Loading...
HomeMy WebLinkAboutbocc.con.120.2013A Rer. 08-30-I1 jls COUNTY CLERK'S CONTRACT COVERSHEET CONTRACT #: 120-2013A ORIGINATING DEPARTMENT: Airport PROCUREMENT OFFICER: Brian Grefe PHONE #: 4292853 PROJECT NAME: AIP 49 Task Order#I CONTRACTOR: Jviation DOLLAR AMOUNT: $596,579.00 LINE ITEM # 404.69.94798.86000 CONTRACT EXECUTION DATE: 8/28/2013 CONTRACT END DATE: 4/30/2018 AUTOMATIC RENEWAL: ❑ YES � NO TERM: Completion ❑ BOCC AGENDA 1TEM (Grants, IGA) ❑ STAFF AUTHORIZED SIGNATURE (Requires BOCC Signature) (Per Revised Procurement Code 7/2005) � OVER$50,000(Requires Section Leader& County Manager's Signature) ✓ CHECK PROCUREMENT TYPE: ❑None ❑ Informal � Formal ❑ Sole Source ❑ Emergency ❑ Outside Agency/State Bid ❑ Compliance with C.R.S. 8-]7-5-]01, 102 as amended (Immigration Porm) ❑ Esempt ❑ Contract Renewal ✓ CHECK CONTRACT TYPE: 3 l �� �� � Services/Maintenance ❑ Employment ❑ License/Use ❑ Intergovernmental Agreement(Resolution Required) ❑ Lease ❑ Non-Profit ❑ Construction ❑ Quasi-Public(e.g:AVH) ❑ Goods, Equipment, Supplies ❑ Grant Agreements(Notify Finance & Resolution Required) ❑ Other(e.g. revenue) � � Change OrdedContract Amend�nent � (C/O: 10%or$25K whichever is Ihe lesser musl hnve County Manager signalure) All Contracts should be proofed and all exhibits and notices must be altached for the following: ✓ � No Pages Missing ✓� All Other[3lanks Filled In ✓ ❑ If Page Left Intentionally Blank—Note on Page ✓❑ All Exhibits Attached ✓ � Page numbered consecutively ✓� All Legal Descriptions a[tached (ijupplicuble) ✓ � All Original Signatures Affixed ✓� Notice of Award/Notice to Proceed Attached (ifapplicable) ✓ � All Dates Filled In ✓❑ Warranty(if applicable) ✓ � Special Instructions for Finance Department: Please incumber and additional $187,262 to the $409,317 already incumbered ✓ � Authorized Procurement Officer's Name: Brian Grefe BY CHECKING ABOVE AND ENTERING NAME,THE AUTHORIZED STAFF PERSON INDICATES THAT THE ATTACHED DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING. NOTE: CLERK'S OFFICE WILL KEEP ORIG[NAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHNES RETAINAGE SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST! Contract#120-2013A Rev. 8.31.11 jaa/js Budget Line Item#404.69.94798.86000 �T� �� �����'� - c�0c���� CHANGE ORDEEUCONTRACT AMENDMENT Change Order Number: 120-2013A (Task Order 1) OWNER: Pitkin County 0233 East Airport Rd. Aspen, Colorado 81611 CONTRACTOR: The On-Call Engineering Contract (the "Agreement ') dated May l, 2013 between the Board of County Commissioners of Pitkin County (the "County") and Jviation, Inc.. (the "Contractor"), is hereby amended as follows: Description of Chanae: -Schedule l: Construct Paved Shoulders on Taxiways "AP', "A2", and "A4" and Taxiway "A" from `A1" to "AS" (Design Only) -Schedule II: Construct Paved Shoulders on Taaiway "AS" through "A8" and Tasiway"A" from "AS" to "A8" (Design Only) -Schedule III: Remove and Reconstruction �xistin�Aircraft Wash/I-lolding Pad (Design Only) ' -Schedule IV: Install Crack Seal and Fog Seal on Run 15/33, Connector Ta�ciways "Al"through"A9" and `B8"through`B9", and Parallel Taxiway"A" from "A8" to "A9" (Design and Construction) -Schedule V (Non-Federal): Install Crack Seal, Fog Seal, and Striping on Airport Landside Parking Lots and Roadways(Design and Construction) Reason for Chan�e Increase engineering services Ori�inal Contract Price $ 0 Net Increase/Decrease in Contract Price(this change order) $ 596,579.00 *Total Adjusted Contract Price (including this change order) $ 596,579.00 In all other respects the Agreement is in full force and effect and remains unchanged by this Amendment. /a �%�2o i ? Contractor ' Dat� 1 Rev 12/27/lOjs Project Coding Original Contract # - q��3 /3 Procurement Of�cer Date See Attachment County Manager Date *Increases over$25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. � 2 �����°� �� Jviation PROJECT NO.ASE AIP 49 ��� ASE AIP 3-08-0003-49 AMENDMENT NO. ONE(1)TO CONTRACT DATED MAY 1, 2013 BETWEEN 7VIATION, INC. AND PITKIN COUNTY BOARD OF COUNTY COMMISSIONERS PITKIN COUNTY, COLORADO The Sponsor and the Engineer (here after referred to as Engineer or Contractar interchangeably) agree to amend their contract for improvements to Pitkin CountyAirport, Colorado to include fees for engineering services. The improvement is included in the Scope of Work ofthe original contract. The items covered by this amendment are detailed as follows: -Schedule I: Construct Paved Shoulder on Taxiways "Al", "A2", and "A4" and Taxiway "A" from "Al" to "AS" C�.=s� _ �^�Y� -Schedule II: Construct Paved Shoulders on Taxiways "AS" through "A8"and Taxiway "A" from "AS" to "A8" (Design Only) -Schedule III: Remove and Reconstruct Existing Aircraft Wash/Holding Pad(Design Only) -Schedule IV: Install Crack Seal and Fog Seal on Runway 15/33, Connector Taxiways "Al" through "A9" and "B8" through "B9", and Parallel Taxiway"A" from "A8° to "A9" (Design and Construction) -Schedule V(Non-Federal): Install Crack Seal, Fog Seal, and Striping on Airport Landside Parking Lots and Roadways (Design and Construction) The Sponsor agrees to pay the Engineer for the services in the following manner: PART A- BASIC SERVICES DESIGN Preliminary Design.......................................................................Lump sum of$30,679.00 Design.........................................................................................Lump sum of$342,821.00 Bidding..........................................................................................Lump sum of$35,817.00 TOTAL BASIC SERVICES........................................................Lump sum of$409,317.00 � Method ofpayment shall be as follows: Interim payments based on work performed by the Engineer and detailed in a report submitted to the Sponsor with the request for payment. A retainer of ten percent of the total contract amount to be paid upon Notice to Proceed for construction, ar, in the evenC the Sponsor does not elect to proceed with construction, the remaining ten percent to be paid upon receipt of request for payment from the Engineer. � PART B- SPECIAL SERVICES(SOILS AND PAVEMENT INVESTIGATIONS/TOPOGRAPHIC SURVEYS/HYDROLOGIC STUDIES/CONSTRUCTION ADMINISTRATION AND FIELD ENGINEERING) The maximum estimated SPECIAL SERVICES engineering is 1s follows: TOPOGRAPHICALSURVEY Topographical Survey.................................................................. Lump sum of$25,000.00 LAND USE PLANNING Land Use Planning........................................................................Lump suin of$10,000.00 CONSTRUCTIONADMINISTRATIONAND FIELD ENGINEERING The estimated maximum for CONSTRUCTION ADMINISTRATION and FIELD ENGINEERiNG is: Construction Administration.........................................................Lump sum of$34,628.00 Pre-Conshuctiou Coordination.....................................................Lump sum of$11,446.Q0 On-Site Construction Coordination.................:............................Lump sum of$82,750.00 Post Construction Coordination.....................................:..............Lump sum of$23,438.00 TOTAL SPECIAL SERVICES....................................................Lump sum of$187,262.00 TOTAL........................................................................................Lump sum of$596,579.00 Method of payment shall be as follows: For services rendered under PART B - SPECIAL SERVICES, the Sponsor agrees to make monthly payments based upon the worlc perfornned by the Engineer,up to 90 percent of the total contract. The final ten percent of the fee shall be due and payable when the project final inspection and the consYruction report have been completed,and when reproducible"Record Drawings"have been submitted to the Sponsor and when the revised Auport Layout Plan has been approved by the FAA or when the construction work has terminated. The "Record Drawings"and Construction Report shal]be submitted within a period of 90 days from end of construction period. This Amendment shall be considered concurrent with completion of audit. Page 2 of 8 � PART C —ASSURANCES I. CIVIL RIGHTS ACT OF 1964, TITLE VI—CONTRACTOR CONTRACTUAL I2EQUIREMENTS Reference: 49 CFR PART 21 During the performance of this contract,the contractor,for itself,its assignees and successors in interest(hereinafter referred to as the "Engineer") agrees as follows: o Compliance with Regulations. The Engineer shall comply with the Regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation (hereinafter,"DOT")Title 49,Code of Federal Regulations,Part 21,as theymay be amended from time to time(hereinafter referred to as the Regulations),which are herein incorporated by reference and made a part of this contract. o Nondiscrimination. The Engineer, with regard to the work performed by it during the contract, shall not discriminate on Yhe grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Engiceer shall r.ot participate ei±her directly or ?r_direc+ly in the discrimination prohibited by section 21.5 ofthe Regulations,including employment practices when the contract covers a program set forth in Appendix B of the Regulations. o Solicitations for Subcontracts,Including Procurements of Materials and Equipment. In all solicitations either by competitive Uidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or leases of equipment,each potential subcontractor or supplier shall be notified by the Engineer of the Engineer's obligations under this contract and the