RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COLORADO APPROVING AN
INTERGOVERNMENTAL AGREEMENT BETWEEN PITKIN COUNTY AND THE
ROARING FORK TRANSPORTATION AUTHORITY(RFTA) TO COMPLETE THE
ASPEN AIRPORT.BUSINESS CEN 1 ER(AABC)PEDESTRIAN TUNNEL AND.
AABC TRANSIT STATION DEVELOPMENT PROJECTS WITH ONE
CONSTRUCTION CONTRACT MANAGED BY RFTA
RESOLUTION NO. 00 q/ -2013
1. The County has appropriated $1,500,000 in order to complete a pedestrian
crossing/tunnel (hereinafter, "Tunnel") of State Highway 82 between the Aspen Airport
Business Center and the Aspen/Pitkin County Airport. The County and RFTA anticipate
that, in 2013, the Colorado Department of Transportation ("CDOT")will award RFTA a
$1,500,000 FASTER grant that, when added to the $1,500,000 in local funding
appropriated by the County, will provide a total of$3,000,000 for the construction of the
Tunnel.
2. The County desires by this Agreement to help coordinate, fund and complete the
construction of the Tunnel by combining the project into a single construction contract
along with RFTA's Bus Rapid Transit Station project (hereinafter"BRT Stations") and
delegate the management of both construction projects to RFTA. A conceptual plan of
the Tunnel.to be owned by the County is attached as Exhibit"A." A conceptual plan for
the BRT Stations to be owned by RFTA is attached as Exhibit`B."
3. Pursuant to the terms of this Agreement, RFTA agrees to assume the primary
responsibility for combining, managing and completing the BRT Stations and the Tunnel
in 2013 or as soon as possible thereafter.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Pitkin County, Colorado that the Chair of the Pitkin County Board of County
Commissioners be authorized to sign the Intergovernmental Agreement with RFTA to
complete the Aspen Airport Business Center(aabc) pedestrian tunnel and aabc transit
station development projects with one construction contract managed by RFTA.
INTRODUCED, FIRST READ,AND SET FOR PUBLIC HEARING ON THE /
DAY OF �✓v�r r 2013.
NOTICE OF PUBLIC}TEARING AND TITLE AND SHORT SUMMARY OF THE
RESOLUTION PUBLISHED IN THE ASPEN TIMES WEEKLY ON - .75- 2 G/3
2013.
l
NOTICE OF PUBLIC HEARING AND THE FULL TEXT OF THE RESOLUTION
POSTED ON THE OFFICIA/I,PITKIN COUNTY WEBSITE (www.aspenpitkin.com )
ON THE »"- DAY OF vvk. tj 2013.
ADOPTED AFTER FINAL READING AND PUBLIC HEARING ON THE / 3
DAY OF }�/�Cc.v�J 2013.
PUBLISHED BY TI ILE AND SHORT SUMMARY, AFTER ADOPTION, IN THE
ASPEN TIMES WEEKLY ON THE ,/4-14 DAY OF YID v -L - 2013.
ATTEST: BOARD OF COUNTY COMMISSIONERS
B / / II • ByT2L
Je: ette Jones Geergc-Idzwman, Chairman
D: .uty County Clerk R'`'ef = ic- &CL
Date: 37261(3
APPROVED AS TO FORM: MANAGER APPROVAL
John Ely_C-o n• • omey Jon P-adectc, County Manager
2
2-
®a 0®
SNOW THROW FENCE TUNNEL UPPER WALL/CEILING
II"MESH ER]WN IORIIL'NEIP:1200 -LIGHT SANDBLAST ROADWAY BARRIER
COLOR:VINYL-COATED
HEADWALL
FCRMLIR R IBS,TETON DRY STACK
COLOR:3 COLOR HAND STAMP Fp /. y
ICJ
LANDSCAPE WALL CAP S' NAI�
CRLORI RED 3 PORTAL F.EYSTONL / c/ L/ 1 t !e KA'r
PROTRUDE 2 FROM _ / I 1 "t
FACE P ARCH )/r T/ ty>` y` 12"cunicRE TE COPING
SANDSTONE PRYING ^� i/".42e A�,r{I Y®e � j� LOOM: 9flaWN 10 MATCF
2% % i• .........III �1 RETA:uInC wH1 It:
SAOSTCNE PAVERS A‘,7,4:6.3A '+'�} Y I�( '
COLOR RED,ROUGH cur A d / A - M I k.
[TRAIL SURFACE J ' ` w'n /t ry_ t F'
LAND sCA E ELCC% WALL It y�r Y •6eyA55q CA j ) „,,,,.,,,z-.47::,:t44,.;W n _
PAVESTOV MBORH HIGHLAND f I t, p F Mi J3 ra}ly.i n,, K IY.'•
STO\E 6 CIABO' 9 'K C :y.}N I(n .Y,A`I1 w•y. �.sC.r�+ V}_y
RET.WiND WALL COLOR:MOUNTAIN MIX
B-3 .A...
EMI_A N t I� _ I . -�—T
jai LI`e �wmrf'a AA ..12 lyl- ,,' r S,7.,.. !, t..._.
M k A�
%: IW/VNr J YRT •'_^"f_-3i 1-�. � �'R ,.?...
.DINTS (MM)� .,H 'SA �-• !'
