Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
bocc.con.amended.060.2014N
7 2015 kjm tTKIN Pitkin County CouNT11 Contract Cover Sheet Please complete the Contract Cover Sheet when the contract is completed and signed by Contractor and Pitkin County Project Manager. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments to Procurement (procurement_help@pitkincounty.com).Any contracts$50,000 and over will be routed for signatures to County Manager and Attorney's Office(if required)by Procurement&Contracts Manager. Contract Information Contract Number 60.2014N Project Name Pitkin County Library Expansion Contractor FCI Constructors,Inc. Budget Line Item 166.63.92863.86200 Additional Budget Line Item(s) Click here to enter text. and special notes to Finance Contract Start Date 6/19/2014 Contract End Date 4/28/2016 Automatic Renewal Yes ❑ No►1 If Construction: Retainage Click here to enter text. If this is a new contractor,please request they complete and submit to Finance a W-9 Form. Contact Information: Department Facilities Project Manager Smith Project Manager 5396 Phone Provide a brief description of the contract: Renovation Phase 2: Construction Design,Clarifications,Assumptions,Dated Sept 28,2015. Changes include addition to project scope,revision to expansion joint, door revisions,window revisions, skylight replacement. Contract Value Summary: Contract Amount $8,390,053.88 This Change order/Amendment amount(if applicable) $2,085,326.00 New Contract Total $10,475,379.88 Procurement Method: None ❑ Informal❑ Formal 0 Sole Source 0 Emergency 0 Contract Renewal 0 Contract Type: Services/Maintenance ❑ Construction 0 Goods,Equipment, Supplies ❑ Change Order/Amendment❑ Other,please explain 0 Click here to enter text. NOTE: CLERKS OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE.ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST. Contract#60.2014 Rev. 8.31.11 jaa/js Budget Line Item# 166.63.92863.86200 plrK IN COUNT CONTRACT AMENDMENT Change Order Number: 60.2014N Dated 9-29-2015 OWNER: Pitkin County Library 485 Rio Grande Place#101 Aspen,Colorado 81611 CONTRACTOR: FCI Constructors,Inc. The Library Expansion Project CM/GC Contract (the "Agreement") dated 6/19/2014 between the Board of County Commissioners of Pitkin County (the "County") and FCI Constructors, Inc. (the "Contractor"), is hereby amended as follows: Description of Change: Pitkin County Library—Renovation Phase 2: a. Construction Design Estimate Dated Sept 28,2015 b. Renovation Phase 2 Estimate,Clarifications and Assumptions,dated Sept. 28,2015 c. The documents defusing the scope of work are as listed in the Clarifications and Assumptions, Item B,with"Pitkin County Library Renovation Change Order 1"drawings,prepared by Snowdon and Hopkins Architects,dated 8/31/15,being the basis,supplemented by additional information. d. FCI Project Schedule dated Sept. 24,2015 TOTAL THIS CHANGE ORDER $2,085,326.00 Reason for Changes COR 034 Addition to Project scope COR 045 Revision to expansion joint details COR 047 Door revision COR 050 Door revision COR-058r1 Widow revision COR 059RN Skylight replacement added to the scope of work Original Contract Price $4,500,000.00 Previous Change Order applied to Guaranteed Maximum Price: $3,890,053.88 Net Increase in Contract Price(this change order) $2,085,326.00 • *Total Adjusted Contract Price(including this change order) $10,475,379.88 This change order extends the time to substantial complete of the work to April 28,2016. Page 1 of 2 Rev 12/27/10 js Project Coding Original Contract# In all other respects the Agreement is in full force and effect and remains unchanged by this Amendment. ,}/—"_'---- , September 29 2015 P Stan Kiser,FC,Constructors Inc Date Jod' '` 'th, aci ities Date 42-42---- V/ta-! r Jon Peacock,County Manager Date *Increases over$25,000 and/or 10%(single increase or accumulative)of original contract must have County Manager signature. 2 .,2}a v¢,ew. P � x Ir. ,, . .'1 )ta insp. a erowt PITKIN COUNTY LIBRARY- RENOVATION PHASE 2 ASPEN, CO PREPARED FOR: PITKIN COUNTY LIBRARY ASPEN, CO CONSTRUCTION DESIGN ESTIMATE September 28, 2015 PREPARED BY:FCI CONSTRUCTORS, INC. FCI Constructors, Inc, Date: September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 ASPEN,CO CONSTRUCTION DESIGN ESTIMATE DESCRIPTION 33,130 TOTAL COST COST/SF NOTES 010000 GENERAL CONDITIONS $ 188,568 $ 5.69 310000 SITE WORK $ (4,845) $ (0.15) _ , 020000 SITEWORK-SELECTIVE DEMO $ 20,000 $ 0.60 030000 CONCRETE $ (1,423) $ (0.04) 040000 MASONRY $ - $ - N/A 050000 METALS $ 85,345 $ 2.58 060000 WOOD&PLASTICS $ 215,109 $ 6.49 070000 THERMAL&MOISTURE PROTECTION $ 10,812 $ 0.33 080000 DOORS&WINDOWS $ 122,240 $ 3.69 090000 FINISHES $ 305,980 $ 9.24 100000 SPECIALTIES $ 2,662 $ 0.08 110000 EQUIPMENT $ 6,511 $ 0.20 120000 FURNISHINGS $ (48,937) $ (1.48) 140000 CONVEYING SYSTEMS $ - $ - N/A 210000 FIRE PROTECTION $ 33,000 $ 1.00 230000 PLUMBING/HVAC $ 136,213 $ 4.11 260000 ELECTRICAL $ 797,277 $ 24.07 270000 LOW VOLTAGE/SPECIAL SYSTEMS $ 81,830 $ 2A7 SUBTOTAL-DIRECT COST $ 1,950,342 S 58.87 PRECONSTRUCTION SERVICES FEE $ - $ - CONTINGENCY CONSTRUCTION $ - $ - 0.00% BUILDERS RISK INSURANCE $ 900 $ 0.03 GENERAL LIABILITY INSURANCE $ 8,000 $ 0.24 0.40% MATERIALS TESTING/INSPECTION $ - $ - BY OWNER PLANNING APPLICATIONS/PERMIT/PLAN REVIEW FEES $ - $ - BY OWNER BUILDING PERMIT $ 1,500 $ 0.05 UTILITY TAP FEES $ - $ - BY OWNER FCI PAYMENT/PERFORMANCE BOND $ 15,870 $ 0.48 2-YEAR WARRANTY FCI CONSTRUCTION PHASE FEE $ 108,714 $ 3.28 5.50% $ - TOTAL ESTIMATED CONSTRUCTION COST 5 2,085,326 $ 62.94 Confidential-FCI Constructors,Inc. Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 9/28/2015 Div.1: GENERAL CONDITIONS Original Design DESCRIPTION I QUANTITY I UNIT I PRICE I MATERIAL I MATERIAL TAX I PRICE I EQUIP/SUB I PRICE I LABOR I LABOR BURDEN TOTAL ONSITE MANAGEMENT PROJECT MANAGER 5 WK $ - $ - $ - S - $ - $ 2,400.00 $ 12,000.00 $ 8,160.00 $ 20,160.00 GENERAL SUPERINTENDENT 13 WK $ - $ - $ - $ - $ - $ 1,850.00 $ 24,050.00 $ 16,354.00 $ 40,404.00 SUPERINTENDENT 30 WK $ - $ - $ - S - $ - $ 1,450.00 $ 43,500.00 $ 29,580.00 $ 73,080.00 OFFICE ENGINEER 5 WK $ - $ - $ - $ - $ - $ 1,350.00 $ 6,750.00 $ 4,590.00 $ 11,340.00 TEMPORARY FACILITIES TEMP PHONE 3 MO $ 350.00 $ 1,050.00 $ - $ - $ 250.00 $ • $ - $ - $ 1,300.00 COMPUTER 3 MO $ - $ • $ - $ 250.00 $ 750.00 $ 100.00 $ 300.00 $ 204.00 $ 1,254.00 TEMP TOILET(4 EA) 3 MO $ - $ - $ - $ 400.00 $ 1,200.00 $ - $ - $ - $ 1,200.00 TEMP WATER 3 MO $ - $ - $ - $ 180.00 $ 540.00 $ - $ - $ - $ 540.00 FIRE EXTINGUISHERS 3 MO $ - $ - $ - $ 30.00 $ 90.00 $ - $ - $ - $ 90.00 SAFETY 3 MO $ - $ - $ - $ 833.33 $ 2,500.00 $ - $ - $ - $ 2,500.00 JOB SIGN 0 EA $ - $ - $ - $ 500.00 $ - $ 50.00 $ - $ - $ - TEMPORARY PARKING 0 EA $ 200.00 $ - $ - $ - $ $ - $ - _ _MISCELLANEOUS OFFICESUPPLIES_ _ 3 MO $ 1,200.00 $ 3,600.00 $ - $ - $ - $ - $ - S - $ 3,600.00 AS-BUILTS AND 08M'S 1 LS $3,000.00 $ 3,000.00 $ - $ - $ - $ - $ - S - $ 3,000.00 FINAL CLEAN 0 SF $ - $ - $ - $ 0.40 $ - $ - $ - $ - $ - TWO YEAR WARRANTY MANAGEMENT 0 LS $ - EQUIPMENT PICKUPNT( RE2 EA)-_�— 4 MO $ - $ - $ - $ 1,450.00 $ 5,075.00 $ - $ - S - $ 5,075.00 CONSTRUCTION EQUIPMENT 0 MO $ - $ - $ 200.00 $ - $ - $ S $ - OUT OF AREA SUBSISTENCE --Y 43 WK $ $ - $ - $ 175.00 $ 7,525.00 $ - $ - S - $ 7,525.00 RENT 4 MO $ - $ - $ - $ 2,500.00 $ 8,750.00 $ - $ - S - $ 8,750.00 RENT 4 MO $ - $ - $ - $ 2,500.00 $ 8,750.00 $ - $ - $ - $ 8,750.00 HOME OFFICE TRAVEL 0 MO $ 630.00 $ - $ - $ - $ - $ - $ - $ $ - TOTALS $ 7,650.00 $ - I $ 35,430.00 $ 86,600.00 5 58,888.00+$. 188,568.00 FCI Constructors,Inc. September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF DESCRIPTION MEASURE QUANTITY UNIT PRICE TOTAL TOTAL 310000 SITE WORK 312100 SITE PREPARATION SOIL/EROSION CONTROL/HAYBALES EXCLUDED LS 100 $ - LS $ - TREE PROTECTION FENCING LF 334.00 $ 8.50 LF $ - SUBTOTAL-SITE PREPARATION $ - 310000 SITE WORK 312580 SffE CONCRETE CONCRETE WALKS-4'THICK SIDEWALK REVISIONS CONCRETE TO SIDEWALKS LS 1.00 $ 500.00 LS $ 500 SUBTOTAL-SITE CONCRETE $ 500 310000 SITE WORK 312900 LANDSCAPING&IRRIGATION 4 SEASONS FINE GRADE LS AREAS LS 982.00 $ 0.07 LS $ 11,655 SOD REPLACEMENT ALLOWANCE LS 256.80 $ 0.57 LS $ 1,500 LANDSCAPE EDGERS-METAL LS 81.00 $ 4.60 LS INCLUDED SHRUBS LS 45.00 $ 42.1.7 LS INCLUDED PLANTING BED MULCH LS 406.00 $ 42.17 LS INCLUDED TRUGRID AT POROUS GRAVEL SYSTEM LS 199.00 $ 9.50 LS INCLUDED 1.8"#57 STONE/CLEAN TO FILL TRUEGRID POROUS GRAVEL SYSTEM CY 148 $ 59.00 CY INCLUDED LS IRRIGATION REPAIR ALLOWANCE LS 3,680.00 $ 0.54 LS $ 1.500 SUBTOTAL-LANDSCAPING&IRRIGATION $ 14,655 312950 SffE FURNISHINGS EXCLUDED SITE FURNITURE-BENCHES EA 4.00 $ 1,200.00 EA $ - SITE FURNITURE-BIKE RACKS EA 4.00 $ 344.00 EA $ - PLANTER POTS-WEATHERED CAST STONE CUBE- W/SOIL,FILTER FABRIC,AND AGGREGATE EA 5.00 $ 450.00 EA $ - • SUBTOTAL-MISC.SITE IMPROVEMENTS $ - 310000 WINTER CONDITIONS GROUND THAW ALLOWANCE REFUND LS 1.00 $ (10,000.00)LS $ (10,000) SUBTOTAL-WINTER CONDITIONS $ (10,000) 310000 ACOUSTICAL FENCE ACOUSTICAL FENCE REFUND LS 100 $ (10,000.00)LS $ (10,000) SUBTOTAL-ACOUSTICAL FENCE $ (10,000) 310000 SITE WORK-TOTALS $ (4,845) DIV 310000 SITE WORK FCI Constructors,Inc.Confidential Page 4 FCI Constructors,Inc. September 28,2015 Project PTTKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL LOWER LEVEL WEST ADDITION- 310000 SITE WORK(BUILDING) EXTERIOR 310000 SITE WORK(BUILDING) LOWER LEVEL 312050 SELECTIVE DEMOLITION FCI SELF PERFORM SALVAGE CONTROL MONITORS EA 1.00 $ 40.10 EA $ 20,000 REMOVE TLT COMPARTMENTS EA 4.00 $ 26.77 EA INCLUDED REMOVE COUNTER TOPS LF 42.00 $ 2.10 LF INCLUDED REMOVE BASE CABINETS LF 42.00 $ 4.10 LF INCLUDED REMOVE WALLCABINETS LF 42.00 $ 2.10 LF INCLUDED REMOVE CIRCULATION DESK EA 1.00 $ 160.10 EA INCLUDED REMOVE INTERIOR GYP BRD CEILINGS SF 1,650.00 $ 0.99 SF INCLUDED REMOVE INTERIOR GYP BEAM WRAP LF 161.00 $ 4.10 LF INCLUDED REMOVE INTERIOR GYP BULKHEAD LF 63.00 $ 2.10 LF INCLUDED REMOVE WD CHAIR RAIL LF 1,923.00 $ 0.50 LF INCLUDED REMOVE WD BASE LF 1,923.00 $ 0.50 LF INCLUDED REMOVE INTERIOR MS/DW PARTITIONS SF 7,124.00 $ 1.10 SF INCLUDED REMOVE INTERIOR DOOR FRAMES EA 29.00 $ 40.00 EA INCLUDED REMOVE WOOD DOORS EA 40.00 $ 32.00 EA INCLUDED REMOVE STAIR EA 1.00 $ 3,400.00 EA INCLUDED DUMPSTER/DUMP FEES EA 10.00 $ 1,000.00 EA INCLUDED DAILY CLEANUP WKS 3.00 $ 1,120.00 WKS INCLUDED SUBTOTAL-SELECTIVE DEMOLITION LOWER LEVEL $ 20,000 DIV 310000 SITEWORK-BUILDING FCI Constructors,Inc.Confidential Page 5 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 310000 SITE WORK(BUILDING) MAIN LEVEL 312050 SELECTIVE DEMOLITION FO SELF PERFORM REMOVE EXTERIOR DOORS EA 4.00 $ 32.00 EA INCLUDED REMOVE INTERIOR DOORS EA 2.00 $ 32.00 EA INCLUDED REMOVE METAL STUD WALLS SF 500.00 $ 1.75 SF INCLUDED REMOVE BUILT-INS MAIN ENTRY LF 20.00 $ 4.10 LF INCLUDED REMOVE SHELVING 228 LF 64.00 $ 2.10 LF INCLUDED REMOVE BASE CABINETS LF 15.00 $ 4.10 LF INCLUDED REMOVE WD CHAIR RAIL LF 1,185.00 $ 0.50 LF INCLUDED REMOVE WD BASE LF 1,185.00 $ 0.50 LF INCLUDED REMOVE WD GUARD RAIL LF 15.00 $ 8.00 LF INCLUDED TEMP WALL-INSTALL/REMOVE SF 744.00 $ 5.25 SF INCLUDED REMOVE HARD UD CEILINGS SF 983.00 $ 3.10 SF INCLUDED REMOVE EXISTING CONCRETE FLOOR SLABS NEW STAIR SF 151.00 $ 8.50 SF INCLUDED SCAFFOLDING FOR CONCRETE REMOVAL NEW STAIR LS 151.00 $ 8.50 LS INCLUDED SAWCUT EXISTING CONCRETE FLOOR SLABS NEW STAIR LF 91.00 $ 5.33 LF INCLUDED STEEL DEMO NEW STAIR SF 151.00 $ 63.00 SF INCLUDED REMOVE EXISTING CONCRETE FLOOR SLABS NEW STAIR SF 151.00 $ 10.00 SF INCLUDED REMOVE STAIRS EA 1.00 $ 3,400.00 EA INCLUDED MISCELLANEOUS REMOVALS HRS 16.00 $ 41.00 HRS INCLUDED DUMPSTER/DUMP FEES EA 4.00 $ 1,000.00 EA INCLUDED DAILY CLEANUP WKS 2.00 $ 914.80 WKS INCLUDED SUBTOTAL-SELECTIVE DEMOLITION MAIN LEVEL $ - 310000 SITE WORK(BUILDING) MEZZ LEVEL 312050 SELECTIVE DEMOLITION FCI SELF PERFORM REMOVE INTERIOR DOORS EA 1.00 $ 32.00 EA INCLUDED REMOVE INTERIOR DOOR FRAMES EA 1.00 $ 40.00 EA INCLUDED REMOVE WD BASE LF 551.00 5 0.50 LF INCLUDED REMOVE INTERIOR MS/DW PARTITIONS SF 150.00 5 1.10 SF INCLUDED DUMPSTER/DUMP FEES EA 1.00 $ 1,000.00 EA INCLUDED DAILY CLEANUP WKS 0.20 $ 1,120.00 WKS INCLUDED SUBTOTAL-SELECTIVE DEMOLITION MEZZ LEVEL $ - 310000 SITE WORK(BUILDING)-TOTALS $ 20,000 DIV 310000 SITEWORK-BUILDING FCI Constructors,Inc.Confidential Page 6 FCI Constructors,Inc. September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 033200 CAST-IN-PLACE CONCRETE CONCRETE 52M CONCRETE STAIR LANDING LOWER LEVEL LS 1.00 $ 15,477.00 LS $ 15,477 CONCRETE TO SLABS ON DECK NORMAL WT-6.5"TOTAL DEPTH LS 1.00 $ - LS INCLUDED CONCRETE STAIR PANS LS 50.00 $ - LS INCLUDED WIRE MESH REINF.-6X6/W2.1 LS 168.30 $ - LS INCLUDED DRILL AND DOWEL TO EXISTING LS 53.00 $ - LS INCLUDED TROWEL FINISH SLABS ON DECK LS 153.00 $ - LS INCLUDED CURE&PROTECT SLABS ON DECK LS 153.00 $ - LS INCLUDED SUBTOTAL-SLABS ON METAL DECKING $ 15,477 030000 CONCRETE 033200 CAST-IN-PLACE CONCRETE CONCRETE PUMPING/HOISTING CONCRETE PUMP DYS 1.00 $ 1,934.00 DYS INCLUDED WINTER CONDITIONS REFUND LS 1.00 $ (20,000.00)LS $ (20,000) LAYOUT/COORDINATION HRS 20.00 $ 64.00 HRS $ 1,280 CLEANUP HRS 20.00 $ 31.00 HRS $ 620 DUMPSTERS PULLS 1.00 $ 1,200.00 PULLS $ 1,200 SUBTOTAL-CONCRETE PUMPING/HOISTING $ (16,900) 030000 CONCRETE-TOTALS $ (1,423) COST PER SF $ (0.04) 030000 CONCRETE FCI Constructors,Inc.Confidential Page 7 FCI Constructors,Inc. September 28,2015 Project• PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 050000 METALS 051200 STRUCTURAL STEEL MYERS STEEL COLUMNS,BEAMS,DECKING LS 1.00 $ 2,460.00 LS $ 82,745 MAIN STAIR STEEL LS 1.00 $ 2,460.00 LS INCLUDED RAIL POSTS LS 1.00 $ 2,460.00 LS INCLUDED WALL RAILS LS 1.00 $ 2,460.00 LS INCLUDED LAYOUT/COORDINATION HRS 25.00 $ 44.00 HRS INCLUDED SAFETY/TEMP BARRICADES HRS 25.00 $ 44.00 HRS $ 1,100 TOUCH UP PRIMER PAINT LS 1.00 $ 750.00 LS INCLUDED CRANE PADS/LEVELING LS - $ 3,400.00 L5 INCLUDED ENGINEERING BUDGET-CABLE TIE OFFS ALLOWANCE LS 1.00 $ - LS $ 1,500 STRUCTURAL STEEL ERECTION DY 3.00 $ 5,210.00 DY INCLUDED SUBTOTAL-STRUCTURAL STEEL $ 85,345 050000 METALS-TOTALS $ 85,345 COST PER SF $ 2.58 050000 METALS FCI Constructors,Inc.Confidential Page 8 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 061100 ROUGH CARPENTRY INTERIOR FRAMING PACKAGE LF • $ 2.70 LF $ - INTERIOR WALL STRAPPING/BLOCKING-@ MILLWORK/CASEWORK 2"X4" LF 1,346.00 $ 0.44 LF $ 592 INTERIOR BLOCKING 3/4"PLYWOOD SF 153.00 $ 0.85 SF $ 130 BLOCKING LABOR 2 GUYS 5 DAYS LS 1.00 $ 3.600.00 LS $ 3,600 PCI SELF-PERFORM LOGISTICS WKS 1.00 $ 7,555.00 WKS $ 7,555 ROUGH HARDWARE/FASTENERS LS 1.00 $ 2,000.00 LS $ 2,000 LAYOUT/SUPERVISION HRS 40.00 $ 46.00 HRS $ 1,840 DUMPSTERS PULLS 1.00 $ 1,200.00 PULLS $ 1,200 SUBTOTAL-ROUGH CARPENTRY $ 16,917 064200 MILLWORK WILKIE SANDERSON 2"P LAM CAP LOWER LEVEL SEAT LF 27.00 $ - LF $ 188,192 BASE CABINETS-SOLID SURFACE IF 126.00 $ - LF INCLUDED COUNTERTOPS-PLASTIC LAM LF 50.00 $ - LF INCLUDED WALL CABINETS-P LAM LF 31.00 $ - LF INCLUDED BASE CABINETS-PLAS LAM LF 82.00 $ - LF INCLUDED COUNTERTOPS-SOLID SURF LF 131.00 $ - LF INCLUDED TALL MAIL SLOTS P LAM EA 1.00 $ - EA INCLUDED WALL MTD SHELF 1-TIER-PLASTIC LAMINATE LF 30.00 $ - LF INCLUDED WORK COUNTERS-SOLID SURF LF 16.00 $ - LF INCLUDED 30"W FULL HT STORAGE CABINETS-PLAS LAM STAFF LOUNGE EA 1.00 $ - EA INCLUDED BIRCH LASER CUT 1"PLYWOOD SCREEN SF 281.00 $ - SF INCLUDED WOOD BASE-6"HIGH LF 2,920.00 $ - LF INCLUDED RED OAK DOOR TRIM LF 1,098.00 $ - LF INCLUDED RED OAK WINDOW TRIM IF 414.00 $ - LF INCLUDED WOOD HANDRAIL IF 210.00 $ - LF INCLUDED RED OAK WINDOW TRIM- REMOVE/SALVAGE/REINSTALL LF 566.00 $ - LF INCLUDED DBL FACED CANOPY TOP-WD SF 175.00 $ - SF INCLUDED DBL FACED CANOPY TOP-SS SF 138.00 $ - SF INCLUDED DBL FACED END PANEL-REUSE SF 170.00 $ - SF INCLUDED DBL FACED END PANEL-SS SF 233.00 $ - SF INCLUDED SEATING AND CUSTOM DESIGN FEATURES•.