Loading...
HomeMy WebLinkAboutbocc.con.amended.241.2015A 7/2015 kjm jiiTKIN Pitkin County CouNT41 Contract Cover Sheet - -- Please complete the Contract Cover Sheet when the contract is completed and signed by Contractor and Pitkin County Project Manager. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments to Procurement (procurement_help@pitkincounty.com).Any contracts$50,000 and over will be routed for signatures to County Manager and Attorney's Office(if required)by Procurement&Contracts Manager. Contract Information Contract Number 241.2015A Project Name Pitkin County Jail Remodel Contractor FCI Constructors,Inc. Budget Line Item ADA Compliant Cell: 110.34.92834.82232 Additional Budget Line Item(s) Fire Suppression System: 110.34.92834.82268 and special notes to Finance Contract Start Date 12/14/2015 Contract End Date 5/31/2016 Automatic Renewal Yes ❑ No- If Construction: Retainage Click here to enter text. If this is a new contractor,please request they complete and submit to Finance a W-9 Form. Contact Information: Department Facilities Project Manager Smith Project Manager 5396 Phone Provide a brief description of the contract: This amendment revises the layout of cell S2 to accommodate recessed prefab shower and revise plumbing fixtures.Added plumbing scope to replace and repair existing plumbing.Add repainting at the main level of the jail. Contract Value Summary: Contract Amount $284,030.00 This Change order/Amendment amount(if applicable) $ 69,710.00 New Contract Total $353,740.000 Procurement Method: None ❑ Informal Formal ❑ Sole Source ❑ Emergency 0 Contract Renewal ❑ Contract Type: Services/Maintenance ❑ Construction ❑ Goods,Equipment, Supplies ❑ Change Order/Amendment ❑ Other,please explain❑ Click here to enter text. NOTE: CLERKS OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE.ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST. Contract#bocc.con.241.2015 Rev. 8.31.11 jaa/js Budget Line Item# 110.34.92834.82232 ‘9frfli1N CouNT CONTRACT AMENDMENT Change Order Number: bocc.con.241.2015A Dated 04-19-2016 OWNER: Pitkin County Jail Remodel 430 E. Main Street Aspen,Colorado 81611 CONTRACTOR: FCI Constructors,Inc. The Pitkin County Jail Remodel Project CM/GC Contract (the "Agreement") dated 12/15/2015 between the Board of County Commissioners of Pitkin County (the "County") and FCI Constructors, Inc. (the "Contractor"), is hereby amended as follows: Description of Change: See attached 1. COR-001,PR-001, Cell S2 Layout Revisions $1,551.00 2. COR-002,PR-002,Plumbing Replacement $33,575.00 3. COR-003,Additional Painting Work $34,584.00 TOTAL THIS CHANGE ORDER $69,710.00 Reason for Changes 1. Revised the layout of cell S2 to accommodate structural requirements for the recessed prefab shower, revised the type and features of the plumbing fixtures (lav/toilet combo and prefab shower), deleted new door at inner side of cell,added new curtain track to provide privacy. 2. Owner requested added plumbing scope to replace and repair existing plumbing conditions per drawings developed by SGM and also based on a field walk between 2H Mechanical and Pitkin County Facilities. 3. Owner requested additional re-painting work at the main level of the jail per site walk with Jodi Smith. Original Contract Price $284,030.00 Previous Change Order applied to Guaranteed Maximum Price: $0.00 Net Increase/Decrease in Contract Price(this change order) $69,710.00 *Total Adjusted Contract Price(including this change order) $353,740.00 This change order extends the time to complete work by NA days. Rev 12/27/10 js Project Coding Original Contract # bocc.con.241.2015 In all other respects the A eement is in full force and effect and remains unchanged by this Ame g nt. I` 4 r /fXe ra.g'•lackme,, FCI Constructors Inc Date Jodi.mith, Facilities Date I_ = 5-7 I/O Jon eacock,County Manager Date *increases over$25,000 and/or 10%(single increase or accumulative)of original contract must have County Manager signature. 2 • FC I COR-001 Constructors,Inc. Detailed,Grouped by Each Number Pitkin County Jail Remodel Project# 10-15-060 FCI Constructors,Inc.-GJ 506 W.Main,Dept J,Aspen,CO 81611 Tel: tbd Fax: 970-434-7583 Category Reference PCCO Number Change Order Request PR-001 +Subcontractor Pricing Notes This change order has been developed to include all costs associated with PR-001,including the following changes: 1.)All plumbing rough-in changes required for relocated lav/toilet combo 2.)All plumbing rough-in changes required for relocated shower 3.)Newly specified lav/toilet unit and revised features for shower unit 4.)Revised layout of CMU walls. 