RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF PITKIN COUNTY,
COLORADO, APPROVING THE HOMESTAKE RESERVOIR INTAKE GATE STRUCTURE
REPLACEMENT LOCATION AND EXTENT REVIEW
Resolution No. PZ-,)a-2012
RECITALS
1. Homestake Partners ( "Applicant ") has applied to the Planning and Zoning Commission of Pitkin County
( "Planning Commission ") to obtain location and extent review approval for a "dam and reservoir
maintenance and repair project ". The work in Pitkin County involves replacement of the Homestake
Tunnel intake gate on the floor of the Reservoir and associated improvements on the Reservoir rim; all as
represented in the application dated March, 2012.
2. The Reservoir is located in the National Forest in far northeast Pitkin County and in Eagle County.
3. The applicable master plans in this case are the "Upper Frying Pan Valley Master Plan" and the
"Overview Comprehensive Plan ". The Reservoir is not specifically referenced in the Frying Pan
plan. The Overview plan has an overriding concern to "Preserve, Conserve, Protect, the existing rural
character of Pitkin County ". The activities proposed do not conflict with existing comprehensive
plans.
4. The Applicants have stated that the proposed work will, "...neither extend or enlarge the capacities of the
Homestake Reservoir or its related diversion facilities, nor change the amount or timing of water
diversions."
5. The Pitkin County Planning and Zoning Commission considered the proposed application at a regularly
scheduled meeting May 15, 2012, and recommended approval by a vote of
6. Pursuant to C.R.S 30 -28- 110(1), the Planning Commission finds that the proposed improvements are
consistent with the applicable County master plans.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission that it hereby grants
approval of the Homestake Reservoir Location and Extent Review for the replacement/repair of the
Homestake Tunnel intake gate and associated improvements, subject to the following conditions.
1. The Applicant shall adhere to all material representations made during the application process or in
public meetings or hearings and shall consider those representations to be conditions of approval.
2. No additional work shall commence in Pitkin County until all required Federal and State permits
have been obtained and a Pitkin County Development Permit has been issued by the Community
Development Director.
3. No additional work shall commence in Pitkin County until an earthmoving permit (s) with drainage
and construction management plan have been approved by Community Development and the County
Engineer.
RECEPTION #: 589700, 06/11/2012 at
03:13:46 PM,
1 OF 2, R $0.00 Doc Code RESOLUTION
Janice K. Vos Caudill, Pitkin County, CO
Resolution No. PZ- 12012
Page 2
APPROVED by the Planning Commission this 15`x' day of May, 2012.
ATTEST:
&n!21'47 &
C�-
Bonnie Waechtler, Administrative Assistant
APPROVED AS TO FORM:
JEly, rry�ttorney
Case P- 028 -12; PID # 247700000000
lancec /cases/Homestake LE pz reso.doc
PLANNING AND ZONING COMMISSION
OF PITKIN COUNTY, COLORADO
Lam.
ohn oward, Chair
Date
APPROVED AS TO CONTENT:
tkg-'(Lki&- &"�
indy Houben, Community Development Director
MEMORANDUM
TO: Pitkin County Planning and Zoning Commission
FROM: Lance Clarke, -Assistant Director
RE: Homestake Water Project -- Location and Extent Review, Public Hearing
DATE: May 15, 2012
SUMMARY OF REQUEST: The Applicant is requesting location and extent review approval for the
Pitkin County portion of what is referred to by the Applicant as a "Reservoir Maintenance and Repair
Project" for the Homestake Reservoir dam, outlet works and intake gate. The replacement of the intake gate
portion of the work will occur in Pitkin County. The larger portion of the work will occur in Eagle County.
The Applicants have stated that the proposed work will, "...neither extend or enlarge the capacities of the
Homestake Reservoir or its related diversion facilities, nor change the amount or timing of water
diversions."
APPLICANT: Homestake Partners (Aurora and Colorado Springs)
OWNER: United States Forest Service
REPRESENTATIVE: Andrea Parker, URS; and Kerry Sundeen, Grand River Consulting
LOCATION: Far northeast corner of Pitkin County
ZONING: Rural Remote
PROCEDURE/PROCESS: C.R.S. 30- 28- 110(1) and Section 2- 30- 30- (h)(10) of the Land Use Code
provide that the Planning Commission shall review the location and extent of public projects proposed by
a governmental entity in the unincorporated area of the County for conformance with the applicable
comprehensive plan or master plan. The Planning Commission's action on a Location and Extent
proposal is essentially "advisory", as disapproval may be overruled by the governmental jurisdiction
making the proposal.
STAFF COMMENTS: The applicable master plans in this case are the "Upper Frying Pan Valley
Master Plan" and the "Overview Comprehensive Plan ". The Reservoir is not specifically referenced in
the Frying Pan plan. The only real reference in the Overview plan would be the overriding concern to
"Preserve, Conserve, Protect, the existing rural character of Pitkin County ". The activities proposed do
not conflict with existing comprehensive plans.
T t
RECOMMENDATION: Staff recommends that the Planning Commission finds the location and extent
review for the replacement/repair improvements related to the intake gate of the Homestake Reservoir to be
in conformance with applicable comprehensive plans, subject to the attached Resolution.
Application provided separately
lancec /cases/Homestake LE pz memo. doc
2
RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF PITKIN COUNTY,
COLORADO, APPROVING THE HOMESTAKE RESERVOIR INTAKE GATE STRUCTURE
REPLACEMENT LOCATION AND EXTENT REVIEW
Resolution No. PZ- -2012
RECITALS
1. Homestake Partners ( "Applicant") has applied to the Planning and Zoning Commission of Pitkin County
( "Planning Commission ") to obtain location and extent review approval for a "dam and reservoir
maintenance and repair project ". The work in Pitkin County involves replacement of the Homestake
Tunnel intake gate on the floor of the Reservoir and associated improvements on the Reservoir rim; all as
represented in the application dated March, 2012.
2. The Reservoir is located in the National Forest in far northeast Pitkin County and in Eagle County.
3. The applicable master plans in this case are the "Upper Frying Pan Valley Master Plan" and the
"Overview Comprehensive Plan ". The Reservoir is not specifically referenced in the Frying Pan
plan. The Overview plan has an overriding concern to "Preserve, Conserve, Protect, the existing rural
character of Pitkin County ". The activities proposed do not conflict with existing comprehensive
plans.
4. The Applicants have stated that the proposed work will, "...neither extend or enlarge the capacities of the
Homestake Reservoir or its related diversion facilities, nor change the amount or timing of water
diversions."
5. The Pitkin County Planning and Zoning Commission considered the proposed application at a regularly
scheduled meeting May 15, 2012, and recommended approval by a vote of
6. Pursuant to C.R.S 30- 28- 110(l), the Planning Commission finds that the proposed improvements are
consistent with the applicable County master plans.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission that it hereby grants
approval of the Homestake Reservoir Location and Extent Review for the replacement/repair of the
Homestake Tunnel intake gate and associated improvements, subject to the following conditions.
I . The Applicant shall adhere to all material representations made during the application process or in
public meetings or hearings and shall consider those representations to be conditions of approval.
2. No additional work shall commence in Pitkin County until all required Federal and State permits
have been obtained and a Pitkin County Development Permit has been issued by the Community
Development Director.
3. No additional work shall commence in Pitkin County until an earthmoving permit (s) with drainage
and construction management plan have been approved by Community Development and the County
Engineer.
E
Resolution No. PZ- -2012
Page 2
APPROVED by the Planning Commission this 15'h day of May, 2012.
ATTEST:
Bonnie Waechtler, Administrative Assistant
APPROVED AS TO FORM:
John Ely, County Attorney
Case P- 028 -12; PID # 247700000000
lancec /cases/Homestake LE pz reso.doc
I
PLANNING AND ZONING COMMISSION
OF PITKIN COUNTY, COLORADO
John Howard, Chair
Date
APPROVED AS TO CONTENT:
L�
indy Houben, ommunity Development Director
PITKIN COUNTY PRE - APPLICATION CONFERENCE SUMMARY
PLANNER: Lance Clarke
PHONE: (970) 920 -5452
LOCATION: Far NW Pitkin County (and in Eagle County)
ZONE: Rural Remote
DATE: August 10, 2011
E -MAIL: lancecOco.pitkin.co.us
PARCEL ID #: USFS
LOT SIZE:
OWNER: Homestake Water Project (Aurora Water and Colorado Springs Utilities)
APPLICANT: Homestake Water Project
REPRESENTATIVE: Kerry Sundeen
2477 T8S R81 W
EMAIL: ksundeenCcDa rand river. us
Type of Application: Location and Extent Review, Land Use Code Development Standards Review
(development standards related to 1041 regulations and other development standards)
Description of Project/Development: The Applicant proposes to repair /replace /rehabilitate portions of the
dam structure (Eagle) and the tunnel intake gate ( Pitkin).
Review by: Planning and Zoning Commission
Land Use Code Section 2 -30 -30 (h) (10)
➢ Frying Pan Master Plan
➢ Overview of the Pitkin County Comprehensive Plan
Development Standards to be addressed in Development Review portion of application:
Review by: Board of County Commissioners (forwarded by Community Development Director)
Land Use Code Chapter 7 (specific Sections, as applicable)
Sec. 7- 10 -50:
Activity Envelope
Sec. 7- 20 -10:
Site Preparation and Grading
Sec. 7- 20 -20:
Steep and Potentially Unstable Slopes
Sec. 7- 20 -30:
Water Courses and Drainage
Sec. 7- 20 -50:
Geologic Hazards
Sec. 7- 20 -70:
Wildlife Habitat
Sec. 7- 20 -80:
River and Stream Corridors and Wetlands.
Public Hearing: Yes, at P &Z and at BOCC. Notice is required for each meeting via posting, mailing and
publication. The Applicant shall post a public notice sign on the property at least 15 days prior to the date
specified for the Public Hearings pursuant to Sec. 2- 20- 100(a)(3) of the Land Use Code. In addition, the
Applicant shall mail notice (by certified mail) to all property owners and mineral estate owners within 300' of
the subject property with the return address of the Community Development Department (form of notice to be
obtained from the Community Development Department). The names and addresses shall be those on the
current tax records of Pitkin County, as they appear no more than 60 days prior to the date of the public
hearing. A property owner receiving the public notice shall have 2 weeks from the date the notice was
postmarked to submit comments or objections to the Community Development Department.
GU0001 of -O
Staff will refer the application to the following agencies: Planning Engineering, CDOW, USFS
FEES: $4,688.00 (make check payable to " Pitkin County Treasurer ")
■ $4,056 Planning Office flat fee (non - refundable; based on 13 hours of staff time; if staff review time
exceeds 16 hours, the Applicant will be charged for additional time above 13 hours at a rate of $312 /hour)
■ $499 Planning Engineering
$108 Publication Fee (two publications)
$25 Clerk Technology Fee
To apply, submit 16 copies (2 unbound) of the following information, unless noted otherwise:
1. Summary letter explaining the request, explaining existing conditions, providing background on prior
approvals and permits, and addressing compliance with the Code sections listed above.
