Loading...
HomeMy WebLinkAboutbocc.con.amended.143.2011F Rev. 08-30-11 jls 11101111fr COUNTY CLERK'S CONTRACT COVERSHEET CONTRACT #: 143-2011F ORIGINATING DEPARTMENT: Airport PROCUREMENT OFFICER: Brian Grefe PHONE #: -4292853 PROJECT NAME: Airport Sustainability Program CONTRACTOR: Mead and Hunt, Inc. DOLLAR AMOUNT: $324,220.00 LINE ITEM# 404.69.91472.82000 CONTRACT EXECUTION DATE: 10/14/2013 CONTRACT END DATE: 7/31/2016 AUTOMATIC RENEWAL: ❑ YES ®NO TERM: Until Complete ❑ BOCC AGENDA ITEM (Grants, IGA) ❑ STAFF AUTHORIZED SIGNATURE (Requires BOCC Signature) (Per Revised Procurement Code 7/2005) ® OVER $50,000 (Requires Section Leader& County Manager's Signature) ✓ CHECK PROCUREMENT TYPE: ❑ None ❑ Informal ® Formal ❑ Sole Source ❑ Emergency ❑ Outside Agency/State Bid ❑ Compliance with C.R.S. 8-17-5-101, 102 as amended(Immigration Form) ❑ Exempt ❑ Contract Renewal ✓ CHECK CONTRACT TYPE: ® Services/Maintenance ❑ Employment ❑ License/Use ❑ Intergovernmental Agreement (Resolution Required) ❑ Lease ❑ Non-Profit ❑ Construction ❑ Quasi-Public(e.g:AVH) ❑ Goods, Equipment, Supplies [' Grant Agreements(Notify Finance & Resolution Required) ❑ Other(e.g. revenue) ® Change Order/Contract Amendment (C/0: 10%or$25K whichever is the lesser must have County Manager signature) All Contracts should be proofed and all exhibits and notices must be attached for the following: ✓ ® No Pages Missing ✓® All Other Blanks Filled In ✓ ® If Page Left Intentionally Blank—Note on Page IN All Exhibits Attached ✓ ® Page numbered consecutively in All Legal Descriptions attached (f applicable) ✓ ® All Original Signatures Affixed in Notice of Award/Notice to Proceed Attached (f applicable) ✓ ® All Dates Filled In ✓❑ Warranty(if applicable) ✓ ❑ Special Instructions for Finance Department: ✓ ® Authorized Procurement Officer's Name: Brian Grefe BY CHECKING ABOVE AND ENTERING NAME,THE AUTHORIZED STAFF PERSON INDICATES THAT THE ATTACHED DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING. NOTE: CLERK'S OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST! Contract#143-2011F Rev. 8.31.11 jaa/js Budget Line Item#404.69.91472.82000 �7 44flll V� G NU 1V �L 1 CHANGE ORDER/CONTRACT AMENDMENT Change Order Number: (6) 143-201 I F OWNER: Pitkin County 0233 East Airport Rd Aspen, Colorado 81611 CONTRACTOR: Mead and Hunt, Inc. 1616 East 15'h Street Tulsa, OK 74120 The Planning Contract #143-2011 (the "Agreement") dated August I, 2011_between the Board of County Commissioners of Pitkin County (the "County") and Mead and Hunt (Barnard Dunkelberg and Co). (the "Contractor"), is hereby amended as follows: Description of Change: TASK ORDER#6 Airport Sustainability Program—Described as attached in the"Scope of Services" Reason for Change This is a negotiated Scope of Work to continue the refinement of the Airport's sustainability programs Original Contract Price $ 0 Net Increase/Decrease in Contract Price (this change order) $324,220.00 *Total Adjusted Contract Price (including this change order) $324,220.00 This change order extends the time to complete work by: No extension to the 5 year contract In all other respects the Agreement is in full force and effect and remains unchanged by this Amendment. 1 1� 9( - 1l • 2ot� Contractor Date OA//3 • Procurement Officer . Date County anger Date Rev 12/27/10 is Project Coding Original Contract# *Increases over$25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. 2 Exhibit A Program of Services Aspen/Pitkin County Airport Sustainability Program Scope of Services Mead & Hunt, Inc. is pleased to submit this proposal to perform sustainability program and climate change tasks for the Aspen/Pitkin County Airport (ASE). This Scope of Services has been prepared in consultation with the Airport and subject matter experts to provide a comprehensive description of the efforts to be undertaken. The proposed scope of services refers to the Mead & Hunt Team (Consultant), as we anticipate the involvement of Mead & Hunt, Synergy Consultants, and BridgeNet International. The objective of this project is to continue the refinement of the Airport's sustainability programs, which include initiatives regarding noise, air quality, greenhouse gasses, energy consumption, and others. The final output of this phased effort (a Sustainability