HomeMy WebLinkAboutbocc.res.048.2014RECEPTIONM 611808, 0711512014 at
09:21:54 AM,
1 OF 7, R $0.00 Doc Code RESOLUTION
Janice K. Vos Caudill, Pitkin County, CO
RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY,
COLORADO, GRANTING THE EICHSTAEDT ACTIVITY ENVELOPE AND SPTE PLAN
APPROVAL
Resolution No. L) -2014
Recitals
1. Carl and Gabrielle Eichstaedt Living Trust ("hereafter Applicant') have applied to the Pitkin County
Board of County Commissioners (BOCC") for a one-step Activity Envelope and Site Plan Review
for bank stabilization work along the right descending bank of the Roaring Fork River. The purpose
of the proposal is to protect private property and restore a severely eroding. bank. A portion of the
project is proposed on the neighboring property to the west. The neighbor has consented to the
application. The Applicant has also applied for excavation and repair of a basement/foundation wall
that is failing.
2. The property is located at 48 Riverbend Road and is referred to as Lot 10 of the Samuelson
Subdivision. (Legal Description, Attachment A).
3. The Applicant has addressed all necessary sections of the Land Use Code, including amended sections
identified in BOCC Ordinance 24-2008.
4. The Applicant will access the project area and stage equipment via lands owned by the Lazy Glen
HOA. P, letter has been provided b, the -1 ,Ty Glen HOA stating their support for the project.
5. The BOCC heard this application at a duly noticed public hearing on May 14ih, 2014 at which time
evidence and testimony were presented with respect to this application.
6. The BOCC finds that the proposal demonstrates that this reach of the Roaring Fork River has severely
eroding banks, and that the bank stabilization is needed to protect private property. This proposal, if
implemented as described, will improve the environmental quality of this reach of the River.
7. The BOCC further finds that the under Section 7-2040 the application has been presented as a bank
stabilization project and has been designed for the purpose of restoring, or preventing furthei
degradation of the right descending bank of the River.
NOW THEREFORE BE IT RESOLVED by the Pitkin County Board of County
Commissioners that it hereby grants approval for the Eichstaedt Activity Envelope and Site Plan subject
to the following conditions, which shall run with the land and be binding on all successors in interest:
The Applicant shall adhere to all material representations made in the current or prior applications or
in public meetings or hearings and shall consider those representations to be conditions of approval,
unless amended by other conditions.
2. Prior to submission of any future permit applications, the Applicant shall be required to submit for
approval by the County Attorney and Community Development a Site Plan with an Activity
Envelope in accordance with Land Use Code Section 2-30-20(g) and Application Manual Section
2.1.12. The above referenced approvals shall be a condition precedent to finalization and
Resolution No:iltLC-1014
Page 2 of 4
recordation. The Applicant shall include the area on the adjacent property within the Activity
Envelope.
3. The Applicant shall submit an carthmoving/floodplain permit that identifies all areas disturbed by
construction and include an engineered drainage plan which addresses how sediments will be
contained on site and prevented from being in contact with the River. The floodplain portion of
the permit work shall be engineered and state how the river improvements will not impact the 100
year floodplain. All applicable State and Federal permit approvals shall be submitted with this
permit application.
4. The permit shall include a detailed revegetation plan that shows native plantings and/or vegetation
to the disturbed areas, and larger trees with larger root systems. All revegetation shall occur
within one growing season of the project's completion as represented in the application. Financial
security for successful revegetation may be required. There shall be no access, pathways, or
walkways to the Roaring Fork River. After planting occurs, no trees, shrubs, or other vegetation
shall be removed from the bank.
5. The Applicant shall provide a detailed construction management plan which delineates access to
the site, and all disturbances, material storage, and parking areas. All disturbances shall be
contained in the approved development envelope. It shall also address how fuel and other
hazardous material will be prevented from entering the waterways and emergency cleanup efforts
in the event of a spill.