2. General application requirements as listed in Section 1 of the Pitkin County Land Use Application Manual.
3. 11" by 17" copies of all 95% construction drawings.
4. Description and engineering drawings and specs of all disturbance in Pitkin County related to roads,
diversions, coffer dams, construction materials, storage of equipment.
5. List of adjudicated water rights.
6. Description and engineering specs of all temporary water "rerouting /bypassing" associated with the project.
7. Description of the "dead pool ".
8. Designation of all disposal and borrow areas.
9. Construction management plan detailing staging, storage areas, manner and hours of work.
10. Forest Service permits.
11. State permits.
12. CDOW comments.
13. Specify current amount of diversion annually, projected annual average diversion amount for ten years
after project completion, and records of diversion amounts annually for the past ten years.
14. Proof of the applicant's right to use the land for the purposes identified in the development application.
15. Consent from the owner of the property for the representative to process the application and represent the
owner.
16. Parcel description, including legal description, and 8 -1/2 "x 11" vicinity map locating the subject property within
Pitkin County.
17. Proof of adequate legal access to the property (1 copy).
18. Executed Pitkin County Community Development Agreement for Payment of Land Use Application Fees
form (1 copy — form attached).
19. List of all property owners and mineral estate owners within 300' of the subject property (1 copy); and
20. Copies of this pre - application Conference Summary Sheet.
NOTES:
PLEASE SUBMIT TWO UNBOUND AND ONE -SIDED COPIES OF YOUR COMPLETE APPLICATION. PLEASE SUBMIT TWO -
SIDED COPIES OF ALL REMAINING COPIES OF YOUR APPLICATION (IF POSSIBLE). THE PARCEL ID SHOULD BE
INCLUDED ON ALL DOCUMENTS INCLUDED IN YOUR APPLICATION.
➢ ALL MAPS SHALL BE FOLDED. One copy of submittal materials shall have all documents in format no larger than 8112" by
111%
This pre- application conference summary is advisory in nature and not binding on the County. The information provided in this
summary is based on current zoning standards and staff's interpretations based upon representations of the applicant.
Additional information may be required upon a complete review of the application.
UuUA2
�rT 'rf'• jfi�rr,l��i>1 �
r *PC
.Jos• F \/4
a w �"�► � iris, �.: ���✓�
TP
A &
A
� ' r
-AaM2
..� ��r �. may 6� ��f` .. �.j4 rt•
4 Y
Al
• M
TABLE OF CONTENTS
Section 1 Location and Extent Review and Land Use Code Development Standards
Review............................................................................................... ..............................1 1
Section 2 Existing Conditions — Homestake Dam and Reservoir Operations ............................2 -1
Section 3 Regulatory Approvals for the Project ............................................... ............................3 -1
Section 4 Compliance with Pitkin County Codes ............................................. ............................4 -1
4.1
Sec.
7- 10 -50:
Activity Envelope .................................. ............................4
-1
4.2
Sec.
7- 20 -10:
Site Preparation and Grading ................ ............................4
-1
4.3
Sec.
7- 20 -20:
Steep and Potentially Unstable Slopes .. ............................4
-1
4.4
Sec.
7- 20 -30:
Water Courses and Drainage ................. ............................4
-1
4.5
Sec.
7- 20 -50:
Geologic Hazards ............................... ...............................
4 -3
4.6
Sec.
7- 20 -70:
Wildlife Habitat ..................................... ............................4
-4
4.7
Sec.
7- 20 -80:
River and Stream Corridors and Wetlands ........................
4 -8
Section 5
000004
References....................................................................................... ............................... 5-1
= N1Pr ashy 41696 He Wa Fnzse 1 sub M120 WorE_ProsTermah,Pnlnu Gok O avon_Epenl_Fwm Pn neo_oevrwmw For Pnmm9 Does 3'192012259 Fm i
TABLE OF CONTENTS
List of Tables
Table 1.0 -1 Summary of Pitkin County Information Requests
Table 3.0 -1 Permit Summary
Table 4.6 -1 Migratory Birds Observed During Field Reconnaissance
Table 4.6 -2 Federally Listed and Candidate Species for Eagle and Pitkin Counties
List of Figures
Figure 1
List of Appendices
Appendix A
Selected Drawings and Specifications for Construction in Pitkin County
Appendix B
Water Rights
Appendix C
Coffer Dam
Appendix D
Dead Pool
Appendix E
Wildlife
Appendix F
Wetlands
Appendix G
Annual Diversion Information
Appendix H
USFS Permits and Land Ownership
Appendix I
Pre - Application Summary
0j "SJ05
UmWPml is =01596_H Sstnks_Phaz 111 ub_CM120 WVd P=dPmmntinoPnkin CULwa�on_EMe -RwlMP4Wmo_Ow— Pot Pnnnn90- 1192a12269PM ii
TABLE OF CONTENTS
Acronyms
AOP
BLM
cfs
CPW
ESA
Homestake
PCN
Project
USACE
USFS
USFWS
GuJ606
Annual Operating Plan
Bureau of Land Management
cubic feet per second
Colorado Parks and Wildlife
Endangered Species Act
Homestake Water Project
Pre - Construction Notification
Homestake Dam and Reservoir Maintenance and Repair Project
Corps of Engineers
U.S. Forest Service
U.S. Fish and Wildlife Service
_m N \Prods¢ 41595_Horo la _Phase II\Sub W120_ Word _PmdPmmmm9rPUkin Lo\ LmA, on _Ement_Rw.00Pnlunce_De..mw_For Pndm90as NIW2012259PM iii
SECTIONONE Location and Went Review and Land Use Code
Development Standards Review
The Homestake Water Project (Homestake) consists of existing and planned water storage and
diversion facilities located in the Homestake Creek and Eagle River watershed. Project facilities
are operated pursuant to Federal rights -of -way and annual operating plans (AOP) approved by
the United States Forest Service (USFS). Homestake Reservoir on Homestake Creek in the
White River National Forest (bordered by the Holy Cross Wilderness Area) stores water
collected by Homestake primarily for trans - mountain use by the Cities of Aurora and Colorado
Springs (the "Homestake Partners ") via the Homestake Tunnel. The northern portion of
Homestake Reservoir, including Homestake Dam and outlet works, is located in Eagle County.
The southern part of the Homestake Reservoir and the inlet to the Homestake Tunnel is located
in Pitkin County. The general location of Homestake is shown on Figure 1.
The Homestake Partners are undertaking the Homestake Dam and Reservoir Maintenance and
Repair Project (Project) to comply with dam safety requirements of the Office of the State
Engineer of Colorado. The existing upstream asphalt concrete facing of the dam has deteriorated
as a result of ultraviolet light exposure, freeze -thaw damage, and severe surface erosion. The
dam crest, the outlet works, and the Homestake Tunnel intake gate also require repairs. The
maintenance required on the dam and outlet works will be conducted in Eagle County. The work
associated with the Homestake Tunnel intake will occur in Pitkin County and is the focus of this
submittal. This Project constitutes normal maintenance activities related to the safe operations of
the dam and reservoir. The maintenance activities will not alter the operation of the existing dam
and reservoir, and they will neither extend or enlarge the capacities of Homestake Reservoir or
its related diversion facilities, nor change the amount or timing of water diversions.
This report was prepared to provide information for the Location and Extent Review and Land
Use Code Development Standards Review that Pitkin County has asserted are required for this
Project. This report and the associated attachments provide supporting information to describe
the proposed maintenance at the intake gate. This report is organized per the directions provided
in the Pre - Application Conference Summary Sheet (Appendix I) Item 1. Additionally, Pitkin
County requested that Homestake provide various items related to the Project for review, as
summarized in the table below.
Table 1.0 -1
Summary of Pitkin County Information Requests
URSUu0U07 X��
241S�_XLTNtl�lO Mxo IISO WXPO Md RMIFWIiNn P*11 CWLv EMwt A rwMP�mnee_o.wxxx'_FW P""D X SlPW13359 PM IA
Pitkin County Information Request
Report Section
1.
Summary letter explaining the request, existing conditions, prior
Sections 1.0 — 4.7
approvals and permits and compliance with selected Pitkin County
codes
2.
General application requirements as listed in Section 1 of the Pitkin
Section 2
County Land Use Application Manual
3.
11x17" construction drawings related to work in Pitkin County
Appendix A
4.
Description and engineering drawings and specs of all disturbances
Appendix A
in Pitkin County related to roads, diversions, coffer dams,
construction materials, and storage of equipment.
5.
List of adjudicated water rights
Appendix B
6.
Description and engineering specs of all temporary water
Appendix C
Irerouting[bypassing" associated with the project.
URSUu0U07 X��
241S�_XLTNtl�lO Mxo IISO WXPO Md RMIFWIiNn P*11 CWLv EMwt A rwMP�mnee_o.wxxx'_FW P""D X SlPW13359 PM IA
SECTIONONE location and Extent Review and land Use Code
Development Standards Review
Table 1.0 -1
Summary of Pitkin County Information Requests
* Note: Appendix F contains the Pre-Construction Notification (PCN) as described in Section 4.7. This report was not a specific
item requested by the County, thus it is not referenced in Table 1.
Pitkin County requested that Homestake consider the compatibility of the gate repair with the
existing Pitkin County Upper Fryingpan Valley Master Plan (Master Plan), amended on March
4, 2008. This Plan states that the caucus area "...extends from the Ruedi Dam up the Fryingpan
River and its watershed to the Continental Divide, including all tributaries flowing into the
Fryingpan River and Ruedi Dam and their watersheds. It includes areas in both Pitkin and Eagle
Counties " Homestake Reservoir and Tunnel is situated in the Eagle River watershed.
Homestake Reservoir and its tributaries do not flow into the Fryingpan River, or Ruedi Dam or
1-12--s" l-2
000JO8
Pitldn County Information Request
Report Section
7.
Description of the "dead pool"
Appendix D
8.
Designation of all disposal and borrow areas
Not Applicable. No borrow or disposal
activities will be conducted in Pitkin
County.
9.
Construction Management Plan detailing staging, storage areas,
Not Applicable. Due to the tight work
manner and hours of work
area, staging of equipment and storage
of materials will occur outside of Pitkin
County. Vehicles will access the
Homestake Tunnel intake for task
related work and will likely exit the
area at the end of the day. Hours of
work will likely occur between lam
and 7pm each day of the week.
10.
U.S. Forest Service permits
Section 3; Appendix H
11.
State permits
Section 3
12.
Colorado Parks and Wildlife (formerly Colorado Division of
Section 3; Appendix E
Wildlife) comments
13.
Specify current amount of diversion annually, projected annual
Appendix G
average diversion for ten years after project completion, and records
of historical diversion amounts annually for the last ten years
14.
Proof of applicant's right to use the land for the purposes identified
Appendix H
in the development application
15.
Consent from owner of the property for the representative to process
Appendix H
the application and represent the owner
16.
