Loading...
HomeMy WebLinkAboutbocc.con.202.2013A Rev. 08-30-11 jls COUNTY CLERK'S CONTRACT COVERSHEET �� CONTRACT #: 202-2013A G�rWl , ORIGINATING DEPARTMENT: Airport PROCUREMENT OFFICER: Dustin Havel PHONE #: 429-2855 PROJECT NAME: Airport Lighting Control and Monitoring System - Megger CONTRACTOR: Precision Control Systems of Indianapolis DOLLAR AMOUNT: $9,550.00 LINE ITEM # 404.25.92225.86871 CONTRACT EXECUTION DATE: 8/29/2013 CONTRACT END DATE: 12/12/2013 AUTOMAT[C RENEWAL: ❑ YES � NO TERM: ❑ BOCC AGGNDA ITEM (Grants, IGA) ❑ STAFF AUTHORIZED SIGNATURE (Requires BOCC Signature) (Per Revised Procurement Code 7/2005) � OVER$50,000 (Requires Section Leader& County Manager's Signature) ✓ CHECK PROCUREMENT TYPE: ❑ None ❑ Informal � Formal ❑ Sole Source ❑ Emergency ❑ Outside Agency/State Bid ❑ Compliance with C.R.S. 8-17-5-i01, 102 as amended (Immigration Form) ❑ Exempt ❑ Contract Renewal ✓ CHECK CONTRACT TYPEi " � ��`' ❑ Services/Maintenance ❑ Employment ❑ License/Use ❑ Intergovernmental Agreement(Resolution Required) ❑ Lease ❑ Non-Profit � Construction ❑ Quasi-Public(e.g.-AVH) ❑ Goods, Equipment, Supplies ❑ Grant Agreements (Notify Finance & Resolution Required) ❑ Other(e.g. revenue) ❑ Change Order/Contract Amendment � (C/O: 10%or$25K whichever is thc lesser must havc County Manager signature) All Contracts should be proofed and all exhibits and notices must be attached for the following: ✓ � No Pages Missing ✓� All Other Blanks Filled In ✓ ❑ If Page Left hitentionally Blank—Note on Page ✓� All Exhibits Attached ✓ � Page numbered consecutively ✓❑ All Legal Descriptions attached ('fapplicahle) ✓ �All Original Signatures Affixed ✓� Notice of Award/Notice to Proceed Attached ('rf appGcafile) ✓ � All Dates Filled In ✓� Warranty(if applicable) ✓ ❑ Special Instructions for Finance Department: ✓ � Authorized Procurement Officer's Name: Dustin Havel BY CHECKING ABOVE AND ENTERING NAME,THE AUTHORIZED STAFF PERSON INDICATES THAT THE ATTACHED DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING. NOTE: CLERK'S OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST! Contract#202-2013 Rev. 8.31.1/jan/js Budget Line Item#404.2592225.8G871 ��� �� ��Si1 1'� 9. � --- C��.���(°�.-� �_.� CHANGE ORDER/CONTRACT AMENDMENT Change Order Number: 202-2013A OWNER: Pitkin County 0233 East Airport Rd. Aspen, Colorado 81611 CONTRACTOR: Precision Control Systems of Indianapolis 7225 Girls School Ave. Indianapolis, IN 46421 The Airport Lighting Control and Monitorin� System (the "AgreemenY') dated August 29`h, 2013 between the Board of County Commissioners of Pitkin County (the "Count}�') and Precision Control Systems of Indianapolis (the"Contractor"), is hereby amended as follows: Descriotion of Chan¢e: Include into the AirpoR Lighting Control and Monitoring System an Insulation Resistance Measuring System (IRMS) as outlined on the attachment. The system will test each cable once per day and record the resistance value. Reason for ChanQe: Evaluating insulation integrity is very unportant in evaluating and testing the integriry of an electrical system. Electrical insulation starts to age as soon as it is made and harsh installation environments, especially those with temperature extremes and/or chemical contamination, cause further deterioration. Identifying these issues early can improve personnel safety and power reliability for the auport lighting circuits. Original Contract Price $ 66,400.00 Net Increase/Decrease in Contract Price(this change order) $ 9,550.00 *Total Adjusted Contract Price(including this change order) $ 75,950.00 In all other respects the Agreemen[is in full force and effect and remains unchanged by this Amendmen[. o�G� �td►tiytiJan, /� 9- �G- /3 , �t.�i . Contractor Date 9�4-/� roc�men� fficeL--�, Date � �( / C�` IU—�— �� County Manager Date � PRECISION _ � Control Systems of Indianapolis , Inc . 7225 Girls School Ave. * Indianapolis, Indiana 46241 * (317)241-3000 * Fax(317)247-6837 Seprember 1 I,2013 At[n: Duslin Havel RE: lnsulation Resistance Measurement Sysrem op[ion FROM: Tom Harmon Per your request,we are pleased to propose one(I) Insula[ion Resistance Measuring System(IRMS),wstom engineered to mee[your requirements. The system will consist of the following: ➢ One(1)Insulation Resistance Monitoring Control Panel • Fully wired for testing 8 Circuits. • The system will test each cable once per day and record the resistance value . The controller will communicate back[o the ALCMS via an Etheme[CATS cable. • The ALCMS will be programmed to display the trend data on the HMI. ➢ Installation and wiring will be subcontracted[o Wes[ern Slope Electric The price for the complete IRMS: $9�SS�.�� USD The price is based on the system being ins[alled as part of the ALCMS sys[em. Please let me know if you have any ques[ions. Sincerely, �%j�7%'P��' Thomas E. Harmon Senior Control Engineer ASPEN/PITKIN COUNTY AIRPORT—IRMS QUOTE PAGE 1 2