Management Plan document) will serve as a benchmark for establishing and then gaging the effectiveness of existing and future sustainability efforts. By their nature, sustainability programs are intended to be living programs, which will be updated in the future to reflect progress and changing conditions. Duration of this effort is covered is approximately 18 months, and will be split up into two phases. Phase 2 may be refined as only approved by the Airport based on the information identified in Phase 1. This Scope of Services consists of the following tasks: PHASE 1 —Approximately 9-12 months 1.1. Project Coordination 1.2. Stakeholder Involvement Program 1.3. Sustainability Objectives and Goals 1.4. Sustainability Goal Tracking 1.5 Data Collection and Inventory Update 1.6 Assess Range of Initiatives for Meeting Goals 1.7 APU Use Reduction PHASE 2— Approximately 8-10 months 2.1. Project Coordination Phase 2 2.2. Stakeholder Involvement Program Phase 2 2.3 Sustainability Management Plan Document 2.4 Climate Action Planning and Canary Initiative Coordination 2.5 Implementation - I - 6-20-13 PHASE 1 Task 1.1. Project Coordination. Description: Throughout the project, the Consultant will work in close liaison with Airport Management and Staff, County Staff, and their consultants to ensure that the sustainability program meet the needs of the Airport and FAA, while maintaining project scope, schedule, and budget. This includes day-to-day coordination throughout Phase 1. It also includes preparing this scope of services. During the course of the effort, regular meetings and discussions will be held between the Consultant and Airport Management. A total of three coordination meetings with two attendees will be conducted specifically for project management and direction in Phase 1. Additional meetings will be conducted during other project-related site visits or through teleconferences. The purpose of the coordination meetings will be to report on progress made on the program since the prior meeting, receive input and guidance, report on important phases or sub-phases that have been completed, identify problems encountered for the purpose of resolution, evaluate and select sustainability plan components presented, and generally afford an opportunity to review the work and plan at various stages of completion. In addition to the coordination meetings, two (2) meetings will be held with the Airport to prioritize the next steps in the plan development. The first meeting will occur to re-launch the goals/objectives and the second meeting will occur approximately six months later. Deliverables: Presentations, meeting preparation and notes for meetings. Task 1.2. Stakeholder Involvement Program. Description: The Stakeholder Involvement Program will occur throughout the duration of the project as needed to facilitate coordination between the Airport, airport tenants, airport users, FAA, state and local agencies, community groups, and surrounding jurisdictions. Using the existing airport stakeholder outreach methods as the foundation, the Consultant will develop a list of stakeholders and refine the list with assistance from the Airport. Key stakeholder involvement will be designed to obtain timely input concerning: • The Airport sustainability goals and program direction • Key initiatives that the program should address • Sustainability measures for consideration The Consultant will endeavor to conduct stakeholder meetings during site visits for other efforts of this study to maximize efficiencies and minimize expense. Additionally, the Consultant will work to use materials and communications with multiple audiences whenever appropriate. The Consultant will be responsible for conducting meetings. Scheduling will be the completed in coordination with airport staff, based upon the airport's current needs. This task also includes providing briefings to the Board of County Commissioners or others as necessary, concurrent with other meetings. 