Loading...
HomeMy WebLinkAboutpitkin.bldg.264304302003 (2008)DOCUMENT LAYOUT Certificate of Occupancy or Letter of Completi Permits Final Inspections Any Supporting Documents Site Plans (NOTE: All structural plans will be grayed out. If you require the ability to see structural plans, you must have a letter from the owner stating you are allowed to have plans. This letter must be submitted to Pitkin County Community Development Department) ASPEN * PITION COMMUNITY DEVELOPMENT DEPARTMENT PERMIT APPLICATION PITKIN COUNTY 9, CITY OF ASPEN ❑ 130 South Galena 970 / 920-5526 970 / 920-5090 Aspen, CO 81611 970 / 920-5532 Inspection Line 970 / 920-5448 Inspection Line PEI�4TeNj� 1. '/01 7lspety LEGAL 0E3CR,IP/TION 2. QDffCa 1Qn/ OWNER3. OWNER'S AU11HORIZE'0 AGENT 4. il�en 04.QQ CONTRACTOR 5. S�Y41.J Co,� ARCHfTECT OR ENGINEER OF RECORD 6. .. I n MaLADDREss cls. /DAJI� MNL ADDRESS Ll. L MAIL ADDRESS 76o 4�oti,er MAIL ADDRESS Z3YOD 2 CLASS OF WORK 7. ❑ NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ USEOFBUILDING INGLE FAMILY ❑MULTI -FAMILY 8• ❑ COMMERCIAURESIDENTIAL ❑ COMMERCIAL ❑ OTHER VALUATION OF WORK DUSTING SQ. FOOTAGE SQUARE FOOTAGE 9. $ 70=0 110. 111L)00 THIS PERMIT 11. Is there food service in this building ❑ YES N&O 12. Is LPG used? ❑ YES RkNO 13. Parcel ID#call 920-5160 ZbI Q7 2V &-fA 14. Description of Work vA L e T Y I . V. • NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING. HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 12 MONTHS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPUCATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOV- ERNING THIS TYPE OF WORK WILL BE COMPUED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE ALTTHORTTY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CON- STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. IT IS MY RESPONSIBILITY TO REVIEW THE APPROVED PLANS AND ANY COMMENTS THAT ARE CONTAINED THEREON AND SEE THAT THE STRUCTURE R PROJECT IS BUILT IN COMPLIANCE WITH ALL APPLICABLE DES. ;4 3-5-ob SIGN4 RE�rj jeetjDkt� PATE) PRIM NAME ENERGY CODE FEE she at BuNdIrm Roml SquereFt.i ZIP PHONE L #k- foc, Asp" PHONE UCENSE NO PHONE LICENSE NO PHONE LICENSE NO CIL , a 2 USE TAX CENSUS CODE PERMRFEE MININGFl OFFSTRB Cweretl z Oca .e y GmuP Lot Arae No. of Stones ICoc. Load NO. OF BEDROOMS We z" IXISRNG AOOEO No. of DWBarg Unite -� ' OFFSTRB Cweretl SPECIAL APPROVALS REO ENVIRO, HEALTH ENGINEERING PARKS NATURAL RESOURCES FIRE MARSHAL WATER TAP ASPEN CONSOL SAN. DIST. OTHER I General Permit BD s co_ D FN MH MS RF o SN 5 FEE R.Sxinldii%P hd? ❑Yec ❑No AWm SAtem AeWksv ❑Yes ❑Nc PAYMENT OF PITKIN COUNTY USE TAX ❑ MONTHLY OR QUARTERLY RETURNS WILL BE SUBMITTED. ❑ DEPOSIT MErHOD.5%OF 25% OF THE PERMIT VALUATION PAID AT ISSUANCE. A FINAL REPORT ON TOTAL ACTUAL COST MUST BE FILED WITH IN 90 DAYS OF SUBSTANTIAL COMPLETION OF WORK AND / OR ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. ❑ EXEMPT. EXEMPT ORGANIZATION ❑ RESALE: STATE & PITKIN COUNTRY RESALE NO. THE DEPOSIT METHOD WILL BE ASSUMED UNLESS OTHERWISE NOTED. ANYONE WHO USES AND / OR CONSUMES BUILDING MATERIALS AND FIXTURES IN PTrKIN COUNTY IS SUBJECT TO THE .5% USE TAX. PROPERTY LIENS MAY BE PLACED ON THE OWNER'S AND /OR THE CONTRACTOR'S PROPERTY WHEN USE TAX IS NOT PAID SIGNATURE OF OWNER OF OWNER BUILDERI euu9 I THIS FORM IS A PERMIT ONLY WHEN VALIDATED WORK STARTED WITHOUT PERMIT WILL BE DOUBLE FEE Energy Cale Fee Plan Check Fee Ing Fee ma GIS Fee Fee Use Tax Deposit Fee Other Fees M ►� �1 L 00352008 PITIMN COUNTY BUILDING PERMIT APPLICATION CHECKLIST DEMOLITION* (RAZING) *"Demolition" means