Loading...
HomeMy WebLinkAboutpitkin.planning.247700000000DOCUMENT LAYOUT THIS FILE MAY OR MAY NOT CONTAIN ALL OF THE INFORMATION LISTED BELOW IN THE FOLLOWING ORDER Summary Sheet Resolution for the BOCC and /or P &Z Ordinance for the BOCC and /or P &Z Determination for the Hearing Officer Administrative Determination Staff Memo Application Public Notice, Acceptance Letter, Referral(s) Letter Site Plan Miscellaneous Plat(s) RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF PITKIN COUNTY, COLORADO, APPROVING THE HOMESTAKE RESERVOIR INTAKE GATE STRUCTURE REPLACEMENT LOCATION AND EXTENT REVIEW Resolution No. PZ-,)a-2012 RECITALS 1. Homestake Partners ( "Applicant ") has applied to the Planning and Zoning Commission of Pitkin County ( "Planning Commission ") to obtain location and extent review approval for a "dam and reservoir maintenance and repair project ". The work in Pitkin County involves replacement of the Homestake Tunnel intake gate on the floor of the Reservoir and associated improvements on the Reservoir rim; all as represented in the application dated March, 2012. 2. The Reservoir is located in the National Forest in far northeast Pitkin County and in Eagle County. 3. The applicable master plans in this case are the "Upper Frying Pan Valley Master Plan" and the "Overview Comprehensive Plan ". The Reservoir is not specifically referenced in the Frying Pan plan. The Overview plan has an overriding concern to "Preserve, Conserve, Protect, the existing rural character of Pitkin County ". The activities proposed do not conflict with existing comprehensive plans. 4. The Applicants have stated that the proposed work will, "...neither extend or enlarge the capacities of the Homestake Reservoir or its related diversion facilities, nor change the amount or timing of water diversions." 5. The Pitkin County Planning and Zoning Commission considered the proposed application at a regularly scheduled meeting May 15, 2012, and recommended approval by a vote of 6. Pursuant to C.R.S 30 -28- 110(1), the Planning Commission finds that the proposed improvements are consistent with the applicable County master plans. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission that it hereby grants approval of the Homestake Reservoir Location and Extent Review for the replacement/repair of the Homestake Tunnel intake gate and associated improvements, subject to the following conditions. 1. The Applicant shall adhere to all material representations made during the application process or in public meetings or hearings and shall consider those representations to be conditions of approval. 2. No additional work shall commence in Pitkin County until all required Federal and State permits have been obtained and a Pitkin County Development Permit has been issued by the Community Development Director. 3. No additional work shall commence in Pitkin County until an earthmoving permit (s) with drainage and construction management plan have been approved by Community Development and the County Engineer. RECEPTION #: 589700, 06/11/2012 at 03:13:46 PM, 1 OF 2, R $0.00 Doc Code RESOLUTION Janice K. Vos Caudill, Pitkin County, CO Resolution No. PZ- 12012 Page 2 APPROVED by the Planning Commission this 15`x' day of May, 2012. ATTEST: &n!21'47 & C�- Bonnie Waechtler, Administrative Assistant APPROVED AS TO FORM: JEly, rry�ttorney Case P- 028 -12; PID # 247700000000 lancec /cases/Homestake LE pz reso.doc PLANNING AND ZONING COMMISSION OF PITKIN COUNTY, COLORADO Lam. ohn oward, Chair Date APPROVED AS TO CONTENT: tkg-'(Lki&- &"� indy Houben, Community Development Director MEMORANDUM TO: Pitkin County Planning and Zoning Commission FROM: Lance Clarke, -Assistant Director RE: Homestake Water Project -- Location and Extent Review, Public Hearing DATE: May 15, 2012 SUMMARY OF REQUEST: The Applicant is requesting location and extent review approval for the Pitkin County portion of what is referred to by the Applicant as a "Reservoir Maintenance and Repair Project" for the Homestake Reservoir dam, outlet works and intake gate. The replacement of the intake gate portion of the work will occur in Pitkin County. The larger portion of the work will occur in Eagle County. The Applicants have stated that the proposed work will, "...neither extend or enlarge the capacities of the Homestake Reservoir or its related diversion facilities, nor change the amount or timing of water diversions." APPLICANT: Homestake Partners (Aurora and Colorado Springs) OWNER: United States Forest Service REPRESENTATIVE: Andrea Parker, URS; and Kerry Sundeen, Grand River Consulting LOCATION: Far northeast corner of Pitkin County ZONING: Rural Remote PROCEDURE/PROCESS: C.R.S. 30- 28- 110(1) and Section 2- 30- 30- (h)(10) of the Land Use Code provide that the Planning Commission shall review the location and extent of public projects proposed by a governmental entity in the unincorporated area of the County for conformance with the applicable comprehensive plan or master plan. The Planning Commission's action on a Location and Extent proposal is essentially "advisory", as disapproval may be overruled by the governmental jurisdiction making the proposal. STAFF COMMENTS: The applicable master plans in this case are the "Upper Frying Pan Valley Master Plan" and the "Overview Comprehensive Plan ". The Reservoir is not specifically referenced in the Frying Pan plan. The only real reference in the Overview plan would be the overriding concern to "Preserve, Conserve, Protect, the existing rural character of Pitkin County ". The activities proposed do not conflict with existing comprehensive plans. T t RECOMMENDATION: Staff recommends that the Planning Commission finds the location and extent review for the replacement/repair improvements related to the intake gate of the Homestake Reservoir to be in conformance with applicable comprehensive plans, subject to the attached Resolution. Application provided separately lancec /cases/Homestake LE pz memo. doc 2 RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF PITKIN COUNTY, COLORADO, APPROVING THE HOMESTAKE RESERVOIR INTAKE GATE STRUCTURE REPLACEMENT LOCATION AND EXTENT REVIEW Resolution No. PZ- -2012 RECITALS 1. Homestake Partners ( "Applicant") has applied to the Planning and Zoning Commission of Pitkin County ( "Planning Commission ") to obtain location and extent review approval for a "dam and reservoir maintenance and repair project ". The work in Pitkin County involves replacement of the Homestake Tunnel intake gate on the floor of the Reservoir and associated improvements on the Reservoir rim; all as represented in the application dated March, 2012. 2. The Reservoir is located in the National Forest in far northeast Pitkin County and in Eagle County. 3. The applicable master plans in this case are the "Upper Frying Pan Valley Master Plan" and the "Overview Comprehensive Plan ". The Reservoir is not specifically referenced in the Frying Pan plan. The Overview plan has an overriding concern to "Preserve, Conserve, Protect, the existing rural character of Pitkin County ". The activities proposed do not conflict with existing comprehensive plans. 4. The Applicants have stated that the proposed work will, "...neither extend or enlarge the capacities of the Homestake Reservoir or its related diversion facilities, nor change the amount or timing of water diversions." 5. The Pitkin County Planning and Zoning Commission considered the proposed application at a regularly scheduled meeting May 15, 2012, and recommended approval by a vote of 6. Pursuant to C.R.S 30- 28- 110(l), the Planning Commission finds that the proposed improvements are consistent with the applicable County master plans. NOW, THEREFORE, BE IT RESOLVED by the Planning Commission that it hereby grants approval of the Homestake Reservoir Location and Extent Review for the replacement/repair of the Homestake Tunnel intake gate and associated improvements, subject to the following conditions. I . The Applicant shall adhere to all material representations made during the application process or in public meetings or hearings and shall consider those representations to be conditions of approval. 2. No additional work shall commence in Pitkin County until all required Federal and State permits have been obtained and a Pitkin County Development Permit has been issued by the Community Development Director. 3. No additional work shall commence in Pitkin County until an earthmoving permit (s) with drainage and construction management plan have been approved by Community Development and the County Engineer. E Resolution No. PZ- -2012 Page 2 APPROVED by the Planning Commission this 15'h day of May, 2012. ATTEST: Bonnie Waechtler, Administrative Assistant APPROVED AS TO FORM: John Ely, County Attorney Case P- 028 -12; PID # 247700000000 lancec /cases/Homestake LE pz reso.doc I PLANNING AND ZONING COMMISSION OF PITKIN COUNTY, COLORADO John Howard, Chair Date APPROVED AS TO CONTENT: L� indy Houben, ommunity Development Director PITKIN COUNTY PRE - APPLICATION CONFERENCE SUMMARY PLANNER: Lance Clarke PHONE: (970) 920 -5452 LOCATION: Far NW Pitkin County (and in Eagle County) ZONE: Rural Remote DATE: August 10, 2011 E -MAIL: lancecOco.pitkin.co.us PARCEL ID #: USFS LOT SIZE: OWNER: Homestake Water Project (Aurora Water and Colorado Springs Utilities) APPLICANT: Homestake Water Project REPRESENTATIVE: Kerry Sundeen 2477 T8S R81 W EMAIL: ksundeenCcDa rand river. us Type of Application: Location and Extent Review, Land Use Code Development Standards Review (development standards related to 1041 regulations and other development standards) Description of Project/Development: The Applicant proposes to repair /replace /rehabilitate portions of the dam structure (Eagle) and the tunnel intake gate ( Pitkin). Review by: Planning and Zoning Commission Land Use Code Section 2 -30 -30 (h) (10) ➢ Frying Pan Master Plan ➢ Overview of the Pitkin County Comprehensive Plan Development Standards to be addressed in Development Review portion of application: Review by: Board of County Commissioners (forwarded by Community Development Director) Land Use Code Chapter 7 (specific Sections, as applicable) Sec. 7- 10 -50: Activity Envelope Sec. 7- 20 -10: Site Preparation and Grading Sec. 7- 20 -20: Steep and Potentially Unstable Slopes Sec. 7- 20 -30: Water Courses and Drainage Sec. 7- 20 -50: Geologic Hazards Sec. 7- 20 -70: Wildlife Habitat Sec. 7- 20 -80: River and Stream Corridors and Wetlands. Public Hearing: Yes, at P &Z and at BOCC. Notice is required for each meeting via posting, mailing and publication. The Applicant shall post a public notice sign on the property at least 15 days prior to the date specified for the Public Hearings pursuant to Sec. 2- 20- 100(a)(3) of the Land Use Code. In addition, the Applicant shall mail notice (by certified mail) to all property owners and mineral estate owners within 300' of the subject property with the return address of the Community Development Department (form of notice to be obtained from the Community Development Department). The names and addresses shall be those on the current tax records of Pitkin County, as they appear no more than 60 days prior to the date of the public hearing. A property owner receiving the public notice shall have 2 weeks from the date the notice was postmarked to submit comments or objections to the Community Development Department. GU0001 of -O Staff will refer the application to the following agencies: Planning Engineering, CDOW, USFS FEES: $4,688.00 (make check payable to " Pitkin County Treasurer ") ■ $4,056 Planning Office flat fee (non - refundable; based on 13 hours of staff time; if staff review time exceeds 16 hours, the Applicant will be charged for additional time above 13 hours at a rate of $312 /hour) ■ $499 Planning Engineering $108 Publication Fee (two publications) $25 Clerk Technology Fee To apply, submit 16 copies (2 unbound) of the following information, unless noted otherwise: 1. Summary letter explaining the request, explaining existing conditions, providing background on prior approvals and permits, and addressing compliance with the Code sections listed above. 