.R.S. 41 -4- 101 et. Seq., 30 -35 -202, Title 10 of the Pitkin County Code, and Section 8.7.2 of the Pitkin County Home Charter. 2. Pitkin County owns, operates maintains and develops the Airport, in Part, with Federal grants, state funds, Passenger Facility Charges (PFC), and user fees; and 3. In April 2002, Pitkin County first adopted a $4.50 PFC to fund certain capital projects; and 4. The Airport intends to continue to collect the $4.50 PFC to accomplish additional projects designed to enhance capacity, safety and improvement of the Aspen/Pitkin County Airport. NOW THEREFORE BE IT RESOLVED by the Board of County Commissioners of Pitkin County, Colorado that: Section 1 The Board of County Commissioners hereby designates the Director of Aviation as the authorized official to file a new application with the Federal Aviation Administration (FAA) and upon FAA approval authorizes the imposition of a PFC at the $4.50 level on each eligible passenger enplaned at the Aspen /Pitkin County Airport, as defined by FAA in 14CFR Part 158.9. Section 2 It is the intent of Pitkin County that such revenues from the PFC at Aspen/Pitkin County. Airport, shall be used in accordance with the capital development program, and the assurances and understandings contained in the application. � l INTRODUCED, FIRST READ, AND SET FOR PUBLIC HEARING ON JANUARY 25, 2012. NOTICE OF PUBLIC HEARING PUBLISHED IN THE ASPEN TIMES WEEKLY ON JANUARY 26, 2012. FULL TEXT OF THE RESOLUTION POSTED IN FULL ON THE ASPEN PITKIN COUNTY WEBSITE ON JANUARY 27, 2012. ADOPTED AFTER FINAL READING AND PUBLIC HEARING ON THE 8 DAY OF FEBRUARY, 2012. PUBLISHED BY TITLE AND SHORT SUMMARY, AFTER ADOPTION, IN THE ASPEN TIMES WEEKLY ON THE 16 DAY OF FEBRUARY, 2012. ATTEST: BOARD OF COUNTY COMMISSIONERS OF PITKIN % COUNTY, COLORADO L A. ki Li /6 �• Je.� ette Jones Michael M. Owsley D- •uty Clerk and ecorder Chair Date: APPROVED AS AS TO FORM: APPROVED AS TO CONTENT: John ) . y, • „ , P. Elwood, A. .E. Ct. • • ney Director of Aviation COUNTY MANAGER: Jon Peacock G/ e - 207.2— U.S. Department Northwest Mountain Region 16011.,ind Avenue, S. W. of Transportation Colorado, Idaho, Montana Renton, Washington 98057 p Oregon, Utah, Washington, Wyoming • Federal Aviation Administration February 17, 2012 Mr. James P. Elwood, AAE • Director of Aviation Aspen /Pitkin County Airport 0233 East Airport Road Aspen, CO 81611 RE: PFC Application: 12- 08 -C -00 -ASE Dear Mr. Elwood: In accordance with 49 United States Code (U.S.C.) 40117 and Section 205(a) of the Surface and Air Transportation Programs Extension Act of 2011, Part II, Public Law 112 -30, enacted September 16, 2011, the Federal Aviation Administration (FAA) acknowledges your notice of intent to impose a Passenger Facility Charge (PFC) at Aspen /Pitkin County Airport (ASE) and to use PFC revenue at ASE. The authority to impose a PFC is contingent on your continued compliance with the terms of 49 U.S.C. 40117, 14 Code of Federal Regulations (CFR) Part 158 and any conditions included in this letter. Your notice of intent, submitted on February 10, 2012 has been assigned the following PFC number: 12- 08 -C -00 -ASE. The FAA does not have any particular objections to your proposed projects, or your notice of intent, in total. Therefore, the FAA acknowledges that you will begin collecting a PFC for ASE at a $4.50 level on August 1, 2012 and complete your collections on February 1, 2016. Furthermore, the FAA acknowledges that you will collect the following amounts for the following projects identified below. PFC Approved Num. Protect Title Level Type Protect Status PFC 001 Acquire