Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
bocc.con.amended.254.2014A
TITKIN Pitkin County CooNTS( Contract Cover Sheet Please complete the Contract Cover Sheet when the contract is completed and signed by Contractor and Pitkin County Project Manager. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments to Procurement(procurement help@pitkincounty.com). Any contracts$50,000 and over will be routed for signatures to County Manager and Attorney's Office(if required)by Procurement &Contracts Manager. Contract Information Contract Number 254-2014 R Project Name Stein Bridge Foundation&Trail Rehabilitation Contractor Mueller Construction Services Budget Line Item 118.57.02511.82844 Additional Budget Line Item(s) Click here to enter text. and special notes to Finance Contract Start Date 5/13/2015 Contract End Date 12/31/2015 Automatic Renewal Yes ❑ No® If Construction: Retainage Yes Retainage If this is a new contractor,please request they complete and submit to Finance a W-9 Form. Contact Information: Department Open Space and Trails Project Manager Lindsey Utter Project Manager 920-5224 Phone Contractor Name Mueller Construction Contractor Phone 970.230.9353 Services Number Provide a brief description of the contract: Stein Bridge foundation construction work and trail rehabilitation from Stein Bridge to the Rio Grande Trail. Contract Value Summary: Contract Amount 294,922.00 This Change order/Amendment amount(if applicable)CO-01 8,095.00 New Contract Total 303,017.00 Procurement Method: None ❑ Informal Formal ® Sole Source 0 Emergency 0 Contract Renewal 0 Contract Type: Services/Maintenance 0 Construction ® Goods,Equipment, Supplies 0 Change Order/Amendment ® Other,please explain 0 Click here to enter text. NOTE:CLERKS OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE.ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST. Contract#254-2014 Rev. 8.31.11 jaa/js Budget Line Item# 118.57.02511.82844 iTKIN COUNT11 CHANGE ORDER/CONTRACT AMENDMENT Change Order Number: 01 OWNER: Pitkin County 530 E.Main Street,3rd FL Aspen,Colorado 81611 CONTRACTOR: The Stein Bridge Foundation and Trail Rehabilitation(the"Agreement")dated May 13,2015 between the Board of County Commissioners of Pitkin County(the"County")and Mueller Construction Services,Inc. (the"Contractor"), is hereby amended as follows: Description of Change: Army Corps permit was delayed 15 days; pier 3 anchor bolts require additional reinforcement;unanticipated replacement of bridge wooden beams(stringers). Reason for Change: Changes in the construction conditions require work outside the original scope of work.And require additional time and logistical costs to accomplish. See Attachment A: Change of conditions explanation; Oct. 1, 2015 Summary of Change Order; Change Order Detail;estimate of flagging/pilot car hours;and Stein Bridge Preliminary and Update Schedules. Original Contract Price $294,922.00 Net Increase/Decrease in Contract Price(this change order) $ 8,095.00 *Total Adjusted Contract Price(including this change order) $303,017.00 This change order extends the time to complete work by December 31,2015. In all other res ects the Agreement is in full force and effect and remains unchanged by this Amdnd t. tb/Se1281 s� Coractor Date Mueller Construction Services,Inc. .1 I 1 ' 1012 /7-015 ' c e ent Officer Date �ndsy Jtter *Increases over S25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. Forwarded message From:Joe Mueller<jmueller@muellerconstruction.net> Date: Fri, Oct 23, 2015 at 11:43 