Parcel description, including legal description and 8.5" x I I"
Appendix H
vicinity map locating the subject property within Pitkin County
17.
Proof of adequate legal access to the property
Appendix H
18.
Executed Pitkin County Community Development Agreement for
Appendix I
Payment of Land Use Application Fees form
19.
List of all property owners and mineral estate owners within 300' of
Section 2
the subject property
20.
Pre - application Conference Summary Sheet
Appendix I
* Note: Appendix F contains the Pre-Construction Notification (PCN) as described in Section 4.7. This report was not a specific
item requested by the County, thus it is not referenced in Table 1.
Pitkin County requested that Homestake consider the compatibility of the gate repair with the
existing Pitkin County Upper Fryingpan Valley Master Plan (Master Plan), amended on March
4, 2008. This Plan states that the caucus area "...extends from the Ruedi Dam up the Fryingpan
River and its watershed to the Continental Divide, including all tributaries flowing into the
Fryingpan River and Ruedi Dam and their watersheds. It includes areas in both Pitkin and Eagle
Counties " Homestake Reservoir and Tunnel is situated in the Eagle River watershed.
Homestake Reservoir and its tributaries do not flow into the Fryingpan River, or Ruedi Dam or
1-12--s" l-2
000JO8
SECTIONONE Location and Extent Review and Land Use Code
Development Standards Review
their watersheds. Furthermore, Homestake Reservoir is not listed or described in the Plan. As a
result, it appears that Homestake Reservoir may not be covered under this Plan. However, at the
request of the County, we have reviewed the compatibility of the planned repairs to the
Homestake Tunnel gate to the Master Plan.
Based upon this review, we have determined that the repair of the tunnel gate is consistent with
the goals and objectives outlined in the Master Plan and in the Comprehensive Plan. The gate
repair is consistent with the unifying concept in the Comprehensive Plan to "Preserve, Conserve
and Protect the existing rural character of Pitkin County ". The gate repair is also consistent with
the Master Plan as outlined below.
Residential Growth. The repair is consistent with the goals of the Plan, in that it will not facilitate
residential development within the upper Fryingpan River watershed, nor will it affect residential
growth within the Eagle River watershed.
Commercial Growth. The gate repair will not affect commercial development in the Fryingpan
River watershed, nor in the Eagle River watershed. The gate repair will not affect agricultural
lands, nor are any zoning changes applicable.
Land Use and Environmental Considerations. The gate repair will preserve agricultural and
recreation use. It will not affect water supplies in either the Fryingpan River watershed or the
Eagle River watershed. The gate repair will not affect wildlife habitat, riparian and wetland
areas, and other environmentally sensitive lands. The gate repair will not affect campgrounds,
recreational sites or trail usage.
Roads. The gate repair will not affect any county roads in Pitkin County, nor will any county
roads in Pitkin County be utilized.
Community Services. The gate repair will not affect law enforcement, emergency services,
school buses, or noxious weeds and trash control.
Historical and Cultural. The gate repair activates will not interfere with the preservation and
protection of historical sites in the Fryingpan Valley, and will not affect historical sites in the
Eagle River watershed.
In summary, the proposed gate repair is associated with routine maintenance to promote human
health and safety, and the operational reliability of the facility. Neither the operation of the
tunnel, nor the existing reservoir footprint, will change with the gate repair. The gate repair is
consistent with the Comprehensive Plan and the Fryingpan Master Plan.
tm.P,aWg 241 H—I.a Pte,. SIeW,,, owoaP �P– m,Pa�00)L– emE�w�R.�PNMO rvw_PUPrW1Dw,1, 012 zSSPM1 -3
uJui09
SECTIONONE Location and Extent Review and Land Use Code
Development Standards Review
INSERT FIGURE 1
w,q��., „zaw�ao...... 1 -4
,j.:�J10
SECTIONTWO
Existing Conditions-
Homestake Dam and Reservoir Operations
As noted above, Homestake Reservoir is located entirely on Federal land managed by the USFS
within the White River National Forest and the USFS is the only property and mineral owner
within 300 feet of the Project site. The current Homestake facilities were completed and began
operations in the 1960s and all of the areas that would be affected by the maintenance Project
have been previously disturbed and are currently occupied by the dam, reservoir, and ancillary
facilities.
Homestake Reservoir receives water from three sources: l) the main stem of Homestake Creek
upstream of the reservoir; 2) Missouri, Fancy, French and Sopris Creeks via the Missouri
Tunnel, which discharges into Homestake Reservoir at the left abutment of Homestake Dam; and
3) the East Fork of Homestake Creek delivered via a 60 -inch diameter welded steel inverted
siphon pipeline terminating near the right abutment of Homestake Dam.
Water diverted into Homestake Reservoir is delivered to the Homestake Partners via the
Homestake Tunnel, which discharges to Lake Fork Creek leading to Turquoise Lake, Twin
Lakes and to the Otero Pump Station and ultimately to the Partners' distribution systems. Water
is released through the Homestake Dam outlet works, into Homestake Creek, a tributary to the
Eagle River, at the toe of the dam.
The Project involves maintenance repairs of several facilities including the dam, the outlet
works, and the Homestake Tunnel intake gate. The rehabilitation of the Homestake Tunnel
intake gate is the only activity that will occur in Pitkin County. The Homestake Tunnel, which
delivers water to Turquoise Reservoir, is located approximately 4,000 upstream feet from the
dam about half way up the reservoir on the south side. Water enters the tunnel through a
reinforced concrete intake structure. During normal operations, the intake gate is held in the
fully opened position with all releases controlled by valves located at the downstream end of the
tunnel. The Project will remove and replace the existing cast iron guard gate and operating
cylinder at the upstream end of the Homestake Tunnel. The existing gate opening in the intake
structure will be partially excavated internally to accept a new gate thimble, and the new thimble
will be grouted in place. A steel structure will be installed on top of the existing intake structure
around the new operating cylinder to protect it from falling debris. In addition, new gate control
equipment will be installed on a new concrete slab on the reservoir rim in the same location as
the existing hydraulic controls. The new slab and controls will be enclosed in a new, lockable
chain link fence. No changes to the Homestake Tunnel or the downstream discharge structure
are included as part of this Project.
N WIN MN 241 N¢n"l P2re_ II ISO _W.120_W¢dPr¢�PVmMn9'AMin CbL¢bw,_EWnlPerwMPiNxa_Cmmaw_Fa RInAnB CO[v Y19R0122,9,. 2 -1
U J J1i
SECTIONTWO Existing conditions —
Romestake Dam and Reservoir Operations
ultsX W�W.In`]]M19b_Nw�F�aFF_Ma�_II W�20 W� RxNmmIbVVM1In Is'�mNa�.F9M_PM»'Y1CSeo OsnerYw FvMMgCee� YI VdX]]9 iM 2-2
0U0012
SECTIOMTWO
Existing Conditions -
Homestake Dam and Reservoir Operations
Photo 2. A view looking south at the Homestake
Tunnel intake and the slope between the intake
and the reservoir rim where the gate controls are
located.
Home; take Tunnel intake gate controls.
U.: ,� 2 -3
000013
SECTIONTHREE Regulatory Approvals for the Project
This section presents a summary of the federal, state, and county environmental permitting
requirements for the proposed dam improvements at Homestake Reservoir. Project activities
will be covered under the AOP administered by the USFS (Appendix H). Additionally,
Homestake is responsible for consulting with federal, state, and county agencies for appropriate
permits related to wetland impacts, sensitive species, cultural resources, and dam safety and
operations. The contractor is responsible for permits related to stormwater management, air
quality, earthmoving activities, and fuel storage. A summary of owner and contractor identified
permits is summarized in Table 3.0 -1.
The construction and future operation of the Project will be carried out in compliance with all
applicable laws and regulations related to water resources, adjacent land uses, and wildlife.
Biological field surveys were conducted to gather baseline environmental data in the Project
area. Field work was performed under the guidance of the USFS, Colorado Parks and Wildlife
(CPW) (formerly Colorado Division of Wildlife), and the U.S. Fish and Wildlife Service
(USFWS) in the summer of 2010. Information obtained from the biological surveys was used as
the basis for coordination with various agencies to verify permitting requirements.
Biological, cultural, and wetlands surveys were conducted in July 2010 by URS and ERO to
identify sensitive resources, and to obtain data for preparation of permits. In conjunction with
the field surveys, URS reviewed available databases and publications and conducted informal
consultation with biologists at White River National Forest, the USFWS, and the CPW to
identify data requirements and procedures for compliance with Section 7 of the Endangered
Species Act (ESA), the Migratory Bird Treaty Act, USFS sensitive species protection, State of
Colorado coordination requirements, and fish salvage. Consultation was also conducted with the
Corps of Engineers (USACE) for Section 404 permitting.
NP,� 59s H— Ph.. sUb � „zo w o,s,P.m� s��. ,� E A ,P,� o� F >, �,�. a,saoaxse 3 -1
OUCJ14
SECTIONTHREE
Table 3.0 -1
Permit Summary
Regulatory Approvals for the Project
O�Zl
000015
N:\Projects\22241596_HO steke_Pheea_II19Ub- W112.0_Word_PM&PermMing1P11kin CoLLL C ion_FxlenLRevlevAPitkinco_Dev iew _For PnnNng.D= 3/19=122:59 PM 3 -2
Permit and /or
Agency
Regulatory
Trigger /Action
Processing Time
Fees
Agency Contact
Notes
Driver
OWNER RESPONSIBILITY
U.S. Forest
USFS listed
Construction activity on
Not applicable
No fee
Rick McNeill
Sensitive species surveys conducted on July 22, 28, and 29 2010 identified six
Service
sensitive species
USFS land
USFS
species of moonworts in the Project Area. The locations of the moonwort
(USFS)
White River National
populations will be fenced and avoided during construction.
Forest/Holy Cross Ranger
Several sensitive animal species occur in the Project vicinity, but temporary
District
construction activity will result in minor impacts.
24747 U.S. Highway 24
Mintum, CO 81645
Findings of surveys are located in a Biological Assessment/Biological Evaluation
970- 827 -5715
(BA/BE) report that was submitted to the USFS in August 2011.
U.S. Army
Clean Water Act
Any activity involving
30 days from receipt of
No fee is required for
Steve Moore
The proposed dam improvements Project will be permitted under NWP 3
Corps of
Section 404
construction in a
a complete permit
government/municipalities
USACE
(Maintenance) and NWP 33 (Temporary Construction, Access, and Dewatering)
Engineers
Nationwide
jurisdictional wetland or
application
initiated submittals
Colorado West Regulatory
A pre- construction notification (PCN) was submitted to the USACE on July 15,
( USACE
Permit NWP)
waters of the U.S.
Branch
1 -1.
400 Rood Avenue, Room 142
Grand Junction, CO 81501
Based on the type and amount of wetland impacts, no compensatory mitigation
970 - 243 -1199
will be required.