2- 6-20-13 Included in this task will be coordination with the City of Aspen's Canary Initiative, and when requested the CORE (Community Office for Resource Efficiency). One meeting every three months is budgeted for this effort in Phase 1. Deliverables: Presentations, meeting preparation and notes for meetings. Task 1.3. Sustainability Objectives and Goals. Description: Sustainability goals for the Airport were developed during the initial phases of the sustainability program. With the passage of time, a key component in identifying progress is utilizing the "plan-do-check-act" cycle to periodically review their goals. This task will review those goals, quantify accomplishments and adapt goals as appropriate to reflect the current state of the Airport and the surrounding community. Refined goals could include achieving a specific outcome (e.g., reduce energy consumption) and initiating changes to an activity (e.g., public involvement), as well as targets and time frames for meeting applicable targets. The Consultant will refine the goals/targets/time frames based upon input from the Airport. The Consultant will propose metrics for measuring parameters relative to the achievement of each goal. In some cases, there will be one metric for a goal and, in other cases, there may need to be several metrics that describe a particular outcome (such as measuring water quality). Metrics will be developed in relation to related operational measures, such as total operations, staff levels, costs, revenue, etc. Deliverables: Working paper outlining the sustainability objectives and goals, as well as a list of metrics including a draft timeline for meeting these goals. Task 1.4. Sustainability Goal Tracking. Description: The Consultant will provide a recommendation for the means and methods for the Airport to use when tracking progress toward achieving goals and targets. Simplified tools, such as spreadsheets, will be developed for calculating and documenting metrics. The spreadsheet will be designed to perform basic calculations using information as generated (total number operations, hours of equipment use, tons of waste, etc.) and provide an output in terms of the sustainability goals. The spreadsheet will include a summary sheet to provide a `report card" type format that can be exported or printed for the purpose of sharing with the community. An emphasis will be placed on developing procedures and tools that utilize information currently available to the Airport. The procedures will not include the use of detailed financial, social, or environmental modeling (EDMS, INM, etc.), but instead rely upon software already available to the Airport (MS Excel, Google Docs, etc.). It is assumed that once tracking methods are developed that subsequent metrics will be maintained by airport staff or covered under future scopes. Deliverables: Tracking tool for select metrics to track success of meeting goals outlined in the previous task. -3 - 6-20-13 Task 1.5. Data Collection and Inventory Update. Description: The Consultant will update the existing inventory of baseline data to reflect the current and historic conditions at the Airport with data that has been made available since the last update. . Information from the Airport as well as regional sustainability and green initiatives such as the Canary Initiative will be collected and reviewed. The Consultant will assist the Airport staff during the compilation of needed information. In many instances, close coordination with Airport staff will be required to access County records and certain utility providers. Using the information collected, the Consultant will update the baseline inventory for each of the sustainability goals and categories. The Consultant will coordinate with the Airport to determine the appropriate year for use for the updated baseline, as necessary. The year selected will often depend upon the availability of information. Available data will be categorized based on level of confidence. This task does not include the measurement or development of data that is not part of existing information available to Airport management currently. Deliverables: Inventory Working Paper summarizing details of the data collection for inventory categories. • Task 1.6. Assess Range of Initiatives for Meeting Goals. Description: The Consultant will develop a listing of candidate airport sustainability initiatives and programs for achieving goals identified in Task 1.3. These initiatives may include management, operational, capital, or mixtures of types. The