Loading...
HomeMy WebLinkAboutbocc.con.297.2015A 7/2015 kjm picKiN Pitkin County COUNT Contract Cover Sheet Please complete the Contract Cover Sheet when the contract is completed and signed by Contractor and Pitkin County Project Manager. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments to Procurement (procurement_help@pitkincounty.com). Any contracts $50,000 and over will be routed for signatures to County Manager and Attorney's Office(if required)by Procurement&Contracts Manager. Contract Information Contract Number 297.2015A Project Name Ute City Building—Tenant Improvement Contractor FCI Constructors,Inc. Budget Line Item 110.18.92818.82726 Additional Budget Line Item(s) Click here to enter text. and special notes to Finance Contract Start Date 12/15/2015 Contract End Date 3/31/2016 Automatic Renewal Yes ❑ No❑ If Construction:Retainage Click here to enter text. If this is a new contractor,please request they complete and submit to Finance a W-9 Form. Contact Information: Department Facilities Project Manager Smith Project Manager 5396 Phone' Provide a brief description of the contract: This amendment addresses the provision of installation of 2 new storeroom locksets, controller and reader boards, card reader access, electrified cabinet locks,wiring for access control system. Costs associated with fire sprinkler piping and heads. Contract Value Summary: Contract Amount $260,433.00 This Change order/Amendment amount(if applicable) $ 11,854.00 New Contract Total $272,287.00 Procurement Method: None ❑ Informal❑ Formal ❑x Sole Source ❑ Emergency ❑ Contract Renewal ❑ Contract Type: Services/Maintenance ❑ Construction ❑x Goods,Equipment, Supplies ❑ Change Order/Amendment ❑ Other,please explain ❑ Click here to enter text. NOTE: CLERKS OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE.ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST. Contract#bocc.con.297.2015 Rev. 8.31.11 jaa/js Budget Line Item#110.18.92818.82726 4,901KI C 1 CONTRACT AMENDMENT Change Order Number:bocc.con.297.2015A Dated 12-15-15 OWNER: Pitkin County Tenant Improvement—Ute City Building Remodel 430 E.Main Street Aspen,Colorado 81611 CON TRACTOR: FCI Constructors,Inc. The Pitkin County Tenant Improvement — Ute City Building Remodel Project CM/GC Contract (the "Agreement") dated 12/15/2015 between the Board of County Commissioners of Pitkin County (the "County") and FCI Constructors,Inc. (the "Contractor"), is hereby amended as follows: Description of Change: See attached 1. BVR-001,Added Data&Electrical Installs(includes RFI-001 Electrical) $0.00 2. COR-001,Access Control $15,585.00 3. COR-005,Add Fire Sprinkler Scope at Unit 205 $7,119.00 4. COR-006,Reduction of Casework Scope ($10,850.00) TOTAL THIS CHANGE ORDER $11,854.00 Reason for Changes 1.Add data cabling and devices scope of work to project.Revised/added to some electrical requirements. 2.Add access control system to project. 3. Add fire sprinkler coverage at upper floor unit (unit 205) to FCI's scope of work (originally is was believed this scope was going to be covered by the landlord). 4.Reduce the casework scope for the project as directed by the owner group. Original Contract Price $260,433.00 Previous Change Order applied to Guaranteed Maximum Price: $0.00 Net Increase/Decrease in Contract Price(this change order) $11,854.00 *Total Adjusted Contract Price(including this change order) $272,287.00 This change order extends the time to complete work by NA days. Rev 12/27/10 js Project Coding Original Contract#bocc.con.297.2015 In all other res p=cts the Ay ee -nt is in full force and effect and remains unchanged by this Ame nt. ' /47% Prady tackmer, / Constructors Inc Date &;;,e, /12/P Jo i :� ith, /n Facilities D to Ar �/A Jon Peacock, County Manager Date *Increases over$25,000 and/or 10%(single increase or accumulative)of original contract must have County Manager signature. 2 t-- i FCI BVR-001 Constructors,Inc. Total Change to Contingency r a Pitkin County-Ute City Building Remodel Project# 10-15-058 FCI Constructors,Inc.-GJ 530 E.Main Street,Aspen,CO 81611 Tel: tbd Fax: 970-434-7583 t leviIc•I(l 'i-001 U G Category a Reference PCCO Number' Budget Variance Report attached pricing quote,attached marked-up drawings Notes F, This BVR has been developed to cover additional costs associated with added data and electrical installations at the Ute City Building(temporary County Elections Offices)as per the attached marked-up drawings from Bruce Flynn.Please note the following clarifications: -The$12,500 allowance for data installations carried in FCI's GMP has been included in this pricing to offset the amount of money being pulled from _- contingency. i. -This pricing indudes rough-in for the access control card readers since those locations were shown on these marked-up drawings.However,the cost =._ for the access control wire,equipment,install,and programming is included in COR-001. -This pricing includes the costs for dedicated electrical circuits for printers and scanners as clarified in RFI-001. -All cabling to be routed back to a low-volt panel(termination point)at the existing electrical room at the SW corner of Elections Processing 103.The county will provide network connectivity at this location. -Data cabling will be ran in bridal rings at the ceiling of unit 106.wire-mold will also be used as needed for data devices at the walls of units 106 and 205. -This BVR does not include any costs for running cabling for security cameras,as camera locations and requirements were not clarified at the time this data/electrical work was priced.FCI has released the data installer to run the required cabling for the security cameras on a time and material . basis and is proposing to fund these costs from existing budgets within the GMP. Itemized Details: General D'escrtption Quote Recd Y. Proposed Durgin Electric LLC $15,985.00 Description of Work: All changes to Durgin Electric's scope of work as follows: -Complete install of phone and data system including raceways,cabling,and devices,per marked-up drawings dated 12/20/15. Pitkin County to provide network connectivity at the demark location.Note that cabling for security cameras is not included in this . change order and is to be completed on a T&M basis. -Rough-in(back boxes and raceways)for rough-in required for the access control system(access control system installed by Current Solutions).Any wire-mold required to get wiring to access control devices at existing doors will be provided and installed by Current Solutions. -Install dedicated circuits for printer and scanner locations per RFI-001. FCI Constructors,Inc.