AM Subject: Stein Bridge Contract Extension and Change Order To: Chris Baroody<chris.baroody@pitkincounty.com>, Lindsey Utter<lindsey.utter@pitkincounty.com> Cc: "Mike Fowler(mikef@sgm-inc.com)"<mikef@sgm-inc.com> Chris—This email serves as notice of changed conditions at the site that merit a contract extension and a change order. The basis of the extension stem from several conditions that are beyond the control of the contractor and were not readily assessable at the time of the bid. • The first condition surrounds the procurement of the Army Corps permit for work that impacts the river below high water line. Per our original bid schedule, we intended to start footing formwork at pier 3 on September 30, 2015 (see attached preliminary schedule submitted with the proposal), but the actual approval letter was not delivered to us until October 14, 2015, a delay of 15 calendar days. • The second condition surrounds the layout of the anchor bolts that attach to the rocks that support the steel columns at pier 3. The actual anchor bolt locations are partially on the rock at the downstream side, and 2 on the very edge of the rock at the upstream side. These conditions will require us to create concrete pilasters at each rock to properly support the anchor bolts and give sufficient bearing of the column base plates. The reinforcing steel and formwork required to create the pilasters were not anticipated at time of bid. The estimated time needed to construct the extra work consists of 4 calendar days. • The third condition stems from the discovery of severely rotted wood beams (stringers)at each end of the bridge. deciliw was made to replace all beams at each end with new timber. The additional work to replace the beams and cut and install blocking at the new beams is a changed condition subject to change order. The estimate time needed to reconstruct the 2 spans consists of 4 calendar days. It's for these reasons that a contract extension and a change order are due. The attached revised schedule reflects the impacts of the delay and shows a new anticipated completion date. Some of the remaining work is weather dependent which may impact our ability to complete the project in the time stated. It is our intention to work expediently to complete the project ahead of this proposed schedule if possible. Sincerely, Joe Mueller President Mueller Construction Services, Inc. 5032 CR 154 Glenwood Springs, CO 81601 Phone 970-230-9353 Fax 970-230-9725 jmueller@muellerconstruction.net Attachment A: Contract 254-2014 CO-01 MUELLER CONSTRUCTION Change Order Detail Summary of Change Order Change Order Number 001 October 1, 2015 Project: Stein Bridge Labor $1,085.00 Equipment $421.60 Materials $4,100.00 Tax on Materials $0.00 Construction Consumables $127.88 Subcontractors $270.00 Sub total $6,004.48 Overhead allowance of 7% $420.31 Allowable profit mark up at 10% $600.45 Total Adds with mark up $7,025.24 Less Credits $0.00 Total change order $7,025.24 Attachment A: Contract 254-2014 CO-01 Change Order Detail Change Order Number 001 Date October 1, 2015 Project: Stein Bridge Change Order Additions Labor Name/Description Unit Qty Rate Total $ Comments Operator hr 3 $35.00 $105.00 Unload and stage on both sides of the river Laborer hr 3 $25.00 $75.00 Carpenter hr 10 $45.00 $450.00 Install new stringers Operator hr 7 $35.00 $245.00 Install new stringers Operator hr 3 $35.00 $105.00 Load damaged stringers to truck Laborer hr 3 $35.00 $105.00 Load damaged stringers to truck $35.00 $0.00 $35.00 $0.00 