Consultant will prepare a matrix that identifies potential overlap and synergies in cases where candidate initiatives meet more than one goal, or can be shared with other parties such as tenants. The Consultant will reference the Sustainable Aviation Guidance Alliance (SAGA), Airport Cooperative Research Program (ACRP) reports, programs at other airports, current airport initiatives and industry best practices when developing the candidate initiatives. The Consultant will conduct a series of three working sessions with airport tenants concerning sustainability opportunities, with the objective of seeking voluntary improvements. Aircraft operators would be expected to include: Skywest, American Airlines Frontier, NetJets, and Atlantic Aviation. Voluntary emission reduction actions that will be discussed with tenants will include: • Actions already undertaken. • Aircraft operational practices, such as use of ground power and reduced use of APUs. • Status of ground support equipment and the ability to convert to lower emission vehicles, including the pursuit of a Voluntary Airport Low Emission (VALE) grant. This discussion will include actions that could be undertaken in the short-term as well as in the mid-term as the ASE terminal is modernized. • Infrastructure that could assist in reductions of emissions. • Other sustainability practices. 4- 6-20-13 The list of candidate airport sustainability initiatives and programs will be screened to determine their viability and appropriateness for implementation at the Airport. Screening of the options will first be conducted at a broad level to determine which ones are reasonably viable. After an initial screening, options will be evaluated to determine their effectiveness for meeting the sustainability goal. Additionally, the staff resources and financial needs for the initiatives will be estimated. The sustainability initiatives will be ranked by key criteria (effectiveness, cost, feasibility, and timeliness) and charted in a matrix for assessment. First cost and total cost will be considered. All evaluations will be based on known results in other locations or estimates based on rules of thumb or spreadsheet calculations. The Consultant will prepare a listing of initiatives recommended for implementation based upon their ability to meet sustainability goals using available resources, as well as input received from stakeholders. The recommendations and rationale for the initiatives will be developed and documented. After the initial recommendations are provided, input will be solicited from the Airport to develop the consensus recommendations for inclusion in the Sustainability Management Plan. Deliverables: Initiatives Working Paper listing draft initiatives/recommendations for implementation based on identified goals. Task 1.7. APU Use Reduction. The Consultant will prepare a review and implementation plan to reduce the use of auxiliary power unit (APU) and engine idling by general-aviation aircraft. Key concerns include conditioned air for avionics, and multiple types of power required. Based on a recent aircraft fleet mix, of the 48 different general aviation aircraft operating, seven types are equipped with APUs: G-II, G-IISP, G-IVSP, G-V, Global Express, CV640, and Gulfstream 150. These aircraft produced 3,733 LTOs (landings and takeoffs) in 2008, or an average of about 11 landing and take-offs per day. Based on information in the FAA's Emission Dispersion Modeling System, the seven aircraft types by private operators generally use four different types of APUs: • GTCP 36[80 HP] on the G-V; • GTCP 36-100 on the G-IISP, G-II, and G-IVSP; • GTCP-36-150 on the Gulfstream 150; and • GTCP 85[200] on the GlobalExpress and CV640. Generally ground power requirements fall into 400hz and 28.5 volts. The Consultant will contact ground power unit (GPU) manufacturers and distributors, and explore systems that are available that supply single power requirements, as well as combined 400hz/28.5 vdc (a 400 hz system with a 28 vcd transformer). In addition to exploring GPU options, the Consultant will also coordinate with airport staff on other measures that may be helpful, including preparation of customer awareness efforts, and discussions on implementation of possible benefits