• INCLUDED P LAM SURFACING SF 76.00 $ - SF INCLUDED LINOLEUM SURFACING SF 364.00 $ - SF INCLUDED UPHOLSTERY FABRIC SF 469.00 $ - SF INCLUDED WALL COVERING SF 100.00 $ - SF INCLUDED P LAM WALL SURFACING SF 257.00 $ - SF INCLUDED MISC WOODWORK/MILLWORK ALLOWANCE SF 25,156.00 $ 0.19 SF $ 10,000 SUBTOTAL-MILLWORK $ 198,192 060000 WOOD&PLASTICS-TOTALS $ 215,109 COST PER SF $ 6.49 060000 WOOD&PLASTICS PCI Constructors,Inc.Confidential Page 9 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY UBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 070000 THERMAL&MOISTURE PROTECTION 078325 APPLIED FIREPROOFING SOUND CRETE SPRAY-APPLIED FIREPROOFING LS 1.00 $ 9.00 LS $ 5,812 PATCHING ALLOWANCE LS 1.00 $ 5,000.00 LS $ 5,000 SUBTOTAL-APPLIED FIREPROOFING $ 10,812 079100 CAULKING&SEALANTS CAULKING SF - $ 0.35 SF $ - SUBTOTAL-CAULKING&SEALANTS $ - 070000 THERMAL&MOISTURE PROTECTION-TOTALS $ 10,812 COST PER SF $ 0.33 070000 THERM&MOIST PROT FCI Constructors,Inc.Confidential Page 10 FCI Constructors,Inc. September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 080000 DOORS&WINDOWS 082160 WOOD DOORS SOLID CORE WOOD DRS-WOOD VENEER-3'X 7' MCKINNEY EA 6.00 $ 350.00 /EA $ 10,887 SOLID CORE WOOD DRS-WOOD VENEER REUSE EXISTING EA 17.00 $ - /EA $ - ADD FOR VISION PANEL CUTOUTS 208 EA 1.00 $ 325.44 /EA INCLUDED STC RATED OPENING AT 211 ALLOWANCE L5 1.00 $ 2,470.00 /EA $ 2,470 ADD FOR RATED WOOD DOORS EA - $ 45.00 /EA $ - INSTALLATION OF WOOD DOORS FCI SELF-PERFORM EA 23.00 $ 193.20 /EA $ 4,444 FCI SELF-PERFORM LOGISTICS WKS 1.00 $ 7,555.00 WKS $ 7,555 SUBTOTAL-WOOD DOORS 23.00 $ 25,356 080000 DOORS&WINDOWS 81113 HOLLOW METAL DOORS&FRAMES HOLLOW METAL DOORS 3'X 8' MCKINNEY EA 2.00 $ 350.00 /EA INCLUDED HOLLOW METAL DOOR INSTALLATION FCI SELF-PERFORM - EA 2.00 $ 226.80 /EA $ 454 FCI SELF-PERFORM LOGISTICS WKS 0.10 $ 7,555.00 WKS $ 756 ADD FOR VISION PANEL CUTOUTS EA - $ - /EA $ - SUBTOTAL-HM DOORS&FRAMES 2.00 $ 1,209 81113 INTEGRATED GLASS DOOR ASSEMBLIES ALPINE GLASS ALUMINUM DOORS 3'X 8' EA 9.00 $ 918.00 /EA $ 68,723 DOOR HARDWARE-ALUMINUM OPENINGS EA 9.00 $ 565.00 EA INCLUDED AUTOMATIC OPERATORS LS - $ 6,000.00 LS $ 6,000 FCI SELF-PERFORM LOGISTICS WKS - $ 7,555.00 WKS $ - ADD FOR VISION PANEL CUTOUTS EA - $ - /EA $ - SUBTOTAL-ALUM OPENINGS 9.00 $ 74,723 083205 ACCESS DOORS WALL/CEILING ACCESS DOORS EA 8.00 $ 183.00 /EA $ 1,464 SUBTOTAL-ACCESS DOORS $ 1,464 085120 WOOD WINDOWS INSTALL RELOCATED WINDOWS EA 3.00 $ 226.00 EA $ 678 FCI SELF-PERFORM LOGISTICS WKS - $ 7,555.00 WKS $ - SUBTOTAL-ALUMINUM WINDOWS $ 678 083456 SECURITY GATES EXCLUDED-BY OWNER RELOCATE EXISTING SECURITY GATE EA - $ - EA $ - PROVIDE AND INSTALL NEW SECURITY GATES EA - EA $ - SHIPPING EA - $ - EA $ - SUBTOTAL-SECURITY GATES $ - 080000 DOORS&WINDOWS FCI Constructors,Inc.Confidential Page 11 FCI Constructors, Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 087210 FINISH HARDWARE MCKINNEY DOOR HARDWARE-HM/WOOD DOOR OPENINGS (LABOR W/DOOR INSTALLATION) EA 8.00 $ 565.00 EA INCLUDED NEW HARDWARE AT EXISTING DOORS ALLOWANCE EA 7.00 $ 1,494.00 EA $ 25,000 SUBTOTAL-FINISH HARDWARE $ 25,000 088110 GLASS&GLAZING APLINE GLASS TOILET RM MIRRORS-UNFRAMED SEE DIV 10 SF - $ 16.80 SF $ - GLAZING FILM AT READING PODS SF 94.00 $ 93.00 SF $ 3,480 GLAZE INTERIOR/EXTERIOR DOORS WOOD,HM,&ALUM SF 94.00 $ 93.00 SF INCLUDED NEW TEMPERED GLASS TO EXISTING WINDOWS AT 306 SF 90.00 $ 50.00 SF INCLUDED EXTERIOR GLAZING CREDIT L5 1.00 $ 44.00 LS $ (9,670) SUBTOTAL-GLASS&GLAZING $ (6,190) 080000 DOORS&WINDOWS-TOTALS $ 122,240 COST PER SF $ 3.69 • 080000 DOORS&WINDOWS FCI Constructors,Inc.Confidential Page 12 FCI Constructors,Inc. September 28,2015 Protect: PRKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 090000 FINISHES 092510 DRYWALL&METAL SUPPORT FRAMING PEAK INTERIORS DRYWALL PTN-DEMSING WALLS LS 1.00 4"MTL TRACK-T&B LS 1.00 $ - LS $ 95,688 ADD FOR SLIP/DEFLECTION TRACK LS 1.00 $ - LS INCLUDED 4"MTL STUD FRAMING LS 1.00 $ - LS INCLUDED BEADS/TRIM LS 1.00 $ - LS INCLUDED 5/8"DW TO STUDS LS 1.00 $ - LS INCLUDED TILE BACKER LS 1.00 $ - LS INCLUDED ACOUSTIC INSULATION TO WALLS LS 1.00 $ - LS INCLUDED TAPE&FINISH DW IS 1.00 $ - LS INCLUDED TAPE&FINISH DW AT NORTH WALL LOWER LEVEL LS 1.00 $ - LS INCLUDED SPRAY FOAM INSULATION AT NORTH WALL LOWER LEVEL-USI LS 1.00 $ - LS $ 6,738 DRYWALL PATCH AT SKYLIGHTS LS 1.00 $ - LS INCLUDED DRYWALL PATCH AT RAISED CEILINGS MAIN LEVEL LS 1.00 $ - LS $ 3.000 DRYWALL CEILINGS INTERIOR GYP BD CEILINGS 11/2"MAIN CARRIER CHANNELS LS 1.00 $ - LS INCLUDED 7/8"CROSS RUNNERS LS 1.00 $ - LS INCLUDED 5/8"DW TO CEILINGS LS 1.00 $ - LS INCLUDED TAPE&FINISH DW CEILINGS LS 1.00 $ - LS INCLUDED MISCELLANEOUS DRYWALL/INTERIORS ITEMS INTERIOR DRYWALL/MS CEILING BULHEADS LS 1.00 $ - LS INCLUDED SHOP DRAWINGS LS 1.00 $ - LS INCLUDED LAYOUT/COORDINATION HRS 40.00 $ 44.00 HRS $ 1,760 CLEANUP HRS 40.00 $ 30.00 HRS $ 1,200 DUMPSTERS PULLS 2.00 $ 1,200.00 PULLS$ 2,400 SUBTOTAL-DRYWALL&METAL SUPPORT FRAMING $ 110,786 090000 FINISHES 093120 CERAMIC TILE CEDAREDGE INTERIORS PORCELAIN CERAMIC FLOOR TILE-THIN SET PHASE 2 UPDATES ALLOWANCE LS 1.00 $ - LS $ 150,000 CERAMIC TILE BASE-COVED-ADHESIVE SET LS 1.00 $ - LS INCLUDED ADD FOR ANTI-FRACTURE MEMBRANE LS 1.00 $ 2.85 LS INCLUDED PORCELAIN WALL TILE-ADHESIVE SET-FULL HT LS 1.00 $ - LS INCLUDED ADD FOR ANTI-FRACTURE MEMBRANE LS 1.00 $ - LS INCLUDED ADD FOR EPDXY MORTAR&GROUT TO FLOORS LS 1.00 $ - LS INCLUDED SUBTOTAL-CERAMIC TILE $ 150,000 095110 ACOUSTICAL CEILINGS PEAK INTERIORS ACT CEILINGS-2'X 2'X1" MAIN LEVEL LS 1.00 $ - LS $ 7,344 ACOUSTICAL CEILINGS PATCH REFUND LS 1.00 $ - LS $ (12,0001 SUBTOTAL-ACOUSTICAL CEILINGS $ (4,656) 090000 FINISHES FCI Constructors,Inc.Confidential Page 13 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 096550 RESILIENT FLOOR&BASE CEDAREDGE 4"H RUBBER BASE-COVED LF 266.00 $ 2.03 IF INCLUDED ' SUBTOTAL-RESILIENT FLOORING&BASE $ - 096615 LINOLEUM FLOORING LINOLEUM FLOORING PER SPEC SF 1,286.00 $ - SF INCLUDED FLOOR PREP-ALLOW 25% SF 321.50 $ - SF INCLUDED SUBTOTAL-RUBBER FLOORING $ - 096815 CARPET CEDAREDGE INTERIORS CARPETING AT STAIRS LS 1.00 $ - LS INCLUDED CARPET PATCH REFUND LS 1.00 $ (5,000.00)15 $ (5,000) FLOOR PATCH AT REMOVED FLOOR BOXES EXCLUDED LS 1.00 $ - LS $ - CARPETING-50CM X 50CM TILES-DIRECT GLUEDOWN SY 95.78 $ - SY INCLUDED SUBTOTAL-CARPET $ (5,000) 090000 FINISHES 099010 PAINTING&WALLCOVERING INNOVATIVE PAINT DRYWALL PTNS-EXISTING WALLS LS 1.00 $ - LS $ 54,850 PAINT DRYWALL PTNS-NEW WALLS PRIME&2 FINISH COATS LS 1.00 $ - LS INCLUDED PAINT DRYWALL CEILINGS-NEW CEILINGS PRIME&1 FINISH COATS LS 4,781.00 $ - LS INCLUDED PAINT HM DOOR FRAMES LS 1.00 $ - LS INCLUDED PAINT HM DOORS LS 1.00 $ - LS INCLUDED STAIN WOOD JAMBS SEE DIV 6 LS - $ - LS DIV 6 STAIN WOOD TRIM SEE DIV 6 LS - $ - LS DIV 6 PAINT METAL HANDRAILS MAIN STAIR LS 1.00 $ - LS INCLUDED TOUCH UP PAINTING HR 200.00 $ 62.00 HR INCLUDED SUBTOTAL-PAINTING&WALLCOVERING $ 54,850 090000 FINISHES-TOTALS $ 305,980 COST PER SF $ 9.24 090000 FINISHES FCI Constructors,Inc.Confidential Page 14 FCI Constructors,Inc. September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY UBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 100000 SPECIALTIES 105220 FIRE EXTINGUISHERS&CABS FIRE EXTINGUISHERS-1011 ABC EA - $ 87.00 EA $ - FIRE EXTINGUISHER CABINETS-PTD STEEL CABINET, DOOR&TRIM-RECESSED EXISTING TO BE RELOCATED EA 3.00 $ 240.00 EA $ 720 SUBTOTAL-FIRE EXTINGUISHERS&CABINETS $ 720 100000 SPECIALTIES 108010 TOILET ROOM ACCESSORIES SPECIALTIES CONTRACTING TOILET PAPER HOLDER BY OWNER EA - EA $ - PAPERTOWELDISPENSER BY OWNER EA - EA $ - FRAMED MIRROR-24"X 30"-STANDARD SS FRAME EA 5.00 $ - EA $ 1,592 HANDICAP GRAB BARS-SS 42" EA 4.00 EA INCLUDED HANDICAP GRAB BARS-SS 36" EA 4.00 EA INCLUDED HANDICAP GRAB BARS-SS 18" EA 5.00 EA INCLUDED LIQUID SOAP DIPSENSER BY OWNER EA - EA $ - DROP DOWN BABY CHANGE STATION BY OWNER EA - EA $ - UNDERCOUNTER LAV GUARD EA 5.00 $ 70.00 EA $ 350 SUBTOTAL-TOILET ROOM ACCESSORIES $ 1,942 100000 SPECIALTIES-TOTALS $ 2,662 COST PER SF $ 0.08 100000 SPECIALTIES FCI Constructors,Inc.Confidential Page 15 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 110000 EQUIPMENT 114550 RESIDENTIAL APPLIANCES REFRIGERATOR-GE 21.2 CF SS TOP-FREEZER ALLOWANCE EA 1.00 $ 1,535.00 EA $ 5,000 GE 30"FREE-STANDING ELECTRIC RANGE-SS EA 1.00 $ 900.00 EA INCLUDED GE 30"HIGH PERFORMANCE RANGE HOOD-SS EA 1.00 $ 725.00 EA INCLUDED GE 2.2 CF COUNTER TOP MICROWAVE OVEN-SS EA 1.00 $ 450.00 EA INCLUDED GE TALL TUB BUILT-IN DISHWASHER-SS EA 1.00 $ 950.00 EA INCLUDED INSINKERATOR FOOD WASTE DISPOSAL-BLACK ENAMEL EA 1.00 $ 375.00 EA INCLUDED FCI SELF-PERFORM LOGISTICS WKS 0.20 $ 7,555.00 WKS $ 1,511 SUBTOTAL-RESIDENTIAL APPLIANCES $ 6,511 110000 EQUIPMENT-TOTALS $ 6,511 COST PER SF $ 0.20 110000 EQUIPMENT FCI Constructors,Inc.Confidential Page 16 FCI Constructors,Inc. September 28,2015 Project PRKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PRKIN COUNTY LIBRARY SF 33,130 UNIT OF UNRPRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 120000 FURNISHINGS 124910 WINDOW TREATMENTS RENOVATION WINDOW SHADES REFUND LS 1.00 $ (48,937.00)LS $ (48,937) SUBTOTAL-WINDOW TREATMENTS $ (48,937) 120000 FURNISHINGS-TOTALS $ (48,937) COST PER SF $ (1.48) 120000 FURNISHINGS FCI Constructors,Inc.Confidential Page 17 FCI Cost Worksheet September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUAN y TOTAL TOTAL 210000 FIRE SUPPRESSION SYSTEMS 215300 FIRE SPRINKLER SYSTEMS DYNAMIC FIRE SPRINKLERS-WET PIPE SYSTEM REVISIONS TO SCOPE SF 33,130.00 SF $ 33,000 ADDITONAL INSPECTIONS DUE TO AHJ LS 1.00 $ - LS $ - REPLACE EXISITNG HEADS LS 1.00 $ - L5 $ - REPLACE EXISITNG ESCUTCHEONS LS 1.00 $ - LS $ - SUBTOTAL-FIRE SPRINKLER SYSTEMS $ 33,000 210000 FIRE SUPPRESSION SYSTEMS-TOTALS $ 33,000 COST PER SF $ 1.00 210000 FIRE SUPPRESSION FCI Constructors,Inc.Confidential Page 18 FCI Cost Worksheet September 28,2015 Project PIIKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PrTKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 22/230000 MECHANICAL 224100 PLUMBING PLUMBING WORK SF 33,130.00 SF PLUMBING DEMO LS 100 $ 94,798 CORE DRILL LS 100 INCLUDED PLUMBING FIXTURES LS 100 INCLUDED WASTE&VENT PIPING LS 1.00 INCLUDED HEAT PIPING IS 100 INCLUDED INSULATION LS 100 INCLUDED DOMESTIC WATER LS 100 INCLUDED CHEMICAL TREATMENT LS 1.00 INCLUDED IRRIGATION CONNECTION LS - $ - LAYOUT/COORDINATION HRS 45.00 $ 44.00 HRS $ 1,980 SUBTOTAL-PLUMBING $ 96,778 $ 2.92 SF 230000 HVAC HVAC WORK HVAC DEMOLITION LS 100 $ - LS $ 37,457 HVAC EQUIPMENT-EXHAUST FANS LS 1.00 $ - LS INCLUDED VAV UNITS LS 100 $ - LS INCLUDED VAV CONTROLS LS 1.00 $ 136.00 IS INCLUDED DUCTWORK&INSULATION IS 100 $ - IS INCLUDED GRILLS&DIFFUSERS LS 1.00 $ - LS INCLUDED FIRE DAMPERS,MAN DAMPERS,SPINS,FLEX FANS IS 100 $ - IS INCLUDED TEST&BALANCE IS 100 $ - LS INCLUDED LAYOUT/COORDINATION HRS 45.00 $ 44.00 HRS $ 1,980 SUBTOTAL-HVAC $ 39,437 $ L19 SF 22/230000 MECHANICAL-TOTALS $ 136,213 COST PER SF $ 4.11 22230000 PLG HVAC FCI Constructors,Inc.Confidential Page 19 FCI Cost Worksheet September 28,2015 Project: PTTKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PTTKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUAY TOTAL TOTAL 260000 ELECTRICAL RA ENTERPRISES 261100 ELECTRICAL WORK ELECTRICAL WORK SF SF TEMPORARY LIGHT&POWER LS $ - LS $ 796,717 GEN COND/LIFTS LS $ - LS INCLUDED DEMO/MAKE SAFE LS $ - LS INCLUDED FIXTURE LABOR CREDIT(EXPANSTION PHASE) S6 LS $ - LS INCLUDED EXISTING RECEPTACLE DELETE DEMO LS $ - LS INCLUDED EXISTING LIGHTING CONTROL DELETE DEMO LS $ - LS INCLUDED EXISTING LIGHTING FIXTURE DELETE DEMO HARD LIDS LS $ - LS INCLUDED CORE DRILL/FIRE STOPPING IS $ - LS INCLUDED MECH&APPLIANCE CONNECTIONS LS LS INCLUDED POWER DISTRIBUTION/BRANCH POWER LS $ - LS INCLUDED LIGHTING-FIXTURES LS $ - LS INCLUDED LIGHTING-INSTALLATION/LIGHTING CONTROLS LS $ - LS INCLUDED LIGHT AIMING EXCLUDED LS - $ 6,812.00 LS $ - TRIM OUT/FINAL CONNECTIONS LS $ - LS INCLUDED HEAT TAPE EXCLUDED LS LS $ - HEAT TAPE CONNECTION EXCLUDED LS LS $ - FIRE ALARM SYSTEM LS $ - LS INCLUDED SECUIRTY GATE CONDUIT ROUGH-IN ALLOWANCE LS $ - LS $ 7,000 SITE LIGHTING/POWER EXCLUDED EA $ - EA $ - DATA/COMMUNICATIONS-ROUGH IN ONLY ALLOWANCE LS $ - LS $ 15,000 SECURITY SYSTEM-ROUGH IN ONLY LS $ - LS INCLUDED AV SYSTEM-ROUGH IN ONLY LS $ - LS INCLUDED STATE ELECTRICAL PERMIT LS $ - LS INCLUDED TEMPORARY GENERATOR ALLOWANCE REFUND LS 1.00 $ (29,000.00)LS $ (29,000) LAYOUT/COORDINATION HRS 90.00 $ 44.00 HRS $ 3,960 DUMPSTERS PULLS 3.00 $ 1,200.00 PULLS $ 3,600 SUBTOTAL-ELECTRICAL $ 797,277 260000 ELECTRICAL-TOTALS $ 797,277 COST PER SF $ 24.07 260000 ELECTRICAL FCI Constructors,Inc.Confidential Page 20 FCI Cost Worksheet September 28,2015 ProJeCC PITHIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITMIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 270000 SPECIAL SYSTEMS 271000 COMMUNICATIONS&DATA SYSTEMS CURRENT SOLUTIONS WIRING&CABLE-INCL TERMINATIONS SF 33,130.00 $ - SF $ 47,877 DATA/COMMUNICATIONS EQUIPMENT LS - $ - LS INCLUDED SUBTOTAL-COMMUNICATIONS&DATA SYSTEMS $ 47,877 274100 AUDIO VISUAL SYSTEM AUDIO VIDEO EXPERTS WIRING&CABLE SF 33,130.00 $ - SF $ 22,200 EQUIPMENT LS - $ - LS INCLUDED DEVICES LS - $ - LS INCLUDED SUBTOTAL-AUDIO VISUAL SYSTEM $ 22,200 281100 SECURITY/ACCESS CONTROL SYSTEM CURRENT SOLUTIONS WIRING&CABLE LS 33,130.00 $ - LS $ 11,753 EQUIPMENT IS - $ - LS INCLUDED DEVICES LS - $ - LS INCLUDED SUBTOTAL-SECURITY/ACCESS CONTROL SYSTEM $ 11,753 270000 SPECIAL SYSTEMS-TOTALS $ 81,830 COST PER SF $ 2.47 27 28000 LV SYSTEMS FCI Constructors,Inc.Confidential Page 21 Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 A. Project Information 1. Project type & size: Interior Renovation of the existing Library. • Base Bid Renovated Area 33,130 SF 2. Estimated construction schedule: Start date: October 1, 2015. Substantial Completion: April 28, 2016. B. General Clarifications 1. This estimate is based on Design documents: i. Pitkin County Library Renovation Change Order 1 Drawings as prepared by Snowdon and Hopkins Architects, dated 8/31/15. ii. Pitkin County Library Expansion Renovation Specifications dated 2/12/15 Volumes 1 and 2. iii. MSR material list dated 2/9/15 iv. Highlighted drawings to clarify scope, as attached. 2. This estimate represents specifically identified construction costs only. Therefore all other costs identified as "Owner's Costs" are not included. The following items are considered to be Owner's Costs: • Pitkin County administrative costs or fees. • Program Management/Owner Representative fees, or reimbursables. • Design Fees or reimbursable. • Permit Fees. • Legal fees or expenses. • F. F. & E. items (Furniture, Fixtures, and Equipment). • Land costs. • Development fees. • Artwork. • Owner's Construction Contingency. • Owner's Design Contingency. • Public Relations Costs. • Remediation Inspection and Demolition Permit Costs. 