Loading...
HomeMy WebLinkAboutpitkin.planning.264327300001 (2)DOCUMENT LAYOUT THIS FILE MAY OR MAY NOT CONTAIN ALL OF THE INFORMATION LISTED BELOW IN THE FOLLOWING ORDER Summary Sheet Resolution for the BOCC and/or P &Z Ordinance for the BOCC and/or P &Z Determination for the Hearing Officer Administrative Determination Staff Memo Application Public Notice, Acceptance Letter, Referral(s) Letter Site Plan Miscellaneous Plat copies (11117) CASE NAM Aspen Snow Storage Minor Amendment to a Development PROJADD Hwy62AspenSnowDumpExemption r OWN/APP:. City of Aspen ADRD— C /S /ZAAspen, C081611 .RER Jack Reid, City Streets Super ADR: 130 S. Galens St. C/S /Z:�Aspen, CO 81611 Email Addc ALLOCATED HO.- FEES DUE:I460 FEES RCVD:`4Gt % OVER REFERRALS Zoning, EH, CDOT Engineer, Land Management, Airport REF BYI DUE:r- -- wGDATE REV BODY PH NOTICED DATE OF FINAL ACTION: �— A�dmin •No BOCC Reso.: No .BOCC Ord: F- I vesting CLOSED: F 1/1012000 BY: TKT PLAT RECORDED_- - VR APPROVAL DATE; CASE TYRi„ Minor Amendmenttoa CASE TYM LA ,t I YYJ:1 CASE TYP4 File Location: Box #225 — PZ: HRG OFF: — ... HO INDEX: .. ADMIN: PLAT(BKPG): n/a ADMIN INDEX 1 VREXPIETY ✓elopment. CASETYP5: I- — I 7 _ CASETYP6: -- It' CASE TYP7,",f -- 99-50##438601 ..r DETERMINATION OF ADMINISTRATIVE APPROVAL BY THE COMMUNITY DEVELOPMENT DIRECTOR FOR THE CITY OF ASPEN MINOR AMENDMENT TO A SPECIAL REVIEW PERMIT Determination No. Admin. 99- �T- RECITALS 1. The City of Aspen requests approval for the continued use of a four (4) acre parcel located at Peapke Ranch immediately northwest of the Pitkin County Service Center as a snow and street sweeping dump site. 2. 11 - proposal requires administrative approval by the Community Development Director. 3. Staff has reviewed the request subject to the standards of the original approval contained within Pitkin County Resolution No. 93 -103 granted June 15, 1993 and Administrative Change to a Development Permit granted on August 20, 1997. NOW, THEREFORE, BE IT DETERMINED by the Pitkin County Community Development Director that BOCC Resolution No. 93 -103 (Attachment A) relating to the City of Aspen Snow Dump Site is hereby amended as follows: 1. Language within the Resolution shall be amended to include street sweep dumping (in addition to snow dumping) as an approved activity on the site. 2. Existing condition No. 7 shall be amended to read, "The operation of trucks on the site shall be limited to the hours of 12:00 (midnight) to 9:00 A.M. except in the case of unusual or emergency circumstances." 3. A new condition No. 23 shall be created to read, "Day hauling shall be permitted for a maximum of five trucks limited to the hours of 9:00 A.M. to 4:00 P.M." 4. Existing condition No. 8 shall be amended to read, "The City shall be responsible for maintenance of the site and all of the installations. The site should be kept free of standing water, trash and debris so that birds, rodents and other animals are not attracted to the area." 5. Existing condition No. 20 shall be amended to read, "The permit shall be issued indefinitely and may be revoked if at any time the City is found not operating in compliance with this approval." 6. Existing condition No. 22 shall be amended to read, "In the event that the property is no longer utilized for snow and/or street sweeping storage, the City of Aspen shall within one year after the cessation of snow and/or street sweep storage use, reclaim the property to a state similar to its natural state. Said reclamation shall include re- grading the site to eliminate the berms, providing adequate topsoil to support native vegetation (if adequate topsoil is not available in the berms) and re- establishing vegetation on the property. 000001 oTG0 43860111215/ 11IIIIII IIIIIIIITERIIIIIIIIIIIIIIIIII 1 of 2 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO 000002 7. A new condition No. 24 shall be created to read, "The City shall install nova -chip surface on Service Center Road as well as the snow dump entrance in the year 2000." 8. A new condition No. 25 shall be created to read, "The Applicant will provide sweeping and flushing services on service center road and the County Shop area upon request from the County." 9. A new condition No. 26 shall be created to read, "Each year the Applicant will provide a written notice to all contractors to strictly obey all traffic signs and to yield right -of -way to County and RFTA vehicles. Failure to comply will result in termination of their contract(s)." 10. A new condition No. 27 shall be created to read, "Any trash shall be collected and removed by the operator when material is dumped. No trash or debris shall be allowed to remain out overnight." 11. A new condition No. 28 shall be created to read, "If blowing trash and debris becomes a problem, the County reserves the right to require the City to fence the site at the City's cost. The County shall be sole determining authority of the need of fencing." 12. A new condition No. 29 shall be created to read, "The City shall be responsible for acquiring all Federal, State and local permits and approvals and shall comply with any and all conditions of such approvals." 13. A new condition No. 30 shall be created to read, "The City shall develop a site for dumping of the street sweeper in the NW comer of the site. The site shall be kept to the minimum size necessary for this operation. 14. A new condition No. 31 shall be created to read, "The City shall not knowingly dump or unload any hazardous material. Should any such material be brought to the site, the City shall remove such material immediately and in such a manner as required by law, and at its sole cost." 15. A new condition No. 32 shall be created to read, "The City shall extend electric power towards the west part of the site in order to provide a more efficient storage area for city equipment." 16. A new condition No. 33 shall be created to read, "The County has the right to terminate this agreement given a one (1) year prior notice to the City." APPROVED this Zc day of 6e-cP, ..1Q, ✓ '1999. C W Cindy Houben Community Development Director �p v- ��3 -0c ccI IG1 -C19 I111111illll111111MEIIIIIIN1111111III HIM 11111111 438601 12/18/1999 12:33P DETERMIN DAVIS SILVI 2 of 2 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO 000003 MEMORANDUM To: Brian Pettet. From: Street Department. Date: 11/7/2005 Subject: Snow Dump Soil Testing. Brian: This is the results of the soil testing at the City of Aspen snow dump / sweeper dump site that was asked for by Pitken County. Attached is a rough map of where the three test sites were and the depth the samples were taken at. 1SDS, site sample is in the street sweeper dump area. 2SDS sample site is in the snow dump area 127 feet from the concrete delineators' going back toward the new road entrance. 3SDS sample site is 74 feet from the new snow dump road entrance going west toward the street sweeper dumping site. We will schedule and deliver too Pitken County the soil sampling results of this snow /sweeper dump site per our agreement terms with the Pitken County / City of Aspen snow dump contract. Thanks Brian. soil testing memo .DOC . j'ju004 m ADA �a Laboratories, Ir Steamboat SOrinUS. CO 80487 Report to: Jerry Nye City of Aspen 130 S. Galena St Aspen, CO 81611 cc: Ed Sadler Project ID: 13764 ACZ Project ID: L53727 Jerry Nye: November 04, 2005 Bill to: Jerry Nye City of Aspen 130 S. Galena St Aspen, CO 81611 Enclosed are the analytical results for sample(s) submitted to ACZ Laboratories, Inc. (ACZ) on October 13, 2005. This project has been assigned to ACZ's project number, L53727. Please reference this number in all future inquiries. All analyses were performed according to ACZ's Quality Assurance Plan, version 11.0. The enclosed results relate only to the samples received under 1-53727. Each section of this report has been reviewed and approved by the appropriate Laboratory Supervisor, or a qualified substitute. Except as noted, the test results for the methods and parameters listed on ACZ's current NELAC certificate letter ( #ACZ) meet all requirements of NELAC. This report shall be used or copied only in its entirety. ACZ is not responsible for the consequences arising from the use of a partial report. All samples and sub - samples associated with this project will be disposed of after December 04, 2005. If the samples are determined to be hazardous, additional charges apply for disposal (typically less than $10 /sample). If you would like the samples to be held longer than ACZ's stated policy or to be returned, please contact your Project Manager or Customer Service Representative for further details and associated costs. ACZ retains analytical reports for five years. If you have any questions or other needs, please contact your Project Manager. 