U.S. Fish and
Section 7 of the
Any activity that may
Not applicable
No fee
Kurt Broderdorp
White River National Forest will be the lead agency for ESA. Lynx is the only
Wildlife
Endangered
adversely affect federally
USFWS
listed species in the Project area. The Project appears to qualify for a "may affect,
Service
Species Act
listed, proposed, or
Western Colorado Field Office
not likely to adversely affect" and formal consultation by the USFS is not
( USFWS) and
(ESA)
candidate endangered
764 Horizon Drive, Building B
expected. The BABE documents the analysis on lynx habitat. The Section 404
Colorado
species or their
Grand Junction, CO 81506
PCN refers to the BABE and USFS ESA compliance.
Parks and
designated critical
970 -243 -2778
Wildlife
habitat.
(CPW)
(previously
Colorado
Division of
Wildlife
[CROW])
O�Zl
000015
N:\Projects\22241596_HO steke_Pheea_II19Ub- W112.0_Word_PM&PermMing1P11kin CoLLL C ion_FxlenLRevlevAPitkinco_Dev iew _For PnnNng.D= 3/19=122:59 PM 3 -2
SECTIONTHREE
Table 3.0 -1
Permit Summary
Regulatory Approvals for the Project
l.�
Vvut116
NAProlecte\ 22241596_ HOmeetake_ Pbaee_ If4Sub_ 00\12.0_Word_Prw \Penni"ing\Pitl nCOVL owtion _FAGnLReNevAPitkinco_DevrevWw For Pdntlng.D= 3/IM0122:59PM 3-3
Permit and/or
Agency
Regulatory
Trigger /Action
Processing Time
Fees
Agency Contact
Notes
Driver
LISFWS
Migratory Bird
Compliance is required
Not applicable
Not applicable
Lara Duran, Wildlife Biologist
No formal permit is required, but Homestake must comply with the MTBA by
Treaty Act
of any Federal activity
Eagle -Holy Cross Ranger
avoiding nesting birds during construction. As the land management agency,
(MTBA)
that may potentially
District
USFS will take the lead in defining and enforcing requirements.
affect a migratory bird or
White River National Forest
an active nest.
970 - 328 -5899 office
970 - 328 -6448
Kurt Broderdorp
USFWS
Western Colorado Field Office
764 Horizon Drive, Building B
Grand Junction, CO 81506
970 -243 -2778
CPW
Fish Salvage
Dewatering Homestake
Not applicable
Not applicable
Kendall Bakich
CPW will coordinate with Homestake in the Summer 2012 on appropriate fish
- Reservoir in 201 -2--
CPW
- protections measures.- If-the dead - pool that remainsin- thexeservoir after
Glenwood Springs Service
dewatering is not appropriate to maintain the fish through construction, CPW may
Center
relocate fish.
50633 Highways 6 & 24
Glenwood Springs, CO 81601
970 -947 -2920
State
Section 106 of
NHPA requires Federal
SHPO has 30 days to
No fee
Mr. Edward Nichols
Cultural resources survey of Project area was conducted on July 21 -22, 2010. No
Department
the National
agencies to take historic
respond to a request for
State Historic Preservation
cultural resources were identified in the Project area.
of Historic
Historic
properties into account
a review of a finding or
Office
USFS submitted form to SHPO on October 26, 2011; concurrence is expected per
Preservation
Preservation Act
for Project activities
a determination.
Colorado Historical Society
the Negative Results Programmatic Agreement (No. 10- MOA- 11021000-014).
(SHPO)
(NHPA)
within their jurisdiction.
1560 Broadway, Suite 400
USFS will conduct tribal consultation, if needed
Denver, CO 80202
303 -866 -3682
Department
Review of Plans
State approval process
By State Statutes, the
$3 per $1,000 of construction
Mr. Garrett Jackson, P.E.
URS received approval from SEO on 8/29/2011
of Natural
and
for regulating dam safety.
Office of the State
cost for a project
Dam Safety Engineer
Resources,
Specifications
Engineer has 6 months
Minimum fee is $100
Colorado Division of Water
Office of the
State
for the
Alteration,
to review an
application; however,
Maximum fee is $3,000
Resources
2754 Compass Dr., #175
Engineer
Modification, or
reviews typically take
Grand Junction, CO 81506
(SEO)
Repair of a Dam
between one to three
970.245 -8355
and Reservoir
months to complete
Department
Minimum
Diverting and storing
Not applicable
Not applicable
Kyle Whitaker
No permit is required
of Natural
downstream
water into Homestake
Division 5 Engineer
Obligations to maintain minimum downstream flows are required only when the
Resources,
flows below
Reservoir
50633 US Hwy 6 & 24
Homestake Project is diverting and storing water
Division of
Homestake Dam
Glenwood Springs, CO 81601
Coordinate with the Eagle County Water Commissioner prior to dewatering the
Water
970 - 945 -5665 x 5015
reservoir (Bill McEwen 970 -328 -6850)
Resources
l.�
Vvut116
NAProlecte\ 22241596_ HOmeetake_ Pbaee_ If4Sub_ 00\12.0_Word_Prw \Penni"ing\Pitl nCOVL owtion _FAGnLReNevAPitkinco_DevrevWw For Pdntlng.D= 3/IM0122:59PM 3-3
SECTIONTHREE
Table 3.0 -1
Permit Summary
Reuulatory Approvals for the Project
=
LA317
N:\ Protects\ 22241595_Homeatake_Phase_II\Sub 00 \12.0_Word_ProcNermMing\Pltkln Co\L=tlan_Fxtent ReWovAPiIXinco_Oevmvlew_For PnnHng.0a 3119=122:59PM 3 -4
Permit and /or
Agency
Regulatory
Trigger /Action
Processing Time
Fees
Agency Contact
Notes
Driver
Eagle County
Consolidated
Processing of asphalt
4 -5 months
$2,205
Bob Narracci
Exemption for 2011 construction activities
Major Special
onsite
Eagle County Planning Director
Exempt from 1041 requirements
Use Permit
P.O. Box 0179
500 Broadway
Eagle, CO 81631
Pitkin County
Clearing,
Any project excavating
To Be Determined
$414 - $643 Permit application
Pitkin County Community
This permit has a one year shelf life; time appropriately with construction activity
Grubbing and
more than 50 cubic yards
fee
Development Department
The permit application requires a vicinity map, land use approvals, map of
Earthmoving
of material
130 South Galena Street
existing and proposed contours, drainage and erosion control plan, construction
Permit
Aspen, CO 81611
management plan, and revegetation plan.
970 - 920 -5526
CONTRACTOR RESPONSIBILITY
USFS
Road Use
Use of Homestake Creek
Not applicable.
Not applicable.
Mark Buchanan
This plan is covered under the Annual Operating Plan (AOP) as part of
� (Fores�ad [FR]
USFS
maintenance work -an(- defines maintenance requirements for the road before,
amtenance
Plan
703) as a construction
Forest Roads Manager
during and after construction
access and haul route
White River National Forest
900 Grand Avenue
The USFS requires submittal of a maintenance plan containing dust abatement
Glenwood Springs, CO 81602
measures, stormwater management, details on appropriate signage, safety
970 - 945 -3222
measures, loading on bridge, and the use of pilot cats.
USFS
Minerals
Removal and processing
The permit will be
A one-time administrative fee is
Olivia Garcia
Contractor will submit the volume of material to be mined for the Project to
Material Permit
of aggregate material
issued once payment is
required and is based on the fair
USFS
Olivia Garcia in order for her to calculate the appropriate permit fees.
from within the reservoir
received, but the
market value of the volume of
White River National Forest
If an off -site source is used, proof that the imported material is clean and is
footprint to use for any
typical turn-around
material that is mined.
900 Grand Ave.
certified weed -free
permanent feature located
time is 7 days.
Glenwood Springs CO 81602
Permit requirements will ultimately be at the discretion of the District Ranger
outside of the reservoir
970 - 945 -3220
(e.g., dam refacing and
road improvements)
This permit is not
required if material is
being hauled to and from
an off -site source
Colorado
Construction
State approval process
Submit application at
$245 Permit application fee
CDPHE
General Permit and SWMP was certified by CDPHE on 8/1612011
Department
Stormwater
for regulating water
least 30 days prior to
Water Quality Control Division
of Health and
General Permit
quality impacts.
the date anticipated
4300 Cherry Creek Drive South
Environment
and Stormwater
Regulates the quality of
discharge with a
Denver, CO 80246 -1530
( CDPHE),
Management
stormwater runoff from
complete SWMP.
(303- 692 -3500
Water Quality
Plan (SWMP)
construction areas that is
cdphe.wgstotm @state.co.us
Control
discharged into
Division
waterways
(WQCD)
=
LA317
N:\ Protects\ 22241595_Homeatake_Phase_II\Sub 00 \12.0_Word_ProcNermMing\Pltkln Co\L=tlan_Fxtent ReWovAPiIXinco_Oevmvlew_For PnnHng.0a 3119=122:59PM 3 -4
SECTIONTHREE
Table 3.0 -1
Permit Summary
Regulatory Approvals for the Project
UmJ U 0 U q 8 N:\PMjoC1e122241588_HOma ke_ Phase_ INSUb _00112.0_WaE_Proc\Pennining\P" 00\L C IiM_Ext$nl_:"ABVAPKklnm DevreAeW_For Pdntlng.D= 3119/20122:69 PM 3 -5
Permit and/or
Agency
Regulatory
Trigger /Action
Processing Time
Fees
Agency Contact
Notes
Driver
CDPHE,
Construction
State approval process
Submit application at
$500 Permit application fee
CDPHE
Construction Stormwater Dewatering Permit was submitted to CDPHE on
WQCD
Stormwater
for regulating stormwater
least 30 days prior to
Water Quality Control Division
8/19/2011
Dewatering
runoff from projects
the date of anticipated
4300 Cherry Creek Drive South
Permit
impacting>1 acre.
discharge with a
Denver, CO 80246 -1530
complete SWMP.
303 -692 -3500
CDPHE,
Individual
Individual industrial
6 months to one year
Based on categories of
Andrew Neuhart
Individual Industrial Wastewater Discharge Permit submitted to CDPHE on
WQCD
Industrial
process water dischargers
discharge and volume
Colorado Department of Public
9/28/2011
Wastewater
to surface water, ground
Mixing zone studies required-
Health and Environment
Discharge Permit
water or stormwater
stream standards
Water Quality Control Division
dischargers.
4300 Cherry Creek Drive South
Denver, CO 80246 -1530
303 - 692 -3655
andrew.neubart@state.co.us
-CD
Constmction
- Regulates the emission -of-
A-GP03- becomes
X50 GP filingfee
-Chip H
-GP- and APEN were - submitted to the- CDPH&on- 8/9120t1
Pollution
Permit or
fugitive dust from land
effective on receipt of
$76.45/hour fee for
Colorado Department of Public
Control
General Permit
development activities
the complete
Construction permit review and
Health and Environment
Division
(GP) for Land
during construction.
application. A
processing
Air Pollution Control Division
(APCD)
Development
State approval process
construction permit
4300 Cherry Creek Drive South
(GP 03)
for air pollution
application may take up
Denver, CO 80246 -1530
Air Pollution
emissions for projects
to 90 days to process
303 -692 -3100
Emission Notice
>25 acres or> 6 months
r.hancock @state.co.us
(APEN)
construction.