-GJ ($12,500.00) Description of Work: Low Volt Allowance FCI Constructors,Inc.-GJ $0.00 Description of Work: Contingency i This proposal includes work dearly itemized herein and attached sub-contractor quotes Should delivery of materials effected by this change delay the work,time extension and General Conditions cost rights are reserved The right to cumulative impact costs is reserved This proposal is good for seven days from date of issuance • • Prolog Manager Printed on: 1/25/2016 fci pm data Page 1 ® I BVR-001 Constructors,Inc. Total Change to Contingency it Requested Days: 0 Total Change to Contingency: ($3,485.00) Approval: Date: �_ -1(4 Vf&rbet-k 21)- b-_ This proposal includes work clearly itemized herein and attached sub-contractor quotes Should delivery of materials effected by this change delay the work,time extension and General Conditions cost rights are reserved The right to cumulative impact costs is reserved This proposal is good for seven days from date of issuance Prolog Manager Printed on: 1125/2016 fci pm data Page 1 LfFiVtGrfrejr:-7ro;r: TR/Cie rA ■. ■-.1.-1•®camIV C.0. # :1 2R C.O. Date : 1/18/2016 181 N. 12TH Street Carbondale, CO 81623 Requested By: !Brady Blackmer Office@DurginElectric.com Customer ID: IFCI Department: [Construction .,JOB,DESCR,IPTION ATtN: Complete turnkey for all phone/data wiring Brady Blackmer Includes bridal rings on ceiling of Unit 106 FCI Constructors, Inc All low-voltage wiremold in Units 106 and 205 30701-70 B, Bldg A Includes a sub-demark board in Unit 106-nonenclosed Grand Junction,CO 81504 Tied in with building demark (970)434-9093 bblackmerafciol.com } QTY', ;DESCRIPTION . . . Material Labor/Sub LINE TOTAL 1 TSC Turnkey Phone/Data Cabling 12,701 15 12,7,01.15;. 4 Surface mount back boxes for"CA"locations 10.00 80 00 No conduit-Current Solutions install their own wiremold 5 Unit 106 Data Stubs to Ceiling for route back to sub-demark 225.00 600.00 825 00' (1.5 hrs/location) 2 Dedicated circuit for printer and for access control system 242.88 640.00 88288;;, is 1 -20A circuit for each location - (4 hrs/circuit) CCTV cabling done on T£&M basis = , SUBTOTAL $ `v 1,499 03! Other Comments or''Special InstructionsTAXABLE 1 NO LINE VOLTAGE POWER FOR CCTV CAMERAS TAX RATE I 0.000%1 NO LINE VOLTAGE POWER AT"CA"LOCATIONS TAX j $ r . = EXPOSED CABLING AT UNIT 106 CEILING Overhead (5%) i $ /2-,.951 Tyler Carlton Profit(5%) ( $ 761.20 ! ' (970)319-3790 TOTAL '$ 15;98g182 tyler@idurainelectric.com SIGNATURE REQUIRED PRIOR TO STARTING WORK Signature: Date: Thank You For Your Business! 0 2011-2014 Vertex42-com . Path:Jd3175:00-Ute City OfticesOeJUTE City OSlice.Cwg 41e1m la*X5u35•E53o-v V , y ,0 0 .- p .\\4 , ,, Ig VS 2 •ITC esA-11ctn a. 1 1 _ 1 1 '41 g _______ r____J1 , o__tux c 1 , ,1 c.., ..., t 2 .i.71. --- 7,t -3? t \3 clf b , m r Z CI a- Z oto v 1" �Y t ( ! o n o o f - O O I f____.__ _.__._______ !C; ic. i -s c e; ? . , 11. Ci) 17 9 , ), %I t , ,,, _.0 Ii 3 . . . . . ,_• ... _ . . ___ .. . - . _..„ •— ... . _ , _,„_,„..., ,,._ __-- . -•....- . ,. , . . _ - _ , . ,,. f los Imiacr--v-uo° . CHITECTURE+ppss . .. : , . -..„ , AR ,PLAIZN 1: I -Pir)51/1 (nAINer-- .r-evuf - -) . .,,, tztaitu i t-i-:1-0 • IC 1' .01 1 . .. f 1 ka-fo5-1 AO --Z i III' .,-----'"-•74 10/4-1 ., ile.... pdle.-,. I , , . •I' ', ' , ' , -.,, .,-1----= I 11 1 I 1 1 , .111 Mt tilis A:A::I tn.,in,:tHs S. tt W9101924 4,13 tr1 9161•::4 c III . _ .. ,. __ 900 r Wan -,. 3,232., i , I , . .,. _ I i ___ _, plip111."""-- 'fill.- t4454TAk -4:., .., ee 77 ...n...-', -.c--...r-d Den ,133,..c.,,t;4e,:L1..1;:net_<,,f,. :::• . t 3 andes : 6-Ri :1' • . ,, . stem net 5,6 ARCHITECTURAL ENGINEE,' ,.. , . . • lfe, - . 1 Ici)b-1 _ - DESIGN GROUP,INC.•11 ..".....r.-....: f .. 11 n F 6-2 , - 106:1 - 8— CI 106-21 , . . t et)41"19251"'PK'S OPOLL, . 'tt.. ' 1 - t I I C'-----' C I 1 • t P"' O ILL)PAWNER/SET CO 114613 PERMIT SET •-"- -I 0 ti• t 106-1'(>334 .. , . -,..,.. ,.. It 1 106-21 , J 0 • ,s1 1 '5 , 1 f., I — pkr . ... , , g . ....r., ,., 106-21 ws- - - 4,? ,,,:a— ., - . --i- , ..•'. 1 ON RODE 1 4 4 --,,-, , UTE CITY BUILDI.k .1 ELECTIONS . 1 , .„...., . , 3 4' .-• '...--!..7 .' .' :WZ:tAtit 'KN. t.... c----A-rrtv.-1 501 E.HOUR AVE LINO-2.2T ., t ARON.(LLAMADO rt•i'" t- •,. L. e.1-11- . - 1 i MAIN LEVEL POWER PLAN -' .- 4. 1101 SCALE 1;e. -tr • , - L'‘'.:•!, ..al re)ljj"t'. ebtaideS ikzist-tc....,- Do riek- •,.', , 0,6, Ci c..907F,01..- ii.c..r..kss. (3 . , 1 NOP 5•ENERAL NOTES MEM ret3 21311.02 ''i ' I I ; KEY I A. ALL 001516119 SI WI.ES MIRED AFFAIR CF OT31126 , ' 1 VALLE LOGAL 066TCHMS A/0 CIRan11312 TO LOGAI_ 1,, 1 AREA LISHTIN9 CIRCUIT. ME(--'- ''"k'''' L 36 06)21 PROVIDE WRPAGE VOAT, D. occur/WC(M2EGIR.MALL sin-cies TO DE SIREITED 2•030.21,STEEL PLDSMOLD WANTED TO 6/ALL APcniE GOLNTER TOP.PLOSPOLD SHALL TIE LEERAID ILS-20-69A-X-12 OR WATTSTOPPER LINE VOLTA6E,GVAL-TECH MODEL 1213-I00 SERJES,FROERA6MED TO FtARJAL-al.12-24111716 OFF,UON. .1., MAIN LEVEL LIGHTINGA!t; t G. C Cl':(NC EGVAL.VERIFY FINIS.I COLOR AND L/3110110 ICW.DED KIM ARCHITECT PRJOR TO FtRLHASE.EG SHALL COORDINATE OLDS-612MT OCCAPAItttY MRSONS TO DE POWER PIAN 144.1131103330 LINE VOLTAC OHALTEC41. . .1 HOLNTINO 1004,1106 06116 301E 61116121.MODEL 121-355 SERIES, , -•' ARCHIEGTURALM1U2OIRK DRAM-105 PRIOR PPOSRARS-00 TO ALITO-OH 30-KMITE 633. TO R03E01-013. LON.6530011 0354.1.1.PASS THROSSO ,t' t t 060-P.4.461'SENSOR AYEAD OF MANVAL 2. 