6. A peer review of the bank stabilization portion of the application shall be conducted by a
professional capable of rendering such analysis. The review shall include an analysis of the
following questions:
• Are there any adverse off-site impacts as a result of the bank stabilization
proj ect?
• If there are adverse impacts, is there appropriate mitigation that could be
implemented to counter those impacts?
If adverse off-site impacts from the project cannot be mitigated reasonably by the Applicant, the
bank stabilization portion of the project may not be implemented and further review is required.
7. The Applicant shall comply with all conditions of the February 5", 2014 letter from Colorado
Parks and Wildlife, Attachment B.
S. No development shall occur outside the approved activity envelope.
9. All bank stabilization work shall be completed between the dates of August 15' to September 30`^.
Basement/foundation repair that does not require access across the River is not part of these date
limitations.
10. Statutory vested rights for the approval contained herein are granted pursuant to the Pitkin County
Land Use Code and Colorado Statutes, subject to the exceptions set forth in Pitkin County Land
Resolution No.v r v -2014
Page 3 of 4
Use Code, § 2-20-1 0 and C.R.S., § 24-68-105. The statutory vested rights granted herein shall
expire on May 1 , 2017.
11. Failure to comply with the conditions of this approval may result in revocation of this approval, or
any subsequent permit(s) or approval(s) related to this property, or vested rights associated with
this property.
Resolution No. !/-(i( -2014
Page 4 of
NOTICE OF PUBLIC HEARING PUBLISHED IN THE ASPEN TIMES on the 20th day of March,
2014.
PUBLISHED AFTER ADOPTION FOR VESTED REAL PROPERTY RIGHTS IN THE ASPEN
TIMES WEEKLY ON UlJ��J 177
APPROVED AND ADOPTED at the public hearing on the 14'h day of May, 2014.
ATTEST:
APPROVED AS TO FORM:
John
nt mey
Case # P0017-14
PID#:246721202013
BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COLORADO
Robert A. Ittner, Jr., Chair
Date: q
APPROVED AS TO CONTENT:
\k goal"
in y Houben,
Community Development Director
Attachment A
Legal Description
LEGAL DFSCILPTION
A PARCEL, OF T,AND SITTJ k rE)3 TWIT. CT 54 OF SEC TTON 21, TO WNSIIIP 3 SOLTT , ,
MN GE 86 WEST OFTME SL\TIi PRTNCIPAL MT.I DW4, MIN N0RT IN'FSTFRLY OF
TAE CFNTFRLINB. OF THr P.OARI\G FORK R1VFR, nIC'R COi•4PLETRLY DESCRIBED AS
FOLLOWS;
BEGMNTNG AT A ?0) NT IN 111$ C1LN7.'FRL.INE OF' HL ROAIUNG FORK RIVER; WRENCI;
AVULG POINT NO2 OF'! RACT 65, SAID TOWNSFIIP AND RANGE, BEARS SOUTH 1305111
.FAST 1$0.32 TTFTI
THENCE NORTH 54030'00" WEST 137.41 FEET;
THENCE NORTH 35030100" EAST 11.5.00 YBET;
THRNCT SOUTH 54030'00" EAST 226.60 FFRT TO A POINT IN TIM, CRNTERLINT, OF SATl3
RIVER;
T.tIENCE SOU`i'I3 649614" )VEST 99.54 FLET AWV G TM CENTERLINE, OF SAID R1VTrR;
THENCR SOUTH 1$031'24" WEST 25.88 FFFT ALONG THE CENTERLINE ON SAID RFV -21,n
TO TRE POPC OF BEGINNING.
County of Piflun, State of Colorado,
also smm n by street and u•.unber as: 43 River Bent] Rond, Iiasnli CO 8162I
COLORADO PARKS & �NILDLIFE
0088 Wildlife Way • Glenwood Springs, Colorado 81601
Phone (970) 947-2920 • FAX (970) 947-2936
wildlife.state.co.us • parks.state.co.us
February 2014
Lesley N1eWhirter
U.S. Army Corps of Engineers
Colorado West Regulatory Branch
400 Rood Avenue. Roan 224
Grand .I unction, CO 91501
I2T: Eichstaedt Residence — N\VP 13 Permit Application
Dear Lesley.