JOINT:
AXIMUM[” -----1 I FOnNLIOER IR)3 FUNNINGBO Ip R-dte ��1�
AShAM 9TONL 91NGLE rtpW S ((``
�
MAXIMUM I 2n I / COLOR SInG.E COLOR'IDCHA / ^'IfdNING W0.L
3ASE rtE%TUx! MLIN-R IB9,TETON DRY STACK
/ ' ' FORMLINER:1291 BUSY HAMMER COLOR: J COLOR HAND'STAINED
'COLOR sINGIE COLOR BEIGE
`� I �'. TRAjL SURPM.E PORTAL f.OLONN STONE
1 I SC ORED COnCRETE FORLINER 1265,LIMESTONE
SAN DIEGO BUFF
^
COLOR:SINGLE COLON RED
{ ^® r. •
i TUNNEL PORTAL PERSPECTIVE SKETCH
TUNNEL_WAL'_ _ PORTAL COLUMY
PORTAL HEADWALL —4--_ PORTAL ARCH
�.,_ STONES
�PORTAL ARCH b- _
6
AND KEYSTCNES. ',,,C"
'xrnsoo SIDES OF
I1 VHOERPAS SHALL BE
` STAINED f20I3
A-,:`'.,\\\ ". CMICREAi[SVPE PAVINC
TEXTURE:SUSN HAMMER
TUNNEL PORTAI:�PLAN COLOR:SMI DIEGO BUFF
§ Print Date:I2/:A/2112 Sheet Revisions Pitkin County - Colorado As Constructed PITKIN COUNTY Project No./Code
I FM Nome:64752a_OES_Aeemena•Plan Lyn pate: Comments Init. SH 82 PEDESTRIAN UNDERPASS
d PUBLIC WORKS DEPT. No ReNner,:
Hen..same::;e Vert.Scale: p geKIN AESTHETICS PLAN 1
P. O 4R.FIeld n9,FL. Revised: Oaignsr: P.NIKCLAI JlrvCme
II$5nc-Y1Swe YO C it 9]0-92C-5206 Calder: P.NINCLAI Numbers
I PARSONS °pil`enio>e°m 3 O COUNT it Subset: sweet meet[; m Sheet Number 72
0 OP
•
ill .
•
k
G ''■
w ro' ro• or
EXISTING ROW
__
•
0
0 '
IC'CURE? TRANSITION HCL S.H.02 .. 0 . 6
(TYPE 0 I: R-ID.00. .
• 0
STA 6054071455.1.8•9-
- I Si - -.BEGIN MIA(PATCHING/(4t1 -\ END C TAP R. \
I ,_____,e---"Nef-ef-triBC•7772.64 ...5.1. -155.a-r-4--- • .._._._._..__
EP-7766.62 STA 8D6+3 .96 76.01'RT
'Pk .• ET) U, U •--- 67 L.F. I.: 5.CURB TRANS151115--5.-ec-er,___ .
--.....6.-5CURB t GUTTERW Ilk .
(TYPE II)
TYPE 2 (SECTION-51MP-=II'-- • ',Ark,-..--A /
CATCH Corte i. sTA .08.1575 51.77'RT
5. GUTTOR
STA./3---5+07.87,5:;;RT.l.'7-2---:• --...-- ---ICI-BH2E1rREI I°wilt') --.----
1:-:--: -_.----- • --.) ' _ 467 Syr,
HMA(PATCHINGMASPH) CONC.P.1AT.(10 14 1 MATCH EXISTING
EGIN_CONC-PV:41.110 IN)•A: GRADE BREAK
.— ---.1.-- _ EP•7772..56 --SORT —
ER47766.62 I :
C- I:
1 A 805.14:11:40- ."ID945-`71 I , TEIC-776733
. •
RI ft . .-I•WRICONEUft .4: _ CURB (SPECIAL AL_ ....."."t 0 U." -7. -,11"....:.•••• I- '' ''s Nu,s.LIP2.7);72:20,7, _
•IF
NO CURB & GUTTER _ _ . . “04/,,.. 4
liffilliliellaWiladl--- - TYPE 2 0E000,4.1Ni - ---,war Po-.-.-.-•:;••44.
,.. 0
"::t------- „E-alltr,. .52---adr--we'414==="aLl-r°7 1 __ _ sEa,417LIA1,5,:NWT_ _,..,
.,
' STATIDN/SH 82 PEDESTRIM-• -_,......:Caffili Ell
• A
4 . •
„ RIER MP. • . 6. I.::
TRANSITION BAR •-
--1- lel':s-rt.., ..F.f- •-- -
BEGIN 4:: NeER il e/P •••••• 45\.r.7 RI II END B TAP • 10:9 LI". END CURB (SPECIAL A) NOTES: 11 siOsst.f- vs-
- STA 805.2680,60.135,RT BEGIN CURB (SPECIAL Al
TOC•775B.S0 PEDESTRIAN RAIL
(STEEL)(SPECIN. A) T6C•7770.60 -------------
1. FOR PLATFORM INFORMATION SEE PLATFORM DETAILS
bLt•IN 7:1 TAPER
TBC■7757.05 SECTION LINE PLAN.
2. CURB TRANSITIONS SHALL BE PAID FOR BY CURB 1,
GUTTER TYPE 2 (SECTION I OR II).
3. CURB TRANSITION QUANTITIES ARE TO BE ADDED TO
t . STA . 7+5 A 93 7.•RT THE CURB I GUTTER(SECTION I OR II)QUANTITIES
Al STA BD6-448.22.03.50:RT -91, 0.94 AS SHOWN DR THE PLAN.
i EPL-7768.84
4. ALL RADIUS DIMENSIONS ARE TO LIP UNLESS
OTHERWISE NOTED.
5. TYPE 7 BARRIER TRANSITIONS SHALL BE PAID FOR
OY TYPE 7 BARRIER (STYLE C-cI. ' _ .
i
6. STATION.OFFSET,AND ELEVATIONS FUR TYPE 7
I BARRIER IS TO CENTER Of BARRIER UNLESS
OTHERWISE NOTED.