Regulations relative.to nondiscrimination on the grounds of race, color, or national origin. o Information and Reports. The Engineer shall provide all information and reports required by the Regulations or directives issued pursuant thereto and shall permit access to ifs books, records,accounts,other sources of information and its facilities as may be determined by the Sponsor or the Federal Aviation Administration (FAA) to be pertinent to ascertain compliance with such Regulations,orders,and instiuctions.Where any information required of an Engineer is in the exclusive possession of another who fails or refuses to furnish this information,the Engineer shall so certify to the sponsor or the FAA,as appropriate,and shall set forth what efforts it has made to obtain the information. � Sanctions for Noncompliance. In the event of the Engineer's noncompliance with the nondiscrimination provisions of this contract, the sponsor shall impose such contract sanctions as it ar the FAA may determine to be appropriate, including, but not limited to: a. Withholding of payments to the Engineer under the contract until the Engineer complies, and/or Page 3 of 8 � b. � Cancellation, termination, or suspension of the contract, in whole or in part. � Incorporation of Provisfons. The Engineer shall include the provisions ofparagraphs one through five (Compliance with Regulations, Nondiscrimination, Solicitations for Subcontracts, Information and Reports, and Sanctions for Noncompliance) in every subcontract,includingprocurements ofmaterials and leases ofequipment,unless exemptby the Regulations or directives issued pursuant thereto. The Engineer shall take such action with respect to any subcontract or procurement as the sponsor or the FAA may direct as a means of ettforcing such provisions including sanctions for noncompliance. Provided, however, that in the event a�ngineer becomes involved in, or is threatened with,litigation with a subcontractor or supplier as a result of sucli direction, the Engineer may request the Sponsor to enter into such litigation to protect the ittterests of the sponsor and, in addition, the Engineer may requesE the United States to enter into such litigation to protect the interests of the United States. II. AIRPORT AND AIRWAY IMPRO VEMENT ACT OI+ 1982, SECTION 520- GENEI2AI, CIVIL RIGHTS PROVISIONS RCfEYHYCE: Airpert a;adf:i;wayl:nprov�:r.en:A�t of19&2,Ssc!ien 520;Title 49 47123;AC I50/5100-I5, Para. IO.c. The Engineer assures that it will comply with pertinent statutes,Executive orders and such rules as are promulgated'to assure that no person shall,on the grounds oFrace,creed,color,national origin, sex, age, or handicap be excludec3 from participating in any activity conducted with or benefting from Federal assistance. This provision obligates the tenanUconcessionaire/lessee or its transferee for the period during which Federal assistanca is extended to the airport a program, except where Federal assistance is to provide, or is in the form of personal property or real property or interest therein or structures or improvements thereon. In these cases the provision obligltes thaparty or any transferee for the longer of the following periods: (a)the period during which the property is used by the airport sponsor or any transferee for a purpose for�vhich Federal assistance is extended, or for anotherpurpose involving the provision of siinilar services or benafits or(b)theperiod during which the airport sponsor or any transferee retains ownership or possession of the property. In the case of Engineers,this provision binds tha Engineers from the bid solicitation period through the completion. of the contract. This provision is in addition to that required of Title VI of the Civil Rights Act of 1964. III. DISADVANTAGED BUSINESS ENTERPRISES Refei�ence: 49 CFR Part 26 a Contract Assurance(§26.13)-The Engineer or subcontractor shall not discriminate on the basis of race,color,national origin,or sex in the performance of this contract.The Engineer shall carry out applicable requirements of49 CFR Part 26 in the award and administration of DOT assisted contracts.Failure by the Engineer to carry out these requirements is a material Page 4 of 8 � breach of this conh-act, which may result in the teirnination of this contract or such other remedy, as the recipient deems appropriate. � Prompt Payment(§26.29)-The prime Engineer agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than Fifteeiz (15) days from the receipt of eacli payment the prime Engineer receives from Sponsor. The prime Engineer agrees further to retum retainage payments to each subcontractor within Fifteen (15) days after the subcontractor's work is satisfactorily completed. Any delay or postponement of paymenf from the above referenced time frame may occur only for good cause following written approval of the Board. This clause applies to both DBE and non- DBE subcontractors. IV. LOBBYING AND INFLUENCING FEDERAL EMPLOYEES Reference: 49 CFR Part 20,Appendix A � No Federal appropriated fiinds shall be paid,by or on behalf of the Engineer,to any person for influencing ar attempting to influence an officer or employee of any agency,a Member of Congress, an officer or employee of Congress, or an employae of a Member of Congress in connection wiih the,naking of aiiy Federai g�ant and the umendmcnt or medif:catior.of any Federal grant. � If any funds other than Federal appropriated fixnds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee ofa Member of Congress in connection with any Federal grant, the Engineer shall complete and submit Standard Form-LLL, "Disclosure of Lobby Activities,"in accordance with its instiuctions. V. ACCESS TO RECORDS AND REPORTS Reference: 49 CFR Part 183G(i);FAA Order 5100.38 The Engineer shall maintain an acceptaUle cost accounting system.The Engineer agrees to provide the Sponsor,the Federal Aviation Administration and the Comptroller General of the United States or any of their duly authozized representative's access to any books,documents,papers,and records of the Engineer which are directly pertinent to the specific contract for the purpose of making audit, examination, excerpts and fianscriptions. The Engineer agrees to maintain all books, records and reports required under this contract for a period of not less than three years after final payment is made and all pending matters are closed. VI. BREACH OF CONTRACT TERMS Reference: 49 CFR Part 18.36 Page 5 of 8 � Any violation or breach of terms of this contract on the part of the Engineer or their subcontractors may result in the suspension or termination of this contract or such other action that may be necessary to enforce the rights of the parties of this agreement. The duties and obligations iinposed by the Contract Documents and the rights and remedies available thereunder shall be in addition to and not a limitation of any duties,obligations,rights and remedies otherwise imposed or available by law. VII. RIGHTS TO INVENTIONS Reference: 49 CFR Part 18.36(i)(8);FAA Order SI0038 All rights to inventions and materials generated under this contrlct are subject to regulations issued by the FAA and the Sponsor of the Federal grant under which this contract is executed. VIII. TRADE RESTRICTION CLAUSE Reference: 49 CFR Part 30.13;FAA Order 5100.38 The Engineer or subcontractor,by submission of an offer and/or execution of a contract,certifies that it: a. is not owned or controlled by one or more citizens of a foreign coimtry included in the list of countries that discriminate against U.S.firins published by the Office of the United States Trade Representative (USTR); b. has not knowingly entered into any contract or subcontract for this proj ect with a person that is a citizen or national of a foreign coLmtry on said list,or is owned or controlled directly or indirectly by one or more citizens or nationals of a foreign country on said list; c. has not procured any product nor suUcontracted for the supply of any product for use on the project that is produced in a foreign country on said list. Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with 49 CFR 30.17, no contract shall be awarded to a Engineer or subcontractor who is unable to certify to the above. If the Eugineer knowingly procures or subcontracts for the supply of any product or service of a foreign countiy on said list for use on the project, the Federal Aviation Administration may direct tluough the Sponsor cancellation of the contract at no cost to the Govemment. Further, the Engineer agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification without modification in each contract and in all lower tier subcontracts. The Engineer may rely on the certification of a prospective subcontractor unless it has knowledge that the certification is enoneous. The Engineer shall provide immediate written notice to the sponsor if the Engineer learns that its Page 6 of 8 8 certification or that of a subcontractor was enoneous when suUmitted or has Uecome erroneous by reason of changed circumstances. The subcontractor agrees to provide written notice to the Engineer if at any time it learns that its certification was enoneous by reason of changed circumstances. This certification is a material representation of fact upon which reliance was placed when making the award. If it is later determined that the Engineer or subconh�actor knowingly rendered an erroneous certification, the Federal Aviation Administration may direct through the Sponsor