3. No provisions have been included for construction work to proceed while the library is occupied for storage or operations. The building department does not offer partial occupancy and the time frame for the library to move back in is unknown at this time. 4. FCI must be allowed access to the work for materials and equipment. 5. If the start of the project is delayed due to the issuance of the permit the general condition expense will have to be adjusted. 6. Site work and landscaping will not be completed until spring of 2016. 1 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 7. No allowances have been included for encountering "soft spots" or unsuitable soils and replacement of same with imported structural fill. 8. A Perc test at Pervious Paver Detention will be performed by FCI and witnessed by Owner. 9. Details showing "compacted subgrade" are assumed to be 8" of scarify and recompact. 10. No additional funds have been included for winter conditions for civil work. Once Mill street plans define the balance of civil scope this will need to be reanalyzed. 11. Plant totals conflict between the plan and the schedule on C06; counts have been included per the plan drawings. 12.An allowance for sod is being carried to replace sod damaged by installation of the drainage system along the south side of the library. 13. Metal edging has been included at the planting areas to be consistent with Expansion landscape details. 14. No irrigation work is shown. It is assumed that there is existing irrigation along the south side of the library where new plantings are shown to be installed; FCI is included an allowance for repairs. 15. It is assumed that the walls where reused wood door frames are to be installed are the same depth as the existing wood door frames. 16. New hardware included is based on the door numbers in the specifications since there are no hardware groups listed on the schedule on A8.1. 17.At doors 213 and 214 a Horton operator is included for each opening; 2 total. 18. Per direction from Pitkin County, aluminum storefront doors have been included at openings 111, 119, 203, 213, and 214 per the attached elevations and hardware sets. The use of thermally broken storefront will require existing HM frames to be removed and replaced with compatible storefront frames; thermally broken doors are thicker than typical doors. This work is included. 19. Gypsum board surfaces will receive a Level 4 finish and texture to match existing. 20. Every effort will be made to keep ceiling heights at the elevations noted on the drawings but conflicts with structure and MEP systems will dictate final elevations. 2 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 21. Wall type 6 at room 244 is noted to have an STC rating of 45-49. The STC rating of existing door and windows to be reused at that area is unknown. 22. FCI has included removal of the drywall along grid A in the basement to allow this wall to be spray insulated. Spray insulation will be installed to give an average R value of 17.25 which will require 2.5" of closed cell urethane. 23. Under sink cabinetry in room 113 is noted to be removed for ADA access. Since no further details are provided work will be included as part of the miscellaneous millwork allowance. 24. Grab bars are the only bathroom accessories furnished and installed; all other accessories are by the owner. 25. New bathroom mirrors have been included as 24x30 framed mirrors as that is what is depicted in elevations on A7 drawings. 26. Fire sprinkler, see attached drawings: A. Lower level — relocate all heads in new trim and reuse existing heads. B. Main Level Under mezzanine— relocate only as necessary, new trim throughout, reuse existing heads. C. High ceiling — Existing heads remain in same location, new trim. D. No fire suppression heads are to be replaced or changed in areas where ceilings are undisturbed, new trim will be installed. 27.The GMP includes cap and abandon existing sanitary sewer. Concrete demo removal of piping, backfill, and concrete patch is not included. 28. It is assumed the new sewer line can tie into the existing sewer line and the grades work. 29. An 84"x22" balancing damper has been included at existing return air duct shown on M2.1 near grid 7 and F; 2H already had a 48"x22" balancing damper included in COR 029RNr1. 30. Security gates and security gate installation are not included; an allowance of $7,000 is carried for conduit rough-in and power and data to the gates. 31. All existing electrical floor boxes are to remain. 3 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 32. Lighting fixture counts are per the EL series drawings. 33. Low voltage wiring has been included per the attached sheets which are based on conversations between Current Solutions, Pitkin County Library, and Marmot. 34.AV scope C. Exclusions 1. Sales tax; this project is tax exempt. 2. Any costs associated with hazardous materials abatement. 3. Costs for third party commissioning. 4. Any requirements for acoustical performance regarding HVAC or plumbing are not included in this proposal as none are specified. 5. Insulation revisions to existing ductwork is not included. 6. Work shown within the clouded area on C01. This work will be priced once design is complete for the City's improvement of Mill Street. Any landscaping shown on C06 west of the new egress sidewalk has also been excluded for this reason. 7. Additional erosion control shown on C07, the south alley is under construction by the City and they are responsible for erosion control during their work. Once completed it will be a hard surface. 8. Work shown that has already been added to the contract: 1. Work shown on CO2, CO3, and C04; this work was included in COR 12. 2. Work shown at the Children's Area and Mezzanine; this was included in COR 22RNr1, Several changes in this area were made on these drawings and not clouded. FCI has made our best effort to capture those changes however, FC reserves the right to compensation for any changes not captured in this COR that are identified in the future. 3. Roof repair between the tower and the skylight; this was included in COR 022RNr1. 4. New skylights and associated work; this was included in COR 059RN. 9. Snowmelt shown on M2.9; it is work performed by the City of Aspen. 10. Rails shown in Storage 133 and associated plywood build up are excluded; this 4 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 work is to be completed by the moving subcontractor direct through Pitkin County. 11. All loose equipment and furnishings equipment. • Furniture — tables, chairs/seats, desks, book shelves, modular furniture, demountable office partitions, etc. • Furnishings — loose shelving, filing cabinets, trash bins, loose storage cabinets. • Equipment other than what is specifically identified in this estimate. • Vending machines or equipment. 12. Telephone/data equipment (telephone switching, handsets, PBX units, computers, network servers, printers, scanners, etc.). 13. Cable or Satellite TV cabling or equipment. 14. Emergency communications system wiring, equipment, devices, & antenna. 15. Costs (materials, equipment, systems) associated with LEED or Green Globes certification. D. List of Allowances 1. Sod replacement for work south of library: $1,500 2. Irrigation repair for work south of library: $1,500 3. Engineering for tie off at roof equipment: $1,500 4. Miscellaneous woodwork and millwork: $10,000 5. Fireproof patching: $5,000 6. Unknowns due to reuse of existing doors and hardware: $25,000 7. Modifications to flooring and wall coverings: $150,000 8. Appliances $5,000 9. Rough-in for security gates: $7,000 10. Low-voltage rough-in: $15,000 5 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 E. List of Allowances Credited Toward Phase 2 work 1. Ground thaw: ($10,000) 2. Acoustical Fence: ($10,000) 3. Winter conditions: ($20,000) 4. Exterior Glazing: ($9,670) 5. Carpet patch: ($5,000) 6. ACT patch: ($12,000) 7. Shades: ($48,937) 8. Unused generator move: ($29,000) End of Clarifications & Assumptions. 6 FCI Constructors,Inc. Project Name: Pitkin County Library Phase 2 9/28/2015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: Doors 111 Metal Group: M451T CG/SS/OG STOPS UP DXS:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 1 Frame Width: 76 Frame Height: 98 Back Member Color:#40 DARK BRONZE : PERMANODIC Face Member Color: #40 DARK BRONZE :PERMANODIC Na-- Awnwe til ^a < — 76 (O.A.FR) 1 < 72 > 2 < > K2 A A CY co O t t co rn '‘.l'\' 'N;s,`\- \\:‘,2: ,\''. \A-. \\\Z\ \ ,,, i.` ', ',. N ,;, -4,,, i'S NA,,,,..) : , S 4, S 1 V — v Page: 1 Of 5 Hardware Set #111-2 Door #111 6/0 x 8/0 Doors to Alley Each to have Catalog # Mfgr. Finish 8 Intermediate Pivots #7226 INT Ives 606 1 Exit Device 3527 A-EL Vonduprin US4 1 Exit Device 3527A-EO Vonduprin US4 1 Rim Cyl 20-057-ICX Schlage 606 1 Mortice Cyl 20-061-ICX @ KR Muir Schlage 606 ESIC Core Schlage 1 Power Supply Vonduprin 2 Door pull 1" Round 8103EZHD 10" 0 Ives 606 2 OH Stop 100S ADJ Gly 606 2 Surface Closer 4111 EDA TBWMS LCN 696 1 Weather-Strip Kawneer Standard 1 Sweep Kawneer Standard 1 7" Threshold 896DKB NGP DKB Balance of Hardware is By Others Project Name: Pitkin County Library Phase 2 9/28/2015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: 119 Metal Group: M451T CG/SS/OG STOPS UP DIS:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 1 Frame Width: 76 Frame Height: 98 Back Member Color:#40 DARK BRONZE : PERMANODIC Face Member Color: #40 DARK BRONZE: PERMANODIC I� q ) 1i 76 (O.A.FR) >, 72 2 ) )1 K 2 h co P‘, t co w Y Page: 2 Of 5 Hardware Set #119-214-2 Door #214 & 119 Exterior 6/0 x 8/0 Main Entry Each to have Catalog # Mfgr. Finish 8 Intermediate Pivots #7226 INT Ives 606 1 Exit Device 3527 A-EL Vonduprin US4 1 Exit Device 3527A-EO Vonduprin US4 1 Power Transfer EPT-10 Vonduprin US4 1 Mortice Cyl 20-061-ICX @ KR Mull Schlage 606 2 FSIC Core 23-030 Schlage 1 Power Supply Vonduprin 2 Door pull 1" Round 8103EZHD 10" 0 Ives 606 2 OH Stop 100S ADJ Gly 606 2 Surface Closer 4111 EDA TBWMS LCN 696 1 Weather-Strip Kawneer Standard 1 Sweep Kawneer Standard 1 7" Threshold 896DKB NGP DKB Balance of Hardware is By Others Project Name: Pitkin County Library Phase 2 912812015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: Doors 213 Metal Group: M451T CG/SS/OG STOPS UP DIS:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 1 Frame Width: 76 Frame Height: 98 Back Member Color:#40 DARK BRONZE: PERMANODIC Face Member Color: #40 DARK BRONZE: PERMANODIC 76 (O.A.FR) 1 72 2 n A co Q t t co t t V V Page: 3 Of 5 Hardware Set #213-2 Door #213 Interior 6/0 x 8/0 Main Entry Each to have Catalog # Mfgr. Finish 8 Intermediate Pivots #7226 INT Ives 606 2 Exit Device 350 Dummy Exits Vonduprin US4 2 Door pull 1" Round 8103EZHD 10" 0 Ives 606 2 Surface Closer 4111 EDA TBWMS LCN 696 FSIC Corc 73-030 Schlage 1 Weather-Strip Kawneer Standard 1 Sweep Kawneer Standard 1 Threshold 896DKB NGP DKB Balance of Hardware is By Others Project Name: Pitkin County Library Phase 2 9/28/2015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: Doors 214 Metal Group: M451T CG/SS/OG STOPS UP D/S:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 1 Frame Width: 76 Frame Height: 98 Back Member Color:#40 DARK BRONZE : PERMANODIC Face Member Color: #40 DARK BRONZE : PERMANODIC 76 (O.A.FR) > 72 2 < > K 2 L � I Q O t t co rn t t �V V Page: 4 Of 5 Project Name: Pitkin County Library Phase 2 9/28/2015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: Door 203 Exterior Metal Group: M451T CG/SS/OG STOPS UP D/S:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 2 Frame Width: 40 Frame Height: 108 Back Member Color:#40 DARK BRONZE : PERMANODIC Face Member Color: #40 DARK BRONZE . PERMANODIC 40 (O.A.FR) 2 -)i r 2 A l 0 co O co co Page: 5 Of 5 Hardware Set #203-2 Door #203 Single 3/0 x 7/0 Each to have Catalog # Mfgr. Finish 3 Intermediate Pivots #7226 INT Ives 606 1 Exit Device 35A-NL-OP-ALK "Alarm" Vonduprin US4 1 Rim Cyl 20-057-ICX Schlage 606 FSIC Cori-_ :_3-030 Schlage 1 Door pull 1" Round 8103EZHD 10" 0 Ives 606 1 OH Stop 100S Adj Gly 606 1 Weather-Strip Kawneer Standard 1 Sweep Kawneer Standard 1 7" Threshold 896DKB NGP DKB 1 Surface Closer 4111 EDA LCN 696 1 Elect Srtike 6300 Elect Strike Vonduprin US32D Balance of Hardware is By Others a CO ra EXISTING ,.:,,,•:,. m RDITti/ATIONti NSTRUCTION, 01 ® 0! ____............. 0 ,_(-_) ,,,,,_ Ise w se T.e va w + w w N 1 — - .Aeur,mwOAu roMa n.� .a w m wR,eT nrrN-.M. m EAx A m.. r 0 — — .4,�._ . . . - �4;�.® oa J=�-s� - - - 111 or b —4,:_li t.,,,,,—,,, 4 n /x. ..tar AQ' 1x6 K y mrna c5 N^D �� .,. I O © ?1 - Q ,w w I 0 2.12-2015 3 o.34 t –.._.._.._.._.. ill C AD I 1, E p!'1 , n 1 9 F • I 6 l',{Li�lI � 11II1111I1:1111111111111 l D. 1 II ADE L gi E !111/1111111111111'Mi. 07041.0 Revl.ed Mese I Scope O W PTIii�8�d Qc _. ENO e•.Ie tlONd M Bane BW PCO INT-22R r • — R7sID sm. � inti .E�Nole No woM1InVaae Reasaaput APCO.INi.23R f, co r .T fife sm., eraea ` ..rNn. awn -E EX9 Frssnes I -.-.-. ........ __-... .--. Z • work defined or Interpreted to be 41 E pnbnad m IMae areas b fee N: E rm..«.,+.e. p r.ler probaan. DLW - 4 a New FInDMe WrnRSP mI+zMI� Wo ERSTE*FOR Oe • - -.t �E n . I^.a' tri "yrs - __ -- _._... _ Z W MAI. yy v WRA a defined as 8/12.15C,000...*, n F–and a.or..le e.m,re.w,r.er bear.Te '.6 --1_ SrNP. 'I comply 0q RCP.a root bas. _.._. .N_'Y J p cover Prwnebr pale.luoewrONM Man MM -- -, .. fC_ (" pales n these are.. ' � I w ITQEKTm rant RAN revue CJ j Z Z I. IaMwe Au ex area AccwTlcAl cealHs r AND Dam __ p Ar THS leve. _- _._._ _ _ _. _. _._ _ .._.._._.._.._. N 3.CM.ISeHA ARE LISTED Ise.ROOM NA.AND ARE J O FR ll TO OF FLOOR SLA•To DOTTDM DE GEM.FRANI. —0- I —.cP ... ,:j ,..."m »�:.. - — — — — —_. _ l a H J < OR BRIO 5, 5 u LIHS WIMPS ARE ROMPED TO ase NEAREST HCH, I i ( < MAMMAL ceo." TERI,NOT® I - I -.,;. — - Z > UO Dee RAN FOR GEM. :" ' ry WTH AN 2)ARE Ex sitb TO RSdAIn. S t I 0 d' lex R. !"r-."4-' irks • — Z O z S. rn CELNDS TO PE P.O.Dee WM ARO. E z w e.REMO.TOL...AM ELECTRICAL ORArar,D FOR THE _ — — — — _ --. _- W N rn LOCATION w L"Hr nxTuas ea«NNeAI ORM,.FOR –I fi{) d ase LOCATION w MECHANICAL SYSTEM DR LLES ANT FIRE I J I I � Q PROTECTION PRAWN'S FOR LOCATION OP SPRINKLER MEADS I — — NO CSL r6 fCVNTED F RE ALARM EQAP.VIR i NXxS TO REMAIN �` _ _ T bHORD.AIv DCYA=CFL-Ar EER-R.S.X0 RNwn D.PRIOR TO DO STNtr OF CHU.COISTRILTIOAMOVATION, "N'�...•-'r✓OV - - - • CONTRACTOR TO VERIFY THAT ALL EASE.NO 1E. RGEEOVATION I ) EXISTING g ACNGTI PITH fiEOfA'.GAL,ELECTRON A T NSTOR TWO WO •S L ,moo a W n Uwe t"DOF�A a rAucs w p ! w CONSTRUCTION g 'a " ..mei•RUTS - 4 4 4.D �o O R'Z a S ..•NOM.OF STRICTURE t 8 4 LOWER LEVEL REFLECTED CEILING PLANED LOVER LEVEL[MURORAN E.ID. 4 , ;, A 2.4 RENO-PHASE U 0 1 • aN. RENOVATION I [X19TIN6 o NORTH ALLEY i CONSTRUCTION I 3 �o ©e Q o; ,3 voOr .„ era Rm. �_mo_ .e w--'-- .�":3--- '- -r S •a I I 1 C):[ , 11.54.11•R.:RAMO„, / erowle.A.[OLEO GA. mums IO INIARRO es Vit: TO iiiiMN= ti 6 1165 3 r $ i M F _f I s iowedw* I I' ' 1 �% -__. _.. X11 -__ ©amu ...- ARU sweet 0 Ill gall . 5 m°o neper• - yy m...�°.AR.�FS ' ` Gds I Mill le, 31° b � µ/�p� 1 ikif 6 q, y I AV te% '.i'! .T®3 p " \ Erre .r6 LL, i prAAe : C} � r� 1 ��iF18�!HR. j2.113" �1 .