5.)Remove part of existing CMU chase near SW comer of cell to meet ADA opening requirements. 6.)Relocate ductwork in old CMU chase near SW corner of cell. 7.)Supply and install(1)4"floor drain at front of shower. 8.)Supply and install(2)new curtains on ceiling track to provide privacy at the lav/toilet unit and the shower. 9.)Supply and install(1)new larger vision light kit and glazing at entry to Cell S2.FCI is proposing to cut-in and replace vision light in existing door in lieu of replacing the door in it's entirety,as detailed in PR-001. Notes: A.)It is FCrs understanding that the beams under the concrete floor will not be in conflict with where the new plumbing rough-in is to be installed. B.)It is FCrs understanding that all new walls are to be 6"CMU walls. C.)It is FCrs understanding that installing a new vision light kit/glass,and resuing the existing door,door frame and hardware is acceptable. D.)Permit costs associated with the"change order"for the building department are included in this pricing. E.)An allowance for electrical connections required for shower unit is included. F.)Pricing for curtains include a 12"mesh top for ventilation. G.)Per conversation with KL&A and WPA,it is FCPs understanding that no additional structural supports are needed for this revised layout including rivisions to piping penetrations.No costs for structural revisions are included. Itemized Details: General Description Quote Recd Proposed 2 H Mechanical,LLC $1,182.00 Description of Work: This change order has been developed to include all costs associated with PR-001,including the following changes: 1.)All plumbing rough-in changes required for relocated lav/toilet combo 2.)All plumbing rough-in changes required for relocated shower 3.)Newly specified lav/toilet unit and shower unit 4.)Supply and install(1)4"floor drain at existing penetration. McKinney Door&Hardware ($1,690.00) This proposal includes work clearly itemized herein and attached sub-contractor quotes Should delivery of materials effected by this change delay the work,time extension and General Conditions cost rights are reserved The right to cumulative impact costs is reserved This proposal is good for seven days from date of issuance Prolog Manager Printed on: 4/15/2016 FCI PM Data Page 1 COR Report •I FC I Detailed,Grouped by Each Number Constructors,Inc. Description of Work: This line item includes a credit for the original cost of replacing the door and frame,and an add for the costs associated with installing a new,larger vision light kit in the existing door.Costs associated with glazing are in a seperate line item.The following is a breakdown of the costs and credits: Credit for new door and frame-($1,700) Credit for labor to install of new door and frame-($280) Add for new vision light kit-$150 Add for labor to install vision light kit-$140 TOTAL-($1,690) NOTE:Labor rate is calculated at$35/hr. FCI Constructors,Inc.-GJ $172.00 Description of Work: All costs associated with supplying and installing 1/4",laminated,tempered glass into existing door with new vision light kit. FCI Constructors,Inc.-GJ $100.00 Description of Work: Allowance for painting new light kit FCI Constructors, Inc.-GJ $648.00 Description of Work: All costs associated with supplying and installing(2)privacy curtains.The curtains priced in this COR include a 12"Mesh top for ventilation purposes.If mesh top is not wanted,$17 can be deducted from this pricing. Materials-$543 Labor-$105($35/hr X 3hr) FCI Constructors, Inc.-GJ $500.00 Description of Work: An allowance for all costs associated with electrical connections for the new shower unit. FCI Constructors, Inc.-GJ $500.00 Description of Work: All costs associated with additional permit fees incurred due to changes made in PR-001 FCI Constructors, Inc.-GJ _ $4.00 Description of Work: Builders Risk Insurance FCI Constructors, Inc.-GJ $6.00 Description of Work: General Liability FCI Constructors, Inc.-GJ $14.00 Description of Work: Bond FCI Constructors, Inc.-GJ $115.00 Description of Work: Fee Requested Days: 0 Total Change: $1,551.00 Approval: S"ad, 9azdeteed Sufiecurtewdeie 04/16/2016 9:53:25 AM Date: Prolog Manager Printed on: 4/15/2016 FCI PM Data Page 2 J-. r-7----,. CHANGE ORDER REQUEST ]OB x 566 S.Westgate Drive _— Gra _ 69891 Grand Jurc6on 708 NAME CO, Pitco(ail Cell S2 Remodel Tel(970)778-4560 n nI.