30 5014.11 RELOCATE ei SECTION OP CONTROL To ALL.C.9 FOR 011/033 CONTROL 'it t EXISTINS TRAGIC TO THIS LOCATION. ovERRIDE CAPASILITf. E 1 I 0 1 ', i.6003000003AMINO OF TIRACK HEADS POD 00930 0301019 ESTALLAllON. ,t, t 1 0 2215 EMAT,Matf ,',t1 1 ne etensn ea too ear MAA/C3,,Is Ar....Vad. i ITAIF'Z'VIWZILT4,-,46-1.7", ; r.,....M`TiVAMTPZIVF,I1 ir . .. _.. _ . ..;. 1 ; -.-..-• ---- ; I --r T .; • -1 c T {' e . .. • , . 1 I . t ; - 2 I 1 11 ----- e., .4., L '3 '''. I . i?.. I C_ -- - -- _ __ __ ____ 13 _ Al . /--, rpTINIFERENC -i i 205-11 I J I /Th I i ——I- ---ii_j rioil -- _ 1 BA 0 -----,\3 TH I i , — I 1 ...c;-5411 )0 F I -77 ' :7' II 0 q2 —.g2 Jigx.2 _ ,' MAIN WORKSPACE I CI_ST I I . I_ I 2cn I E.. 205 Y, 205-I p. . , 11 ; i, 1 1 ;•...----,1 -11 __I F WORKSPACE II - .-L (;171:1 i11111 7 11 D I i .). ,-----. .----. ? (. 1 ) t 2) 3..) (\4/) i, -..'. 1'UPPER LEVEL LIGHTING PLAN. I .. scot,14. V Ir ( I,I 1 r 1 1., I OithFria% PC.71 1. . 1 i k i t . el. Go-Tv ce -vtAteP-Ps-5 "ro • a i 0 1.-riagvur() f3-1° Pe-0- vlowc-4- ie Dp(rpr e.n..3...reC7r,0 1-) -1.115)0 2 1 ANSSQ0A .0.01010VC,T101.2 FP.MA 1 4 gol--roc-% vm 8 PA-t-6 loco -co t75- , fi• pfs-rP, copliv-o-v0P-- i 3 ' i- corrTikp,- la-c,arps ratt-rr - opot-gcrt 1 -tz) P ITC° c,0isr-re-Duir9--- 0.4 ,lor-c,e' I Eip 1 i .. ... .. .. ' ' ''' ' „ --_. . - . . , ______ .• _ - - ____ ._ - _ ... . , . - _.--, . . . . , i.---, I t, LI' S ARCHITECTURE+PLANNING ti 1 ; ; - ------— --— -- - T— I . t 1 ( ) -._.... i 1 . . ,.._..., ..__, , <2120E.-10 i 4 01 1341 LI.1111111 WM i lllll 144 11:11 B )----- ___ __i---_—-—- f B) 41,gia I 921"31 VI 9/5,910/S10 -- -------- I I ! 4 C1311W., 4 1 0 , ID) I-4-1 1.2,s5T1 1 ,900 0Walee Street.Suite 1.4350 - i DeNver.Co'orado 80202 ) 1-I_p E , 301.9961014 VOiCE 1' — d I C,C .-7i 15 i -- — aettelignEaedesisn-int.ccm 4‘...- .1 % v.,,,w,LoJe4I5n-Iln.corn ' 1 ,,,_ ARCHITECTURAL ENGINEERING i LT -r - i Pi I c:... i , DESIGN GROUP,INC. I i 0'50V1-'. I H2c*.-si _wo __225,42-ji ., L .i BATH, 1 QC I'l 1 4'44'47- - , ! 41.2os-m_ I zoil i q I i II 0 ...- 1 I lY•1 , I ___-%. i .1 71 iG CLST I • MAIN WORKSPACE 1 , ; I I I I I Hite CD 11.11-15 rROGR.R.:s SET .,.- g. CO Il-ISIS TERMITEET '-' i ,. I ' 2053 ,---L.7,1 FLEX WORKSPACE 1 -,.=_, , 1 203 1 .CTI I 1/CO PAM.'206 lit ill 1 I 11 : 41___.ji 1 I -, I 1 I 1 1 I_ tii 5ITOV I , ..),,.0. 1_41205-5 0 •-io::,T2o5-1 R14 - -- 1 1 ,---..„ •• ''' ,--, r 1 I I • 0 'I I I i I I i - . I i •--I---, i ,.--- .---1-- ..__ ) t 3 ; I 4 t ,..__, 2 I UPPER LEVEL POWER PLAN no; SCALIA".r-o• i, t UTE CITY BUILDING ELECTIONS OFFICES 4' KEYNOTE LEGEND 6ENERAL NOTEE, cm E NYMAN AVE.UNIT.!,35 .) KEY A. ALL EAT SIGNS WALL IDE KREP AHEAD Or ASTEN,COLORADO VALLE LOCAL SATCHELS 14.427 CORCLATED TO LOCAL I 0 AREA LIGHTING LIRGUIT. i L 1J10 VOLTAGE TEERHOSTAT SUPPLIED BY G. OGORANLY 52I0OR HALL SVITTLIES TODD VECW,HICAL CONTRACTOR INSTALLED BY HATTSTOPPER LE,0 VOLTAGE,SEAL-TELLL CO.COORDINATE EXALT REGUIREMENTS WM VOL/SI.DA-100 SERIES,PFtpeRAM.co To 1.1C-PRIORI TO INSTALLATION. HAMJAL-4241,12-1411.RE OFR,TON. L. CEILING-MOUNT OCC/PA/SOY SET/SO/SD To NE HALTSTOFES2 UTE VOLTA6E.CVAL-TECN SIN/SLE CIRCA;140093_01-555 SERIES, t PROGRAM-02 TO A.110-0,4„3041IUTE OFF, NOR CIRCUIT ONALL PASO T419490011 CKGI.PANC.T SENSOR AYEAD Of KARIN_ CONTROL TO ALLOSI FOR ONIC47 CONTROL OVERRIPE CAPABILITY. ano•-•-•-•-•-' '''''''''''"" '".".. " i .--- I • & 29 CISC-TJ C etik.U&Ve•el S - 0 ! PVY2610 FLttN 0 1 P445... Mint ha, IIII0 1 2 , 1 coo-70-ov vo.ocras. Goo/el.-1%0A) 21511.e.1 W,CHLE Ft'1)54L' leVe5kD .... LITC4111.4c-4,4a • l '-eltz-vi 0 UITER LEVEL LIGHTING i AND POWER PLAN Ft' - /ims from> E201 . 4 I I c.:,--q-i, cix-v-r&DL-p.oc-,ass 4701,--na .201 ,L.1,1,0,0111, V1.11100.000.00,000110. rigiill‘;'..""N.30E1.::AFFATTEZT, - , I-- Request t: Request for Information 001 ii'CI _ { . i . Detailed,RFIs Grouped by RFI Number ,- Constructors,Inc. , i Pitkin County Lite City Building Remodel Project# 10-15-058 FCI Constructors,Inc.-GJ t: 530 E. Main Street,Aspen,CO 81611 Tel: tbd Fax:.970-434-7583 RFI#: 001 Date Created: 1/712016 Answer Company Answered By Author Company Authored By Poss Architecture&Planning Joel Harries FCI Constructors, Inc.-GJ Tyler Volkmann i. 605 E. Main Street P.O.Box 1767 is Aspen, CO 81611 Grand Junction,CO 81502 i Co-Respondent Author RFI Number I. t� .. i t Subject Discipline Category i. Dedicated Circuits,For Machine Locations Electrical Clarification G Cc: Company Name. Contact Name Copies Notes ECI Constructors,Inc.-GJ Brady Blackmer 1 FCI Constructors,Inc.-GJ Charlie Evernham 1 t t FCI Constructors,Inc.