cancellation of the contract or subcontract for default at no cost to the Goverrunent. Nothing contained in the foregoing shall be constiued to require establislunent of a system ofrecoids in arder to render, in good faith, the certification required Uy this provision: The knowledge and information of an Engineer is not required to exceed that which is normally possessed Uy 1 prudent peison in the ordinary course of business dealings. This certification concerns a matter within the jurisdiction of an agency of the United States of Americl and the malcing of a false, fictitious, or fraudulent certification may render the mlker subject to prosecution under Tifle 18, United States Code, Section 1001. � I�:. TERNIINATION OF CONTRACT Refererice: 49 CFR Part 18.36(i)(2);FAA Order SI00.38 o The Sponsor may, by written notice, ternunate this contract in whole or in part at any time, either for the Sponsor's convenience or because of failure to fulfill the contract obligations. Upon receipt of such notice services shall be immediately discontinued (unless the notice directs otherwise) and all materials as may have been accumulated in performing this contract, whether completed or in progress, delivered to the Sponsor. o If the termination is for the convenience of the Sponsor, an equitable adjustment in the contract price shall be made, but no amount shall be allowed for anticipated profit on unperformed services. � If the termination is due to failure to fulfill the Engineer's obligations,the Sponsor may take over the work and prosecute the same to completion by contract or otherwise. In such case, the Engineer shall be liable to the Sponsor for any additional cost occasioned to the Sponsor thereby. o If, afCer notice of termination for failure to fulfill contract obligations, it is determined that the Engineer had not so failed,the termination shall be deemed to have been effected for the convenience of the Sponsar. In such event,adjustment in the contract price shall be made as provided in paragraph 2 of this clause. � The rights and remedies of the sponsor provided in this clause are in addition to any other rights and remedies provided by law or under this contract. Page 7 of 8 � X. CERTIFICATION RLGARDING DF]3ARIVIENT, SUSPENSION, INELIGIBILITY AND VOLUN'CARY EXCLUS[ON Referer:ee: 49 CFR Part 29;FAA Order• SI00.38 The bidder/offeror certifies,by suUmission ofthis proposal or acceptance ofthis contract,that neither it nor its principals is presently debaired,suspended,proposed for debarment,declared ineligiUle,or voluntarily excIudect fiom participation in this transaction by any Federal department or agency. It furtl�er agrees by snbmitting tliis proposal that it will include this clause without modification iu all lower tier transactions, solicitations, proposals, contracts, and suUcontracts. Where the bidder/offeror/Engineer or any lower tier parficipanf is unable to certify fo this sfatement, it shall attach an explanatiai to tl�is solicitation/proposal. All other terms a�id conditions of the original connact shall remain in effect. IN WITNESS WHEREOF,the parties ltereto have affixed Cheir signatm-es Cliis ��3 day of �9�5'� 2013. SPONSOR: PITKIN COUNTY COLORADO By: � � � / �T�ood-�To'rl I i'Lt�c>C�i 33�3�o f�:a��t��> C�7l�Yb 1"� I`��clr1 (�,1� � ENGINEER: JVIATTON, INC. / � By: D. Ingram Pn Page 8 of 8 �� Aspen-Pitkin County Airport May 21�2013 AIP 3-OS-0003-49 SCOPE OF WORK FOR ASPEN-PITKIN COUNTY AIRPORT Aspen, Colorado 3-08-0003-49 This pxoject will consist of preparing Consuvction Plans, Contr2ct Documee�ts and Technical Specificauons along with Bidding for Schedules I, II, III, IV, and V and Construction Administration and Construction Coocdination for Schedules IV and V woxk. This woxk will be split into hw bid packages with Schedules I, II,and III making up one bid pack package and Sdiedules IV and V making up the other as described below. DESCRIPTION: BID PACKAGE NO.1 Schedule I—Constxuct Paved Shouldeis on Taxiways "A1"."A2",and"A4" and Taxiway"A"fxom "Al"to `°A5" (Design Only� Schedule I work will involve the design of the Fixst phase of paved shoulders adjacent to e�sung ta�ciways on the a�port that do not cuxxeutly have paved shouldexs. This would include connectox Ta�ciwlys "Al","A2", and"A4"and parallel Taaciway"A" fxom connectox Ta2ciway"A1 thxough "AS". Staxung in 2007,with the tehabilitauon oERunway 15/33,the Aspen/Pitkin Countytlirpoit has placed an emphasis on constructing paved shoulders adjacent to any new full strength ai�field paveinent. As a cesult,the airpoxt currendy has paved shonlders on Runmay?5/33, connecr�r Taaciways "P_9", "BR",and`B9", rh?portion ef�arallel Ta�way"A"that was included in the 2011 Runway 33 extension pxoject,and the Deice/Run-up pad constructed in 2012. By compleung paved shouldets on the temainder of the airField tazciways,the airpoxt would be following the FAA xecommendauon kom AC 150/5300-13A which states that"Paved shoulders are recommended for taaciways, taacilanes, and apxons accommodating ADG-III aiccraEt." The Aspen/Pitkiu County Auport cucxendy accoinmodates ADG-II aircraft. Paved shouldexs pxovide two pximary benefits, improved drainage by incxeasing the speed and eEficienry thlt moisture is directed away fxom the pavement, and improved snow cemoval capabilities,paxticulacly axound xunway/taaciway edge lighting as a paved sucface is much easiet to xemove snow Erom than a satuxated soil area. Additional work associated with the paved shouldexs will be some minor safety area grading and potential adjustrnent of edge lighung,cleanouts,and other suxface strucmxes�vithin the project limits. Schedule II—Constmct Paved Shouldets on Taxiways "AS"tlirough "A8" and Taxi�vay"A" &om `�A5" to "AS" Design Only) Schedule II woxk will involve the design oF the second pl�ase of paved shouldexs adjacent to eacisung taznways on the airport that do not cuxrently have paved shoulders. This would include connector Ta�ciways "AS" through "AS"and paxallel Taxiway"A"fxom connectox Taxiway"AS tl�rough "A8". StaTting in 2007,with the xehabilitation of Runway 15/33, the Aspen/PiHtin County Aiiport has placed an emphasis on construcung paved shoulders adjacent to any new full strength a�field pavement. As 1 xesult,The tirpoxt cuxxendy has paved shouldexs on Runway 15/33, counector Tazciways"A9",`B8", and`B9", the poxuon oE parallel Taxiway"A" that was included in the 2011 Runway 33 extension pxoject, and the Deice/Run-up pad constructed in 2012. By completing paved shouldexs on the remainder of the airfield tazciways, the aupoct would be following tlie FAA recommendauon fxom AC 150/5300-13A wlzich states that"Paved shouldexs axe xecommended Eox taxiways,ta�lanes,and apxons accommodatinp,ADG-IIiaucxaft." The Aspen/Pitkin County tlirpoct wrxently accommodates ADG-II aixcraft. Paved shouldeis provide hvo pximaty benefits, impxoved deainage by increasing the speed and efficienry that moisture is directed away Fiom the P2vement, and unproved snow xemoval caPabilities,paruwlarly aiound runway/taxiway edge lighting as a Paved suiF:tce is much easier to remove snow fxom than a satutared soil azea. Additional work associated with the paved shouldexs will be some minor safety axea gtading and potenual adjustment oF edge lighting,cleanouts,and other suxface structuxes witivn the project limits. Jviauon,Inc. 7 oj15 ASE 3-08-0003-49 Revl ' � Aspen-Pi[kin County Airport May 21�2013 AIP 3-OS-0003-49 Schedule III—Remove and Reconstcuct Existing Airccafr Wash/Holding Pad(Design Only) Schedule III work will involve the design fox the complete xemoval and xeconstruction of an e�cisting wash/holding bay at the airport. The primary puxpose of the wash/holding bay is to provide a location whexe airccaft having mechanical pcoblems,especially involving the leaking of Eluids,can be parked until cepairs can be perfoxmed on the tircxaft. The wash/holdi�g pad has a trench dxain that�vill collect any fluid that is xeleased from an aixcxaft and transpoxt it to a holding axea/tank whece it can be pumped out and disposed oE pxopeily. The secondary purpose that this wash/holding pad serves is a parking location Eox lacgei coxporate/business jets. The e�sting was/holding pad is located on an old concxete building foundation that is sevexely cracked and uneven. This pxoject will completely xemove the e�cisting building Eoundation and replace the washJholding pad with a new concrete section and trench dxain. Installation of addidonal subsurface drainage and storage tanks will also be evaluated. By xemoving and xeconstructing this existing wash/holding bay, the aupoxt will be able to couuuue to utilize an axea of the auport where aixcxaft parking is already limited. IE left alone, the e�sung wash/holding pad will quickly Uecome uuusable Eor aircxaft because of its deteciorated condiuon. BID PACKAGE NO.2 Schedule IV—Install Crack Seal and Fog Seal on Runway 15/33, Connector Taxiways"A1" through "A9"and`B8"through`B9", and Parallel Taxiway"A" from "AS" to "A9" (Design and �'cn�tcuc[icr.l Schedule IV work will include the design and construction Eox pavement maintenance on Runway 15/33, Connector Taaciways "Al" through"A9"and`B8"through`B9", and Paxallel Ta�way"A"fcom"A8° to "A9". This woxk will include installztion of crack sealant and peifoeming cxack xepaus/minox pavement xepaixs in the eacisting asphalt as well as application of a Fog seal/xejuvenator on tlie asphalt pavement. The last time the ezcisting mnway pavement and connectox ta�way pavement, excluding