1 5
L Print Dole:2/1/2015
5 Sheet Revisions Project No.
f "'";—vv—va.,-41tsto IIIRT:NW--tt,o9 CONSTRUCTION PLAN
0564 ame:66,ANICuv_HCL_PlanDl.d90 Dole: Comments
5 Ink , ....: l:.?,5,37;11`g, AABC STATION -UPVALLEY 2010-00(2
, Merit Scole:I.•40' Vert.SEAN N/A GED in!4..V'PV.r.,j
LI Unit Woo-motion Unit Leader Initials C)
nape rem Troussuntstimmain. wthAiii.;cii Tei.'3.,i7—— sevIted: OS nrre NT Struchse
CI 1141 ot.DI sow iee 4.wen ere,-re.AN - Droller: Ere Nen+ere -
— COM f49:44.,SO Men LAnoCCIO CO 10001
:=0 :---- 4,0 4444473 120.51441k Void: Sheet Subset: CIVIL Subset Sheets: C-5 OF W Sheet Number 11591168
. '
CONTRACT 0/555-0/3,
INTERGOVERNMENTAL AGREEMENT BETWEEN PITKIN COUNTY AND
THE ROARING FORK TRANSPORTATION AUTHORITY (RFTA) TO
COMPLETE THE ASPEN AIRPORT BUSINESS CENTER (AABC) PEDESTRIAN
TUNNEL AND AABC TRANSIT STATION DEVELOPMENT PROJECTS WITH
ONE CONSTRUCTION CONTRACT MANAGED BY RFTA
This INTERGOVERNMENTAL AGREEMENT (hereinafter "Agreement") is made and
entered into this a0lti day of M,UGit. , 2013, by and between the BOARD OF
COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO, a body corporate and
politic ("County") and the ROARING FORK TRANSPORTATION AUTHORITY ("RFTA"), a
regional transportation authority created pursuant to Section 43-4-601, et seq., C.R.S., as
amended whose address is 0051 Service Center Road Aspen, Colorado 81611.
RECITALS
1. The County has appropriated$1,500,000 in order to complete a pedestrian
crossing/tunnel(hereinafter, "Tunnel") of State Highway 82 between the Aspen Airport Business
Center and the Aspen/Pitkin County Airport. The County and RFTA anticipate that, in 2013, the
Colorado Department of Transportation("CDOT") will award RFTA a$1,500,000 FAS 1 ER
grant that, when added to the $1,500,000 in local funding appropriated by the County,will
provide a total of$3,000,000 for the construction of the Tunnel.
2. The County desires by this Agreement to help coordinate, fund and complete the
construction of the Tunnel by combining the project into a single construction contract along
with RFTA's Bus Rapid Transit Station project(hereinafter"BRT Stations") and delegate the
management of both construction projects to RFTA. A conceptual plan of the Tunnel to be
owned by the County is attached as Exhibit"A:" A conceptual plan for the BRT Stations to be
owned by RFTA is attached as Exhibit"B."
3. Pursuant to the terms of this Agreement,RFTA agrees to assume the primary
responsibility_for_combining,-managing and completing the BRT Stations and the Tunnel in 2013
or as soon as possible thereafter.
AGREEMENT
NOW, THEREFORE, for and in consideration of the mutual covenants and
agreements set forth herein, and for other good and valuable considerations, the receipt and
sufficiency of which are hereby acknowledged, the County and RFTA agree as follows:
1. This Agreement is entered into by the Parties contingent upon the following assumptions
regarding the project:
a. All required utility relocations on the upvalley side of State Highway 82 are
anticipated to be completed by June 21, 2013 and all utility relocations on the
downvalley side of Highway 82 are anticipated to be completed by September 20,
2013.
1
b. The County will manage all required utility relocations because some relocations will
encroach on Pitkin County Greenbelt and Pitkin County Airport property,which is
owned by the County.
c. Both RFTA and the County will set aside five percent (5%)of their appropriated
funds for project contingency based upon their engineer's estimates for each design.
d. Both RFTA and the County acknowledge that the discovery or occurrence of
extraordinary unforeseen site conditions after the start of construction may delay
completion of the project for an unknown period of time.
2. RFTA's responsibilities associated with administering government agreements,
procurement;contracts and project management.
a. The purpose of this Agreement is to coordinate the construction of the County's
Tunnel with the construction of RFTA's BRT Stations as one construction project
under the management and supervision of RFTA, but with the direct input from the
County as to the Tunnel component of the construction contract. Once the
construction contract is approved by the County Public Works Director, the County
shall be responsible to perform all obligations as owner of the Tunnel component.
b. It is anticipated that, in 2013, RFTA will become the grantee of a$1,500,000
FASTER grant from CDOT that, in addition to $1,500,000 in County funding,will be
used to provide a total of$3,000,000 in funding for the Tunnel. The County will
provide up to $3,000,000 in funding for the construction of the Tunnel with
reimbursement to the County by RFTA of$1,500,000 in FASTER funding upon
completion of the Tunnel project. The $3,000,000 will be used exclusively for costs
associated with the Tunnel and may not be used for any costs associated with the
BRT Stations.
c. RFTA will solicit competitive bids for constructing the combined BRT Stations and
Tunnel construction projects following RFTA's procurement process. RFTA will
structure the Invitation for Bids and resulting contract to ensure segregation of all
project costs between the Tunnel and BRT Stations.
d. The County will be represented on the procurement selection team by its Public
Works Director and the County Engineer. The Public Works Director shall review
the bids and provide written concurrence that the $3,000,000 in Tunnel funding will
be sufficient to defray all agreed upon costs associated with construction of the
Tunnel, including project management by RFTA, construction management by
consultants and all required permits. Any additional portion of the Tunnel cost shall
be paid for by the County. RFTA and the County will develop cost sharing
percentages for all agreed upon costs after construction bids are received and prior to
the start of construction. The cost sharing percentages will be agreed to in writing by
RFTA and the Public Works Director, or his designee.