-GJ Eric Sander-Cederlof 1 Poss Architecture&Planning Richard de Campo 1 }•: Integrated Construction Solutions Bruce Flynn 1 I Question Date Required: 1/14/2016 Per the attached email correspondence,3 receptacles for the projectneed to be powered from dedicated circuits.Those 3 i. receptacles include the 2 receptacles at Secure.Storage 102 thatare noted for"PRINTER',plus 1 receptacle that will be l used for a scanner. It does not appear that the electrical drawings call-out which receptacle needs to be dedicated the scanner.Please clarify that item.Once that is clarified,FCI will proceed with this change.Please advise if unacceptable. Suggestion I, Answer Date Answered: Poss agrees with the decision. See attached drawing E101 for revised outlet locations. Electrical has also l agreed with the changes. Joel Harries, 01-08-16 i i i r i. i' Prolog Manager Printed on: 1/7/2016 FCI PM Data Page 1 } } From:Bruce Flynn [mailto:bruce@integratedconstructionsolutions.com) Sent:Tuesday,January 5,2016 11:14 AM To:Joel Harries<jharries@billposs.com>;Kit Davidson<kdavidson@aedesign-inc.com>;Bryan Jass<bjass@aedesign- inc.com>;Brady Blackmer<BBlackmer@fciol.com> Cc:Bill Mast(william.mast@pitkincounty.com)<william.mast@pitkincounty.com>; Kelly McNicholas <kelly.mcnicholas@pitkincounty.com>;Jim Raff<jraffcc@gmail.com>; David Detwiler <dave@integratedconstructionsolutions.corn> Subject:dedicated circuits for machine locations at lower level Ute City bldg Poss and FCI team: We were advised in meeting yesterday that the 3 outlets shown for printers/scanners at Ute City should be on dedicated circuits if reasonable as critical infrastructure during elections processing events. Can you advise all if this is possible given limits to elec service in this space. Thx Bruce Flynn Principal,AIA, LEED AP Integrated Construction Solutions 303.870.6492 1 -, —- .. ...__ ,... , _... . ..... P ci (A g 1_ P • st t i t It i,E) c • A ,i P fa 11) 1.... I i t 1 _ _ . _ _. ___. li t..... -J d 1 ...... • PO 1 ,E- __,___ 0 —_ v V 1 r 0 pa. il ..,.....:_)- r- H.1 z 1 - 4 _ _ _ 1 c.. V.. c3 5 5 n z ,...... 6 ,c_,.. 17- = ' 1 i . c., 1,- 11) 3 (--\ L.'j .1) ..... _E _ _ 2 F - 4> .7c 1 — 2 Z g i 1 ,k.., , ., Ago 0 i,•:...,, El) ..11) ti. `...) i 2 2 2 ! •piminimimmiumummim 1 1 -"t, oil- 8 a t.... If II l ...•'.. 0 1 (V Q I fl 0 ..... 4. 2 1- 2 2 - e 1t1 (4 3 A de .now i 9 "W'WO vo 03 3 Inalw mmo AI! fl f Pg L 1 Ey r LZ17 • 1 .--. tt cs tii, ' T ;V PCEL�PIAIU+'' -P-a.pi niu,Nie-e-- t-tivuff-7---) . ,, P8,► 1 4.49 , IC ------ 11 in. • ill i ---`--- `{ --. , i ___.„,..6_ s� i1 i I. 1f 106-9 I.... �� (1 I Ilk THESE 3 OUTLETS „„ 1, -, � 1 3, J ON DEDICATED ua,,,vR,r„> Uc�,Jtan `t' .c,�. V ; gam, ( TS EACH 01.05.16 -= „ u�es, < 1:I i.Lr''''4"'' ' L jri 9T^ arms 3, ii-41 i E,1-l�' .ed k r.,-58 '• ' ARCHITECTURAL ENGIN 1 !i Imo, ---1ADD PRINTER DESIGN GROUP INc 1, 'tc ( D. . . OUTLET THIS �,,, cl - 10 -11 to t LOCATION n rt _k o t X71 . i i .; 1 1 I . ,ss.-a. iL f 1 .® A-, CO 11.11.15 PRUORFS I I A CD 111615 PERUIITEE”` 0 . STI 10641,15 ": I ( '..1,134 - „ t 5 1. 06-71 I 0 (E) 106-71 g, ;f' 4 g 106-71 A ,�;.la P, .905' '11;4,4/ (E1 PS'T '• .. Q off RccP ' I t.:1. kce'.� -t UTE CITY 13UILDf 1 I EtECTfO{�S OFFf. i. • I -*-7-'-'-'• � :.N �._. I 04 A_r ` 501 E.NI3UN AVE.user N �{�i./J�Pj� R-� .i`PLV,COLORADO til 1 I MAIN LEVEL POWER PLAN I 1,1,8 5C,,,T,;.•_1W I 6 ` re '6-t✓iGeeS i. 0.6... CI C,.91.)-rr O D KEYN�T LEGEND 6EIERAL MOTES emu r1,) �_ KEY1531161 } VAL1.E A. ALL DLT 51635 WALL EE.COT NEAR OF DOME LOCAL Sh1TG&IN6 AND CIRCUITED TO LOCAL UTE Cat()MCC 0°73. o AREA U CIRCT. e I. EG 55W1 PROVIDE' OCE M0.hT. D. OGGIs'NGY�_ETOOR HALL O 1TGFv5 TO DE MOW '• t Fr[L�'_') 7-CIROIOT.STEM FLOE/MOLD Hi.M®TO SV�Ti5TOPPER LLL VOLTPA.DUAL-,[t,4 WALL ABOVE RALE/LOUVER TOP.PLUSHOIO MTDA DW-100 INE VO,TADS,DNr'ED TO < j 511AL1. LE6RAt1J eA-7O GCA-x-I1,OR N1M111/Al.-CA.17-11111/1E OFF VON. MAIN LEVEL LIGHTING.�'wa1 KUAL VERIFY A FlHITECT RIO TO LEv6755 DE PG\VF.R PLAN :1' ���� NEEDEDRRG4tA NTH ARCHITECT PRIOR TO C. F ATT.T�L CL AEe, 1ECH (`J' RIRGHASE.EG SHALL COORDINATE JSa34.E CIRCUIT.MOOR O-065:�tIFS, �f A ON+6 LOCATION WITH ARGHaE H-IH. A'1L1190RK DRAH PRIOR PR06RA OT E TO AUTO-011 30-MR�JTE OFF. {.. TO ROUSH-RL OC CARO/1r 9W1 PASS T,•OFMAT OCCUPANCY 5QEOR FORAD OF ELIAL �. 2. EG SHALL RELOCATE T 6.5EGT.GV OF CONTRUA.TO ALLOW TOR ON/CFF CONTROL : ; EXISTING TRACK TO TH15 LOCATION. OVERRIDE GMA911.I1Y. 1)1I 1 COORDINATE AMOK OF TRACK NEAPS KIN I ONI,ER gFi79 INSTALLATION. I � 01015 Me%rt"iil ,;,c `^��. Erriu,ra�ic."Ma artx`m . SGNI�IpiC33���,4, •, I Cl.%,(Y%�nYF i➢ 6 u 1, � t elFC Constructors,Inc. Detailed, Grouped by Each Number(w/Arch,and Owner Approve° Pitkin County-Ute City Building Remodel Project# 10-15-058 FCI Constructors,Inc.-GJ 530 E.Main Street,Aspen,CO 81611 Tel: tbd Fax: 970-434-7583 _ 4th. A,cess 'es clic p a ;Category Reference PCCO Number - Change Order Request attached pricing back-up,attached overview sketch Notes This COR developed to incorporate an access control system into the Ute City Building temporary Elections Office's.Access control system to be added as follows: -Vanderbilt brand system with controller and reader boards -Electric strike/card reader access control at the following doors(4 doors total):entry door from main lobby into Main Workspace 101,door between 101 and Secure Storage 102,door between 101 and Election Processing 103,entry door from upstairs corridor into Main Workspace 201 (reference the attached overview) -Electrified cabinet locks/card reader access control for the storage cabinet at Main Workspace 101 (5 cabinet doors total) -All wiring,equipment boxes,programming,and training for the access control system EXCLUSIONS,QUALIFICATIONS,CLARIFICATIONS 1.)Pricing includes the supply and install of 2 new storeroom locksets for the existing main doors into each unit.These existing doors do not have storeroom function locksets and need to be replaced to work with the electric strikes being added. 2.)Pricing does not include cabinet locks for the owner's cabinet units that will be relocated from the existing Elections Office and installed at the west walls of Election Processing 103.It is assumed that the keypad locks currently installed on these existing cabinets will remain. 3.)Costs for raceways and backboxes for the access control system is not included in this COR.That pricing is lumped into Durgin Electric's pricing for the added low-volt/data installations(reference COR-002). !' 