Snow Removal Equipment (Plow). $4.50 Concurrent Acknowledged $500,000 002 Extend Runway 15/33. $4.50 Concurrent Acknowledged $2,416,632 003 Construct Connector Taxiway. $4.50 Concurrent Acknowledged $47,087 004 Construct South De -ice Pad Apron. $4.50 Concurrent Acknowledged $113,231 005 Improve Runway Safety Area. $4.50 Concurrent Acknowledged $104,642 006 PFC Application and Administration Fees. $4.50 Concurrent Acknowledged $30,000 Total $3,211,592 All projects are pay -as- you -go financed. The public agency did not receive any disagreement as a result of their public notice and air carrier consultation meeting. • 3 2 The public agency requests that the following class of air carrier be excluded from the requirement to collect PFC's: Nonscheduled /On- Demand Carriers — ATCO filing FAA Form 1800 -31. All public agencies collecting PFC's are sdbject to reporting, recordkeeping, and auditing requirements as described in Part 158, Subpart D (section 158.61 et. seq.). The charge- effective date must be the first day of the month and must be at least 30 days from the date of this letter. We request that you provide a copy of your notice to the FAA when you notify the domestic and foreign air carriers to begin collecting PFC's. Also, you are responsible for coordinating any construction with the appropriate federal offices, as you would with any non- federally funded construction. Be advised, section 158.33(a)(1) requires you to implement your concurrent impose and use projects, that the FAA has not objected to, within 2 years of the date of this letter. Section 158.33(a)(1) requires the public agency to begin implementation of a project no later than 2 years after receiving clearance to use PFC revenue on that project. Also be advised, that the ability to collect on this application is governed by either the charge - expiration date, noted above, or when full collection authority (PFC collections plus interest) is reached - whichever comes first. Therefore, it is important to monitor your rate of collection. A decision summary table showing the cumulative history of PFC decisions for ASE is enclosed for your use. We have also enclosed the list of advisory circulars with which you must comply in accordance with your certification of assurance number 9, Standards and Specifications. Also, you may wish to check out our website to confirm whether this action has been recorded on the 'PFC Approved Locations, Collections, and Expiration Dates' report. It is generated each month, and is located at: www.faa.gov /airports /pfc /monthly_reports. If you have any questions pertaining to this application, please contact Mr. Jesse Lyman of the Denver Airports District Office, at: (303) 342 -1262. . Sincerely, ... riegiti2se. Carolyn T. Read Manager, Planning, Environmental and Financial Programs Branch Northwest Mountain Region Enclosures • 4/ 3 Decision Summary Report Approved for Approved for Application Collection Use 93- 01 -C -00 -ASE* $1,533,541 $1,533,541 93- 01 -C -01 -ASE* 81,445 81,445 98-02-C-00-AS E* 1,020,000 1,020,000 98- 02 -C -01 -ASE* (145,883) (145,883) 99- 03 -C -00 -ASE* 1,354,000 1,354,000 99- 03 -C -01 -ASE* 26,097 26,097 02-04-C-00-AS E* 986,381 986,381 02- 04- C -01 -AS E* (273, 235) (273, 235) 04-05-C-00-AS E* 2,274,162 2,274,162 04-05-C-01-AS E* 11,999 11,999 07- 06 -C -00 -ASE 2,078,000 2,078,000 10- 07 -C -00 -ASE 1,640,955 1,640,955 12- 08 -C -00 -ASE 3, 211, 592 3,211,592 Report Total $13,799,054 $13,799,054 *Application is closed. 