�eZ 11 ° 11111111FF6I$!1 11 C> ItffI 7. _,..n., ..T ® _ �; _ > I • 114I I �: m ••- •,.. + �° " PEI } uard 4-C) 1111Plifililliii .pe•. / \ TRLLm ieau+�rraiT4//41/1:EE���q�sb C.7 I � � � I �� Comm.IITLEO �13.,^'13""" f f Ep �A --- -..dee.FULLR. 1; I r� g � I �`,� ® 1 `Ma I e�TS.+u Aw i \ - __-_.--. _ enuT i i i ,.....7, 'J _ _ _ 11:11:113 11 11 w�Pn„ei smveawax 1 OINIUMIIIRO F F1 N ntlase bb PLO RT 32R 1 ie wrk meAe„reeA ee PeR of PCO-.RT-3zF I _ k W lo Ere eq nkkr Omtetlne �11 II, 8 >- , 4' ERcl r9 En eeee N •E—: rea,;a�r Le I �_ E.IL d Q W epbRbr M1orMwn ✓ . cc W t* Finishes ♦.,ti I- ID m work b defined as 8:13/15 change Order.i I I J �Am eM ar rebel ety spkRkrl�eede to SI_ �__-". .nY e�. .new door OM Mans flushLU MIRE coved Wales MAO Lli ° �.__�.._.._.._.._.. I— O c,m CPA m..w+Norn. J 111 __ 0 COLE.r FROM TOP Q ARE R ,� IT TICEI**AMA SEE �FoP M� ka .— o H OR LLIR5 UNA5e IIS'ePHA E I ` I n (.� Q i OJ ° SReFOCR 5,8 o����.,� �< Y � .PP •. FOR GEV.WaNIAI.LC 1^..'' •��F ------— � I Z o HTR ar ARE ExSnw TO REMAIN�ITATRSuwePAee AS L1 MATERIAL NOTED Z ABG 55AI, I Z w I.AL:°.R BOARD GEIL,RE5 TO BE FANTOD SST ARO — _ �— a 5. R b.1.161 MO ELECTRICAL S.RwA`,UFARFGR,� ligalibiga., >�rTHE_LOCATEo~AGRFORL 5T5RH P SPRIILI.Ab FI �RA.55F�R T�RGF�d»�R�AoSo e.ROT LE1 M1PHS TO REMAIN A5 ALARM 63ePrBlT. I i A51OI® LELL dfLeeTRICTIO4MEOVATIIM 1 ELECTRICAL''� 2 RAI..OW COMIRACTOR MILL . �, RENOVATION I EXI5TIN6 '.. 1 ,I, 5 AWOPX TMrr�«GEOL. Ad, s222ARue2. • -__ p ; CONSTRUCTION I — „ lltt ° E: ;T». SOUTH AL Y O (.) I� 2 a - •eoTTGr,of STRtcMC 8 4 MAIN LEVEL ® REFLECTED CEILING PLAN Over LEI.. - = = A 2.5 � I RENO-PHASE II 0 2 • R�NOT'ATION EXISTING iEr SE. ". 0ez 0re, 0_ CONSTRUCTION —K' otosI rMun mxMl — i I g! RI aUTTB3 I I g T° ISTIScAU , , , \ I ' 212.2015 l � .. _ ,t � . e rts A o.nran I ao.,..' I c t ... 1•i. A q l�jl[!�I 111111 nTrr..r , � ' 1 1.: H , 'vgi .cF .st+�.-{ I + I J ���el 1111 .1.. . _ .:,...,.....,: , 1 • r �� I 1 t I to_ -4. —_ I 1 Il 11F�!h tit; O _. a �k -§ O • , .. .._L \ . • 1_ 1 0 i �';�o 101,,, ,,, z _.—iiii---.- _ yy ''—iiii I: I E 1111111111111111' F 1 I ,1tle iPPP Rereetl Phase Scope plNWR rNc4lnr. __-__ 707'11116. "'' .: 1 I __ I5.4n6,u Ed PCO Nts": - I O •tL Nae Np wvkln hMee,r,aa nprl of Pco-lNi-uR \ il a k los fire sprinkler prplMm \ - I - I.,*.,y,._ o..[�.iw..< /�/ 12 'E'-Festal,Fnlspes I r i _-� I 1 c•..an CPILIN6.k1Ji NO Ctrs „n,!/a0 •,N! •�",°„7:::.—...::::::•:',=' p woo defiMHnelherPrehed tdM '- OR UUO RWc SL/.e TO BOTTOM . Q \� 5+Rr L rev Ctrs re CM OP Cek.Me.RAHM pe„7:: M Riese areas Iw fire so nkbr protection �1 l C[L NS NE16NTS ARE rouNIMO TOT!1EM8°T N. z CO I lcAO ir.ES ' r:. -_... 3.SEE RµPCR CEO.w.2wK.c N-•New Finishes I m NI5OESSMTK![xISIIN°TO REMAIN pa.p MATERIAL A Mork u defined as 9/1115 Charge Order St '.6' `` --�. I ..KL eTv BO..L[hLA.sS TO Q PAINTED SEE SHEET A3 0 F `7 Replace concealed spr n.Mad corer plates w uwwss R i s w on sprinkler heads in these areas onN ''14'5 - I TO LksrmNs.sho.i w.xlcK NSS rcR, W °. ATIOu aF LKwO rhxTut[e,eC.1uRlC°�'aK ON�vahs5 R'm . � K ARO A MOWED Pe!K Ja Eaar.ENT O o h�P�R La m�!USER STRAW, _ ,,... ...--� AT!MST..SLOTTO err 6 Q `� /� rwi®e,e ns ,�P.eua,rtr.hdnu \\�� `SHAW II_(/MME I As FLAT c[lL his TO REMAIN U j =:ii O 'I PRiola TO THE START or COLS.CONSTRUCTIORMENOVATION pL, oRTo Y o i mm I eo.wwmxxJ-- w hut..nRCNreci OF,w.uecR®a.Ncls enewlccahea.eu•• GOMM�h.....k.a s. - •w a z w CORM(1515.1J—,,,, �,� �^' a !:x sT © o — i MG.COMM i � LCI..h....•man — ooe.•oiToh,Or' STRUCTURE ! w .. 1 RENOVATION EXISTING {• hM �, .. / GONSTRUG-ION as ��.� a MEZZANINE LEVEL F. g M a TOWER SOFFIT PLAN t-1 REFLECTED CEILIN6 PLAN ED .EURniELE..CEEEidax., A 2.6 NORTH I�r� h1OhEIR RENO-PHASE II o • • I J 4;XISTING 4 PENOVA'ION I CONSTFUCTION ' a.,j. 'I • ►t ►4 11.4 't I , m ® (DE4 Po . Et - ;�I I I'i - IC 0. ODD 1 I Po OM HI - FITI 11 VV E - -o1 Ai E - r -�•— OM ® ON1 I I 0310 'I curs I E voter Phone n ISE G__� — 1 1 l. I�'i" ., LJ LJ fhU for Phone ---1_-.�_ OW OM 4 C +)l r' -=.,_ _ H 4 H ♦ 1 County 8 1 Marmot I •• • • ' •• 1 County -V 1 Marmot HVAC System 1 1,g, -1 O Denotes the Cable Count LOWER LEV 14 rum 1 =I County Marmot 26 2641 •i 1 1 , 1 1 7_7_7_=9 n5 8 J i coal 1 r-, �r , 4+ 1 2 I I I q t+ +1 0 1 1........................ 1 I... I +4 0 2 'WAP 0 1 __ : )r:S IIi' ire...: I Total: Total Locations- 0104 Mese Avenue Pitkin County Library Renovation Drawing:I ower L Grer8 jvrv9vn,CO 91504 120 North Mill Street Date: 9/21/15 PHONE'.1910)258.1175 en,As Colorado Page#: 1-t CUtreirk011itionS PAX:1970)245-290e Pg I L - - \I t L \'4\0 , t i \\ �� 4 �' \ 1 01 t 11 1 -0—————1 Iiii —Er .-- L -q ILA-- i I I,„ M Ir 11 la ;. ISI -- -r , T J lI 1 ' \\ ��.1n 11 I L \ ` awl •s'_ I IIp) I \ _ •� / it ❑ 014 fi\9 II h__.—._-- ri \`\ \ \ C—_ " 1, .� "_ • 11 ` 3 C)111 D ` . e r-- �: \`� \ Self Check 3I �'I1 J 111 OM�._ :tom I 1 ie, 1116N _ UP // 1''� ALI ♦ 1 County 8 1 Marmot L1. /0,.,..„ 1 J. 1I . .i'n o ♦ 1 County A T a it • ® - 0 ♦ 1 Marmot .,`r... � I 0 Denotes the Cable Count 'I llPo 41 I MAIN LEVEL FLOOR PLAN iNo 4 ► 4 I County Marmot t-_1 0 ❑ I g ♦ 8 84 PHASE T],PHASE 1 i 1 + 1 1 ♦♦ 0 23 1 1+ 2 9 iL ® --— i net i ++ 0 0 RENOVATION - EXISTING VI' 0 O f CONSTRUCTION V 0 0 Intel 14 a Total Lnfatiota• 3t8e Move Avenue Pitkin County Library Renovation Drawing: Main L Grand Junction,CD 81500 120 North Mill Street Date: 9/21/15 CIflhI.tS VNONE 19]0)P52nC]5 � 0/Ot101iS rnx:lazo)zaszaoe Aspen,Colorado Page 9: 1-2 RENOVATION , EXISTING CONSTRUCTION iti .. ................. r———— I \\ A — —r-- FA \ rA / \ 5 ri On l M1 I �� JLJ1 / I I �-1r9 —i f— 'NOV [§1: _ 1 N 1111 " I7E .lC&N. ,///—\ Li 7:-7 . IIS 1� J li lir L / 111 r o � d .I V •i Il�iriaiia. .� ,�,,'h. 1 �i T 1 T 11 111 if T I,I."_ r _ o 0 1 TI 1 ♦ 1 County&1 Marmot ���Nl '41-1-2 �. �ihal�sF f� r 1w ® li v �v \\ V 1 Count •y y 1r-o' ♦ 1 Marmot I 1' ,I ,A 11 I ✓ Denotes the Cable Count II 001 4 f„012eicnox n 0) , 1 MEZZANINE LEVEL FLOOR PLAN Il �� ® (' 'I 1 County Marmot 1 L I V 3 3 — ..... n « JCI � � PHASE V 0HASE 11 I K-°"/ ® \ 0 3 / v v ♦♦ 0 6 I fir 0 0 / wr \ i1 0 0 _ LI j---P wef 0 0 4 PI'(VA Tux I EXISTING RUCT 1 CONSTRUCPON ir 0 0 i iasal: 2 15 Total Locations 'I'I // - 3184 Mem Avenue Pitkin County Library Renovation Drawing: `� Gm3184 junction.CO 81504 120 North Mill Street Date: 9/21/15 PFAX.(970)245-2808 C��A�$OItl�lOJiS FA%:(9]0)2462808 Aspen,Colorado Page#:_,1,1_, PITKIN COUNTY library insp,re growl PITKIN COUNTY LIBRARY- RENOVATION PHASE 2 ASPEN, CO PREPARED FOR: PITKIN COUNTY LIBRARY ASPEN, CO CONSTRUCTION DESIGN ESTIMATE September 28, 2015 PREPARED BY: FCI CONSTRUCTORS, INC. FCI Constructors, Inc. Date: September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 ASPEN,CO CONSTRUCTION DESIGN ESTIMATE DESCRIPTION 33,130 TOTAL COST COST/SF NOTES 010000 GENERAL CONDITIONS $ 188,568 $ 5.69 _ 310000 SITE WORK $ (4,845) $ (0.15) 020000 SITEWORK-SELECTIVE DEMO $ 20,000 $ 0.60 _ 030000 CONCRETE $ (1,423) $ (0.04) _ 040000 MASONRY $ - $ - N/A 050000 METALS $ 85,345 $ 2.58 060000 WOOD&PLASTICS $ 215,109 $ 6.49 070000 THERMAL&MOISTURE PROTECTION $ 10,812 $ 0.33 080000 DOORS&WINDOWS $ 122,240 $ 3.69 090000 FINISHES $ 305,980 $ 9.24 100000 SPECIALTIES $ 2,662 $ 0.08 110000 EQUIPMENT $ 6,511 $ 0.20 120000 FURNISHINGS $ (48,937) $ (1.48) 140000 CONVEYING SYSTEMS $ - $ - N/A _ 210000 FIRE PROTECTION $ 33,000 $ 1.00 230000 PLUMBING/HVAC $ 136,213 $ 4.11 260000 ELECTRICAL $ 797,277 $ 24.07 270000 LOW VOLTAGE/SPECIAL SYSTEMS $ 81,830 $ 2.47 SUBTOTAL-DIRECT COST $ 3.950.342 $ 58.87 PRECONSTRUCTION SERVICES FEE $ - $ - CONTINGENCY CONSTRUCTION $ - $ - 0.00% BUILDERS RISK INSURANCE $ 900 $ 0.03 GENERAL LIABILITY INSURANCE $ 8,000 $ 0.24 0.40% MATERIALS TESTING/INSPECTION $ - $ - BY OWNER PLANNING APPLICATIONS/PERMIT/PLAN REVIEW FEES $ - $ - BY OWNER BUILDING PERMIT $ 1,500 $ 0.05 UTILITY TAP FEES _ $ - $ - BY OWNER FCI PAYMENT/PERFORMANCE BOND $ 15.870 $ 0.48 2-YEAR WARRANTY FCI CONSTRUCTION PHASE FEE $ 108,714 $ 3.28 5.50% $ TOTAL ESTIMATED CONSTRUCTION COST $ 2,085,326 $ 62.94 Confidential-FCI Constructors,Inc. 2 Project: PITKIN COUNTY UBRARY-RENOVATION PHASE 2 9/28/2015 Div.1: GENERAL CONDITIONS Original Design DESCRIPTION I QUANTITY1 UNIT 1 PRICE 1 MATERIAL I MATERIAL TAX I PRICE I EQUIP/SUB 1 PRICE I LABOR I LABOR BURDEN TOTAL ONSITE MANAGEMENT PROJECT MANAGER 5 WK $ - $ - $ - $ - $ - $ 2,400.00 $ 12,000.00 $ 8,160.00 $ 20,160.00 GENERAL SUPERINTENDENT 13 WK $ - $ - $ - $ - $ - $ 1,850.00 $ 24,050.00 $ 16,354.00 $ 40,404.00 SUPERINTENDENT 30 WK $ - $ - $ - $ - $ - $ 1,450.00 $ 43,500.00 $ 29,580.00 5 73,080.00 OFFICE ENGINEER 5 WK $ - $ - $ - $ - $ - $ 1,350.00 $ 6,750.00 $ 4,590.00 $ 11,340.00 TEMPORARY FACILITIES TEMP _PHONE --- ----�--- 3 MO $ 350.00 $ 1,050.00 $ - $ - $ 250.00 $ - $ - $ - $ 1,300.00 COMPUTER 3 MO $ - $ - $ - $ 250.00 $ 750.00 $ 100.00 $ 300.00 $ 204.00 $ 1,254.00 TEMP TOILET(4 EA) 3 MO $ - $ - $ - $ 400.00 $ 1,200.00 $ - $ - $ - $ 1,200.00 TEMP WATER 3 MO $ - $ - $ - $ 180.00 $ 540.00 $ - $ - $ - $ 540.00 FIRE EXTINGUISHERS 3 MO $ - $ - $ - $ 30.00 $ 90.00 $ - $ - $ - $ 90.00 SAFETY 3 MO $ - $ - $ - $ 833.33 $ 2,500.00 $ - $ - $ - $ 2,500.00 JOB SIGN 0 EA $ - $ - $ - $ 500.00 $ - $ 50.00 $ - $ - $ - TEMPORARY PARKING 0 EA $ 200.00 $ - $ - $ - $ - $ - $ - ______ _MISCELLANEOUS________ OFFICE SUPPLIES 3 MO $ 1,200.00 $ 3,600.00 $ - $ - $ - $ - $ - $ - $ 3,600.00 AS-BUILTS AND O&M'S 1 LS $3,000.00 $ 3,000.00 $ - $ - $ - $ - $ - $ - $ 3,000.00 FINAL CLEAN 0 SF $ - $ - $ - $ 0.40 $ - $ - $ - $ - $ - TWO YEAR WARRANTY MANAGEMENT 0 LS $ - _EQUIPMENT PICKUP (2�A RENT ) _ _ __ 4 MO $ - $ - $ - $ 1,450.00 $ 5,075.00 $ - $ - $ - $ 5,075.00 CONSTRUCTION EQUIPMENT 0 MO $ - $ - $ 200.00 $ - $ - $ - $ - $ - OUT OF AREA SUBSISTENCE ------------------ 43 WK $ - $ - $ - $- 175.00 $ 7,525.00 $ - $ - $ • $ 7,525.00 RENT 4 MO $ - $ - $ - $ 2,500.00 $ 8,750.00 $ - $ - $ - $ 8,750.00 RENT 4 MO $ - $ - $ - $ 2,500.00 $ 8,750.00 $ - $ - $ - $ 8,750.00 HOME OFFICE TRAVEL 0 MO $ 630.00 $ - $ - $ - $ - $ - $ - $ - $ - TOTALS $ 7,650.00 $ - $ 35,430.00 $ 86,600.00 $ 58,888.001$ 188,568.00 FCI Constructors,Inc. September 28,2015 Project PITKIN COUNTY UBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY UBRARY SF 33,130 UNIT OF DESCRIPTION MEASURE QUANTITY UNIT PRICE TOTAL TOTAL 310000 SITE WORK 312100 SITE PREPARATION SOIL/EROSION CONTROL/HAYBALES EXCLUDED LS 1.00 $ - LS $ - TREE PROTECTION FENCING LF 334.00 $ 8.50 LF $ - SUBTOTAL-SITE PREPARATION $ - • 310000 SITE WORK 312580 SITE CONCRETE CONCRETE WALKS-4'THICK SIDEWALK REVISIONS CONCRETE TO SIDEWALKS LS 1.00 $ 500.00 LS $ 500 SUBTOTAL-SITE CONCRETE $ 500 310000 SITE WORK 312900 LANDSCAPING&IRRIGATION 4 SEASONS FINE GRADE LS AREAS LS 982.00 $ 0.07 LS $ 11,655 SOD REPLACEMENT ALLOWANCE LS 256.80 $ 0.57 LS $ 1,500 LANDSCAPE EDGERS-METAL LS 81.00 $ 4.60 LS INCLUDED SHRUBS LS 45.00 $ 42.17 LS INCLUDED PLANTING BED MULCH LS 406.00 $ 42.17 LS INCLUDED TRUGRID AT POROUS GRAVEL SYSTEM LS 199.00 $ 9.50 LS INCLUDED 1.8"857 STONE/CLEAN TO FILL TRUEGRID POROUS GRAVEL SYSTEM CY 1.48 $ 59.00 CY INCLUDED LS IRRIGATION REPAIR ALLOWANCE LS 3,680.00 $ 0.54 LS $ 1,500 SUBTOTAL-LANDSCAPING&IRRIGATION $ 14,655 312950 SITE FURNISHINGS EXCLUDED SITE FURNITURE-BENCHES EA 4.00 $ 1,200.00 EA $ - SITE FURNITURE-BIKE RACKS EA 4.00 $ 344.00 EA $ - PLANTER POTS-WEATHERED CAST STONE CUBE- W/SOIL,FILTER FABRIC,AND AGGREGATE EA 5.00 $ 450.00 EA $ - SUBTOTAL-MISC.SITE IMPROVEMENTS $ - 310000 WINTER CONDRIONS GROUND THAW ALLOWANCE REFUND LS 1.00 $ (10,000.00)LS $ (10,000) SUBTOTAL-WINTER CONDITIONS $ (10,000) 310000 ACOUSTICAL FENCE ACOUSTICAL FENCE REFUND LS 1.00 $ (10,000.00)LS $ (10,000) SUBTOTAL-ACOUSTICAL FENCE $ (10,000) 310000 SITE WORK-TOTALS $ (4,845) DIV 310000 SITEWORK FCI Constructors,Inc.Confidential Page 4 FCI Constructors,Inc. September 28,2015 Project PRKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PRKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANITTY TOTAL TOTAL LOWER LEVEL WESTADDITJON- 310000 SITE WORK(BUILDING) EXTERIOR 310000 SITE WORK(BUILDING) LOWER LEVEL 312050 SELECTIVE DEMOLITION FG SELF PERFORM SALVAGE CONTROL MONITORS EA 1.00 $ 40.10 EA $ 20,000 REMOVE TLT COMPARTMENTS EA 4.00 $ 26.77 EA INCLUDED REMOVE COUNTER TOPS LF 42.00 $ 2.10 LF INCLUDED REMOVE BASE CABINETS LF 42.00 $ 4.10 LF INCLUDED REMOVE WALLCABINETS LF 42.00 $ 2.10 LF INCLUDED REMOVE CIRCULATION DESK EA 1.00 $ 160.10 EA INCLUDED REMOVE INTERIOR GYP BRD CEILINGS SF 1,650.00 $ 0.99 SF INCLUDED REMOVE INTERIOR GYP BEAM WRAP LF 161.00 $ 4.10 LF INCLUDED REMOVE INTERIOR GYP BULKHEAD LF 63.00 $ 2.10 LF INCLUDED REMOVE WD CHAIR RAIL LF 1,923.00 $ 0.50 LF INCLUDED REMOVE WD BASE LF 1,92300 $ 0.50 LF INCLUDED REMOVE INTERIOR MS/DW PARTITIONS SF 7,124.00 $ 1.10 SF INCLUDED REMOVE INTERIOR DOOR FRAMES EA 29.00 $ 40.00 EA INCLUDED REMOVE WOOD DOORS EA 40.00 $ 32.00 EA INCLUDED REMOVE STAIR EA 1.00 $ 3,400.00 EA INCLUDED DUMPSTER/DUMP FEES EA 10.00 $ 1,000.00 EA INCLUDED DAILY CLEANUP WKS 3.00 $ 1,120.00 WKS INCLUDED SUBTOTAL-SELECTIVE DEMOLITION LOWER LEVEL $ 20,000 DIV 310000 SITEWORK-BUILDING FCI Constructors,Inc.Confidential Page 5 FCI Constructors,Inc. September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PIWIN COUNTY UBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 310000 SITE WORK(BUILDING) MAIN LEVEL 312050 SELECTIVE DEMOLITION FCI SELF PERFORM REMOVE EXTERIOR DOORS EA 4.00 $ 32.00 EA INCLUDED REMOVE INTERIOR DOORS EA 2.00 $ 32.00 EA INCLUDED REMOVE METAL STUD WALLS SF 500.00 $ 1.75 SF INCLUDED REMOVE BUILT-INS MAIN ENTRY LF 20.00 $ 4.10 IS INCLUDED REMOVE SHELVING 228 LF 64.00 $ 2.10 LF INCLUDED REMOVE BASE CABINETS LF 15.00 $ 4.10 LF INCLUDED REMOVE WD CHAIR RAIL LF 1,185.00 $ 0.50 LF INCLUDED REMOVE WD BASE LF 1,185.00 $ 0.50 LF INCLUDED REMOVE WD GUARD RAIL LF 15.00 $ 8.00 LF INCLUDED TEMP WALL-INSTALL/REMOVE SF 744.00 $ 5.25 SF INCLUDED REMOVE HARD UD CEILINGS SF 983.00 $ 3.10 SF INCLUDED REMOVE EXISTING CONCRETE FLOOR SLABS NEW STAIR SF 151.00 $ 8.50 SF INCLUDED SCAFFOLDING FOR CONCRETE REMOVAL NEW STAIR LS 151.00 $ 8.50 LS INCLUDED SAWCUT EXISTING CONCRETE FLOOR SLABS NEW STAIR LF 91.00 $ 5.33 LF INCLUDED STEEL DEMO NEW STAIR SF 151.00 $ 63.00 SF INCLUDED REMOVE EXISTING CONCRETE FLOOR SLABS NEW STAIR SF 151.00 $ 10.00 SF INCLUDED REMOVE STAIRS EA 1.00 $ 3,400.00 EA INCLUDED MISCELLANEOUS REMOVALS HRS 16.00 $ 41.00 HRS INCLUDED DUMPSTER/DUMP FEES EA 4.00 $ 1,000.00 EA INCLUDED DAILY CLEANUP WKS 2.00 $ 914.80 WKS INCLUDED SUBTOTAL-SELECTIVE DEMOLITION MAIN LEVEL $ - 310000 SITE WORK(BUILDING) MEZZ LEVEL 312050 SELECTIVE DEMOLITION FCI SELF PERFORM REMOVE INTERIOR DOORS EA 1.00 $ 32.00 EA INCLUDED REMOVE INTERIOR DOOR FRAMES EA 1.00 $ 40.00 EA INCLUDED REMOVE WD BASE LF 551.00 $ 0.50 LF INCLUDED REMOVE INTERIOR MS/DW PARTITIONS SF 150.00 $ 1.10 SF INCLUDED DUMPSTER/DUMP FEES EA 1.00 $ 1,000.00 EA INCLUDED DAILY CLEANUP WKS 0.20 $ 1,120.00 WKS INCLUDED SUBTOTAL-SELECTIVE DEMOLITION MEZZ LEVEL $ - 310000 SITE WORK(BUILDING)-TOTALS $ 20,000 DIV 310000 SITE WORK-BUILDING FCI Constructors,Inc.Confidential Page 6 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PFTKIN COUNTY LIBRARY SF 33,130 • UNFT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 033200 CAST-IN-PLACE CONCRETE CONCRETE S2M CONCRETE STAIR LANDING LOWER LEVEL LS 1.00 $ 15,477.00 LS $ 15,477 CONCRETE TO SLABS ON DECK NORMAL WT-6.5"TOTAL DEPTH LS 1.00 $ - LS INCLUDED CONCRETE STAIR PANS LS 50.00 $ - LS INCLUDED WIRE MESH REINF.