4.)Costs for a 20N120V circuit for the access control system controller is not included in this COR.That pricing is lumped into Durgin Electric's pricing for the added low-volt/data installations(reference COR-002). 5.)An interface between the access control system and the fire alarm system is not included as it is assumed not to be needed. 6.)A credit is included in this COR for the allowance FCI was carrying in the GMP for keypad locksets for access control(keypad locksets no longer required). "'The cabinet at 101 that is planned to receive electrified locks and 5 card readers for the 5 door cabinet.However,this could be revised to have the electrified locks operate off of a single card reader.Please advise if this is a revision that is wanted. Itemized Details: General Description Quote Recd Proposed Current Solutions $15,044.00 Description of Work: Supply and install Vanderbilt access control system at Ute City Building temporary Elections Office's.Access control system to be added as follows: -Vanderbilt brand system with controller and reader boards -Electric strike/card reader access control at the following doors(4 doors total):entry door from main lobby into Main Workspace 101,door between 101 and Secure Storage 102,door between 101 and Election Processing 103,entry door from upstairs corridor into Main Workspace 201 (reference the attached overview) -Electrified cabinet Icoks/card reader access control for the storage cabinet at Main Workspace 101 (5 cabinet doors total) -All wiring,equipment boxes,programming,and training FCI Constructors,Inc.-GJ $787.00 This proposal indudes work clearly itemized herein and attached sub-contractor quotes Should delivery of materials effected by this change delay the work,time extension and General Conditions cost rights are reserved The right to cumulative impact costs is reserved This proposal is good for seven days from date of issuance Prolog Manager Printed on: 1/11/2016 fci pm data Page 1 COR Report •I FC I Detailed, Grouped by Each Number(w/Arch,and Owner Constructors.Inc. Approval) Description of Work: Supply(2)additional storeroom function locksets for the entry door from main lobby into Main Workspace 101 and entry door from upstairs corridor into Main Workspace 201 (these locksets to be installed into existing doors).New storeroom locksets required to function with added electric strikes/card readers at these doors. Material:$517 Labor to Install:6 hours @$45/hr.=$270 tl FCI Constructors,Inc.-GJ ($1,600.00) Description of Work: Credit for keypad lockset allowance carried in the GMP. FCI Constructors,Inc.-GJ $14.00 Description of Work: Builders Risk Insurance FCI Constructors,Inc.-GJ $71.00 Description of Work: General Liability FCI Constructors,Inc.-GJ $115.00 Description of Work: Bond FCI Constructors,Inc.-GJ $1,154.00 Description of Work: Fee Requested Days: 0 f_ Total Change:$15,585.00 Architect Approval: Owner Approval: Date: Date: � —� (4, Prolog Manager Printed on: 1/11/2016 fci pm data Page 2 • -^- '--~--~_....^ --~---______---_ _------___--.....-' --^ --~~ ____--_----~---~------~ -~-~----------�'-----�-'-- i -- ' i ... at L " 'Grand Junction,CO 81504, ' . -Reference:Lite City Building _, t : '''''' 0urrni'Solutions proposes to provide the following Vanderbilt equipment for the Elections Space. i � ~z�/�f ndtra�i ..�` � ^�- -'i`� . � ' ` 'Cost break | � r° ^ �^ " $S81 :2" - : -' -'r.We at Current Solutions appreciate yoUr business and will do everything,,-06" ible-,..to.,9purp iopi. unending t. | | 2700 N. FREEWAY PHONE: (719)543-3124 PUEBLO, CO 81003 (800)215-7614 Gliffi IC KIN NI EY FAX: (719)543-1921 DOOR & HARDWARE TRANSIT MIX DOOR COLORADO STATE SAFE&LOCK (719)475-0100 (719)634-7233 Cob Springs(719)545-7233 Pueblo 01-11-16 Brady Blackmer FCI Constructors 3070 I-70B Bldg A Grand Jctn, CO 81504 RE: Aspen Ute City Bldg —Added 2 Storage Function Locks Brady Per our conversation today 2 additional storage function locksets are needed. Please see the cost add below: 2 ea—28-65G04KL US26D Sargent Storage Function Locks-$ 462.00 (taxes not included) • $ 231.00 each lock including keying the locks alike to the others and shipping costs The locks were ordered this morning and should be delivered to the jobsite beginning to middle of next week. Please contact me with any questions. thanks Thanks $462.00 x 12% self-perform fee = Isaac Benavidez $517.44 Project Manager CONTRACT BUILDERS HARDWARE STEELCRAFT HOLLOW METAL SCHLAGE, BEST,YALE WOOD DOORS posy ��=m uz it: -- — ---- • Doan SCHEDULE It NDWA¢C 16:IITIFOiilh•{IPlF7ahlaII E ¢WP I� I R ' ® SDR wnavARc ] ro ncr o0aniansLr H ,11 ,-- 1 f 1 NMIt IODDR'MEI WM. 1-M[WNi TMIERNCS�fGVEIVPC EIA¢DwA¢E IINxa14W,O¢WI DOES 1-MEADER TRACKER I -. - OSI POCAEI 3%. TO 1.4. M SaTW,v,.to, 'IQUD�•CGYCN vCNCFA-NIDR�W EDY65ib3..ZliSR1uL 1-¢AN MAxO[¢f LL g I nNy,, PERM DOOR NOCK IDNNSDN baRPNON*ROAMOEDUAI 1,COMPPAIRS C V �� i ] RDNWP ND' ]7,14. Sn .,,,,,",,,,,R.Ava M1l4S� ReOWLIF.DrtACn�dfOi laFDMmbUC¢u 1.OURPCR H�. q� . ] SN ]b-� SAII4111CPu A �mio WlanWM. 1C..k. . 0 � � -�T"�IOtC UN0.5KCSpCCRNDIA..tOC3RS1pLCIRAIS — 1•]aNB STDp SC ]•CND MACROS � I t !.r— OP.!.MO6 gPINION xp[ Yx[wi Yll work.SNDEIYDl[DN LNAt ¢•EASE PLAID R Ib 2 . : rnO 7RGCIDC 1 MO 4 . @� MORTISE PIMPS San 2.SuNeERsuurNORM.70P Acton= ., ;if. Ltl (7\ z ?bIP&4KIDED •.v..v.. m.u.uu... r N I ,INET- ACCESS CONTROLLEDO Q ( " -"y'a-�I®-pT 4AUE � READERS(S WOR I 5 O MAIN LEVEL EGRESS PLAN SUIMMEcOPPRO KED CASEWORK i! „•2-r stxwsz _ a11 I, STRIKE MD `°."' III '�',V I aT onws �. _-`R-------"'--'1 '�1 I E ETORADE7.4 KROH T..n 44411/4 1 WKSRr,... III �I J Q _ - KHOK✓m¢•DY I Q j ,ANNMOROSPACF NaNx 1 a.m �'� [ar.Tma Iwly R:rumwor A I M r]r-aArn raR A udTaODNIMcut ...._�, D rEAD y <ID c 11 `a�`m�r�'7:212' :.D �y - L� NA rave.,tr m CO Til wm °' li 14.1.4 PROMADOST4 Dao¢MHRSC -R' / D,mNw- 1 22 CD il.lo 5 n[Nn>CT 11 SEr tlr tIJ{ V SII'-� IS P. O , E%hATMG OFFICE WAGE PC. MN Tmc4i1oNssTrN°e vao ' . ftroPI Z 4 ELECTION PEODEDDNO . DA¢DUaA 1 RAMC C W.iix6flWt 1 - e- _I20200-0 �..n.vl rats✓ UTE CITY BUILDING - 77 .. •261ER PROVIDED, MI CAB2TET3•NO D ELECTIONS OFFICES e�wse I b1 89 EmtaNAVEt.Wr la. ^�^ um �___ I WNTROIIsn •, N 4 OCRS ENDED - 6rC.44tlOGRl I' J � vs�rurn01cn can 7+ I 121 1 D`arNu`msr:,,irtn I 5 ras umDu+ 1 (7-) • I I nN 0 O O O W102I. ® MAIN LEVEL DEMO FLOOR PLAN LEGEND e MAIN LEVEL PROPOSED FLOOR PLAN Rte,, { a•la. o «... S POMO NAW C= MAIN LEVEL POST=OENDruUa S.PROPOSED FLOOR P1A.NS ± 7 m aAEcw¢¢CArex'7 A101 O.2122321.. A 79y 1 • I 1 :.. ....