HomeMy WebLinkAboutbocc.con.amended.001.2012C Rev. 08-30J/jls
COUNTY CLERK'S
CONTRACT COVERSHEET
CONTRACT #: ,3�7����r�yj1G'�tl�
obl � aoI Z C
ORIGINATING DEPARTMENT: PW Transportation
PROCUREMENT OFFICER: Gerald Piclding PHONE #: -9205206
PROJECT NAME: General Lngineering Contract for Services CONTRACTOR: S�iM I1lC.
DOLLAR AMOUNT: $49,650.00 LINE ITEM # I 10.5496200.82000
CONTRACT EXECUTION DATE: 1/1/2012 CONTRACT END llATE: 12/31/2013
AUTOMATIC RENEWAL: ❑ YES �,NO TERM:
❑ [30CC AGENDA ITEM (Grants, lGA) ❑ STAPF AUTI-IORIZED SIGNATURE
(Requires BOCC Signature) (Per Revised Procurement Code 7/2005)
� OVER $50,000 (Requires Section Leader& County Manager's Signature)
✓ CHF.CK PROCUREMENT TYPE:
❑ None ❑ Informal ❑ Formal ❑ Sole Source ❑ Emergency ❑ Outside Agency/State Bid
❑ Compliance with C.R.S. 8-17-5-101, 102 as amended (Immigration Fonn) ❑ Exempt
❑ Contract Renewal
✓ CHECK CONTRACT TYPE: � � �� �
� Services/Maintenance ❑ Employment
❑ LicenseNse ❑ Intergovernmental Agreement (Resolution Required) .
❑ Lease ❑ Non-Profit
❑ Construction ❑ Quasi-Public (e.g.-AVH)
❑ Goods, Equipment, Supplies ❑ Grant Agreements (Notify Finance & Resolution Required)
❑ Other(e.g. revenue) � Change Order/Contract Amendment
(C/O: 10%or$25K whichever is thc Icsser must have County Manager signawre)
All Contrac[s should be proofed and all exhibits and notices mus,t bc attached for the following:
✓ �No Pages Missing ✓� All Other 131anks Filled In
✓ � IP Page Left Intentionally Blank—Note on Page ✓�All 8xhibits Attached
✓ � Page mmibered consecutively ✓❑ All Legal Descriptions attached (fapplicab(e)
✓ � All Original Signatures Aftixed ✓❑ Noticc of Award/Notice to Proceed Attached (ifapplrcable)
✓ � All Dates Filled In ✓❑ Warranty(if applicable)
✓ ❑ Special Instructions for Finance Department:
✓ � Authorized Procurement Officer's Name: Gerald Fielding
BY CHECKING ABOVE AND ENTERING NAME,THE AUTHORIZEll STAFF PERSON IIVDICATF.S THAT
THE ATTACHED DOCUMENT HAS BEEN PROOFED ANU READY FOR SCANNING.
NOTE: CLERK'S OFFICG WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE
ARCHIVES RETAINAGG SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST!
Contract#2012-I Rev. 8.31.1/jna/js
Budget Line Item# 110.54.96200.82000
,(1�z'KI1�
6�
��U 1�T T�
C%�,C_�
CHANGC ORDER/CONTRACT AMENDMENT
Change Order Number: �
OWNER: Pitkin County
Aspen, Colorado 81611
CONTRACTOR:
7'he General Lngineering Contract for services (the "Agreement") dated Januarv 2012 between the
Board of County Com�nissioners of Pitkin County (the "County") and SGM Inc.. (the "Contractor'), is
hereby amended as follows: ,
Description of Change: � ' ' '
Extends work into the 2013 Calendar year as delineated' in the contract. Adds 2013 appropriations of
budget, and add the work of the attached task order. .
Reason for Chan�e
This is Che allocation of 2013 money to the 2 year contract awarded in 2012.