04/Nov /05 Tony Antalek, Project Manager, has reviewed and approved this report in its entirety. ACCpR a x 4EPAD.01.06.05 01 L53727 Page 1 of 16 000005 AGZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334 -5493 City of Aspen ACZ Sample ID: L53727 -01 Project ID: 13764 Date Sampled: 10112105 8:47 Sample ID: 1SDS 2' Date Received: 10113105 Locator: Sample Matrix: Soil Analysis Method: M8015B GCIFID Extract Method: M3550 Compound TPH C10 to C28 Surrogate Recoveries OTP Analyst: mss Extract Date: 10126105 10:30 Analysis Date: 10131105 12:35 Dilution Factor: 33.08 000084 -15 -1 868 U mgXg 3 20 70 125 REPOR.02 06.05.01 r' O U '\ 06 L53727' Page 2 of 16 ADZ Laboratories, Inc. 177o n. ... e e.,d— rn onno7 ionn1 ovn_�nno City of Aspen ACZ Sample ID: L53727 -02 Project ID: 13764 Date Sampled: 10112105 8 :47 Sample ID: 1SDS 3' Date Received: 10113105 Locator: Sample Matrix: Soil Analysis Method: M8015B GC /FID Extract Method: M3550 Compound TPH C10 to C28 Surrogate Recoveries OTP Analyst: mss Extract Date: 10126105 10:30 Analysis Date: 10131105 14:34 Dilution Factor: 33.29 U mg /Kg 3 20 000084 -15 -1 884 % 70 125 REPOR 02.06 05 01 J 0 0 0 O7 L53727: Page 3 of 16 ADZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334 -5493 City of Aspen Project ID: 13764 Sample ID: 1SDS 5' Locator: Analysis Method: M8015B GC /FID Extract Method: M3550 Compound TPH C10 to C28 Surrogate Recoveries OTP 6 REPQOR.02.06.05.01 (`' U U0OOv ACZ Sample ID: L53727 -03 Date Sampled: 101121058:47 Date Received: 10113105 Sample Matrix: Soil Analyst: mss Extract Date: 10126105 10:30 Analysis Date: 10131105 15:14 Dilution Factor: 33.33 6 J mg /Kg 3 20 000064 -15 -1 887 % 70 125 L53727: Page 4 of 16 ADZ Laboratories, Inc. 1771 /lnuin A�II Il i��in ClnnmAnnl Cn�in.�n (`!1 O/IAO7 /4/1/11 'J'JA CAr1'J City of Aspen ACZ Sample ID: L53727 -04 Project ID: 13764 Date Sampled: 101121059:07 Sample ID: 2SDS 2' Date Received: 10113105 Locator: Sample Matrix: Soil Analysis Method: M8015B GCIFID Extract Method: M3550 Compound TPH C10 to C28 Surrogate Recoveries OTP Analyst: mss Extract Date: 10126105 10:30 Analysis Date: 10131105 15:53 Dilution Factor: 33.19 u mg /Kg 3 20 000084 -15 -1 849 70 125 REPOR.02.06.05.01 L53727: Page 5 of 16 OOUtIa � ACZ Laboratories, Inc. 777111.......A.,. II...... C........ M..... C...: --- 11 .n...7 1./11'J A C1I( City of Aspen ACZ Sample ID: L53727 -05 Project ID: 13764 Date Sampled: 10112105 9:07 Sample ID: 2SDS 3' Date Received: 10113105 Locator: Sample Matrix: Soil Analysis Method. M8015B GCIFID Extract Method: M3550 Compound TPH CIO to C28 Surrogate Recoveries OTP Analyst: mss Extract Date: 10/26/05 10:30 Analysis Date: 10131105 17:12 Dilution Factor: 33.09 U mg /Kg 3 20 000084 -15 -1 807 % 70 125 U 1- REPOR.02.06 05 01 U U 0 A L53727: Page 6 of 16 o ACZ Laboratories, Inc. City of Aspen ACZ Sample ID: L53727 -06 Project ID: 13764 Date Sampled: 10112105 9:07 Sample ID: 2SDS 5' Date Received: 10113105 Locator: Sample Matrix: Soil Analysis Method: M8015B GC /FID Extract Method: M3550 Compound TPH C10 to C28 Surrogate Recoveries OTP REPOR.02.06.05.01 OOt;OJ -1 Analyst: mss Extract Date: 10126105 10:30 Analysis Date: 10131105 17.52 Dilution Factor: 33.2 u mg/Kg 3 20 000084 -15 -1 85 % 70 125 L53727: Page 7 of t6 ADZ Laboratories, Inc. ....�., c—; --- 11 RnARV /RMI Tld -SAoQ City of Aspen ACZ Sample ID: L53727 -07 Project ID: 13764 Date Sampled: 10112105 9:45 Sample ID: 3SDS 2' Date Received: 10113105 Locator: Sample Matrix: Soil Analysis Method: M8015B GCIFID Extract Method: M3550 Compound TPH C70 to C28 Surrogate Recoveries OTP 000084 -15 -1 6 Analyst: mss Extract Date: 10126105 10:30 Analysis Date: 10131105 18:32 Dilution Factor: 32.89 J mg/Kg 3 20 853 70 125 REPOR.02.06.05 01 L53727: Page 8 of 16 OOuO12 ACZ Laboratories, Inc. o-- r. ..... ...0 n,...., c ............... c...:...... rn 101 ffl 11w_Fw07 City of Aspen ACZ Sample ID: L53727 -08 Project ID: 13764 Date Sampled: 10112105 9:45 Sample ID: 3SDS 3' Date Received: 10113105 Locator: Sample Matrix: Soil Analysis Method: M8015B GC /FID Extract Method: M355O Compound TPH C10 to C28 Surrogate Recoveries OTP Analyst: mss Extract Date: 10126105 10:30 Analysis Date: 10131105 19:12 Dilution Factor: 33.03 4 J mg /Kg 3 20 000084 -15 -1 73 70 125 REPOR 02 06 05.01 L53727: Page 9 of 16 Oi1U013 AGZ Laboratories, Inc. 2773 Downhill Drive Steamboat Spnngs, CO 80487 (800) 334 -5493 City of Aspen ACZ Sample ID: L53727 -09 Project ID: 13764 Date Sampled: 10112105 9:45 Sample ID: 3SDS 5' Date Received: 10113105 Locator: Sample Matrix: Soil Analysis Method: M8015B GCIFID Extract Method: M3550 Compound TPH C10 to C28 Surrogate Recoveries OTP Analyst: mss Extract Date: 10126105 10:30 Analysis Date: 10131105 19:52 Dilution Factor: 33.17 U mg /Kg 3 20 000084 -15 -1 73 70 125 REPOR 02.06.05 01 L53727: Page 10 of 16 0OU014 Laboratories, Inc. Blanks Verifies that there is no or minimal contamination in the prep method procedure. Control Samples Verifies the accuracy of the method, including the prep procedure. Duplicates Verifies the precision of the instrument and /or method. Spikes /Fortified Matrix Determines sample matrix interferences, if any. B Analyte detected In daily blank H Analysis exceeded method hold lime. J Analyte concentration detected at a value between MDL and PQL R Poor spike recovery accepted because the other spike in the set fell within the given limits T High Relative Percent Difference (RPD) accepted because sample concentrations are less than 10x the MDL. U Analyte was analyzed for but not detected at the indicated MDL V High blank data accepted because sample concentration is 10 times higher than blank concentration W Poor recovery for Silver quality control Is accepted because Silver often precipitates with Chloride. X Quality contreol sample is out of control. Z Poor spike recovery is accepted because sample concentration is four times greater than spike concentration P Analyte concentration differs from second detector by more than 40%. E Analyte concentration is estimated due to result exceeding calibration range. M Analyte concentration Is estimated due to matrix Interferences. L53727. Page 11 of 16 L) uv015 AraZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334 -5493 City of Aspen ACZ Project ID: L53727 All No extended qualifiers associated with this analysis REPAD.15.06.05.01 DOU016 L53727: Page 12 of 16 ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334 -5493 City of Aspen ACZ Project ID: L53727 �. _� 51 rT d r........a .,...... No certification qualifiers associated with this analysi< REPAD.05.06.05.01 10- -00017 L53727: Page 13 of 16 ADZ Laboratories, Inc. 2773 Downhill Dnve Steamboat Springs, CO 80487 (800) 334 -5493 City of Aspen ACZ Project ID: L53727 13764 Date Received: 10/13/2005 Received By: Date Printed: 10/13/2005 1) Does this project require special handling procedures such as CLIP protocol? 2) Are the custody seals on the cooler intact? 3) Are the custody seals on the sample containers intact? 4) Is there a Chain of Custody or other directive shipping papers present? 5) Is the Chain of Custody complete? 6) Is the Chain of Custody in agreement with the samples received? 7) Is there enough sample for all requested analyses? 8) Are all samples within holding times for requested analyses? 9) Were all sample containers received intact? 10) Are the temperature blanks present? 11) Are the trip blanks (VOA and /or Cyanide) present? 12) Are samples requiring no headspace, headspace free? 13) Do the samples that require a Foreign Soils Permit have one? The Chain of Custody was not reliquished. COC HAS NOT BEEN RELINQUISHED. YES NO NA A message was left with JERRY NYE on 10/13/2005. A MESSAGE WAS LEFT WITH CLIENT AS TO WHAT ACTION TO TAKE. Cooler Id Temp ( °C) Rad (pRlhr) 203 109 15 REPAD.03 11 00 01 Client must contact ACZ Protect Manager if analysis should not proceed for samples received outside of thermal preservation acceptance criteria. UO f .018 L53727- Page 14 of 16 ACZ Laboratories, Inc. 2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334 -5493 City of Aspen ACZ Project ID: L53727 13764 Date Received: 10/13/2005 Received By: SAMPLE CLIENT ID R <2 G <2 Y <2 YG<2 B <2 BG <2 O<2 T >12 P >12 N/A RAD L53727 -01 1 SIDS 2' pH must be <2 G Filtered /Nitric GREEN pH must be < 2 O Raw /Sulfuric ORANGE pH must be < 2 x Raw /NaOH L53727 -02 1SDS 3' T Raw /NaOH Zinc Acetate TAN pH must be> 12 Y Raw /Sulfuric YELLOW pH must be <2 YG x YELLOW GLASS L53727 -03 1SDS 5' No preservative needed Not applicable RAID Gamma /Beta dose rate Not applicable must be < 250 pR/hr x L53727 -04 2SDS 2' x L53727 -05 2SDS 3' x L53727 -06 2SDS 5' x L5 3727 -07 SDS 2' x L53727 -08 3SDS 3' x L53727 -09 13SDS 5' x Abbreviation Description Container Type Preservative /Limits R Raw /Nitric RED pH must be < 2 B Filtered /Sulfuric BLUE pH must be < 2 BG Filtered /Sulfuric BLUE GLASS pH must be <2 G Filtered /Nitric GREEN pH must be < 2 O Raw /Sulfuric ORANGE pH must be < 2 P Raw /NaOH PURPLE pH must be > 12 T Raw /NaOH Zinc Acetate TAN pH must be> 12 Y Raw /Sulfuric YELLOW pH must be <2 YG Raw /Sulfuric YELLOW GLASS pH must be < 2 NIA No preservative needed Not applicable RAID Gamma /Beta dose rate Not applicable must be < 250 pR/hr REPAID 03 11.00.01 L53727: Page 15 of 16 UOis019 10/14/2005 06:47 i7JIML177n1M Laboratories, Inc. If asmple(p racalved past holding tirm (H'f), or it InwtgdaM NT remains to oemplah anaiyate before expiration, WWI ACZ pronxd with "saNd short HT 011*80e? ) f" NO" thenACZwIgoomaot silent for further InstructIOM IfnsIthw"YES "not "ND" J V a .,7= n, ,.,_,n 4- -lm- &.ITF9If I I I I can YES NO tdeh4 SW (sorbs. vrrw> • ow (Gm rd we" - ww 0Wj ward - pw toma,q waror) - eL (81000) - 80 ("1) • a (00) • MW (410"M 0M, orsa G,5s 64Ay sgA1 roca)vacs FRMAD050.09.05.02 Whits+ Return with sample. Yollow- Rataln for your records. 