�.--. -. ,-, i 1: poss , ,..,,c,,,E„.„„..PIASISINil 11 'I r•--;.. . 1•A 'a'1,..S''''' . .1 't 1 rratr -I ODOR 5000D0I.0 0100W It -..,— pAniforami GROUP . h VON MO 1 I.PASSACERIMMONCYLINCMCAL 1.001C trzlA4 H-9 ,..: INIMIZTV rT,n____ 1,...,1N.00:LW:CI 7...T.I mE,C,..mi THT001.:s5£11Aserrot Flaim:vralin,E, 12EliA.TMICIE00‘Ur.M.,OTE.S ,..r. v.,____. 1 rw1151.1 3•MOUISI MK. I.BASUOAROSTO. 2•50.EKUIS ILEA,FLOE TOP 6 00Wto.0 I ill I 1 ..i.‘ ----i" A.-1W; --j-..6.---r,,— ,,,,.. —7,, , -7,-----1—£.40700E1000WIIINIFATOWADKCCESSIIKEVAAOWARCTOXAMIPASSACISEIVTOBEFO,V,---. • I .IM MIK w1111 WO WALLS,SAIRGEM ilbte UNL CREW. ,. , 4.0•MI 1 Mi. 1 . . . . 01000100000000.1 1000000 I21 .Kaaasaaares9aaMATH M 003r%EGHT 0RAM ! NRDYAPC FCERAMMCI NOTES T_ A 0010 0500 ,CAO MI MA AETALMOONfUME,WRAPGYP011OCMADAtJAMSAWTCAT WOL.RAMC 1 11412.a MO=5441.00100 00000 0000 a MED TV 550 we. ix • WA OACIAL WINDOW MAME MAP OP 011 MOAN AT JAWS MID MEAD AMMON/fliii.ii 49. UPPER LEVEL EGRESS PLAN ii.vr lc 3'1,400 Stu MIN 1/A•MEVLAL . i' ......". o C) ® 0 • 0 „ ‘il. 39,3, ! T in tanti.PArSMITIALAET ,. . 4 •• CV iaa.aa likOcAtion, I. j• 10,9 I 4.. 17...7 OP , ELECTFICI .4, ., al I 143.il anotakaa an I,•Van ma GMICT0 • I • Co 11.11.1.ttIMarsOustA4SW NEW Cr 11.1011000041000 1,1 I 0I ---•.4. 00 I _ __... _ sttpMRWm1, =rm. ..., , PK QAT. , 1 0 . 0 0 —0 : —"siat sm.1.1.ix st ! 1 'CI •• ii, 0 i , • •• I% AACC'"ram.'""2‘011:4. o s• ..... ,... .. ,,..1,11„1,...,.,2,.,, , • norra Yar.,.a.am lam A '."7..... • ,o. '„:,. ..Z.,7.../...T t? 0 ..e.. EMS= .,r:..j°•tt."sis-•se Ks=.-0-.41I-ac'2_'.a,Ar,;1( e 0a.taA.sOM.aCKnAAiTaT.te,. [, _—.01tmtnue..le.lr.nn.t•i..,,,j"Z...1t•.,0 ,.I1CinCkUo.nS,I TMMAN Vl 1'=' 'EIKm".CKEC0r,1.00„0‘-•d•-1„A7,nA,0„a,te'.re.. OFCESPCE 0, j 0e000 06000r,Ae, /210 z..1,.1a1iA1. '—1l1‘„0,1I,,71IUm'ylh1i,lFi r ill1•,1 ‘'•,d'1M—.„,'b8.i'••KDMO-A¢c•-au-,--...,,.;, IC) AiUeVlTLMEIMaCAti.l.IwTA.Yn,D i NBtnUtI•ILDING , zt — ELECTIONS OFFICES - u , ..: ,. •ei.-,3”r Am KA KL/A•2,r. .. [3.1./ r., -'.. 1114A171.51. anT • c .v \-..elf =XX, 0 \ m../ `4 ---' 4 lazu . RIX WORIORAC,a . L [I \-ML•a••LON NALL = 1 ' E-] , I V 5vIr 0 0 0 I- . 1 ' Mr- 1 I I 4 DM Dv G anon Iv.,vax. cost.CetUal I 0 t ...As 1 . , -I—- .—e 0 ' \. ,. ,1 , ,In. I L3,n• arm ARM rOOTPItsa MOs.r. mar. Iillict i1 1 I I ... 21. . g 0 (j) CS 0 0 0 0 0 UPPER LEVEL DEMO I. LEGEND £.intOtrasala 00000 MANS icv TAWS =I 0 UPPER LEVEL DEMO FLOOR PLAN '''''''''''' = 1CD UPPER LEVEL PROPOSED FLOOR.PLAN rem Cm"was.tA 0 A201 0005000 1.0041 0 .••••••••• i A.:-.. a£Starloa KA=/=:;= 0000I5.1,1===.... ir,,,,,,,,,..7.4*-•ig:—,...7M--- . li . . • i . , —,.,................ .I . . ti • FC I COR-005 l Constructors,Inc. Detailed, Grouped by Each Number(w/Arch,and Owner Approval) jfrOL/e Yr l Pitkin County-Ute City Building Remodel Project# 10-15-058 FCI Constructors,Inc.-GJ 530 E.Main Street,Aspen,CO 81611 Tel: tbd Fax: 970-434-7583 _ X11 tit f rir ~ 6.2= [ A+ r ( l Category Reference PCCO Number Change Order Request attached pricing quote Notes This COR has been developed for additional costs associated with installing the fire sprinkler piping and heads at the upper floor unit 205.Originally it was believed that the landlord was responsible for both the new riser to reach the upper floor and the fire sprinkler coverage for unit 205(that was the assumption made in FCI's GMP estimate).However,it was clarified after the GMP was established that the landlord was responsible for getting the fire riser to the upper floor space only and the County would be responsible to install the fire protection system to provide coverage at unit 205. Itemized Details: €General Descriptiion Quote.Rec d Proposed FCI Constructors,Inc.-GJ $6,500.00 Description of Work: Flame-Out Fire Protection,Inc.:Supply and install fire sprinkler piping and heads to provide proper coverage for unit 205 at the upper floor.This includes design documents and permitting as required. FCI Constructors,Inc.-GJ $7.00 Description of Work: Builders Risk Insurance FCI Constructors,Inc.-GJ $33.00 Description of Work: General Liability FCI Constructors,Inc.-GJ $52.00 Description of Work:Bond FCI Constructors,Inc.-GJ $527.00 Description of Work: Fee Requested Days: 0 Total Change:$7,119.00 Architect Approval: Owner Approval: �'— Date: Date: ( —2-7_COLLICN 1AlYr alp Ei,e4/64j) This proposal includes work dearly itemized herein and attached sub-contractor quotes Should delivery of materials effected by this change delay the work,time extension and General Conditions cost rights are reserved The right to cumulative impact costs is reserved This proposal is good for seven days from date of issuance Prolog Manager Printed on: 1/25/2016 fci pm data Page 1 } FLAMEOUT FIRE PROTECTION,Inc. P.O.Box 56 Basalt,CO 81654 Phone(970)927.4933 Fax(970)927-3817 December 8,2015 FCt Constructors. inc. P.O.Box I767 Grand Junction,CO 81502 Attn:Brady RE: lite City Building Tenant Improvement FIRE PROTECTION Fire protection bid is as follows: -Bid price based on plans sent 11/16/15 and walkthrough dated: 1212/15 -Bid pricing for breakout listed below By landlord-Flame-Out