--�-'J CUSTOMER Fax(866)298-6054 r _w s�1,.. -,—L L 1. FCI Constructers Al G C 7G� DAA CHANGE ORDER S ISSUED TO: 4/6/2016 6989I-COR-I CUSTOMER REFERENCE PR-001 FCI Constructors,Inc. CHANGE ORDER TITLE Revise Penal Ware Fixtures&Misc.Adds Plumhlrc Lust Sheet Metal COQ PLUMBING HVAC Task r: DESCRIPTION SUBCONTRACT MATERIA[. HOOP_ LABOR and m1,182.00 - .. Penal Ware fxture price increase bawd an 1,18200 - aisal model numbers _— - - 11 r. pups,traps,supply tubs on(21) 2,125.00 72.00 4,680.00 111,211 R glace senna an(sec su ofn • a lavatory 2,600 00� 5 93700 faucets Isate:hd submitul-we.•.,Id furnish .00 4000 leas pop-up drain unless requested) - - 257.00 Replace mop sink fauces 127.00 2.1 t 130.00 � 700 130.00 2.128.W _ Reptacx(e)existing penal ware talc[flush salves �_ _ - Rough-in material for flush valve rcplacnkn .1.00 3.900.00 5.372.00 1,472.00 t _ - _ Replace(12)Fluor drains located outside show: 36.00 2,340.00 3.231.W grate up to cele f screws w. .dram 891.W _ and add longer vandal ptuco el.includes new• •V - Replaceleak. , trots waste pipe,finings.and 1.088.00 78.00 5.070.00 .. teased atm ball valves per sed plumbing . ..date 3/1916 _ SUBTOTALDESCRIPTION of WORK COMPLETED: Tools Furnish labor and materials to replace defective plumbing per PR#1. Consumables �'4t-90 Other Total Before Rood fielTEr 4:99— • Bond CHANGE ORDER TOTAL $ T4,'P —— CUSTOMER APPROVAL SIPRINT NAME SIGNATURE CUSTOMER COMMENTS Note Matenals listed on this page are an estimate to create a lump sum pnce All matenal taxes,where appl,rable.are pad at point of sale when we purchase from our supplier Construction Specisltios" CONSTRUCTION SPECIALTIES, INC Cubicle Curtains Division 3 Werner Way Lebanon,NJ 08833 Te1:908-236-0800 Fax:908-849-4398 Quote No: A78257_00 Scan: 201500650140 Quote Date: 2016-04-13 Bid Date: 2016-04-13 Project: Pitkin County Jail Remodel Representative: ASPEN,CO Bowman Construction Supply Jamie Vanasdale 10801 E 54th Avenue Denver, Colorado 80239 United States Phone:(303)696-8960 Fax:(303)373-0268 Email:jamie@bowmanconstructionsupply.com Architect: Location: Proposal based on types and quantities per Fax/Email dated:2016-04-12 Item Description Qty Units C/S Cubicle Curtains Standard Line Color TBD Traditional Curtain @ 5'-9"wide x 6'-9"high 1 EA C/S Cubicle Curtains Standard Line Color TBD Traditional Curtain @ 17'-6"wide x 6'-9"high 1 EA 6062 Anodized Surface mounted cubicle track with accessories, (2)units. 20 LF Material Furnished Only, FOB Plant,Tax Excluded. Total:$526.00 PRICING OPTIONS: 1. ADD$17.00 to project total cost if 12"Mesh Tops is considered as an option,due to no mesh height specified. QUALIFYING NOTES: 1. If specified fabric is in stock at the fabric manufacturer at time of production release,Curtains can ship in 3 weeks or less. If fabric is NOT in stock lead times can vary from 4 to 14+weeks subject to manufacturers'fabric availability. Please contact the factory to confirm your projects specific lead time. 2. All prices are based on types and quantities as listed above and not per plans and specifications. 3. C/S is bidding aluminum track#6062,#1062N carriers,#262 carrier gates,#162 carrier stop(Track dimensions are 1 3/8"x 3/4"deep).C/S products can be viewed at www.c-sgroup.com 4. Track with lengths over 9 feet will be spliced in order to ship via Fed-Ex. 5. Included F.O.B. Plant apply only for single shipment, if Partial shipments are required, price is subject to change. 6. C/S is bidding 72"W Fabric,Standard Line, Fabric to be Seam, Curtains to finish 12"AFF, Curtains to have no Mesh Tops, 10%fullness for ceiling height of 8'0".C/S Standard Line as Follows:Windsor, New Shadow Cube, Lynx, River Birch, Xanadu,Allegro and Connections. EXCLUSION NOTES: 1. All Items not specifically listed are Expressly Excluded. 2. Excluding mounting hardware,above ceiling supports,and wood blocking to mount cubicle track to ceiling.Contractor shall provide hardware required. 3. Tee's,Y's and switches. Estimator: Miguel Hernandez Acceptance: Shipping: Bill To: Ship To: Address: Address: City/State/Zip: City/State/Zip: Purchase Order No: Requested Delivery Date: Customer Name: Site Phone No Customer Signature: Email Address: Contact Phone No: A78257_00 Page Iof2 Price is FOB plant,freight prepaid within continental U.S.or FAS dock export point.Tax not included. TERMS 8 CONDITIONS 1.C/S Standard Terns and Conditions shall apply. 2.Payment terms are Net 30 Days,with no retention allowed. 