2. General application requirements as listed in Section 1 of the Pitkin County Land Use Application Manual. 3. 11" by 17" copies of all 95% construction drawings. 4. Description and engineering drawings and specs of all disturbance in Pitkin County related to roads, diversions, coffer dams, construction materials, storage of equipment. 5. List of adjudicated water rights. 6. Description and engineering specs of all temporary water "rerouting /bypassing" associated with the project. 7. Description of the "dead pool ". 8. Designation of all disposal and borrow areas. 9. Construction management plan detailing staging, storage areas, manner and hours of work. 10. Forest Service permits. 11. State permits. 12. CDOW comments. 13. Specify current amount of diversion annually, projected annual average diversion amount for ten years after project completion, and records of diversion amounts annually for the past ten years. 14. Proof of the applicant's right to use the land for the purposes identified in the development application. 15. Consent from the owner of the property for the representative to process the application and represent the owner. 16. Parcel description, including legal description, and 8 -1/2 "x 11" vicinity map locating the subject property within Pitkin County. 17. Proof of adequate legal access to the property (1 copy). 18. Executed Pitkin County Community Development Agreement for Payment of Land Use Application Fees form (1 copy — form attached). 19. List of all property owners and mineral estate owners within 300' of the subject property (1 copy); and 20. Copies of this pre - application Conference Summary Sheet. NOTES: PLEASE SUBMIT TWO UNBOUND AND ONE -SIDED COPIES OF YOUR COMPLETE APPLICATION. PLEASE SUBMIT TWO - SIDED COPIES OF ALL REMAINING COPIES OF YOUR APPLICATION (IF POSSIBLE). THE PARCEL ID SHOULD BE INCLUDED ON ALL DOCUMENTS INCLUDED IN YOUR APPLICATION. ➢ ALL MAPS SHALL BE FOLDED. One copy of submittal materials shall have all documents in format no larger than 8112" by 111% This pre- application conference summary is advisory in nature and not binding on the County. The information provided in this summary is based on current zoning standards and staff's interpretations based upon representations of the applicant. Additional information may be required upon a complete review of the application. UuUA2 �rT 'rf'• jfi�rr,l��i>1 � r *PC .Jos• F \/4 a w �"�► � iris, �.: ���✓� TP A & A � ' r -AaM2 ..� ��r �. may 6� ��f` .. �.j4 rt• 4 Y Al • M TABLE OF CONTENTS Section 1 Location and Extent Review and Land Use Code Development Standards Review............................................................................................... ..............................1 1 Section 2 Existing Conditions — Homestake Dam and Reservoir Operations ............................2 -1 Section 3 Regulatory Approvals for the Project ............................................... ............................3 -1 Section 4 Compliance with Pitkin County Codes ............................................. ............................4 -1 4.1 Sec. 7- 10 -50: Activity Envelope .................................. ............................4 -1 4.2 Sec. 7- 20 -10: Site Preparation and Grading ................ ............................4 -1 4.3 Sec. 7- 20 -20: Steep and Potentially Unstable Slopes .. ............................4 -1 4.4 Sec. 7- 20 -30: Water Courses and Drainage ................. ............................4 -1 4.5 Sec. 7- 20 -50: Geologic Hazards ............................... ............................... 4 -3 4.6 Sec. 7- 20 -70: Wildlife Habitat ..................................... ............................4 -4 4.7 Sec. 7- 20 -80: River and Stream Corridors and Wetlands ........................ 4 -8 Section 5 000004 References....................................................................................... ............................... 5-1 = N1Pr ashy 41696 He Wa Fnzse 1 sub M120 WorE_ProsTermah,Pnlnu Gok O avon_Epenl_Fwm Pn neo_oevrwmw For Pnmm9 Does 3'192012259 Fm i TABLE OF CONTENTS List of Tables Table 1.0 -1 Summary of Pitkin County Information Requests Table 3.0 -1 Permit Summary Table 4.6 -1 Migratory Birds Observed During Field Reconnaissance Table 4.6 -2 Federally Listed and Candidate Species for Eagle and Pitkin Counties List of Figures Figure 1 List of Appendices Appendix A Selected Drawings and Specifications for Construction in Pitkin County Appendix B Water Rights Appendix C Coffer Dam Appendix D Dead Pool Appendix E Wildlife Appendix F Wetlands Appendix G Annual Diversion Information Appendix H USFS Permits and Land Ownership Appendix I Pre - Application Summary 0j "SJ05 UmWPml is =01596_H Sstnks_Phaz 111 ub_CM120 WVd P=dPmmntinoPnkin CULwa�on_EMe -RwlMP4Wmo_Ow— Pot Pnnnn90- 1192a12269PM ii TABLE OF CONTENTS Acronyms AOP BLM cfs CPW ESA Homestake PCN Project USACE USFS USFWS GuJ606 Annual Operating Plan Bureau of Land Management cubic feet per second Colorado Parks and Wildlife Endangered Species Act Homestake Water Project Pre - Construction Notification Homestake Dam and Reservoir Maintenance and Repair Project Corps of Engineers U.S. Forest Service U.S. Fish and Wildlife Service _m N \Prods¢ 41595_Horo la _Phase II\Sub W120_ Word _PmdPmmmm9rPUkin Lo\ LmA, on _Ement_Rw.00Pnlunce_De..mw_For Pndm90as NIW2012259PM iii SECTIONONE Location and Went Review and Land Use Code Development Standards Review The Homestake Water Project (Homestake) consists of existing and planned water storage and diversion facilities located in the Homestake Creek and Eagle River watershed. Project facilities are operated pursuant to Federal rights -of -way and annual operating plans (AOP) approved by the United States Forest Service (USFS). Homestake Reservoir on Homestake Creek in the White River National Forest (bordered by the Holy Cross Wilderness Area) stores water collected by Homestake primarily for trans - mountain use by the Cities of Aurora and Colorado Springs (the "Homestake Partners ") via the Homestake Tunnel. The northern portion of Homestake Reservoir, including Homestake Dam and outlet works, is located in Eagle County. The southern part of the Homestake Reservoir and the inlet to the Homestake Tunnel is located in Pitkin County. The general location of Homestake is shown on Figure 1. The Homestake Partners are undertaking the Homestake Dam and Reservoir Maintenance and Repair Project (Project) to comply with dam safety requirements of the Office of the State Engineer of Colorado. The existing upstream asphalt concrete facing of the dam has deteriorated as a result of ultraviolet light exposure, freeze -thaw damage, and severe surface erosion. The dam crest, the outlet works, and the Homestake Tunnel intake gate also require repairs. The maintenance required on the dam and outlet works will be conducted in Eagle County. The work associated with the Homestake Tunnel intake will occur in Pitkin County and is the focus of this submittal. This Project constitutes normal maintenance activities related to the safe operations of the dam and reservoir. The maintenance activities will not alter the operation of the existing dam and reservoir, and they will neither extend or enlarge the capacities of Homestake Reservoir or its related diversion facilities, nor change the amount or timing of water diversions. This report was prepared to provide information for the Location and Extent Review and Land Use Code Development Standards Review that Pitkin County has asserted are required for this Project. This report and the associated attachments provide supporting information to describe the proposed maintenance at the intake gate. This report is organized per the directions provided in the Pre - Application Conference Summary Sheet (Appendix I) Item 1. Additionally, Pitkin County requested that Homestake provide various items related to the Project for review, as summarized in the table below. Table 1.0 -1 Summary of Pitkin County Information Requests URSUu0U07 X�� 241S�_XLTNtl�lO Mxo IISO WXPO Md RMIFWIiNn P*11 CWLv EMwt A rwMP�mnee_o.wxxx'_FW P""D X SlPW13359 PM IA Pitkin County Information Request Report Section 1. Summary letter explaining the request, existing conditions, prior Sections 1.0 — 4.7 approvals and permits and compliance with selected Pitkin County codes 2. General application requirements as listed in Section 1 of the Pitkin Section 2 County Land Use Application Manual 3. 11x17" construction drawings related to work in Pitkin County Appendix A 4. Description and engineering drawings and specs of all disturbances Appendix A in Pitkin County related to roads, diversions, coffer dams, construction materials, and storage of equipment. 5. List of adjudicated water rights Appendix B 6. Description and engineering specs of all temporary water Appendix C Irerouting[bypassing" associated with the project. URSUu0U07 X�� 241S�_XLTNtl�lO Mxo IISO WXPO Md RMIFWIiNn P*11 CWLv EMwt A rwMP�mnee_o.wxxx'_FW P""D X SlPW13359 PM IA SECTIONONE location and Extent Review and land Use Code Development Standards Review Table 1.0 -1 Summary of Pitkin County Information Requests * Note: Appendix F contains the Pre-Construction Notification (PCN) as described in Section 4.7. This report was not a specific item requested by the County, thus it is not referenced in Table 1. Pitkin County requested that Homestake consider the compatibility of the gate repair with the existing Pitkin County Upper Fryingpan Valley Master Plan (Master Plan), amended on March 4, 2008. This Plan states that the caucus area "...extends from the Ruedi Dam up the Fryingpan River and its watershed to the Continental Divide, including all tributaries flowing into the Fryingpan River and Ruedi Dam and their watersheds. It includes areas in both Pitkin and Eagle Counties " Homestake Reservoir and Tunnel is situated in the Eagle River watershed. Homestake Reservoir and its tributaries do not flow into the Fryingpan River, or Ruedi Dam or 1-12--s" l-2 000JO8 Pitldn County Information Request Report Section 7. Description of the "dead pool" Appendix D 8. Designation of all disposal and borrow areas Not Applicable. No borrow or disposal activities will be conducted in Pitkin County. 