Colorado
Fuel Storage
All aboveground storage
All owners or operators
The operator is required to pay
Crystal Cortes
Fuel Storage Registration required for 2012 construction activities
Department
Registration
tanks (ASTs)
of aboveground
an annual registration fee in the
CDLE
of Labor and
> 660 gallons and facility
Petroleum storage tanks
amount allowed by the current
Division of Oil & Public Safety
Employment
data must be registered,
with a capacity
state law for each regulated tank
633 17th Street, Suite 500,
(CDLE)
re- registered or updated
between 660 and
owned or operated, until the
Denver, CO 80202 -3660
on a form provided by
40,000 gallons must
regulated AST is permanently
303 - 318 -8507
CDLE, regardless of
annually register their
closed or until the operator has
whether the ASTs and
tanks with the Division
instituted a change -in- service to
facilities are currently in
of Oil and Public
a substance other than
service or out of service
Safety. In addition, a
petroleum.
new registration must
AST registrations will be billed
be filed within 30 days
the annual tanks fees. Fees for
of a tank installation,
tanks are $35 per tank per year.
removal, upgrade or
change in service.
UmJ U 0 U q 8 N:\PMjoC1e122241588_HOma ke_ Phase_ INSUb _00112.0_WaE_Proc\Pennining\P" 00\L C IiM_Ext$nl_:"ABVAPKklnm DevreAeW_For Pdntlng.D= 3119/20122:69 PM 3 -5
SECTIONFOUR Compliance With Min County Codes
The proposed maintenance Project complies with applicable Pitkin County land use standards, as
described below.
4.1 SEC. 7- 10 -50: ACTIVITY ENVELOPE
Planned construction activities in Pitkin County consist of work occurring in and around the
Homestake Tunnel intake (please refer to engineering drawings in Appendix A). This work
includes the following: improvement of existing access roads within the reservoir basin,
construction of a low -head cofferdam, removal of the existing slide gate, installation of a new
slide gate, installation of new gate controls and gate control lines, miscellaneous painting of
components, and removal of the cofferdam. Construction is planned to occur between May and
August of 2012. Due to the tight work area in the vicinity of the intake, staging of most
equipment and storage of materials will occur outside of Pitkin County. Vehicles will access the
Homestake Tunnel intake for task related work and will likely exit the area at the end of the day.
Hours of work will likely be between lam and 7pm Monday through Saturday.
4.2 SEC. 7- 20 -10: SITE PREPARATION AND GRADING
Site preparation and grading will consist of improvements to existing roads to access the Intake
and the preparation and installation of a low -head cofferdam conveyance feature. All planned
features are temporary and will be removed upon completion of the intake improvements. Please
refer to Appendix A for detailed engineering drawings and specifications.
4.3 SEC. 7- 20 -20: STEEP AND POTENTIALLY UNSTABLE SLOPES
The Homestake Tunnel intake is located at the toe of the reservoir rim slope. The existing
controls are located on the reservoir bank directly above the intake. The slopes between the
intake and the controls consist primarily of bedrock outcrops and shallow colluvial deposits.
These slopes have been accessed during previous construction activities and no significant
excavation activities are planned as part of this work. The Project Team does not expect to
encounter unstable slopes in this area.
4.4 SEC. 7- 20 -30: WATER COURSES AND DRAINAGE
Homestake Reservoir is located within the Eagle watershed (Hydrologic Unit Code 14010003),
off of Homestake Road and is located within both Eagle and Pitkin Counties. The reservoir has a
surface area of 335 acres and stores about 42,881 acre -feet of water at the spillway crest
elevation of 10,266.5 feet. The original construction was completed in 1967.
Homestake Reservoir receives water primarily from three sources: the main stem of Homestake
Creek upstream of the reservoir, Missouri, Fancy, French, and Sopris Creeks via the Missouri
Tunnel, and the East Fork of the Homestake Creek via the East Fork pipeline. Diversions occur
primarily from the beginning of May through mid - August. The mean annual diversion rate for
the Missouri Tunnel is 14.7 cubic feet per second (cfs), and for the East Fork pipeline is 5.5 cfs.
Flows in Homestake Creek vary widely from year to year, with a peak mean daily flow of 135
cfs, and daily inflow in excess of 300 to 400 cfs for only a few days in the last 36 years. Inflow is
generally below 50 cfs after August 1.
UMN \Pqg t42 415%_HOmeAake_PMa Mub W120_Wad Pr \Pe MlnQPIbn Co \LO *n6en1_Reie PftW -Dwrwpew_For PnmmgW M912012259PM 4-1
ODUM9
SECTIONFOUR Compliance With Pitkin County Codes
Water deliveries are generally made through the Homestake Tunnel, which leads to Turquoise
Lake. Homestake Tunnel is 11.5 feet in diameter. Flow in the tunnel is controlled by a valve
structure located at the downstream end of the tunnel. Releases from the reservoir are also made
through the Homestake Dam outlet works at the toe of the dam, to Middle Fork of Homestake
Creek. The daily outflow from the outlet works is generally less than 20 cfs, and there have been
only 7 days in the last 36 years when the daily outflow exceeded 100 cfs.
The Homestake Partners will not divert water through the Missouri Tunnel (Missouri, Sopris,
Fancy and French Creeks) in 2012. Diversions from the East Fork will be limited to flows
needed for construction only. Therefore, reservoir inflows will be limited to flows in the
mainstem of Homestake Creek and areas directly adjacent to the reservoir. Water will be
released from the reservoir through the Homestake Tunnel and through the dam outlet works. In
2013, reservoir storage from Homestake Creek, and diversions from the East Fork and the
Missouri Tunnel will resume, although reservoir storage will be within a reduced elevation well
below the crest of the dam.
The overall volume of streamflow in Homestake Creek downstream of the Project will likely
increase in 2012, as the only water diverted to Turquoise Reservoir will be natural inflow to the
reservoir. During construction, the magnitude of peak stream flow in Homestake Creek will not
likely exceed the peak stream flow that have historically occurred since the System has been in
operation. This is because historical peak flows (recorded after construction of the System) have
been similar to peak native stream flow that would have occurred if the Project had not been
diverting water.
In anticipation of the 2012 construction activities, Homestake Reservoir has been drained. Two
cofferdams are planned to be constructed to control inflows to the reservoir, which are
anticipated to peak around mid -June. The main cofferdam will be located in Eagle County about
200 feet upstream of the toe of the dam, at the location of a partially breached cofferdam
previously used during the original dam construction. The cofferdam is anticipated to be
constructed using fill material borrowed from the reservoir bottom and imported from offsite. A
smaller low -head cofferdam will be located in Pitkin County at the Homestake Tunnel intake and
will extend about 50 feet into the existing reservoir. The two cofferdams will serve to isolate the
upstream face of the dam and the Homestake Tunnel intake from reservoir inflows. Inflows will
be directed either through the Homestake Dam outlet works, or the Homestake Tunnel intake, as
needed depending on reservoir inflows and schedule of work to facilitate construction activities.
At the end of the 2012 construction season, the cofferdams will be breached and any imported
materials will be removed and disposed offsite. Conceptual design for the coffer dams is
provided in Appendix C.
The construction should have no adverse effects to water quality. The contractor is required to
implement water quality control measures during construction and has prepared a water quality
control plan and stormwater management plan and obtained stormwater and water quality
permits. The plan includes use of settling basins, filtration systems as needed, and regular
monitoring. The primary containment will be effected by the cofferdam above the outlet works
intake. Water contained between this cofferdam and the main dam will be controlled, monitored,
treated and discharged into the active pool behind the cofferdam, and secondarily into the outlet
works and from there to Homestake Creek.
Ouvd20
UMN \Prq..0?241598_1b..Aoke_Wasa_Ii Sub_001120_Wad PlMPe Ming`P9kn Co%LmMt n_P enl_RwieWPnknco_D,omiew_For Pnnling0ax &19I2o12259PM 4-2
SECTIONFOUR Compliance With Pitkin Comny Codes
During construction, sediment fencing will be placed along the edges of wetlands and surface
water bodies that are adjacent to the access roads and other construction areas to prevent
degradation of water quality and to restrict vehicle movement into those areas. Stockpile,
laydown and disturbed areas will be silt fenced. Hay bale barriers and wattles will be used in
highly erodible areas if they are identified.
4.5 SEC. 7- 20 -50: GEOLOGIC HAZARDS
Homestake Dam is located on the Middle Fork of Homestake Creek, about 0.4 mile above the
confluence with the East Fork of Homestake Creek. The dam and reservoir are in existence, and
the footprint of the Project will be entirely within areas occupied by current facilities and areas
disturbed during original construction of the original dam. Construction activities will not alter
ecological units or landforms in the Project area. The Project is not anticipated to affect geology
or geologic hazards, including avalanche, landslide, flood, settlement or siltation. Since
construction will not occur in the winter, no avalanche control measures will be implemented. A
summary of the regional site geology is provided below.
The Project area is located in the glaciated valley of Middle Homestake Creek, surrounded by the
Holy Cross Wilderness Area. Bedrock consists of Laramide intrusive rocks about 40-72 million
years old, and Precambrian metamorphic rocks felsic and homblendic gneisses 1.7 -1.8 million
years old, which are exposed on the ice - scoured walls of the valley and in some areas on the
valley floor (Tweto 1979). Limited portions of the valley are occupied by glacial drift of the
Pinedale and Bull Lake glaciations along with some modern alluvium. Elevations in the Project
area range from about 10,000 to 10,300 feet, while the ridges above the valley reach 11,200 to
12,500 feet.
Information on soils was obtained from the Holy Cross Area Soil Survey (USFS 1999). The
predominant soils in the Project area are mapped as Man -Made Lands and Water. The dam,
staging and laydown areas and portions of the access roads are mapped as Map Unit ML (man-
made land). All of the construction areas within the reservoir including the coffer dams and
water quality control features are in Map Unit W (Water).
A portion of the access roads is in Map Unit 223B (Leighcan Family — Rock Outcrop —
Cryoquolls complex, 0 to 40 % slopes). This map unit is about 40% Leighcan and similar soils,
30% rock outcrop, and 20 % cryoquolls and similar soils. Leighcan soils are occupied by
lodgepole pine and spruce -fir forests, consist of very cobbly and stony coarse sand and sandy
loam, and are somewhat excessively drained soils with an effective rooting depth of 20 to
40 inches. Cryoquolls are occupied by willow and sedge wetlands, consist of silt loams in the
upper 15 inches, are very poorly drained, and have a seasonal water table within one foot of the
surface and a depth greater than 60 inches.
There are several avalanche chutes around the reservoir, including one at the left dam abutment.