Original Contract Price $ 109.280
Net Inerease/Decrease in Contract Price(this change order) $ 49,650
*Total Adjusted Contract Price (including this change order) $ 158,930
"Chis change order extends the time to complete work by 1 year.
In all other respects the Agreement is in full force and effect and remains unchanged by this
Amendment.
�. 5�, � 1,3
SGM Date
� 5��i�3
County ngineer �� Date
_��1�%1�
County anager Date
*Increases over $25,000 and/or 10°/a (single increase or accumulative) of original contract must have
County Managcr signature.
I
, _.
Intent�onaliy
I�eft Blank
c`:; •�. :.> ;�' -s
. � �- —
_ S
�
2013 General En in��pport
Pitkin County Public Works
Engineering Support Services Task Order
The planned services for this Task Order are to provide technical and engineering supporl,
construction management and QA/QC testing on an as directed basis, to support the Pitkin
County Public Works staff for its 2013 construction projects. The majority of this support will be
associated with the AABC Improvemcnts. A Man-hour estimate has been compiled for
budgetary purposes, but all directed work shall not exceed this budget without Pitkin County
approvals.
Work could consist of any of the following activities for the project: construction management
and inspection, QA/QC, public invo]vement, structural analysis, hydrologic analysis and
hydraulic design, coordination of utility relocations, existing condition survey, geotechnical
engineering, environmental studies and assessments, traffic engineering, right-of-way staking,
construction phasing plans as well as any coordination with Pitkin County, CDOT and affected
communities.
The work products, on a directed basis, may consist of public involvement materials, exhibits,
reports, studies, preliminary plans and final plans and construction drawings, specifications,
contract and bid documents. All drawings will be prepared in I1"x17" format to CDOT
standards and Pitkin County guidelines. Standard drawings and specifications for construction
will be those used by CDOT/Pitkin County Public Works Department. CDOT nomenclature and
work item codes will be used for bid items, references to the work and the preparation of
estimates and bid tabulations.
Task 1.0 Project Management and Coordination
1.1 Initial Project Meetin¢. An initial Design Scoping Review meeting will be held
and an on-sitc inspection will be made ro ensure that the project team is familiar
wiYh the existing conditions as well as the project requirements.
1.2 Pro�ress Meetings. SGM and Pitkin County will meet at least once per month to
coordinate the work effort, resolve problems, update the schedule, and determine
information or items required from other agencies.
L3 Proaress Reports and Billines. Progress reports and billings will bc submitted on
a monthly basis to the County Project Manager and will indude a billing
summary with total percent billed for each task. Weekly updates will be provided
by email.
2013 Task Order 01 Page I of 2 2/]0/2013
�
Task 2.0 Construction Management Support—AS DIRECTEll BY COUNTY
2.1 Construction Mana ee ment:
SGM will be responsible for conducting the Construction Management for this
project. Their scope oP work includes the following:
• Construction lnspection. Daily, on-site inspection of Contractor's work to
assure conformance with the plans and specifications, daily documentation
and reporting of Contracrors field resources, work zones, and productivity.
Coordination with County, Geotcchnical Fngineer, Gngineer-o1'-Record, and
Contractor.
2.2 Geotechnical En�ineerinQ:
SGM's subconsultant, Yeh and Associates; will be responsible for conducting the
materials testing for this prqject. Their scope of work includes the following:
• Materials testina. Provide density testing for aggregate base and testing of
concrete and asphalt during placement. The frequency and type oftests will be
in accordance with CDOT specifications or as directed by the County Project
Engineer. All personnel provided by Yeh and Associates responsible for the
materials testing and documcntation on this project will be qualified and
certified for CDOT projects. A trained and qualified technician from Yeh and
Associates will observe, sample, and test the materials and work on the
project, as required by the specifications. Materials incorporated into the work
will be documented for acceptance and project. Materials records will be
maintained in accordance with CDOT documents and will coordinate with the
County Project Engineec Preliminary written field reports of all tests and
observation results will be submitted to the Project Manager as soon as results
are available. Daily field reports will be made available to the Project
Manager by Yeh and Associates. Thc final daily rcports after review by the
Quality Control Manager will bc forwarded no later than one week following
the testing. Results of all tests takcn, including failing tests, will be reported.