5 A p1.A ��° � ;11 \ FAA �$�, a � Airports ii_s_' RPM` Current FAA Advisory Circulars Required for Use in AIP Funded and PFC Approved Projects Updated: 1/25/2012 View the most current versions of these ACs and any associated changes at: http: / /www.faa.gov /airports /resources /advisory circulars NUMBER TITLE 70/7460-1K Obstruction Marking and Lighting 150/5000 -13A Announcement of Availability —RTCA Inc., Document RTCA -221, Guidance and Recommended Requirements for Airports Surface Movement Sensors 150/5020 -1 Noise Control and Compatibility Planning for Airports 150/5070 -6B Airport Master Plans Change 1 150/5070 -7 The Airport System Planning Process 150/5100 -13B Development of State Standards for Non Primary Airports 150/5200 -28D Notices to Airmen (NOTAMS) for Airport Operators 150/5200 -30C Airport Winter Safety and Operations 150/5200 -33B Hazardous Wildlife Attractants On or Near Airports 150/5210 -5D Painting, Marking and Lighting of Vehicles Used on an Airport 150/5210 -7D Aircraft Rescue and Fire Fighting Communications 150/5210 -13C Airport Water Rescue Plans and Equipment 150/5210 -14B Aircraft Rescue Fire Fighting Equipment, Tools, and Clothing 150/5210 -15A Airport Rescue & Firefighting Station Building Design 150/5210 -18A Systems for Interactive Training of Airport Personnel FAA Advisory Circulars Required for Use in Updated 1/25/2012 Page 1 of 5 AIP Funded and PFC Approved Projects ARP NUMBER TITLE 150/5210 -19A Driver's Enhanced Vision System (DEVS) 150/5220 -10E Guide Specification for Aircraft Rescue and Firefighting Vehicles 150/5220 -16D Automated Weather Observing Systems for Non - Federal Applications 150/5220 -17B Aircraft Rescue and Firefighting (ARFF) Training Facilities 150/5220 -18A Buildings for Storage and Maintenance of Airport Snow and Ice Control Equipment and Materials 150/5220 -20 Airport Snow and Ice Control Equipment Change 1 150/5220 -21B Guide Specification for Lifts Used to Board Airline Passengers With Mobility Impairments 150/5220 -22A Engineered Materials Arresting System (EMAS) for Aircraft Overruns 150/5220 -23 Frangible Connections 150/5220 -24 Foreign Object Debris Detection Equipment 150/5300 -7B FAA Policy on Facility Relocations Occasioned by Airport Improvements or Changes 150/5300 -13 Airport Design Changes 1 - 18 150/5300 -14B Design of Aircraft Deicing Facilities 150/5300 -16A General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the National Geodetic Survey 150/5300 -17C General Guidance and Specifications for Aeronautical Survey Airport Imagery Acquisition and Submission to the National Geodetic Survey 150/5300 -18B General Guidance and Specifications for Submission of Aeronautical Surveys to NGS: Field Data Collection and Geographic Information System (GIS) Standards 150/5320 -5C Surface Drainage Design Change 1 150/5320 -6E Airport Pavement Design and Evaluation 150/5320 -12C Measurement, Construction, and Maintenance of Skid Resistant Airport Change 8 Pavement Surfaces 150/5320 -15A Management of Airport Industrial Waste FAA Advisory Circulars Required for Use in Updated 1/25/2012 Page 2 of 5 AIP Funded and PFC Approved Projects ARP NUMBER _ :'. TITLE 150/5325 -4B Runway Length Requirements for Airport Design 150/5335 -5B Standardized Method of Reporting Airport Pavement Strength PCN 150/5340 -1 K Standards for Airport Markings 150/5340 -5C Segmented Circle Airport Marker System 150/5340 -18F Standards for Airport Sign Systems 150/5340 -30F Design and Installation Details for Airport Visual Aids 150/5345 -3G Specification for L821 Panels for the Control of Airport Lighting 150/5345 -5B Circuit Selector Switch 150/5345 -7E Specification for L824 Underground Electrical Cable for Airport Lighting Circuits 