9. Construction Management Plan detailing staging, storage areas, Not Applicable. Due to the tight work manner and hours of work area, staging of equipment and storage of materials will occur outside of Pitkin County. Vehicles will access the Homestake Tunnel intake for task related work and will likely exit the area at the end of the day. Hours of work will likely occur between lam and 7pm each day of the week. 10. U.S. Forest Service permits Section 3; Appendix H 11. State permits Section 3 12. Colorado Parks and Wildlife (formerly Colorado Division of Section 3; Appendix E Wildlife) comments 13. Specify current amount of diversion annually, projected annual Appendix G average diversion for ten years after project completion, and records of historical diversion amounts annually for the last ten years 14. Proof of applicant's right to use the land for the purposes identified Appendix H in the development application 15. Consent from owner of the property for the representative to process Appendix H the application and represent the owner 16. Parcel description, including legal description and 8.5" x I I" Appendix H vicinity map locating the subject property within Pitkin County 17. Proof of adequate legal access to the property Appendix H 18. Executed Pitkin County Community Development Agreement for Appendix I Payment of Land Use Application Fees form 19. List of all property owners and mineral estate owners within 300' of Section 2 the subject property 20. Pre - application Conference Summary Sheet Appendix I * Note: Appendix F contains the Pre-Construction Notification (PCN) as described in Section 4.7. This report was not a specific item requested by the County, thus it is not referenced in Table 1. Pitkin County requested that Homestake consider the compatibility of the gate repair with the existing Pitkin County Upper Fryingpan Valley Master Plan (Master Plan), amended on March 4, 2008. This Plan states that the caucus area "...extends from the Ruedi Dam up the Fryingpan River and its watershed to the Continental Divide, including all tributaries flowing into the Fryingpan River and Ruedi Dam and their watersheds. It includes areas in both Pitkin and Eagle Counties " Homestake Reservoir and Tunnel is situated in the Eagle River watershed. Homestake Reservoir and its tributaries do not flow into the Fryingpan River, or Ruedi Dam or 1-12--s" l-2 000JO8 SECTIONONE Location and Extent Review and Land Use Code Development Standards Review their watersheds. Furthermore, Homestake Reservoir is not listed or described in the Plan. As a result, it appears that Homestake Reservoir may not be covered under this Plan. However, at the request of the County, we have reviewed the compatibility of the planned repairs to the Homestake Tunnel gate to the Master Plan. Based upon this review, we have determined that the repair of the tunnel gate is consistent with the goals and objectives outlined in the Master Plan and in the Comprehensive Plan. The gate repair is consistent with the unifying concept in the Comprehensive Plan to "Preserve, Conserve and Protect the existing rural character of Pitkin County ". The gate repair is also consistent with the Master Plan as outlined below. Residential Growth. The repair is consistent with the goals of the Plan, in that it will not facilitate residential development within the upper Fryingpan River watershed, nor will it affect residential growth within the Eagle River watershed. Commercial Growth. The gate repair will not affect commercial development in the Fryingpan River watershed, nor in the Eagle River watershed. The gate repair will not affect agricultural lands, nor are any zoning changes applicable. Land Use and Environmental Considerations. The gate repair will preserve agricultural and recreation use. It will not affect water supplies in either the Fryingpan River watershed or the Eagle River watershed. The gate repair will not affect wildlife habitat, riparian and wetland areas, and other environmentally sensitive lands. The gate repair will not affect campgrounds, recreational sites or trail usage. Roads. The gate repair will not affect any county roads in Pitkin County, nor will any county roads in Pitkin County be utilized. Community Services. The gate repair will not affect law enforcement, emergency services, school buses, or noxious weeds and trash control. Historical and Cultural. The gate repair activates will not interfere with the preservation and protection of historical sites in the Fryingpan Valley, and will not affect historical sites in the Eagle River watershed. In summary, the proposed gate repair is associated with routine maintenance to promote human health and safety, and the operational reliability of the facility. Neither the operation of the tunnel, nor the existing reservoir footprint, will change with the gate repair. The gate repair is consistent with the Comprehensive Plan and the Fryingpan Master Plan. tm.P,aWg 241 H—I.a Pte,. SIeW,,, owoaP �P– m,Pa�00)L– emE�w�R.�PNMO rvw_PUPrW1Dw,1, 012 zSSPM1 -3 uJui09 SECTIONONE Location and Extent Review and Land Use Code Development Standards Review INSERT FIGURE 1 w,q��., „zaw�ao...... 1 -4 ,j.:�J10 SECTIONTWO Existing Conditions- Homestake Dam and Reservoir Operations As noted above, Homestake Reservoir is located entirely on Federal land managed by the USFS within the White River National Forest and the USFS is the only property and mineral owner within 300 feet of the Project site. The current Homestake facilities were completed and began operations in the 1960s and all of the areas that would be affected by the maintenance Project have been previously disturbed and are currently occupied by the dam, reservoir, and ancillary facilities. Homestake Reservoir receives water from three sources: l) the main stem of Homestake Creek upstream of the reservoir; 2) Missouri, Fancy, French and Sopris Creeks via the Missouri Tunnel, which discharges into Homestake Reservoir at the left abutment of Homestake Dam; and 3) the East Fork of Homestake Creek delivered via a 60 -inch diameter welded steel inverted siphon pipeline terminating near the right abutment of Homestake Dam. Water diverted into Homestake Reservoir is delivered to the Homestake Partners via the Homestake Tunnel, which discharges to Lake Fork Creek leading to Turquoise Lake, Twin Lakes and to the Otero Pump Station and ultimately to the Partners' distribution systems. Water is released through the Homestake Dam outlet works, into Homestake Creek, a tributary to the Eagle River, at the toe of the dam. The Project involves maintenance repairs of several facilities including the dam, the outlet works, and the Homestake Tunnel intake gate. The rehabilitation of the Homestake Tunnel intake gate is the only activity that will occur in Pitkin County. The Homestake Tunnel, which delivers water to Turquoise Reservoir, is located approximately 4,000 upstream feet from the dam about half way up the reservoir on the south side. Water enters the tunnel through a reinforced concrete intake structure. During normal operations, the intake gate is held in the fully opened position with all releases controlled by valves located at the downstream end of the tunnel. The Project will remove and replace the existing cast iron guard gate and operating cylinder at the upstream end of the Homestake Tunnel. The existing gate opening in the intake structure will be partially excavated internally to accept a new gate thimble, and the new thimble will be grouted in place. A steel structure will be installed on top of the existing intake structure around the new operating cylinder to protect it from falling debris. In addition, new gate control equipment will be installed on a new concrete slab on the reservoir rim in the same location as the existing hydraulic controls. The new slab and controls will be enclosed in a new, lockable chain link fence. No changes to the Homestake Tunnel or the downstream discharge structure are included as part of this Project. N WIN MN 241 N¢n"l P2re_ II ISO _W.120_W¢dPr¢�PVmMn9'AMin CbL¢bw,_EWnlPerwMPiNxa_Cmmaw_Fa RInAnB CO[v Y19R0122,9,. 2 -1 U J J1i SECTIONTWO Existing conditions — Romestake Dam and Reservoir Operations ultsX W�W.In`]]M19b_Nw�F�aFF_Ma�_II W�20 W� RxNmmIbVVM1In Is'�mNa�.F9M_PM»'Y1CSeo OsnerYw FvMMgCee� YI VdX]]9 iM 2-2 0U0012 SECTIOMTWO Existing Conditions - Homestake Dam and Reservoir Operations Photo 2. A view looking south at the Homestake Tunnel intake and the slope between the intake and the reservoir rim where the gate controls are located. Home; take Tunnel intake gate controls. U.: ,� 2 -3 000013 SECTIONTHREE Regulatory Approvals for the Project This section presents a summary of the federal, state, and county environmental permitting requirements for the proposed dam improvements at Homestake Reservoir. Project activities will be covered under the AOP administered by the USFS (Appendix H). Additionally, Homestake is responsible for consulting with federal, state, and county agencies for appropriate permits related to wetland impacts, sensitive species, cultural resources, and dam safety and operations. The contractor is responsible for permits related to stormwater management, air quality, earthmoving activities, and fuel storage. A summary of owner and contractor identified permits is summarized in Table 3.0 -1. The construction and future operation of the Project will be carried out in compliance with all applicable laws and regulations related to water resources, adjacent land uses, and wildlife. Biological field surveys were conducted to gather baseline environmental data in the Project area. Field work was performed under the guidance of the USFS, Colorado Parks and Wildlife (CPW) (formerly Colorado Division of Wildlife), and the U.S. Fish and Wildlife Service (USFWS) in the summer of 2010. Information obtained from the biological surveys was used as the basis for coordination with various agencies to verify permitting requirements. Biological, cultural, and wetlands surveys were conducted in July 2010 by URS and ERO to identify sensitive resources, and to obtain data for preparation of permits. In conjunction with the field surveys, URS reviewed available databases and publications and conducted informal consultation with biologists at White River National Forest, the USFWS, and the CPW to identify data requirements and procedures for compliance with Section 7 of the Endangered Species Act (ESA), the Migratory Bird Treaty Act, USFS sensitive species protection, State of Colorado coordination requirements, and fish salvage. Consultation was also conducted with the Corps of Engineers (USACE) for Section 404 permitting. NP,� 59s H— Ph.. sUb � „zo w o,s,P.m� s��. ,� E A ,P,� o� F >, �,�. a,saoaxse 3 -1 OUCJ14 SECTIONTHREE Table 3.0 -1 Permit Summary Regulatory Approvals for the Project O�Zl 000015 N:\Projects\22241596_HO steke_Pheea_II19Ub- W112.0_Word_PM&PermMing1P11kin CoLLL C ion_FxlenLRevlevAPitkinco_Dev iew _For PnnNng.D= 3/19=122:59 PM 3 -2 Permit and /or Agency Regulatory Trigger /Action Processing Time Fees Agency Contact Notes Driver OWNER RESPONSIBILITY U.S. Forest USFS listed Construction activity on Not applicable No fee Rick McNeill Sensitive species surveys conducted on July 22, 28, and 29 2010 identified six Service sensitive species USFS land USFS species of moonworts in the Project Area. The locations of the moonwort (USFS) White River National populations will be fenced and avoided during construction. Forest/Holy Cross Ranger Several sensitive animal species occur in the Project vicinity, but temporary District construction activity will result in minor impacts. 