Trees and rocks deposited on the ice - covered reservoir in the winter are sometimes rafted to the
dam and have to be removed. Homestake does not currently conduct any avalanche control
activities either at the dam and reservoir or along the Homestake Road. There are no landslide
areas in or near the Project area.
GUUJ-21
N\PMq sV 2415%_Hmn ake_POese_g\S� 90120 Wo _PrMPewffling\PObncoLLL"*n_E enl_ReviexlP9k DwreIM Fa Pnnhng DO 119/2012259PM 4-3
SECTIONFOUR Compliance with PRO COnntV Codes
4.6 SEC. 7- 20 -70: WILDLIFE HABITAT
The Project area provides seasonal habitats for various species (NDIS 2010), including: Elk
(summer range throughout the Project area, except the reservoir, and winter concentration and
severe winter range occurs downstream of the Project area along the Homestake Creek Road to
the junction with Highway 24); Mule deer (overall range throughout the Project area, except the
reservoir); Moose (overall range and winter range downstream from the dam, extending outside
of the Project area along Homestake Creek Road); Black bear (overall range throughout the
Project area, except the reservoir, and a bear/human conflict area along Homestake Creek Road
downstream of the Project area); and Mountain lion (overall range throughout the Project area,
except the reservoir). In addition, seasonal range for Bighorn sheep (Olds canadensis), mountain
goat (Oreamnos americanus) and ptarmigan (Lagopus muta) is found on the ridge east of the
reservoir, but not within the Project area. Relict beaver (Castor canadensis) dams were observed
below the reservoir.
Because all construction would occur in previously disturbed areas or in areas currently occupied
by the dam, reservoir and roads, there will be no loss of forest habitat. The primary impacts to
terrestrial wildlife may be temporary disturbance and displacement during construction as noise
and human activity associated with construction may disturb or displace sensitive wildlife from
forested and wetland habitats adjacent to the Project area. There is already regular human use of
the Project area by recreationists that may result in some level of displacement or habituation.
The existing dam and reservoir are a barrier to wildlife movement up the valley, and wildlife
movement patterns will not change during construction. Although the area near the dam and
access roads is used as habitat by several big game species, it is not considered sensitive for
them.
The dam is currently accessed during the winter by Homestake personnel using snowmobiles or
snowcats on Homestake Road. This vehicle use, along with recreational snowmobiling, results
in a packed surface that is used by wildlife for travel during the winter. During construction,
Homestake Road will be plowed starting in March 2012 and April 2013. Wildlife are likely to
continue to use the plowed road, but may be more vulnerable to harassment if plowing creates a
canyon effect in some areas of deep snow that impairs escape off the road. CPW has expressed a
concern that the plowed road might encourage early season use by members of the general
public, and subsequent wildlife harassment or poaching. However, the USFS has approved the
installation of a gate on FR 703 (also known as Homestake Road) to the east of Homestake
Creek near Highway 24. The gate is expected to be installed in March 2012.
Fish and aquatic habitat in the reservoir will be temporarily affected by drawdown of the
reservoir and by changes in stream flows below the reservoir during construction. The reservoir
has been drawn down beginning in late 2011 and will reach a minimum level in April 2012. A
residual pool will be maintained because the reservoir basin (bottom) is deeper than the elevation
of the outlet works and Homestake Tunnel. The reservoir will begin to be refilled November
2012, but will not reach normal levels until construction is completed in 2013. Preliminary
discussions have been held with CPW regarding the potential for fish salvage from the reservoir.
There are no formal requirements for fish salvage, and no permitting or plans needed, other than
assistance to CPW in accessing the area during construction. CPW stopped stocking Homestake
Reservoir in 2008 in anticipation of the maintenance work and drawdown. Since public access
will not be allowed when the reservoir is drawn down, there will be no public salvage
(suspension of normal bag limits), and any salvage will be performed by CPW. CPW fish
ry\Plgecls\222C15M Han"A PM1a -H \5. W120_WOrtl_Proc \Pa'mming\PtlWn CO\LocMion Exlenl_ParievAPObnw_Devre + iew_F.Pnnlin,D 3M2012259PM 4 -4
kjJuJ22
SECTIONFOUR Compliance With PRO COUIN Cedes
biologists plan to evaluate the need for salvage in late May or June of 2012 to determine whether
there are fish in distress as a result of dewatering that should be salvaged.
Migratory Birds
Table 4.6 -1 provides a list of migratory birds that were observed during the field reconnaissance
and which are likely to nest in the area. No raptor nests were observed. Additional bird species
that were not observed during the field visit, such as woodpeckers and flycatchers, are likely to
be found in the Project area.
Table 4.6 -1
Migratory Birds Observed During Field Reconnaissance
Name
Species
I Primary habitat where observed
Mallard
Anas platvrhpnchos
Reservoir
Common merganser
Mergus merganser
Reservoir
Cooper's hawk
Accipiter cooperii
Over mixed aspen/conifer
Spotted sandpiper
Actitis macalarius
Shoreline
Broad- tailed hummingbird
Selasphorus platycercus
Mix of riparian shrub, conifers, open areas
Red -naped sapsucker
Sphvrapicas euchalis
Mix of riparian shrub, conifers, open areas
Western wood -pewee
Contopus sordidulus
Mix of riparian shrub, conifers, open areas
Violet -green swallow
Tachwineta thalassina
Open areas (over dam and reservoir)
Mountain chickadee
Poecile gambeli
Spruce -fir forest
Ruby - crowned kinglet
Regulus calendula
Spruce-fir forest
Townsend's solitaire
Mpadestes rownsendi
Spruce -fir forest
Hermit thrush
Catharus guttatus
Mix of riparian shrub, conifers, open areas
American robin
Turdus migratorias
Spruce -fir forest
Orange - crowned warbler
Vermivora celata
Riparian shrub
Yellow - rumped warbler
Dendroica coronara
Spruce -fir forest
Wilson's warbler
Wilsonia pusilla
Riparian shrub
Lincoln's sparrow
Melospiza
Riparian shrub
White- crowned sparrow
Zonotrichia leucophn's
Riparian shrub
Dark -eyed bunco
Junco hvemalis
Spruce -fir forest
Pine siskin
Spinus pinus
Spruce -fir forest
Evening grosbeak
Coothraustes resperitinus
I Riparian deciduous forest
The Project is expected to have no effects to migratory birds, including sensitive bird species. In
the unlikely event that clearing of riparian shrubs or cutting of trees is required for the Project,
surveys or other mitigation will be required by USFS prior to construction activity. Potential
methods include clearing of the construction area in advance of the breeding season to make the
area unsuitable for nesting, timing of construction to avoid the breeding season, or use of pre -
construction surveys to identify bird nests, combined with delays in construction for individual
nests until the young birds have fledged and left the nest. The first two are preferable because
they do not involve delays in construction once it is underway, and have a greater likelihood of
N \PrgecIS 41596JbMe ke_PM, Mub W120_WO Pre PermMing \RWn Col"ion_r 00_NerieMPM Dwv iew For PnnlingD &1912D12259 PM 4-5
V� uUGi23
SECTIONFOUR Compliance With Pitkin Comny Codes
not affecting active bird nests, as such nests can be very difficult to locate. If mitigation is
needed for migratory birds, appropriate methods will be coordinated with the USFS. The same
procedures will also protect USFS sensitive bird species nests, including boreal owl, northern
goshawk, and olive -sided flycatcher.
Federal Endangered, Threatened, Proposed and Candidate Species
Lists of federal species and critical habitat for Eagle and Pitkin Counties were obtained from the
USFWS Colorado Ecological Service website ( USFWS 2010). There are ten endangered or
threatened species and one candidate species listed for Eagle and Pitkin Counties (Table 4.6 -2).
Table 4.6 -2
Federally Listed and Candidate Species for Eagle and Pitkin Counties
Species
Scientific Name
Status*
Habitat
Habitat Present?
Black- footed ferret
Mustela nigripes
E
Prairie Dog towns
No
Bonytail
Gila elegans
E
Large rivers in Colorado
Habitat present
River Basin
downstream
Canada lynx
Lynx canadensis
T
Subalpine forests
Yes
Colorado
Ptychocheilus Lucius
E
Large rivers in Colorado
Habitat present
pikeminnow
river Basin
downstream
Greenback
Oncorhynchus cdarki
T
Montane and subalpine
Yes, but outside
cutthroat trout
stormas
streams
known range
Humpback chub
Gila cy'pha
E
Large rivers in Colorado
Habitat present
River Basin
downstream
Mexican spotted
Strix occidentalis lucida
T
Dense mixed forest and
No
owl
canyons, foothills and
lower montane
Razorback sucker
Xyrauchen teranus
E
Large rivers in Colorado
Habitat present
River Basin
downstream
Umcompahgre
Boloria acrocneina
E
Alpine tundra
No
fritillary butterfly
Ute ladies' - tresses
Spiranthes diluvialis
T
Wet meadows and stream
No
orchid
edges, below 7,000 feet
Yellow - billed
Coccyzus americanus
C
Low - elevation riparian
No
cue
I
woodland
Note: E = endangered, T = threatened, C = candidate
The only federally listed or candidate terrestrial animal species with habitat in the Project area is
Canada lynx, but no portion of the Southern Rockies (including the Project area) is designated as
lynx critical habitat by the USFWS. More information about this species is provided in the
Biological Assessment/Biological Evaluation report (Appendix E). There is suitable habitat for
greenback cutthroat trout in the Project area, but the Project area is outside of its known or
suspected range. Four endangered fish species are found downstream of the Project area in the
major tributaries of the Colorado River system, including bonytail, Colorado pikeminnow,
humpback chub, or razorback sucker. Under the ESA, impacts to these four species need to be
considered for projects that could result in new depletions (changes in amount or timing) to the
Colorado River system. Because the Project does not new involve depletions, there will be no
MN\Prgec 22415 Homa ake PM II\Sub_=12o_WO P= \Pei nng\Pabn COLOC n FiW ReieMPakrw De+ ew_For PnnLngOw NIW2012259PM 4-6
uuu'j24
SECTIONFOUR Compliance With Pitkin County Codes
effect on these species. No federally listed, proposed, or candidate plant species have habitat in
the Project area.
The Project is anticipated to involve minor temporary impacts to lynx as construction activities
may temporarily displace Canada lynx from the vicinity of the construction areas. There will be
no permanent loss of habitat, and use and maintenance of the existing access roads will have no
adverse effects. The Project would be in compliance with the objectives and guidelines of USFS
management of lynx in the Southern Rockies. A Biological Assessment has been prepared for
the Project and is provided in Appendix D.
Other federally listed animal species, including greenback cutthroat trout, Mexican spotted owl,
Uncompahgre fritillary butterfly, and yellow - billed cuckoo will not be affected by the Project.
Colorado River fish living downstream of Homestake Reservoir will not be affected because the
maintenance Project will not create new depletions.
