Loading...
HomeMy WebLinkAboutbocc.res.096.2012 A RES4LUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITHIN COUNTY,COLORADO,APPROVING A REVISION TO THE 2012 BUDGET FOR THE '/Z-CENT TRANSIT SALES AND USE TAX FUND RESOLUTION NO. ���o -2012 RECITALS 1. The Aspen City Council,the Pitkin County Board of County Commissioners and the Town Council of Snowmass Village (the "Parties")have previously identified general elements of their Comprehensive Valley Transportation Plan (the "Plan") which are eligible for funding from the Pitkin County one-half cent transit sales and use tax. 2. By intergovernmental agreement dated September 14, 1993,the Parties agreed: a. to conduct regular public meetings to continue to refine and agree upon proposed projects and transportation elements consistent with or complimentary to the Plan;and b. that all expenditures and projects to be funded from the Counry-wide one-half cent transit sales and use t� sha11 be agreed upon by the Parties and evidenced by a resolution adopted by the governing body of each party. 3. At a public meeting held on October 18, 2012, the Parties considered the following supplemental budget request for 2012: Increase the �1ABC pedestrian crossing design & engineering by$125,000. 4. By adoption of this resolution the Board of County Commissioners wishes to approve the supplemental budget request. NOW THEREFORE BE IT RESOLVED by the Board of County Commissioners of Pitkin County, Colorado,that the following increase to the 2012 budget for the one-half cent transit sales and use tax is hereby approved as summarized below: AABC pedestrian crossing design & engineering $125,000 INTRODUCED,READ AND ADOPTED ON NOVEMBER 14,2012. T ST: BOARD OF COUNTY COMMISSIONERS OF PITHIN COUNTY COLORADO �, By: (�y � Je ette Jones Michael M.Owsley,Chair n D uty Covnty Clerk Date: /��`1f' '�0/� MANAGER APPROVAL: � �P Jon e cock,County anager Parsons Scope vs. Budget Summary October 29th, 2012 As requested of Parsons by the E.O.T.C. during the meeting on October 18th, 2012, below is an itemized list of scope elements necessary to provide a thorough and complete Public Involvement Process, Alternatives Analysis, required Agency Coordination, Preliminary Design, Utility Design, Final Design and Post Advertisement Support for the Pitkin County Pedestrian Crossing of SH 82 near the AABC. The Project tasks below are broken out as original scope elements and unforeseen or additional out of scope work. Several of these categories are comprised of both in-scope and out-of-scope elements. The out-of-scope work has often been part of in-scope services but required a higher amount of efFort than could have been anticipated at the time of contract execution with Pitkin County. Originaf Scope Required Tasks: Required Bud�et: Hours: Planning and Alternatives Analysis Phase: Coordination and Interface with CDOT,Airport, RFTA and Citizens: $90,000 = 682 Hrs • As-needed meetings with each Agency and Public Groups to gain input on proper site and crossing technique • Evaluation of options with both public groups and agency of recommended design and locations with below grade and above grade option. • Coordination and Interface with CDOT updating them on design decisions and requesting comments • Update Airport, RFTA and Citizens on preferred selection Preliminary Design: Coordination and InterFace with CDOT,Airport, RFTA and Citizens: $70,000 = 594 Hrs • Meetings with Agencies to review pfan • Design preferred option to present to both public groups and agencies to evaluate design issues • Update Airport, RFTA and Citizens on preferred selection Final Design: Extensive coordination with CDOT� $90,000 = 800 Hrs • Coordination Meeting with multiple Agencies • Final Design of Preferred Alternative • Construction Plan and Specification Package Developed and sent for Advertisement �ub-Total for Origina(Scope Budget: $250,000 Unforeseen/Additional Scope Required Tasks: Required Bud�et: Hours: Pianning and Alternatives Analysis Phase: Coordination and InterFace with CDOT,Airport, RFTA and Citizens: $51,500 = 356 Hrs • Individual meetings with multiple Agencies and Public ensured proper siting • Thorough Evaluation Process with both public groups and agency/consultant teams to design and evaluate 2 locations with a below grade and above grade option. • Continued high level of coordination and Interface with CDOTto identify plan format,funding,schedule and environmental process requirements • Preliminary layout and evaluation efforts of 4 alternatives, 2 above and 2 below grade crossings Responses to E.O.T.C.request for additional evaluation: $ 4,500 = 61 Hrs • Structural evaluation of McBride Proposal • Quantity/Cost Estimate of McBride Proposa! • 2 additional renderings of alternative sites • 3 additional rendered cross-sections developed for site Preliminary Design: Coordination and Interface with CDOT,Airport, RFTA and Citizens: $25,000 = 263 Hrs • Additional Potholing needs,special use permit preparation and Traffic Phasing required for tunnel alternative instead of a simpler bridge option. RFTA—Airport and CDOT Coordination Efforts: Coordination and Interface with CDOT,Airport,RFTA and Citizens: $10,000 = 86 Hrs • Additionai Meetings with aN Agencies coordinating multiple ahasing and design options to create an integrated project • Thorough Evafuation Process with agency/consultant teams to evaluate crossing design,schedule,scope and cost sharing. • Additional Meetings with all Agencies including sharing and receiving files from RFTA Consultant • Provide multi-project schedule and interfaces to ensure constructabitity of 3 projects CDOT Plan Checking and Design Process: $30,000 = 260 Hrs • Alternative Structures Selection Report • Alternative Wall Selection Report m...�.v.�,,.�2.��,�-�,. ., • Additional coordination with CDOT and spec+alty groups • Multiple discussions on plan process as CDOT or Iocal agency • CDOT requested Parsons provide recommendation for most appropriate drainage design requirements. Post Design Advertisement Support: $ 4,000 = 34 Hrs • Additional hours estimated to answer contractor questions regarding design, quantities or specifications Sub-Total for Additional Budset Reauired: 5125.000 Project Total: $375,000 This list of required steps, including unanticipated planning, design and coordination is intended to describe legitimate reasons as to why the tunnel project is exceeding the budgetary goa! of$250,000. Parsons, under the direction of the E.O.T.C. and County Staff, has strived to execute the project as efficiently as possible. Thank you for yourtime and your trust and if you have any further questions we would be happy to answer. Parsons Team