the 2011 extension construcuon,was xehabilitated was in 2007. Since that time,no pavement inaintenance has been perfoxmed in these areas. This pxoject will�ssist the airpoxt to pxovide a safe opexating environment for aix travel as well as pxolong the useful life of e�cisting pavements at the airport. Schedule V(Non-Federal) —Install Crack Seal.Fog Seal, and StripinQ on Airpott Landside Parking Lots and Road�va�s (Design and Consttuction� Schedule V woxk will include the design and construction for pavement mainten�nce on all of the landside pavement on the airpoxt. This work will include installation of crack sealant and perfoxmiug cxack tepairs/minor pavement tepaixs in the existing asphalt as well as application of a fog seal/xejuvenatox on the asphalt plvement. Restriping of the parking lots and roadways will also be included. The landside paveinent fox the aitpoxt l�as not had any maintenance pexfocmed on it since 2007. This pxoject will assist tlie airpoxt to pxolong the useful liEe of ewsting pavements at tl�e airpor[. SCOPE OF WORK: The Engineexing fees�vill be bxoken into two parts, Part A-Basic Services; 1) Pxeliminary Design Phase, 2) Design Phase, and 3) Bidding Phase, and Part B-Special Services; 4) Constcuction Administration Phase, 5) Pre-Constcuction Phase, 6) Construction Cootdination Phase, or Fie1d Engineexing, and 7) Post Consttuction Phase. Patts A and B and the seven phases are descxibed in moxe detail belo�v. Based on the Engineex's pceliminary cost estimate, the estimated cost of the seven phases for the five schedules of work is approacimately$5,000,000.00. Jviauoq Inc. 2 of 75 ASE 3-OS-0003-49 I� Rev1 Aspen-Pitkin County Airport May 21,2013 AIP 3-08-0003-49 PART A-BASIC SERVICES for Construct Air6eld Taxiway Shoulders, Reconstruct Existing Wash/Holding Pad,and Airfield Pavement Maintenance(Scliedules I, II,III, and I�. Paxt A- Basic Services will consist of tlie preluninary dcsigu ph�se, design phase, and bidding phase. Also i�cluded aze dixect subcon[ract costs such as topographical surveyiag. 1.0 Pre/iminaryDesign PGase 11 Preliminaty Meetings with the Sponsot and FAA. Meeungs with the Sponsox ro detecmine critical dates and the feasibility of die pxoposed woxk uid to establish the need for topogcaphical suxveying. Various meetings duxing the design phase will also be conducted to revie�v the pxogress of the design and discuss construction details, pxoposed time frame of the constructioq and special xequirements oE the project. It is anticipated that thexe urill be a minvnum of 3 meetings with the Sponsar and/ox the F.St1, with some meetings occucxing in Aspen and some in Denver. 1.2 Prepate Project Scope of Work and Contract. This task includes establishiag the scope of work thxough xeview and meetings with the Sponsor. This also includes drafting the contract Fox the woxk to be completed by the Engineex fox the Spousor. 1.3 Coordinate Topographical Surveying. Survey will be required in ordec to complete the desigc� for the pcoject. Tliis task includes pieparing the xequixements,li�nits oF work, scheduling and conducting die survey. Ezcisung pavement gxades whexe the new airfield pavement will tie into the e�cisting pavement will xequire ac�iit;aGor.. F:r.ally, e:;i;ung ut:lities, a :equued, may:ieed to bz ver;fied, o�; tue e�cis�t,�. clegotintuig with a suroey Firm to pexform this work and fox pxoviding an on-site survey crew during suroeying is included in this item. 1.4 Coordinate Pavement and Geotechnical Investigation. Pavement and Geotechnical invesugation will not be xequired fox this pxoject. Pavement design wIll be completed utilizing geotechnical work completed undex pxevious scopes of work, fox runway rehabilitation and ta�way reconstxuction. 1.5 Prepare Disadvantaged Business Entetprise (DBE) Pxogram. Update the annual Disadvantaged Business Enteipxise goals to xeEled the current pxoject. Reseaxch the cuxrent state highway cextified DBP, lisungs and area contxactoxs to determine the availability of potenual DBE contractoxs. Prepare pcelicniiiary construction estimates and establish the potenual DBE woxk items. Finalize the DBE goal work sheets fot the Sponsor fox submittal to the FAt1 Civil Rights OEFice fox approval. 1.6 Prepare Federal Grant Application. This task consists of pxepariug the federal grant application. The Application will be subrrutted during the initial portion of the pxoject Pxeparation of the Application will include the follo�ving: ➢ Ptepaxe Fedexa1424 foxm ➢ Prepaxe Project I'unding Suinmaxy ➢ Pxepare Program Narrative, discussing the Purpose and Need of the woxk and the Method of Accomplishment ➢ Pcoject Sketch (11"x17") ➢ Pxepaze Prelitninary Estimate ➢ Environmental Checklist(See Item 1.8 below) ➢ Attach the wrxent Grant Assurances The Engineex will submit the application to the Sponsox for apptoval and signatuxes. Aftec obtaining the necessary signatures, the Engineex will forward at least two copies of the signed application to the FAA fox fuxthex pxocessing. Jviation,Inc. 3 oj75 AS�3-OS-0003-49 Revl � � Aspen-Pitkin County Airport May 21�2013 . AIP 3-08-0003-49 1.7 Update and Modify Exhibit "A" Propecty Map. The Engineer will xevie�v, and update, if necessary, the Aupott ptoperty map to include land paxcels, ownership desctipuon, recording informauon (County xecoxds of Book and Page Numbexs) and Pt1A interest a�d acquisition dates. The Exhibit"A"will have each parcel colored fox easy identification. It is anticipated that thexe will not be any updates on this pxoject. One copy of the Exhibit"A" (halE size 11" x 17") will be submitted with eadi copy of the grant application. The cunent AIP Pxoject Number will be sliown on the submitted Exhibit"A." 1.8 Prepace Environmental Checklist. The emixonmental checklist for the Constxuct Aicfield Taxiway ShouldeLS and Reconstruct Existing Wash/Holding Pad will be completed for diis pxoject. The checklist addresses how the pxoject aEfects the envuonmental aspects as defined under fedexal guidelines for env�onmental assessments. 2.0 Design Phase 2.1 Ptepate Pteliminaty Contract Documents. The Engineex will pxepaxe the pxeliminary Cont�act Documents induding invitation fox bids, uistructiou to biddecs, pxoposal, eyual employme�t oppoxtunity clauses, construction contract agreement, pexfoxmance bond, payment bond, and genexal pxovisions. Thexe will be hvo (2) bid packages, each with the� own set of Contract Documents for this pcoject The fixst bid package will include Contract Docume�ts far the Constrvct tlixfield Ta�way Shoulders and Reconshuct Existing Wash/Holding Pad (Schedules I, II, and IIn poxtion oE the project The second bid package �vill include Contract Documeuts fox the Pavement Maintenance (Schedule N and Schedule V Non-Fedexal) parrio�of rhe pre;e�t Preparation will include establishing the]ocation fox the bid opening,dates for advertisement,and descripuon oF the woxk schedule. PreliminaLy Cont�act Documents will be pcepared as early as possible duxing the design phase and submitted ro the Sponsot fox review by the Sponsots attorney. The most cuxrent Pitkin County general conditions and contract dauses will be incorporated into these documents,as xequixed. 2.2 Analyze Pavement Investigation Data. Historical recards of construcdon pxojects on the airpoxt for aceas that will be aEEected by the Construct 1lirfield Tlxiway Shoulders, Reconstruct E�sung Wash/Holdi�g Pad, and AirField Pavement Maintenance pxoject will be consulted to detexmuie ezusung pavement sections. No sepacate investigation will occuc. 2.3 Analyze Topographie Sutvey Data. T'his woik iucludes aualyzing the topographical suroeying data aud pteparing the data for use with computex modeling. Included are the Eollowing separate tasks: ➢ Input raw suroey data into the computex piogram in oxdex to soct data into company standaid layecs fox efFicient analysis. ➢ Verify suxvey data from as-built conditions as available with latest field survey. ➢ Soxt all data points Uy layeis and descxiption fox computex modeling. ➢ Prepaze Triangulated Integcated Netwoxk (TIN - suxEace model) of e:cisung �ound contouis, pavement edges, roadways, electrical equipment, drainage Features, buildi�gs, fences and othec miscellaneous entiues. ➢ Genecate thcee-dimensional contouc model Fxom TIN. ➢ Ptepare and process data fot pavement pcofiles, grading and/or paving cxoss secuons, and drainage featuxes. 