of proceeding on additional efforts related to the intelligent camera systems that have been installed. Steps that could be implemented in this area include: 5 - 6-20-13 • Continue meeting with the FBO to discuss the problem and solicit recommended approach to reducing APU/on-ground engine use. • Reviewing options for replacing APU/engine use with ground power. • Development of additional poster and flyer materials that could be placed at the FBO and other locations concerning APU and on-ground engine use. • Coordinate with the FBO and Airport Traffic Control Tower Staff to optimize aircraft parking patterns to reduce noise impacts. • Explore having a notice about APU and on-ground power use placed on the Automatic Terminal Information Service (ATIS) as well as in the Jeppesen Manual. • Review of costs versus benefits of implementing ground engine usage monitoring/regulation, along with potential ordinances promoting lower usage. Deliverables: Technical Report on the potential implementation of APUs. PHASE 2 Task 2.1. Project Coordination — Phase 2. Description: Throughout the project, the Consultant will work in close liaison with Airport Management and Staff, County Staff, and their consultants to ensure that the sustainability program meet the needs of the Airport and FAA, while maintaining project scope, schedule, and budget. During the course of the effort, regular meetings and discussions will be held between the Consultant and Airport Management. A total of three coordination meetings will be conducted specifically for project management and direction in Phase 2. Additional meetings will be conducted during other project-related site visits or through teleconferences. The purpose of the coordination meetings will be to report on progress made on the program since the prior meeting, receive input and guidance, report on important phases or sub-phases that have been completed, identify problems encountered for the purpose of resolution, evaluate and select sustainability plan components presented, and generally afford an opportunity to review the work and plan at various stages of completion. Deliverables: Presentations, meeting preparation and notes for meetings. Task 2.2. Stakeholder Involvement Program. Description: The Stakeholder Involvement Program will occur throughout the duration of the project as needed to facilitate coordination between the Airport, airport tenants, airport users, FAA, state and local agencies, community groups, and surrounding jurisdictions. Using the existing airport stakeholder outreach methods as the foundation, the Consultant will develop a list of stakeholders and refine the list with assistance from the Airport. -6 - 6-20-13 Key stakeholder involvement will be designed to obtain timely input concerning: • The Airport sustainability goals and program direction • Key initiatives that the program should address • Sustainability measures for consideration The Consultant will endeavor to conduct stakeholder meetings during site visits for other efforts of this study to maximize efficiencies and minimize expense. Additionally, the Consultant will work to use materials and communications with multiple audiences whenever appropriate. The Consultant will be responsible for conducting meetings. This task also includes providing briefings to the Board of County Commissioners or others as necessary, concurrent with other meetings. Included in this task will be coordination with the City of Aspen's Canary Initiative, and when requested the CORE (Community Office for Resource Efficiency). One meeting every three months is budgeted for this effort for Phase 2. Deliverables: Presentations, meeting preparation and notes for meetings. Task 2.3. Sustainability Management Plan (SMP) Document. Description: Over the next decade, it is anticipated that Pitkin County will undertake a number of construction projects at the Airport, including modernization of the passenger terminal. In undertaking these initiatives, the County wishes to ensure that future development, as well as activities leading to planned developments, is undertaken in a sustainable manner. In a prior phase, the Consultant team prepared a construction best management plan sustainability element. During this task, the