0 0 �10224 -2005 06:42 9708791012 PA L53727: Page 16 of 16 M Airi v,,,vr 13W22 08/26/93 13,36 Roc 9.00 BK 7= P8 311 tL Silvia Davts, Pitkin Cnty Clerk, Doc 9.00 -j h REBOLDTZON OP TIE BOARD or COMM COMMOSIONLES 33 OP PISEZR COUNTY, CoLopJ.DO, GRASTr" gpECZAL REVZES, "• SODDIVIOZON Ma'"TION AND GXQB E1210'fION APPROVAL Put TIE POIIR ACRE SNON STORAGE SITE POR THE CM OF AspEy ` Resolution No. 90- RECITALS 1. Tie Board of County Commissioners of Pitkin County �• (hereinafter "Board") has reviewed the request by the City of Aspen 'f > (hereinafter "Applicant`) for Special Review Permit, Subdivision :! I ideemption, and GMQS Exemption for real property within Pitkin + County. pp ix• 2. The subject p. Operty has also received rezoning approval from cy,` ( the Board as evidenced by Ordinance number 90 - 09. ' '• , j 3. The properly is part of the Paepke Ranch, which he County is 1 currently under contract to purchase from the heirs of Paepke d f Estate. The four acre site is located immediately northwest of the - Pitkin County Service Center :.+ ♦. The property is to be accessed off of Highway 92 via an 2 Pnsement over the existing driveway that severs the Pitkin County 5- -:ice Center and the Roaring Fork Transit Agency MrTA). 3 5. The Pitkin Co my Planninc and Zoning COmmissicn reviewed th ± quest at a regularly scheduled meetine Or. No ~ : applicant's r� 17, 1992 and found it to be generally consistent with the Pitk�n r` County Land Use Code and recommended approval to the Board with 'r •• ` ' conditions. k i 6. The Board of County Commissioners of Pitkin County, r ^viewed the applicant's request at a public meeting on Atril :1, 1992 at f(;; which time testimony and evidence was offered by the plicant and the nubli ^. ) y , Noe, - MEPORE, BE IT RESOLVED by the Board of County Commissioners that it does hereby grant Spedial Review, Subdivision Exemption, and GMQe Exemption al proval for the City of Aspen Snow !J Storage Fite subject to the following conditions: 1 t 1 1. No iaorovsments shall be allowed on the site until the property has been conveyed to the County. - 2. The applicant shall provide a SuLlivision Exemption Plat prior !� j jto issuance of a grading permit for the property. 1 1. A detailed gradin g plan, showing mitigation s for I I ' t minimizing erosion during constrvatton, shall be reviewed s evieved erd i approved by the County Engineer prier to issuance of a grading r I ' i -• 000021 I 4~ I 1 i I UC O T922 .I i 1:lL.Yd,��Y• �� w e360e32 oe/ "" "' � w a.:"! "via Davis, P3 i3l G!" e•00 RK 722 Pg •. ltkln y Clerk. J12 Doc e•00 • 4p� 0SOlUtion if 93 _ /6; �•• Page 2 __ .':r•, ' . Permit. "•- a• The County shall maintain "•' -' r;a northeast a 30-f side of the subject °Ot vide easement along access to the cite for g the remainder of h purpose° of The ° °cement shall the Paepke Airport Ranch providing be .+;• t•• $' Plat, recorded on the Subdivision y• Hl °mption•• ' s• Snow stored on the ■ garbage, The ■!L shall be generel'y ;`.. shall free remove silts hell be Policed for denris end end oil stained r) scraped to 30118 every spring. The berms •� proposed for in height and the site shall be designed form in to undulated natural land order to blend with the surrounding minimum The height necessacrm3. of LAe snow ry to screen the pines shall be the Piles. Final dumping �. 1' activities and reviewed grading Plans for Planning Office permit. shall be Prior to o issue ncee of a grading ` 7• The o • P ration of hours trucks on the site ■M! to the of emergency AM ncylcircumstances. except in the easlimited unusual or 8. if observed Operation results is any at ardinq attract i -3l eater which is sl!minatedtas xped t birds, the standing water expeditiously shall y as possible. be 9• Should the City• s hauling en ell flier operation with Count be Sound retain the right Y or RF:A activities, to seriously g to restrict or e•eee the County shall time until a remedy for thn eonrllct °pound Sone At 1 - can ba Any i0. The applicant Shall I be re Of planned Improvements °U'red to pay a Portion of the coat to the frontage of Richway 92, in S i when rcaC on �h�t� pp`'cant *pall be based °Vements are made. Thecost ito total .rips on thud On the estimated proportional proposed °now ontaes storage Operation. fcad generated by the 1 13. The aPPlicent shall be required to ebtaia from .he color,de b. y an •rtmant If commencing snow storage on es` Pr Prior to operations on site.l 12, The applicant shall be re any necessary Improvements for the ° ist;l Part-,'c-'Pate in improvements existin Paying for �f1• 'hall be Said conducted to determined by L1a Pavement avem Analysis Analysis in the spring of 13. NO vehicle or equipment store Q ° those necessary for ' or ectivStles 1•� the other snow storage operation shall be i4 � I 00 Q 02 •360432 06.26/93 13s36 Rec 1.00 SK T2a^ PG 313 Silvia Davis, Pitkin Cnty Cle,­k, Doc S.00 Resolution 1 93 - M3 Page 3 Allowed on the site. 14. The amlic&nt shall be allowed to utilize water from the County's Public Works Facility for a period not to exceed two (2) years, unless an extension to this time to by both parties. limit is agreed 15. The applicant shall Pay any and all costs associated with' installing ano removing the drip irrigation system, including the installation and removal Of a meter at the point of connection to the County's watex line- The applicant shall reimburse the County on a monthly basis for all water used. 1 16- The applicant's operation shall be required to meet the regulations in the County's Noise Abatement Ordinance (Ord 092-06). Should any valid complaints regarding noise associated with the proposed snow storage operation be registered, the applicant shall be required to =itiqate the noise Or apply for a permit Pursuant to C,,dinance 92-06 section 17. 17. The applicant shall obtain a Colorado Department of Health Fugitive Dust Permit prior to issuance of a grading permit for the property. 13. The applicant site during a dust suppressant to the exposed soils on the d ring those months when there is na'snOld on the property. 19. The proposed use shall comply with applicable County, State, and Federal regulations. 20. The proposed use shall be reviewed by the Planning Commission if after the first season to evaluate the effectiveness of t1he t approved mitigation measures. The applicant shall be required to file a summary report annually thereafter in accordance vitl•& requirements for Special Review Permits. 21. The applicant shall abide by all material Mr9untst-A., from ftnaludl_nq the OntabIr SO, 1992 letter from VAvls,Harn Inc.) and at the Public meeting. 22. In the event that the property is no longer utilized for snow torage, the Applicant shall, within one year after t he ce cessation of the snow storage use, reclaim the property to a state similar to its existing shall condition. said reclamation inc�ljde regrading the site to e�iminate the berms, providing adequate topsoil to support M Zive vecetation (if adequate topsoil is not available in the berms) an reestablishing native vegetation on the property. I 00 Q 02 �a y A ,J �� ♦ .• .- tea', -� �" 1y /y, � �. � . - y, 2360432 08/26/93 13156 ROC i.00 BK 7= PS 314 Y A Dilvia Davis, Pitkin Cnty Clark, Doc 0.00 hsolntion / 93 - ` •'•i % Pags 4 ' yi . t „ y' v tae board or County Coueiseicnera et a regular sueting on Jvne iS, 1993. i .�..;, f 1011M 07 7IMS COL2:T L'Q^!S3lII011z21, Dill L/e�, Caa reaa t Date �f fd"j- 93\ JC"an:_e Jaass, Dtput7 Clerk a#d levorees Arno LD As To CC1T=Ti AM. Onm as TO YMS ana .line 7COaep+y., T G R7, taut, C016ty Planning Diraetor County Attorns ssao.DOnc. anoWmp � i V ti. 1 ' C -�k i UOJ24 �s .. ., w e.