to tear down completely, to do away with, or to raze. Any partial removal of a structure which the Community Development Director and Chief Building Official find has the effect of completely razing a unit, even while some portion or portions of it remain in place, shall be considered demolition. Renovation of a unit in place shall not be considered "demolition". NOTE: This is a general list of required information. More information may be required as each project is individually evaluated. When such a request is made, the application can progress only after the necessary information is received. 4 If the proposed demolition requires County Land Use Review, all final approvals must be obtained PRIOR to submission of a building permit application. Contact a planner at 920-5526 to determine if a Land Use Review is needed. ❑ The applicant shall provide two (2) copies of approvals pertaining to the parcel, including but not limited to: Deed Restrictions; Resolutions; Development Orders: Final Recorded Plats; Administrative Approvals; HPC Approval. Verification that all conditions of approval are being met should be called out in the development plans. ❑ P4rmit Application form (including legal description) (10 _Peconstruction Plan checklist ❑ onstruction Management plan -2 copies Water Department checklist (service—area) (❑ .'onditions of Demolition form ❑ Floor area of existing structure: ❑ Number of existing legal dwelling units: ❑ Number of existing bedrooms: (bedroom defined as having a closet and access to a bathroom) ❑ Photographs of the structure to help determine if it is an historic and/or archaeological resource (Check with the Historic Preservation Officer at 920-9225.) ❑ Approximate year of construction: ❑ Architect: Environmental Health Department concerns: (920-5070) ❑ Check with Environmental Health to see if a fugitive dust control plan is needed. City Water and Electric Departments concerns: (920-5030) ❑ Inventories ❑ Water service disconnect application Aspen Consolidated Sanitation District concerns: (925-3601) ❑ Contact A.C.S.D. regarding line locates, service line capping, and permits. Fire Department concern: (925-5532) ❑ The Fire Department may wish to use this structure for a training exercise prior to demolition. JOB ADDRESS Pitkin County PARCEL I.D. NUMBER (applicant to provide) o� w e n %11t1 Community Development n C:\Documents and Settings\debbiew\Local SettingsUemporary Internet Fi1es\0LK37\DemoCkLst.doc January, p( 2004 •.r.. -...n IVLVLIY IW GI GVVV IL.L.Iva rYYI/Uul Colorado Department of Public Health and Fnvironment Air Pollution Control Division - Stationary Sources Program o- Indoor Air Unit 4,300 Cherry Creek Drive South, APCD-SS-1i1 Denver; Colorado 80246-1530 Phoge; 303692-3100- Fax: 303-782-0278 00 352-00 8 . .. E-mail: asbestos@sta[te.eo:us DEMOLITION :APPROVAL NOTICE This approval. notice is granted subject to Colorado Air Quality Control Connnaission Regulation No; 8, Part.B, adopted December 16, 2003, and effective March 2, 2005, the Colorado Air Pollution Prevention and Control Act. C.R-S. (25-`1-101 and 25-7-501 et seq). This notice signifies that the. structure was inspected for asbestos and CFCs and the demolition contractor has properly notified the Colorado Department of Public Health and Environment pursuant.to Regulation No. 8, Part B. As a contractor, you iooay'be subject to other demolition licenses and-permits,depending on the requirements of the.county and municipality in which the woik is being perforrupd. The Colorado Department of Public Health and Environment, Air Pollution Control Division, strongly suggests that you check with county and municipal authorities in order to deterimiue any other local building/permitting requirements ihat must be met. . Please note that certain asbestos=containing materials (ACINI) may remain in the structure .. 