2
e. Contingent upon the County's written authorization and subject to RFTA's
satisfaction that it meets RFTA requirements,RFTA will execute the contract with
the selected construction contractor(hereinafter, "Contractor") for the Tunnel and
BRT Stations, with the goal of completing the combined projects in the 2013
construction season, or as soon as possible thereafter.
f. RFTA, directly and/or through an engineering consultant,will manage the combined
construction projects and ensure that design specifications are followed,testing
protocols are met, and the combined projects are constructed meeting previously
engineered plans and specifications.
g. RFTA will pay the Contractor for work performed on the Tunnel portion of the
construction contract and request reimbursement from the County by means of
monthly or periodic pay applications or invoices.
h. RFTA will not incur costs associated with the FASTER grant portion of the Tunnel
unless and until it receives an executed grant agreement from CDOT or written
authorization from CDOT that will enable RFTA to be reimbursed for costs incurred
in connection with the anticipated FASTER grant, prior to execution of the grant
agreement. It is anticipated that the amount of FAS IER grant funding that will be
awarded to RFTA in 2013 will be $1,500,000. In addition,the grant will require a
20%.or$375,000, local match making the amount of funding encumbered by the
FAS IER grant a total of$1,875,000. It is understood by the County and RFTA that
until CDOT authorizes RFTA to incur Tunnel-related construction costs associated
with the FASTER grant,RFTA will only be able to expend $1,125,000 ($1,500,000 -
$375,000) of the County's $1,500,000 contribution to the Tunnel construction project,
inasmuch as $375,000 of the County's $1,500,000 must be applied as match for the
FAS 1 ER grant.
i. RFTA anticipates that the cost of the BRT Stations portion of the overall project will
not exceed$1,161,000. If the apparent low bid for the BRT Stations portion of the
overall project exceeds $1,161,000, RFTA may either: a.) secure a supplemental
appropriation from its Board of Directors to cover the deficit and proceed with the
project; b.) re-solicit bids for construction of the overall project; or c.) separate the
BRT Stations and Tunnel into two construction projects to be separately managed by
RFTA and the County, respectively.
3. The County's responsibilities associated with coordination,permits, cost allocation,
approval of change orders, funding, and payments for the construction of the Tunnel.
a. The County will be involved in coordinating and supporting the management of the
Tunnel construction project by assisting RFTA with the following activities: a.)
obtaining all required permits for the Tunnel and BRT Stations, including permits for
all required utility relocations, from the County's Community Development and
Building departments; b.) obtaining and/or providing all necessary Right of Way
(ROW)clearances, including Federal Aviation Administration (FAA)clearance; c.)
3
7
managing all required utility relocations for the Tunnel and BRT Stations, including
agreements with the utility companies and contracts with contractors performing the
actual utility relocation work; d.) attending and providing input at weekly construction
meetings with RFTA; and e.) making periodic site visits as needed.
b. All consultant services provided prior to award of a construction contract(i.e.
Engineering,Environmental Clearances, ROW services,Utility Engineering)will be
paid for by the County with prior budgeted funds.
c. The County will work with CDOT to execute and fund all necessary utility relocation
agreements for the project by February 28, 2013. Required documentation for all
agreements, easements and rights of way will be completed by the County and supplied
to CDOT and the utility companies prior to the start of construction.
d.. The County Engineer or the Public Works Director or a designee of the Public Works
Director shall be available when needed to evaluate and approve proposed
modifications to the Tunnel plan design and to authorize any necessary change orders
before RFTA issues them to the Contractor.
e. All payment applications or invoices from RFTA for expenses incurred for the Tunnel
will be routed through the Public Works Director or the Public Works Director's
designee for approval. Payment to RFTA shall be made within 30 days of County's
receipt of payment applications or invoices from RFTA.
f. Funding for the Tunnel provided by the County will not exceed $3,000,000 unless there
is an additional appropriation from the Board of County Commissioners. No
construction contract shall be awarded and entered into with regard to the construction
of the Tunnel component without the written approval of the Public Works Director,
which approval shall not be unreasonably withheld, and shall certify that the County
has funds and will pay for the Tunnel and that the County will comply in all respects
with the obligations as owner of the Tunnel.
4. Project collaboration,problem solving and change order approval.
RFTA, CDOT and the County will form a collaborative Construction Management Team
(hereinafter"Team") that will meet at least weekly throughout the life of the project. The
Team will address construction issues and changes as they develop throughout the
construction of the Tunnel. Tunnel project modifications and other project decisions will
be made on a consensus basis by the Team. All change orders with regard to the Tunnel
must be approved by the Public Works Director or the Public Works Director's designee
prior to execution by RFTA and the Contractor. Because time is of the essence, the
Public Works Director,or his designee, shall be available on short notice to discuss
critical issues and provide necessary authorization for changes that otherwise might result
in costly time delays and financial impacts for the Tunnel.
