HomeMy WebLinkAboutbocc.con.113.2013A Rev. 08-30-//jls COUNTY CLERK'S CONTRACT COVERSHEET CONTRACT #: 1 13-2013 A ORIGINATING DEPAI2TMCNT: Public Works Transportation PROCUREMENT OFFICER: Gerald Pielding PHONE #: -9205206 PROJECT NAME: Aspen Airport Business Center Road Improvement Prqject CONTRACTOR: Conerete Express, Inc. DOLLAR AMOUNT: $0.00 LINE ITEM# 1 10.5496200.87370 CONTRACT EXF,CUTION llATE: 4/29/2013 CONTRACT END DATE: 11/1/2013 AUTOMATIC RENEWAL: ❑ YES � NO TERM: ❑ [30CC AGENDA ITEM (Grants, IGA) ❑ STAPF AUTHORI7.ED SIGNATURE (Requires BOCC Signature) (Per Revised Procurement Code 7/2005) � OVER $50,000(Requires Section Leader& County Managers Signature) ✓ CHECK PROCUREMENT TYPE: ❑ None ❑ Informal � Formal ❑ Sole Source ❑ Emergency ❑ Outside Agency/State Qid ❑ Compliance with C.R.S. 8-17-5-101, 102 as amended (Immigration Form) ❑ Exempt ❑ Contract Renewal ✓ CHECKCONTRACTTYPE: ( ���� �� ❑ Services/Maintenance ❑ Employment ❑ License/Use ❑ Intergovernmenlal Agreement(Resolution Required) ❑ Lease ❑ Non-Profit � Construction ❑ Quasi-Public (e.g:AVH) ❑ Goods, Equipment, Supplies ❑ Grant Agreements(Notify Finance& Resolution Required) ❑ Other(e.g. revenue) � Change Order/Contract Amendment (C/O: 10%or$?�K whichevcr is Ihe lesser must have Counq�Manager signaiure) All Contracts should be proofed and all e�hibits and notices must be attached for the following: ✓ � No Pages Missing ✓� All Other Blanks Filled In ✓ � If Page Lefr Intentionally Blank—Note on Page ✓� All E�hibits Attached ✓ � Page numbered consecutively ✓� All Legal Descriptions attached (rfnpplrcable) ✓ � All Original Signatures Affi�ed ✓❑ Notice of Award/Notice to Proceed Attached ('f npplrcnble) ✓ � All Dates Filled In ✓❑ Warranty(if applicable) ✓ ❑ Special Instructions for Finance Department: ✓ � Authorized Procurement Officer's Name: Gerald Fielding BY CHECKING ABOVE ANU ENTERING NAME,THE AUTHORIZED STAFF PERSON INDICATES THAT THE ATTACHED DOCUMENT HAS BEEN PROOFED ANll READY FOR SCANNING. NOTE: CLERK'S OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHNES RETAINAGE SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST! Conhact#I 13-2013 Rev. 8.31.11 jaa/js Budget Line Item# 110.54.96200.87370 $�' � YN ���J�1 '�''� Ci�oC_V�' CHANGE ORDEI2/CONTRACT AMENDMENT Change Order Number: A OWNER: Pitkin County 76 Service Center Road Aspen, Colorado 81611 r - - - - - -, CONTRACTOR: t� �,, The Asuen Airport Business Center-RoaB�Improvement Proiect Contract (the "AgreemenY') dated April 23, 20]3 between the Board of County Corrimissioners of Pitkin',County (the "County") and Concrete Express, Ina (the "Contr`actor"), is hereby amended as follows: � Description of Change: li Addition of items: -•-• -- --- � - =-- - . _ . . • Hourly Equipment Rates to be used in contract revisions • Change in materials used o HDPE Pipe shall be substituded for the RCP call for in the contract • 50% of savings shall be reduced from the billing for pipe in place. This amount shall be equal to $5,596.50 � o Boulder Wall shall be substituted for Keystone Block Wall • Savings of$4,508.75 shall be reduced from the billing of the contract. o Plastic Detectable Waming Plates substituted for Cast Iron, Item 608-00100, Concrete Curb Ramp [w/metal detectable waming well] unit price shall change to $1433.81/ea. • Additional work and materials needed to complete work, not in the contract o Manhole risers ■ Manhole at�0+95 DP-01 (near river) $381.00 ■ Manhole at�O+DP-08 (near I-Ioly Cross Substation) $254.00 o Type D/C Inlet, changed from triple type C Iniet at 0+00 of DP-08. • Included are inlets, grouted boulder wall with 1.5-2' boulders for $874.02 on top of existing cost of 3 (ea) @ $3000.00. Tota1=3874A2 0 4 Foot Manhole added on the 300 road to collect both