3.Prices are fire against escalation for 90 days from date of this quote,and for shipment within 6 months thereafter.Orders shipped beyond shall be subject to escalation of 1.5%per month for each month or partial month thereafter and invoiced at time of shipment. 4.The quotation may be withdrawn if not accepted e,tldn 90 days of quotation. 5.Orders resulting from this quotation should be made out to Construction Specialties.Inc Go the representative listed above. 6.For projects located outside the U.S.Construction Specialties requires that all freight forwarders who handle C/S product be C-TPAT certified.Please contact your local representative for more information and a list of available C-TPAT carriers in your area. 7.Construction Specialties,Inc.will be fisted as the USPPI(United States Principal Party in Interest)on all transactions for shipments exporting from the US.This will include filing with US Customs and Export Documentation completion. A78257_00 Page 2 of 2 � I R PI TKIN COUNTY JAIL REMODEL PARCEL ID 4:273707347851 +25 P10 011.66 DE Pl. ASPEN,CO 11611 MAKING UT OWNER 0d.0 INFORMATION MAIN COUNTY JAIL 185 RIO GRANGE RACF A-101 EASTNOOANN LEVEL FLOOR PUN E.-0W N LEvEL CEILING FLAN ASPEN,0011 611 m01,06f0 Nv.%LEA:L FL000 RAN CONTACT:00V BIRO PROPOSED MAN LEVEL CEILING PLAN (V)070A292053 A.-701IN7ETOR EA 7pNS-CELL S-2 CONSULTANTS ETNICTNILL MIME ILEA,INC. APPLICABLE CODES 215 N.10TN.STRUT CARRONOALE,CO II623 2009 IBC CONTACT:PAN Damn 2000 IECC m 210.112711.2009 IMC IFI 274112M19. 2009 IPC RAE PR0TECR!N 2009 IFGC VE11TA1 FIRE ENIWEERRN CO 2011 NEC MU W.MENTA PEWS. CITY OF ASPEN MUNICIPAL CODE TITLE 8 u1 INOON,CO CONTACT:KENNETH SUTTON OCCUPANCY 1-3 m 3113315.3301R11 GENERAL COMM CONSTRUCTION TYPE TYPE 1 TEl FIRE SPRINKLERS-NFPA 13 PERMIT P R #1 3 N 24 N 16 ;l mI .1,;�15,CIVI` 141 PITKIN COUNTY JAIL REMODEL - INFORMATION 485 RIO GRANDE PLACE ASPEN,CO 81611 IAGIFOW 14 1.4.010110f NHE ISM RWR A0.0 T T Qo Q gi° Q WPA ,•1 0 .._ _ T __I . _ _ ! MDD. ® ® I PITKIN COUNTY • MODEL 1 j JAIL REMODEL j n fob j 195 110 GRANDE PL. 1 - j *511■,CO 11115 1® II-®`; .r - --"--� sm+. j F� OWNER V j I ROOF BINION COUNtt JAII 2.4 -- -------'-- '— ElMMl75E © 1 Olga I © 5 10 GRANDE PIACI 1 ® I OAvxo®• n. ASPEN,CO 81611 -_ GONIAL]:DON 61X0 .. ''1 11! M I' --4-1.4 — .1;'�' 1,,1 970.429.2053 ? 111111111. 1 � .. �'.'a 0 aIlliil �kg-�_-I •07 ® ® � /\ CONSULTANTS '+- l - �_ 4 5 f/MOCTUOfL ROM Or I _ _[]_� / ,.c \J NLAA,INC. © 5.1 1 _ _ I II'lll'I�1� • EICLIETX.SUM B1 II I ••■'f. CAM90NOAlE.CO B1Y7I (/��+� CONMACT:ON OONEM77 �l .. .��_� #1)970..27.174 a5.8 '� I1.:.• 1 (F)9715927.5104 . ,, 9l D ® MO I —. �I LI k IA 1•19 '' ---- � HMEM071=6 IMF s ISM W.ALFRED. M.C0 O . • —©-- " U 12104 W.AlfWEOA PMWY. LAKEWOOD,eill CO 0— I ® , �' I o] I ovum YENYf7M SIMON (V)303.015.3300 4211 -- 8.9 1 pID=ICELL I C 92YEMAL CON1ACT011 110 CI .1111k I I ® OOMIG SOL ! ® fElL CM grak 1.0mc . . I -IC) 1.151-111/4.4 J It �' I MT:.r1: 0;it- -r !1�/ : 11111® =— I P. i I �.n� u la■ 1111111111111111111 �®nl I . I %1„ I 1-----.-.--- tl Fs 'Mill L— ® II — —_�� — _ 12m O , , o-.----I - -_ ' ,.., r„., ® I ! P R#l_3.24.16 I I, 0 OPz'J 1 ! OAS: •:'041 -----.-. I PROM:7111LLII.275.15 14 — —.T-4 I .----. I 104 N 11115 ffi l albI I IN%IR 1111115 ] I I Hen: I IL i 1 0 0 ® iEXISTING MAIN LEVEL PLAN AA O O OC D F C H 0 110171 n 1501 FIRMAN::1501 Pdin Iwo,Nil Alt EXISTING MAIN LEVEL FLOOR PLAN ■-AO� \I /8•1 -T'—D• A L • 0 T 0 0 b 4,4 Q I WPB 1 0-- PITKIN COUNTY -- .. ,I ¢,— 'il --_-- i 0-- JAIL REMODEL 0 0 0 R �1 415 110 CO IT II Ii -' ---JC7, 31:, I� --� OWNER ilt C> — d lMINIX COUNTY JAN I • F65 RID GRANDE PLACE (=E aR>•Aii I�Ytl:[}.11M I- CONTACT,Sall BI RD ■ ial�ghlO;A 3 0 0 0 . s»R.h1�_I____ CONSULTANTS 'RppI `111.7_� i!MR J A .—.—.—.—.—.�\ {111tOTIIMtF�igEFF =RPM --------- 4 1 ILIA,INC. e — r = �tr — Ni��is \/ SIS IL RTX.{MET �m, ■1�1 L. 111,11:,1"....,_....=.71.:„.2! i S _I L���.I CANTACT,DA.CO 11515 5.1 I ®= min •• Flit �i11■111 j� ...-`u—/1 i'IPI CONTACT,DAN DO 11515 ES 1 11.01 I;I�.:E„s-1-�- m n6anam �1 -1.. .. • .....1 I iIa—�1 IFt nD.exTsw --_, ►DI`, !J ME PROTECTION n LOBBT _ VFRITAi FIRE ENGINEERING CO O I 1 I -B © ■ ..1______ Eamrimeil'�a�ORR.■ill �I,-�I O 12]61 W.MAMA PXWV. I ' (+�1 00N1■■JIB II� �I uI100114 6.3 • I -- CONTACT:.CO SUTTON LJ0r4yr�li_ _ IIJ7 R�7 lI — ---0 VI303.a9.310tall 6.■ I '-� ® 1� ; v°HbAsF .i.1 I Nom_ FFXENuoomNemN L ®I dim!''11.21 .7,&" �'r 7 grill TN .