USFS Sensitive Animal Species
The Project area includes sensitive habitat for a total of eight Region 2 sensitive animal species,
including boreal toad (Anaxyrus boreas), northern goshawk (Accipiter gentilis), boreal owl
(Aegolius funereus), olive -sided flycatcher (Contopus cooperi), Colorado River cutthroat trout
(Oncorhynchus clarki pleuritucus), American marten (Martes ainericana), and pygmy shrew
(Sorex hoyi). More information about these species is provided in the Biological Assessment/
Biological Evaluation report (Appendix E). One additional species, American three -toed
woodpecker (Picoides dorsalis), was previously listed as a sensitive species and was on the list
of species provided to URS by the Holy Cross Ranger District in 2010, but was removed from
the 2011 sensitive species list (USFS 2011).
Impacts to USFS sensitive species are addressed in the Biological Assessment/Biological
Evaluation (Appendix E). The Project is expected to have no impact on boreal owl, wolverine,
or American marten. The Project may cause minor short-term impacts to northern goshawk,
olive -sided flycatcher, Colorado River cutthroat trout, boreal toad, and pygmy shrew. It is not
likely to result in a loss of viability on the planning area for any of these species, or to cause a
trend to federal listing or a loss of species viability range wide.
USFS Sensitive Plant Species
Special status species surveys were conducted in July 2010 using a list of species provided by
Rick McNeill of the White River National Forest. Several of the target species were moonworts,
and therefore all USFS sensitive moonworts that may occur in the central Rocky Mountains were
surveyed (USFS 2011). Six species of moonworts were found, two of which, trianglelobe
moonwort (Botrychium ascendens), and narrowleaf grapefern (Botrychhun lineari) are USFS
sensitive species. No other sensitive plant species were found. A copy of the survey report is
provided as Appendix C of the Biological Assessment/Biological Evaluation (Appendix E).
The Project is expected to have no impact on triangleleaf moonwort and narrowleaf grapefern.
The moonworts are located adjacent to the access roads and not within proposed construction
areas. Impacts are being avoided by fencing the edges of the sites to prevent access or accidental
impact during construction.
MN\Prgec1a222415 H..Wake PM. IIMSub_W120_WO P. \P..lin9\POWn Co\LOCaw_FaW Rwlexl ftmo_Dere Pew_Fa Pnntin9Cttx M912012259PM 4-/
ujuJ25
SECTIONFOUR Compliance with Pitkin CouW codes
4.7 SEC. 7- 20 -80: RIVER AND STREAM CORRIDORS AND WETLANDS
Homestake has received approval from the USACE under Nationwide Permits 3 and 33 for the
proposed maintenance Project. Homestake disclosed potential impacts to wetlands and waters of
the U.S. in the Pre - Construction Notification (PCN) report contained in Appendix F. No
wetlands in Pitkin County will be impacted.
Wetlands surveys and delineations of the dam improvement footprint were conducted in July
2010. Sixteen wetlands totaling 1.4 acres were identified, most of which are located along the
access roads (see Figure 2 in PCN, Appendix F). In addition, the Middle and East Forks of
Homestake Creek (0.18 acre) were also delineated as other waters of the U.S.
A maximum of 0.0005 acres (234 square feet), in seven wetlands (in Eagle County) may be
permanently impacted by road improvements within the 16 -foot road corridor of each access
road. The impact is minimal because the roads will not be widened. Construction activities will
also affect about 15 acres within the basin of the existing reservoir, in areas that are normally
inundated by water or that may be used as borrow areas. All of the impacts within the reservoir
basin will be temporary. Additional information regarding impacts to wetlands and other waters
can be found in the Clean Water Act Section 404 PCN (Appendix F).
During construction, sediment fencing will be placed along the edges of wetlands and surface
water bodies that are adjacent to the access roads and other construction areas to prevent
degradation of water quality and to restrict vehicle movement into those areas. The primary
pollutant that will be controlled will be sediment load and suspended solids. It is assumed that
no chemical treatment will be required beyond clarifying and settling out suspended solids.
� '. J� N
■ M N\Pr %ecI 2415%_V me ake_Plase_IASub_W120 Wo -Pm PermMin9 \Ripn Co \LO is -6 enl_Re iex Pnkmo_NCar iew_For PnnLng�x W1912012259PM 4-8
SECTIONFIVE
References
Natural Diversity Information Source (NDIS). 2010. GIS data for Big Game Seasonal Ranges.
Colorado Division of Wildlife. http: / /ndis.nrel.colostate.edu/
Tweto, Ogden. 1979. Geologic Map of Colorado. U.S. Geological Survey, Denver, CO. Scale
1:500,000, 2 sheets.
United States Forest Service (USFS). 1999. Holy Cross Area Soil Survey. Available on the internet
at White River National Forest -Land and Resource Management - Geospatial Data.
USFS. 2011. FSM 2600 — Wildlife, Fish and Sensitive Plant Habitat Management. Chapter 2670 —
Threatened, Endangered and Sensitive Plants and Animals. Forest Service Manual, Rocky
Mountain Region, Denver, CO. Effective May 25, 2011.
vuJJ27
C N\P,geo1S222415%_NOmee e_PMS _Mub_W120_Wad P, %Pm ftnglP knCoTO io2P eM_ReieMNU mo Dwrwiew_Fo,PnMing Uo V19M12259PM 54
C)
0
C)
0
N
00
V/
m
0
r
m
0
0
1
N
D
DPAWaG
D
a
0
m
WMNu
I+ICO=
A ron,rh
O m O N
y �A
2 m
m00�
z y
Lmi
g�m�Y
mZp�n
ap
O
Ozc
oo
z CFA
m ozm0
DODN o
pp0
m N
0
D
m
z n
z �
m
a
D
LOS
A
O
m
z`
m m
p A
'T
N
O
z
p
Vrt;1l
V y p
� m
i
ZD
m
ARm
Nm�
o��
o
D
A m Z
o
L m
mmm
L
_mf
SL+i
[p^mo
O O A
�1 A
rL
pm
O
N
p L
�O
q
A
� ;
N
I
0
I V/
til
�rx
x °lorb
dN�
x
H
�z00
Cl
o
tij
cN
G
~ VI
yon
aox
dox
w ro
O
W
0
W
� ro
� ro
MO
N
0
til
H
wove
x
0
z
my�
tI
7i
t/ +
tv
til
CA
til
C
M0
N
x�
J
n
d
ty
�I
r_
M0
n
H
iii m � i a ({ ..i- sy£ u•i'
O D i Z et fl
0 0 0
I OR
y ^x
V
ca
J
ny
IM ORAWINO PATH'. N'. \Projecb \2 241596_Hw wWke_Phaee_II\SW_00 \7.0_CPD_O S \PI SH= \0 -3 CENOW SIZE PM(60).dwg Mlum, wNm n, e/31/2011 1 u N
c N P G N c-
c .'
J j
r i
n ZO mN 02 OLsp
ysyy > io onZ ;Z. F� o I.Sm
'A<COK 2� --AD]5C} NNZWO£
00 mz O Amy m� Omlpj'J DO D'In�1 f/1 Om
mTmmO mm UZICm mm A E5 .N_N -QO yQ
PPOOMm y 4�� �RTrATm1IO 2�9CN0
4NO.. o xm2 AF 2Cpm L� ypOm T / �• j O
IpJmym +� m ;m O m< X00 000A S^ I _ A O
mp0 C Fj 2A COO ALz �OOpm C
Np TT p0 Dyo O O 222 A // F
WC m2C XOy Op m
iO V� CC}� Or SyO y-14l Vl �Apy r / i
X
AO DO y
N IpelK
m 2
s 20,
'L
F_ y
M AOy N ° °Z N O�,FF m f `1 'A II
El OC
m OC Im � ZN ti�zN S / '� \\ I/ ml2 Z;
lie sm °
!q- w zzo f / �/ % R go
3
(/I 00Ay p Z ! O
�®
I
_ 'm 1.
fi m v zx mn.. �.•
j}}
fC K � NDD-1A I
�Op-AI NFO ZO
\
:Em p D
v l'D2 SOm I`10m�
A O j vxy bin =zmm{12
Cr O >: D
1 2 \ FA czi.z yx I fl I Z�
In ME 1� ��o o N2� i II� Ij l oy/
A DO0
z
�I
=2S i
mE"
2
° N °
$y' y'�M1•tb I`{J O < 11
L 2 IICL
,}
o 0,
0
mir
O. \ �•
m im50 rD0 gm
$$ smz I PI 2 1! O^'
o <07 In K�z •I -sl^ NiAq m
9 c I �vAx AO mpS I O1 =
DAm mT M 0 OL 1 N S
O �z v�^ l f�mv� I0 £�S o % 'I
�� N� III pn2a m0Zy p >QOS
m(/1 pm O+I \ DnOC �r �yf/15 I
77cc x 2 Z O O z
"! O [
I( �psm 00
5 gypy F / m ( Ezy
Pg MO D
_O �G I c 1\ xo
�
p
0 o e o
m m 4 i Y C� E V -3v3 II Si
iNd m >OA mj
PUBLIC NOTICE
RE: Homestake Water Project Location and Extent Review
(Case #P028 -12; PID 2477 - 000 -00 -000)
NOTICE IS HEREBY GIVEN that a public hearing will be held on Tuesday, May 15,
2012 at a regular meeting to begin at 5:00 p.m. or as soon thereafter as the conduct of
business allows, before the Pitkin County Planning and Zoning Commission, Plaza One
Conference Room, 530 E. Main St., Aspen to consider an application submitted by
Homestake Water Project (37200 US Hwy 24N, Buena Vista, Co 81211) requesting to
repair /replace /rehabilitate portions of the dam structure (Eagle) and the tunnel intake gate
( Pitkin). The property is located at Homestake Reservoir and is legally described as
Township 8 South, Range 81 West of the 6`h P.M., Water Division 5, Water District 37,
DAM ID. 370109. The State Parcel Identification Number for the property is 2477 -000-
00 -000. The application is available for public inspection in the Community
Development Department, City Hall, 130 S. Galena St., Aspen, CO 81611. For further
information contact Lance Clarke at the Pitkin Community Development Department (970)
920 -5452.
s/, Joe Krabacher
Chair
Pitkin County Planning and Zoning Commission
Published in the Aspen Times Weekly on April 12, 2012.
Pitkin County Account 002.02.
Public Privale
Attention Applicant/Representative:
It is your responsibility to do the following:
1. Mail this Public Notice to all adjacent property owners and mineral estate
owners at least 30 days prior to the hearing with the return address of the
Community Development Department. The names and addresses shall be
those on the current tax records of Pitkin County as they appeared no more
than 60 days prior to the date of the public hearing
2. Submit the Affidavit of Notice by Posting & Mailing (previously sent to you
with your applicant letter) as proof of compliance with the Code at the hearing.