'dudug demolition. Therefore;atq. demolitiion, debris left behind after the completion of post - demolition site cleanup may constiitnte a "reason to know of asb'est6s-contaminated soil' at the site, subject to the requiremei is of Section'S* hof the .Solid Waste,Regulations (6 CCR 1007-2, Part I). THE ORIGINAL PERMIT MUST" 13E POSTED ON SITE AT ALL TEWES. q. Immediately notfy Me Unit bf project modfrkadons.by fxr (number above) or. a -mail (address above) and die appropriate county health depardnent by far. Project mod cations include changes in the, scope of work or the scheduled work dates, etc This demolition notice is valid beginning 2/10/2008 through 11:59 PM on.3/10/2008. The actual scheduled work dates are from 21,10./2008 thro4,h 3/101.2008. Approval issued on: 1/25/2008 Amount Paid= $55.00 Record number: 60269 Check number: 1509 Notice Number: 08PI0325D . Asbestos Building Inspector: For the location specified below: John 8. Taylor Main douse Cerification No.: 2342 5911 Upper River Rd Inspection Dater 10/21/2007 Woody Creek Pitkin County Pitkin Counp This notice has been issued to: Shaw Construction Inc, GJ MAR 06 2008 Issued by: RL 4e 760 Horizon Dr. Community Developmew Grand Junction, CO 81506-- —" 3 00J52000 PITIUN COUNTY CONDITIONS OF DEMOLmON Please review and check the items that will apply to this demolition. Jobsite shall be maintained in a safe manner with adequate barricades and signage to protect the general public.. Excavations shall be properly protected. All utilities shall be disconnected per requirements of individual utility companies. Contact City of Aspen Water, City of Aspen Electric or Holy Cross Energy, KN Energy, cable TV, and Qwest prior to commencing demolition. 14 All demolition equipment, dumpsters, and trucks must remain on private property at all times. I Proper erosion control and stormwater management measures shall be in place prior to the commencement of any demolition. M Vehicles are not allowed to track mud or debris on public streets. IN All fugitive or loose dust and debris must be controlled and not allowed to blow on public streets or adjacent properties. M The haul route of demolition materials shall be the most direct route to Highway 82. Follow Highway 82 out of town. Ed Haul trucks shall be covered with tarps or other protective coverings to prevent material from falling off or blowing out of trucks. $a Contact the Pitkin County Planning Engineer prior to the start of any demolition to schedule a site visit W Please call 923-3487 to coordinate recycle material that can be separated and hauled to the Pitkin County Landfill as part of our resource recovery program. Contact the Historic Preservation Officer at 920-9225 regarding demolition of any garages or sheds. OWNER OR REPRESENT. JOB ADDRESS /(/� PARCEL I.D. NLTMBER Z(V q30 G:\county\admm\forms\democond doc I unt�' MAR 06 2008 Commulft D006elopment Efficient Building Program Deconstruction Plan 2.1 Required for additions, remodels, or scrape -offs only Project Address: IMSubmittal Date: Contractor: 5 Phone: 97 yro0 Properly Owner: Date of Demo: -3117106 Project Descriptii Project Size (sq. ft) 1&960 Deconstruction Contract Phone: ' 1. Is the project a partial or complete demolition/ deconstruction? Partial