�' ♦ r A .. Y MEMORANDUM DATE: November 3, 1999 TO: Cindy Houben, Community Development Director FROM: Brian McNellis, Planner SUBJECT: City of Aspen Snow Storage Site REQUEST: The applicant requests administrative approval for Minor Amendment of a Special Use Permit to Resolution No. 93 -103 APPLICANT: City of Aspen REPRESENTATIVE: Jack Reid, City Streets Superintendent LOCATION: A four (4) acre parcel located at Peapke Ranch immediately northwest of the Pitkin County Service Center. PROCEDURE/PROCESS: Administrative Review BACKGROUND/DESCRIPTION OF PROPOSAL: On June 15, 1993, the BOCC granted Special Review approval to the City of Aspen for utilization of a four (4) acre parcel in Pitkin County for snow dumping purposes. On August 20, 1997 an Administrative Change to a Development Permit was granted for temporary use of the snow dump for street sweeper dumping as well. Since the approval for street sweep dumping expired June 15th, 1998 the new amendment should include street sweeper dumping as an approval of the original resolution. STAFF ANALYSIS OF THE PROPOSAL: The City of Aspen has operated in compliance with the conditions of the original approval specified in Resolution No. 93- 103 approved August 23, 1993 and the Changes to a Development Permit approved August 20, 1997. RECOMMENDATIONS AND CONDITIONS OF APPROVAL: Staff recommends approval of the requested Special Review Permit and recommends continued use of the subject property indefinitely as a snow and road sweeper dump based on compliance with the previous approvals and future compliance with all conditions. This approval is subject to the conditions in the attached Administrative Approval Document. ohj'25 MEMORANDUM TO: Lance Clark, Deputy Community Development Director FROM: Lee Cassin, City Environmental Health Director � < C DATE: January 31,1999 RE: Extension of Temporary Use for Street Sweeping Staging Area The City of Aspen would like to apply for approval to extend the use of the street sweeping dirt staging area. The City requests an administrative approval of continued use of the site, based on our environmental investigation (see attached memo). As you know, small piles of street cleaning dirt are stored temporarily at this site until once or twice a week, the material is taken to the county landfill. This reduces VMT and air pollution since each time the sweeper is full, it does not have to drive all the way to the landfill. I have investigated the soil characteristics of the area, looked at the site design, conferred with several other states about their guidelines for (permanent) storage of this material, and found the locations of surrounding wells. The site is ideal since it is more than the recommended distance from the river, and it is also provided with a berm between the site and river. There are no close wells, the soil percolation rate is not extremely fast, and the material is quite dry in the winter when it would be expected to contain more MgC12- Many other states and communities use this material for fill, for cover, or re -use it the next year. The City of Aspen is investigating the possibility of developing a long -term solution of recycling the material, but that process is some time in the future. I have visited the site with Tom Dunlop, and you may want to confirm with him the characterization of this site as by far the most environmentally benign location that has been found for temporary storage of this material. I would recommend the following conditions for use of the street cleaning dirt area. • The site shall be kept to the minimum size necessary for this operation. • (When I visited the site, there was no trash whatsoever, but to cover that possibility): Any trash shall be collected and removed by the operator when material is dumped. • The City shall be responsible for maintaining the site and shall prevent the existence of any trash or debris that would attract animals or rodents. • This approval should not have an expiration date. • There would not be a limit to the hours the street - cleaning trucks can use the site, because in winter, street cleaning usually must occur during the day when it has warmed up. • If you feel a truck speed limit would be helpful, that would be acceptable, although I believe the street cleaning trucks cannot go very fast. Administrative Sign -off, Pitkin County Community Development Department 0OL026 r MEMORANDUM TO: Amy Margerum, City Manager FROM: Lee Cassin, City Environmental Health Director `75 < (:�L_ DATE: January 6, 1999 RE: . Disposal of Street Cleaning Dirt ENVIRONMENTAL HEALTH DEPARTMENT SUMMARY: The City of Aspen needs to find a long -term solution to the issue of interim storage of road sand sweepings before the material is periodically taken to the county landfill. This memo discusses information about the environmental safety of continuing to stage the material at the County Snow Dump Site. The City Engineer is also researching the possibility of developing a patented method for recycling the material as a long -term alternative to landfilling it. BACKGROUND: The City of Aspen applied to Pitkin County for permission to temporarily store dirt from street cleaning operations at the snow dump site. The material is taken to this site as it is collected and when there is a dump truck load, it is taken to the landfill. This is done approximately once /wegk. So this site is not the permanent repository for the dirt, but a place to store small amounts until it is taken to the dump. Using this site was approved for six months, and this time has expired. A decision should be made about whether we can store the material there without risk of significant environmental impact. If so, we could ask the county for the ability to continue using the site. If not, another alternative should be found quickly. DISCUSSION: I have contacted the departments of transportation of all the snowbelt states, and the federal transportation department as well, to learn what guidelines they have for disposal of this material. It should be kept in mind that this site is not for disposal, but for temporarily storing small amounts of dirt until they can be taken to the landfill. Other state guidelines: The states of Connecticut and Rhode Island both have comprehensive sets of guidelines, geared to preventing damage to wetlands, silting of surface waters, and impacts on potable water supplies. For Connecticut, these include careful selection of the disposal site considering distance to wells, wetlands, and rivers. They recommend using an open field where any drainage would flow through grass or native vegetation. The site should not be within 100 ft. of any river, 100 feet of a private well, within 250' of a public water supply well, or below the seasonal groundwater level. They recommend limiting disposal to less than 100 cu yards "unless the municipality maintains permanent records of any larger fill location ". I have obtained records of all of the permitted wells in the area from the Colorado Division of Water Resources. From the map I have, it appears that the site is 0.1 mile from the nearest well. The site is more than the required distance from the river and is not near the seasonal groundwater level. The amount gtnrPd at the site at anv one time is less than 10 cubic vards. UO�U27 130 SOUTH GALENA STREET - ASPEN, COLORAOo 81611 -1975 PHONE 970,929 507E FAX 9i 0.920.5197 Primed.n Rx,W Paper The State of Connecticut recomriOds covering the material with 3" of t64 and stabilizing if necessary to prevent erosion. This is for permanent storage sites. The State of Connecticut also recommends using the material as aggregate, in certain gardening activities, as fill in composting sites, re -using it the following year after mixing with fresh sand, mixing with gravel for use under roads or parking lots, and spreading on lawns or wooded areas. The State of .Rhode Island recommends use of this material as landfill cover material, road base, backfill for publie works projects like culverts, and reusing the following year. They do not use it as fill in wetlands, near wellheads; or in residential yards or park playgrounds. The material can be used in an unrestricted "manner if it is first tested for lead, hydrocarbons, and other toxic compounds. Comments from other state agencies: Many state agencies felt that most of the salt will'already have washed out of the dirt"while it was on the roadway, and that the sweepings would not be considered harmful. Pennsylvania tries to use the material as fill and in road and other