4
5. Proiect Cost Assignments and final payment.
a. Construction management costs will be assigned directly to either the Tunnel or to the
BRT Stations based upon where management time was spent.
b. Construction management costs that cannot be directly assigned to either the Tunnel
or the BRT Stations shall either be split evenly between the two projects or in
accordance with cost sharing percentages to be agreed on in writing by RFTA and the
Public Works Director, or his designee.
c. Construction costs,that cannot be directly assigned to either the Tunnel or the BRT
Stations (such as mobilization and traffic control) shall be split in accordance with
cost sharing percentages to be agreed on in writing by RFTA and the Public Works
Director, or his designee.
d. All other direct construction costs shall be assigned to either the Tunnel or to the BRT
Stations based on which project originally included the specified work.
Project acceptance and final payment for the construction of the Tunnel will be approved
by RFTA, CDOT and the Public Works Director. Once approved by the Team, final
payment to RFTA for work performed by the Contractor will be made by the County
within 30 days of receiving a pay application or invoice from RFTA, once the Public
Works Director, or his designee, approves the job completion.
6. Cash Flow and Reimbursement.
a. The County will provide a total of up to $3,000,000 to pay for the construction of the
Tunnel. When the FASTER grant funds become available to RFTA to pay for
Contractor invoices, RFTA will begin submitting Contractor invoices to CDOT for
reimbursement. At that time,RFTA will only invoice the County for the 20% local
share of the FASTER grant expenses, until all FASTER grant funds have been
expended. If all of the $1,500,000 in FASTER grant funds are expended before the
Tunnel is completed, RFTA will resume submitting the entire amount of Contractor
invoices to the County until the overall $3,000,000 Tunnel project cap has.been
reached. Throughout the project and as CDOT makes payments to RFTA,RFTA will
reimburse the County for any amounts the County has advanced for the Tunnel
project that the County is owed from the FASTER grant, up to $1,500,000. All
reimbursements shall be completed within three months of final project acceptance.
b. If additional funds, in excess of$3,000,000,are required to complete the Tunnel
portion of the project,the funds may be either fully appropriated by the County or the
County may be reimbursed by CDOT for any additional expenditures. RFTA will not
incur costs for the Tunnel portion of the project in excess of$3,000,000 without prior
written authorization from the County. RFTA funds for the BRT Stations portion of
5 •
9
the overall construction project may not be used to pay for any costs associated with
the Tunnel portion of the overall construction project.
c. RFTA shall not proceed with the Tunnel portion of the Contract if the cost is
anticipated to exceed $3,000,000, unless otherwise directed by the Public Works
Director with assurances that funds have been appropriated and that the extra cost
will be paid for by the County. RFTA shall not be deemed to be a guarantor of the
cost of the Tunnel.
d. Tunnel project expense reports and forecasts will be presented to and discussed by the
Team as often as practicable, but at least on a monthly basis during the life of the
Tunnel construction project. If, for any reason, it appears that the cost of completing
construction of the Tunnel could exceed$3,000,000, RFTA will notify the County
and request written instructions as to whether it should continue or discontinue
constructing the Tunnel.
7. Public Outreach.
The County and RFTA shall coordinate a robust public outreach campaign to provide the
public with project information before project initiation and will provide regular public
updates throughout the project. The County and RFTA will designate a single point of
contact for each agency that will be responsible for this coordinated effort and public
information. The County shall operate as the lead entity with RFTA staff support and all
public outreach information will be approved by both agencies before it is made public.
8. Maintenance Responsibilities.
Upon final completion of the project and reconciliation of project expenses between
RFTA and the County, the County will assume maintenance responsibility for the
Tunnel. RFTA will maintain the BRT Stations in accordance with its MOU/Master
Lease Agreement with CDOT, signed on January 19, 2012.
9. Site Utilities.
Upon final completion of the project and reconciliation of project expenses between
RFTA and the County, responsibility for payment of the following ongoing utility costs
shall be split in accordance with cost sharing percentages to be agreed on in writing by
RFTA and the Public Works Director, or his designee:
a. Emergency telephone and Internet Wi-Fi service
b. Electrical for lighting and snowmelt
c. Irrigation water
10. Hold Harmless. To the extent permitted by law,the County and RFTA shall each defend
and hold harmless the other from and against any injury, claim or damage to any third
party arising out of or in connection with each party's operations under this Agreement.
6
//
Nothing in this Agreement, however, is intended or shall be construed to constitute a
waiver on the part of RFTA or the County of the provisions of Section 24-10-101, et seq.,
Colorado Revised Statutes, commonly known as the Colorado Governmental Immunity
Act.
11. Choice of Law. This Agreement and every related document shall be governed and
construed in accordance with the laws of the State of Colorado.
12. Attorneys' Fees. In the event the interpretation or enforcement of this Agreement
should ever become the subject of litigation,arbitration or mediation between
RFTA(or its successors and assigns) and the County, the substantially prevailing
party shall be awarded its reasonable costs and attorneys' fees and costs incurred
in connection therewith.
13. Notices. All notices or other communication required or permitted under this Agreement
shall be in writing, shall be personally delivered or sent by certified mail,postage prepaid
and return receipt requested, and such notices shall be deemed given when received.
Notices shall be directed to the following addresses:
To Pitkin County:
Pitkin County Public Works
Attn: Director
76 Service Center Road
Aspen, CO 81611
With a copy to:
Pitkin County Attorney
530 East Main Street, Suite 302
Aspen, Colorado 81611
To RFTA:
Roaring Fork Transportation Authority
Attn: BRT Project Manager
1340 Main Street
Carbondale, CO 81623
With a copy to:
Roaring Fork Transportation Authority
Attn: CEO
2307 Wulfsohn Road
Glenwood Springs, CO 81601
Notice of any change of address shall be given by written notice in the manner detailed in
this paragraph.
7
•
14. Performance. The Parties agree to perform any and all acts,without limitation, as may be
reasonably necessary to fully effectuate the intent and purposes of this Agreement.