Complete x 2. How much of the structure will be demolished/ deconstructed? < 1000 sq. ft. _ < 2000 sq. ft._ <3000 sq. ft. k— >3000 sq. ft. 3. Lumber, metal, doors, windows, concrete, and some appliances can be recycled or dont d for re -use. Do you intend to deconstruct project for materials recovery? Yes No (If No, go to question #5) 4. If you intend to deconstruct, who will'b performing the work? ��A Contractor Name and Phone Number: . Z4-010 4--Vwme I� �a.nncp<.n� Method of deposition: Donation? Recipient: 5. Will demolition waste be recycled? YesK No 6. What types and amounts of reusable or recyclable materials will this project generate? (Please complete table on reverse.) Of akin county RAR 06 2000 CO MMU"ity Develop►nent U 15. Provide a map showing where will delivery trucks (including dump, concrete and all tractor trailor trucks) be staged prior to delivery? Received? ❑ YES ❑ No 16. Any other information pertinent to parking on the job site or construction management: ❑ va ❑ NO If there is any anticipated traffic Interference on County Roads, Dispatch must be notified Each day of work 920-5310 17a. Signatur of person res ibl Willis plan: 17b. Date: _ 3�5 D8 18a. Printed a e: ,�,. �r 186. Phone: aG3 l��z I 1 FOR STAFF USE ONLY (Do NOT WRITE BELOW THIS LINE): 19. Approval comments: ! in County MAR 06 2008 Ca 20a. ppr y i tanning En er 20b. Dal6. evelopffient 5n;� CONSTRUCTION M AGEMENT PLAN 130 S. Galena St. • Aspen, CO 81611 970.920.5526 Fax 970.920. 9 GC.� Permit # WZ5. It is expecietl that a construction staging will be contir#d to the building enve ope. orkers 'from the'obsite. are encouraged to carpool to an Vehicles CANNOT be parked on County Roads or Right of Way. 1. Job Address: 5911 Upper Riypr Rnnd 2. Legal description of property: 3. Owner's Name: Contact/Fax Number. Mailing Address: Resort Ventures Bracken Richardson 4. Owner's Authorized Agent: Contact/Fax Number: Mailing Address: 5. Contractor's Name: ConiacUFax Number: Mailing Adtlress: Shaw Builders Paul on'n 6. Architect of Engineer on Record: Contact/Fax Number Mailing Address: Micheal Fuller Architects Chris 81506 7. Parcel I.D. Number (applicant to provide): Basalt, Co 81621 B. Valuation of Work to be Performed: $1.4 Million ❑ ResMendal ❑ rnmmocal ® tnd D"bi inert 9. What is the expected duration of construction activity? 5 Months 10. Will all soil be re-used on site? 11. Will there be a delivery coordinator on site? Yes 12. Will there be a delivery schedule? If °yes" please provide. No 13. Will there be a traffic control plan? N 14. Provide two 2 site plans with the following Information: FOR STAFF ONLY 14a. Location of all Building, Activity and Landscape Envelopes. Received? �OYES ❑ No 14b. Parking areas for worker's vehicles. �,..,f Received? `4C1YES ONO 14c. Locations for materials storage, construction trailers, and any other staged items. Received? YF5 ❑ No 14d. Emergency access route to the site. 15. Provide a map showing where will delivery trucks (including dump, concrete and all tractor trallor trucks) be staged prior to delivery? Received?Y� ❑ NO Received? ❑ YES ❑ No 16. Any other information pertinent to parking on the job site or construction management: ❑ YES ❑ NO If there is any anticipated traffic Interference on County Roads, Dispatch must be notified Each day of work 9205310 17a. Signature of person responsible for this plan: 17b. Date: 18a. Printed Name: 181b. Phone: FOR STAFF USE ONLY (DO NOT WRrTE BELOW THIS LINE): 19. Approval comments: #te- cr1hchudf dUe, " 20a. Approveditkin C ty Planning Engine 20h. Date: v Q /