24747 U.S. Highway 24 Mintum, CO 81645 Findings of surveys are located in a Biological Assessment/Biological Evaluation 970- 827 -5715 (BA/BE) report that was submitted to the USFS in August 2011. U.S. Army Clean Water Act Any activity involving 30 days from receipt of No fee is required for Steve Moore The proposed dam improvements Project will be permitted under NWP 3 Corps of Section 404 construction in a a complete permit government/municipalities USACE (Maintenance) and NWP 33 (Temporary Construction, Access, and Dewatering) Engineers Nationwide jurisdictional wetland or application initiated submittals Colorado West Regulatory A pre- construction notification (PCN) was submitted to the USACE on July 15, ( USACE Permit NWP) waters of the U.S. Branch 1 -1. 400 Rood Avenue, Room 142 Grand Junction, CO 81501 Based on the type and amount of wetland impacts, no compensatory mitigation 970 - 243 -1199 will be required. U.S. Fish and Section 7 of the Any activity that may Not applicable No fee Kurt Broderdorp White River National Forest will be the lead agency for ESA. Lynx is the only Wildlife Endangered adversely affect federally USFWS listed species in the Project area. The Project appears to qualify for a "may affect, Service Species Act listed, proposed, or Western Colorado Field Office not likely to adversely affect" and formal consultation by the USFS is not ( USFWS) and (ESA) candidate endangered 764 Horizon Drive, Building B expected. The BABE documents the analysis on lynx habitat. The Section 404 Colorado species or their Grand Junction, CO 81506 PCN refers to the BABE and USFS ESA compliance. Parks and designated critical 970 -243 -2778 Wildlife habitat. (CPW) (previously Colorado Division of Wildlife [CROW]) O�Zl 000015 N:\Projects\22241596_HO steke_Pheea_II19Ub- W112.0_Word_PM&PermMing1P11kin CoLLL C ion_FxlenLRevlevAPitkinco_Dev iew _For PnnNng.D= 3/19=122:59 PM 3 -2 SECTIONTHREE Table 3.0 -1 Permit Summary Regulatory Approvals for the Project l.� Vvut116 NAProlecte\ 22241596_ HOmeetake_ Pbaee_ If4Sub_ 00\12.0_Word_Prw \Penni"ing\Pitl nCOVL owtion _FAGnLReNevAPitkinco_DevrevWw For Pdntlng.D= 3/IM0122:59PM 3-3 Permit and/or Agency Regulatory Trigger /Action Processing Time Fees Agency Contact Notes Driver LISFWS Migratory Bird Compliance is required Not applicable Not applicable Lara Duran, Wildlife Biologist No formal permit is required, but Homestake must comply with the MTBA by Treaty Act of any Federal activity Eagle -Holy Cross Ranger avoiding nesting birds during construction. As the land management agency, (MTBA) that may potentially District USFS will take the lead in defining and enforcing requirements. affect a migratory bird or White River National Forest an active nest. 970 - 328 -5899 office 970 - 328 -6448 Kurt Broderdorp USFWS Western Colorado Field Office 764 Horizon Drive, Building B Grand Junction, CO 81506 970 -243 -2778 CPW Fish Salvage Dewatering Homestake Not applicable Not applicable Kendall Bakich CPW will coordinate with Homestake in the Summer 2012 on appropriate fish - Reservoir in 201 -2-- CPW - protections measures.- If-the dead - pool that remainsin- thexeservoir after Glenwood Springs Service dewatering is not appropriate to maintain the fish through construction, CPW may Center relocate fish. 50633 Highways 6 & 24 Glenwood Springs, CO 81601 970 -947 -2920 State Section 106 of NHPA requires Federal SHPO has 30 days to No fee Mr. Edward Nichols Cultural resources survey of Project area was conducted on July 21 -22, 2010. No Department the National agencies to take historic respond to a request for State Historic Preservation cultural resources were identified in the Project area. of Historic Historic properties into account a review of a finding or Office USFS submitted form to SHPO on October 26, 2011; concurrence is expected per Preservation Preservation Act for Project activities a determination. Colorado Historical Society the Negative Results Programmatic Agreement (No. 10- MOA- 11021000-014). (SHPO) (NHPA) within their jurisdiction. 1560 Broadway, Suite 400 USFS will conduct tribal consultation, if needed Denver, CO 80202 303 -866 -3682 Department Review of Plans State approval process By State Statutes, the $3 per $1,000 of construction Mr. Garrett Jackson, P.E. URS received approval from SEO on 8/29/2011 of Natural and for regulating dam safety. Office of the State cost for a project Dam Safety Engineer Resources, Specifications Engineer has 6 months Minimum fee is $100 Colorado Division of Water Office of the State for the Alteration, to review an application; however, Maximum fee is $3,000 Resources 2754 Compass Dr., #175 Engineer Modification, or reviews typically take Grand Junction, CO 81506 (SEO) Repair of a Dam between one to three 970.245 -8355 and Reservoir months to complete Department Minimum Diverting and storing Not applicable Not applicable Kyle Whitaker No permit is required of Natural downstream water into Homestake Division 5 Engineer Obligations to maintain minimum downstream flows are required only when the Resources, flows below Reservoir 50633 US Hwy 6 & 24 Homestake Project is diverting and storing water Division of Homestake Dam Glenwood Springs, CO 81601 Coordinate with the Eagle County Water Commissioner prior to dewatering the Water 970 - 945 -5665 x 5015 reservoir (Bill McEwen 970 -328 -6850) Resources l.� Vvut116 NAProlecte\ 22241596_ HOmeetake_ Pbaee_ If4Sub_ 00\12.0_Word_Prw \Penni"ing\Pitl nCOVL owtion _FAGnLReNevAPitkinco_DevrevWw For Pdntlng.D= 3/IM0122:59PM 3-3 SECTIONTHREE Table 3.0 -1 Permit Summary Reuulatory Approvals for the Project = LA317 N:\ Protects\ 22241595_Homeatake_Phase_II\Sub 00 \12.0_Word_ProcNermMing\Pltkln Co\L=tlan_Fxtent ReWovAPiIXinco_Oevmvlew_For PnnHng.0a 3119=122:59PM 3 -4 Permit and /or Agency Regulatory Trigger /Action Processing Time Fees Agency Contact Notes Driver Eagle County Consolidated Processing of asphalt 4 -5 months $2,205 Bob Narracci Exemption for 2011 construction activities Major Special onsite Eagle County Planning Director Exempt from 1041 requirements Use Permit P.O. Box 0179 500 Broadway Eagle, CO 81631 Pitkin County Clearing, Any project excavating To Be Determined $414 - $643 Permit application Pitkin County Community This permit has a one year shelf life; time appropriately with construction activity Grubbing and more than 50 cubic yards fee Development Department The permit application requires a vicinity map, land use approvals, map of Earthmoving of material 130 South Galena Street existing and proposed contours, drainage and erosion control plan, construction Permit Aspen, CO 81611 management plan, and revegetation plan. 970 - 920 -5526 CONTRACTOR RESPONSIBILITY USFS Road Use Use of Homestake Creek Not applicable. Not applicable. Mark Buchanan This plan is covered under the Annual Operating Plan (AOP) as part of � (Fores�ad [FR] USFS maintenance work -an(- defines maintenance requirements for the road before, amtenance Plan 703) as a construction Forest Roads Manager during and after construction access and haul route White River National Forest 900 Grand Avenue The USFS requires submittal of a maintenance plan containing dust abatement Glenwood Springs, CO 81602 measures, stormwater management, details on appropriate signage, safety 970 - 945 -3222 measures, loading on bridge, and the use of pilot cats. USFS Minerals Removal and processing The permit will be A one-time administrative fee is Olivia Garcia Contractor will submit the volume of material to be mined for the Project to Material Permit of aggregate material issued once payment is required and is based on the fair USFS Olivia Garcia in order for her to calculate the appropriate permit fees. from within the reservoir received, but the market value of the volume of White River National Forest If an off -site source is used, proof that the imported material is clean and is footprint to use for any typical turn-around material that is mined. 900 Grand Ave. certified weed -free permanent feature located time is 7 days. Glenwood Springs CO 81602 Permit requirements will ultimately be at the discretion of the District Ranger outside of the reservoir 970 - 945 -3220 (e.g., dam refacing and road improvements) This permit is not required if material is being hauled to and from an off -site source Colorado Construction State approval process Submit application at $245 Permit application fee CDPHE General Permit and SWMP was certified by CDPHE on 8/1612011 Department Stormwater for regulating water least 30 days prior to Water Quality Control Division of Health and General Permit quality impacts. the date anticipated 4300 Cherry Creek Drive South Environment and Stormwater Regulates the quality of discharge with a Denver, CO 80246 -1530 ( CDPHE), Management stormwater runoff from complete SWMP. (303- 692 -3500 Water Quality Plan (SWMP) construction areas that is cdphe.wgstotm @state.co.us Control discharged into Division waterways (WQCD) = LA317 N:\ Protects\ 22241595_Homeatake_Phase_II\Sub 00 \12.0_Word_ProcNermMing\Pltkln Co\L=tlan_Fxtent ReWovAPiIXinco_Oevmvlew_For PnnHng.0a 3119=122:59PM 3 -4 SECTIONTHREE Table 3.0 -1 Permit Summary Regulatory Approvals for the Project UmJ U 0 U q 8 N:\PMjoC1e122241588_HOma ke_ Phase_ INSUb _00112.0_WaE_Proc\Pennining\P" 00\L C IiM_Ext$nl_:"ABVAPKklnm DevreAeW_For Pdntlng.D= 3119/20122:69 PM 3 -5 Permit and/or Agency Regulatory Trigger /Action Processing Time Fees Agency Contact Notes Driver CDPHE, Construction State approval process Submit application at $500 Permit application fee CDPHE Construction Stormwater Dewatering Permit was submitted to CDPHE on WQCD Stormwater for regulating stormwater least 30 days prior to Water Quality Control Division 8/19/2011 Dewatering runoff from projects the date of anticipated 4300 Cherry Creek Drive South Permit impacting>1 acre. discharge with a Denver, CO 80246 -1530 complete SWMP. 303 -692 -3500 CDPHE, Individual Individual industrial 6 months to one year Based on categories of Andrew Neuhart Individual Industrial Wastewater Discharge Permit submitted to CDPHE on WQCD Industrial process water dischargers discharge and volume Colorado Department of Public 9/28/2011 Wastewater to surface water, ground Mixing zone studies required- Health and Environment Discharge Permit water or stormwater stream standards Water Quality Control Division dischargers. 