2013 7'ask Order Ol Page 2 of 2 2/10/2013
_/
,t�,J$GM ESTIMATED BY: Dan Cokley
PROJECT: AABC Drainage Improvements DATE: 2/8/2013
CLIENT: Pitkin County REVISION: 1
SGM Hours and Labb�Charges "
. . . � . ■ � . . . . . .
1 PIC Princi al-In-Charge Louis Meyer $165.00 2 $330.00
2 PM Pro'ect Mana er Dan Cokley $145.00 40 $5,800.00
3 CM Construction Mana er Blaine Wright $125.00 0 $0.00
4 CT Construction Technician Joe Bair $100.00 160 $16,000.00
5 ADM Admin. Assistant Joan Preisner $65.00 16 $1,040.00
Subtotal 2181 $23,170.00
� ..�.�,: _• Suticonsultants
.i s,'ae"kxi�.
• •� - �- � � � , ., ,
1 YEH Geotechnical Yeh &Assoc $25,500.00
Subtotal $25,500.00
Other Direct Costs $980.00
TOTAL COST $49 650.00
t Date: 2/10/2013 Page 1 of 3 SGM Confidential
�
�
AABC Drainage Improvements SCHEDULE OF FEES 65GM
7;,:;; . • F , SGM �
PHASESANO�TASKS � E E tg �E� E F � �s suboui oesyn
_'":`&�' '�P�« — 'n `u � °as a � °a�H°a���Oa �. ��� � � �:. � olHaurs �cos��
1.1 P�ojetlMee�ings 2 16 OB B ]C 3].WO
12Pro'eciCOOrEination �a Yn f3a80
'- *+b=�# � :.CZSUtifoUI:PM1ase1 3. <0 :;{ aB e. ' - , �.ei?�.II ` �� ".! Be fHpW'
$,1 Cons�mtllonOE5erva0on 110 B 40 511]20
' •,_ __ . sutitotni:�anases t� >� .,: �nxl.e I ' � 91 fi��..� ". 6§�. ` ? I c 1. �+ao � sniso
TOTPL:Phases 1-2 a ao o iso is e o c c o o a o aia 5 xa.no
Print Date:Z10I2013 Page 2 of 3 SGM Corifidential
�
AABC Drainage Improvements �SGM
Other Direct Ex enses : . �., '
;x�.. . .. . .
.�. - , . . . . � ' I .� '
Mileage $0.70 per mile 1400 $980.00
Plotting, 24x36, B/W $2.00 per plot 0 $0.00
Plotting, 24x36, Color $4.00 per plot 0 $0.00
Repraductions, 8Y:x11, B/W $0.15 per copy 0 $0.00
Reproductions, 11x17, B/W $0.15 percopy 0 $0.00
Reproductions, 8Yzx11, Color $025 per copy 0 $0.00
Reproductions, 11x17, Color $0.50 percopy 0 $0.00
Newsletters, Tri-fold, Color $0.75 per copy 0 $0.00
Newspaper Notice $500.00 per week 0 $0.00
Poster Board Exhibits $75.00 each 0 $0.00
u oa
�,� , , : � � � .
�t Date: 2/10/2013 Page 3 of 3 SGM Confidential
' �
�ntent�o��l�;�
I.,eft �lank
�
�� Yeh and Associates, Inc.
Consulting Enginecrs&Scientists
February 8, 2013 Proposal 2013P-G016
Mr. Dan Cokley
SGM
I 18 West Sixth Street, Sui[e 200
Glenwood Springs, CO 81601
SubjecL Proposal for Materials Testing Services for the Aspen Airport Business Center(AABC)
llrainage Improvement Project in Aspen, Colorado
Dear Mc Cokley,
This letter presents Yeh and Associates, Inc. proposed scope of work, estimated project costs, fee
schedule and general conditions for providing field and laboratory materials testing for the proposed
project.