I Total Labors $1,085.001 Equipment Name/Description Unit Qty Rate Total$ Comments Genie fork lift hr 1 $36.85 $36.85 Equipment to unload and stage stringers Skid steer hr 1 $15.75 $15.75 Equipment to unload and stage stringers Truck and trailer hr 2 $9.80 $19.60 Equipment to unload and stage stringers Cat 308 excavator hr 7 $34.94 $244.58 Install new stringers Cat 308 excavator hr 3 $34.94 $104.82 Load damaged stringers to truck $34.94 $0.00 $34.94 $0.00 $34.94 $0.00 I Total Equipment' $421.601 Materials Unit Name/Description Unit Qty Price Total$ Comments 4x12x16 DF#1 and better stringers Is 1 $4,100.00 $4,100.00 Treated Stringers $0.00 $0.00 $0.00 I Total Materials' $4,100.001 Construction Consumables Unit Name/Description Unit Qty Price Total$ Comments Small tools as a percent of labor(7.5% Is 1 $81.38 $81.38 Dump Fees to 0.75 $62.00 $46.50 Disposal fee for stringers $0.00 $0.00 $0.00 $0.00 I Total Consumables' $127.881 Subcontractors Name/Description Unit Qty Rate Total$ Comments Trucking to haul stringers to dump hr 3 $90.00 $270.00 Trucking to haul to dump $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I Total Subcontractors' $270.00' Attachment A: Contract 254-2014 CO-01 Stein Bridge Rio Grande Trail Impacts Estimate of flagging/pilot car hours Estimated Time per load Total Hours Estimated Estimated In and out(Hours) Per Product Product Tons Loads Allows for turn around Time 3/4" Road base 153 12 0.67 8.04 Crusher Fines 61 5 0.67 3.35 Special backfill 100 8 0.67 5.36 Haul off of excess material 74 6 0.67 4.02 Micro pile mob in and out 1 2 2 Excavator Demob 1 1 1 Total Estimated Flagging/Pilot Hours 23.77 Estimated Costs Flagging @ $35 per hour $831.95 Pilot Car @ $10 per hour $237.70 Total Estimate Cost $1,069.65 Attachment A: Contract 254-2014 CO-01 Act Orig Early Early Total 2015 ID Description Dur Start Finish Float SEP OCT Nov DEC 31 07 14 21 28 05 12 19 26 02 09 16 23 30 07 14 Preconstruction Items 1000 Start 0 08SEP15 0 *Start East Side of River Work 2000 Mob to site,set up traffic control 1 08SEP15 08SEP15 0 1 Mob to site,set up traffic control 2010 Clear and grub this side 3 09SEP15 11SEP15 0 MI Clear and grub this side 2020 Create access to abut,fill roadway 5 14SEP15 18SEP15 0 mam— Create access to abut,fill roadway 2030 Excavate for pier 3 2 21SEP15 22SEP15 0 0 Excavate for pier 3 2040 Install Micro pile and rock dowels at pier 5 23SEP15 29SEP15 0 1===1 Install Micro pile and rock dowels at pier 2050 Form and place footing 5 30SEP15 060CT15 0 o Form and place footing 2060 Install steel columns 2 070CT15 080CT15 0 0 Install steel columns 2070 Lift bridge this end,set on beam 1 090CT15 090CT15 0 a Lift bridge this end,set on beam 2080 Demo old columns 2 120CT15 130CT15 0 o Demo old columns 2090 Form and place pier stem 12 140CT15 290CT15 0 ^ - - - 4 Form and place pier stem 2100 Complete excavation 2 300CT15 02NOV15 2d o Complete excavation 2110 Install retainng wall 4 03NOV15 06NOV15 2d 1._._I Install retainng wall 2120 Install Micro pile at abut 1 09NOV15 09NOV15 2d 0 Install Micro pile at abut 2130 Form and place abut 2 10NOV15 11 NOV15 2d 0 Form and place abut 2140 Install timber span 4 12NOV15 17NOV15 2d r 1 Install timber span 2150 Install road base and fines 5 18NOV15 24NOV15 2d t I Install road base and fines 2160 Clean up 2 25NOV15 26NOV15 2d CD Clean up 10000 Finish 0 30NOV15 0 *Finish West Side of River Work 3000 Clear and grub this side 1 23SEP15 23SEP15 13d a Clear and grub this side 3010 Excavate for pier 2 1 24SEP15 24SEP15 13d a