construction projects. Their feeling was that "it would be hard to imagine a whole lot.of " harmful' compounds that could leach from the piles and run off to cause problems with ground water or streams. They recommended making sure the site be above the floodplain. They suspect that the particle size will prevent much salt from being absorbed, and note that while there may be some magnesium in the dirt (as there is in. native dirt), the chloride is likely to be more mobile and not in the dirt. They recommend using the material under parking lots and roads, and would give it away and allow in residential areas except for concerns about liability. To verify its content in runoff, they suggested sampling the runoff. It would also be desirable to place this material in soils that have neither a very fast, not an extremely slow percolation "rate. (If too fast, the liquid will too quickly travel to possible groundwater. If too slow, the liquid could pool on the surface and be washed off by rainwater.) Fortunately, we do have some limited soil test data for this area, with percolation rates of around 20 minutes per inch. This is an intermediate perc rate that will allow some filtering of the effluent before it reaches any groundwater. In Vermont,.this material is used as fill. or cover, or is re =used the following year. They use sodium chloride (rock salt) instead of magnesium chloride. Site investigation: tion: The site has a natural berm between it and the river, since the storage area was dug into the ground. It would be impossible for material washing off of these piles to flow over the berm into the river. The site is in the middle of a flat, open, vegetated area that drains away from the river. In any case, any liquid at the site comes from snowmelt, rather than these dirt piles. (If enough stored snow melted fast enough, it could wash over the berm.) I intended to collect a sample of water that had washed off of the dirt piles, knowing that while this liquid could have higher concentrations of salts than would leave the site, testing it would provide an upper limit on the amount of salt in the piles. I was unable to collect a sample because there was not only no liquid running off of the piles, but there hadn't-been in the past, and the piles were completely dry. In fact, I thoughtI was in the wrong location and that the piles were compost the city or county was making. The " material.was a light and fluffy mixture of dirt and leaves. (In the summer, more water is used on-the streets and the dirt is much wetter. In the winter when.MgC12 is present on the roads; a minimal amount of water, if any, is used, and as a consequence the dirt is quite dry.) 0001028 Other implications of choice: From an air quality point of view, it would be better to dispose of or recycle the material closer to town, to avoid the exhaust and reentrained dust emissions from haul trucks going out to this site and then to the landfill. However, the snow dump site would be better from this point of view than taking'the material to the landfill each time. The city shop site is closer to the river, so would be a less desirable site than the present location from the point of view of proximity to water. There is obviously an environmental benefit to reusing the material as fill or cover, or in the following year's sanding. The City could 41so consider giving the material to the county or CDOT for their use the following year, mixed with new material. RECOMMENDATION: The City should look into the possibilities of reusing the material, so it will not. waste 'space in the landfill. However, until a process is developed and found to be feasible, a storage/ ' staging site is needed. Given the suitable soil, distance from the river and wells, dryness of the dirt, and relatively - harmless nature of the dirt, it appears that the current snow dump site is a much better alternative for storage than other sites farther away that would require greater trucking_ distances. It is also better than available'sites closer to town. The snow dump site appears to be ideally located and designed to isolate the site from the river. The street - cleaning dirt is so dry in the winter when MgC12 is used, that it is unlikely that salts leach out of it before it is taken to the landfill. I would encourage continued use of this site from an environmental point of view. I have also visited this site with Tom Dunlop, who felt that this location is "the most benign place for snow that we've ever found." UUu029 tJ O flyfaurCOOM a 11T x To: Cindy Houben, Community Development Director From: Bud Eylar Re: Administrative Change to a development permit; City of Aspen Snow Storage Facility-Temporary Use as Street Sweeping Dumping Area Dat . 8/2 1997 We recommend an administrative level sign -off for a condition to Resolutio 93 -103 allow the City to temporarily use the snow dump for street sweeper dumping. T ese are the conditions of approval we recommend: G • The City of Aspen shall be responsible for acquiring all Federal, State and local permits and approvals and shall comply with any and all conditions of such approvals. G� • The City shall develop a site for dumping in the street sweeper in the NW comer of the site. The site shall be kept to the minimum size necessary for this operation and shall be developed with an impervious surface for unloading the sweeper. The pad shall be build so that water is collected and drains to a drywell. • The material dumped from the sweeper shall be collected and placed into a wildlife proof container. All trash and debris shall be collected into the container no less that once a day and no trash or debris shall be allowed to remain out overnight. • If blowing trash and debris becomes a problem, the County reserves the right to require the City to fence the site at the City's cost. The County shall be the sole determining authority of the need for fencing. • The City shall be responsible for maintenance of the site and all of the installations. The site should be kept free of standing water, trash and debris so that birds rodents and other animals are not attracted to the area, causing either health or safety problems for the sin-rounding property owners. • June 15th, 1998, is the date by which all activities approved under this permit shall cease and all structures or significant construction shall be removed. It should be noted that any and all approvals and permits obtained from Federal, State and local local agencies shall be permitted for the date established and no longer. • The City shall not knowingly dump or unload any hazardous material. Should any such material be brought to the site, the City shall remove such material immediately and in such a manner as required by law, at its sole cost. Administrative sign -off Pitkin County Community Development Director 00CRO30 n 2a5 (per 4CA1C" ) WL lGC I•'F"r NO�" YEc —IovJ �d- MEMORANDUM To: Cindy Houben, Community Development Director From: Bud Eylar Re: Administrative Change to a development permit; City of Aspen Snow Storage Facility-Temporary Use as Street Sweeping Dumping Area Dat . 8/2 1997 _:c-'( ( CCI*- 11r, (Z-1n �,_ 41�n_ o,�� We recommend an administrative level sign -off for a condition to Resolutio 93 -103 allow the City to temporarily use the snow dump for street sweeper dumping. T ese are the conditions of approval we recommend: • The City of Aspen shall be responsible for acquiring all Federal, State and local permits and approvals and shall comply with any and all conditions of such approvals. • The City shall develop a site for dumping in the street sweeper in the NW corner of the site. The site shall be kept to the minimum size necessary for this operation and shall be developed with an impervious surface for unloading the sweeper. The pad shall be build so that water is collected and drains to a drywell. • The material dumped from the sweeper shall be collected and placed into a wildlife proof container. All trash and debris shall be collected into the container no less that once a day and no trash or debris shall be allowed to remain out overnight. • If blowing trash and debris becomes a problem, the County reserves the right to require the City to fence the site at the City's cost. The County shall be the sole determining authority of the need for fencing. • The City shall be responsible for maintenance of the site and all of the installations. The site should be kept free of standing water, trash and debris so that birds rodents and other animals are not attracted to the area, causing either health or safety problems for the surrounding property owners. • June 15th, 1998, is the date by which all activities approved under this