F.. 1)Main Fire main piping riser: will bill landlord for this -Drain/recharge existing fire sprinkler system(as needed) ' -Extend existing fire riser main from main level to 2"level -Will need to ultilize existing chase were existing riser main is located -Full access to chase will be needed,chase to be demo'd and reconstructed by others -Cap off piping to accommodate future tenant finish on 2"level Already included in FCI's 2)Main Level: GMP -Drain/recharge fire sprinkler system as needed -Move,extend existing fire sprinklers and piping to accommodate new tenant layout(per plan) -May ultilize flexible drops to accommodate new layout -Install new concealed sprinklers with standard white trim Scope being added via 3)2' Level: COR-005 -Drain/recharge fire sprinkler system as needed -Extend fire sprinkler main and cap off in unit to the south of tenant finish unit and cap off for future fire Sprinkler coverage for 2"level S -Install new fire sprinklers and piping to accommodate tenant finish in 1 unit only on 2"level -Install concealed type sprinklers with standard white trim -2"a level pricing based on no sprinkler coverage for concealed combustible spaces above ceiling,bid plans do not provide this information. See alternate pricing below GENERAL BID CONDTIONS: -installation of new fire sprinklers and piping in existing building unit spaces on areas of construction only 1- -Added fire sprinklers and piping will be an extension off of existing fire sprinkler system. Adequate space and adequate chase areas will be needed(by others) -Bid based sizing additional fire sprinkler system to accommodate future expansion of system to the balance of Building -Fire sprinkler bid based on sprinkler coverage for noncombustible spaces(open or concealed) -Spaces to be sprinkled will need to retain a noncombustible barrier between existing framing/structure and open shell space(ie:sheetrock) -Fire sprinkler system will be installed in accordance with NFPA 13 and local applicable codes -Fire sprinkler system will be designed and calculated by a NICET level 4 designer FIRE PROTECTION Cont... GENERAL BID CONDITIONS Cont... -Sprinkler system will be installed in steel pipe and fittings •Sprinklers will be commercial type pendent,upright,sidewall and concealed type sprinklers(brass/white finish) -Sprinkler system will be a wet type system throughout -Permit/inspections/submittal with fire department -Tests and inspections/parking permits -Installation of all nessacary components for NFPA 13 codes and local codes **NOTE** Bid price is based on main water supply having enough flow and pressure to accommodate system demand(4"service) **NOTE** Alarm systems to be installed by others "*NOTE** A full set ofperinit plans must be provided along with mech.plans,electrical plans,etc. **NOTE** Allow a minimum of 2 weeks for system design and Fire Marshall approval **NOTE** General Contractor must provide builders risk insurance **NOTE** A pre installation meeting will be required with the G.C.and other subcontractors for coordination **NOTE** For proper fire sprinkler installation,sprinkler piping may have to pass through steel beams or micro- lams,if piping can not pass through steel or micro lams,adequate soffits or drop ceilings will be furnished to insure proper sprinkler installation and coverage **NOTE**An adequate sized floor drain will be needed in fire sprinkler equipment room **NOTE**Sprinkler layout are NFPA 13 and Fire Marshall approval,any deviation from this may be a change order **NOTE**ALL AREAS OF WORK MUST BE ACCESSIBLE AT ALL TIMES DURING NORMAL WORK HOURS **NOTE**BID PRICING DOES NOT INCLUDE ANY UPSIZING OF THE EXISTING FIRE SPRINKLER SYSTEM OR 4"WATER SERVICE COMING INTO BUILDING. Final determination of any fire main upsizing may be found during fire sprinkler design. At the preliminary site visit and survey we could not determine if upsizing would be needed EXCLUSIONS: -NO FIRE SPRINKLER WORK IN ANY OTHER PORTION OF BUILDING OR IN COMMOM AREAS -No electric or low voltage wiring -No exterior or interior audible!visual notification devices,electrical devices or alarm systems of any kind -No fire extinguishers -NO CONCRETE CORE DRILLING OF CUTTING,NO CUTTING OF STEEL FRAMING OF ANY KIND,NO PATCHING OF SHEETROCK,CONCRETE,BLOCK/BRICK WALLS,Etc. -No installation of bent sensors or smoke detectors -No installation of alarms systems of any kind to include:hand pull stations and system monitoring -No outside work -NO FREEZE PROTECTION OF ANY KIND -NO TENANT FINISH INCLUDED IN BID(other than stated above) -NO DEMO WORK OF ANY KIND -No movement of existing fire sprinkler piping in main building to accommodate other trades -No water storage tanks or fire booster pump -NO PROTECTION OF PROPERTY OR MOVING OF FURNITURE,etc. -NO PROTECTION OF EXISTING FINISHES -No fire proofing or caulking **NOTE** FLAMEOUT FIRE PROTECTION RESERVES THE RIGHT TO ADJUST THE FIRE SPRINKLER BID DUE TO ANY UNFORESEEN CHANGES THE FIRE MARSHALL MAY IMPOSE By landlord -Flame-Out PRICING: will bill landlord for this #1 Fire Main Extension Price: S2,240.00 Already included in FCI's GMP #2 Main Level Pricing: $3,800.00 Scope being added via #3 2"Level Pricing: $6,500.00< COR-005 N/A-coverage for above ceiling spaces not required **BID VALID FOR 36 DAYS** Signed: ,Date: (FCI Constructors,Inc.) i Signed: gri= ,Date: (Flameout Fire Protection,Inc.) 11, ® FC I COR-006 Constructors,Inc. Detailed,Grouped by Each Number(w/Arch,and Owner Approval) COAL LA:)6) ()\-let4 (- Pitkin County-Ute City Building Remodel Project# 10-15-058 FCI Constructors,Inc.