Consultant team will review this plan with the Airport and update it where appropriate. This includes reporting that was to be completed during the runway extension and subsequent projects by others. Upon completion this will serve as one element of the broader SMP. The SMP document will include documentation of all of the elements discussed is this scope of services. It is expected that the plan will identify: • Development of a sustainability vision • Development of sustainability guidelines and measurement tools • Development of performance standards and checklists The Consultant will document the process and results of the sustainability planning process and recommendations. An outline of the document will be submitted for review and approval before the preparation of a draft document. A Draft Sustainability Management Plan document will be submitted to the Airport for review and comments. Up to five hard copies and electronic copies of the draft document will be produced. Upon receipt of comments on the draft, a Final Sustainability Management Plan document will be prepared and delivered to the Sponsor. This task includes the production of five hard copy versions and electronic versions of the final document. -7- 6-20-13 Concurrent with completion of the Final Sustainability Management Plan document, the Consultant will prepare text and graphics outlining the Airport's sustainability policies and management plan. The materials will be provided in a format that can be easily posted to or adapted for the Airport's website. A general PowerPoint presentation will be prepared and provided for use by the Airport for presenting the Airport's sustainability policies and management plan. The materials will be drafted and submitted to the Airport for review, and revised based upon comments. Deliverables: Sustainability Management Plan, PowerPoint Presentation on the Sustainability Management Plan and website copy. Task 2.4. Climate Action Planning and Canary Initiative Coordination. The City of Aspen commissioned the Canary Initiative for purposes of instituting greenhouse gas reduction actions to reduce the Aspen area's contribution to climate change. Recognizing that the inventory prepared for the Airport in the initial Canary Initiative overstated the Airport's contribution to the community's emissions, Pitkin County commissioned the Consultant to update those emissions during the most recent revisions conducted by the City. This task includes the efforts to continue coordination with the City of Aspen toward the refinement of the Canary Initiative as well to ensure that the Airport is appropriately represented during development of initiatives undertaken by the City of Aspen. During this task, the Consultant Team will build upon the work of prior phases that updated the greenhouse gas inventory. This information will be updated and a draft technical memo prepared which will form an appendix of the SMP document. It is anticipated that the Canary Initiative staff will update their inventory during the work of this scope of services. The Consultant Team will prepare the Airport inventory for the Canary Initiative's use and coordinate with the Canary Initiative to encourage embracing the work of the Airport's SMP. The Consultant will prepare a technical report that summarizes the results. A draft report will be delivered to Pitkin County for review and comment. Upon receipt of comments, a final report will be prepared. Deliverables: Draft Technical Memo with updated greenhouse gas inventory. Task 2.5. Implementation. The Consultant will work with Airport staff to develop an implementation plan for successful initiation and long-term management of various parts of the Sustainability Management Plan. An implementation plan document will be prepared as a separate document from the Program. The implementation plan document will outline the steps necessary for implementation, individuals and groups responsible for implementing each step, and an estimate of short-term and long-term effort and cost to each stakeholder for implementation. The implementation plan will be developed through consultation with airport staff, airport users and tenants, the public interest committee, and other interested parties. The product of this task depends largely on the specific recommendations outlined in the program. 