Whenever any action is required or permitted to be taken by the Parties under the terms
of this Agreement, such action may be taken and performed by any authorized officer,
director, agent or other representative of the Parties.
15. No Third Party Beneficiaries. It is the intent of the Parties that no third party beneficiary
interest is created in this Agreement. The Parties hereto are not presently aware of any
actions by them or any of their authorized representatives which would form the basis for
interpretation construing a different intent and expressly disclaim any such acts or
actions.
16. No Waiver of Governmental Immunity. RFTA and the County, their directors, officials,
officers, agents and employees are relying upon and do not waive or abrogate, or intend
to waive or abrogate by any provision of this Agreement the monetary limitations or any
other rights immunities or protections afforded by the Colorado Governmental Immunity
Act, C.R.S. § 24-10-101, et seq., as it may be amended from time.,to time.
17. Breach or Termination. In the event of a breach of any provision of this Agreement,
written notice of the breach, which shall include a reasonably specific description of what
constitutes the breach and what corrective action or cure is required by the party giving
the notice, shall be given by the non-breaching party. If within ten (10) days after receipt
of such written notice, the breaching party has not cured the breach, of if cure cannot be
reasonably accomplished within ten (10)days, the breaching party has not commenced
what curative measures are possible and is not prosecuting the same to timely
completion, the non-breaching party may, in addition to such contractual remedies as
may be available, ask a court of competent jurisdiction for appropriate injunctive relief.'
18. Disputes. Any unresolved dispute arising under this Agreement which is not resolved by
agreement shall be referred to the RFTA CEO and County Manager, who shall promptly
confer with each other and members of the their Boards, and who shall reduce their
decisions to writing and mail or otherwise furnish a copy thereof to the Parties. The
decision of the RFTA CEO and the County Manager shall be final and conclusive unless,
within five (5) days from the date of receipt of such decision or lack thereof, either Party,
furnishes to the other a written notice of appeal.
In the event of an appeal, such dispute shall then be referred to the RFTA Board and the
Board of County Commissioners who shall meet in joint session within ten(10) calendar
days thereof. If no resolution is then achieved the dispute may be settled by appropriate
legal proceedings, or, if the Parties mutually agree,through mediation, arbitration or
administrative process. Pending any binding arbitration or administrative decision,
appeal or judgment referred to in this paragraph or the settlement of any dispute arising
. under this Agreement,RFTA shall nonetheless proceed diligently with the performance
of this Agreement as directed by the RFTA.
8
lJ
19. Entire Agreement. This Agreement constitutes the entire and complete agreement of the
Parties in regard to the subject matter herein. No promise or undertaking has been made
by any party, and no understanding exists with respect to the transaction herein
contemplated except as expressly set forth herein. All prior and contemporaneous
negotiations and understandings between the Parties are embodied and merged into this
Agreement.
20. Severability. If any term or provision of this Agreement shall be held to he invalid or
unenforceable, the remaining terms and provisions of this Agreement shall continue to
exist and shall be valid and enforceable to the fullest extent permitted by law.
•
21. Amendment. This Agreement may only be amended by a written document executed by
the County and RFTA, or its successors and assigns.
22. Venue. Venue for any legal action relating to this Agreement shall be in the District
Court in and for the County of Pitkin, Colorado.
23. Appropriation. All financial obligations of RFTA or the County under and pursuant to
this Agreement are subject to prior appropriations of monies expressly made by RFTA or
the County for the purpose of this Agreement.
24. No Personal Liability. No elected official, director, officer, agent or employee of RFTA
or the County shall be charged personally or held contractually liable by or to the other
party under any term or provision of this Agreement or because of any breach thereof or
because of its or their execution, approval or attempted execution of this Agreement.
25. Paragraph Headings. The paragraph headings in this Agreement have been inserted solely
for convenience of reference and are not a part of this instrument and shall have no effect
upon construction or interpretation.
26. Waiver. No failure or delay of the Parties to exercise any power or right under this
Agreement shall operate as a waiver thereof,nor shall any single or partial exercise of
any such right or power, or any abandonment or discontinuance of steps to enforce such
right or power,preclude any other or further exercise thereof or the exercise of any other
right or power. Nothing contained in this Agreement shall constitute a waiver of any
right,power or authority of the Parties hereto, except as expressly provided for herein.
27. Counterparts. This Agreement may be executed in duplicate original counterparts, each
of which shall constitute an original, but all of which shall constitute one and the same
document.
28. Authority to Execute. By signing this Agreement,the Parties acknowledge and represent
to one another that all procedures necessary to validly contract and execute this
Agreement have been performed and that the persons signing for each party have been
duly authorized to do so. The Parties acknowledge and agree that no representation or
9
I3
inducement has been made regarding the rights set forth in this Agreement that is not
expressly set forth herein.
29. Force Majeure. RFTA shall not be in violation of this Agreement by failure to perform
any obligation express or implied hereunder by causes beyond RFTA's control,
including, without limitation, acts of God, boycotts, strikes, embargoes, unforeseen
shortages of labor,fuel, or other items essential to provide service, acts of public enemy,
riots, rebellions, accidents, vandalism, or governmental laws, regulations, or approvals.
RFTA shall, as soon as reasonably practicable, but in no event later than ten (10) days of
any such failure,potential delay or default, notify the County in writing of the causes of
the failure,potential delay or default and the facts relating thereto.