Project Description: We understand that the project includes removal and reconstruction of pavement and
flatwork in the AABC. The project includes asphalt and concrete pavement removal and replacement
throughout the site and placement of new sidewalk in select portions of the site.
Scope of Work: Based on our understanding ofthe project, we will provide density testing for aggregate
base and testing of concrete and asphalt during placement The frequency and type of tests will be in
accordance with CDOT specifications or as directed by the Project Engineer.
All personnel provided by Yeh and Associates responsible for the materials testing and documentation on
this project will be qualified and certified for CDOT projects. A trained and qualified technician from
Yeh and Associates will observe, sample,and test the materials and work on the project,as required by
the specifications. Materials incorporated into the work will be documented for acceptance and project
materials records will be maintained in accordance with CDOT documents and will coordinate with the
Project Engineer and Construction Managec Preliminary written field reports of all tests and observation
results will be submitted to the Project Manager as soon as results are available. Daily field reports will
be made available to the Project Manager by Yeh and Associates. The final daily reports after review by
the Quality Control Manager will be forwarded no later than one week following the testiag. Results of
all tests taken, including failing tests, will be reported.
The aggregate base, concrete and asphalt testing may include:
• Recommending acccptance or rejection of sources of material in accordance with project
specifications;
• Documenting test results and observations in accordance with project specifications;
• Hot mix asphalt testing will be in accordance wi[h the project specifications;
• Concrete will be tested in accordance with project standards;
• Conducting field observa[ions and performing on site field tests such as nuclear gauge
moisture/density tests, ete.
• Documenting materials incorporated in the work to meet the project specifications.
5700 East Iicans Avenuc, Denver, CO 80222, (303) 781 -9590, Pax (303) 781-9583
1525 Blake Avenuc, Glenwood Springs, CO 81601 , (970) 384-I500, [ax (970) 384- I501
570 "Curncr Drivc, Sui[e D, Uurango, CO 81303, (970) 382-9590, Fax (970) 382-9583
i � �
Proposal for Matcrials Testing and Inspecbon Services
AA6C Urainage Improvemenls,Aspcn
Proposed Costs: Based on project information, we have estimated the number of site visits required to
adequately test road basc, concrete and asphalt. We are providing a cost estimate based on an average of
3 visits per week and 6 hours per visit of a techniciads time for a 4 month (16 weeks)construction
duration. We have also included project engineer and stafftime to review field tests results, format and
finalize test results. Costs also include Proctor tes[s to correlate field tes[ results. The client will be
invoiced on a unit rate basis. We estimate the following approximate costs for the projech
AABC Drainuge Lnprovements
Technician for Material Testing(16 weeks c�r 18 hrshveek@$75/hr) $21,600
Proctor Compaction Testin�(2 tests @$95 each) $ 190
Staff Engineer(16 hrs@$85/hr) $ 1,360
Project Engineer(6 hrs@$135/hr) $ 810
Vehicle Milea�e (16 weeks o 180 mi/week(c�$0.55�/mile) $ 1,599
Subtotal Cost $25,559
The rotal proposed cost for this scope of work is S 25,559.
The above scope of work and estimated costs are based on our understanding of the project using the
project information provided to us.The work required to perform materials testing and consVuction
observation will vary depending upon the project construction schedule.A timely notice(preferably 24
hours) is required to schedule materials testing. If requested, additional materials testing and geotechnical
engineering services will be provided at the rates shown on the attached Standard Fee Schedule.
Sincerely,
YEH AND ASSOCIATES, INC.
��--���.�
Richard Johnson, P.E.