® ,-"gym o it i --- .......n ------� 1 I i `i1'1❑ � • ���A �, «F� . ..,� ri7.Com gli la _. _lleu a,'n 2111 AI TT _ r lc m 'na—L® NI - '°"® _ 1 IRS I -, , JJ Tao ... M o SII .0. El :�!I I�I/.�l�i L jVI ■�{■�, ®Tal. R.�aI:aR .�� I .„..riminrwIlIMMERWSINIEC-11 WM I.=GI IM 0-- S lair �. MM1��!LL—_I ------.—, � z--r�-�.rL;...rr— _ _ . 2 I � ... ® _I� � � 1►1 �� �I: ' I I I 111 I • 11 I PR# 1_3.2, 3.24.16 CEI1! 11I I11I PN 11II./AM IRIS i1R u 11X@7216 I — 0I r, O ---- Mt@6112113 .6 0 1EXISTING MAIN ! LEVEL CEILING ® b b b b 66 b b PROW N 759 IIIfW/7151 P:'ii lwnh l�" NORTH it\ EXISTING MAIN LEVEL CEILING PLAN A_202 \I yr-1._6. 11 Q Q Q Q Q Eo Q Q I I I I ) I i I I 1 I I I 0 — 0 - I I °6 ® PITKIN COUNTY JAIL REMODEL I 12J 1 I aE 110 PL. 1 I .. �R alb .Co 11611 I I I �� D I I+.A ) . —0 OWNER 2.a -1I. i, -- © ©' - ri*.IY couYnfu -. I ; © r 1E4 65 RIO GRAM RACE ® . .. ISM,CO 81611 COMM 8180 Q1 . A\1 1 R. \I 1 I .2 E '. ^ 11,1 971122.2013 we I I m.iiiilll�, nlnwl�1 n oh CONSULTANTS _ M� __I --- Q STRUCTURAL MOWER 5 _ . I " a ILLA.INC. I� �' 215 N.INK STREET I� I . LL' CONTACT:DA CO 11821 JIM CWJ" COYTICNKS DOHEBEET T •• •ice C-O1 O�S OM mnO.B22.in1 5.1, I I "DI Io l•l 2.0 L ® IFI 170.832.61.1 l Mar .1: B FIRE minnow MITES FIRE ENGINEERING CO 13361C PY W Y R LAKEWOOD,COag mIa CONTACT:KENNETH SUTTON I -- 0 119 303.685.3300 8311 � I T � M9-7—/-.4, aYbASE CELL GENERAL COMIRICIOR IBD ,' Cil1 ROOMwo 1 ] ! = IL . , Ehi ® 6ity ';-. '7 alx _ V- am 1 2y2LG 1D . D fou �I,R I a ,.. , •.• © 1 � '11' 1 I 1 uE W m'IIIOIIIIIIIppll I ®W,ir �� _ 1._.----_-1_— BTAET _ '� 1 �°�' I 7 ® M z1e Li P R#1 3.124.18 DPMI m I W� -- !Mill _-----.—.----_ -- 0 IIOWbtll;lil;1.11.13 1 I V%@ MI5 ®R IMM a Ullll;x11.1;lHlf MEI I KI PEW:MIA P17:D (GAJ (�8[�) (K�) MVEL PLAN AA `l 0 O 60 O 0 1lEYML 1101 RY.Lpml PE NORTH AA PROPOSED MAIN LEVEL FLOOR PL L A■�AO� \I ,/a•-1•-p. A-203 0 0 Q Q Q 99 Q o .._ _ 77; i®, ' 2PITRIN COUNTY O OO1L• L REMODEL SBS RIO GRANDE PL. ASPEN,COD , '1. I!oll11� 131=4.11 .: - OWNER 0----- --- ---oi .o -o � I1 Ia �' wMON CUNT mL MI-. �i�lL21._ 1.1— AS RIO CRAMPLict �.` �r,' Mi-7Ail AMC CO 11611 sRm w,fib- 1 CO950A29.0053TAC:DON NIRO as 0 0 0 �e1111111., ' �..L.a©..LB,■' �IIII .0 ��I]r■r■j 1 w, �� ••* IrM�� — CONSULTANTS a a.INC. 1IIIIII13MSgii■EA Joni „ . iT6.11TN.STRfn 5., IB S■II 1�'■�I j� Mr@'t iIi cuRalloALf,CO NISI ® ® ®p_„f ,gip_��- ■■ �E 'Y� CONTACT:DAM OMAN 5.6 I i■/al Drat l■ izzI�emi l I —\I® IN eio.en.S e• �.�R�id„ �n 's_Q. 'n I ,I\—II FIRE PROTECTION I _op_ Loxxr I�I © , .-._.. ,- FIRITAfiICTIONMFfRIMOLO (7•15)- - "_�-��ii a, II tw-. a 1iBNW ALEYFDA PM. sa - ■Ir/r"?I11■F,II%.1■■3I 1I I MMO.,CO , [OL.IL• Mei:oi71.1 l =. CONTACT MEMMEIN SUTTON e.e A • mil' R� es M BUB.LB.BBOe 011 iPLT I ROn 1' ry i:!�`I®Ifa GENERAL CONTRACTOR a7raiL TED 1 IF "ma= II`® o — �h � f=>W. —0 1 /11 ,81113 0owI --Pa -- .:L>. 11 -- _IS L: - 1 � ;, a ��- Iw� I : 1 ' 1J m �� 01li— ■ I 'e-�r. C 1 �� �� iI o 8./131 111 ' �!IIIII0-1-18_111111111 0 '7167�L I, ."'''= r ,r. .JOl1 r. 1-s1 __ w a�' ..... , � `� ��—ix'II RR71I3im :: 1 �:_ -- INTI. . _®O— i �(. !��lI sir \ : PR#1 J24.,G iI0 I1,B MIN1 - • I no 11 __=111��_ -. LJ1JI1— I IIWC: 10----- ( 1 eMimi �� 11,11.. rR.Laue,7L.ILur.Is1�If N%k 71RI6 IM/.m UI.eIS 7.li.1e 7.1/.1/■, Jr .IBN CRI ICI ', , • _—_ 1 1 I MIR:7ri1x 1 1 1 III 1 1 11 I fiillliii. I 0 0 ii J PROPOSED MAIN a (�L/p� thO OO LEVEL CCG. PLAN AA 0 /3 Tutt rt is[. NORTH di' PROPSED MAIN LEVEL CEILING PLAN 411" ,/e•-r-o- A-204 WPA ' PITKIN COUNTY JAIL REMODEL FG Q OWNER -- PIDGIN COUNT,JAIL I AO RIO GRANGE PLACE ASPEN,C011611 CONTACT:NON BIRO WI 110.429.20S3 CONSULTANTS CELL 1 W2 I sTecn, WAILR Il{I.INC. I 219 N.MR.FIRM CARPOYBAIF.CO el Sxx CONTACT:DAN DONERTY i D . I I CELL I meTN.ensnA .�� � S2 I I IB 110.827s181 RR PROTECTION _ I ____ I BEAM _ ® NSONA FIRE(NNINNOSA PERINO CO —"-- I --- �_ m.o. I DM W.MAEDA PIWY. N r .- UIfWDTO,CO TTON vl O *CD ■I wa.Am•LAY m 303315.1.— CONTACT: EDTN ll ��lpEq�R1._c IF 2.Z'_— e�I ���h D+ BEAM NSNP!UU L01f111ACTOR DAYKoOM I W3 I e I : i •N�ihnNo - ------------- jl .-----m,= -s, .. lAm1._11; BEAM _ I `Ir� f,ylanI �� _.___.—.___ _R 1 liiii':':�Al. --"Em, _ _ BEAM.