30. Independent Contractor.
a. RFTA's relationship to the County and the performance of this Agreement is that of
an independent contractor. RFTA personnel performing services under this
Agreement shall at all times be under RFTA's exclusive direction and control and
shall be employees of RFTA and not employees of the County. RFTA shall have and
exercise complete control over the supervision of its employees.
b. Nothing is this Agreement shall be construed to convey any title or interest to the
County in RFTA facilities or equipment; nor shall anything in this Agreement be
construed to convey any title or interest in County facilities or equipment to RFTA;
nor shall RFTA and the County be deemed to have created a partnership or joint
venture.
10
l�
IN WITNESS WHEREOF,the Parties have hereunto set their hands and seals as of the
day and year first above written.
BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COLORADO
•
. By:C21 A
!G7en�m an
{x-04 A 4 1-f'f M'r ?r 127GCc-
AT . : APPROVED AS TO FORM:
B . iI 1/. . .r ---)i BY: -� .
Je. ette Jones,Depu l,�Clerk John M. El : Attorney
ROARING FORK TRANSPORTATION AUT ORITY
(cZarl) . ,.
rok Jacque Whitsitt, Chair, RFTA Board of Directors
Al LEST: • APPROVED AS TO FORM: •
•
—Y:c-------N.........c.._ i Byr—C4 -?-,C --
Edna Adeh, RFTA Secretary Paul J. Taddune, General Counsel,RFTA
•
•
C:\word\RFTA.IGA.AABC.Pedestrian TunneL.PJT.Todd.rev.1.18.13
•
II .
/5-
e% se
A -
SNOW •DROP FENCE TUNNEL UPPER PALL/CEILING
11,AS:/4(L°ZOATED FORMLINER:1200 -LICHT SANDBLAST RumwAy EostRiER
• PRADWALL
•
-
FORMLINElif IBR,TETON DRY STACK , . ,
MOP:3 COLOR HARD NE
STAID ' „..!. :‘,.......s... 2,-VAL;,1 MLs.„..L.;
••PW.C.A'Svi, . ••. -..t."•"-
LAFIDWAPE WALL CM? 3 PORTAL KEYS/ONES
.COLOR:RED
PROTRUDE 2::FROM
SAISOSTEPIE PAVING . . ,,r-F,•:&cz:.(,...,;•101 71 g',4056_ gisto-rnoff,-;..tan...,0,,-
vx:VX 2..
SANDSTONE PAVERS - '•' 7ft;.. ..”:.• - 8,,ZG i id d:.- 'w .5' r;10.
—_//7 :,;.s Ii$s.,ir :1/2111::44,'- '71.!Irr44.98 St5:;$01!...arial5C7- -r*-.;.::; -.77,e:P .:."---UNID r-TRA1L SURFACE
/
LANDSCAPE BLOCII VI ALL_ Mit `;* . .4'{. 0 '1/4'1.i VAT"'eligN 5. li • 75' 4,4i.,, ..;........t--r
Z-1-- —C-3-------- .:"; --
COLOR:MOURTAIN MIX
RETAINGIG WALL
7/8001 .1, Gqt:
A'."I..-:9 ,a,t,-:,.1.r--
b .4•—i---•rr";-'--W-- —l"ttuMmI'S''mNiFFAlitg. Br. c-'.:,•-r
, .
.--
:.
%DINTS :WOO—\
I
y FoRMLINETit 1273,RuNNINGBOGO•......c•--- LI . ...._ 7 C. ',...f.
..
JOINT:Ves
• MMIUUM
24• ,
.... . . . ..
'
LT... . ,COLOR:SINGLE COLOR ESLOE • •
•t:
TRAIL SOFACE
COLORED CONCRETE
-SAN,DIEGO BUFF RF 00 RR LTIALN E FraL21.10M5N.ITIEUsNTE
ONE
COLOR:SINGLE COLOR RED
1 ...
.."•• A..-.•=7-:":* "-- .
.---......-..L,
;,
TUNNEL PORTAL PERSPECTIVE SKETCH
TIPINEL.PP,Ets i
PORTAL COLUMN
4
„f------...- .!;:t----- PORTAL ARCH
PORTAL ME.ROWkL--/ -TTP.- .,,,em” STONES
PORTAL ARCH _ --. '----
'Al MCI KEYSTONES /.7r7":,\■ Vr------_._ - •
• N. IN
''''t ti■ r/ ‘' •
. EXPOSED•SILO OF__
VIA18121493.'LL"
''...,,....—.;!..:‘
prvirsiG
TUNNEL PORT -ZPLAN. , • LoL'ATEZ
1 ,
I.
H .
)
PITKIN COUNTY Project No./Code•As Constructed
§ Print Dote:12/14/2012 Sheet Revisions Pitkin County - Colorado
- SH 82 PEDESTRIAN UNDERPASS --
I FM Nome:64752B_DES_Aasmetics PPR I.4on Dote: Comments Ind. ..,• ,
PURLIC RORKS DEPT No Revisions: AESTHETICS PLAN 1
Hods:Scoter Its• Vert,Seale: c
%Tn.IN 0,R:FleklIm PG Rested: Designer: P.IOLAI'structore I
- Octollen P.NINCLAI Nmmbete
.:.; 1726 Ltreoln sum sco (=Io . till T
C° 1 970-920-5208
Vold: 99best. ' Stet ants: al fleet NIRobRF 72
PARSONS .00eseAC0 ROMs
. 13031613.7s07
" .
•
• t
. t\.....
-",..,.._
MIT)
et .
"....„zzr_mk....
•
. . .
0. dr am
EXISTING ROW
0 __ -- .
• . .-.
co -
-------------
' Co
ST:"±-'-''_,ta' -'t•, = .771'--i-=.1&---,--------...,--- ____ew,..4„,.._0 .
• • • .