-6X6/W2.1 LS 168.30 $ - LS INCLUDED DRILL AND DOWEL TO EXISTING LS 53.00 $ - LS INCLUDED TROWEL FINISH SLABS ON DECK L5 153.00 $ - LS INCLUDED CURE&PROTECT SLABS ON DECK LS 153.00 $ - LS INCLUDED SUBTOTAL-SLABS ON METAL DECKING $ 15,477 030000 CONCRETE 033200 CAST-IN-PLACE CONCRETE CONCRETE PUMPING/HOISTING CONCRETE PUMP DYS 1.00 $ 1,934.00 DYS INCLUDED WINTER CONDITIONS REFUND LS 1.00 $ (20,000.00)L5 $ (20,000) LAYOUT/COORDINATION HRS 20.00 $ 64.00 HRS $ 1,280 CLEANUP HRS 20.00 $ 31.00 HRS $ 620 DUMPSTERS PULLS 1.00 $ 1,200.00 PULLS $ 1,200 SUBTOTAL-CONCRETE PUMPING/HOISTING $ (16,900) 030000 CONCRETE-TOTALS $ (1,423) COST PER SF $ (0.04) 030000 CONCRETE FCI Constructors,Inc.Confidential Page 7 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 050000 METALS 051200 STRUCTURAL STEEL MYERS STEEL COLUMNS,BEAMS,DECKING LS 1.00 $ 2,460.00 LS $ 82,745 MAIN STAIR STEEL LS 1.00 $ 2,460.00 LS INCLUDED RAIL POSTS LS 1.00 $ 2,460.00 L5 INCLUDED WALL RAILS LS 1.00 $ 2,460.00 L5 INCLUDED LAYOUT/COORDINATION HRS 25.00 $ 44.00 HRS INCLUDED SAFETY/TEMP BARRICADES HRS 25.00 $ 44.00 HRS $ 1,100 TOUCH UP PRIMER PAINT L5 1.00 $ 750.00 L5 INCLUDED CRANE PADS/LEVEUNG LS - $ 3,400.00 LS INCLUDED ENGINEERING BUDGET-CABLE TIE OFFS ALLOWANCE LS 1.00 $ - LS $ 1,500 STRUCTURAL STEEL ERECTION DY 3.00 $ 5,210.00 DY INCLUDED SUBTOTAL-STRUCTURAL STEEL $ 85,345 050000 METALS-TOTALS $ 85,345 COST PER SF $ 2.58 050000 METALS FCI Constructors,Inc.Confidential Page 8 FCI Constructors,Inc. September 28,2015 Project: PI TKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNFTPRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 061100 ROUGH CARPENTRY INTERIOR FRAMING PACKAGE LF - $ 2.70 IF $ - INTERIOR WALL STRAPPING/BLOCKING-@ MILLWORK/CASEWORK 2"X4" LF 1,346.00 $ 0.44 LF $ 592 INTERIOR BLOCKING 3/4"PLYWOOD SF 153.00 $ 0.85 SF $ 130 BLOCKING LABOR 2 GUYS5 DAYS LS 1.00 $ 3,600.00 LS $ 3,600 FCI SELF-PERFORM LOGISTICS WKS 1.00 $ 7,555.00 WKS $ 7,555 ROUGH HARDWARE/FASTENERS LS 1.00 $ 2,000.00 LS $ 2,000 LAYOUT/SUPERVISION HRS 40.00 $ 46.00 HRS $ 1,840 DUMPSTERS PULLS 1.00 $ 1,200.00 PULLS $ 1,200 SUBTOTAL-ROUGH CARPENTRY $ 16,917 064200 MILLWORK WILKIE SANDERSON 2"P LAM CAP LOWER LEVEL SEAT LF 27.00 $ - LF $ 188,192 BASE CABINETS-SOLID SURFACE LF 126.00 $ - LF INCLUDED COUNTERTOPS-PLASTIC LAM LF 50.00 $ - LF INCLUDED WALL CABINETS-P LAM LF 31.00 $ - LF INCLUDED BASE CABINETS-PLAS LAM LF 82.00 $ - LF INCLUDED COUNTERTOPS-SOLID SURF LF 131.00 $ - LF INCLUDED TALL MAIL SLOTS P LAM EA 1.00 $ - EA INCLUDED WALL MTD SHELF 1-TIER-PLASTIC LAMINATE LF 30.00 $ - LF INCLUDED WORK COUNTERS-SOLID SURF LF 16.00 $ - LF INCLUDED 30"W FULL HT STORAGE CABINETS-PLAS LAM STAFF LOUNGE EA 1.00 $ - EA INCLUDED BIRCH LASER CUT 1"PLYWOOD SCREEN SF 281.00 $ - SF INCLUDED WOOD BASE-6"HIGH LF 2,920.00 $ - LF INCLUDED RED OAK DOOR TRIM LF 1,098.00 $ - LF INCLUDED RED OAK WINDOW TRIM LF 414.00 $ - LF INCLUDED WOOD HANDRAIL LF 210.00 $ - LF INCLUDED RED OAK WINDOW TRIM- REMOVE/SALVAGE/REINSTALL LF 566.00 $ - LF INCLUDED DBL FACED CANOPY TOP-WD SF 175.00 $ - SF INCLUDED DBL FACED CANOPY TOP-SS SF 138.00 $ - SF INCLUDED DBL FACED END PANEL-REUSE SF 170.00 $ - SF INCLUDED DBL FACED END PANEL-SS SF 233.00 $ - SF INCLUDED SEATING AND CUSTOM DESIGN FEATURES•" INCLUDED P LAM SURFACING SF 76.00 $ - SF INCLUDED LINOLEUM SURFACING SF 364.00 $ - SF INCLUDED UPHOLSTERY FABRIC SF 469.00 $ - SF INCLUDED WALL COVERING SF 100.00 $ - SF INCLUDED P LAM WALL SURFACING SF 257.00 $ - SF INCLUDED MISC WOODWORK/MILLWORK ALLOWANCE SF 25,156.00 $ 0.19 SF $ 10,000 SUBTOTAL-MILLWORK $ 198,192 060000 WOOD&PLASTICS-TOTALS $ 215,109 COST PER SF $ 6.49 060000 WOOD&PLASTICS FCI Constructors,Inc.Confidential Page 9 FCI Constructors,Inc. September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PFTKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 070000 THERMAL&MOISTURE PROTECTION 078325 APPLIED FIREPROOFING SOUND CRETE SPRAY-APPLIED FIREPROOFING LS 1.00 $ 9.00 LS $ 5,812 PATCHING ALLOWANCE LS 1.00 $ 5,000.00 LS $ 5,000 SUBTOTAL-APPLIED FIREPROOFING $ 10,812 079100 CAULKING&SEALANTS CAULKING SF - $ 0.35 SF $ SUBTOTAL-CAULKING&SEALANTS $ - 070000 THERMAL&MOISTURE PROTECTION-TOTALS $ 10,812 COST PER SF $ 0.33 070000 THERM&MOIST PROT FCI Constructors,Inc.Confidential Page 10 FCI Constructors,Inc. September 28,2015 Project: PRKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PRKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 080000 DOORS&WINDOWS 082160 WOOD DOORS SOLID CORE WOOD DRS-WOOD VENEER-3'X 7' MCKINNEY EA 6.00 $ 350.00 /EA $ 10,887 SOLID CORE WOOD DRS-WOOD VENEER REUSE EXISTING EA 17.00 S - /EA $ - ADD FOR VISION PANEL CUTOUTS 208 EA 1.00 $ 325.44 /EA INCLUDED STC RATED OPENING AT 211 ALLOWANCE LS 1.00 $ 2,470.00 /EA $ 2,470 ADD FOR RATED WOOD DOORS EA - $ 45.00 /EA $ - INSTALLATION OF WOOD DOORS FCI SELF-PERFORM EA 23.00 $ 193.20 /EA $ 4,444 FCI SELF-PERFORM LOGISTICS WKS 1.00 $ 7,555.00 WKS $ 7,555 SUBTOTAL-WOOD DOORS 23.00 $ 25,356 080000 DOORS&WINDOWS 81113 HOLLOW METAL DOORS&FRAMES HOLLOW METAL DOORS 3'X 8' MCKINNEY EA 2.00 $ 350.00 /EA INCLUDED HOLLOW METAL DOOR INSTALLATION FCI SELF-PERFORM EA 2.00 $ 226.80 /EA $ 454 FCI SELF-PERFORM LOGISTICS WKS 0.10 $ 7,555.00 WKS $ 756 ADD FOR VISION PANEL CUTOUTS EA - $ - /EA $ - SUBTOTAL-HM DOORS&FRAMES 2.00 $ 1,209 81113 INTEGRATED GLASS DOOR ASSEMBLIES ALPINE GLASS ALUMINUM DOORS 3'X 8' EA 9.00 $ 918.00 /EA $ 68,723 DOOR HARDWARE-ALUMINUM OPENINGS EA 9.00 $ 565.00 EA INCLUDED AUTOMATIC OPERATORS LS - $ 6,000.00 LS $ 6,000 FCI SELF-PERFORM LOGISTICS WKS - S 7,555.00 WKS $ - ADD FOR VISION PANEL CUTOUTS EA - $ - /EA $ - SUBTOTAL-ALUM OPENINGS 9.00 $ 74,723 083205 ACCESS DOORS WALL/CEILING ACCESS DOORS EA 8.00 $ 183.00 /EA $ 1,464 SUBTOTAL-ACCESS DOORS $ 1,464 085120 WOOD WINDOWS INSTALL RELOCATED WINDOWS EA 3.00 $ 226.00 EA $ 678 FCI SELF-PERFORM LOGISTICS WKS - $ 7,555.00 WKS $ - SUBTOTAL-ALUMINUM WINDOWS $ 678 083456 SECURITY GATES EXCLUDED-BY OWNER RELOCATE EXISTING SECURITY GATE EA - $ - EA $ - PROVIDE AND INSTALL NEW SECURITY GATES EA - EA $ - SHIPPING EA - $ - EA $ - SUBTOTAL-SECURITY GATES $ - 080000 DOORS&WINDOWS FCI Constructors,Inc.Confidential Page 11 FCI Constructors,Inc. September 28,2015 Project: PRKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 087210 FINISH HARDWARE MCKINNEY DOOR HARDWARE-HM/WOOD DOOR OPENINGS (LABOR W/DOOR INSTALLATION) EA 8.00 $ 565.00 EA INCLUDED NEW HARDWARE AT EXISTING DOORS ALLOWANCE EA 7.00 $ 1,494.00 EA $ 25,000 SUBTOTAL-FINISH HARDWARE $ 25,000 088110 GLASS&GLAZING APLINE GLASS TOILET RM MIRRORS-UNFRAMED SEE DIV 10 SF - $ 16.80 SF $ - GLAZING FILM AT READING PODS SF 94.00 $ 93.00 SF $ 3,480 GLAZE INTERIOR/EXTERIOR DOORS WOOD,HM,&ALUM SF 94.00 $ 93.00 SF INCLUDED NEW TEMPERED GLASS TO EXISTING WINDOWS AT 306 SF 90.00 $ 50.00 SF INCLUDED EXTERIOR GLAZING CREDIT LS 1.00 $ 44.00 LS $ (9,670) SUBTOTAL-GLASS&GLAZING $ (6,190) 080000 DOORS&WINDOWS-TOTALS $ 122,240 COST PER SF $ 3.69 080000 DOORS&WINDOWS FCI Constructors,Inc.Confidential Page 12 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 090000 FINISHES 092510 DRYWALL&METAL SUPPORT FRAMING PEAK INTERIORS DRYWALL PTN-DEMSING WALLS LS 1.00 4"MTL TRACK-T&B LS 1.00 $ - LS $ 95,688 ADD FOR SLIP/DEFLECTION TRACK LS 1.00 $ - LS INCLUDED 4"MTL STUD FRAMING LS 1.00 $ - LS INCLUDED BEADS/TRIM LS 1.00 $ - LS INCLUDED 5/8"DW TO STUDS LS 1.00 $ - LS INCLUDED TILE BACKER LS 1.00 $ - LS INCLUDED ACOUSTIC INSULATION TO WALLS LS 1.00 $ - LS INCLUDED TAPE&FINISH DW LS 1.00 $ - LS INCLUDED TAPE&FINISH DW AT NORTH WALL LOWER LEVEL LS 1.00 $ - LS INCLUDED SPRAY FOAM INSULATION AT NORTH WALL LOWER LEVEL-USI LS 1.00 $ - LS $ 6,738 DRYWALL PATCH AT SKYLIGHTS LS 1.00 $ - LS INCLUDED DRYWALL PATCH AT RAISED CEILINGS MAIN LEVEL LS 1.00 $ - LS $ 3,000 DRYWALL CEILINGS INTERIOR GYP BD CEILINGS 11/2"MAIN CARRIER CHANNELS LS 1.00 $ - LS INCLUDED 7/8"CROSS RUNNERS LS 1.00 $ - LS INCLUDED 5/8"DW TO CEILINGS LS 1.00 $ - LS INCLUDED TAPE&FINISH DW CEILINGS LS 1.00 $ - LS INCLUDED MISCELLANEOUS DRYWALL/INTERIORS ITEMS INTERIOR DRYWALL/MS CEILING BULHEADS LS 1.00 $ - LS INCLUDED SHOP DRAWINGS LS 1.00 $ - LS INCLUDED LAYOUT/COORDINATION HRS 40.00 $ 44.00 HRS $ 1,760 CLEANUP HRS 40.00 $ 30.00 HRS $ 1,200 DUMPSTERS PULLS 2.00 $ 1,200.00 PULLS$ 2,400 SUBTOTAL-DRYWALL&METAL SUPPORT FRAMING $ 110,786 090000 FINISHES 093120 CERAMIC TILE CEDAREDGE INTERIORS PORCELAIN CERAMIC FLOOR TILE-THIN SET PHASE 2 UPDATES ALLOWANCE LS 1.00 $ - LS $ 150,000 CERAMIC TILE BASE-COVED-ADHESIVE SET LS 1.00 $ - LS INCLUDED ADD FOR ANTI-FRACTURE MEMBRANE LS 1.00 $ 2.85 LS INCLUDED PORCELAIN WALL TILE-ADHESIVE SET-FULL HT LS 1.00 $ - LS INCLUDED ADD FOR ANTI-FRACTURE MEMBRANE LS 1.00 $ - LS INCLUDED ADD FOR EPDXY MORTAR&GROUT TO FLOORS LS 1.00 $ - LS INCLUDED SUBTOTAL-CERAMIC TILE $ 150,000 095110 ACOUSTICAL CEILINGS PEAK INTERIORS ACT CEILINGS-2'X 2'X1" MAIN LEVEL LS 1.00 $ - LS $ 7,344 ACOUSTICAL CEILINGS PATCH REFUND LS 1.00 $ - LS $ (12,000) SUBTOTAL-ACOUSTICAL CEILINGS $ (4,656) 090000 FINISHES FCI Constructors,Inc.Confidential Page 13 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 096550 RESILIENT FLOOR&BASE CEDAREDGE 4"H RUBBER BASE-COVED LF 266.00 $ 2.03 LF INCLUDED SUBTOTAL-RESILIENT FLOORING&BASE $ - 096615 LINOLEUM FLOORING LINOLEUM FLOORING PER SPEC SF 1,286.00 $ - SF INCLUDED FLOOR PREP-ALLOW 25% SF 321.50 $ - SF INCLUDED SUBTOTAL-RUBBER FLOORING $ - 096815 CARPET CEDAREDGE INTERIORS CARPETING AT STAIRS LS 1.00 $ - LS INCLUDED CARPET PATCH REFUND LS 1.00 $ (5,000.00)LS $ (5,000) FLOOR PATCH AT REMOVED FLOOR BOXES EXCLUDED LS 1.00 $ - LS $ - CARPETING-50CM X 50CM TILES-DIRECT GLUEDOWN SY 95.78 $ - SY INCLUDED SUBTOTAL-CARPET $ (5,000) 090000 FINISHES 099010 PAINTING&WALLCOVERING INNOVATIVE PAINT DRYWALL PTNS-EXISTING WALLS LS 1.00 $ - LS $ 54,850 PAINT DRYWALL PTNS-NEW WALLS PRIME&2 FINISH COATS LS 1.00 $ - LS INCLUDED PAINT DRYWALL CEILINGS-NEW CEILINGS PRIME&2 FINISH COATS LS 4,781.00 $ - LS INCLUDED PAINT HM DOOR FRAMES LS 1.00 $ - LS INCLUDED PAINT HM DOORS LS 1.00 $ - LS INCLUDED STAIN WOOD JAMBS SEE DIV 6 LS - $ - LS DIV 6 STAIN WOOD TRIM SEE DIV 6 LS - $ - LS DIV 6 PAINT METAL HANDRAILS MAIN STAIR LS 1.00 $ - LS INCLUDED TOUCH UP PAINTING HR 200.00 $ 62.00 HR INCLUDED SUBTOTAL-PAINTING&WALLCOVERING $ 54,850 090000 FINISHES-TOTALS $ 305,980 COST PER SF $ 9.24 090000 FINISHES PCI Constructors,Inc.Confidential Page 14 FCI Constructors,Inc. September 28,2015 Project: PIPKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNfTPRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 100000 SPECIALTIES 105220 FIRE EXTINGUISHERS&CABS FIRE EXTINGUISHERS-10U ABC EA - $ 87.00 EA $ - FIRE EXTINGUISHER CABINETS-PTD STEEL CABINET, DOOR&TRIM-RECESSED EXISTING TO BE RELOCATED EA 3.00 $ 240.00 EA $ 720 SUBTOTAL-FIRE EXTINGUISHERS&CABINETS $ 720 100000 SPECIALTIES 108010 TOILET ROOM ACCESSORIES SPECIALTIES CONTRACTING TOILET PAPER HOLDER BY OWNER EA - EA $ - PAPER TOWEL DISPENSER BY OWNER EA - EA $ - FRAMED MIRROR-24"X 30"-STANDARD SS FRAME EA 5.00 $ - EA $ 1,592 HANDICAP GRAB BARS-SS 42" EA 4.00 EA INCLUDED HANDICAP GRAB BARS-SS 36" EA 4.00 EA INCLUDED HANDICAP GRAB BARS-SS 18" EA 5.00 EA INCLUDED LIQUID SOAP DIPSENSER BY OWNER EA - EA $ - DROP DOWN BABY CHANGE STATION BY OWNER EA - EA $ - UNDERCOUNTER LAV GUARD EA 5.00 $ 70.00 EA $ 350 SUBTOTAL-TOILET ROOM ACCESSORIES $ 1.942 100000 SPECIALTIES-TOTALS $ 2,662 COST PER SF $ 0.08 100000 SPECIALTIES FCI Constructors,Inc.Confidential Page 15 FCI Constructors,Inc. September 28,2015 Project: PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 110000 EQUIPMENT 114550 RESIDENTIAL APPLIANCES REFRIGERATOR-GE 21.2 CF SS TOP-FREEZER ALLOWANCE EA 1.00 $ 1,535.00 EA $ 5,000 GE 30"FREE-STANDING ELECTRIC RANGE-S5 EA 1.00 $ 900.00 EA INCLUDED GE 30"HIGH PERFORMANCE RANGE HOOD-SS EA 1.00 $ 725.00 EA INCLUDED GE 2.2 CF COUNTER TOP MICROWAVE OVEN-SS EA 1.00 $ 450.00 EA INCLUDED GE TALL TUB BUILT-IN DISHWASHER-SS EA 1.00 $ 950.00 EA INCLUDED INSINKERATOR FOOD WASTE DISPOSAL-BLACK ENAMEL EA 1.00 $ 375.00 EA INCLUDED FCI SELF-PERFORM LOGISTICS WKS 0.20 $ 7,555.00 WKS $ 1,511 SUBTOTAL-RESIDENTIAL APPLIANCES $ 6,511 110000 EQUIPMENT-TOTALS $ 6,511 COST PER SF $ 0.20 110000 EQUIPMENT FCI Constructors,Inc.Confidential Page 16 FCI Constructors,Inc. September 28,2015 Project PRKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PRKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 120000 FURNISHINGS 124910 WINDOW TREATMENTS RENOVATION WINDOW SHADES REFUND LS 1.00 $ (48,937.00)L5 $ (48,937) SUBTOTAL-WINDOW TREATMENTS $ (48,937) 120000 FURNISHINGS-TOTALS $ (48,937) COST PER SF $ (1.48) 120000 FURNISHINGS FCI Constructors,Inc.Confidential Page 17 FCI Cost Worksheet September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PFTKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QuANTfY TOTAL TOTAL 210000 FIRE SUPPRESSION SYSTEMS 215300 FIRE SPRINKLER SYSTEMS DYNAMIC FIRE SPRINKLERS-WET PIPE SYSTEM REVISIONS TO SCOPE SF 33,130.00 SF $ 33,000 ADDRONAL INSPECTIONS DUE TO AH1 LS 1.00 $ - LS $ - REPLACE EXISITNG HEADS LS LOO $ - LS $ - REPLACE EXISITNG ESCUTCHEONS LS 1.00 $ - LS $ - SUBTOTAL-FIRE SPRINKLER SYSTEMS $ 33,000 210000 FIRE SUPPRESSION SYSTEMS-TOTALS $ 33,000 COST PER SF $ 1.00 210000 FIRE SUPPRESSION FCI Constructors,Inc.Confidential Page 18 FCI Cost Worksheet September 28,2015 Project PITKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PTIKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 22/230000 MECHANICAL 224100 PLUMBING PLUMBING WORK SF 33,130.00 SF PLUMBING DEMO LS 100 $ 94,796 CORE DRILL LS 100 INCLUDED PLUMBING FIXTURES LS 1.00 INCLUDED WASTE&VENT PIPING LS 100 INCLUDED HEAT PIPING LS 1.00 INCLUDED INSULATION LS 100 INCLUDED DOMESTIC WATER LS 100 INCLUDED CHEMICAL TREATMENT LS 1.00 INCLUDED IRRIGATION CONNECTION LS - $ - LAYOUT/COORDINATION HRS 45.00 $ 44.00 HRS $ 1,980 SUBTOTAL-PLUMBING $ 96,776 $ 2.92 SF 230000 HVAC HVAC WORK HVAC DEMOLITION LS 1.00 $ - LS $ 37,457 HVAC EQUIPMENT-EXHAUST FANS LS 1.00 $ - LS INCLUDED VAV UNITS LS 1.00 $ - LS INCLUDED VAV CONTROLS LS 1.00 $ 136.00 LS INCLUDED DUCTWORK&INSULATION LS 100 $ - LS INCLUDED GRILLS&DIFFUSERS LS 1.00 $ - LS INCLUDED FIRE DAMPERS,MAN DAMPERS,SPINS,FLEX FANS LS 100 $ - LS INCLUDED TEST&BALANCE LS 1.00 $ - LS INCLUDED LAYOUT/COORDINATION HRS 45.00 $ 44.00 HRS $ 1,980 SUBTOTAL-HVAC $ 39,437 $ L19 SF 22/230000 MECHANICAL-TOTALS $ 136,21.3 COST PER SF $ 4.11 22230000 PLG HVAC FCI Constructors,Inc.Confidential Page 19 FCI Cost Worksheet September 28,2015 Project PFTKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PfTKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 280000 ELECTRICAL RA ENTERPRISES 281100 ELECTRICAL WORK ELECTRICAL WORK SF SF TEMPORARY LIGHT&POWER LS $ - LS $ 798,717 GEN COND/LIFTS LS $ - LS INCLUDED DEMO/MAKE SAFE LS $ - LS INCLUDED FIXTURE LABOR CREDIT(EXPANSTION PHASE) S6 LS $ - L5 INCLUDED EXISTING RECEPTACLE DELETE DEMO LS $ - L5 INCLUDED EXISTING LIGHTING CONTROL DELETE DEMO LS $ - LS INCLUDED EXISTING LIGHTING FIXTURE DELETE DEMO HARD LIDS LS $ - LS INCLUDED CORE DRILL/FIRE STOPPING LS $ - LS INCLUDED MECH&APPLIANCE CONNECTIONS LS LS INCLUDED POWER DISTRIBUTION/BRANCH POWER LS $ - LS INCLUDED