4300 Cherry Creek Drive South Denver, CO 80246 -1530 303 - 692 -3655 andrew.neubart@state.co.us -CD Constmction - Regulates the emission -of- A-GP03- becomes X50 GP filingfee -Chip H -GP- and APEN were - submitted to the- CDPH&on- 8/9120t1 Pollution Permit or fugitive dust from land effective on receipt of $76.45/hour fee for Colorado Department of Public Control General Permit development activities the complete Construction permit review and Health and Environment Division (GP) for Land during construction. application. A processing Air Pollution Control Division (APCD) Development State approval process construction permit 4300 Cherry Creek Drive South (GP 03) for air pollution application may take up Denver, CO 80246 -1530 Air Pollution emissions for projects to 90 days to process 303 -692 -3100 Emission Notice >25 acres or> 6 months r.hancock @state.co.us (APEN) construction. Colorado Fuel Storage All aboveground storage All owners or operators The operator is required to pay Crystal Cortes Fuel Storage Registration required for 2012 construction activities Department Registration tanks (ASTs) of aboveground an annual registration fee in the CDLE of Labor and > 660 gallons and facility Petroleum storage tanks amount allowed by the current Division of Oil & Public Safety Employment data must be registered, with a capacity state law for each regulated tank 633 17th Street, Suite 500, (CDLE) re- registered or updated between 660 and owned or operated, until the Denver, CO 80202 -3660 on a form provided by 40,000 gallons must regulated AST is permanently 303 - 318 -8507 CDLE, regardless of annually register their closed or until the operator has whether the ASTs and tanks with the Division instituted a change -in- service to facilities are currently in of Oil and Public a substance other than service or out of service Safety. In addition, a petroleum. new registration must AST registrations will be billed be filed within 30 days the annual tanks fees. Fees for of a tank installation, tanks are $35 per tank per year. removal, upgrade or change in service. UmJ U 0 U q 8 N:\PMjoC1e122241588_HOma ke_ Phase_ INSUb _00112.0_WaE_Proc\Pennining\P" 00\L C IiM_Ext$nl_:"ABVAPKklnm DevreAeW_For Pdntlng.D= 3119/20122:69 PM 3 -5 SECTIONFOUR Compliance With Min County Codes The proposed maintenance Project complies with applicable Pitkin County land use standards, as described below. 4.1 SEC. 7- 10 -50: ACTIVITY ENVELOPE Planned construction activities in Pitkin County consist of work occurring in and around the Homestake Tunnel intake (please refer to engineering drawings in Appendix A). This work includes the following: improvement of existing access roads within the reservoir basin, construction of a low -head cofferdam, removal of the existing slide gate, installation of a new slide gate, installation of new gate controls and gate control lines, miscellaneous painting of components, and removal of the cofferdam. Construction is planned to occur between May and August of 2012. Due to the tight work area in the vicinity of the intake, staging of most equipment and storage of materials will occur outside of Pitkin County. Vehicles will access the Homestake Tunnel intake for task related work and will likely exit the area at the end of the day. Hours of work will likely be between lam and 7pm Monday through Saturday. 4.2 SEC. 7- 20 -10: SITE PREPARATION AND GRADING Site preparation and grading will consist of improvements to existing roads to access the Intake and the preparation and installation of a low -head cofferdam conveyance feature. All planned features are temporary and will be removed upon completion of the intake improvements. Please refer to Appendix A for detailed engineering drawings and specifications. 4.3 SEC. 7- 20 -20: STEEP AND POTENTIALLY UNSTABLE SLOPES The Homestake Tunnel intake is located at the toe of the reservoir rim slope. The existing controls are located on the reservoir bank directly above the intake. The slopes between the intake and the controls consist primarily of bedrock outcrops and shallow colluvial deposits. These slopes have been accessed during previous construction activities and no significant excavation activities are planned as part of this work. The Project Team does not expect to encounter unstable slopes in this area. 4.4 SEC. 7- 20 -30: WATER COURSES AND DRAINAGE Homestake Reservoir is located within the Eagle watershed (Hydrologic Unit Code 14010003), off of Homestake Road and is located within both Eagle and Pitkin Counties. The reservoir has a surface area of 335 acres and stores about 42,881 acre -feet of water at the spillway crest elevation of 10,266.5 feet. The original construction was completed in 1967. Homestake Reservoir receives water primarily from three sources: the main stem of Homestake Creek upstream of the reservoir, Missouri, Fancy, French, and Sopris Creeks via the Missouri Tunnel, and the East Fork of the Homestake Creek via the East Fork pipeline. Diversions occur primarily from the beginning of May through mid - August. The mean annual diversion rate for the Missouri Tunnel is 14.7 cubic feet per second (cfs), and for the East Fork pipeline is 5.5 cfs. Flows in Homestake Creek vary widely from year to year, with a peak mean daily flow of 135 cfs, and daily inflow in excess of 300 to 400 cfs for only a few days in the last 36 years. Inflow is generally below 50 cfs after August 1. UMN \Pqg t42 415%_HOmeAake_PMa Mub W120_Wad Pr \Pe MlnQPIbn Co \LO *n6en1_Reie PftW -Dwrwpew_For PnmmgW M912012259PM 4-1 ODUM9 SECTIONFOUR Compliance With Pitkin County Codes Water deliveries are generally made through the Homestake Tunnel, which leads to Turquoise Lake. Homestake Tunnel is 11.5 feet in diameter. Flow in the tunnel is controlled by a valve structure located at the downstream end of the tunnel. Releases from the reservoir are also made through the Homestake Dam outlet works at the toe of the dam, to Middle Fork of Homestake Creek. The daily outflow from the outlet works is generally less than 20 cfs, and there have been only 7 days in the last 36 years when the daily outflow exceeded 100 cfs. The Homestake Partners will not divert water through the Missouri Tunnel (Missouri, Sopris, Fancy and French Creeks) in 2012. Diversions from the East Fork will be limited to flows needed for construction only. Therefore, reservoir inflows will be limited to flows in the mainstem of Homestake Creek and areas directly adjacent to the reservoir. Water will be released from the reservoir through the Homestake Tunnel and through the dam outlet works. In 2013, reservoir storage from Homestake Creek, and diversions from the East Fork and the Missouri Tunnel will resume, although reservoir storage will be within a reduced elevation well below the crest of the dam. The overall volume of streamflow in Homestake Creek downstream of the Project will likely increase in 2012, as the only water diverted to Turquoise Reservoir will be natural inflow to the reservoir. During construction, the magnitude of peak stream flow in Homestake Creek will not likely exceed the peak stream flow that have historically occurred since the System has been in operation. This is because historical peak flows (recorded after construction of the System) have been similar to peak native stream flow that would have occurred if the Project had not been diverting water. In anticipation of the 2012 construction activities, Homestake Reservoir has been drained. Two cofferdams are planned to be constructed to control inflows to the reservoir, which are anticipated to peak around mid -June. The main cofferdam will be located in Eagle County about 200 feet upstream of the toe of the dam, at the location of a partially breached cofferdam previously used during the original dam construction. The cofferdam is anticipated to be constructed using fill material borrowed from the reservoir bottom and imported from offsite. A smaller low -head cofferdam will be located in Pitkin County at the Homestake Tunnel intake and will extend about 50 feet into the existing reservoir. The two cofferdams will serve to isolate the upstream face of the dam and the Homestake Tunnel intake from reservoir inflows. Inflows will be directed either through the Homestake Dam outlet works, or the Homestake Tunnel intake, as needed depending on reservoir inflows and schedule of work to facilitate construction activities. At the end of the 2012 construction season, the cofferdams will be breached and any imported materials will be removed and disposed offsite. Conceptual design for the coffer dams is provided in Appendix C. The construction should have no adverse effects to water quality. The contractor is required to implement water quality control measures during construction and has prepared a water quality control plan and stormwater management plan and obtained stormwater and water quality permits. The plan includes use of settling basins, filtration systems as needed, and regular monitoring. The primary containment will be effected by the cofferdam above the outlet works intake. Water contained between this cofferdam and the main dam will be controlled, monitored, treated and discharged into the active pool behind the cofferdam, and secondarily into the outlet works and from there to Homestake Creek. Ouvd20 UMN \Prq..0?241598_1­b..Aoke_Wasa_Ii Sub_001120_Wad PlMPe Ming`P9kn Co%LmMt n_P enl_RwieWPnknco_D,omiew_For Pnnling0ax &19I2o12259PM 4-2 SECTIONFOUR Compliance With Pitkin Comny Codes During construction, sediment fencing will be placed along the edges of wetlands and surface water bodies that are adjacent to the access roads and other construction areas to prevent degradation of water quality and to restrict vehicle movement into those areas. Stockpile, laydown and disturbed areas will be silt fenced. Hay bale barriers and wattles will be used in highly erodible areas if they are identified. 