8- 6-20-13 Additionally, the Consultant will assist the Airport with identifying projects that would be eligible for the FAA's VALE funding. The Airport is listed on the FAA's web site as an eligible airport, as Pitkin County is designated by the EPA as in maintenance for coarse particles (PM10). Such actions could include infrastructure designed to reduce existing emissions, such as preconditioned air/ground power (to reduce APU use), electric charging stations for GSE, a Compressed Natural Gas (CNG) Station, paving unpaved roads, as well as the incremental cost of vehicle conversions. While ASE is an eligible airport, FAA guidance notes that projects should meet the cost-effectiveness criteria to be funded. To date, the FAA has deviated from the cost-effectiveness criteria for certain infrastructure projects, as experience with certain mitigation occurs in the airport setting. The Consultant will review possible projects, develop estimates of the costs, emission reduction benefits, and coordinate with FAA to determine the probability of receiving VALE funding. In addition to VALE funding the Consultant will assist the Airport with pursuing grants for the procurement of zero emissions vehicles under the new FAA grant eligibility program for energy efficiency. The Consultant will review potential project costs and benefits and prepare an application for the Airport to submit to the FAA. If accepted the FAA would fund up to 50 percent of the cost of acquisition and supporting infrastructure. Deliverables: Implementation Plan. VALE grant application and other implementation analysis as determined after Phase 1. -9- 6-20-13 • AauenPXdnCO,mh timorl 0604051 PI1m1M 040000 Mrrgf SBIIIwAIrpl Eagoew „Npol E4mm ie0M007040300 44M01AMe Nre9VCwullm4 0400Ne11n1em4Wm0 "0"741 6 n N program 040661 $ S.W R e E 21000 041100x: E r: E 1000 R r: E 30.00 040660: S BBW HAsH,. 3 25900 c E 100300 0 s E6wnaea Totals Conl401ma1V Hans 1 Coal Hours I Cat Hours 1 Cod Hens 1 Cost Haas 1 Cost Hours 1 cost Hours 1 Cost Hours I Coot Hours I Cost E Cent Cod Ea Coos Cost PHASE I Task 11 Project Coordination 38 0 9540.00 40 0 0100.00 20 $ IMW 8 E 1272.00 0 I E - 4 3 30250 30 $ ]..500.0] 0 I3 1132 S 312300 S 0000.0 E 20].00 $ $ 51, 39,304 Task l2 Stakeholder involvement P negam 12 E 3.100 03 40 0 8400.00 30 E 5300.00 30 I1 477000 20 $ 2803.00 0 3 20 0 3000.50 0 IE 112 1{. $0300 0 120.0 E 200.00 $ • $ d 11 3330 Task 1.3 Slntalnadllly Objectives and Goals 2 $ 530.00 18 0 3300.00 4 E 810.00 1 I E 638.0 0 I$ - 0 S r le 40000 0 I E • 42 5, •0306 E - $ $ $ 0366 Task14 Suslalla0llly Doannasking $ 8 E 1600.00 4 E 040.50 I0 6540.00 8 3 1040.00 0 3 - 18 3 400.00 0 $ 0 00 E - S - E { x 42 7.100 Task 10 Gap Collo-almond Inventory Update 0 E 10 b 210.0 0 E IA0 W (E 8300.00 0 3 IOWW 0 3 - 31 3 SW].W e E 110000 02 'S 1>p00 E - E E 5= 1>a00 Tan(1.0 Muss Range of initiatives for Meeting Goals. 4 $ 1;90.00 24 0 0010.00 32 0 5720.00 32 IE 5008.00 0 $ 1040.0 0 0 I6 0 400.00 24 $ a 100 i5 ' 2)300 E - E E 5 27}83 Tas617 APU Use Reduction f 1.000 00 24 11 6 ` (Y E T CO 00 E 280 0 l 00 0 00 0 e L 8 1 S •.000 W S Pv . .a . 216 `OT1P SE ‘4t X C 1 " ] n , "Z 1.: . fir r a � ^1 .E. 1 C{F] 179.251 1111601 Task 2.1 ProjMCOOMIrallon Phase 2 0 $ 212050 20 0 4000.0 12 $ 2530.0 8 I$ 1272.00 0 3 r 0 0 - 30 0 3,500.00 0 0 .=26= r5 17,612 3 6.0060 E 200000 E 3 1,1,r rasa 2.2 6046004400 vaiemel4 Program Phase 2 8 $ 212000 20 E 4260.00 10 0 210.00 0 E 127200 0 $ - 0 S 20 0 5000.60 b {' 114802 $ 1250.1 $ 1,20 00 E Ta0623 Suslalmllllly Management Plan Document 4 $ 1.0'00.00 IB E 3,090.00 0 $ 1690.00 60 $ 5540 00 24 $ 3120.50 IA S 1580.00 32 0 800].00 0 3 • 00 3 21]]6 E E 3 ! .M.H O'fl}2a ran 2A Climate Action Planning and Canary initiative Cooldlmtlol 2 E sac co 28 E 5160.0 4 E 840.00 0 0 - 0 0 0 0 - 0 0 10060.00 0 11,02' !. 214131 3 - S 1 000 00 $ • { ':4 0122,630 Tan 2.5 1171plernentatOn 8 3 21000 0 E 12 me co 00 E 1600.00 00 0 12,220 00 18 3 200.00 8 E 001.00 16 E 40>0.60 0 b 3200 kA 61104 E E - E f 481.486 PHASES TOTAL PM 344"66 5 v, _ 1 . �1a a= .. .! 2]860000 N ' 6],660 3Ta �i=a 51.610 ]54 f 66.266 100 {% '1]000 26 ! 2,744 36s� 1 0000000 v e6 � $ 10]SO- 1602 2 011.626, f 160000 { x.6300 5. 'Sr 3E4230 W