Excavate for pier 2 3020 Install Micro pile at pier 5 30SEP15 060CT15 10d ===Install Micro pile at pier 3030 Form and place footing pads 2 070CT15 080CT15 10d 0 Form and place footing pads 3040 Install steel columns 2 090CT15 120CT15 10d =Install steel columns 3050 Lift bridge this end,set on beam 1 130CT15 130CT15 10d 0 Lift bridge this end,set on beam 3060 Demo old columns 2 140CT15 150CT15 10d 0 Demo old columns 3070 Form and place pier stem 11 300CT15 13NOV15 0 ®Form and place pier stem 3080 Complete excavation 1 16NOV15 16NOV15 0 0 Complete excavation 3090 Install Micro pile at abut 1 17NOV15 17NOV15 0 0 Install Micro pile at abut 3100 Form and place abut 2 18NOV15 19NOV15 0 o Form and place abut 3110 Install timber span 4 20NOV15 25NOV15 0 c===Install timber span 3120 Install road base and fines 2 26NOV15 27NOV15 0 ®Install road base and fin 3130 Clean up 1 30NOV15 30NOV15 0 13 Clean up Start date 08SEP15 1. Finish date 30NOV15 1 Earlybar Data date 08SEP15 Mueller Construction Services, Inc. =Progress bar Run date 14NOV14 �Critical bar Page number 1A Stein Bridge Preliminary Schedule —Summary bar 4 Start milestone point ©Primavera Systems,Inc. Attachment A: Contract 254-2014 CO-01 0 Finish milestone point Act orifi Early Early Total 2015 2016 ID Description Dur Start Finish Float OCT NOV DEC JAN 05 12 19 26 02 09 16 23 30 07 14 21 28 04 11 ' - • 1 y( t;1i rl(41 1000 Start I 012100115 I I 0 •Start 205C Form and place footin 8 210CT1 E 30OCT1 E 0 I�Form and place footing 2060 Install steel columns 2 02NOV15 03NOV15 0 J MI Install steel columns 2070 Lift bridge this end,set on beam 1 04NOV15 04NOV15 0 liil Lift bridge this end,set on beam 2080 Demo old columns 2 05NOV15 06NOV15 0 E Demo old columns 2090 Form and place pier stem 9 09NOV15 19NOV15 0 t pier stem . _ _ Form and place 2100 Complete excavation 2 20NOV15 23NOV15 0 I eComplete excavation 2110 Install retainng wall 4 24NOV15 27NOV15 0 t t i t t Install retainng wall 2120 Install Micro pile at abut 1 30NOV15 30NOV15 0 ! i ; i Install Micro pile at abut 213( Form and place abi 2 01DEC1t 02DEC1E 0 t t t t t t IForm and place abut 2140 Install timber span 7 03DEC15 11DEC15 0 t t t t t t Install timber span 2150 Install road base and fines 5 14DEC15 18DEC15 0 t t � t t _� Install road base and fines 2160 Clean up 2 21DEC15 22DEC15 0 t t t r t Clean up t t t t t € i IFinish 10000 Finish 0 22DEC15 0 ! t t , 114 AABC Side of River Work 3030 Form and place footing 5 02NOV15 06NOV15 4d —.16aii.61 Form and place footing 3040 Install steel columns 2 09NOV15 10NOV15 4d Install steel columns 305( Lift bridge this end,set on bea 1 11 NOV1° 11 NOV1 E 4d Lift bridge this end,set on beam 3060 Demo old columns 2 12NOV15 13NOV15 4d Demo old columns 3070 Form and place pier stem 9 20NOV15 02DEC15 0 I Form and place pier stem 3080 Complete excavation 1 03DEC15 03DEC15 0 rzlaComplete excavation 3090 Install Micro pile at abut 1 04DEC15 04DEC15 0 Install Micro pile at abut 3100 Form and place abut 2 07DEC15 08DEC15 0 Form and place abut 3110 Install timber span 7 09DEC15 17DEC15 0 CiEl Install timber span 3120 Install road base and fines 2 18DEC15 21DEC15 0Install road base and fines 3130 Clean up 1 22DEC15 22DEC15 0 Clean up Start date 21 OCT15 =Early bar Finish date 22DEC15 I I Progress bar Data date 21OCT15 Mueller Construction Services, Inc. =Critical bar Run date 220CT15 Stein Bridge Updated Schedule Summary bar Page number 1A O Start milestone point ©Primavera Systems,Inc. AttachmentA: Contract 254-2014 CQ-01 0 Finish milestone point