LIGHTING-FIXTURES LS $ - LS INCLUDED LIGHTING-INSTALLATION/LIGHTING CONTROLS LS $ - LS INCLUDED LIGHT AIMING EXCLUDED LS - $ 6,812.00 LS $ - TRIM OUT/FINAL CONNECTIONS IS $ - LS INCLUDED HEAT TAPE EXCLUDED LS LS $ - HEAT TAPE CONNECTION EXCLUDED LS LS $ - FIRE ALARM SYSTEM LS $ - LS INCLUDED SECUIRTY GATE CONDUIT ROUGH-IN ALLOWANCE LS $ - IS $ 7,000 SITE LIGHTING/POWER EXCLUDED EA $ - EA $ - DATA/COMMUNICATIONS-ROUGH IN ONLY ALLOWANCE LS $ - LS $ 15,000 SECURITY SYSTEM-ROUGH IN ONLY LS $ - LS INCLUDED AV SYSTEM-ROUGH IN ONLY LS $ - LS INCLUDED STATE ELECTRICAL PERMIT LS $ - LS INCLUDED TEMPORARY GENERATOR ALLOWANCE REFUND LS 1.00 $ (29,000.00)LS $ (29,000) LAYOUT/COORDINATION HRS 90.00 $ 44.00 HRS $ 3,960 DUMPSTERS PULLS 3.00 $ 1,200.00 PULLS $ 3,600 SUBTOTAL-ELECTRICAL $ 797,277 260000 ELECTRICAL-TOTALS $ 797,277 COST PER SF $ 24.07 260000 ELECTRICAL FCI Constructors,Inc.Confidential Page 20 FCI Cost Worksheet September 28,2015 Project: PrIKIN COUNTY LIBRARY-RENOVATION PHASE 2 CONSTRUCTION DESIGN ESTIMATE PITKIN COUNTY LIBRARY SF 33,130 UNIT OF UNIT PRICE DESCRIPTION MEASURE QUANTITY TOTAL TOTAL 270000 SPECIAL SYSTEMS 271000 COMMUNICATIONS&DATA SYSTEMS CURRENT SOLUTIONS WIRING&CABLE-INCL TERMINATIONS SF 33.130.00 $ SF $ 47,877 DATA/COMMUNICATIONS EQUIPMENT LS - $ LS INCLUDED SUBTOTAL-COMMUNICATIONS&DATA SYSTEMS $ 47,877 274100 AUDIO VISUAL SYSTEM AUDIO VIDEO EXPERTS WIRING&CABLE SF 33,130.00 $ - SF $ 22,200 EQUIPMENT LS - $ - LS INCLUDED DEVICES LS - $ LS INCLUDED SUBTOTAL-AUDIO VISUAL SYSTEM $ 22,200 281100 SECURITY/ACCESS CONTROL SYSTEM CURRENT SOLUTIONS WIRING&CABLE LS 33,130.00 $ - LS $ 11,753 EQUIPMENT LS - $ - LS INCLUDED DEVICES LS - $ LS INCLUDED SUBTOTAL-SECURITY/ACCESS CONTROL SYSTEM $ 11,753 270000 SPECIAL SYSTEMS-TOTALS $ 81,830 COST PER SF $ 2.47 27 28000 LV SYSTEMS ECI Constructors,Inc.Confidential Page 21 Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 A. Project Information 1. Project type &size: Interior Renovation of the existing Library. • Base Bid Renovated Area 33,130 SF 2. Estimated construction schedule: Start date: October 1, 2015. Substantial Completion: April 28, 2016. B. General Clarifications 1. This estimate is based on Design documents: i. Pitkin County Library Renovation Change Order 1 Drawings as prepared by Snowdon and Hopkins Architects, dated 8/31/15. ii. Pitkin County Library Expansion Renovation Specifications dated 2/12/15 Volumes 1 and 2. iii. MSR material list dated 2/9/15 iv. Highlighted drawings to clarify scope, as attached. 2. This estimate represents specifically identified construction costs only. Therefore all other costs identified as "Owner's Costs" are not included. The following items are considered to be Owner's Costs: • Pitkin County administrative costs or fees. • Program Management/Owner Representative fees, or reimbursables. • Design Fees or reimbursable. • Permit Fees. • Legal fees or expenses. • F. F. & E. items (Furniture, Fixtures, and Equipment). • Land costs. • Development fees. • Artwork. • Owner's Construction Contingency. • Owner's Design Contingency. • Public Relations Costs. • Remediation Inspection and Demolition Permit Costs. 3. No provisions have been included for construction work to proceed while the library is occupied for storage or operations. The building department does not offer partial occupancy and the time frame for the library to move back in is unknown at this time. 4. FCI must be allowed access to the work for materials and equipment. 5. If the start of the project is delayed due to the issuance of the permit the general condition expense will have to be adjusted. 6. Site work and landscaping will not be completed until spring of 2016. 1 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 7. No allowances have been included for encountering "soft spots" or unsuitable soils and replacement of same with imported structural fill. 8. A Perc test at Pervious Paver Detention will be performed by FCI and witnessed by Owner. 9. Details showing "compacted subgrade" are assumed to be 8" of scarify and recompact. 10. No additional funds have been included for winter conditions for civil work. Once Mill street plans define the balance of civil scope this will need to be reanalyzed. 11. Plant totals conflict between the plan and the schedule on C06; counts have been included per the plan drawings. 12. An allowance for sod is being carried to replace sod damaged by installation of the drainage system along the south side of the library. 13. Metal edging has been included at the planting areas to be consistent with Expansion landscape details. 14. No irrigation work is shown. It is assumed that there is existing irrigation along the south side of the library where new plantings are shown to be installed; FCI is included an allowance for repairs. 15. It is assumed that the walls where reused wood door frames are to be installed are the same depth as the existing wood door frames. 16. New hardware included is based on the door numbers in the specifications since there are no hardware groups listed on the schedule on A8.1. 17.At doors 213 and 214 a Horton operator is included for each opening; 2 total. 18. Per direction from Pitkin County, aluminum storefront doors have been included at openings 111, 119, 203, 213, and 214 per the attached elevations and hardware sets. The use of thermally broken storefront will require existing HM frames to be removed and replaced with compatible storefront frames; thermally broken doors are thicker than typical doors. This work is included. 19. Gypsum board surfaces will receive a Level 4 finish and texture to match existing. 20. Every effort will be made to keep ceiling heights at the elevations noted on the drawings but conflicts with structure and MEP systems will dictate final elevations. 2 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 21.Wall type 6 at room 244 is noted to have an STC rating of 45-49. The STC rating of existing door and windows to be reused at that area is unknown. 22. FCI has included removal of the drywall along grid A in the basement to allow this wall to be spray insulated. Spray insulation will be installed to give an average R value of 17.25 which will require 2.5" of closed cell urethane. 23. Under sink cabinetry in room 113 is noted to be removed for ADA access. Since no further details are provided work will be included as part of the miscellaneous millwork allowance. 24. Grab bars are the only bathroom accessories furnished and installed; all other accessories are by the owner. 25. New bathroom mirrors have been included as 24x30 framed mirrors as that is what is depicted in elevations on A7 drawings. 26. Fire sprinkler, see attached drawings: A. Lower level — relocate all heads in new trim and reuse existing heads. B. Main Level Under mezzanine— relocate only as necessary, new trim throughout, reuse existing heads. C. High ceiling — Existing heads remain in same location, new trim. D. No fire suppression heads are to be replaced or changed in areas where ceilings are undisturbed, new trim will be installed. 27.The GMP includes cap and abandon existing sanitary sewer. Concrete demo removal of piping, backfill, and concrete patch is not included. 28. It is assumed the new sewer line can tie into the existing sewer line and the grades work. 29.An 84"x22" balancing damper has been included at existing return air duct shown on M2.1 near grid 7 and F; 2H already had a 48"x22" balancing damper included in COR 029RNr1. 30. Security gates and security gate installation are not included; an allowance of $7,000 is carried for conduit rough-in and power and data to the gates. 31. All existing electrical floor boxes are to remain. 3 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 32. Lighting fixture counts are per the EL series drawings. 33. Low voltage wiring has been included per the attached sheets which are based on conversations between Current Solutions, Pitkin County Library, and Marmot. 34. AV scope C. Exclusions 1. Sales tax; this project is tax exempt. 2. Any costs associated with hazardous materials abatement. 3. Costs for third party commissioning. 4. Any requirements for acoustical performance regarding HVAC or plumbing are not included in this proposal as none are specified. 5. Insulation revisions to existing ductwork is not included. 6. Work shown within the clouded area on C01. This work will be priced once design is complete for the City's improvement of Mill Street. Any landscaping shown on C06 west of the new egress sidewalk has also been excluded for this reason. 7. Additional erosion control shown on C07, the south alley is under construction by the City and they are responsible for erosion control during their work. Once completed it will be a hard surface. 8. Work shown that has already been added to the contract: 1. Work shown on CO2, CO3, and C04; this work was included in COR 12. 2. Work shown at the Children's Area and Mezzanine; this was included in COR 22RNr1. Several changes in this area were made on these drawings and not clouded. FCI has made our best effort to capture those changes however, FC reserves the right to compensation for any changes not captured in this COR that are identified in the future. 3. Roof repair between the tower and the skylight; this was included in COR 022RNr1. 4. New skylights and associated work; this was included in COR 059RN. 9. Snowmelt shown on M2.9; it is work performed by the City of Aspen. 10. Rails shown in Storage 133 and associated plywood build up are excluded; this 4 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 work is to be completed by the moving subcontractor direct through Pitkin County. 11.All loose equipment and furnishings equipment. • Furniture — tables, chairs/seats, desks, book shelves, modular furniture, demountable office partitions, etc. • Furnishings — loose shelving, filing cabinets, trash bins, loose storage cabinets. • Equipment other than what is specifically identified in this estimate. • Vending machines or equipment. 12.Telephone/data equipment (telephone switching, handsets, PBX units, computers, network servers, printers, scanners, etc.). 13. Cable or Satellite TV cabling or equipment. 14. Emergency communications system wiring, equipment, devices, & antenna. 15. Costs (materials, equipment, systems) associated with LEED or Green Globes certification. D. List of Allowances 1. Sod replacement for work south of library: $1,500 2. Irrigation repair for work south of library: $1,500 3. Engineering for tie off at roof equipment: $1,500 4. Miscellaneous woodwork and millwork: $10,000 5. Fireproof patching: $5,000 6. Unknowns due to reuse of existing doors and hardware: $25,000 7. Modifications to flooring and wall coverings: $150,000 8. Appliances $5,000 9. Rough-in for security gates: $7,000 10. Low-voltage rough-in: $15,000 5 FCI Constructors,Inc. Pitkin County Library RENOVATION Phase 2 Estimate 120 Mill Street Clarifications & Assumptions Aspen, CO September 28, 2015 E. List of Allowances Credited Toward Phase 2 work 1. Ground thaw: ($10,000) 2. Acoustical Fence: ($10,000) 3. Winter conditions: ($20,000) 4. Exterior Glazing: ($9,670) 5. Carpet patch: ($5,000) 6. ACT patch: ($12,000) 7. Shades: ($48,937) 8. Unused generator move: ($29,000) End of Clarifications & Assumptions. 6 FCI Constructors,Inc. Project Name: Pitkin County Library Phase 2 9/28/2015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: Doors 111 Metal Group: M451T CG/SS/OG STOPS UP CIS:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 1 Frame Width: 76 Frame Height: 98 Back Member Color:#40 DARK BRONZE : PERMANODIC Face Member Color: #40 DARK BRONZE : PERMANODIC k � Away' 1l ! - � 76 (O.A.FR) > I < 72 > 2 -AI( IF -2 A h ----- IX LL (0 Q 0) I 0 t t 1 c0 0) ii .\:,44; \ t, -„ ,\,,,,.\\ 'V,,.:','\ 3.- if.'"..\ .\\,, ,,','''- .':,\, ,', N ', \,', t 4,\\:iHt:\.\\\\1/4 \ , 's•.,., ri) As 1 ,,,A„:411/4 \ ''' SI S y W Page: 1 Of 5 Hardware Set #111-2 Door #111 6/0 x 8/0 Doors to Alley Each to have Catalog # Mfgr. Finish 8 Intermediate Pivots #7226 INT Ives 606 1 Exit Device 3527 A-EL Vonduprin US4 1 Exit Device 3527A-EO Vonduprin US4 1 Rim Cyl 20-057-ICX Schlage 606 1 Mortice Cyl 20-061-ICX @ KR Mum Schlage 606 FSIC Corr- 23-O3f`= Schlage 1 Power Supply Vonduprin 2 Door pull 1" Round 8103EZHD 10" 0 Ives 606 2 OH Stop 100S ADJ Gly 606 2 Surface Closer 4111 EDA TBWMS LCN 696 1 Weather-Strip Kawneer Standard 1 Sweep Kawneer Standard 1 7" Threshold 896DKB NGP DKB Balance of Hardware is By Others Project Name: Pitkin County Library Phase 2 9/28/2015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: 119 Metal Group: M451T CG/SS/OG STOPS UP D/S:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 1 Frame Width: 76 Frame Height: 98 Back Member Color:#40 DARK BRONZE : PERMANODIC Face Member Color: #40 DARK BRONZE : PERMANODIC ,C 76 (O.A.FR) > 72 2 A A C7 ,Y er e, u_o co Cr w t t f Page: 2 Of 5 Hardware Set #119-214-2 Door #214 & 119 Exterior 6/0 x 8/0 Main Entry Each to have Catalog # Mfgr. Finish 8 Intermediate Pivots #7226 INT Ives 606 1 Exit Device 3527 A-EL Vonduprin US4 1 Exit Device 3527A-EO Vonduprin US4 1 Power Transfer EPT-10 Vonduprin US4 1 Mortice Cyl 20-061-ICX @ KR Mull Schlage 606 2 FSIC Core 23-030 Schlage 606 1 Power Supply Vonduprin 2 Door pull 1" Round 8103EZHD 10" 0 Ives 606 2 OH Stop 100S ADJ Gly 606 2 Surface Closer 4111 EDA TBWMS LCN 696 1 Weather-Strip Kawneer Standard 1 Sweep Kawneer Standard 1 7" Threshold 896DKB NGP DKB Balance of Hardware is By Others Project Name: Pitkin County Library Phase 2 912$1201511:03 AM Frame Set Name: Frame Set 1 Frame Name: Doors 213 Metal Group: M451T CG/SS/OG STOPS UP D/S:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 1 Frame Width: 76 Frame Height: 98 Back Member Color:#40 DARK BRONZE: PERMANODIC Face Member Color: #40 DARK BRONZE:PERMANODIC 76 (O.A.FR) 1 72 > 2 - < > A, A Cr LL CO O t t a) rn t t v Page: 3 Of 5 Hardware Set #213-2 Door #213 Interior 6/0 x 8/0 Main Entry Each to have Catalog # Mfgr. Finish 8 Intermediate Pivots #7226 INT Ives 606 2 Exit Device 350 Dummy Exits Vonduprin US4 2 Door pull 1" Round 8103EZHD 10" 0 Ives 606 2 Surface Closer 4111 EDA TBWMS LCN 696 FSIC Core 23-030 Schlage 1 Weather-Strip Kawneer Standard 1 Sweep Kawneer Standard 1 Threshold 896DKB NGP DKB Balance of Hardware is By Others Project Name: Pitkin County Library Phase 2 9/28/2015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: Doors 214 Metal Group: M451T CG/SS/OG STOPS UP DIS:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 1 Frame Width: 76 Frame Height: 98 Back Member Color:#40 DARK BRONZE : PERMANODIC Face Member Color:#40 DARK BRONZE : PERMANODIC 4114- 4 76 (O.A.FR) > 72 > 2 -A < > K 2 — A IX tL Q O t t co 0) t t V V Page: 4 Of 5 Project Name: Pitkin County Library Phase 2 9/28/2015 11:03 AM Frame Set Name: Frame Set 1 Frame Name: Door 203 Exterior Metal Group: M451T CG/SS/OG STOPS UP D/S:1 Frame Type: Standard Required: 1 Panels: 1 Rows: 2 Frame Width: 40 Frame Height: 108 Back Member Color:#40 DARK BRONZE . PERMANODIC Face Member Color: #40 DARK BRONZE: PERMANODIC 40 (O.A.FR) 2 —moi 2 A L.L 0 co O co co Y Y y Page: 5 Of 5 Hardware Set #203-2 Door #203 Single 3/0 x 7/0 Each to have Catalog # Mfgr. Finish 3 Intermediate Pivots 117226 INT Ives 606 1 Exit Device 35A-NL-OP-ALK "Alarm" Vonduprin US4 1 Rim Cyl 20-057-ICX Schlage 606 FSC Cor,_ /3-030 Schlage 1 Door pull 1" Round 8103EZHD 10" 0 Ives 606 1 OH Stop 100S Adj Gly 606 1 Weather-Strip Kawneer Standard 1 Sweep Kawneer Standard 1 7" Threshold 896DKB NGP DKB 1 Surface Closer 4111 EDA LCN 696 1 Elect Srtike 6300 Elect Strike Vonduprin US32D Balance of Hardware is By Others r -- w,. I EXISTING ly �YwRetovAnoN 0 CONSTRUCTION a o � o Q C.,o �e4 p o ��� � wt a !e M I --_eons M.O., ,. martin nrnr.Au--- I .gym, II i 0 — — i •� — _ ,— — — — _a U s I ,, 0. ., %, ®,, 1 , !, 4„ „,,, , ,,..,,,,,...._,„, , i ,„ .,,,,,,, ...