4.5 SEC. 7- 20 -50: GEOLOGIC HAZARDS Homestake Dam is located on the Middle Fork of Homestake Creek, about 0.4 mile above the confluence with the East Fork of Homestake Creek. The dam and reservoir are in existence, and the footprint of the Project will be entirely within areas occupied by current facilities and areas disturbed during original construction of the original dam. Construction activities will not alter ecological units or landforms in the Project area. The Project is not anticipated to affect geology or geologic hazards, including avalanche, landslide, flood, settlement or siltation. Since construction will not occur in the winter, no avalanche control measures will be implemented. A summary of the regional site geology is provided below. The Project area is located in the glaciated valley of Middle Homestake Creek, surrounded by the Holy Cross Wilderness Area. Bedrock consists of Laramide intrusive rocks about 40-72 million years old, and Precambrian metamorphic rocks felsic and homblendic gneisses 1.7 -1.8 million years old, which are exposed on the ice - scoured walls of the valley and in some areas on the valley floor (Tweto 1979). Limited portions of the valley are occupied by glacial drift of the Pinedale and Bull Lake glaciations along with some modern alluvium. Elevations in the Project area range from about 10,000 to 10,300 feet, while the ridges above the valley reach 11,200 to 12,500 feet. Information on soils was obtained from the Holy Cross Area Soil Survey (USFS 1999). The predominant soils in the Project area are mapped as Man -Made Lands and Water. The dam, staging and laydown areas and portions of the access roads are mapped as Map Unit ML (man- made land). All of the construction areas within the reservoir including the coffer dams and water quality control features are in Map Unit W (Water). A portion of the access roads is in Map Unit 223B (Leighcan Family — Rock Outcrop — Cryoquolls complex, 0 to 40 % slopes). This map unit is about 40% Leighcan and similar soils, 30% rock outcrop, and 20 % cryoquolls and similar soils. Leighcan soils are occupied by lodgepole pine and spruce -fir forests, consist of very cobbly and stony coarse sand and sandy loam, and are somewhat excessively drained soils with an effective rooting depth of 20 to 40 inches. Cryoquolls are occupied by willow and sedge wetlands, consist of silt loams in the upper 15 inches, are very poorly drained, and have a seasonal water table within one foot of the surface and a depth greater than 60 inches. There are several avalanche chutes around the reservoir, including one at the left dam abutment. Trees and rocks deposited on the ice - covered reservoir in the winter are sometimes rafted to the dam and have to be removed. Homestake does not currently conduct any avalanche control activities either at the dam and reservoir or along the Homestake Road. There are no landslide areas in or near the Project area. GUUJ-21 N\PMq sV 2415%_Hmn ake_POese_g\S� 90120 Wo _PrMPewffling\PObncoLLL"*n_E enl_ReviexlP9k DwreIM Fa Pnnhng DO 119/2012259PM 4-3 SECTIONFOUR Compliance with PRO COnntV Codes 4.6 SEC. 7- 20 -70: WILDLIFE HABITAT The Project area provides seasonal habitats for various species (NDIS 2010), including: Elk (summer range throughout the Project area, except the reservoir, and winter concentration and severe winter range occurs downstream of the Project area along the Homestake Creek Road to the junction with Highway 24); Mule deer (overall range throughout the Project area, except the reservoir); Moose (overall range and winter range downstream from the dam, extending outside of the Project area along Homestake Creek Road); Black bear (overall range throughout the Project area, except the reservoir, and a bear/human conflict area along Homestake Creek Road downstream of the Project area); and Mountain lion (overall range throughout the Project area, except the reservoir). In addition, seasonal range for Bighorn sheep (Olds canadensis), mountain goat (Oreamnos americanus) and ptarmigan (Lagopus muta) is found on the ridge east of the reservoir, but not within the Project area. Relict beaver (Castor canadensis) dams were observed below the reservoir. Because all construction would occur in previously disturbed areas or in areas currently occupied by the dam, reservoir and roads, there will be no loss of forest habitat. The primary impacts to terrestrial wildlife may be temporary disturbance and displacement during construction as noise and human activity associated with construction may disturb or displace sensitive wildlife from forested and wetland habitats adjacent to the Project area. There is already regular human use of the Project area by recreationists that may result in some level of displacement or habituation. The existing dam and reservoir are a barrier to wildlife movement up the valley, and wildlife movement patterns will not change during construction. Although the area near the dam and access roads is used as habitat by several big game species, it is not considered sensitive for them. The dam is currently accessed during the winter by Homestake personnel using snowmobiles or snowcats on Homestake Road. This vehicle use, along with recreational snowmobiling, results in a packed surface that is used by wildlife for travel during the winter. During construction, Homestake Road will be plowed starting in March 2012 and April 2013. Wildlife are likely to continue to use the plowed road, but may be more vulnerable to harassment if plowing creates a canyon effect in some areas of deep snow that impairs escape off the road. CPW has expressed a concern that the plowed road might encourage early season use by members of the general public, and subsequent wildlife harassment or poaching. However, the USFS has approved the installation of a gate on FR 703 (also known as Homestake Road) to the east of Homestake Creek near Highway 24. The gate is expected to be installed in March 2012. Fish and aquatic habitat in the reservoir will be temporarily affected by drawdown of the reservoir and by changes in stream flows below the reservoir during construction. The reservoir has been drawn down beginning in late 2011 and will reach a minimum level in April 2012. A residual pool will be maintained because the reservoir basin (bottom) is deeper than the elevation of the outlet works and Homestake Tunnel. The reservoir will begin to be refilled November 2012, but will not reach normal levels until construction is completed in 2013. Preliminary discussions have been held with CPW regarding the potential for fish salvage from the reservoir. There are no formal requirements for fish salvage, and no permitting or plans needed, other than assistance to CPW in accessing the area during construction. CPW stopped stocking Homestake Reservoir in 2008 in anticipation of the maintenance work and drawdown. Since public access will not be allowed when the reservoir is drawn down, there will be no public salvage (suspension of normal bag limits), and any salvage will be performed by CPW. CPW fish ry\Plgecls\222C15M Han"A PM1a -H \5. W120_WOrtl_Proc \Pa'mming\PtlWn CO\LocMion Exlenl_ParievAPObnw_Devre + iew_F.Pnnlin,D 3M2012259PM 4 -4 kjJuJ22 SECTIONFOUR Compliance With PRO COUIN Cedes biologists plan to evaluate the need for salvage in late May or June of 2012 to determine whether there are fish in distress as a result of dewatering that should be salvaged. Migratory Birds Table 4.6 -1 provides a list of migratory birds that were observed during the field reconnaissance and which are likely to nest in the area. No raptor nests were observed. Additional bird species that were not observed during the field visit, such as woodpeckers and flycatchers, are likely to be found in the Project area. Table 4.6 -1 Migratory Birds Observed During Field Reconnaissance Name Species I Primary habitat where observed Mallard Anas platvrhpnchos Reservoir Common merganser Mergus merganser Reservoir Cooper's hawk Accipiter cooperii Over mixed aspen/conifer Spotted sandpiper Actitis macalarius Shoreline Broad- tailed hummingbird Selasphorus platycercus Mix of riparian shrub, conifers, open areas Red -naped sapsucker Sphvrapicas euchalis Mix of riparian shrub, conifers, open areas Western wood -pewee Contopus sordidulus Mix of riparian shrub, conifers, open areas Violet -green swallow Tachwineta thalassina Open areas (over dam and reservoir) Mountain chickadee Poecile gambeli Spruce -fir forest Ruby - crowned kinglet Regulus calendula Spruce-fir forest Townsend's solitaire Mpadestes rownsendi Spruce -fir forest Hermit thrush Catharus guttatus Mix of riparian shrub, conifers, open areas American robin Turdus migratorias Spruce -fir forest Orange - crowned warbler Vermivora celata Riparian shrub Yellow - rumped warbler Dendroica coronara Spruce -fir forest Wilson's warbler Wilsonia pusilla Riparian shrub Lincoln's sparrow Melospiza Riparian shrub White- crowned sparrow Zonotrichia leucophn's Riparian shrub Dark -eyed bunco Junco hvemalis Spruce -fir forest Pine siskin Spinus pinus Spruce -fir forest Evening grosbeak Coothraustes resperitinus I Riparian deciduous forest The Project is expected to have no effects to migratory birds, including sensitive bird species. In the unlikely event that clearing of riparian shrubs or cutting of trees is required for the Project, surveys or other mitigation will be required by USFS prior to construction activity. Potential methods include clearing of the construction area in advance of the breeding season to make the area unsuitable for nesting, timing of construction to avoid the breeding season, or use of pre - construction surveys to identify bird nests, combined with delays in construction for individual nests until the young birds have fledged and left the nest. The first two are preferable because they do not involve delays in construction once it is underway, and have a greater likelihood of N \PrgecIS 41596JbMe ke_PM, Mub W120_WO Pre PermMing \RWn Col"ion_r 00_NerieMPM Dwv iew For PnnlingD &1912D12259 PM 4-5 V� uUGi23 SECTIONFOUR Compliance With Pitkin Comny Codes not affecting active bird nests, as such nests can be very difficult to locate. If mitigation is needed for migratory birds, appropriate methods will be coordinated with the USFS. The same procedures will also protect USFS sensitive bird species nests, including boreal owl, northern goshawk, and olive -sided flycatcher. Federal Endangered, Threatened, Proposed and Candidate Species Lists of federal species and critical habitat for Eagle and Pitkin Counties were obtained from the USFWS Colorado Ecological Service website ( USFWS 2010). There are ten endangered or threatened species and one candidate species listed for Eagle and Pitkin Counties (Table 4.6 -2). Table 4.6 -2 Federally Listed and Candidate Species for Eagle and Pitkin Counties Species Scientific Name Status* Habitat Habitat Present? Black- footed ferret Mustela nigripes E Prairie Dog towns No Bonytail Gila elegans E Large rivers in Colorado Habitat present River Basin downstream Canada lynx Lynx canadensis T Subalpine forests Yes Colorado Ptychocheilus Lucius E Large rivers in Colorado Habitat present pikeminnow river Basin downstream Greenback Oncorhynchus cdarki T Montane and subalpine Yes, but outside cutthroat trout stormas streams known range Humpback chub Gila cy'pha E Large rivers in Colorado Habitat present River Basin downstream Mexican spotted Strix occidentalis lucida T Dense mixed forest and No owl canyons, foothills and lower montane Razorback sucker Xyrauchen teranus E Large rivers in Colorado Habitat present River Basin downstream Umcompahgre Boloria acrocneina E Alpine tundra No fritillary butterfly Ute ladies' - tresses Spiranthes diluvialis T Wet meadows and stream No orchid edges, below 7,000 feet Yellow - billed Coccyzus americanus C Low - elevation riparian No cue I woodland Note: E = endangered, T = threatened, C = candidate The