—_ I I CELL , CELL Ni IN2J I —0 PR#17.24.16 KEt. c EXISTING PENETRA1TON TO BE EUMINAYED AND GROIITED. e NEW PENETRATION Egg NEW CMU WALL =EXISTING WALL MME ENLARGEDPLAN - CELL S2 PIIS 11B,11.I9.LIPAS IMAM _ EMRIXB !Mat 1.17.16.IA.II OM011F1 PI 1/4" V-0" PIM MU Additional structural NOTES A.CONTRACTOR TO RENEW LAY-OUT OF PENETRATIONS IN THE FIELD PRIOR 3.2E416.R prowled TO DRILLING. provide. P.!eller B.ALL NEW PENETRATIONS TO BE CUT THROUGH'HIGH FLUTES OF THE METAL provided by KLAA ADA CELL S.2 DECKING.CONSULT WTN CONTRACTOR/ARCHITECT IF NOT POSSIBLE PRIOR TD Ianac5edl. ENLARGED PLANS DRILLING. v1Og Er N ISM A-205 " I (::::) ('T) ( ) nT/ PITR COUNTY JAIL REMODEL 210 ANDE Pl. • j I I 405 AS/IN,ECO 11611 I I NEW B"GMU WALLS N''Y 1h' . SINGLE COURSE BOND BEAM EXISTNC W/(1)/4 HORIZONTAL BAR TO MATCH EXISTING j OWNER WINDOW I ACORN STAINLESS STEEL METAL CEILING METAL CEILINGADA SHOWER UNIT MUIR COUNTY 2111 SYSTEM -_�-_--_- _—_-_ SYSTEM 115 RIO NUNS PACE B"w U ALL ASPM,CO 111111 BEAM NC CONC. I- BEAM EXISING CONC. ' �(,-.,�. -IC CONTACT:DON BIRD REPAINT EXISTING REPAINT EXISTING ,�I TVI 970.129.2953 CMU WALLS I CMU WALLS 1-T!Mil „ b 1 __ I CONSULTANTS I ,I. 1: wd STRUCTURAL Fw1REER "�'� 'I' „ it 3 IIIA I12T b b �, 215 Y.12TH.STREET CARBONDALE,CO 111623 bii I CONTACT DAN 01)$101127.5171 I 1 I1 1 If 1920.92x.5191 1/4. S-OT TIRE PROTECTION 1 1 .4 ‘y.T. VENUS TINE FNNINFEMYN CO J-r 12161 W.WHIM MY...'-.19---S--117.:-.- ' ORC1VENUSMNEN/00W CO CONTACT:KENNETH SUTTON NORTH - CELL S2 EAST - CELL - 50001115]500.21I MEMCORIRICTOR e 3/5" =1'-0" a 3/8" = 1.-0" too Q Q T Q j 1 1 I wcREASE SIZE DF cuss UGIT I FROM 5X18(EXISTING)TO I METALLMCEIUNG 10"X18"(PROPOSED). I S TALLMCEIUNG -_--_-_---_ _ EXISTING CONC. --__- ----__----_- I _—{ EXISTING CONC. NEW 6"CMU WALL III1i BEAMBEAM ACORN 1449FA ALAR SERIES �� DEMO EXISTNC DEMO EXISTING STAINLESS STEEL uV/ ' DOOR.FRAME DOOR.FRAME ANSPR#1 3.24.16 TOILET COMBO UNIT I' j DAT. 1_� HEADWALL1-1 1 1/2"DIA STN. NEW PAINTED CMU REPAINT EXISTING STEEL GRAB BARS- I0 1C„ I AUGN. 'o CHASE WALLS BEYOND I REPLACE EXISTNG HM DOOR&FRAME CMU WALLS W/NEW DOOR AND FNNAAME WITHIN .� ���I I 1.' W/- EXISTNG OPENING. I ? 115 111011115.2 1.15,1115 1.11.11 I 90%40.220.15 00%(0 I.21.1S,IAA I I i A1X11 I II A SOUTH - CELL S2 WEST - CELL S2 INTERIOR 3/8" =1'-0" e 3/8" = 1'-0" ELEVATIONS PRAM 0 1501 NA N XM%1501 IAA(Anry JA A-101 I �+ KL&A, Inc. Structural Engineers and Builders 215 N. 12th Street, Unit E, Carbondale, CO 81623 ph 970 927 5174 www.klaa.com 150 S.Main Street 421 East Fourth Street 1875 Lawrence St.,#700 1717 Washington Ave.,#100 Buffalo,WY 82834 Loveland,CO 80537 Denver,CO 80202 Golden,CO 80228 March 28,2016 Willis Pember WPA 412 North Mill Street Aspen,CO 81611 Re: Pitkin County Jail Dear Willis: KL&A has reviewed the architectural ASI#3 document for Cell S2 on the above referenced project. That plan indicates a total six new penetrations in the existing composite concrete floor. KL&A has reviewed these new penetration locations and determined that they are acceptable without any additional structural strengthening. KL&A should review the laid out penetrations in the field prior to placement to ensure that the cores match the intended layout. Please let me know if there are any questions. Sincerely, \\\\I3 REG,, 11 O PO Dp ,(5.5„ 4, Dan Doherty,P.E. 0 42674 -<:• Principal Engineerper`, 03/28/2016.! ///41iss/ONAL c,\ GASnall Jobs\Pitkin County JaiL160328 Pitkin Cowry Jail Sttwxwal LetterAocx • FCI COR-002 Constructors,Inc. Detailed,Grouped by Each Number Pitkin County Jail Remodel Project# 10-15-060 FCI Constructors,Inc.-GJ 506 W.Main,Dept J,Aspen,CO 81611 Tel: tbd Fax: 970-434-7583 Category Reference PCCO Number Change Order Request SGM Plumbing Rework Drawings+2H Pricing Notes Per Owner request,a walk-through of the existing plumbing in the building was completed to determine the condition of the plumbing piping.This change order has been developed to include all costs associated with SGM Plumbing Rework Drawings,as well as the items detailed by the Owner per walk through completed by 2H and Pitkin County.The following details plumbing items included in SGM Plumbing Rework Drawings and the site walk. Please refer to subcontractor pricing for broken out pricing of each of the following line items: 1.)The first item on the subcontractors pricing is associated with revisions to Cell S2's layout,and is included in COR-001.This cost does not apply to COR-002. 2.)Replace stops,traps and supply tubes on(24)lavatories.All(24)units do not appear on the drawings,however(24)locations were confirmed on walk through with Pitkin County. 3.)Replace faucets on(20)of the above lavatory faucets.New Kohler'Triton'faucets are to be installed,and the same faucet type can be used at each required location. 4.)Replace mop sink faucet.This item is not included in SGM Plumbing Rework Drawings.However,replacing the mop sink was an Owner request during walk through. 