Loading...
HomeMy WebLinkAboutbocc.con.amended.050.1999A_ co�c�r � Q so ,� QQQ �4- ol �o�� Do�,�� CHANGE ORDER Change Order No: 1 Contract: Landf'ill Operatfans Original Contract Date: Anrll 28. 1999 CONTRAC'TOR: Pitkin Connty Waste Svstems. LLC Tha following CHANGES are hereby made to the Contract Documents: Pursuant to the attached propasal dated August 6. 1999 from Pitkin Countv Waste Systems. LLC (PCWS). PCWS will perform closurc activities on Phase I(approximatelx 4 acres) _in. accordance with the Eneineering Design and Ooerations Plan and ttie JUSi�ICATION for Change fo ColY(ract Documents: PCWS was selected as �.he land�"ill operator in an apen bidding process in the s r�ing o�� 1Lev h�yg nerformed in accordance with the terms of the contract, which includes the manufactttre of approxirnately 26.000 cubic yards Qf v�rious soil materials for nse in closure activities. They currentiv have ec�uipment and the labor force available to perforin �his work. and have done numerous projects like ihis at ott►er Iandfill sites. No other conlractor in the area has such previous experience. including our previous landfill �,qntractor fthis is the first area of our Iandfill to be closed under the a�proved engineering desi�n and ciosure plan). In addition, the value of this change order is less than 10% of the annuaI value of the operating contract ($963,b95�, CHANGE TO CON`i'RACT PRICE (Attach Detailed Calculation Sheeis) (Jriginal Contract Price: Current Contract Price (as adjusted by previous change orders); Tncrease or Decrease in Contract Price by this Change Order: Ne�v Contract Pxice due to this Change Order: NO CAANGE TO CONTRACT TIME Completion date for this project (elosure work) wilI be: November 1, i999 $ 4,$18,475 $ (same) $ 9i,255�` $ 4,909,730 APPROYALS REQUIRED - To be effective, this Change Order must be appraved by PITHIIV COUNTY � General Conditions - Exhibit 1 ����-� �� C: WmeU�41A1RFPFORMS�PR6JECT5�tA1: DFILL\Cf�angel.doe lofi 5eptember 1, 1999 Revzsion 0 ` ,,�-- . � , �, ,�ii��Kr•n� �o�N�y 1V1�. Miles Stotts Solid Waste Manager Piikin County Resaurce Recovery 76 Service Center Road Aspen, Colorado 81611 November 22, I999 Re: Proposat for Completion of Closure Work, Loading Services and Road Maintenance, and Moving of Smuggler Soil Dear Mr. Stotts: Pursuant to your request PCWS is pieased to submit this proposal for campletion of additional closure �vork, loading services and road maintenance, and moving of Stnuggler soii at the Pitldn County Landfill. Specifically, the tasks to be performed include the following: ❑ PCWS will close approximately %s acre of the Phase I Closure area which evas not included the original specifications. All closure activities �vill be in accordance with the County specifications. o PCWS �vill perfoim all topsoil, compost and aggregate toading services currently being conducted by #he County. 7n addition, PCWS will provide back-up snow pIowsng services and apply sand/salt mixture (provide by County) to the paved access road and parking areas, originating at Highway 82 and terminating at the unpaved landfill access roads internal to the landfill. a PCWS will utilize the approximately 15,000 cubic yards of lead-contamina#ed soil stored in the Smuggler Superfiind Soil Storage Area as daily and intermediate cover in the tandfill. Utilization of the soil wili include loading, transportation, unloading and appiication of the soil. In addition, PCWS will provide fmal closure of the storage area including removal of the plastic liner and finat grading. The County provide revegetation of the area. Following is a breakdown o£ the costs af the project along ��ith the lump sum price. Item Cost Closure Work (1/2 acre) Loading Services and Road Maintenance SmuggIer Soils $13,000.00 64,020.OQ per year 52,500.00 We appreciate the opportunity to provide services to Pitkin County. Should you accept this proposal please advise and PCWS �vill prepare the appropriate addendum to our cui�rent conhact. Sinc ely, , �_ ,il.�,a'u.� Lari��'. c: Mr. Lee Tharp, P.E. % P.O. BoX 1.276 � BASALT, COI.oRADO 81621-1276 • MoBILE: (970) 948-3048 • FAX/PHONE: (970) 7Q4-1070 Agenda Item Title: BOCC Meeting Date: Staff Responsible; ,i AGENDA ITEM SUMMARY Solid Was#e Center Operations: Closure work, landscaping & wood grinding 5eptember 22, 1999 Miles Stotts Description of fssues: When the contract with Pitkin Cour�ty Waste Systems, LLC was adopted, there were at two issues that were not fully addressed — finishing closure work started by the previous contractor, and payment for grinding a farge stockpile of wood waste that accumuia#ed prior to fhe start of their work. Closure and landscaping — PCWS is the only coniractor in the Roaring Fork Valley with previous experience in closure of landfili celis under the current regulations,. They submitted a proposal to finish the closure work for a price well within our accrual for Phase 1, and their scheduEe should atlow fqr revegetation to occur this fall. We afso seek approval to pertorm the revege#ation of the closed area and landscaping waric at our en#rance under our existing budget, aithough proposals for tha# work have nat yet been received. A local landscape designer is drafting a plan for the entrance. If additional funds are necessary to complete the landscaping wark, they are available from anather line i#em (a semi-tractor that we wili not be purchasing at least until the evaluafion of our recycling operation is compleie r�ext year). Wood Grinding - The wood grinding for our compost operation is being done by the same