„ e. I ® ....„,,,....„,,,,,it , 1 Swro �, \1165 a etl FAfW mFrxl—� v I +� mYiOE. O I ,..�. 5 0 2 122015 ''•••:',-.7: :, °� ; m I�'' Sae=y p/s nM Y ill' • 6 pp p !1 max.. • A = 1 a,� .. _ IPS if!,ip Pli • Epp ill! iP=PP .„------.....--2—' :"1 Nx°ew P4 D i!kilt illi a e 8 ill ' "14- NI aircessur_aesele 1.0101.3..11014.5 AMA NE 11°1'111111;i 15 V 11 ASO. .�.a. �..°� 6gP�111 e GI hliiiillil LI I B.. 1'g7 ! ' t •r Iaatll���ai 6 - - — ® - I ea.am P11!i� R<we0 MeseSnipe oenv r VM R1. i ne 0 .e a IP PCO INT 2. o f ... .. _1, •� se neo..p.RbPCO.INT-22R -- Rna1� x ,emrmea to ee 4 3 .. sporeerprotearonar 010�.. D Ce Ne New FM:s.s Oelwi MST. c4-1 w.Tc»eanw Few ne i. .. ......_ __. 4 m defined as 811515 Chan.ONn ft eR1TILM FI.Ts.a'! eie n .w R �.b a._} —. IRN2GTID GAUN.n AN enTc h a1 t Z CC RF,LAE Asr r� ELNe TRE Aro 6.0 �J /� AT re.Leve 1'.1.._.._.._.._.._.�..�.._.._.. _ _ _ _ -_.. _..__.._. Z iNJ_ N 0 �J i 2 u°1Ns 1EwNn ARE LS1e0.mn ROOM NAFE A.10 RF 0 H OR TOP a. R,,,..TOEOM.aCE1L..RAr«R� — I • CEIL Ne K ARE R TO I.NEAREST„CN e; U Q o • FL.Fes.. we HATER. uRI.MATERIAL.TED —. .N AN ti An EXIST.To RM..FAT ,ERAR , Z O z o i • ALL.TR GOAR .001163 TO DEP M.SCE ARO. P.M. Z 0. e.REFER TO 06.011 a.. ELKIRX.N.ORN'.R 5 h.I. . __. W LOCATION OF L1.1.1x,16119 1ECHAN.AL DRAWN.FOR __ �O Q. LL G THE LOCATION OF.ECNA.UL SYS.E.LLES .0 FO • 1 . 1 I , F..�TIONORA.H6SFORlaATbnOFSRR1KLE.1EAOS ; Aro ce LN°FOA,FRE ALARM.013.10 _r F ewL7 aRawcT . CONTRACTOR TO MLR TO oeGEE. *Ex. �n.covArnN `t VERIFY .T.6NO K. I@ipyATION I EXIoTINIS =0. ` 'eAs MO ;toll o ww w 4w , _ - LMWR _ } . cownxucnoN a.te.)-EXPSTRe4 4.8 O6 nome /J CI-''-'s--'—'43 _~~~i ,.2 A 2 .OS..OTTOM OF STE... „ LOWER LEVEL REFLECTED CEILING PLAN ED LONER Lava Ors.PL. • 1. ..,°. A 2.4 ilosimi MpR1M RENO-PHASE 11 0 2 e RENOVATION I XI$1'IN6 i• e d NORTH ALLEY di e CONSTRUCTION ▪ a (.:?_..o 413 ...... 0 C)0 ITO 0 ID ® w ar + , 7 -,� i631 * ,.Nn•RiWe...m 1 ,uecin—`mow I I g A SI >arae.0 nN:veNe.o® neaatnrea® :\.- I R. „n aan e.l.A� 72 II wrc,aN -- c.w fi N � � �> 4404 (.°N.. I Ido A1C 2-12-2015 sQ 11'41111AV 11 I Z N 010] / \ '.�. *i°.�'n-"•'.•=1'.‘, I- _ WPM. 1 e.u.. 7 �I•{�eyP°I . rale'? I '',...,/. ,..e a•.,.ew I e 1#pg;Ili D I MOW Nal PLATM W.M X-\ ' '^ \1 I 9 lll�i�F� iti F ei `• , _ D ..._ I ...__. IOMR TO Move aim L • dm II L 1 ! i1I_..... Nenx,F'E.v i �Y i1 A � ' � � �'1�e5ggt I II e,.REM I .. -nu•,+elm / tee; RENOVATION 1 n EXISTING 1 CONSTRICTION /� r OI 7/ 0 7:..0 5 S. O O: 8 0 `{ Q oK T „ m av IN WW1 na e0 ro g. m O — _ ._ C rt p — — - . . w . . . . . C. �..a .Ta MN WINN L11W . .,, Ij 1165 O ---- —E z _— O R T Ib2016 I ani e TN,/ Rte " illi iixi ° q t 11 E . ,� _ . 4:-.1:14.4..:1., � m � I iii 1 O \ _ 1. f. ;.; i �, ' 'iii�li°ill �a I 111 I '9iE Ing r T� l �I I ' ���°������,I��y�� 1D 1 I— — — _ d IiiIii611111 1 Rewe-E Prete I S of Wort 'MC.ITTRE.Y1- 1/411Tv — — IntlpCep n Base Rb PCO NT nit •E N.No work In Mese areas at RN of PCO INT 2M ��S" 1 I - \ --..p In fire spookier proMWm ,,,r 1�1 Se 1 O 'E' Fonlrq Fn"Nes '� ✓• {..-/ f . c.o er LGI N!•PLAN NOMA Ce LISTED BELOPI ROC.NAM •�No work NefircNwn a�Iw M1reo� 1 f T �_ T " OR EN O. Fl.oOn SL/�B TO BOTiOkf Lr LGAHa5 Nx.VA11B 1 Q pe�ebmea m,nese are MON r�w S Ce s ie pro ecpon 1 tom;," - 2.Ce L NS NEISNTS ARE RO ED TO M NEAREST INC. �x + j.S3 WITHµµFOR CEtpN nnsewal.U �I CO APS EN151.3 TO REMAIN FATCAREPAR A5 ill T0 NewFnnees + E. . NbM1 n Oce neE as d,1,90 14 e.Oreer°1 / _. 1 I ._ �I'' I ,. ALL STP SCAM CERwS TO BE PAINTED SEE Sr6T rwO. • w Reaam crncealeN p,inxa�a<I Or/041. TMO�n,w. - �s ' s.Perm To Lwmru �>R�K DR..e } on sp,mRer heads n u,en vaso onrr. Z ® 1 µ.: I d+ t -'? .MECHANIC,r,Ru RAM.,MR Z T. SyStEm PS APO 1 1, -"T _'_r ; _. .._.._.._..- ,ao E T .OR.m::� AT"a F ES°R.KLER HEADS Z O i• S LOCATION ti em+m n..,c.0 _ 1- '... HT ...r e.NBTna asor®en mo Ciu•".10 ws D*amu, O Q PATCHAREPw DMPIRCESORr 0 � _ , T,�BT..T�TM�CDNeT�T aN,..kT,.,T�x Z � ri- o NN „wc" �RwE�:"'�Np NO "o O " illoolo mPARC PARC. �, Nom. TD..N DEEP�E, Z Z P.lxlsNYill °°� c� �1 MPKK1 -. ••� �eD.9.9.EwpTM9K� N Z fn �°"� Celli L H DN „Rp meta ee e:�.,.� is RLNOVATION EXISTING1R 121(qctIN i r^'� wCANSTRUGTIONI �a14.4 ne ' O 1:Free...,......„, A MEZZANINE LEVEL a TOWER SOFFIT PLAN J I REFLECTED GEILINb PLAN ® MEM.. FZ..LEVE1C"'p""N �:- x�E. B•. b. R N x E. • _r PLAN as A 2.6 1.0 RENO-PHASE II I I EXISTING RENOVATION I CONSTRUCTION 4 ' 1 1 1 . . » _�... ..paras 4a ... •sssc .a:ra a�:.___ __ ___- ►� -. 04 04 I/ ® / / 4 j I yi to 8 P 1.11.4.11 ill H , 01Z13 , turn " I1111 .._, ,.1 ® ® ►4 4 ► am 1C1 0 CI Enr WAp ,—, dE__ b =,-•'—r---f A Gzfl T6 m r I p C-- , I 1 uuu E for Phone -w1y =• ,_=,„ .! , ;li A cm L'_®1/2 _:. r .. GI G] `ori \ E-valor Phone El om .Ma � �I r , . Hi ♦ 1 County&1 Marmot ♦♦ ♦ ♦ u ♦ 1 County , 2 II 1 ♦ 1 Marmot HVAC System I 0 'l ZS ' Denotes the Cable Count /-•I i r. I li County Marmot It ♦ 26 26 _ l.._ p6'-` q '© i 1 1 J �____ n � ■ 5 8 ® � I ®`t ® C I' f ++ 1 2 I =' 1$ 0 1 +4 0 2 Z I 'WV 0 1 RENOVATION I EXISTING Vir O O , - CONSTRUCTION , Intal2.5 . Total Locations' 46 3164 Mese Avenue Pitkin County Library Renovation Drawing:Lower L Gone JunGbn.CO 61504 120 North Mill Street Date: 9/21/15 PHONE:10101250-1115 C Solutions FAY:10101 24 5-2 6 0 6 Aspen,Colorado Page 9: 1-1 I L 1; i L ;o r 1 11 I a I I l7 * ii ifi __ .,. or ‘, .\ I 1 n d ; III 0 I 01 EL 0 O ❑ A .... Self Chock V SI ,�_ z►- \LLL_JJJ' • 1 County 8 1 Marmot II 0 eL 7 -qri 'V - ---\\ •,, 1J. Q 74 o 1 County .1- 1- 1 O ♦ 1 MarmotI ) I 0 Denotes the Cable Count i O. Po 4 I VAIN LEVEL FLOOR PLAN 1 10 I.4 I County Marmot_ ❑ ❑ ❑ If p • •8 8 4 PHASE 11 PHA`SE11 i 1 1 i s vv 0 23 afil +4 0 0RENOVATION - EXISTING Wept/ 0 0 fCONSTRUCTION 77 V 0 0 Tolal: 14 5.1 Total LnretIona" /� 3i�Moa nv.n,,. Pttkin County Library Renovation Drawing:Main L. �J GmnC Junction,CO 81501 120 NorM Mill Street Date: 9/21/15 7°-(4,75 PO:197001 a56-1175 SOIUf101IS . 1e7o1 zesztae Aspen,Colorado Page p: 1-2 I RENOVATION J EX STING 1 CONSTRUCTION -, r ._.... .r-.r ,...�...._ _1 __ I I I / I \ I i III \\ q+�Nwl V 5 , � JL s. II' . �, Y li L��J Li ir - — 4, r---1 y � F at , ��/ F L L' / zw \ V° �..,,�o o __. --- ri 13921 __\ i. L - �, • • ,4‘,/ -J-11-I--L1-i1-1-11-11-11 I.. \r I I/ o U.. 11 11 11 1 I �'T1'l T tl t .. -1, „ \• V 1L yJ 1 L_ll 1lJ ® l I ♦ 1 County&1 Marmot ? ,,,��ii�iJ����I�� 2 `�1110. 12 ten'itEaLla.: V ® �.lilI \ ♦ 1 County '1y/1111 2 A x a i o \\� �� ♦ 1 Marmot - r .. sYFi /'1 RP=LnE �0///V Denotes the Cable Count .�4.ss ✓ ® MEZZANINE LEVEL FLOOR PLAN ® - �� , County Marmot 1I --- �Jy / PHASr T' PHA.>F: 1 M / --......._ r,niw -.... _.. \\ `-/ I/ V 3 3 C / 1110110.2 0 3 �� ''''''.4 ♦♦ 0 6 7_ ..,.... I • // // I v ��.. ++ 0 0 / / I \ woe. \ 1+ 0 0 1 ,EINr 111111„ ` _i 44 o o Weep 0 0 RENOVATION I EXISTING V 0 0 1 I CONSTRUCTION Total: 2 15 Total Locations 'I 1 //L. 3180 Mesa Avenue Pitkin L County Library Renovation Drawing:Meal._ `� Grann Junction.CO 81504 120 North Mill Street Date. 9/21/15 PHONE:(9101 2 5 8-1115 CVt t$OItlf,ofls FAx:(910)045-2eoe Aspen,Colorado Page#:._,J.1_, PITKIN COUNTY LIBRARY 24-Sep-15 08:51 Activity Name Activity Original Start Finish 014 2015 2016 2017 Duration Q3 04 Q1 Q2 03 04 Q1 Q2 Q3 Q4 Q1 Q2 03 -)4 PITKIN COUNTY LIBRARY 10-Jun-14A 06-May-16 106-May-16,PITKIN COUNTY LIBR 328 10-Jun-14A 12-Oct-15 'i 4 12-Oct-15,PERMITS NEW EGRESS DOOR PERMIT 131 18-Jul-14A 16-Jan-15 Vw1"111 16-Jan-15A,NEW EGRESS DOOR PERMIT Permit Set-Egress Door 100% 6 18-Jul-14 A 25-Jul-14A I Permit Set-Egress Door City Review-Egress Door 100% 65 17-Oct-14 A 15-Jan-15 IIIIM City Review- gress Door Permit Egress Door 100% 1 16-Jan-15A 16-Jan-15 I Permit-Egres Door ADDITION PERMIT 237 10-Jun-14A 15-Jun-15 115-4n-15A,ADDITION PERMIT r-- Permit Set-PCL Addition 100% 80 10-Jun-14A 01-Dec-1z Il Permit Set-PCL Addition City Review-PCL Addition 100% 70' 16-Feb-15A 10-Jun-15 City eview-PCL Addition Permit-PCL Addition 100% 1 15-Jun-15A 15-Jun-15 I Per it-PCL Addition RENOVATION PHASE 1 PERMIT 218 16-Oct-14A 18-Aug-1E Vm.Ifflmr 8-Aug-15 A,RENOVATION PHASE 1 PERMT Permit Set-Renovation Phase 1 7 100% 90 16-Oct-14 A 19-Feb-1E =1M Permit Set- enovation Phase 1 City Review-Renovation Phase 1 100% 45 20-Feb-15A 17-Aug-1E IMIl ity Review-Renovation Phase 1 Permit-Renovation Phase 1 s— 100% 1 17-Aug-15 A 18-Aug-1E I Permit-Renovation Phase 1 RENOVATION PHASE 2 PERMIT 30 09-Sep-15A 12-Oct-15 TV 12-Oct-15,RENOVATION PHASE 2 PERMIT n Permit Set-Renovation Phase 2 100% 1,09-Sep-15 A 09-Sep-1E I Permit Set-Renovation Phase 2 City Review-Renovation Phase 2 75% 30 10-Sep-15 A 09-Oct-15 City Review-Renovation Phase 2 ' Permit-Renovation Phase 2 0% 1 09-Oct-15 12-Oct-15I Permit-Renovation Phase 2 j 250 16-Oct-14 A 30-Sep-15 30-Sep-15,BID/GMP/NTP Winter Construction Delay 100%- 45 02-Dec-14 A 16-Feb-1E MI Winter Cons ruction Delay NEW EGRESS DOOR 92 16-Oct-14A 26-Jan-15 V'/ 26-Jan-15 A, EW EGRESS DOOR Bid/GMP Process-Egress Door 100%,____ 00%,—_ 28 16-Oct-14 A 24-Nov-14 - Bid/GMP Proce -Egress Door Owner Notice to Proceed-Egress Door 100%! 10 25-Nov-14 A 09-Jan-15 M Owner Notice t Proceed-Egress Door Procure Materials-Egress Door 100%. 30 12-Jan-15 A 26-Jan-15 I Procure Mate ials-Egress Door ADDITION 53 28-Jan-15A 27 May-1E 1/ 27-May-15 A,ADDITION Bid/GMP Proposal Preparation-Addition 100% 5 28-Jan-15 A 04-Feb-1E I Bid/GMP Proposal Preparation-Addition Bid Date-Addition 100% 0 28-Jan-15A • Bid Date-Addition Owner Notice to Proceed-Addition 100% — 5 04-Feb-15 A 10-Feb-1E I Owner Notic to Proceed-Addition Addendum#2-Issue,Price,Approve 100% 20 16-Mar-15 A 27-May-1 t— Adde dum#2-Issue,Price,Approve RENOVATION PHASE 1 15 10-Mar-15A 26-Jun-15 Nm1 26- un-15 A,RENOVATION PHASE 1 Bid Date-Renovation-Phase 1 100% 0 10-Mar-15 A • Bid Date- enovation-Phase 1 Bid/GMP Proposal Preparation-Renovation Phas 100% 5 11-Mar-15 A 17-Mar-1E I Bid/GMP' roposal Preparation-Renovation Phase 1 Owner Notice to Proceed-Renovation Phase 1 100% 10 17-Mar-15 A 26-Jun-15 Ow er Notice to Proceed-Renovation Phase 1 MEM Actual Work f- - I Critical Remaining... Page 1 of 8 Data Date:30-Sep-15 I Remaining Work • • Milestone ©Oracle Corporation PITKIN COUNTY LIBRARY 24-Sep-15 08:51 Activity Name Activity Original Start Finish 014 2015 2016 2017 Duration imnlata Q3 Q4 Q1 Q2 03 Q4 Q1 Q2 Q3 I Q4 Q1 Q2 I Q3 p4 RENOVATION PHASE 2 41 05-Aug-15A 30-Sep-15 i'm1 30-Sep-15,RENOVATION PHASE 2 o DD Documents-Renovation Phase 2 100% 10 05-Aug-15 A 18-Aug-1E U DD Documents-Renovation Phase 2 CD Documents-Renovation Phase 2 100% 1 31-Aug-15 A 09-Sep-1 f I CD Documents-Renovation Phase'2 Bid!GMP Preperation-Renovation Phase 2 100% 15 09-Sep-15 A 28-Sep-1E I Bid/GMP Preperation-Renovation phase 2 Owner Notice to Proceed 0% 1 30-Sep-15 30-Sep-15 I Owner Notice to Proceed 14-Jan-16,ADDITION CONSTRUCT ON �___ ADDITION SUBMITTALS,FABRICATION,DELIVERY .165 02-Feb-1-5.A 20 Oct-15 20-Oct-15,ADDITION SUBMITTALS,FABRICA Structural Steel Shop Drawing Submittal-Addition 100% 20 02-Feb-15 A 23-Feb-1E • Structural Steel Shop Drawing Submittal-Addition Concrete&Rebar Submittal-Addition 100% 20 16-Mar-15A 30-Apr-15 = Concrete&Rebar Submittal-Addition Shop g 100% p Structural Steel Drawing Review-Addition 100/0 10 23-Mar-15 A 01-Apr-15 I StructuralSteel Shop Drawing Review-Addition Doors&Hardware Submittal-Addition 100% 15 30-Mar-15A 17-Jul-15A 1 Doors&Hardware Submittal-Addition Structural Steel Fabrication/Delivery-Addition 100% 25 07-Apr-15A 05-May-1F ■ Structural Steel Fabrication/Delivery-Addition Temporary Shoring Plan Submittal-Addition 100% 15 17-Apr-15 A 20-Apr-15 I Temporary Shoring Plan Submittal-Addition Temporary Shoring Plan Review-Addition 100% 10 20-Apr-15 A 20-Apr-15 I Temporary Shoring Plan Review-Addition Concrete&Rebar Review-Addition 100% 10 01-May-15A.04-May-1; I Concrete&Rebar Review-Addition Concrete&Rebar Fabrication/Delivery-Addition 100% 20 04-May-15A 22-May-1E ■ Concrete&Rebar Fabrication/Delivery-Addition Doors&Hardware Review-Addition 100% 10 09-Jul-15 A 17-Jul-15 A I Doors&Hardware Review-Addition Doors&Hardware Fabrication/Delivery-Addition 50% 30 10-Aug-15A 20-Oct-15 ® Doors&Hardware Fabrication/Delivery-Additior ADDITION(PRE PERMIT WORK) 38 09-Feb-15A 17-Apr-15 N 117-Apr-115A,ADDITION(PRE PERMIT WORK) Mobilize-Office Set Up,Storage 100% 10 09-Feb-15A 20-Feb-if I Mobilize-Offipe Set Up,Storage Install New Egress Door 100% 10 16-Feb-15A 06-Mar-1E ■ Install New Egress Door Ground Breaking 100% 1 17-Feb-15A 17-Feb-1E I Ground Breaking Plaza Tree Removal 1 100% 2 18-Feb-15 A 19-Feb-1 f I Plaza Tree Ftemoval Construction/Acoustical Fencing 100% 5 23-Feb-15A 11-Mar-15 I Constructgn/Acoustical Fencing Temporary Striping at Garage 100% 5'26-Feb-15A 13-Apr-15 = Temporary Striping at Garage Temporary Fencing and Signage at Garage , 100 5 04-Mar-15 A 17-Apr-15 M Temporary Fencing and Signage at Garage Relocate Existing Utilities in Garage /0 100%J 15 09-Mar-15A 27-Mar-1f ■ Relocate Existing Utilities in Garage Earthwork-Thaw Overburden on Garage ' 100% 15 11-Mar-15 A 11-Mar-15 I Earthwork-Thaw Overburden on Garage ADDITION SITE WORK 174 16-Mar-15A 112-Nov-15 Nm•mm • 12-Nov-15,ADDITION SITE WORK !— Earthwork-Demo and Remove Garage Overburden 100% 7 16-Mar-15A '17-Apr-15 • Earthwork-Demo and Remove Garage Overburden Inspection-City of Aspen Check Topping/Precast 100% 5 17-Apr-15A '19-Jun-15 M InsPection-City of Aspen Check Topping/Precast Mech-Site Storm Drain System 100% 5 06-Jul-15A 31-Aug-1E M Mech-Site Storm Drain System Concrete-Exterior Topping Slab Pourback ° 100% 51 13-Jul-15A 24-Jul-15A I Concrete-Exterior Topping Slab Pourback MMI Actual Work Critical Remaining... Page 2 of 8 Data Date:30-Sep-15 IMM Remaining Work • • Milestone ©Oracle Corporation PITKIN COUNTY LIBRARY 24-Sep-15 08:51 Activity Name Activity Original Start Finish 014 I 2015 2016 2017 Duration 03 04 Q1 02 03 Q4 Q1 Q2 03 04 01 Q2 Q3 )4 imnlata tt' Electrical,Transformer Relocation 100% 15 10-Aug-15A 28-Aug-1E ■ Electrical,Transformer Relocation • Waterproofing-Exterior System Below Grade 10% 15 21-Sep-15A 28-Oct-15 111 Waterproofing-Exterior System Below Grade North Alley Vault M 0%I 15 05-Oct-15` 23-Oct-15 • North Alley Vault . Patch/Repair Concrete at North Alley Vault 0% Patch/Repair Concrete at North Alley Vault ° 5'26-Oct-15 30-Oct-15 I Inspection,City Of Aspen-Plaza Waterproofing 0% 1 28-Oct-15 29-Oct-15 I Inspection,City Of Aspen-Plaza Waterprbofidg Protect Waterproofing System ! 