permit shall cease and all structures or significant construction shall be removed. It should be noted that any and all approvals and permits obtained from Federal, State and local local agencies shall be permitted for the date established and no longer. • The City shall not knowingly dump or unload any hazardous material. Should any such material be brought to the site, the City shall remove such material immediately and in such a manner as required by law, at its sole cost. Administrative sign -off Pitkin County Community Development Director auj31 �u v CSI MEMORANDUM To: Cindy Houben From: Bud Eylar Date: 8/19/1997 Re: City of Aspen Snow Storage Facility - Temporary Use as Street Sweeping Dumping Area Cindy, We have reviewed and discussed the proposal for use of the area next to the County Shop and the Colorado Department of Transportation Maintenance Facility and have come up with the following list of conditions: • The City of Aspen shall be responsible for acquiring all Federal, State and local permits and approvals and shall comply with any and all conditions of such approvals. • The City shall develop a site for dumping in the street sweeper in the NW corner of the site. The site shall be kept to the minimum size necessary for this operation and shall be developed with an impervious surface for unloading the sweeper. The pad shall be build so that water is collected and drains to a drywell. • The material dumped from the sweeper shall be collected and placed into a wildlife proof container. All trash and debris shall be collected into the container no less that once a day and no trash or debris shall be allowed to remain out overnight. • If blowing trash and debris becomes a problem, the County reserves the right to require the City to fence the site at the City's cost. The County shall be the sole determining authority of the need for fencing. • The City shall be responsible for maintenance of the site and all of the installations. The site should be kept free of standing water, trash and debris so that birds rodents and other animals are not attracted to the area, causing either health or safety problems for the surrounding property owners. • We should establish a specific date by which all activities approved under this permit shall cease and all structures or significant construction shall be removed. It should be noted that any and all approvals and permits obtained from Federal, State and local local agencies shall be permitted for the date established and no longer. • The City shall not knowingly dump or unload any hazardous material. Should any such material be brought to the site, the City shall remove such material immediately and in such a manner as required by law, at its sole cost. Cindy, you may also want to talk to John Ely and to Hilary Smith to get any conditions to indemnification, liability waivers, and insurance coverage's. iUvt332 DEPARTMENT OF HIGHWAYS 202 Centennial St. P.O. Box 1430 Glenwood Springs, Colorado 81602-1430 (303) 945 -7629 September 30, 1992 Land Use Planning Commission 130 South Galena Aspen, CO 81611 5TATE OF COLORADO a Re: Land for snow melting being aquired by the City of Aspen. Gentlemen: It is our understanding that a parcel of land is being purchased for the purpose of snow removal and melting. This parcel is approximately 4 acres and is located adjacent to our property on the west. If proper drainage and containment procedures are followed, I see no reason this should interfere with County or State functions or day to day routine business. The Colorado Department of Transportation does approve of this operation. J. Bryce Sanburg Hwy. Mtce. Supt. III A. L. Pierce r. Hwy. Mtce. Supv. xc: Sanburg/Drieth File, 0' 0 33 MEMORANDUM To: Stan Clauson From: Jack Reid Date: July 22 1997 Subject: City of Aspen Snow Storage Site There were 22 Special Conditions of approval. The following is a summary of the Special Conditions required by Pitkin County for the City's use of the Snow Storage Site. and the response to those conditions. 1 No Improvements were made to the site before the County owned it. 2 Subdivision Exemption Plat - Book 35, Page 85 3 A grading plan for construction was submitted prior to the work being done. A final grading plan, done by a licensed surveyor. is included with this packet, to show that the project drains as was intended. 4 The haul road into the project is along the* river side. allowing access through to -the Faepke property if needed. 5 The site is kept relatively clean of debris. It is graded after the snow melts and any trash or other debris is hauled to the landfill. 6 The berms meet the condition requirements. They meander and undulate and are the appropriate height and width. 7 The nighttime operation is kept to 10:00 to 07:00 whenever possible. We notify Brian Pettet whenever we need to run later. Now that we have a new blower, which loads trucks much faster, we are better able to keep within the time frame. OOsrU34 8 The site drains to the north west corner and standing water is kept to a minimum. 9 We have not found ourselves to be in conflict with RFTA of the County except on a few occasions. When that happened we were asked to cut the number of trucks to mitigate the conflict. Most of the time, we're finished before there would be a conflict. 10 N/A at this time. 11 We have a letter from CDOT Highway Maintenance Superintendent III (copy included) stating that our operation would not interfere with traffic regarding County of State functions, and approving the operation. 12 N/A at, this time. 13 The only things being stored at the site are boulders. There were many boulders generated when we excavated the site and at that time they were piled along the south fence next to the County Shop berm. Since then, Pitkin County, CDOT and we have had need of these boulders for various projects and we have kept an ongoing supply there for all of us to use. 14 We did use water from the County Shop. to get our vegetation started. 15 We paid for all the irrigation for our project and it has since been removed. 16 A copy of the Noise Monitoring is enclosed. This was done by the Aspen / Pitkin County Environmental Health Department. 17 A fugitive dust permit was obtained. 18 A dust suppressant is applied. The snow we haul to the site contains Magnesium Chloride, a dust suppressant, and more is added if needed. 19 The site complies with applicable County. State and Federal regulations. 20 This summary is for the annual review 21 All materials used in construction and revegetation are as stated in the application. 22 N/A at this time. 006035 ASPEN +PITKIN ENV 7NMENTAL HEALTH DEPA"MENT SOUND LEVEL MONITORING Location: Paepcke Property Date: 11/11/92 Noise Source Being Monitored: trucks dumping snow at proposed 'snow m It r site Sky: cloudy Wind Speed: 6 mph Temp: 15 F° Equipment: SLM Model: GR- 1565 -C Microphone: GR 1560 -2133 Calibrator: GR- 1562 -A SLM Calibration Date (Major): May 1992 Start -up Operation: SLM On: x Windscreen" x Battery Test: x "A" Scale Selection (Slow Response) x Calibration: 112 dB(A) Time: R ,.m_ Hz: 1nno Monitoring Range: 110 dB(A) To I 2 dB(A) Tripod Height: not used Angle of SLM to Ground: „/a Ambient Level: 43 dB(A) Readings: 250 feet from site (near RFTA build_ngs) Back up beeper: 112 truck only 50 dB(A) Tailgate banging: 60 dB(A) 012, = °3 and 0.4 Exceleration to raise truck bed: 50 dB(A) 011 and 013 52 dB(A) 012 51 dB(A) 114 Vibrator: 63 dB(A) trucks 111 and 77'2 (others did not have this equipment) Shut -down Operation: Ambient Level: 52 dB(A) Calibration: 112 dB(A) Time: 8:30 a.m. Hz: 1000 Battery 'Pest: Environmental Health Officer: Tom Dunlop and Barbara Umbreit A/P E.H.D. 6/80 (Location map on reverse side) OG, 036 130 S.. th Galena Sr,eat Aspen, Colorado H 16 19 MESSAGE DISPLAY TO Jack Reid CC Cindy Houben CC Lance Clarke CC Bud Eylar CC Joanna Schaffner From: Joanna Schaffner Postmark: Nov 04,96 2:10 PM Subject: C -DOT Access permit for snowdump site ------------------------- Message: C -DOT reserves the right the volume or use of the condition, we need either documentation from C -DOT and approved the changes Li'v i� j to re- review or update access permits when access is changed. So to address this a new access permit, or a letter or other which indicates that they have reviewed and will not require a new permit. PITKIN COUNTY PRE- APPLICATION CONFERENCE SUMMARY PLANNER: Lance Clarke DATE: November 5, 1996 PROJECT: City of Aspen Snow Storage Site PROJECT ADDRESS/PARCEL ID #: 2643 - 273 -00 -001 APPLICANT: City of Aspen REPRESENTATIVE: Jack Reid, City Streets Superintendent REPRESENTATIVE'S PHONE: 920 -5133 SUMMARY 1. Type of Application: Annual Review of Special Review Permit as provided in Land Use Code Section 3- 210.10. 