Colorado Parks and Wildlife (CPN) personnel have reviewed the bank stabilization project
proposal submitted by Water Resource Consultants. LLC for the Eichstaedt Residence on
the Roaring, Fork River. CP\V has no objections to the proposed project, but Would like to
request the following best management practices be incorporate by the proponent:
• Disinfect heavy equipment, hand tools, boots and any other equipment that was
previously used in a river. stream, lake, pond, or wetland prior to tri the
equipment to another water body and disinfect equipment again upon project
completion. The disinfection practice should follow this outline:
a. Remove all mud and debris From equipment and spray/soak equipment with a
1:15 solution of disinfection solution containing the following ingredients:
Dialkyl dimethyl ammonium chloride.: -l0`.% by wei_hi;
• Alkyl dimethyl benzyl ammonium chloride, ;-10% by weight;
• Nonyl phenol ethoxylate, 5-10%byweighc
• Sodium sesquicarbonate, 1-5%;
• Ethyl alcohol. 1-5"ro; and
Tetrasodium ethylene diaminetetraacetate, 1-5%;
• and water, keeping the equipment moist for at least 10 minutes and managing
rinsate as a solid waste in accordance with local, county. state, or federal
regulations; OR
b. Spray/soak equipment with water greater than 140 degrees Fahrenheit for at
least 10 minutes.
Conduct in -channel construction between the dates of August 15 and September 30
to effectively avoid disruption to If spawning behavior and activity. In the permit
application letter dated January 27. an alternate timing window of February-lvlarch
STATE OF COLORADO
John `.N. Hid<en!ooper, Governor • Mike King, Exectrive Diredor, Department of Nalual Resoume_s
Bob D. Bmscheid, Director, Colorado Pares and Wildlife
Perks and wildlife Commission: Robert W. Bay • Chris Castilian, Ser,retay • Jeanne Home
Bill Kane, Chair= Gaspar Pemoone • James Pribyl • John Singletary
Meek Smith, Mce-Chair • James Vigil • Dean Wingfield • Michelle Zimmerman
[k Offido Members: Mike King and John Salazar
was proposed as an option. CPV✓ does not support in -stream work during this period
aitd requests the project be completed during the August 15 to September 30
%t indow.
Minimize the release of line sediment by visually monitoring turbidity 100 meters
clownsneam ofthe construction site. If water clarity is noticeably different 100
meters below the site of disiu Bance than it is above the site, construction activities
should cease to allow Nvater to clear before resumim-.
Given the short duration of this project and prior communication between Mr. Currier and
CPW staff. there are cun'ently no further recommendations. CP\V appreciates the notice and
Opportunity to continent on this project. If there are questions or need for further
information, please contact Kendall Bakich, Aquatic Biologist, at (970) 947-2920 or "Faylor
Ehn; Land Use Specialist. at (970) 947-2971.
Sincerely.
/er,
ildIil'e Manager
Cc. Kevin Wright. District Wildlife Manager
Paul Currier. Water Resource Consultants. LLC=
File
STATE OF COLORADO
John lh'. Hicken:mpsr, Governor • -'Ake King, Executive Director, Depanmenf of PJalural Reseur,^aS
Bob D. Broscheid. Director, Colorado Parks and Wildlife
Parks and Wildlife Commission_ Robert W. Bray • Chns Castilian. Secretary • Jeanne Home
Bill Kane, Chair • Gaspar Pemcone_ • James Pnbyl • John Singletary
Lnark Smith, UceLhair • James Vigil • Dean Wingfield • Michelle Zimmerman
Ex ONcio Memters: Mike King and John Salazar