0% 2 29-Oct-15 02-Nov-15 I Protect Waterproofing System Irrigation and Landscaping,On Grade 0% 8 02-Nov-15 12-Nov-15 fl Irrigation and Landscaping,On Grade ADDITION BUILDING 223 09-Mar-15 A 14-Jan-16 14-Jan-16,ADDITION BUILDING Steel-Locate Rebar and Prep for Connectors in Pre 100% 15 09-Mar-15 A 03-Apr-15 ■ Steel-Locate Rebar and Prep for Connectors in Precast Demo-Mass Demo,Entry,Dbl tees,Brick,Conc 100% 24 13-Apr-15A 29-May-1! = Demo Mass Demo,Entry,Dbl tees,Brick,,Cbric Steel-Erect Children Area Floor System 100% 12 06-May-15A 05-Jun-15 IN Steel-Erect Children Area Floor System Concrete-Foundations,Slabs 100%: 20 14-May-15A 31-Aug-1P 5 18-May-15A 22-May-it Concrete-Foundations,Slabs Steel-Install Bracing on Dbl Tee Precast 100%':— I Steel-Install Bracing on Dbl Tee Precast Steel-Erect Walls, Roof,Decking 100%' 16 15-Jun-15A 24-Jul-15A MI Steel-Erect Walls, Roof, Decking Framing Exterior Walls 100% 16 27-Jul-15A 30-Sep-1E =III Framing Exterior Walls Insulation-Rigid Under Slab 100%' 5'27-Jul-15A 28-Aug-1E ■ Insulation-Rigid Under Slab Fire Proof Spray 100%1 7 24-Aug-15 A 24-Sep-1E ■ Fire Proof Spray Carpentry-Window,Door and Roof System Backing 75%1 10124-Aug-15 A 02-Oct-15 MI Carpentry-Window, Door and Roof System Backir Mech-Roof Curbs Install— 100% 2 24-Aug-15A 27-Aug-1E I Mech-Roof Curbs Install Mech-Remove Old Chiller 100% 1 25-Aug-15A 25-Aug-1E I Mech-Remove Old Chiller Roofing,Single Ply Membrane System 100% 10 28-Aug-15 A 25-Sep-1E. r Roofing,Single Ply Membrane System Mech-Roof Drain Systems 100%; 3 31-Aug-15A 25-Sep-1E ■ Mech-Roof Drain Systems • Mech-HVAC RI 50% 10 14-Sep-15 A '06-Oct-15 ■ Mech-HVAC RI Steel,Rework Existing Chiller Support Structure 100% 2 16-Sep-15A 21-Sep-1E I Steel,Rework Existing Chiller Support Structure Sheathing-Exterior Walls 100% 7 17-Sep-15 A 30-Sep-1E ■ Sheathing-Exterior Walls Framing-Interior Walls 75% 6 21-Sep-15 A 01-Oct-15 1 Framing-Interior Walls Patch/Repair Roofing @ Old Chiller 100%', 2 21-Sep-15 A 22-Sep-1E I Patch/Repair Roofing @ Old Chiller Mech-Roof Top Equipment Install 100% 5 24-Sep-15 A 30-Sep-1E I Mech-Roof Top Equipment Install Mech-Install New Chiller 100%i 4 24-Sep-15A 25-Sep-1f. I Mech-Install New Chiller Waterproofing-Fluid Applied Membrane 15%i 5 28-Sep-15A 06-Oct-15 I Waterproofing-Fluid Applied Membrane Elect.RI 10%; 14 28-Sep-15A 16-Oct-15 • Elect.RI Expansion Joint-Exterior System 0% 6 30-Sep-15 07-Oct-15 B Expansion Joint-Exterior System Masonry-Brick Infill ' 0%1 5 30-Sep-15 06-Oct-15 II Masonry-Brick Infill Mech-Plumbing RI 0%1 14 30-Sep-15 19-Oct-15 ❑ Mech-Plumbing RI MEM Actual Work Critical Remaining... Page 3 of 8 Data Date:30-Sep-15 Remaining Work • •Miestone ©Oracle Corporation PITKIN COUNTY LIBRARY 24-Sep-15 08:51 Activity Name Activity Original Start Finish 014 2015 2016 2017 Duration Q3 04 01 02 03 04 01 02 03 04 Q1 02 03 )4 __ -,mnlate Insulation&Vapor Barrier-Thermal 0% 3 30-Sep-15 02-Oct-15 I Insulation&Vapor Barrier-Thermat Additional Steel for Green Roof Railing-CCD#2 0% 5 30-Sep-15 06-Oct-15 I Additional Steel for Green Roof Railing-CCD#2 Mech-Fire Sprinkler RI 0% 6 01-Oct-15 09-Oct-15 I Mech-Fire Sprinkler RI Framing-Ceilings and Soffits 0% 5 01-Oct-15 08-Oct-15 I Framing-Ceilings and Soffits 5 06-Oct-15 '13-Oct-15 I Doors Widows-Mtlg Clad Wood Ex hint Doors Widows-Mtl Clad Wood Exterior 0% }!— �z T T Insulation-2"rigid w/Z Furringon Exterior 0% 6 06-Oct-15 14-Oct-15 I Insulation-2"rigid w/Z Furringon Exterior Metal Panels-Field Measure for Mtl Panels 0% 2 06-Oct-15 08-Oct-15 I Metal Panels-Field Measure for Mtl Panels Steel-Decorative Railing @ Green Roof 0% 3 07-Oct-15 09-Oct-15 I Steel-Decorative Railing @ Green RoOf Additional Parapet Framing @ Green Roof-CCD# 0% 5 07-Oct-15 13-Oct-15 I Additional Parapet Framing @ Grgen Itgof-CCS Metal Panel-Fabricate from Field Measure 0% 10 08-Oct-15 22-Oct-15 I Metal Panel-Fabricate from Field Measure Insulation-Acoustical-Interior i 0% 5 13-Oct-15 19-Oct-15 1 Insulation-Acoustical-Interior Roofing,Green Roof System 0% 10 14-Oct-15 27-Oct-15 1 Roofing,Green Roof System Drywall-Walls,Hang&Finish 0% 10 21-Oct-15 03-Nov-15 I Drywall-Walls,Hang&Finish Metal Panels-Install --- _ 0% 6 22-Oct-15 30-Oct-15 I Metal Panels-Install Pavers-Roof Pavers at Green Roof 0% 5 28-Oct-15* 03-Nov-15 I Pavers-Roof Pavers at Green Roof Drywall-Ceilings and Soffits 0% 8 02-Nov-15 11-Nov-15 ' I Drywall-Ceilings and Soffits Doors-Weiland Sliding Door Install 0% 5 04-Nov-15 10-Nov-15 ' I Doors-Weiland Sliding Door Install Doors-Wood Interior Door Frames 0% 3 04-Nov-15 06-Nov-15 I Doors-Wood Interior Door Frames Paint-Interior 0% 15 09-Nov-15 27-Nov-15 ■ Paint-Interior Carpentry-Ext Siding and Soffits 0% 5 11-Nov-15 17-Nov-15 I Carpentry-Ext Siding and Soffits Hardware-Exterior Door Install 0% 3 11-Nov-15 13-Nov-15 I Hardware-Exterior Door Install ACT-Acoustical Ceiling Grid 0% 5 16-Nov-15 20-Nov-15 I ACT-Acoustical Ceiling Grid 1 Paint-Exterior Paint&Stain 0% 5 18-Nov-15 24-Nov-15 I Paint-Exterior Paint&Stain Ceramic Tile-Install 0% 15,18-Nov-15 08-Dec-15 ' ID Ceramic Tile-Install MEP Final Connect to ACT Grid 0% 5 20-Nov-15 26-Nov-15 1 I MEP Final Connect to ACT Grid Mech-HVAC Controls and Final Trim 0% 10 23-Nov-15 04-Dec-15 0 Mech-HVAC Controls and Final Trim Millwork-Install Millwork 0% 4 26-Nov-15 01-Dec-15 I Millwork-Install Millwork ACT-Install Tile&Wood Acs Panels 0% 5 27-Nov-15 03-Dec-15 0 ACT-Install Tile&Wood Acs Panels Flooring-Wood Flooring&Base 0% 6 27-Nov-15 04-Dec-15 0 Flooring-Wood Flooring&Base -- Carpentry-Interior Acoustical Wood Paneling 0%; 8 30-Nov-15 09-Dec-15 0 Carpentry-Interior Acoustical Wood Paneling Elect-Final Trim 0%1 5 30-Nov-15 04-Dec-15 I I Elect-Final Trim Mech-Fire Sprinkler Trim and Final 0 %t % 5'30-Nov-15 04-Dec-15 1 I Mech-Fire Sprinkler Trim and Final Doors-Overhead Coiling Door 0% 3'02-Dec-15 04-Dec-15 I Doors-Overhead Coiling Door Mech,Plumbing Fixtures and Trim 0% 51 04-Dec-15 ,10-Dec-15 I Mech,Plumbing Fixtures and Trim III Actual Work I' I Critical Remaining... Page 4 of 8 Data Date:30-Sep-15 I♦ Remaining Work • • Milestone ©Oracle Corporation PITKIN COUNTY LIBRARY 24-Sep-15 08:51 Activity Name Activity Original Start Finish 014 2015 2016 2017 % Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 02 Q3 Q4 Q1 Q2 Q3 14 -11nietr Flooring-Carpet 0% 5 04-Dec-15 10-Dec-15 I Flooring-Carpet Toilet Part&Accessories 0%1 3 11-Dec-15 15-Dec-15 I Toilet Part&Accessories Doors-Install Interior Doors and Hardware 0%, 5 11-Dec-15 17-Dec-15 0 Doors-Install Interior Doors and HatdWer� Punch-Initial Deficiency List&Fix 0% 10 17-Dec-15 30-Dec-15 0 Punch-Initial Deficiency List& i){ Punch-Design team and Owner 0%, 1 31-Dec-15 31-Dec-15 I Punch Design team and Owhdr Substantial Completion 0%1 1 01-Jan-16 01-Jan-16* I Substantial Completion { Punch-Correct All Issues 0% 8 04-Jan-16 13-Jan-16 I Punch-CorrectAlllssues Final Acceptance 00/o 0 14-Jan-16 14-Jan-16 , I Final Acceptance RENOVATION PHAS •NSTRUCTION 214 29-Jun-15A ..`-16 N 121-Apr-16,RENOVATION PHASE 1 RENOVATION SUBMITTALS,FABRICATION,DELIVER 40 31-Aug-15 A 27-Oci-15 r1 27-Oct-15,RENOVATION SUBt4ItTA4S P.A$F13 4 31- u -15 A 27-Oct-15 ct/Submittal Process- Subcontract/Submittal RENOVATION BASE BID&ALTERNATES 1,3,4,5,60% 175 29-Junn-15A 26-Feb-16 Subcont26-Feb--16 RENOVATION�BASE BID& Disconnects 100% 10 29-Jun-15A 24-Jul-15A • Di connects Protect Existing 100% 51 29-Jun-15A 17-Jul-15A ■ Pr tect Existing Demo Walls,Flooring,Ceilings 100% 20 29-Jun-15A 28-Sep-1E Demo Walls,Flooring,Ceilings Salvage Existing I 100%; 10 29-Jun-15A 04-Aug-1: • S Ivage Existing Demo Mechanical,Plumbing , 100%1 10 06-Jul-15A 17-Jul-15A I D o Mechanical,Plumbing Structural Steel and Decking 100% 10 08-Sep-15 A 16-Sep-1E I Structural Steel and Decking Slab on Deck 100%` 5 21-Sep-15 A 23-Sep-1: I Slab on Deck Fireproofing 100% 3 22-Sep-15A 24-Sep-1E Fireproofing Framing 0% 15,30-Sep-15 20-Oct-15 Framing Plumbing Rough In 0% 10 14-Oct-15 27-Oct-15 I Plumbing Rough In Electrical Rough In 0% 10 14-Oct-15 27-Oct-15 I Electrical Rough In Fire Suppression 0% 6 21-Oct-15 28-Oct-15 I Fire Suppression i. Mechanical Rough In 0% 15 21-Oct-15 10-Nov-15 ■ Mechanical Rough In Insulation,Drywall,and Finish 0% 15 22-Oct-15 11-Nov-15 II Insulation,Drywall,and Finish Stain,Paint,Wallcovering 0% 20:11-Nov-15 08-Dec-15 0 Stain,Paint,Wallcovering Ceramic Tile 0% 10 12-Nov-15 25-Nov-15 I Ceramic Tile Plumbing Fixtures 0% 5 26-Nov-15 02-Dec-15 I Plumbing Fixtures Casework&Millwork 0% 20 02-Dec-15 29-Dec-15 0 Casework&Millwork Toilet Accessories 0% 5 03-Dec-15 =09-Dec-15 I Toilet Accessories Ceiling Grid 0% 5 09-Dec-15 15-Dec-15 0 Ceiling Grid Electrical Fixtures,Devices 1 0% 7 16-Dec-15 24-Dec-15 1 0 Electrical Fixtures,Devices MINN Actual Work Critical Remaining... Page 5 of 8 Data Date:30-Sep-15 1 Remaining Work • • Milestone ©Oracle Corporation PITKIN COUNTY LIBRARY 24-Sep-15 08:51 Activity Name Activity Original Start Finish 014 2015 2016 2017 Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 .)4 imnlPtp " GRDs 0% 5 16-Dec-15 22-Dec-15 0 GRDs Ceiling Tile 0% 7 25-Dec-15 04-Jan-16 0 Ceiling Tle la AV System • 0% 10 25-Dec-15 07-Jan-16 ❑ AV System Data/Communication Devices 0% 10 25-Dec-15 07-Jan-16 ❑ Data/Communication Devices Resilient Floor&Base 0%' 5 30-Dec-15 05-Jan-16 0 Resilient Floor&Base Carpet 0%, 10 30-Dec-15 12-Jan-16 0 Carpet Reinstall Wood Handrail0% 5 30-Dec-15 05-Jan-16 0 Reinstall Wood Handrail Doors&Hardware 0%; 7 13-Jan-16 21-Jan-16 0 Doors&Hardware Acoustical Treatments 0% 5 13-Jan-16 19-Jan-16 0 Acoustical Treatments Window Treatments 0% 3 18-Jan-16 20-Jan-16 I Window Treatments Automatic Door Operators 0% 3 22-Jan-16 26-Jan-16 0 Automatic Door Operators Signage-ALLOWANCE 0% 3 22-Jan-16 26-Jan-16 0 Signage-ALLOWANCE Test&Balance 0% 5 22-Jan-16 28-Jan-16 0 Test&Balance Punch-Initial Deficiency List&Fix 0% 10 29-Jan-16 11-Feb-16 0 Punch-Initial Deficiency List&Fix Punch-Design Team and Owner I 0% 1 11-Feb-16 11-Feb-16 I Punch-Design Team and Owner Substantial Completion-Renovation 0% 1112-Feb-16 12-Feb-16* I Substantial Completion-Renovation Punch-Correct All Issues 0% 10 15-Feb-16 26-Feb-16 0 Punch-Correct All Issues Final Acceptance 0% 0 26-Feb-16 • Final Acceptance RENOVATION ALTERNATE 2 116 12-Nov-15 21-Apr-16 V 121-Apr-16,RENOVATION ALTERN, Bio Detention and 4"Conveyance 0% 10 12-Nov-15 25-N -15 0 Bio Detention and 4"Conveyance Pervious Paver Detention 0% ov10 26-Nov-15 09-Dec-15 0 Pervious Paver Detention Sidewalk 0% 10 10-Dec-15 23-Dec-15 ❑ Sidewalk r Patch/Repair Existing Landscaping ; 0% 15 01_-Apr-16` 21-Apr-16 El Patch/Repair Existing Landscaping OVATION: T-I4-0 TON 180 31-Aug-15A 06-May-161 06-May-16,RENOVATION PHASE SUBMITTALS/FABRICATION 82 31-Aug-15A 22-Dec-15 ‘ml. 22-Dec-15,SUBMITTALS/FABRICATION Structural Steel and Stair Submittal/Fabrication 40% 75 31-Aug-15 A 01-Dec-15 ICI Structural Steel and Stair Submittal/Fabricatio Skylight Submittals&Procurement 0% 60 30-Sep-15 22-Dec-15 I I Skylight Submittals&Procurement RENOVATION PHASE 2 CONSTRUCTION - 157 01-Oct-15 06-May-16 111 • 06-May-16,RENOVATION PHASE Protect Existing 0% 5 01-Oct-15 07-Oct-15 I Protect Existing Salvage Existing 0% 5 01-Oct-15 07-Oct-15 I Salvage Existing Demo Walls,Millwork,Casework,Etc 0% 15 08-Oct-15 28-Oct-15 • Demo Walls,Millwork,Casework,Etc Demo Existing Stair 0%'F: 20 22-Oct-15 18-Nov-15 ■ Demo Existing Stair Demo Main Entry Vestibule 0% 4129-Oct-15 03-Nov-15 I Demo Main Entry Vestibule Actual Work IMM Critical Remaining... Page 6 of 8 Data Date:30-Sep-15 MINE Remaining Work • • Milestone ©Oracle Corporation PITKIN COUNTY LIBRARY 24-Sep-15 08:51 Activity Name Activity Original Start Finish 014 2015 2016 2017 Duration Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 4 -,mniPta Infill Floor at Main Entry 0% 1 04-Nov-15 04-Nov-15 I Infill Floor at Main Entry Structural Demo for New Stair 0% 5 19-Nov-15 25-Nov-15 0 Structural Demo for New Stair Structural Steel/Deck Infills 0% 10 02-Dec-15 115-Dec-15 0 Structural Steel/Deck Infills Steel Stairs 0% 10 09-Dec-15 22-Dec-15 0 Steel Stairs Concrete Slabs on Deck 0% 5 16-Dec-15 22-Dec-15 0 Concrete Slabs on Deck Pour Stair Pans 0% 2 23-Dec-15 24-Dec-15 I Pour Stair Pans Soffit/Wall Framing 0% 15 23-Dec-15 12-Jan-16 0 Soffit/Wall Framing Ductwork 0% 15 23-Dec-15 12-Jan-16 ❑ Ductwork In-Wall Rough 0% 15 30-Dec-15 19-Jan-16 ❑ In-Wall Rough Patch Fireproofing 0% 10 13-Jan-16 26-Jan-16 0 Patch Fireproofing Insulation,Drywall,and Finish 0%1 20 13-Jan-16 09-Feb-16 0 Insulation,Drywall,and Finish Stain,Paint,and Wallcovering 0%i 15 10-Feb-16 01-Mar-16 0 Stain,Paint,and Wallcovering 1 Casework/Millwork 0%i 20 24-Feb-16 22-Mar-160 Casework/Millwork Bathroom Flooring/Walls 0%I 5 02-Mar-16 08-Mar-16 0 Bathroom Flooring/Walls ACT Grid 0% 7 02-Mar-16 10-Mar-16 0 ACT Grid Fire Suppression Drops 0% 5 02-Mar-16 08-Mar-16 0 Fire Suppression Drops Plumbing Fixtures 0% 5 09-Mar-16 15-Mar-16— 0 Plumbing Fixtures Electrical Fixtures and Devices 0%, 15 11-Mar-16 31-Mar-16— ❑ Electrical Fixtures and Devices IT Rough-In 0% 10 11-Mar-16 24-Mar-16 0 IT Rough-In GRDs 0% 5 11-Mar-16 17-Mar-16 0 GRDs Toilet Accessories I 0% 3 16-Mar-16 18-Mar-16 I Toilet Accessories __ Signage 0%, 3'23-Mar-16 25-Mar-16 I Signage FEs and Misc Specialties 0% 10 23-Mar-16 05-Apr-16 0 FEs and Misc Specialties Reinstall Wood Handrail 0% 5 23-Mar-16 29-Mar-16 0 Reinstall Wood Handrail Doors&Hardware 0% 10 23-Mar-16 05-Apr-16 0 Doors&Hardware IT Devices 0% 7 25-Mar-16 04-Apr-16 0 IT Devices ACT Tile 0%; 5 01-Apr-16 07-Apr-16 0 ACT Tile Book Security Systems-BY OWNER 0% 3 06-Apr-16 08-Apr-16_ I Book Security Systems-BY OWNEF Test&Balance 0% 15 08-Apr-16 28-Apr-16 0 Test&Balance Punch-Initial Deficiency List&Fix 0% 15 08-Apr-16 r28-Apr-16 0 Punch-Initial Deficiency List&Fix Substantial Completion-Renovation Phase2 0% 1 28-Apr-16 28-Apr-16 I Substantial Completion-Renovatioi Punch-Design Team and Owner0% 5 29-Apr-16 05-May-16 0 Punch-Design Team and Owner Punch-Correct All Issues 0% 5`29-Apr-16 05-May-16 0 Punch-Correct All Issues Final Acceptance 0% 1 06-May-16 06-May-16 I Final Acceptance Actual Work t.--- ..1 Critical Remaining... Page 7 of 8 Data Date 30-Sep-15 111 Remaining Work • • Milestone ©Oracle Corporation PITKIN COUNTY LIBRARY 24-Sep-15 08:51 Activity Name Activity Original Start Finish 014 2015 2016 2017 Duration 03 Q4 01 Q2 Q3 Q4 01 Q2 Q3 Q4 Q1 Q2 03 4 _ imnlata ROOFTOP 32 21-Dec-15 02-Feb-16 ImI 02-Feb-16,ROOFTOP Anchor Points At Chiller 0% 5 21-Dec-15 25-Dec-15 I Anchor Points At Chiller -Remove Exisitng Skylights 0% 10 23-Dec-15 05-Jan-16 5 Remove Exisitng Skylights Skylight Flashing at Curbs 0/° 5 06-Jan-16 12-Jan-16 I Skylight Flashing at Curbs Replacement Skylights 0`% 15 13-Jan-16 02-Feb-16 III Replacement Skylights Rooting&Deck Replacement 0% 15 13-Jan-16 02-Feb-16 ® Roofing&Deck Replacement • MILL STREET IMPROVEMENTSIMPROV . 152 01-Oct-15 29-Apr-16 � 29-Apr-16,MILL STRE pT Winter DelayMITI Street Improvements 0% 110 01-Oct-15 02-Mar-16 Winter Dela Mill Street Im'rovemente Demo ExistingCurrbSdewalk 0%, 15 24-Mar-16 30-Mar-16 • Demo CExsting/Currb/S'ermitK 0%/ROW Permits 03-Mar-16 23-Mar-16 Road Existing Idew�l� Mass Excavation/Fine Grading 0%;� 10 31-Mar-16 13-Apr-16 I Mass Excavation/Fine Grading Form/Place Curbs 0% 5 14-Apr-10 20-Apr-16 I Form/Place Curbs Form/Place Sidewalks 0% 5 21-Apr-lb 27-Apr-16 I Form/Place Sidewalks Remove Closures/Clean-Up i 0% 2 25-Apr-1( 29-Apr-16 I Remove Closures/Clean-Up Actual Work ! Critical Remaining... Page 8 of 8 Data Date:30-Sep-15 Remaining Work • • Milestone ©Oracle Corporation