•
Co„
o 6
o
ID CURB TRANSITION HCL SM.82 0 , ;
O •
(TYPE II R 3000
STA 5051-117PCSTIE"RT gi\I ', I S.H.82 SI A 508+28.53 57.09•RT-------.----1.-___' „
BEGIN HIM(PATCHING/IA 1._v.-_-\--\--
ENO 4:1 A' R
1 EP-7766.62 1 TA 806+3 IN MCNIFF . _,Ar,„.,_ _.... _
E o U•T . 4.,,t.. -.---- 57 L.F. - 5.CURE 6RAITSIT10/68.L-P-G-_- , '
11 ..\--e•-.Nr•v-- -Catra-1.114),-;$ _L______ - __-•CURB 6 GUTTER; (TYPE II)
- -_11— =•-nes=c-tenginci .
CATCH CURD ; • 'S'TIT`86131(35E 6 7?'NT .....
CURB &GUTTER
NI HATA IPATC N PH)P '-'t---.NI-"16,4-
TIRE-2-(SECTION-111AY - ..
STA.805.1.0T87 55.18.NT! • ---'- CATCH CURB HMA(PATCHINGMASPI-0 CONC.PVLT.(10 IN) 1 MATCH EXISTING__
B a . -VIA 7 10 N.• II TA .054-52.94-8(emerrr----
EPA7785.51 ILA
• `GRACE BREAK ' No- •v (111_p_
e!
STA 8115+0800- ..•,•T 11 TEICe7767J3 'MATCH EXISTING
B GIN YP 1 ARRI R .,,... .--1 elligall=nartirTh, -'=1-1CallttiRE-CTAA_A)-1::—Z-4' -'-'. eMirgil‘ H41_. 6A-o-ALIP-.71V•59
_al :•••=7,L.:/:::, _.._, •
,:- -,- -
,- A ___-.46.-)7' if ..... --• .0...,■%\%\x‘lv
---7- 15•• --.: rill ""tiiiiiiiiimr°E.-nalt. -I'''-CONC.ilDEWAill_. , NO case s GUTTER.. , ....4.. Lie
iCHITIORIME0r1W-OLTI---- 2 TYPE 2 (SECTION J11.0--'---Lt.
..! +63.51 74 011R7
1121----"•----: ---1 ..'1 . __..-- A-Pranasi, -.Trat6-----A.CaSig IhRV 1 .01.BC-7772.69 / . .0 Or • q?".10 tO
--- BEGIN CURB GUT TER --
_--.
t
-- T ,.., - --STATION/SK 62 PECESTR/MaaraMIELMagnanala e TYPE 2 (SECTION • ' -- .
TC.• 0
UNDçNPASS•• --" _- --.
P1.1 BARRIER Ale ' •'',. •Ir
TRANSITION -- .1 . . __ • (TYPE 1):1-c--A -.--ePTESTISW
,• Th'•8137+51.513.76172-01•RTF- ---- ACCESS COWTQ$1.---A-riftb..'.9?/01(1013./R7 vi
.
• N 40 AP R" It,'Neis, .........,c,e.-z•
t ENO 7:1 TAPER • MILE. END CURB(SPECIAL A) NOTES: ....P/ONAL.V.Per
STA 805+16.60,150.85•RT
ELGIN 7(1 TAPER
IBC-7757.05 BEGIN CURB (SPECIAL A)
TBC•7760.50 PEDESTRIAN RAIL
(STEELI(SPECIAL A) TBC-7770.60
SECTION LINE I. FOR PLATFORM INFORMATION SEE PLATFORM DETAILS
PLAN.
5 2 CURB TRANSITIONS SHALL BE PAID FOR BY CURB 6
51 , GUTTER TYPE 2 (SECTION 1 OR 10.
81
STA :07+53.8 0 TER IT 3. CURB TRANSITION QUANTITIES APE TO BE ADDED TO
THE CURB 16 GUTTER (SECTION 1 OR II)GUANTITIES
5. TA ..54.4.• • •••CT . PL. 7 0.94 AS SHOWN ON THE PLAN.
1 EPL-7755.54
1. ALL RADIUS DTI/ENSIGNS ME TC LIP UNLESS
?.' OTHERWISE NOTED.
•
t . 5. TYPE 7 BARRIER TRANSITIONS SHALL BE PAID FOR
BY TYPE 7 BARRIER (STYLE C-C).
L
. i •
EL STATION.OFFSET,AM) ELEVATIONS FOR TYPE 7
i •
• . BARRIER IS TO CENTER OF BARRIER LPILESS
OTHERWISE NOTED.
3 PURI Dote:2/1/201 Sheet Revisions
. _. ,_..n.n...--ara eirekkteekWirl CONSTRUCTION PLAN Project No.
Fie Nome:55_0.03CUV_HCL-PloR01.09n Dote(
2 eccimen" 2 -irt' VethanA .p:°SitnTPN1,(44i •R I • AMC STATION -UPVALLEY 2010-0012
Haft Seek(PLA401 Vert.Seale; N/A QM
•/°- ::?rieir::),,6,..; No ev sleep
A
k-.. &v-47211,44•61eILITgaQ81
e Urit InlarrnolIen Mt Leader INIMIs (=)
DeLIGRATI NO Structure
' 4111
. Reams 111e,74/41010R7KINN ANN1111114 WW1,./Zia:1.1.4 . N4441
C WO.1111 17MT /t,5.1011.,',van,
Ge:otler: EAR 1441111.1.1
1 =3 ....-..--. °nevi:wpm 11103
114.1114.011 tfrailvXO co UNION
„Lump& • Void: Sheet Subset: CIVIL Subset Steels: C-5 OF 10 Sheet Number BS RIM
•
• .
•
. •
• ,
•
. ' .