5.)Replace(8)existing penal ware toilet flush valves.This item is not included in SGM Plumbing Rework Drawings,however it was another item that was requested by Owner during walk through. 6.)Rough-in material for flush valve replacement.This item is not included in SGM Plumbing Rework Drawings,however it was another item that was requested by Owner during walk through. 7.)Replace(12)floor drains located outside showers and add longer vandal proof screws to bring drain grate up to tile level.Includes new epoxy. 8.)Replace leaking sanitary waste pipe,fittings,and domestic water ball valves per revised plumbing drawings dated 3/15/16. Valve tagging and pipe identification is included in this. NOTES: A.)New fixtures that are to be installed will be per the fixture schedule on Sheet P102. B.)Painting touch up is included in the pricing. C.)This COR includes all costs associated with changes made in SGM Plumbing Rework Drawings,as well as items discussed during walk through with Pitkin County that may not have made it into SGM Plumbing Rework Drawings. D.)This pricing is not an allowance,and is being submitted as a hard cost for the work that is associated with the above mentioned line items. Itemized Details: General Description Quote Recd Proposed 2 H Mechanical,LLC _ $30,331.00 This proposal includes work clearly itemized herein and attached sub-contractor quotes Should delivery of materials effected by this change delay the work,time extension and General Conditions cost rights are reserved The right to cumulative impact costs is reserved This proposal is good for seven days from date of issuance Prolog Manager Printed on: 4/15/2016 FCI PM Data Page 1 COR Report • FCI Detailed,Grouped by Each Number Constructors.Inc. Description of Work: Per Owner request,a walk-through of the existing plumbing in the building was completed to determine the condition of the plumbing piping.This change order has been developed to include all costs associated with PR-002 and walk through held between 2H Mechanical and Pitkin County.The following details the plumbing items that are to be replaced: 1.)Replace stops,traps and supply tubes on(24)lavatories. 2.)Replace faucets on(20)of the above lavatory faucets. 3.)Replace mop sink faucet 4.)Replace(8)existing penal ware toilet flush valves 5.)Rough-in material for flush valve replacement 6.)Replace(12)floor drains located outside showers and add longer vadal proof screws to bring drain grate up to tile level. Includes new epoxy. 7.)Replace leaking sanitary waste pipe,fittings,and domestic water ball valves per revised plumbing drawings dated 3/15/16. FCI Constructors,Inc.-GJ $250.00 Description of Work: All costs associated with paint touch up. FCI Constructors,Inc.-GJ $76.00 Description of Work: Builders Risk Insurance FCI Constructors,Inc.-GJ _ $123.00 Description of Work: General Liability FCI Constructors,Inc.-GJ $308.00 Description of Work: Bond FCI Constructors,Inc.-GJ $2,487.00 Description of Work: Fee Requested Days: 0 Total Change: $33,575.00 Approval: Date: Prolog Manager Printed on: 4/15/2016 FCI PM Data Page 2 ( " CHANGE ORDER REQUEST _!tJOB# 566 S. WeLe DfiVe 69891 Grand 3unchonCO, JOB NAME Tel 81505 • LLL�� Pitco)ail Cell S2 Remodel Tel(970)778-4560 CUSTOMER Fax(866)298-6054 (uAgalra@ FCl Constructors DATE CHANGE ORDER# ISSUED TO: 4/8/2016 69891-C'OR-1 CUSTOMER REFERENCE PR4)o l FCI Constndors,Inc. CHANGE ORDER TTILE Revise Penal Ware Fixtures&Misc.Adds F%lumbvnq l..051.Sheet Metal Cost PLUMBING HVAC 1-a5.1,, DESCRIPTION SUBCONTRACT MATERIAL )lCUR5 IABOR S S S - _— 1. Acorn Proal Ware hum price increasest�on da Millill 72.00 4 680.00 6,805.00 ��„�traps.supply when on(24) _.125.00 hlav - - as-atoms - Replace faucets on(20)of the alwsc lavatory 40 OU 2,000.00 5,937 l)0 fauccis(sec attached subnuttal.we:Fuld furnish 3,337 00 less pgrup drain unless rcquustsd) . 