2A Inventory Existing Utilities. This task includes reviewing pxevious dxawings, a site visit by the Engineex to assess field co�ditions, and consulting �vith the local utility companies to identify all utilities within the pxoject site,if any.This will include the coordination of possible xelocations,if necessary. Jviatiaq Inc. 4 of 75 ASE 3-OS-0003-09 � Revt / Aspen-Pitkin County Airport May 21�2013 AIP 3-OS-0003-49 2.5 Ptepare Preliminary Plans. Pxeliminary plans wIll bc prepared depicung the limits of woxk foi the ptoposed pxoject. Thexe will be two (2) bid packages, each with d�eir own plan set fot this ptoject. The flrst bid package willinclude construction plans, Ear the Construct tlirfield Ta:uway Shoulders and Reconstruct Fxisting Wash/Holding Pad (Schedules I,II, and II� poxuon of the pxoject. Plan sheets will include airport safety plans,geotechnical investigation infoxmation,phasing plans, demoliuon plans,geometric plans,grading plans, drainage plans, proposed pavement plaq pxoposed pavement typical secuons, utility plans, striping plans,and electrical plans. The second bid package will indude construction plans for the Pavement Maintenance (Scliedule N and Schedule V Non-Federal) portion of the pxoject. Plan sheets will include airpoxt safety plans, phasing plans, and stsiping plans. The following list of drawings will be used as a guideline. Additional dxawings may be added during tlie design phase if tequ�ed. Bid Package No.l ➢ Cover Sheet(1 Sheet)—Project tide,projed/grant numbexs,and Eunding agencies. ➢ Index to Drawings, Summaty of Approximate Quanrities, and Genetal Notes (1 Sheets) — Lists all drawings,approsimate quantiues,gener2l uotes and legends whexe applicable. ➢ Consttuction Layout Plan and Survey Control (1 Sheet) — Depicts overall 1liipoct layout uid scLematicaily idcr,tifies key pmject eieruznts sucn as Co;ir.ac�oi access, siorage avu s�aguig axeas. Also,idenufies all peTtinent survey control monument information far the Pioject. ➢ Construction Operation Plan (Safety Layout Plan) (1 Sheet) — Identifies to the Contractor the safety pxoceduxes fox the project. ➢ Pavement / Geotechnical Investigatiou Plan (1 Sheet) — Idenufies e�sting pavement and soils data pertinent to the projec[. ➢ Construction Phasing & Operations Plan (4 Sl�eets) — Identifies to the Contractor the phasing requirements and operating pxocedures fox the pxoject. ➢ Demolition Plan (12 Sheets) — Identifies all e�sang pavement and utility xemoval limits as well as any structures to be xemoved,xelocated, adjusted or reconstructed. ➢ Geometric Layout Plan (12 Sheets) — Idenufies the geometric layout of the proposed paved shouldexs and wash/holding had. ➢ Gtading Layout Plan (12 Sheets) —Depicts the pcoposed and esisting gcades associated with the proposed paved sliouldcss and wash/holding pad. ➢ Drainage Layout Plan (1 Sheet) — Depicts the pxoposed drainage layout associated with the pxoposed wasli/holding pad. ➢ Paving Sheets (1 Sheet) — Sho�vs the pxoposed and existing pavement grades associated�vitli the pxoposed wash/holding pad. ➢ Typical Section Sheet (1 Sheet) — IdentiFies the pxoposed typical pavement sections associated �vith the proposed paved shoulders and wash/holding pad. ➢ Joint Detail Sheet (1 Sheet) — Identifies the pxoposed joinung associated with the new concxere pavement on the wash/holding pad. ➢ Trench Deain Plan and Ptofiles (1 Sheet) — Sl�ows the pxoEiles associated with the pxoposed wash/holding pad. ➢ Drainage Details (2 Sheets) — Covers any necessary dxainage details for the pcoject including trench drain details. ➢ Collection System for Wash Pad (2 Sheets) — Covexs any necessary wash pad collection system details fox the project. ➢ Pavement Matldng Layout (2 Sheets) — Depicts the proposed pavement markings on the pxoposed paved shouldexs and wash/holding pad Jviation,Inc. 5 oj15 ASE 3-08-0003-49 Revl /� Aspen-Pitkin CountyAirport biay 21�2013 AIP 3-OB-0003A9 ➢ Pavement Marlting Details (1 Sheets) — Covers 1ny necessary pavement marking details Eor the pxoject. ➢ Etosion Control Plan (4 Sheets) — Depicts ecosion control measures associlted with the paved shoulders and wash/holding pad pxoject. ➢ Erosion Control Details (1 Sheets)—Covexs any necessary ecosion control details Ear the project. ➢ Electrical Legend and Notes (1 Sheet)—Lists general electrical notes and legend. ➢ Eleetxieal Layout Plan (2 Sheets) — Identifies the pxoposed electxical layout Eox the pxoposed paved shoulders and wash/holding pad. ➢ Electrical Details (2 Sheets) — Covers any necessary electrical details and wuing diagrams far the project. ➢ PLAN SET TOTALING 67 SHEETS Bid Package No. 2 ➢ Cover Sheet(1 Sheet)—Project title,pcoject/grant numUers, and funding agencies. ➢ Index to Dtawings, Summary of Approximate Quantities, and Geneial Notes (1 Sheets) — Lists all drawings, appxo�cimate quanuties,genexal notes and]egends whexe applicable. ➢ Construction Layout Plan and Survey Control (1 Sheet) — Depicts overall tlirport layout and schematically identiFies key project elements such as Contractor access, starage and staging areas. Also,identifies all pextinent suroey control monument information for die pxoject. ➢ Constnrction Onera!ion 1_'lae !Saf?ty I:2;ont Plan) ll Sheerl — Identifes to the Cnnrcar,roc the saEe[y procedures For the project. ➢ Constiuction Phasing & Operations Plan (8 Sheets) — Iden[ifies to the Contcactor the phasing requixements and opezating proceduxes Eor the project. ➢ Asphalt Crack Seal/Fog Seal Layout Sheets (12 Sheets) —Depicts ]imits for crack seal and fog seal work on the pxoject. ➢ Asphalt Crack Seal/Asphalt Repait Detail Sheet (1 Sheets) — Covexs any necessary details Eor the crack seal and fog seal woxk on the pxoject. ➢ Pavement Marking Layout (10 Sheets) — Depicts the pxoposed pavement maxkings on the landside packing and roadway work. ➢ Pavement Matldng Details (2 Sheets) — Covers any necessary pavement marking details Ear tlie project. ➢ PLAN SET TOTALING 37 SHEETS 2.G Prepare Preliminary Technical Specifications. The Engineex will assemble the Technical Specificauons necessary Eor the intended woxk. Standazd FAA speciFications will be utilized wheTe possible. Additional specificauons will be prepaxed to addeess woxk items Fox matexials that are not covered by the FAA Specifications. Thexe will be two (2) bid packages, each with theix own technical speciEtcations for this project. The Fixst bid package unll include specifications For the Construct A�field "I'a�way Shoulders and Reconstruct E�sting Wash/Holding Pad (Schedules I, II, and II� poition oF the project. The second bid package will include specificauons fot the Pavement Maintenance (Sdzedule IV and Schedule V Non-Fedexal) poruon of the project. Bid Package No. 1 The standaxd FAA Specifications to be utilized will include, but not be limited to, the following items: ]viatioqInc GoJ15 ASE3-OS-0003-49 � Rev1 / Aspen-Pitkin County ti�port May 21�2013 AIP 3-OS-0003-49 ➢ Item P-151 Clearing&Givbbing ➢ Item P-152 Exclvation and Embankment ➢ Item P-153 Contxolled Low-S[cength Material ➢ Item P-154 Subbase Couxse ➢ Item P-156 Temporary Air and Watee Pollution,Soil Exosion,and Siltation Control ➢ Item P-208 Aggcegatc Base Coucse ➢ Item P-401 Plant Mix Bihuninous Pavements ➢ Item P-403 (Coloxado Modified)Plant Mix Asphalt Pavements ➢ Item P-501 Poxtland Cement Conciete Plvement ➢ Item P-603 Bitmninous Tack Coat ➢ Item P-605 Joint Sealing Filler ➢ Item P-610 Structural Portland Cement Concxete ➢ Item P-620 Runway and Ta�ciway Painting ➢ Item D-701 Pipe Fox Stoxm Sewexs and Culvexts ➢ Item D-705 Pipe Undexdeains foc Airparts ➢ Item D-751 Manholes,Catch Basins, Inlets and Inspection Holes ➢ Item T-901 Seeding and Exosion Control ➢ Item T-905 Topsoiling ➢ Item L-108 Installation of Undexgxound Cable for Aixpoxts ➢ Item L-110 Installation of Airpoxt Uudexground�Iectrical Duct ➢ Item L-115 Electrical Manholes and Junction Structuxes ➢ Itrm I.-125 Tnsrallario+, oE Airnoxt Liv,htui;Systems The added non-Ft1A technical speciFications will include but not be limited to the Eollowing items: ➢ Item P-100 Mobilization ➢ Item P-140 Paveinent Removal ➢ Item P-159 Watexing ➢ Item P-222 Soil Sterilization ➢ Item P-310 Geosynthetic Fabrics ➢ Item D-750 Tcench Drains ➢ Item Ir139 Tempoiary Constrvction Maxker Lights Othex technical speciEcations will be included�s needed. Bid Package No.2 The standaxd FAt�Specifications to be utiliaed will uiclude,but not be limited to, the following items: ➢ Item P-403 (Coloxado Modified) Plant Mizc Asphalt Pavements ➢ Item P-620 Runway and Ta�w1y Painting ➢ Item P-603 Bituminous Tack Colt The added non-Ft1,S tech��ical specificauons will include but not be limited to the Eollowing items: ➢ Item P-100 Mobilization D Item P-315 Asphalt Reinforcement Gxid Tack Film Mesh ➢ Itein P-600 Crack Repau ➢ Item P-601 Ccack Sealing ➢ Item P-GOS Fog Seal ➢ Item L-139 Tempoxary Constrvction Maxker Lights Jviation,Inc. 7 af 75 ASG 3-08-0003-49 Revi � .�y / Aspen-Pitkin County Airport , May 21�2013 AIP 3-OS-0003-49 Otlier technical specifications will be included as needed. 2.7 Prepare Pceliminary Special Pcovisions. The Engineex will pxepare Special Pxovisions to addiess, ox expound on, conditions that requixe addiuonal claxification. Thexe will be two (2) bid packages, each with theix own Special Provisions for this pxoject. The First bid package will include Special Provisions for the Construct AuEeld Ta�ciway Shouldexs and Reconsteuct E�sung�'Vash/Holding Pad (Schedules I, II, and IIn poction of the project. The second bid package will includc Special Pxovisioi�s fox the Pavemcnt Maintenance (Schedule IV and Schedule V Non-Fedexal)poction of die pxoject. They�uill include,Uut axe not be limited to, the follo�ving items: ➢ Descxiption of��/oxk ➢ Haul Roads/Pioject Access D Airport Security ➢ ��/ork Schedule ➢ Adclitional Quality Control Requuements ➢ Pre-Construcdon Confexence ➢ Sequencing of the Work ➢ ClosureofAOA's ➢ Accident Prevention ➢ Undexgxound Cables/Utilities ➢ Guarantees/Insuxance%Taxes/Permits ➢ Contracts/Subcontracts ➢ Addiuonal DBE Information ➢ Liquidated Damages ➢ Construction Opecational Plan ➢ Safety Standards and Impacts ➢ Additional Acceptance Testing Issues ➢ Grade Control and SuxEace Tolexance for Paving Woxk ➢ Special Tesung Considerations ➢ Pxoject Closeout Forms 2.8 Prepare Drainage Analysis and Storm Dcainage Design. Not applicable. 2.9 Pxepare Pavement Desig��. This task will consist oE calcaladng the pavement section and submitting the design report to the 1^AA for appxoval. Paveinent stsength will be calculated in accoxdance with the FAA Advisory Cuculax I50/5320-6�,Aixpoxt Pavemei�t Design 1nd Evaluation. 