2. Describe action /type of development being requested: Annual review of City of Aspen snow storage site special review permit. 3. Areas in which Applicant has been requested to respond, types of reports requested: Please submit a report to the Community Development Director addressing the conditions of approval listed in BOCC Reso. No 93 -103 and the conformance of the use with the conditions of the permit. Please include any requests for changes or adjustments to the conditions. Be certain to address boulder storage, hours of operation, and final grading plan. Include this pre - application summary sheet with application. Referrals will be to the County Engineer, Environmental Health, Zoning, Land Management, Airport, CDOT. 4. Review is before: Administrative, if report shows compliance and no changes to conditions are requested. BOCC review if there is noncompliance or changes are requested. 5. Public Hearing: Yes, if item is forwarded to BOCC. 000038 6. Number of copies of the application to be submitted: 24. 7. What fee was applicant requested to submit: None. Please call Lance Clarke at 920 -5452 if there are questions. preapps \sndmppre.doc 000039 Suzanne Konchan, 10:W AM 12/31/98, Re: City SnoVIDump I X- Sender: suzannek @commons.co.pitkin.co.us Date: Thu, 31 Dec 1998 10:08:21 -0700 To: lancec @co.pitkin.co.us, cindyh @co.pitkin From: Suzanne Konchan <suzannek @ci.aspen.co. Subject: Re: City Snow Dump Cc: Brianp @co.pitkin.co.us, stanb @co.pitkin. > Lance /Cindy: .co.us us> co.us, bude @co.pitkin.co.us Just so we all have the same information ..... I suggested to Amy two weeks ago the City HAD to formally file an amendment to the conditions of the original special review to amend the set hours of operation, I still think that was the right call. For all I know there may in fact be other condition violations that also need to be addressed. Moreover, I believe the safety /circulation issue will be triggered by that amendment, especially given the animal shelter proposal. The best solution will likely be a seperated access fox both the snow dump and animal shelter facilties. Perhaps a letter from com dev to Amy and Jack outlining the remaining for an amendment request, and the suggestion (if you agree) to process concurrently with the animal shelter, would be appropriate. suzanne X- Sender: brianp @pubwork >Date: Wed, 30 Dec 1998 16:22:13 -0700 >To: Suzanne Konchan <suzannek @ci.aspen.co.us> >From: Brian Pettet <brianp @ci.aspen.co.us> > Subject: Re: City Snow Dump need M' I it >No on both accounts. In fact, while I was gone during the last snow fall >Stan Hall had to "get out of the way of a hauling truck" in order to avoid >an accident on his way to lunch. No one had been contacted. >At 09:11 AM 12/31/98 -0700, you wrote: >>> Brian: >>Does Jack "mostly" abide by the time they >>can't? >>suzanne >>Date: Wed, 30 Dec 1998 16:11:47 -0700 >>>X- Sender: lancec @comdev restrictions and contact you when (MST) >To: Suzanne Konchan <suzannek @ci.aspen.co.us> >>>From: Lance Clarke <lancec @ci.aspen.co.us> >>>Subject: Re: City Snow Dump >>>Cc: Bude @co.pitkin.co.us, Joannas @co.pitkin.co.us Printed for Lance Clarke <lancec @co.pitkin.co.us> 1 •000.040 Suzanne Konchan, 10:(8 AM 12/31/98, Re: City Sno* Dump >>> Suzanne -I'll talk with others, but what I know now is" -There have been no >>>changes or modifications to 93 approval. -After much pushing Jack Reid wrote >>>a letter to Stan Clausen in July, 97, addressing his version of compliance >>>with conditions. - Regarding the limit to hours of operation, he said, "The >>>nighttime operation is kept to 10:00 to 7:00 whenever possible. We notify >>>Brian Pettet whenever we need to run later ". - Regarding conflict with county >>>or RFTA activities, he said, "We have not found ourselves to be in conflict >>>with RFTA or the County except on few occasions. When that hppened we were >>>asked to cut the number of trucks to mitigate the conflict ". -I'm not aware >>>of any County response to this July, 97 letter. We could get with Public >>>Works and revisit compliance with the whole set of conditions. LC >>>At 02:51 PM 12/30/98 -0700, you wrote: »» Dear All: >>>>I spoke with Amy Margerum about ten days ago about the animal shelter, and » »specifically the traffic safety concerns we had since the City has never >>>>complied with their hours of operation condition of special review. Amy was » »under what I believe is a misunderstanding that the condition had been » »modified and there was no longer a compliance issue. She had evidently been >>>>told by Jack Reid that everything was fine because he wrote the County a >>>>letter. Can anyone help clarify for me what communication with Jack has >>>>occurred, and in fact that the condition is still a violation as far as the » »special review is concerned. » »Amy was also a bit skeptical that their extended operation really created a >>>>traffic safety issue. I indicated we though it was, and sketched a quick » »site plan pointing out how CDOT, Pitco fleet, RFTA, the snowdump and the »» fuel farm converge in a less than ideal way. She suggested an independent Printed for Lance Clarke <lancec @co.pitkin.co.us> 2 GOuJ41 Suzanne Konchan, 10.0*"AM 12/31/98, Re: City SnoW-�bump » »traffic engineer verify or confirm if there was truly a problem. If they » »want to pay a consultant, fine by me. Another efficient way may be for Bud >>>>and Nick Adeh to review together, if they both agree professionally its a » »problem, then that may be enough. In the meantime, if the violation issue » »is still out there, I think the timing to address the frontage road we >>>>outlined at the animal shelter meeting might be then. In fact, if the >>>>animal shelter application is going forward timely, it might be most >>>>efficient to bring the P &Z then BOCC both the modification of snow dump »» conditions and the snow dump together for a joint review. >>>>Let me know your thoughts, or any factual corrections you might have. >>>>Suzanne 0OU042 Printed for Lance Clarke <lancec @co.pitkin.co.us> 3 Stan Berryman, 01:19``g4 1/14/99 Disposal of Stl'get Cleaning di X- Sender: stanb @pubwork Date: Thu, 14 Jan 1999 13:19:46 -0700 To: suzannek @co.pitkin.co.us, lancec @co.pitkin From: Stan Berryman <stanb @ci.aspen.co.us> Subject: Disposal of Street Cleaning dirt Cc: bude @co.pitkin.co.us, brianp @co.pitkin.co. co.us us, stanh @co.pitkin.co.us I think that Jack is embellishing the discussion he had with Bud and I. While we thought that the signage and letters were good ideas, neither of us told jack that these actions would meet all our concerns. Speed enforcement is probably not going to happen. We still think that the original hours of restrictions are valid. stanb >X- Sender: suzannek @commons.co.pitkin.co.us >Date: Wed, 13 Jan 1999 12:09:02 -0700 >To: cindyh @co.pitkin.co.us, stanb@co.pitkin.co.us >From: Suzanne Konchan <suzannek @ci.aspen.co.us> > Subject: Disposal of Street Cleaning dirt »CH /SB: >FYI. Stan, is it true that with slower speeds and a yeild sign, all of >Public Works safety concerns given the broader hours of snow dump operations >are met? That seems to be what Jack thinks. >sk >X- Sender: amym @commons >>Date: Wed, 13 Jan 1999 10:32:25 -0700 >>To: suzannek @ci.aspen.co.us >>From: Amy Margerum <amym @ci.aspen.co.us> >>Subject: Disposal of Street Cleaning dirt >>Just an FYI to let you know we are working them >>resolved. Thanks for bringing them to my >>>X- Sender: jackr @commons.ci.aspen.co.us >>>Date: Wed, 13 Jan 1999 07:58:11 -0700 >>>To: leec @ci.aspen.co.us >>>From: Jack Reid <jackr @ci.aspen.co.us> >>>Subject: Disposal of Street Cleaning dirt >>>Cc: amym @ci.aspen.co.us, randyr @ci.aspen. >>> bude @ci.aspen.co.us on these issues and getting attention! co.us, stanb @ci.aspen.co.us, Prin d_fo Lance Clarke <lancec @co.pitkin.co.us> 1 U' 4 Stan Berryman, 01:19`k 1/14/99 Disposal of Sti -'et Cleaning di >>>Lee, this is an excellent memo. The only area where I feel your suggestion >>>isn't feasable is the use of the stuff as recycled street sand or fill. It >>>is so silty that it won't compact, thus not acceptable for fill. Also, the >>>percentage of street sand in a given pile is quite low. Not worth the >>>money to reclaim it. It is mostly very fine street dirt /silt. I don't see >>>why the land fill couldn't use it for cover though. >>>I spoke with Stan Berryman and Bud Eylar together yesterday. I committed >>>to putting up a yield sign (I said stop, but I think yield is more >>>appropriate) where our trucks come out of the snow dump area, and sending a >>>letter to our truckers asking them to keep the speed down, and to yield to >>>any