CONTRACT #: 37.2015A
ORIGINATING DEPARTMENT: Facilities
PROCUREMENT OFFICER: Jodi Smith PHONE #: 5396
PROJECT NAME: Library Construction Inspection & Testing CONTRACTOR: HP Geotech
DOLLAR AMOUNT: $13,500.00 LINE ITEM # 166.63.92863.82600
CONTRACT EXECUTION DATE: 6/16/2015 CONTRACT END DATE: 5/25/2016
AUTOMATIC RENEWAL: ❑ YES ® NO TERM: 30 days
❑ BOCC AGENDA ITEM (Grants, IGA) ® STAFF AUTHORIZED SIGNATURE
(Requires BOCC Signature) (Per Revised Procurement Code 7/2005)
❑ OVER $50,000 (Requires Section Leader & County Manager's Signature)
✓ CHECK PROCUREMENT TYPE:
❑ None ® Informal ❑ Formal ❑ Sole Source ❑ Emergency ❑ Outside Agency/State Bid
❑ Compliance with C.R.S. 8-17-5-101, 102 as amended (Immigration Form) ❑ Exempt
❑ Contract Renewal
✓ CHECK CONTRACT TYPE:
® Services/Maintenance ❑ Employment
❑ License/Use ❑ Intergovernmental Agreement (Resolution Required)
❑ Lease ❑ Non -Profit
❑ Construction ❑ Quasi -Public (e.g.-AVH)
❑ Goods, Equipment, Supplies ❑ Grant Agreements (Notify Finance & Resolution Required)
❑ Other (e.g. revenue) ❑ Change Order/Contract Amendment
(C/O: 10% or $25K whichever is the lesser must have County Manager signature)
All Contracts should be proofed and all exhibits and notices must be attached for the following:
✓ ® No Pages Missing
✓ ® If Page Left Intentionally Blank —Note on Page
✓ ® Page numbered consecutively
✓ ® All Original Signatures Affixed
✓ ® All Dates Filled In
✓ ❑ Special Instructions for Finance Department:
✓ ❑ Authorized Procurement Officer's Name:
✓® All Other Blanks Filled In
✓® All Exhibits Attached
✓❑ All Legal Descriptions attached (if applicable)
✓❑ Notice of Award/Notice to Proceed Attached (f applicab,
✓❑ Warranty (if applicable)
BY CHECKING ABOVE AND ENTERING NAME, THE AUTHORIZED STAFF PERSON INDICATES THAT
THE ATTACHED DOCUMENT HAS BEEN PROOFED AND READY FOR SCANNING.
NOTE: CLERK'S OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE
ARCHIVES RETAINAGE SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST!
Contract # bocc.con.37.2015
Budget Line Item # 166.63.92863.82600
CHANGE ORDER
Change Order Number: bocc.con.amended.37.2015A
OWNER: Pitkin County Facilities
485 Rio Grande #101
Aspen, Colorado 81611
CONTRACTOR: Hepworth-Pawlak Geotechnical, Inc. (HP Geotech)
Rev. 8.3LI I jaaljs
The Library Construction Inspection & Testing (the "Agreement') dated February 9, 2015 between the
Board of County Commissioners of Pitkin County (the "County") and Hepworth-Pawlak Geotechnical,
Inc. (HP Geotech) (the "Contractor"), is hereby amended as follows:
Current Scone of Work:
Concrete Reinforcing Steel/Epoxy Anchor Inspection
Estimated Cost per Inspection Site Visit $250
Estimated Cost for Projected 6 Inspections $1500
Concrete Testing
Estimated Cost per Test $400
Estimated Cost for Projected 6 Tests $2400
Fireproofing Inspection
Estimated Cost per Inspection Site Visit $500
Estimated Cost for Projected 2 Inspections $1000
Structural Steel Welded and Bolted Connections Inspection
Estimated Cost per Structural Steel Inspection Site Visit $500
Estimated Cost for Projected 5 Structural Steel Site Visits $2500
Description of Change:
Concrete Reinforcing Steel/Epoxy Anchor Inspection
Estimated Additional number of site visits
Estimated Cost for additional 8 visits $2,000
Concrete Testing
Estimated Additional number of site visits
Estimated Cost for additional 0 visits $0
Rev 12/27/10js
Project Coding Original Contract #
Fireproofing Inspection
Estimated additional number of site visits 2
Estimated cost for additional 2 visits $1,000
Structural Steel Welded and Bolted Connections Inspection
Estimated additional number of site visits 20
Estimated Cost for additional 20 visits $10,000
Earthwork Compaction Testin
Estimated number of site visits 2
Estimated Cost for 2 visits $500
Total Cost of Change $13,500
Reason for Change
The currently estimated amount of structural steel weldingibolting, epoxy -embedded concrete anchor and
fireproofing inspections required for the project exceeds the initial project proposal estimate. Two
earthwork compaction testing site visits are also now anticipated.
Original Contract Price $ 10,000
Net Increase/Decrease in Contract Price (this change order) $ 13,500
*Total Adjusted Contract Price (including this change order) $ 23,500
In all other respects the Agreement is in full force and effect and remains unchanged by this
Amendment.
Date
c, Z(' /
Date
to 14e i if
Date