Project Manager
Attachment: Standard Fee Schedule
General Conditions
Page � 2 ��
� U
EffecOVe July 25,2012
YEH AND ASSOCIATES, INC.
FEESCHEDULE
ENGINEERING
Principal $160.00 per hour Enginecr or Geobgist Intern $i0.00 per hour
Sr.Projce[Manager $14�.00 per hour Scnior Picld Engineed'fcchnician $77.00 per hour
Project Munager $135.00 per hour Pield Engineering Technician $G7.00 per hour
Scnior Pmjcct Enginccr or Gcologist $I 13.00 per hour Luboratory Technician $62.00 per hour
Cmphics Specialist $120.00 per hour I,aboratory'I'echnician Intern $50.00 per hour
Senior Pield Inspector $98.00 per hour Dratler $83.00 per hour
Project 8ngineer or Gcologist $9R.00 per hour Administrative Assistant $60.00 per hour
Pield Inspec[or $88.00 per hour Sc Speeialist/Sr.Hngineering Consultam $195.00 per hour
StuITl:ngineer or Geulogist $83.00 per hour Bspert Testimony and Cour[Appearanee $350.00 per hour
(Covers ploraring and genernl sa�pervisia�,freld trips,anah�sis, consultation,pre��oro[ion of reporls,and Irove!(ime.)
LABORATORY TESTING
Nniurul Moisturc Contcnt $5.00 Sinnd:ird Proctor Comp�ction(ASTM D-G98) $90.00
Nuwral DcnsiTy $IOAO Moditicd ProctorCoinpacLion(ASTM D-1557) $100.00
Attcrbcrg Limit(AS'fM D43 18) $60.00 "R"-Value(AS7'M 2R44) $350.00
Aggrogale Spccific Gmvity $60.00 Organic Content(AS'I'M D-2974) $30.00
Gradaiion Anahsis(AS'fM D-422) Concrete Compression"I'est,each $14.00
a. NI Standard Sieve to#200 Sieve $60.00 Asphalt Content
b. Less than I.5"Do�vn tu#200 Sieve $50.00 u. Igni[ion Furnace Calibration,Per mix $350.00
c. Pemcn[Less 7'han#200 Sieve $30.00 b.Calibration of Nuclear Asphalt Gauge $350.00
d. li��dromctcrAnalysis, add$55.00 c. %AC $75.00
Swcll-Consolidation d.Gradalion $75.00
n. Loaded to 10,000 psf $50.00 Ma�imum Specific Gruvip�(Rice-AASIi'I'0 7'-209) $65.00
- b.Per load in Addition to IQ000 psf $5.00 [3ulk Specific Grarit}�(AASH1'O T-IGG) $40.00
Soil Unconfined Compressive Strength(AS'fM D-21G6) $35.00 Fracture�aces $75.00
(Samp/e pick-ap andyrepnrn(ion of remo/dsamples for applicnble lnboratorv tea�above will be billed at/rour/v Lahoratory Tech�rici<m
ra(e)
MISCELLANEOUS AND OUTSIDE SERVICES
Full'fime Aulo or Pickup Mileage $25.00/day+$0.55 per milc
Auto or Pickup Mileage(Lcss[han full timc) Curtenl Allowable IRS Ralc
Equipment Rental,ela Cosl+10°/u
Geotcchnical Urilling Subcon[ractor Cosl+10%
'fral7ic Control Subcontrac[or Cost+10°u
Spcciul Laboratory Testing Cos[+10%
Oul-of-to�m living and travel costs(Lcss thnn 3 days): Mcfils,Airfarc,le�dging,Car Rcntul,Parking,Toll,ctc. At Cosl
Out-of-town living and travel costs(Longer than 3 days):
-Airfare,Lodging,Car Rental,ParAing,'I�oll,etc. Ai Cost
-Pcr Diem Currcnt GSA CONUS Ratc
Othcr outsidc Scrvices Cost+I 0%
Interest charged a�er 30 days from invoice da[e 1.5%per month
Acceptcd by:
Date:
' ll
Effective January 1,2011
GENERAL CONDITIONS
INVOICES
' Yeh and Associates,Inc.(Y&A)will submit progress invoices to client monthly and a final bill upon completion of the services.