150/5345-1OG Specification for Constant Current Regulators Regulator Monitors 150/5345 -12F Specification for Airport and Heliport Beacon 150/5345 -13B Specification for L841 Auxiliary Relay Cabinet Assembly for Pilot Control of Airport Lighting Circuits 150/5345 -26D Specification for L823 Plug and Receptacle, Cable Connectors 150/5345 -27D Specification for Wind Cone Assemblies 150/5345 -28G Precision Approach Path Indicator (PAPI) Systems 150/5345 -39D FAA Specification L853, Runway and Taxiway Retroreflective Markers 150/5345 -42F Specification for Airport Light Bases, Transformer Housings, Junction Boxes and Accessories 150/5345 -43F Specification for Obstruction Lighting Equipment 150/5345 -44J Specification for Taxiway and Runway Signs 150/5345 -45C Low - Impact Resistant (LIR) Structures 150/5345 -46D Specification for Runway and Taxiway Light Fixtures 150/5345 -47C Specifications for Series to Series Isolation Transformers for Airport Lighting System 150/5345 -49C Specification L854, Radio Control Equipment FAA Advisory Circulars Required for Use In Updated 1/25/2012 Page 3 of 5 AIP Funded and PFC Approved Projects ARP NUMBER . TITLE 150/5345 -50B Specification for Portable Runway and Taxiway Lights 150/5345 -51 B Specification for Discharge -Type Flasher Equipment 150/5345 -52A Generic Visual Glideslope Indicators (GVGI) 150/5345 -53C Airport Lighting Equipment Certification Program 150/5345 -54B Specification for L -1884, Power and Control Unit for Land and Hold Short 150/5345 -55A Specification for L893, Lighted Visual Aid to Indicate Temporary Runway Closure 150/5345 -56B Specification for L -890 Airport Lighting Control and Monitoring System (ALCMS) 150/5360 -9 Planning and Design of Airport Terminal Facilities at Non -Hub Locations 150/5360 -12E Airport Signing and Graphics 150/5360 -13 Planning and Design Guidance for Airport Terminal Facilities Change 1 150/5360 -14 Access to Airports By Individuals With Disabilities 150/5370 -2F Operational Safety on Airports During Construction 150/5370 -10F Standards for Specifying Construction of Airports 150/5370 -11 B Use of Nondestructive Testing Devices in the Evaluation of Airport Pavement 150/5380 -6B Guidelines and Procedures for Maintenance of Airport Pavements 150/5390 -2B Heliport Design 150/5395 -1 Seaplane Bases FAA Advisory Circulars Required for Use in Updated 1/25/2012 Page 4 of 5 AIP Funded and PFC Approved Projects ARP THE FOLLOWING ADDITIONAL APPLY TO AIP PROJECTS ONLY DATED: 1/25/2012 NUMBER TITL "E 150/5100 -14D Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects 150/5100 -15A Civil Rights Requirements for the Airport Improvement Program 150/5100 -17 Land Acquisition and Relocation Assistance for Airport Improvement Program Changes 1 - 6 Assisted Projects 150/5200 -37 Introduction to Safety Management Systems (SMS) for Airport Operators 150/5300 -15A Use of Value Engineering for Engineering Design of Airports Grant Projects 150/5320 -17 Airfield Pavement Surface Evaluation and Rating (PASER) Manuals 150/5370 -6D Construction Progress and Inspection Report — Airport Grant Program Changes 1 - 4 150/5370 -12A Quality Control of Construction for Airport Grant Projects 150/5370 -13A Offpeak Construction of Airport Pavements Using Hot -Mix Asphalt 150/5380 -7A Airport Pavement Management Program THE FOLLOWING ADDITIONAL APPLY TO PFC PROJECTS ONLY DATED: 1/25/2012 NUMBER TITLE 150/5000 -12 Announcement of Availability — Passenger Facility Charge (PFC) Application (FAA Form 5500 -1) FAA Advisory Circulars Required for Use in Updated 1/25/2012 Page 5 of 5 AIP Funded and PFC Approved Projects ARP