2.10 Compile/Submit Permits. The Engineex will pxepaxe tlie Applicadon and Nouce for Fugitive Dust Emission Permit, if x new oi renewal pexinit is cequixed, and submit to the Sponsox for appxoval and signature. The Sponsox will Ue xesponsiUle fox submitting the Applicauon to the Coloxado Depaxhnent of Health Eor appxoval. Special use pexmits tl�at can be identified during the design phase of the pxoject wIll be idenufied in d�e Special Provisions of the Contract Documents fox the Contractor's benefit. The Contractor will be xesponsible fox any special use pecmits including 1ny surface disdiatge xequirements �nd the Storm Water Management Construction Plan Permit. The Sponsoc�vill pay Eox or xeimburse the costs fot pecmits and/ox application fees to the Engineer. 2.11 Calculate Estimated Quantities. The Engineex will calculate all necessary quantities Eoc the vaxious wotk items. Quantities will be consistent with the specificauons and acceptable quantity calculation practices. 2.12 Prepare Estimate of Ptobable Consttuction Cost. Using the final quantities calculated following the Jviadon,inc. 8 of 75 ASE 3-OS-0003-49 Revl / � Aspen-Pitkin County Airport May 21�2013 AIP 3-08-0003-49 completion of the plans and specifications, tlze Fngineer will prepaxe the construcuon cost estimate. The estimate will be based on inFormation obtained from pxevious pcojects, contractoxs, matexial suppliers, and other databases available. 2.13 Prepate Construction Phasing and Safety Plan. A Construction Phasing and SaFety Plan will be developed to outline the pxocedures,cooxdination, and conrsol oE construction acuvity on the ai�oxt. The purpose of the plan is to minimize disrupuon to aircraft opexations,identify project saFety concexns, avoid hazaxdous airpoct situauons,and pxovide a single source of procedural inEoxmation fox use during construction activities. There will be two (2) bid packages,each with theix own Construction Phasing and Safety Plan Eor this pxoject. The fixst bid package will include a Construction Phasing and Snfety Plau fox the Construct Aufield Taxiway Shoulders and Reconstruct E�sting Wash/Holding Pad(Schedules I,II,aud III) poxuon of the pxoject. The second bid package will include a Construcuon Phasing and Safety Plan Eox the Pavement Mai�tenance (Schedule IV and Schedule V Non-Feder�l) poxtion of the project 214 Prepate Design EngineePs Repott and Modification of Standards. Duxing the pceparation oE the pxeliininary plans and specifications, a design repoxt will be pxepaxed accoxding ro the curxent Ft1t1 Northwest Mountain Region Design Repart guidelines. The repoxt will include the summary of the project, schedule for the compleuon of the design,bidding and construction of the work,and a detailed descripuon of the woxk. Modifications to the FAA standaxds, 1s aecessary, fox the project will be complied and pxesented to the FAA and Sponsor, and included in the design repart The xepoxt will also wntain any altexnative design concepts that wexe invesugated and evaluated. A Construc[ion Phasing and Safety Plan and Engineer's cost estimate will be induded with the xepott. Thexe will be hvo (2) bid packages,each with their own Design Engineer's Repoct for this pxoject. The fust bid package will include a Design Engineex's Report fox the Construct AixEeld Taxiway Shouldexs 1nd Reconstruct Eacisting Wash/Holding Pad (Schedules I,II, and III) portion of the pxoject. The second bid package will include a Design Engineec's Repoxt Eor the Pavement Maintenance(Schedule IV and Schedule V Non-Fedecal) poction of the project. 2.15 Coordinate Phases for Construction. This task involves meeung with the Aspen-Pitkin County Aupoxt staff, as xequ�cd, to discuss tl�e opexations of the Airpoxt to help determine how the constmction phasing of the ptoject will effect these operauons. Fxom these meetings, a complete Constmction Phasing and Safety Plan will be developed to be included within the Contract Documents as well as depicted within the construcuon drawings. This plan will thoxoughly discuss the opexations of the tlirpoct and the Contractox and safety requixements duxing the pxoject Eoc both landside and airside axeas oE the tlirport. There will be two (2) bid packages that wil] xequice construcuon phasing cooxdinadon fox this pxoject. Thc first bid package will include construction phasing coocdination Eox the Construct Aufield Taaci�vay Shouldexs and Reconstxuct Eacisting Wasl�/Holding Pad (Schedules I,II, nnd IIn partion oF the pxoject. The second bid package will include construcuon phasing coordination Eor the Pavement Maintenance (Schedule IV and Schedule V Non-Federal) poxtion of the pxoject. 2.16 Plans Review at 60%, 95% Complete and Final. Duxing vazious stages of the compleaon of the plans and specifications, the Engineex will submit a set of dxawings and speciflcations to the Sponsox for their xeview. Meetings will be scl�eduled as xequ�ed Eor pexiodic xeviews including a 95% plans in hand xeview to make a final inspecuon of die pxoject. The project�vill be xeviewed with the FAA to obtain theix concucrence with the design. These will be two (2) bid packages that will xequue plans review for this pxoject. The fitst bid package will include plans xeview for the Construct AuField Ta�way Shouldexs and Reconstruct Eacisting Wash/Holding Pad(Schedules I,II,and III)pox[ion of the pTOject The second bid package will include plans xeview fox the Jviauoq Inc. 9 aji5 AS�3-OS-0003-49 �/� Revl i Aspen-Pitldn County Airport May 21�2013 AIP 3-08-0003-49 Pavement Maintenance (Schedule IV and Schedule V Non-Federal) poxtion of the pxoject. 2.17 In-House Quality Control. Priar to the final set of Construcdon Dxawings, Specifications and Contract Documents being submitted to the FAA 1nd die Sponsor, a thorough in-house quality conrsol review oE the construction documents will be conducted. This process�vill include an independent xeview of the Construction Drawings,SpeciFcations and Contract Documents being subinitted, by a licensed Engineex, other than the Engineer whom pexEoxmed the design of the pxoject, comments oEEered by the Engineec that pexformed the xeview and revisions to the Const�uction Drawings, Specifications and Contract Documents shall beincorpoxated accordingly. Thexe will be hvo (2) bid packages that will xequue In-House Quality Cont�ol fox this project. The first Uid package�vill include Quality Control fox the Constcuct tlixfield Tauway Shouldecs and Reconstruct�zcisung Wash/Holding Pad(Schedules I,II,and II�poxtion of the pLOject. The second bid package will indude Quality Control Ear the Pavement Maintenance(Schedule IV and Schedule V Non-Federal) poxtion of the project. 218 Prepare and Submit Final Plans and Specifications. A Emal set of Constmction Dxawings, Technical SpeciFcations and Contract Documents will Ue piepared which incorporates all revisions, modificauons and coxxections determined ducing the Sponsox xeview and tlie plans-in-hand site visit. Half- size (11"X 1T') Construction Dxlwings will be provided to the Sponsor. Thexe will be two (2) bid packages that will Ue submitted for this pxoject. Tlie fitst bid package will include final plans and specificatiene Ear the Co:�stmct Aixfield Ta:.iway Sheulders and P.econstn:ct E:.isting Wash/Holding Pad(Schedules I,II,and III) poxtion oE the pxoject. The second bid package will include final plans and speciFications fox die Pavement Maintenance (Schedule IV and Sd�edule V Non-Fedexal) poxtion of the pxoject. 2.19 Ptepare Local Land Use Apptoval Exhibits and Permit Infocmation. Pxior to completion of design,exhibits depicting the pcoposed unpxovements will be cceared and inEoxmation xequued fox Iocal Land Use Approvals will be compiled. This effort will be cooxdinated with die local Land Use P1lnner who will assist in providing mquixements,assembling the information,and attending meeungs for appcovals. 3.0 Bidding Phase 31 Advettise fot Bids. Requixed adveitiseinent dates, and bidding dates urill Ue established. The �ngaieer will submit notificauon, on behalf of the Sponsor, to the local and selected publications far the upcoming pxoject Invitauons for bids will be emailed to selected fums to assuxe local contractoxs and matexial suppliers axe awazc of the pending pcoject. Appxosimately 15 copies of the final plans and specificauons will be printed Eor disteibudon to prospecuve contractors. The applicable xequirements under the cuxcent Aspen- Pitkin County Auport DBE Pxogram shall be adhered to in the solicita[ion. Them will be two (2) bid packages that will xequv e advexdsement for this project. The £ust Uid package will advertise Ear the Construct Airfield Tasiway Shoulders and Reconstruct E�sting�Y/ash/Holding Pad (Schedules I,II,and III)portion of the pcoject. The second bid package will advextise fox the Pavement Maintenance(Schedule IV and Schedule V Non-Federal) poruon oF the pxoject. 3.2 Prepa[e/Conduct Pte-Bid MeeUng. The Engineex will atrend and conduct the Pie-Bid Meeting with potential contractors and the Sponsor to xeview the pxoject and answex quesuons. The meeting will be conducted at the Airpoxt and will include a site inspecuon. Thexe will be two (2) Uid packages tl�at will requi�e�re-bid meetin�s for this project. The First bid package will include a pxe-bid meeting for the Constmct AirField Ta�ciway ShouldeLS and Reconstruct Existing Wash/Holding Pad(Schedules I,II,and IIn poxtion of the pxoject. The second bid package wii include a Jviauon,Inc 10 of 15 ASE 3-08-0003-49 Revl � � Aspen-Pitkin County Airport May 21�2013 AIP 3-OS-0003-49 pce-bid meeting fox the Pavement Maintenance(Schedule IV and Schedule V Non-Federal) poction oE the pxoject. 