Invoices will show charges for different personnel and expense classifications.A more detailetl separation of charges antl backup
data,such as timesheets and invoices,is available.Each invoice is due on presentation and is past-due thirty(30)days from invoice
date.Client agrees to pay a finance charge of one and one-half percent 1�-���al per month,or the maximum rale allowetl by law,on
past-due accounts. -
SAMPLES
All samples of soil and rock will be discarded thirty(30)days after report submitlal.Upon ClienPS written request and authorization,
samples will be deliveretl in accordance with ClienPS instmctions,or stored for an agreed charge.
RIGHT-OF-ENTRY �
Unless otherwise agreed,Client will furnish right-of-eniry for Y&A to make 6orings,surveys and/or exploralions.Y8A will take
reasonable precautions to reduce damage lo property.However,it is untlerstood by Clienl ihat in the normal course of work,some
damage may occur.
UTILITIES �
Y&A will request responsible utility owners to locate oft-site lines.Client agrees to be solely responsible for designaling the locations
ot all utility lines and subterranean stmcWres within the property lines of the projecL Y&A will not be liable for damage to
subterranean strucWres(pipes,tanks,conduits,wires,etc.)which are not correctly locatetl on or off the site.
JOB SITE
Client agrees that the construction contractor will be required by Client to assume sole antl complete responsibility forjob site
conditions during constmction of the project,including safety of persons and property.Clien�further agrees to indemnify and holtl
Y&A harmless from any and all liability in connection with the performance of work during construction of this project,excepting
liability arising directly from the negligence of Y&A.
Client agrees that Y&A shall not be responsible for the constmction contractor's means,methods,techniques,sequences or
procetlures,nor for the contractors failure to constmct the project in accordance with plans and specifications,applicable codes,
and/or with generally accepted construction practices.
REPORTS
Reporls,plans and other work prepared by Y&A remain the property of Y&A.Client agrees ihat all reports and other work furnished
to the Client and his agents not paid for will be retumed upon demand,and will not be used for licensing,permits,design andlor
conSlruCtion.
WARRANN
Y&A agrees in connection with services pertormed under Ihis AgreemeM that such services are performed with ihe care and skill
ortlinarily exercisetl by members of the protession practicing untler similar contlitions al the same time antl in[he same or similar
locality.No warranty,expressed or implied,is made or intended by rendition of consulting services or by fumishing oral or written
reports of ihe fndings made.
Client recognizes that subsurface conditions beneath the project site may vary from those encounteretl in borings,surveys or
explorations and that information and recommendalions developetl by Y8A are based solely on the information available to it.Any
exploratioq testing,surveys and analysis associated with the work will be performed by Y8A solely to fulfill the purpose of ihis
Service Agreement and Y8A is not responsible for interpretation by others of ihe information developetl.
Risk Allocation
Y&A's potential liability to Clienl and others is grossly disproportionale to Y8A's fee due to the size,scope and value of the project.
Therefore,unless Client and Y&A othervvise agree in writing in consideration for an increase in Y&A's fee,Client,including its
tlirectors,officers,partners,employees,agents,contractors and their respec�ive assigns.agree to limit Y&A's liability(whether
arising from contract,staWtory violation or tort)to$50,000. This limitation shall apply to all phases of Services peAormetl in
conneclion with this Project whether subsequent to or prior to the execution of this agreemenL In no event shall Y&A be liable for
consequential,incidental or special damages. �
DISPUTES
Should either party hereto bring suit in court to enforce any terms of this Agreement,it is agreed that the prevailing party shall be
entitled to recover his costs,expenses and reasonable attomeys'fees.
Acceptetl by:
Date:
' �/