3. Pick up Public Notice sign from the Pitkin County Community Development
Department, 130 South Galena Street, Aspen, CO (970) 920 -5526
4. Post the Public Notice sign on the property at least fifteen days (15) prior to
the hearing
5. Remove the Public Notice sign within one week after hearing date
County of Pitkin } AFFIDAVIT OF NOTICE &
} ss. MAILING PURSUANT TO
State of Colorado } PITKIN COUNTY LAND USE
CODE SECTION 2 -20 -100
I, Kerry Sundeen, being or representing an Applicant to the Pitkin County Development
Department, personally certify that I have complied with the public notice requirements pursuant to
Section 2 -20 -100 of the Pitkin County Land Use Regulations in the following manner:
I . By mailing of notice, a copy of which is attached hereto, by first- class, postage prepaid U.S. Mail at
least 30 days prior to the public hearing to all owners of property within 300' to the subject property,
as indicated on the attached list, on the 6th day of April, 2012 (which is 40 days prior to the public
hearing date of May 15, 2012). The names and addresses of the adjacent property owners shall be
those on the current tax records of Pitkin County as they appeared no more than 60 days prior to the
public hearing.
2. By mailing of notice, a copy of which is attached hereto, by first- class, postage prepaid U.S. Mail at
least 30 days prior to the public hearing to the owner(s) of the mineral estate underneath the subject
property, as indicated on the attached list, on the 6th day of April, 2012 (which is 40 days prior to the
public hearing date of May 15, 2012). The names and addresses of the mineral estate owners shall
be those on the current tax records of Pitkin County as they appeared no more than 60 days prior to
the public hearing.
3. By posting a sign in a conspicuous place on the subject property (as it could be seen from the nearest
public way) on the 4th day of April, 2012, which is at least fifteen (15) days prior to e public
hearing. A photograph of the posted sign is attached hereto/
yzvvlf� 1�% &V_Je1e_n
Applicant' ame
(Attach photograph here)
ft-AINLTATE ?-4. 0✓< 'NF GI I iA,.� ll Cr". C
AND -AL TWWEL INTAKE GATI (IJmz.�
rNO EETY IS t.�ATE4 AT NoN %M Rt.ERVaeR
lb"smir 8 -a Pk,%F. $I wg.T oc THE P.M
Eos /ILNIN60U11AFSOELAANMIX OFUCET
1]0 E GALENA 6T, AE;EN CO �9f0 »2M1SStE
i
Signed before me this day of
2012by
WITNESS MY HAND AND OFFICIAL SEAL
My commission expires: 10 J Vb J ZO 12.
Notary Public
maAft r ►e _ K - "Dko't S
Notary Public's Signature
MELANIE K. DAVIS
Notary Public
State of Colorado
April 6, 2012
Mr. Dave Neely
District Ranger, Eagle -Holy Cross Ranger District
Holy Cross Office
24747 US Highway 24
Minturn, CO 81645
RE: Homestake Dam Maintenance and Repair Project
Property Owner Notice
Dear Mr. Neely,
As you may know, the Homestake Dam and Reservoir in Eagle County, Colorado, is undergoing
scheduled maintenance in 2012 and 2013. These activities are routine maintenance, and must
be completed to ensure that the project continues to operate in a safe and reliable manner.
This is a notice to all property owners and mineral estate owners within 300 feet of the subject
property of a public hearing before Pitkin County Planning and Zoning Commission scheduled
for Tuesday, May 15, 2012. This meeting shall begin at S:OOpm before the Pitkin County
Planning and Zoning Commission, in the Plaza One Conference Room, 530 East Main Street,
Aspen, Colorado.
Please find enclosed a copy of the public notice for your review. Please contact us if you have
any questions or clarifications.
Sincerely,
i7. Sundeen
?stake Project Representative
hment
Cc: Tom Vidmar, Homestake Project
Ron Sanchez, Colorado Springs Utilities
-2
April 6, 2012
Scott Fitzwilliams
Forest Supervisor, White River National Forest
PO Box 948
900 Grand Avenue
Glenwood Springs, CO. 81601
RE: Homestake Dam Maintenance and Repair Project
Property Owner Notice
Dear Mr. Fitzwilliams,
As you may know, the Homestake Dam and Reservoir in Eagle County, Colorado, is undergoing
scheduled maintenance in 2012 and 2013. These activities are routine maintenance, and must
be completed to ensure that the project continues to operate in a safe and reliable manner.
This is a notice to all property owners and mineral estate owners within 300 feet of the subject
property of a public hearing before Pitkin County Planning and Zoning Commission scheduled
for Tuesday, May 15, 2012. This meeting shall begin at S:OOpm before the Pitkin County
Planning and Zoning Commission, in the Plaza One Conference Room, 530 East Main Street,
Aspen, Colorado.
Please find enclosed a copy of the public notice for your review. Please contact us if you have
any questions or clarifications.
Sincerely,
D. Sundeen
stake Project Representative
ttachment
Cc: Tom Vidmar, Homestake Project
Ron Sanchez, Colorado Springs Utilities
Brett Gracely, Colorado Springs Utilities
PUBLIC NOTICE
RE: Homestake Water Project Location and Extent Review
(Case #P028 -12; PID 2477 - 000 -00 -000)
NOTICE IS HEREBY GIVEN that a public hearing will be held on Tuesday, May 15,
2012 at a regular meeting to begin at 5:00 p.m. or as soon thereafter as the conduct of
business allows, before the Pitkin County Planning and Zoning Commission, Plaza One
Conference Room, 530 E. Main St., Aspen to consider an application submitted by
Homestake Water Project (37200 US Hwy 24N, Buena Vista, Co 81211) requesting to
repair /replace /rehabilitate portions of the dam structure (Eagle) and the tunnel intake gate
( Pitkin). The property is located at Homestake Reservoir and is legally described as
Township 8 South, Range 81 West of the 6h P.M., Water Division 5, Water District 37,
DAM ID. 370109. The State Parcel Identification Number for the property is 2477 -000-
00 -000. The application is available for public inspection in the Community
Development Department, City Hall, 130 S. Galena St., Aspen, CO 81611. For further
information contact Lance Clarke at the Pitkin Community Development Department (970)
920 -5452.
s/, Joe Krabacher
Chair
Pitkin County Planning and Zoning Commission
Published in the Aspen Times Weekly on April 12, 2012.
1
Lance Clarke
From: Parker, Andrea [andrea.parker @urs.com]
Sent: Thursday, April 05, 2012 8:41 AM
To: Lance Clarke
Cc: Ron Sanchez (rjsanchez @csu.org); Zusi, Michael
Subject: Sign Posted at Homestake Reservoir
Attachments: Homestake Sign #1.jpg; Homestake Sign #3.jpg; Homestake Sign #4.jpg; Homestake Sign #
6.jpg
Good Morning Lance,
The signs for the public hearing on May 15th are now posted at the site. We will be sure to attach the photos to the
affidavit that we bring to the hearing.
Regards, Andrea
Andrea Parker
URS
8181 E. Tufts Avenue
Denver, CO 80237
Phone (303) 796 -4764
Fax(303)694 -3946
andrea.parker @urs.com
j�, Please consider the environment before printing.
From: Slack, David
Sent: Wednesday, April 04, 2012 3:56 PM
To: Zusi, Michael; Parker, Andrea
Subject: Homestake Sign
Here are some pictures of the installed Public Notice sign.
The GPS point is: 13 S. 0382846
4370280
Let me know if you ever need me to do anything else.
David Slack, Field Technician
URS Corporation
713 Cooper Avenue, Ste. 100
Glenwood Springs, CO 81601
(970) 384 -4741— Work
(970) 379 -4246 — Cell
Note New E -Mail — david.slack @urs.com
This e -mail and any attachments contain URS Corporation confidential information that may be proprietary or privileged. If you
receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this
information and you should destroy the e-mail and any attachments or copies.
1
I a� 3
Is
. , t-.
Homestake Dam an e
Maintenance an
Pitkin County Community
Development 'Department
WATER
WATER
A�
14 q
5/15/2012
1
5/15/2012
2
Project Needs
"I.,
(1) Dam Safety Repairs..
— Required by the State Engineer'
- Asphalt Face Rehabilitation (Eagle Coun
crest Removal and Reconstruction
eagle_ County)
Repairs Will Not Modify Project rapacity,
Diversions, or.- Operation
ar
3
5/15/2012
3
5/1,5/2012
4
5/15/2012
LC
5/15/2012
Primary Contacts During Construction
• Homestake Proiect: URS: Mike
Tom Vidmar / Andrea Ra
Tom Hankins } ,,
(719) 668 -9595 (303) - 196 -47
• Colorado Springs ACA Moltz:
Utilities: Ron Sanchez Cote Philip
� MR-
r
5/15/2012
7
PITKIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
(970) 920 -5526 FAX# (970) 920 -5439
March 27, 2012
Kerry Sundeen
37200 US HWY 24N
Buena Vista, CO 81211
ksundeenngrandriver.us
Re: Homestake Water Project Location and Extent Review, Land Use Code Development Standards
Review
(PID #2477 - 000 -00 -000; CASE # P028 -12)
Dear Ms. Sundeen:
The Planning Office has completed its preliminary review of the captioned application. We have determined that
this application is complete. After a more detailed review of the submittal information, additional information
specific to the application may be requested in order to adequately review and process the application.
The planner in charge of the review will request the information from you directly.
We have scheduled this application at a public hearing before the Pitkin County Planning and Zoning Commission
on Tuesday, May 15, 2012 at a meeting to begin at 5:00 pm before the Pitkin County Planning and Zoning
Commission, in the Plaza One Conference Room, 530 East main Street, Aspen, Colorado. Should this date be
inconvenient for you please contact me within 3 working days of the date of this letter. After that the agenda date
will be considered final and changes to the schedule or tabling of the application will only be allowed for
unavoidable technical problems. The Friday before the meeting date, we will call to inform you that a copy of the
memo pertaining to the application is available for you to pick up at the Community Development Office.
Please note that it is your responsibility to post a public notice sign on the property at least fifteen days prior to
the public hearing (and remove it within one week after). You are also required to mail notice (you may obtain
a copy of the public notice from our office) to all property owners and mineral estate owners within 300' of the
subject property at least 30 days prior to the hearing with the return address of the Community Development
Department given above. The names and addresses shall be those on the current tax records of Pitkin County as
they appeared no more than 60 days prior to the date of the public hearing. Please submit the enclosed Affidavit
of Notice by Posting & Mailing as proof of compliance with the code at the hearing.
If you have any questions, please call Lance Clarke, the planner assigned to your case, at (970) 920 -5452
Sincerely,
Bonnie Waechtler
Administrative Assistant
Encl: Affidavit (Code Section 2 -20 -100)
PITKIN COUNTY COMMUNITY DEVELOPMENT
Permit Receipt
RECEIPT NUMBER 00032212
Name: Colorado Springs Utilities Date:3/27/2012
Project Address: 0 HOMESTAKE RESERVOIR
Type: check
# 206872
Permit Number
Fee Description
Amount
0028.2012.PLAN
PP- Flat Fee
4,056.00
0028.2012.PLAN
PP- Clerk Tech Fee
25.00
0028.2012.PLAN
PP- Public Notice Fee
108.00
0028.2012.PLAN
PP- Planning Eng Referral Fee
499.00
Total:
4,688.00