type R inlets and tie into main pipe on 500 Road - $2,191.20 Reason for Chanee • Hourly contract rates were not recorded with the original • HDPE was more economical to use ' • A vast amount of boulders are being produced via excavation on site, substituting for keystone saves both CEI and Pitkin County. • Plastic detectable waming plates are more economical than the cast iron Y��ent�on�lly �.,eft �la�k � , Rcv 12/27/IOjs Project Coding Original Contract # • Manhole risers were needed to amend the project as designed. Manhole shifts to fit field conditions largely drove those decisions • The triple type C inlet in the plans would not work with the size of pipe planned. A change in type was needed to accommodate other aspects of design. • The 4' manhole was added to avoid several utilities around the 300 and 400 road intersections Original Contract Price $ 3,120,000 Net Increase/Decrease in Contract Price(this change order) $ 0 *Total Adjusted Contract Price (including this change order) $ 3,120,000 All of these changes are to be rectified bv using the Minor Contract Revision line _ _ _ _ — V � This change order extends tlie time to complete work by 0 days. ". 2 .., ', _ -. h a �: �' �< r; .s ,`;.•�;u , ., �� In all other respects the :Agreement is in full��force and effect and remains unchanged by this Amendment. J n�; ".. `'.� .', ' JOSEPH M.O'DEA ° ���v�ce�siuerrr �/�`ti/10/3 o ._ . ._ . _ ._.._ _Dat��< ��4'/3 rocuremen O r �— Date . � Ir�ten�ionally �ef� ��a�k ry r •�y��: �Y/���'.I.C'� . � .;�?iaW����f� . � . .. c � r � 't: . .. �♦ ...y .,- ., .,�...� iC' _-5`: .� ` . `�ti'.�.•. , C , � . . " ` _. _ j . y r ,� � � 2013 CCl TIMG& EQUIP1Yi�NT RATGS i I TiME&MATERIAL I EQUIPMENT RENTAL SEC770N � KOMATSU WA420LOADER 4.SYARDS Q 5130.OD/HR � KOMATSU 1VA320LOADER 3.SYARDS rer $120.00/HR KOMATSU PC400 EXCAVATOR 3-4 YARDS �n $170.00/IiR i KOMATSU PC300 EXCAVATOR 2-3 YARDS �J 5150.0�/[-iR � KOMATSU PC200 EXCAVATOR I.5-2.0 YARDS Q 5130.00/HR � � KOMATSU PC2001VBREAKER �,nl 5215.00lHR KOMATSU DRESSER SHEEPSFOOT ROLLER (,nl $90.00/Hlt CAT DS DOZER W/G 14AY BLADE& SLOPEBOARD a 5130.00/HR CAT D6 DOZER �a 5130.001HR CAT 9G6 LOADER a SI70.00/HIi CAT 950LOADER 4.SYARDS Qn 5120.00/HR CAT ���93&LOADER. r,., 4YARDS � SI15,00/I-IR CAT � 627C SCRAPER °-" ' " "�- -�-.-_5250.00/HR CAT 623C SCRAPER Q 5150.00/HR CAT � 615 SCRAPER C �u140.00/FIR CAT ; 613CSCRAPER;�'.' �"`�,"'.�;;.ra��, .'�,� SI30.00/HR CAT 140G BLADE � `� � ���` ' `� ��'I��Q 5120.00 MR CAT ! 130G BLADE;�; � �.,� �,� '+:;.,Y �' @ S120A0(H[t CAT j 420RUBBERT[RED'HOE •. _ rLil SI00.00/HR CAT � 345 EXCAVATOR cLil ;5�190,00lHR CAT �.TCHALLENGER&DISC Ca SI80.00/HR CAT CS433SB ROLLSR" - -. -_ Cn � _;585.00/HR CAT 815COMPACTOR en S725.00/HR CAT 613 WATER WAGON rCt 5340.00fHR 4000 GALLON WATER T2UCK en 585.00/HR 1600 CALLON WATER'PRUCK rer $75.U0 hIR JOEII�DEER 450C EXCAVATOR Q 5210.00/HR FALCO E3F,DDING CONVEYOR rei S45.00AIR COMPACTIONWHEELEXTENSION @ $15.00/HR TRACK UNILOADER en 5120.00/HR CASE 1845 UNILOADER W/8[LEAKER @ 590.00/HR CASE WITHOUTBREAKER @ $70.00/HR 246 RUBBER TIRE SKIDSTEER Q 590.00/HR LOWBOY/TRANSPORT n� 5120.00/HR END DUMP-AOCK TRAtLER (.al �90,00/HR END DUMP-6ELLY DUMP @ 590.00/HR RSX SHEEPSFOOT ROLLER Q S10S.00/HR GROVE 30TONALLTERRAINCRANE rCil 5140.00/HR VAC-TRUCK-POTHOLETRUCK en S195.00/HR SUPERINTENDENTW/TRUCK Q 585.00/HR FOREMANfECS/CCS W/TRUCK r(�il 570.00/HR FORMSETTERlFIMSHE2 @ 551.00/HR LABOR rci $45.00/HR FLAGGER rei 530.00/HR SERVICE NIECHAN[C Q 57i.00/HR WELDE2 rei 575.00 MR *TIME TO BE TRACKED BY MEMO DAILY+FAX TS ACCEPTABLE. _ ..._ _ . - ' RATES NOT APPGICABLE POR OVERTIME WORK OUTSIDE THE SCOPE OF CONTRACT WORKING HOURS,AN OVERTIME RATE ADD-ON WILL BE AGREED TO PR102 TO THE WORK BEING PHRFORMED � I Inten�o�al�.y �eft �lank �