3.3 Ptepate Addenda.Any necessary addenda will be issued to clarify and modiEy the pxoject as xequixed by the Sponsox and/oc the FAA. Any necessary addenda will be reviewed with the Ft1A and Sponsors Representative pxiar to issuing. The addenda will meet all design and construction standards as xequixed by the PAA. Addenda will be made available to the planholders either through e-mail, mail, or via facsunile transmission. - Thexe will be hvo (2) bid packages for which lddendums may be requ�ed fox this pxoject. The Fust bid package will include the Construct Airfield Taaciway Shoulders and Reconstruct E�cisting Wash/Holding Pad (Schedules I,II,and IIn poxtion of the project. The second bid package will include the Pavement Maintenance(Schedule IV and Schedule V Non-Fedexal)portion of the pcoject. 3.4 Consult�vith Prospective Biddets. During tlie bidding pxocess, the Engiaeer�vill be available to claxify bidding issues with contractoxs and suppGers, and fox wnsultation with the vaxious entides associated widi the pxoject. This item also includes contacung biddecs to generate intecest in the pxoject. Thexe will be hvo (2)bid packages fox which consulting with pcospective Uiddexs will be xequixed Eox this pzoject The fi�st bid package will indude the Consuuct tlirfield Taxiway Shoulders and Reconstrvct E�cisting Wash/I-Iolding Pad (Schedules I,II,and III)portion of the pxoject. The second bid package will include the Pavement Maintenance(Schedule IV and Schedule V Non-Fedexal) poxtion oE the project. 3.5 Conduct Bid Opening. 'I'he Engineex will attend and assist with a bid opening at the Sponsox's location. There will be two (2) bid packages for which a bid opening will be requixed for this project. The first bid package will include a bid opening for the Construct tlirfield Ta:uway Shouldexs and Reconstruct E�cisting Wash/Holding Pad (Schedules I,II,and III)portion of[he pxoject. The second bid package will iudude a bid opening Eoi the Pavement Maintenance (Schedule IV and Schedule V Non-Fedeial) poxuon oE the pxoject. 3.6 Revie�v Bid Ptoposals. �ngineec will xeview all the bid proposals subinitted. An analysis oE the bid pxices,DBE parucipnuon,and conteactor s quaGficauon fox die wock will be completed. There will be hvo (2) bid packages Eor wliich bid proposals will Ue xeviewed Fox this project. The first bid package will include reviewing bid ptoposals foc the Construct Aufield Ta�way Shouldexs and Reconstruct F,xisung Wash/Holding Pad(Schedules I, II,and III) poxuon of the ptoject. The second bid package will ii�clude revicwing bid pxoposals Eor the Pavement Maintenlnce (Schedule IV and Schedule V Non-Fedexal) poxtion of the project. 3.7 Prepare Recommendation of Awatd. The Engineex will prepaxe a Recommendation oEAwaxd fox the Sponsoc to accept or reject the bids, as subinitted. If xejecuon is recommended, the �ngineer will supply an explanation for the� xecormnenda[ion and possible alrexnauve acdons the Sponsor can puxsue to complete the pxoject. Thexe will be two (2) bid packages for which a Recorrunendation oEAward will be xequixed fot this pxoject. The Fust bid package will iuclude a Recommendation of Aw1xd for the Construct A�field Tasiway Shouldexs and Reconstmct E�cisting Wash/Holding Pad(Schedules I, II, and IIn poruon oE the pioject. The second bid package will include a Recommendauon of Award Eox the Pavement Maintenance (Schedule IV and Schedule V Non-Federal) partion of the pxoject. Jviafion,Inc. U oj15 ASE 3-OS-0003-49 Revl � / / Aspen-Pitkin CountyAirport May 21�2013 AIP 3-OS-0003-49 Specia!Conside�ations The following special consideraUOns axe xequired Eoi this project but will be completed by Sub-Consultants to the Engineer. The cost foc this work will be included in the Engineering Contract Agreement �vith the Sponsox and the costs axe ui addition to the Engineering Fees. Conduct Topographical Surveying. (Sopris Engineexing, Inc.) - Suivey will be requued in oxder to complete the design for the pxoject. Survey shall include the following: ➢ Survey of ceisung infield axeas within pLOject limits . ➢ Survey of eacisting l�/ash/Holding Pad ➢ Vexificauon of the eacisting pavement elevations at tie in points on airfield pavement. ➢ Vexificauon of existing infrastructure, as xequ�ed. ➢ VeriEtcation of existing utiliues,as cequued. ➢ During design, thexe may be the need to veciEy odiex eacisung suroey infoxmation oc extend the lunits of the e�sting survey. Conduct Land Use Planning Cooxdination (TG Malloy Cousulting) - Consists oE a local land use planner, reviewing and cooxdinating design, and design xevisions �vith local land use ofFicials. Pxiox to completion of the design, land use appiovals ��ill liave been completed, and in some cases, xevisions requested by the Sponsor oi PAP,will requixe mdxess with the land use planning officials. This task will also assist in cooxdinauon with any and all Land Use conditions not wvexed under the pximary scope oE woxk. PART B - SPECIAL SERVICES Patt B - Special Services (Schedules IV and V Non-Federal only) will consist oE the construction administration phase, pre-construction coorduiation phase, on-site const�uction coordinauon phase, and post-construction/pxoject close out phase. 4.0 Construction Administration Phase 4.1 Prepare Consttuction Contract and Documents. This item accounts for the Engineex's in-house efforts duzing and immediately aEtex the pioject bidcling. The Engineei will prepare the Notice of tlwaxd, Notice to Proceed and Contract Agxeements for the Sponsor's appxoval and signatures. Appcopxiate copies will be subinitted to the successful Contractox(s) fos their signahires. 4.2 Office Assistance. Office Engineexing staff, CAD personnel,and clerical staff will be xe9uued to assist the Resident Engineex(s) as necessary duxing construction. Specific items to be accomplisAed include compiling and sending additional infoxmauon xequested from the office to the pxoject site, pxoviding secondary engineexing opinions on issues arising during construction, maintiining pxoject Eiles as necessary (field £des axe mirxoxed in the office for continuity) and vaxious othei items necessary in the day to day operaaons. 4.3 Periodic Cost Estimates and Request for Reimbucsement. The Engineer will prepare periodic cost estimates duxing construction and FAt1 requests for mimbuxsement of fiinds. A xequest for reimbuxsement will be submitted to the Sponsoi fox xeview and appcoval piiox ro the Sponsor requesting teimbuxsement fxom the appropriate agency. 4.4 Weekly/Monthly Repotts. The Pxoject Managec will review pro�ess repoxts weekly and monthly. 4.5 Matetial Submittal Review. Matesial subinittal data will be xeviewed and approved by the Resident � Jviauoq I�c. 72 af 15 ASE 3-OS-0003-49 Revt �� Aspen-Pitkin County Aiiport . May 21�2013 AIP 3-08-0003-49 Engineex(s) or office personnel, iE the Resident Engineer(s) aze unable to makc final deterailnauon oF compliance. 4.6 Change Order/Supplemental Agreement. Clexical and dxaEdng personnel will assist with chaage oxdexs and supplemental agreements as necessary. 4.7 Review Safety Plan Compliance Document. The Engineec will assist the airpoxt in reviewing the Safety Plan Compliance Document submitted by the Contractor, foc adhexence to the Consuvcuon Phasing and Safety Plan,peiox to issuance of the Notice to Pxoceed. S.OPte-Construction Coordination Phase 5.1 Prepare Pcoject Files. The Engineex is Lequixed to assuxe the constmc[ion contxacts axe in oxder, the bonds have Ueen completed, and the Contractor has been provided with adequate copies of the construction plans. The Plans will be updated to include all addenda items issued during bidding. Clerical will pxepare tl�e quantity sheet, tesung sheets, construction xepoxt farmat, etc. The Engineer will make five copies of the plans and specifica[ions Eox die Contractoi s use duxing wnst�vction. 5.2 Prepare/Conduct Pte-Consttuction Meeting. Ti�e Engineer will schedule the pxe-consuvction meeting and inform all necessary paxties. The Pcoject bfanager and the Resident Engineer�vill establisl�a pce- construcdon meeting agenda to xeview Ft1A and pioject specific xequixements pxioi to commencing construcuon. The meeting will be conducted at the tliiport and �vill include the Pioject Managec, Resident Eagince,, Spoasc., t;;e Ft1A (i: �sail:ibie), Coiivaciot, Souconuactoxs, airport tenants affected 'uy tl�e constrvction,and utility companies. 5.3 Prepare/Submit Construction Management Plan. Not Applicable. 6.0 On-Site Construction Coordination PGase This phase will consist oE pxoviding one full time Resident engineer far the duxauon of the pxoject,suppoxted by the Project Managex. It will be the cesponsibility oE the Resident Engineex to have sufficient on-site construction cooxdination to ensuie that the pxoject is completed accoxding to good construcuon pcacuce and is consistent with the Engineer's dicecuon. The construction is estimated ro take 30 Calendax days. Overhead costs,travel costs,and per diem axe ui addition to the engineexing hours expended. G.1 Field Inspection/Coordination. The Project M2nager �vill makc onc on-site visit to observe the ptogxess of the work and deal with construction issues as necessary. 