-GJ 530 E.Main Street,Aspen,CO 81611 Tel: tbd Fax: 970-434-7583 j1251201fi C ed et ori( )Cas w• k Scope et din.A.a ova Change Order Request attached revised casework quote 1Notes t fi This COR has been developed to provide a credit to the owner for casework scope of work deleted from the project.This includes the deletion of the following: -Work surfaces(desks)at Main Workspace 101 -Work surfaces at(desks)at Main Workspace 201 and associated pony walls(to be wood framed by FCI) k_ . For clarification,the following casework items are still included in FCI's scope of work and are being fabricated and installed as part of this project: -Cabinet unit at the east wall of 101 -Heavy duty shelves at 102 -Cabinet unit at 201 (on the wall as you come into the space) -Shelves at 201(north wall of workspace) Itemized Details: General Descrlptlon ; $ w. Quote Rec'tl _w.` Proposed Osburn&Sons ($10,850.00) Description of Work: Osbum Cabinets&Design:Delete the supply,fabricate,and install of the following casework items: -Work surfaces(desks)at Main Workspace 101 -Work surfaces at(desks)at Main Workspace 201 and associated pony walls(to be wood framed by FCI) Requested Days: 0 Total Change: ($10,850.00) ti Architect Approval: Owner Approval: j -j l� Date: Date: 411 _ 91eVIA4-"L (4A1 Vit/ka-t This proposal includes work dearly itemized herein and attached sub-contractor quotes Should delivery of materials effected by this change delay the work,time extension and General Conditions cost rights are reserved The right to cumulative impact costs is reserved This proposal is good for seven days from date of issuance Prolog Manager Printed on: 1/25/2016 fd pm data Page 1 i. 1 SRT I Pie 'sburn PROPOSAL , j;m1 , CABINETS& DESIGN # `„ ,� exception!Quality Since 1974 PAGE 1 OF 2 e r,_:-r.1•. 6k- -9' ma OSBURN CABINETS &DESIGN 9`?'"WpO°' 682 W.GUNNISON AVE. DATE: January 6,2016 GRAND JUNCTION,CO 81505 THIS PROPOSAL PHONE(970)242-6899 MAY BE WITHDRAWN 1. FAX:(970)243-2341 AFTER 30 DAYS i' I r.. PROJECT QUOTED: Ute City Building Elections Offices ARCHITECT: POSS Architecture&Planning I- t BID DATE: 12/1/15 AWI CERTIFICATIONS: No E DRAWINGS DATED: 11/16/15 , ACKNOWLEDGE ADDENDA#'S: None AWI QCP PROJECT NUMBER: n/a I` SPEC BOOK: None t . ALTERNATE BIDS: None AWI GRADE: Na a t I.. WE HEREBY PROPOSE TO FURNISH MATERIAL,LABOR,TOOLS,AND EQUIPMENT TO FABRICATE,DELIVER AND INSTALL THE FOLLOWING: BASE BID ._. i i White frameless melamine cabinets with PLAM exposed surfaces for the following areas: 1 Main Workspace 101 and Main Workspace 201. i' Osburn custom commercial grade cabinets. #. Blum 110°self-closing hinges,insert hinges. Excludes magnetic catches. € PVC(.018")edgebanding on all shelves and panels. , , PVC(3mm)edgebanding on all doors and drawer fronts. Osburn standard 4"dull chrome pulls. Osburn standard 5mm clear plastic shelf clip with.metal post. t' Excludes cabinet locks. t' ' Excludes PLAM countertops for the following areas: t Main Workspace 101 and Main Workspace 201. d Excludes Mobile Desk'for Main Workspace 201. Excludes FastCap metal SpeedBrace supports. I. Excludes black plastic wire grommets. PLAM storage shelves for Main'Workspace 201.. I. Includes heavy-duty standards and heavy-duty brackets,steel with zinc coating. 1 White melamine storage.shelves for Secure Storage 102. i Includes heavy-duty standards and heavy-duty brackets,steel with zinc coating. Solid wood wall cap and wall cap trim for Main Workplace 201. ► Excludes PLAM pony wails for Main Workspace 101. I Excludes(1)straight wall for plan north desk. i. Excludes(1)L-shaped wall for plan south desk. r Excludes(2)PLAM end panels(modesty panels), 1 for each desk. I Includes one delivery and one installer trip to job site. Please plan accordingly. 1 includes CARB2 compliant particleboard. Excludes MDF and NAUF materials. 4 Y i i t I, i I 1 L�RTIF/FO • •sburn .. -. PROPOSAL ( i \%' CABINETS&DESIGN . •k" exceptional Quality Since 1974 PAGE 2 OF 2 AG s.ir,.,o-k OSBURN CABINETS&DESIGN A6�WoOOstf) 682 W.GUNNISON AVE. DATE: January 6,2016 .. GRAND JUNCTION,CO 81505 THIS PROPOSAL PHONE:(970)242-6899 MAY BE WITHDRAWN FAX:(970)243-2341 AFTER 30 DAYS PROJECT QUOTED: Ute City Building Elections Offices ARCHITECT: POSS Architecture&Planning BID DATE: 1211115 AWI CERTIFICATIONS: No DRAWINGS DATED: 11/16115 ACKNOWLEDGE ADDENDA WS: None AWI OCP PROJECT NUMBER: Na SPEC BOOK: None ALTERNATE BIDS: None AWI GRADE: nla III WE HEREBY PROPOSE TO FURNISH MATERIAL,LABOR,TOOLS,AND EQUIPMENT TO FABRICATE,DELIVER AND INSTALL THE FOLLOWING: BASE BID UNLESS PLAM COLORS HAVE BEEN SPECIFIED,BID PRICE ONLY REFLECTS THE FOLLOWING TYPES OF PLAM FINISHES: WILSONART 40 MATTE&FORMICA-58 MATTE. OSBURN RESERVES THE RIGHT TO UP-DATE THE PRICE OF THE BID IF A DIFFERENT FINISH IS CHOSEN. OTHER LAMINATES.ARE AVAILABLE SUBJECT TO PRICE AND AVAILABILITY GENERAL EXCLUSIONS: ALL VERTICAL TRANSPORTATION OF PRODUCT. GC TO PROVIDE CRANE WHEN APPLIACABLE. BLOCKING AND BACKING PLYWOOD CONSTRUCTION AND BACKER SHEETS FOR ALL PLAM COUNTERTOPS UNLESS SPECIFIED ABOVE. FEEL FREE TO CALL OSBURN ABOUT THESE OUT-DATED DESIGN SPECS FOR PLAM COUNTERTOPS. ALL RUNNING AND STANDING TRIM NOT SPECIFIED ABOVE ALL EXTERIOR MATERIALS AND INSTALLATION STORAGE FACILITIES UPON DELIVERY OF CASEWORK SECURITY OF OSBURN CABINETS&DESIGN PRODUCTS DURING INSTALLATION ALL BONDING .. 11 ALL OTHER TAXES NOT SPECIFIED BELOW F, ALL DEMO WORK NOT LISTED ABOVE. OSBURN CABINETS&DESIGN TO PROVIDE SHOP DRAWINGS.NO FABRICATION SHALL START UNTIL APPROVAL OF SHOP DRAWINGS. ALL ITEMS MANUFACTURED BY OSBURN CABINETS&DESIGN PER PLANS AND SPECIFICATIONS AS INTERPRETED BY OSBURN CABINETS&DESIGN. BASE BID FABRICATION AND DELIVERY: $9,590.00 Casework/Millwork BASE BID FABRICATION/DEUINSTALL: $0.00 Solid Surface TAX AT: 0.00% $0.00 ADD FOR INSTALLATION: + $1,055.00 Casework/Millwork JESSE OSBURN ERIC ROSLING NEW TOTAL: $10,645:00 ORIGINAL CONTRACT AMOUNT: - $21,495.00 CHANGE ORDER AMOUNT: ($10,850.00) . i