subcontractor who has ground our wood wastes for the last two years. There are na other contractors with equipment capable of ineefing our specifications in the Roaring Fork Valley, and this contractor was the only one in the state who was available this summer. Grinding of wood caming fo the site after PCWS took over is included in their contract price; this work is an extra. Approximatefy Sn,000 cubic yards of raw wood was onsite, which will generate 15,fl00 to 20,000 cubic yards af shredded wood. This expense is already budgeted as a purchased service. The action needed is ta increase the existing purchase order for extras to the fulE budgeted amount ($100,000). Both items are fully �udgeted and the existing contract already provides for change orders. A change orcfer to the contract is needed to allow PCWS to per#arm the closure work, and BOCC approval is needed for purchase orders fior both iterrts. Legal and Finance concur with our approach to sole-sourcing this wQrlc. Alternatives/Options 1. Approve the contract change order, as well as budget change and over $10,000 purchase order. 2. Request furiher negotiation with PCWS. 3. Direci staff to issue a new Request for Proposals. Staff Recommendation: Staff recorrtmends Option 1. 3 �. � WASTE SYSTEMS, LLC " August 6, I994 VIr. Miles Stotts Solid Waste Manager Pitkin County Resource Recovery 76 Service Center Road Aspen, Colorado 81611 Re; Prvposal far Completion of Ctosure Activities on Phase I Dear Mr. Stotts: . Pursuant to your request PCWS is pleased #a submit this proposal for closure activities on Phase I of the Pitkin County Landf I1. In accordance �vith the approved closure pfan far the facility tlie following tasks must be perforEned:. � Final Cover Barrier Layer: PCWS will move and place the final cover barrier layer which will consist of at least 18" (after compaetion) of material which meets the specifications outlined in Section 02220 ofthe closure plan. In general this inaterial wiil be piaced in Iifts and compaeted to achieve a permeabiliry of 1 x 10"S cm/sec or less. Prodt�ction of this ma#eriai will be in accordance with the current contract ancf �vill be i��vaiced separately. ❑ Frost Protection Layer: PCWS will move and place the frost protection Iayer which wiil consist of at least 24" (after coinpaction) of material �vhich meets the specifications autlined in Section 02210 of The closure plan. In general this material tivill be placed in lifts and compacted, however, there is no permeability requirement. Production of this tnaterial �vill be i�� accordance �vith the current contract and �vili be invoiced separately. o Topsoil: FCWS will move and ptace the topsoi111yer tvhicE� tivill consist oPat least 6" (after placeme��t) of topsoil curre�3tly stockpiied on-site. Production of this material �vill be in accordance �vith the current contract and �vill be invoiced separately ❑ Vegetation: Vegetation �vi13 be tlie responsibility of the CoiEi�ty. o Storm�vater Structures: PCWS will cof�struct stormwater inai�agentei�t structures �vhicli �vitl include a rip-rapped letdo�vn chflnne! on the northeast eorner oFthe area to 6e clased. In addiEio�i perimeter storm�vater channels �vili be constructed along the north and so�tth periitieters to be closed. Tl�e no►-thern channel �vill no�v need to be raised to itt tt�e existing contours. It is assumed that incoming loads of aggregate will be diverted fi•o�n the current i�nioacfi��g area and directed to tl�e drlinage cliunnel. Iii the event it is necessary for on-site �t�aterial to be e�cavated and ptaced in tlze channel dt�e to t��e iacE: of �naterial able to be divei�ted from the icicoming loarls an additional cost �vill be cltarged as outlined below. ❑ Surveyin�: PCWS �vilt provide ihe construction and ��erification surveying during the �roject. �ny required contour mapping �vill be the responsibility of tlie Counry. . � P.O. Bi)X l?7(� • Bt�;�r�t.1', COC.O[:ADU S�1b21-1?7Ei » bI061L�: (970} 9�#5-30-�5 • F��X/ PHONE: (97U) 70�-1071} Mr. IVliles Stotts P'itkin County Resource Recovery Page 2 August b, 1999 The co�istruction needs to be completed by October 1 if at al! possible but no later than Octaber 15 to allow seeding by the County during the fall season. Third parEy CQA tivill be provided by the County and we �vill maintain quality communications tivith the County and their consulta�2ts to ma:cimize coordination of the project and the individuat tasks, After revie�v of the drawings and inspecting the surveying which �vas recently completed tiie area ready for closure is approxitnately 3 acres of disposal area plus perimeter drainage channels. The eastern limits of closure wouid be approsimateiy ttie line formed by grid # 1 south to grid #52 as shotivn the plan sheet entitled "Surveying Coordinates for Phase 1 F€nal Cover and 1'erimeter Channel Construction" dated .Tune 1998 and prepared by Gotder Associates. �ollowing is a breakdo�vti of the costs of the project along �vitii the lump swn price. Item Cost F'snal Caver Barrier Layer Frost Protection Laye�• Topsoil Stormwater Stn�ctures�` Lump Sum Tatal $29,110.40 3 8,1 �36.00 i l,Q3G.00 12,953,00 $ 91,255.00 �If on-site material is used for raisi��g of tl�e perimeter storm�vater cf�annel an additional cost of $6.35 per cubie yard �vi11 be cltarged. We appreciate the opportunity to provide services to Pit[:i�l Courtty. Shotild you accept this proposal please advise and PCWS �vill prepare tl�e appropriat$ adde��du►aa to our cu�•re+�t contrac�. Sincerely, Lee D. Tharp, P.E, c: fvt�•. Rick Hoffman I�fr. Lar�y Girot�� �