6.2 Resident Engineering. The Resident Engineexs will be on-site full time 2nd �voxk appxo�mately 12 houxs per day. It is assumed that the Engineexs will be ablc to complete daily documentation in the couxse oE the 12-houx day and that total inspection on-site tune is anticipated to be 31 Calendar days including all punchlist and quality control efEoxts. 6.3 Review Construction Submittals. The constrvction coardination will consist of ceviewing and aPpcoving the shop dxawings and material submittal data fxom the Contractor. The Resident Engineec will review copies oE the Contractor's survey data Fot pavement grades. The Resident Engineex will xeview othec construcuon items foc genexal compliance�vith tl�e construction documents. 6.4 Review Contractoc Paycoll Forms. The Engineex will be xe9u�ed to make employee interviews and xeview Contractor s weekly payroll xecoxds as required by the Ft1A. t1s past of this eFEort, all payrolls will be Teviewed and logged/date stamped when received. A log identifying curxent status of reviews,and any action taken to cotxect noted discxePancies, will be pxovided fox Sponsox revie�v at time of RFR pxocessing as ]viatioa,Inc. 73 of 75 ASfi 3-08-0003-49 Rev1 �`� J Aspen-Pitldn County Airport bfay 21�2013 AIP 3-08-0003-49 appropriate. G.5 Calculate Cons[�uction Quantities. The Reside�t Engineer will maintain recoxd oE the progress and vrill xeview the quantity xecords with the Con[ractox on a pexiodic basis. G.G Periodic Cost Estimates. The Resident Engineex will prepare the Pexiodic Cost Estim�tes and xeview the quantities with the Contractor. The �ngineer, Airpoxt and Contrador will resolve disccepancies, ox disagreements with the Contractox's recoxds. 6.7 Prepace Requests for Reimbucsement. The Engineer will utilize the cost estimates and pxepaxe a markup RFR which will be submitted to the ofEtce Eor finalizauon. After xeceiving the RFR ftom the office, the Engineer will be requ�ed to vexify all enuies and tlien submit copies to the Sponsox fox pcocessing. G.8 Prepare Daily Reports. The Resident Engineec will maintain a daily log oF the construcuon activities for the duration of time on site. G.9 Prepate/Submit Weekly Reports. The Resident Engineer �vill pxepare a weekly status xepoxt using the FAA's standard form. The xepoxt will be submitted to the Sponsor, the Ft1A,and the office. 6.10 Review QC/QA Results provided by Contractor/Engineer. The Pcoject Ma�agex and Resident Engineer will review and cooxdinate xevisions by the Contxactox for Quality Control and die Engineer's testing firm Eox Quality Assuxance submittals pexformed as part of the acceptance testing xequired by Pt1t1 Standard Specifications. This will occur on a weekly basis and at pxoject completion. 7.0 Pos[Consttuclion Coordmation Phase This phlse urill consist oEpxoject close out and site cleanup. 7.1 Conduct Final Inspection. The �ngineei, along with the Sponsor and Ft1t1 (iE available), �vill conduct the fin11 inspection. 7.2 Cootdinate Final Surveys. Not Applicable 7.3 Prepare Clean-up Item List. The Engineer will assure the Contractox has xemoved all construction eyuipment and construction debris from the Airport, that all access points hlve been te-secuxed (Fences eepaued,gates closed and locked, keys retuxned,etc.) and the site is dean. 7.4 Engineering Recoxd Dcawings. The Engineex will pxepacc the Record Drawings indicaung modificltions made during construction. The actual deafting involved on these items is covered undec the Construcuon Administradon Phase of the project. 7.5 Engineeting Final Construction Report. The Engineex�vill prepare the final Construcuon Repoxt and include the Sponsors CezdFcations (Attachments 1, 2, 3, 4, and 5). The actual derical woxk involved on this item is covexed uudes tl�e Construction Administr2uon Phase of the pcoject. 7.6 Summaxize Ptoject Costs. The Engineex will be requixed to obtain all administrative expenses, Engineecing Eees and costs, surveying costs, testing cos[ and contraction costs associated with project and assemble a total psoject summary. The summary will be compaxed with the available fuuding. 7.7 Assist with Projec[Audit. l�/hen xequested by the Sponsor ox Ft1t1, the Edgineec urill assist with the project, or year-end audit. The Engineex will provide files xequested that axe pextinent ro the pxoject cost and completion. Jviation,Inc. 14 of lf ASG 3-08-0003-49 � Revl � Aspen-Pitkin CountyAilport May 21�2013 AIP 3-08-0003-49 7.7 ALP Update. Not Applicable 7.8 Ai�port Secutity Program and Airport Certification Manual Diagxam Updares. Not applicablc. Special Considerations ➢ None Jviation,Inc. 15 of>S ASC 3-OS-0003-49 �� Revt � 88$88880 88888 &y � �$ � �=�» F3 R3�3SR� 'y __ I a p 9 � s � a�sa8 = � � � ssss8 s. sg g s = ; � ; mm�� � ���R � � £ r &'= ���a_ � '&�a � y _ =ar ' �$o��'-� �rt . � »»�... »Nr � � Z�� � 8, 8 8 8 88$8 $ -. �, $ � �}� �a $$3�� -„�-�,� $ ,���..- �as� -- � 9 �Z� "` � � m<� o�a � sss° - e � °S " ' ma o ' Ah= a � c '� .,, H m `9t R„ � $ � o �°.r �.;�° � _ � g � � � N'� w x s " _ _ .. _ »�.�� o � � ���sa� � sgs� � s � z � : =Na�°s � naH� � _ , s �°� � � s ..»..»» �g < � � sa<aa . . . s s e ? -"�g� - - a s � e _ � u 8 „ � „ : � 6 � a F.a $m9H8 wN„ s �� _ _ _�� ^ . . . - � R A a� d � - � � �� SmS88 $ »NN ` v � � � o $ S _ -'=�$ . . . ; G $ v �e m� ; � s x � „ � : ra` � � �x - .� . y �N � S ...��.,.. »...» a w ' � go $� �ws n� v . ,.. � =p�AR" _ ' `� � °- 'ro?.9 $` c g.a.��j y egggs g gs&e s s c :�e� "mm�� ;, �e�� .,' _ : 4 5 �^�`". e'� c ��»�Ur � �:°� � - � $ e g� w � � � u �<� ` ' Gl gex�.y � :�S��a � g °a . 5�� Sy� a FR . - eR �a'��'ffi .2 � •��`_ , _ � °�7�?� � �c.�'�o � r� � �V r Vos�� 3� � o��� � £ < F �e;y� � � � '�� o ' �� .��. .��, ` _ e�=_>> ` ��9,�� � � . x ����x � o� � =e - ; Y �� �' S9 E E o � � � 2.� � a -� � � . � � w� C �, � 9o8E s ., � �� a ��S:�n a Z 5 � S ���� � ` s s o 3 '�d �s � Va 9�6 m w�o2�9 � ,.. � E � c� S°�� ' -� $ �a `° � :�� < Y �" � o i °� x $ ��� a �� `� a �€c u � � � z "8 � 7 � � `g � °ip� ' g�� � v 9� 5� : 5 ao A ����g'a � ��poa � _ m � ���a a� i o� � m o s ; < _ _ p eNN ¢ _ �a as a ��� m ��� � .'c, g "" "" """ �6 g ssaosgs saa�aae � ^� as assaaas�€ s �sassa saseaa;= � � � � ��^ ���g ?_�a _aaaa =_ssAa::�� - � ? fly'z.$.x�. ��$saa+_a � �g � . �"�n sa�. �� _ - - I - �z» -- - � n w' � � q, J � � s a $a&$� d a 885188 $ � � � � �R.°.9�Af 9 �^'� S2S�n' A_ '� 2 } y 'sy' e g � 3 r - � a � � - � � _-zasa� _s��£ :a_ ' q �� e = aaas� = 'a � a�oS� �V 2 ' ' � � z � a " , � a 3 � ��se , � �ga�, - �° � t a � � q e g � R � tt Si An RR ,�', .� 5 a _ _� � '� 8 - � - A `.�l ,� $ _ tl$ � 6 n 6 .. 9 G 3 � e � j 8 ^ �J � �3 . ._�8g° n-°��83� R F $ F - 8 ^ � ..,q ., e ;V „ 3 � � � � � ; R � ss s _ a ' � R _ a � � $ � g 8 � � � ^ a8 _ F3 R a � � � R SS n � .+ r �q8 a �:g � . ' ;dS ^9R'- m3693R ^_ �� � �8 ��»� = RJ » aa � � � �5_ _ � S .A . -°. $ � G � S � � � � 8 '� S 5 � _S � F .0 � _ "' _" ' � _ a ��£��V J F £ �a� z v � �2 a �3 _ s �Z _ � � e e � � �£ z � � z3 a � � o §3� � rEa a y 9 � �p�$ � 6t �`O `�P JS 2 ¢ F�� � v ya � � i �3A :��q5 �X� � s > > � �`���F - 6€�iC` L � 'c r a . ° a�ac'"�r� �6 ^ '� ��5� ��a°s � i a9y����� - . � o " 5 "- �e % `teY � d �' e E ° � . 5�S� sr od�eF_ e8�dra� s - � - e��5.ee � a �� = e e o c ¢ � H7H �i N H __ _ ___ _ AaGB i. K z �� RaGa 3� & � � � s§sssss aessasa. � z asa asas� sa. ' � :.R�aG�_ s»�3�8,_ - � �aj ��sx »�� v� �'ss� es= _ � a p`$ � B { 3 SSR8o$ � � 8858$ 8 ^ � 5 RR9# �S� g SRAR� A_ � �� ` ' �� � $ s _ ' � � =aa .x:- � a'=�e�.; w: : � .,Ea�:�: � � og - aS � s & _ � �ga., aa "�em , s� a � ��� � S � s � � a e ^ � °q % J � E $ � � � $ x �g 8 � � ' $ a � � s xs � � � � " • rv= z � e a � R A � R b 5 � „ � » 8, a p 3 y � .l e�BR Yn� yxa�" '� `'1 - � . � _ 9 � � ���eR . NS �p$ -- � '� . �2 . �< 3 � C �q : m 3 a � d � � g G � ^ � � � : � ��s�55 °5 �<<�a" J � r ie i ' 2 i • �i �;� £� � rN 7 E e � � � g@ g 33 Q Y x " 8 � � � i � y P� � •�`� c�SG� � ' 3 � � �3e�.E �� c y= ' " = 9: 3iao� : '��a � 3e � e Stl5 "-. E a �l �o��i�2� ° �e - W z ° e F § - x� a8 � ' °�w� � ' ' �V �999 s aaasaaas gssaas?� sass sss sasassa.� _ ^a N�RRS'.�a�d ��R.a� »>„ � ^5��.���AS 4AA3ASnj � S� �S� = �S� »FF '-_ d N � � � y� Y q 8 SH�SS$ 8i i 8 88A888 = " �Y � AGSSS� S: 5 A �RAR ,:S.r u � - r � - � y 3 � E F : � u° = � ___ _ _R� tls�C ���F aS., _ deddi_`? V � �a �.< � � � - � c � a ;y $ ^, E . Y8 � ��$ _ _ ' O � ��� ��3 H 3 � a � o $ g p $ = E J � J � - � 8, o � A 9 �8 & xe � � � s � 3 � � rv - �N^ � 8 � � - _� � � _ 5 ' $ r � a u # � � ' � � a - - s., . � 'x � a�- � g . s �„ � - a - - - � ~ 5 � �3s 3 �ma x z�G ° y » ' §" �3:A a.,.. ax ��» �`' 5 & r � � 8 t ' - - ' a �5 8 � �9 $ � � � ° J �2. ' 35 :J � c " �3 t aE ia 53 �` � ai �" < `3 F " � � t" `s g E s z is � � �� �5 ° 9 ° � S � o �� ��a � ��p ' i.3@� a `� . ���; g �B2 9 ���&�yE � � l���g 53a� � ;�� 3�� e � � ; - � S o� ; 3gafi� �Sg.N � o�aa'S'�� ` �� e � 35 a�5�5�25'z � i c e pg - _ a : �a �x � - �u��: a� Contract#120-2013A Rev.S18.l 1 jan/js Budget Line Item#404.69.94798.86000 ���� � � �RY qJ 1�9 �� ..._._.,—_- �=f.o..��� _.._�._.." NOTICE TO PROC�GD DATE: 9/23/13 TO: J.D. Ingram, PL' Jviation, Inc. 900 S. Broadway, Suite 350 llenver, CO 80209 FROM: Pitkin County 0233 East Airport Rd. Aspen, Colorado 816ll You are hereby authorized to proceed on August 28, 2013 or within ten (10) consecutive calendar days thereafrer, with the work covered by Pitkin County Contrlct #120-2013A. All required permitting should be approved �md on site prior Yo commencement of work. By: Brian Gre:e Assistant Aviation Director- Administration 3v