County vehicles in the area. Stan and Bud feel that speed is the only >>>real issue with our use of the facility. I agree and we'll do our best to >>>mitigate it. I've already spoken with my crew about it. >>>Please let me know what Cindy says, and we'll proceed as necessary. >>>Thanks- -Jack >>><JR> UUUU'4' 4 Printed £or Lance Clarke <lancec @co.pitkin.co.us> 2 Suzanne Konchan, 02:9w PM 2/2/99 -, Re: City Sno*� Dump X- Sender: suzannek @commons.co.pitkin.co.us Date: Tue, 02 Feb 1999 14:38:54 -0700 To: Stan Berryman <stanb @ci.aspen.co.us> From: Suzanne Konchan <suzannek @ci.aspen.co.us> Subject: Re: City Snow Dump Cc: lancec @co.pitkin.co.us, cindyh @co.pitkin.co.us Stan This does not alleviate the need for the BOCC to formally amend conditions. Your agreement with Jack can only be a recommendation to the BOCC. Nonetheless, if you are comfortable with these changes, great! What effect would the animal shelter have on the snow dump access in this location? suzanne At 01:28 PM 2/2/99 -0700, you wrote: >We at the County have met with Jack Reid regarding utilization of the City >Snow Dump and have agreed to the following: >1. Change the condition of operations for night hauling(22 trucks) from >midnight to 7:OOam to midnight to 9:OOam >2. Add day hauling for a maximum of five trucks from 9:OOam to 4:OOpm >3. Leave the provision in which provides for extended hours in the case of >emergencies >4. The City will install a yield sign at the exit of the snow dump and sign >service center road for 15 mph speeds. >5. The City will extend electric power to the west in order to provide a >more efficient and safer storage area for city equipment >6. The City will install a nova -chip surface on service center road and >continuing into the snow dump entrance in the year 2000 >7. The City will provide sweeping and flushing services on service center >road and the affected County shop area upon request from the County. >8. The City will provide written notice to all contractors to strictly obey >all traffic signs and yield right of way to County and RFTA vehicles. >Failure to comply will result in the termination of their contract(s) >We hope this resolves this issue >stanb >006045 (Printed for Lance Clarke <lancec @co.pitkin.co.us> 1 I_ Stan Berryman, 01:28`E 2/2/99 -, City Snow Dump X- Sender: stanb @pubwork Date: Tue, 02 Feb 1999 13:28:49 -0700 To: suzannek @co.pitkin.co.us, amym @co.pitkin.co.us, cindyh @co.pitkin.co.us, lancec @co.pitkin.co.us, randyr @co.pitkin.co.us, leec @co.pitkin.co.us From: Stan Berryman <stanb @ci.aspen.co.us> Subject: City Snow Dump Cc: jackr @co.pitkin.co.us, brianp @co.pitkin.co.us, bude @co.pitkin.co.us, stanh @co.pitkin.co.us We at the County have met with Jack Reid regarding utilization of the City Snow Dump and have agreed to the following: 1. Change the condition of operations for night hauling(22 trucks) from midnight to 7:00am to midnight to 9:00am 2. Add day hauling for a maximum of five trucks from 9:00am to 4:00pm 3. Leave the provision in which provides for extended hours in the case of emergencies 4. The City will install a yield sign at the exit of the snow dump and sign service center road for 15 mph speeds. 5. The City will extend electric power to the west in order to provide a more efficient and safer storage area for city equipment 6. The City will install a nova -chip surface on service center road and continuing into the snow dump entrance in the year 2000 7. The City will provide sweeping and flushing services on service center road and the affected County shop area upon request from the County. 8. The City will provide written notice to all contractors to strictly obey all traffic signs and yield right of way to County and RFTA vehicles. Failure to comply will result in the termination of their contract(s) We hope this resolves this issue stanb 000046 (Printed for Lance Clarke <lancec @co.pitkin.co.us> 1 Suzanne Ronchan, 12:--..r PM 2/10/99 , Re: snow dumpy dirt dump X- Sender: suzannek @commons.co.pitkin.co.us Date: Wed, 10 Feb 1999 12:57:58 -0700 To: Lance Clarke <lancec @ci.aspen.co.us> From: Suzanne Konchan <suzannek @ci.aspen.co.us> Subject: Re: snow dump /dirt dump You're the Hearing Officer..... your call. suzanne At 04:43 PM 2/9/99 -0700, you wrote: >It looks as if Jack Reid has come to agreement with Stan Berryman, et al on >snow dump.They are asking for update on dirt dump too (same location). I >don't believe there has been any problem with that. You mentioned to Stan >the need for application and BOCC approval. I'd be willing to go with >application and fee and admin approval under "minor amendment to development >permit" since all seem to be in agreement. Does that sound ok to you? 00U047 ted for Lance Clarke <lancec @co.pitkin.co.us> 1 Lee Cassin, 10:03 AM�s /20/99 , Re: street dirt craning site Date: Tue, 20 Apr 1999 10:03:43 -0600 (MDT) X- Sender: leec @comdev To: Lance Clarke < lancec @ci.aspen.co.us> From: Lee Cassin <leec @ci.aspen.co.us> Subject: Re: street dirt cleaning site linda chi, jack's admin assistant. she's been trying hard to get this taken care of but i think had the wrong impression that she didn't need to do anything. i think if you tell her the amount of the je and get her the application form to fill out, if she needs one, she'll take care of it. thanks, lance lee lee At 08:29 AM 4/20/99 -0600, you wrote: > Who's Linda? »X- Sender: lindach @commons >>Date: Tue, 20 Apr 1999 05:37:40 -0600 >>To: lancec @ci.aspen.co.us >>From: Linda Chi < lindach @ci.aspen.co.us> >>Subject: Re: street dirt cleaning site >>Lance, >> Please let me know the basics & I will try to get this taken care of. >>Thanks, >>L. >>>Date: Mon, 19 Apr 1999 15:00:38 -0600 (MDT) >>>X- Sender: leec @comdev >>>To: Lance Clarke <lancec @ci.aspen.co.us> >>>From: Lee Cassin <leec @ci.aspen.co.us> >>> Subject: Re: street dirt cleaning site >>>Cc: lindach @ci.aspen.co.us >>> lance, >>>you can tell I'm doing the once -a- quarter going thru my inbox. is this >>>possibly taken care of yet? thanks >>>lee >>>At 03:45 PM 2/17/99 -0700, you wrote: » »I wish I could cross it off my list! i've seen no JE Printed for Lance Clarke <lancec @co.pitkin.co.us> Linda Chi, 10:38 AM 10721/99, Re: snow dump permiT X- Sender: lindach @commons Date: Thu, 21 Oct 1999 10:38:55 -0400 To: Lee Cassin <leec @ci.aspen.co.us> From: Linda Chi <lindach @ci.aspen.co.us> Subject: Re: snow dump permit Lee, I called Pat in the finance Department. The check was cut May 19th in the amount of $460.00. She said the check has not cleared the bank yet. I have requested a copy. Once I have received the copy, I will forward a copy to you. L At 09:10 AM 10/21/99 -0600, you wrote: > Linda, >We're talking about 2 different checks, I think. I'm NOT talking about the >fine we had to pay to the state health dept. I'm taking about the fee we had >to pay to Pitkin County to process our application for a renewal of the snow >dump site permit. >thanks, Lee >At 08:01 AM 10/21/99 -0400, you wrote: >>Lee, >> The check is: dated 06/23/99, amount $2,000.00. number 014941. I >>sent it certified and the receipt is stamped with the name Joe R. Trevizo, >>Dept. of Health. I will send over a copy of everything. Let me know if you >>need anything else. >>L. >>At 04:54 PM 10/20/99 -0600, you wrote: >>>Linda, >>> Lance has never approved the application we submitted for the renewal of the >>>snow dump permit. As I recall, you did a check. I assume when it showed up >>>on the Planning Office's books, no one knew what it was for. Could you >>>possibly tell me the amount and date of the check. Then I can give that info >>>to Lance so he can make us legal. Here I've been telling everyone we already >>>accomplished this! >>> UOU047 Printed for Lee Cassin <leec @ci.aspen.co.us> 1 COMMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado 81611 (970) 920 -5090 Pitkin County Land Use: 172 Board of Adjustment 159 County land Use Code 173 Deposit y�0 174 Flat Fee 162 Zoning and Sign 169 Public Notice 160 Planning Enforcement Referral Fees: RB 115 Access Permit _ 179 County Clerk 193 County Engineer 194 Environmental Health 198 Housing 190 Land Management 196 Wildlife Officer Other Fees: 155 Building Fees: 170 Board of Appeals 135 Building Code Sales j 105 Building Permit 100 Contractor License 120 Electrical Permit 195 Energy Code Review 115 Mechanical Permit 150 Plan Check { 110 Plumbing Permit I 130 { Reinspection 151 I Aspen Sanitation f 152 AVFD Fire Marshal Other Fees: 155 Use Tax 165 Copy Performance Deposit 185 Park Dedication 186 Parking Cash in Lieu 166 CIS Maps IS CIS Requirements RB 116 Road Impact Fees TOTAL �L NAME: ADDRESS /PROJEGh': CHECK# CASE: 1 -1.T4: 1" IG TIAL: PIES: � DATE: (a �I 0 �_ INITIAL: i