only federally listed or candidate terrestrial animal species with habitat in the Project area is Canada lynx, but no portion of the Southern Rockies (including the Project area) is designated as lynx critical habitat by the USFWS. More information about this species is provided in the Biological Assessment/Biological Evaluation report (Appendix E). There is suitable habitat for greenback cutthroat trout in the Project area, but the Project area is outside of its known or suspected range. Four endangered fish species are found downstream of the Project area in the major tributaries of the Colorado River system, including bonytail, Colorado pikeminnow, humpback chub, or razorback sucker. Under the ESA, impacts to these four species need to be considered for projects that could result in new depletions (changes in amount or timing) to the Colorado River system. Because the Project does not new involve depletions, there will be no MN\Prgec 22415 Homa ake PM II\Sub_=12o_WO P= \Pei nng\Pabn COLOC n FiW ReieMPakrw De+ ew_For PnnLngOw NIW2012259PM 4-6 uuu'j24 SECTIONFOUR Compliance With Pitkin County Codes effect on these species. No federally listed, proposed, or candidate plant species have habitat in the Project area. The Project is anticipated to involve minor temporary impacts to lynx as construction activities may temporarily displace Canada lynx from the vicinity of the construction areas. There will be no permanent loss of habitat, and use and maintenance of the existing access roads will have no adverse effects. The Project would be in compliance with the objectives and guidelines of USFS management of lynx in the Southern Rockies. A Biological Assessment has been prepared for the Project and is provided in Appendix D. Other federally listed animal species, including greenback cutthroat trout, Mexican spotted owl, Uncompahgre fritillary butterfly, and yellow - billed cuckoo will not be affected by the Project. Colorado River fish living downstream of Homestake Reservoir will not be affected because the maintenance Project will not create new depletions. USFS Sensitive Animal Species The Project area includes sensitive habitat for a total of eight Region 2 sensitive animal species, including boreal toad (Anaxyrus boreas), northern goshawk (Accipiter gentilis), boreal owl (Aegolius funereus), olive -sided flycatcher (Contopus cooperi), Colorado River cutthroat trout (Oncorhynchus clarki pleuritucus), American marten (Martes ainericana), and pygmy shrew (Sorex hoyi). More information about these species is provided in the Biological Assessment/ Biological Evaluation report (Appendix E). One additional species, American three -toed woodpecker (Picoides dorsalis), was previously listed as a sensitive species and was on the list of species provided to URS by the Holy Cross Ranger District in 2010, but was removed from the 2011 sensitive species list (USFS 2011). Impacts to USFS sensitive species are addressed in the Biological Assessment/Biological Evaluation (Appendix E). The Project is expected to have no impact on boreal owl, wolverine, or American marten. The Project may cause minor short-term impacts to northern goshawk, olive -sided flycatcher, Colorado River cutthroat trout, boreal toad, and pygmy shrew. It is not likely to result in a loss of viability on the planning area for any of these species, or to cause a trend to federal listing or a loss of species viability range wide. USFS Sensitive Plant Species Special status species surveys were conducted in July 2010 using a list of species provided by Rick McNeill of the White River National Forest. Several of the target species were moonworts, and therefore all USFS sensitive moonworts that may occur in the central Rocky Mountains were surveyed (USFS 2011). Six species of moonworts were found, two of which, trianglelobe moonwort (Botrychium ascendens), and narrowleaf grapefern (Botrychhun lineari) are USFS sensitive species. No other sensitive plant species were found. A copy of the survey report is provided as Appendix C of the Biological Assessment/Biological Evaluation (Appendix E). The Project is expected to have no impact on triangleleaf moonwort and narrowleaf grapefern. The moonworts are located adjacent to the access roads and not within proposed construction areas. Impacts are being avoided by fencing the edges of the sites to prevent access or accidental impact during construction. MN\Prgec1a222415 H..Wake PM. IIMSub_W120_WO P. \P..lin9\POWn Co\LOCaw_FaW Rwlexl ftmo_Dere Pew_Fa Pnntin9Cttx M912012259PM 4-/ ujuJ25 SECTIONFOUR Compliance with Pitkin CouW codes 4.7 SEC. 7- 20 -80: RIVER AND STREAM CORRIDORS AND WETLANDS Homestake has received approval from the USACE under Nationwide Permits 3 and 33 for the proposed maintenance Project. Homestake disclosed potential impacts to wetlands and waters of the U.S. in the Pre - Construction Notification (PCN) report contained in Appendix F. No wetlands in Pitkin County will be impacted. Wetlands surveys and delineations of the dam improvement footprint were conducted in July 2010. Sixteen wetlands totaling 1.4 acres were identified, most of which are located along the access roads (see Figure 2 in PCN, Appendix F). In addition, the Middle and East Forks of Homestake Creek (0.18 acre) were also delineated as other waters of the U.S. A maximum of 0.0005 acres (234 square feet), in seven wetlands (in Eagle County) may be permanently impacted by road improvements within the 16 -foot road corridor of each access road. The impact is minimal because the roads will not be widened. Construction activities will also affect about 15 acres within the basin of the existing reservoir, in areas that are normally inundated by water or that may be used as borrow areas. All of the impacts within the reservoir basin will be temporary. Additional information regarding impacts to wetlands and other waters can be found in the Clean Water Act Section 404 PCN (Appendix F). During construction, sediment fencing will be placed along the edges of wetlands and surface water bodies that are adjacent to the access roads and other construction areas to prevent degradation of water quality and to restrict vehicle movement into those areas. The primary pollutant that will be controlled will be sediment load and suspended solids. It is assumed that no chemical treatment will be required beyond clarifying and settling out suspended solids. � '. J� N ■ M N\Pr %ecI 2415%_V me ake_Plase_IASub_W120 Wo -Pm PermMin9 \Ripn Co \LO is -6 enl_Re iex Pnkmo_NCar iew_For PnnLng�x W1912012259PM 4-8 SECTIONFIVE References Natural Diversity Information Source (NDIS). 2010. GIS data for Big Game Seasonal Ranges. Colorado Division of Wildlife. http: / /ndis.nrel.colostate.edu/ Tweto, Ogden. 1979. Geologic Map of Colorado. U.S. Geological Survey, Denver, CO. Scale 1:500,000, 2 sheets. United States Forest Service (USFS). 1999. Holy Cross Area Soil Survey. Available on the internet at White River National Forest -Land and Resource Management - Geospatial Data. USFS. 2011. FSM 2600 — Wildlife, Fish and Sensitive Plant Habitat Management. Chapter 2670 — Threatened, Endangered and Sensitive Plants and Animals. Forest Service Manual, Rocky Mountain Region, Denver, CO. Effective May 25, 2011. vuJJ27 C N\P,geo1S222415%_NOmee e_PMS _Mub_W120_Wad P, %Pm ftnglP knCoTO io2P eM_ReieMNU mo Dwrwiew_Fo,PnMing Uo V19M12259PM 54 C) 0 C) 0 N 00 V/ m 0 r m 0 0 1 N D DPAWaG D a 0 m WMNu I+ICO= A ron,rh O m O N y �A 2 m m00� z y Lmi g�m�Y mZp�n ap O Ozc oo z CFA m ozm0 DODN o pp0 m N 0 D m z n z � m a D LOS A O m z` m m p A 'T N O z p Vrt;1l V y p � m i ZD m ARm Nm� o�� o D A m Z o L m mmm L _mf SL+i [p^mo O O A �1 A rL pm O N p L �O q A � ; N I 0 I V/ til �rx x °lorb dN� x H �z00 Cl o tij cN G ~ VI yon aox dox w ro O W 0 W � ro � ro MO N 0 til H wove x 0 z my� tI 7i t/ + tv til CA til C M0 N x� J n d ty �I r_ M0 n H iii m � i a ({ ..i- sy£ u•i' O D i Z et fl 0 0 0 I OR y ^x V ca J ny IM ORAWINO PATH'. N'. \Projecb \2 241596_Hw wWke_Phaee_II\SW_00 \7.0_CPD_O S \PI SH= \0 -3 CENOW SIZE PM(60).dwg Mlum, wNm n, e/31/2011 1 u N c N P G N c- c .' J j r i n ZO mN 02 OLsp ysyy > io onZ ;Z. F� o I.Sm 'A<COK 2� --AD]5C} NNZWO£ 00 mz O Amy m� Omlpj'J DO D'In�1 f/1 Om mTmmO mm UZICm mm A E5 .N_N -QO yQ PPOOMm y 4�� �RTrATm1IO 2�9CN0 4NO.. o xm2 AF 2Cpm L� ypOm T / �• j O IpJmym +� m ;m O m< X00 000A S^ I _ A O mp0 C Fj 2A COO ALz �OOpm C Np TT p0 Dyo O O 222 A // F WC m2C XOy Op m iO V� CC}� Or SyO y-14l Vl �Apy r / i X AO DO y N IpelK m 2 s 20, 'L F_ y M AOy N ° °Z N O�,FF m f `1 'A II El OC m OC Im � ZN ti�zN S / '� \\ I/ ml2 Z; lie sm ° !q- w zzo f / �/ % R go 3 (/I 00Ay p Z ! O �® I _ 'm 1. fi m v zx mn.. �.• j}} fC K � NDD-1A I �Op-AI NFO ZO \ :Em p D v l'D2 SOm I`10m� A O j vxy bin =zmm{12 Cr O >: D 1 2 \ FA czi.z yx I fl I Z� In ME 1� ��o o N2� i II� Ij l oy/ A DO0 z �I =2S i mE" 2 ° N ° $y' y'�M1•tb I`{J O < 11 L 2 IICL ,} o 0, 0 mir O. \ �• m im50 rD0 gm $$ smz I PI 2 1! O^' o <07 In K�z •I -sl^ NiAq m 9 c I �vAx AO mpS I O1 = DAm mT M 0 OL 1 N S O �z v�^ l f�mv� I0 £�S o % 'I �� N� III pn2a m0Zy p >QOS m(/1 pm O+I \ DnOC �r �yf/15 I 77cc x 2 Z O O z "! O [ I( �psm 00 5 gypy F / m ( Ezy Pg MO D _O �G I c 1\ xo � p 0 o e o m m 4 i Y C� E V -3v3 II Si iNd m >OA mj PUBLIC NOTICE RE: Homestake Water Project Location and Extent Review (Case #P028 -12; PID 2477 - 000 -00 -000) NOTICE IS HEREBY GIVEN that a public hearing will be held on Tuesday, May 15, 2012 at a regular meeting to begin at 5:00 p.m. or as soon thereafter as the conduct of business allows, before the Pitkin County Planning and Zoning Commission, Plaza One Conference Room, 530 E. Main St., Aspen to consider an application submitted by Homestake Water Project (37200 US Hwy 24N, Buena Vista, Co 81211) requesting to repair /replace /rehabilitate portions of the dam structure (Eagle) and the tunnel intake gate ( Pitkin). The property is located at Homestake Reservoir and is legally described as Township 8 South, Range 81 West of the 6`h P.M., Water Division 5, Water District 37, DAM ID. 370109. The State Parcel Identification Number for the property is 2477 -000- 00 -000. The application is available for public inspection in the Community Development Department, City Hall, 130 S. Galena St., Aspen, CO 81611. For further information contact Lance Clarke at the Pitkin Community Development Department (970) 920 -5452. s/, Joe Krabacher Chair Pitkin County Planning and Zoning Commission Published in the Aspen Times Weekly on April 12, 2012. Pitkin County Account 002.02. Public Privale Attention Applicant/Representative: It is your responsibility to do the following: 1. Mail this Public Notice to all adjacent property owners and mineral estate owners at least 30 days prior to the hearing with the return address of the Community Development Department. The names and addresses shall be those on the current tax records of Pitkin County as they appeared no more than 60 days prior to the date of the public hearing 2. Submit the Affidavit of Notice by Posting & Mailing (previously sent to you with your applicant letter) as proof of compliance with the Code at the hearing. 3. Pick up Public Notice sign from the Pitkin County Community Development Department, 130 South Galena Street, Aspen, CO (970) 920 -5526 4. Post the Public Notice sign on the property at least fifteen days (15) prior to the hearing 5. Remove the Public Notice sign within one week after hearing date County of Pitkin } AFFIDAVIT OF NOTICE & } ss. MAILING PURSUANT TO State of Colorado } PITKIN COUNTY LAND USE CODE SECTION 2 -20 -100 I, Kerry Sundeen, being or representing an Applicant to the Pitkin County Development Department, personally certify that I have complied with the public notice requirements pursuant to Section 2 -20 -100 of the Pitkin County Land Use Regulations in the following manner: I . By mailing of notice, a copy of which is attached hereto, by first- class, postage prepaid U.S. Mail at least 30 days prior to the public hearing to all owners of property within 300' to the subject property, as indicated on the attached list, on the 6th day of April, 2012 (which is 40 days prior to the public hearing date of May 15, 2012). The names and addresses of the adjacent property owners shall be those on the current tax records of Pitkin County as they appeared no more than 60 days prior to the public hearing. 2. By mailing of notice, a copy of which is attached hereto, by first- class, postage prepaid U.S. Mail at least 30 days prior to the public hearing to the owner(s) of the mineral estate underneath the subject property, as indicated on the attached list, on the 6th day of April, 2012 (which is 40 days prior to the public hearing date of May 15, 2012). The names and addresses of the mineral estate owners shall be those on the current tax records of Pitkin County as they appeared no more than 60 days prior to the public hearing. 3. By posting a sign in a conspicuous place on the subject property (as it could be seen from the nearest public way) on the 4th day of April, 2012, which is at least fifteen (15) days prior to e public hearing. A photograph of the posted sign is attached hereto/ yzvvlf� 1�% &V_Je1e_n Applicant' ame (Attach photograph here) ft-AINLTATE ?-4. 0✓< 'NF GI I iA,.� ll Cr". C AND -AL TWWEL INTAKE GATI (IJmz.� rNO EETY IS t.�ATE4 AT NoN %M Rt.ERVaeR lb"smir 8 -a Pk,%F. $I wg.T oc THE P.M Eos /ILNIN60U11AFSOELAANMIX OFUCET 1]0 E GALENA 6T, AE;EN CO �9f0 »2M1SStE i Signed before me this day of 2012by WITNESS MY HAND AND OFFICIAL SEAL My commission expires: 10 J Vb J ZO 12. Notary Public maAft r ►e _ K - "Dko't S Notary Public's Signature MELANIE K. DAVIS Notary Public State of Colorado April 6, 2012 Mr. Dave Neely District Ranger, Eagle -Holy Cross Ranger District Holy Cross Office 24747 US Highway 24 Minturn, CO 81645 RE: Homestake Dam Maintenance and Repair Project Property Owner Notice Dear Mr. Neely, As you may know, the Homestake Dam and Reservoir in Eagle County, Colorado, is undergoing scheduled maintenance in 2012 and 2013. These activities are routine maintenance, and must be completed to ensure that the project continues to operate in a safe and reliable manner. This is a notice to all property owners and mineral estate owners within 300 feet of the subject property of a public hearing before Pitkin County Planning and Zoning Commission scheduled for Tuesday, May 15, 2012. This meeting shall begin at S:OOpm before the Pitkin County Planning and Zoning Commission, in the Plaza One Conference Room, 530 East Main Street, Aspen, Colorado. Please find enclosed a copy of the public notice for your review. Please contact us if you have any questions or clarifications. Sincerely, i7. Sundeen ?stake Project Representative hment Cc: Tom Vidmar, Homestake Project Ron Sanchez, Colorado Springs Utilities -2 April 6, 2012 Scott Fitzwilliams Forest Supervisor, White River National Forest PO Box 948 900 Grand Avenue Glenwood Springs, CO. 81601 RE: Homestake Dam Maintenance and Repair Project Property Owner Notice Dear Mr. Fitzwilliams, As you may know, the Homestake Dam and Reservoir in Eagle County, Colorado, is undergoing scheduled maintenance in 2012 and 2013. These activities are routine maintenance, and must be completed to ensure that the project continues to operate in a safe and reliable manner. This is a notice to all property owners and mineral estate owners within 300 feet of the subject property of a public hearing before Pitkin County Planning and Zoning Commission scheduled for Tuesday, May 15, 2012. This meeting shall begin at S:OOpm before the Pitkin County Planning and Zoning Commission, in the Plaza One Conference Room, 530 East Main Street, Aspen, Colorado. Please find enclosed a copy of the public notice for your review. Please contact us if you have any questions or clarifications. Sincerely, D. Sundeen stake Project Representative ttachment Cc: Tom Vidmar, Homestake Project Ron Sanchez, Colorado Springs Utilities Brett Gracely, Colorado Springs Utilities PUBLIC NOTICE RE: Homestake Water Project Location and Extent Review (Case #P028 -12; PID 2477 - 000 -00 -000) NOTICE IS HEREBY GIVEN that a public hearing will be held on Tuesday, May 15, 2012 at a regular meeting to begin at 5:00 p.m. or as soon thereafter as the conduct of business allows, before the Pitkin County Planning and Zoning Commission, Plaza One Conference Room, 530 E. Main St., Aspen to consider an application submitted by Homestake Water Project (37200 US Hwy 24N, Buena Vista, Co 81211) requesting to repair /replace /rehabilitate portions of the dam structure (Eagle) and the tunnel intake gate ( Pitkin). The property is located at Homestake Reservoir and is legally described as Township 8 South, Range 81 West of the 6h P.M., Water Division 5, Water District 37, DAM ID. 370109. The State Parcel Identification Number for the property is 2477 -000- 00 -000. The application is available for public inspection in the Community Development Department, City Hall, 130 S. Galena St., Aspen, CO 81611. For further information contact Lance Clarke at the Pitkin Community Development Department (970) 920 -5452. s/, Joe Krabacher Chair Pitkin County Planning and Zoning Commission Published in the Aspen Times Weekly on April 12, 2012. 1 Lance Clarke From: Parker, Andrea [andrea.parker @urs.com] Sent: Thursday, April 05, 2012 8:41 AM To: Lance Clarke Cc: Ron Sanchez (rjsanchez @csu.org); Zusi, Michael Subject: Sign Posted at Homestake Reservoir Attachments: Homestake Sign #1.jpg; Homestake Sign #3.jpg; Homestake Sign #4.jpg; Homestake Sign # 6.jpg Good Morning Lance, The signs for the public hearing on May 15th are now posted at the site. We will be sure to attach the photos to the affidavit that we bring to the hearing. Regards, Andrea Andrea Parker URS 8181 E. Tufts Avenue Denver, CO 80237 Phone (303) 796 -4764 Fax(303)694 -3946 andrea.parker @urs.com j�, Please consider the environment before printing. From: Slack, David Sent: Wednesday, April 04, 2012 3:56 PM To: Zusi, Michael; Parker, Andrea Subject: Homestake Sign Here are some pictures of the installed Public Notice sign. The GPS point is: 13 S. 0382846 4370280 Let me know if you ever need me to do anything else. David Slack, Field Technician URS Corporation 713 Cooper Avenue, Ste. 100 Glenwood Springs, CO 81601 (970) 384 -4741— Work (970) 379 -4246 — Cell Note New E -Mail — david.slack @urs.com This e -mail and any attachments contain URS Corporation confidential information that may be proprietary or privileged. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies. 1 I a� 3 Is . , t-. Homestake Dam an e Maintenance an Pitkin County Community Development 'Department WATER WATER A� 14 q 5/15/2012 1 5/15/2012 2 Project Needs "I., (1) Dam Safety Repairs.. — Required by the State Engineer' - Asphalt Face Rehabilitation (Eagle Coun crest Removal and Reconstruction eagle_ County) Repairs Will Not Modify Project rapacity, Diversions, or.- Operation ar 3 5/15/2012 3 5/1,5/2012 4 5/15/2012 LC 5/15/2012 Primary Contacts During Construction • Homestake Proiect: URS: Mike Tom Vidmar / Andrea Ra Tom Hankins } ,, (719) 668 -9595 (303) - 196 -47 • Colorado Springs ACA Moltz: Utilities: Ron Sanchez Cote Philip � MR- r 5/15/2012 7 PITKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado 81611 (970) 920 -5526 FAX# (970) 920 -5439 March 27, 2012 Kerry Sundeen 37200 US HWY 24N Buena Vista, CO 81211 ksundeenngrandriver.us Re: Homestake Water Project Location and Extent Review, Land Use Code Development Standards Review (PID #2477 - 000 -00 -000; CASE # P028 -12) Dear Ms. Sundeen: The Planning Office has completed its preliminary review of the captioned application. We have determined that this application is complete. After a more detailed review of the submittal information, additional information specific to the application may be requested in order to adequately review and process the application. The planner in charge of the review will request the information from you directly. We have scheduled this application at a public hearing before the Pitkin County Planning and Zoning Commission on Tuesday, May 15, 2012 at a meeting to begin at 5:00 pm before the Pitkin County Planning and Zoning Commission, in the Plaza One Conference Room, 530 East main Street, Aspen, Colorado. Should this date be inconvenient for you please contact me within 3 working days of the date of this letter. After that the agenda date will be considered final and changes to the schedule or tabling of the application will only be allowed for unavoidable technical problems. The Friday before the meeting date, we will call to inform you that a copy of the memo pertaining to the application is available for you to pick up at the Community Development Office. Please note that it is your responsibility to post a public notice sign on the property at least fifteen days prior to the public hearing (and remove it within one week after). You are also required to mail notice (you may obtain a copy of the public notice from our office) to all property owners and mineral estate owners within 300' of the subject property at least 30 days prior to the hearing with the return address of the Community Development Department given above. The names and addresses shall be those on the current tax records of Pitkin County as they appeared no more than 60 days prior to the date of the public hearing. Please submit the enclosed Affidavit of Notice by Posting & Mailing as proof of compliance with the code at the hearing. If you have any questions, please call Lance Clarke, the planner assigned to your case, at (970) 920 -5452 Sincerely, Bonnie Waechtler Administrative Assistant Encl: Affidavit (Code Section 2 -20 -100) PITKIN COUNTY COMMUNITY DEVELOPMENT Permit Receipt RECEIPT NUMBER 00032212 Name: Colorado Springs Utilities Date:3/27/2012 Project Address: 0 HOMESTAKE RESERVOIR Type: check # 206872 Permit Number Fee Description Amount 0028.2012.PLAN PP- Flat Fee 4,056.00 0028.2012.PLAN PP- Clerk Tech Fee 25.00 0028.2012.PLAN PP- Public Notice Fee 108.00 0028.2012.PLAN PP- Planning Eng Referral Fee 499.00 Total: 4,688.00