170.00 127.00 2.00 -- RepWcc mop _ __rum 257.00_ _ - 1,98.W 2.00 130.00 2,128.W - Replace(R,cawing Acral wave tak't Gush vales 5.372.W - 1,472.00 60.00 3,900.00 Rough-in nutcnal for flush salve rcplacnw-nt - Rcplave(12)floor drums located outside showers 36.00 '_.3.10.W 3,231.00 and add longer sandal prtwof ser�vs w bring drain 891.00 - grate up to ole level.incw.4s new sport - - Replace Iukuig iomtran waste ptpc,fittings.and 5,070()n 6,1 S8 UU 1,088.00 78.00 dms:stc water ball salvia per revisalplumbing - draw date 3115116 - - . Illiri sreTorAl, $29,888.00------�0.0° DESCRIPTION of WORK COMPLETED: Tools 2143a Furnish labor and materials to replace defective plumbing per PR#1. Consumables 228.99 Other Total Before Bond 99 bond __$ __— - CHANGE ORDER TOTAL $30,331.00 CUSTOMER APPROVAL SIGNATURE PRINT NAME LCUSTOMER COMMENTS 1 Note Matenals listed on this page are an estimate to create a lump sum puce All matenal taxes,where applicable are paid at point of sale when we purchase from our supplier KOHLER. Faucets Triton® Shelf-back Bathroom Sink Faucet K-8046-2A Features • Brass construction. • Brass valve bodies. • Valvet®valves. • Grid drain with tailpiece. • For 5-1/2" (140 mm)centers. ar` �. ) • Standard handles.• 1-1/4" (32 mm)spout. • Lower flow aerator options are available. (Please refer to the Kohler Price Book). • 2.0 gal/min (7.6 I/min)maximum flow rate[max at 60 psi (4.14 bar)]. Optional Accessories 1160594 Large Spray Aerator 0.35 gpm (1.3 1/min) ADA Codes/Standards ASME A112.18.1/CSA B125.1 NSF 61 NSF 372 DOE - Energy Policy Act 1992 ADA ICC/ANSI A117.1 All applicable US Federal and State material regulations KOHLER® One-Year Limited Warranty See website for detailed warranty information. USA/Canada: 1-800-4KOHLER (1-800-456-4537) THE BOLD LOOK Kohler Co. reserves the right to make revisions without notice to product specifications. OF KOHLER For the most current Specification Sheet, go to www.kohler.com. 3-28-2016 02:25 KOHLER. Faucets Shelf-back Bathroom SinkTritont Faucauce K-8046-2A 1-1/4" 1-5/8" (32 mm) (41 mm) L-5-1/2" (140 mm)-1 r �U 1-3/8 (35 mm) vI 1n11 0 2-1/8" 3/16" (5 mm) (54 mm) 0 2-3/8" (60 mm) 2-1/4" NI 0 1-13/16" (57 mm) (46 mm) 1-3/4" (44 mm) U 4" (102 mm) 1-1/4" OD +I I I/ Grid Drain Technical Information Notes All product dimensions are nominal. Install this product according to the installation Spout reach: 1-1/4" (32 mm) guide. Drain included: YES ADA compliant when installed to the specific Drain tailpiece YES requirements of these regulations. included: Faucet: Flow rate: 2 gal/min (7.6 I/min) Pressure: 60 psi (4.1 bar) USA/Canada: 1-800-4KOHLER (1-800-456-4537) THE BOLD LOOK Kohler Co. reserves the right to make revisions without notice to product specifications. OF KOHLER. For the most current Specification Sheet, go to www.kohler.com. 3-28-2016 02:25 .... nal.ate sai.wow rta a,rasa.... I 1 O G ® G c 1 Ili !� u a - - jj 1 1 o VIII! 1 GI el 4 it (1)-- fl. -F- 1 11 ;10 gg s e 9 11 p gg C' •0 el, gig te!'- � ° l I Ci) ED 5 d, � o i 01 08 0 0 O k k i i a 4 i i 1 L L ; R L 8 = k k k k k k k k k k k 8 L ��� yO 9 i R i 9 39i i i >} i 9 i 9 i 9 i 9 i 9 i 9 i 9 i$ i ek A �Atg 4 z m !Ai II t t t r Olt ;I. 1 1 1 11 11 4 4 1$A1 2 t g Q �� 0 N Yii .Y •I. .i rii i 1 € 8 R D r t 9 8€ E' r'? ti i taiE€i ii t€� €i1!- t1a11 /i i6 1 1 lid; Z < 1` 11Z 11 11 11 € i111t1 € i11 11111 11 €SIN1 g a ; 1 i?: 11 i " P I - I ! si isisititiji - I i - I t l tI i7 11 Itc� A 9 1L 11 d1 �1 A, 111 9n 9 ~ m 00 1 0 3m 1 1 t i i 1 I ! I I 1 I III ! I I I I I t ! I I I I i ; - n D D z — m Zi 7, —" . ' PITKIN COUNTY JAIL 6SG M O - < 506 E MAIN o ° ' 118 Wan Sixth Sven,Svue 200 6 ASPEN,CO 81611 G` wood945 Sperm,C004 -xOs81N6rc'.xom Z I • E raAr.rItIONVI SEWN 1.9..7004 MS/.ar r0 A, O ® O(7 OP O :wu,,.. ::«s 'n °i come-clogs MEOW 1r5r Ar alp OF .2.i 1160 I 310 I I I (0' O I O I I: 0, is s 'i 00 `i olid 0 - • TIS ro I s I i r6. I -17Q i z ' Deo O W U 0— .O { 8 Z "°aO -O j ! -O 0 : O I _Dino, + 0 Or nu a .n or o l; j 1 1 pFp i fl I [7[7FP E . P N. ML EXISTING r I T.NS LOWER LEVEL PLUMBING PLAN PLUMBINGPIAN O 0 O u.P s; P1.01 r..-) Cc)_)• ,,. CIO - , , E 1 F G I , K Q § W.iLl 4S i '1-1-'1 1 0 MIOVifle MI•AMIE SIO 71110.1.fIPPLY Ur.Al 000 Z reil, 0).0 : 1 I 0 PROVIOT NEW s.rsarrkcem Hm7e.a.er OMNI IIRNG.NO -1 : 11,01NO NV PAW ro MINN AM COASIONT ''' , 0=5 ML:lir No..:=1,11_.:MAW IN INXIIION Mtn" I , 0 Azwg. , NI"LW A••SMION AS•SMIOLE KOUT fliE Ilr,ON, ! SALTON OF MIL DR 5.10,,11,I S A Mt(mom.1,3s now W 7AF. ip IF'clEI-L"-71[1(i 5 -''''.1:` 1 I,PC ONRidt IIND0.1 I!Ii 1r I 11 I 1 i i , 11 1 orni frf-'0 1 i : • ,r: 1 1 I 1 H alv,i ,... , ..,.., , ,- TIr., .,. .._______,-..i. PLUMBING FLIGURE SCHEDULE -1 ' L,-' :L. 1 '. ''94,XL ; :I me me MU ACCILICLOWS mar ••••••••.••••...1•••r• warms 1 1 1\\ 1 1.7.-121 rau 11 • 1 ' Ces. AMY SP,M , i 130 , ' MI , 13I0 MOT I. 10-0 AMP MAY - - wow aim srorrso-sc-• - ...7"..A•••••,Z ROWE II _ I_.1Y Milt! =Ili! ifi} .1 ABA INO sot ow 1,r,',11.,„,?,. esorssrsourer roor soya sow,shosu sear ro s os am 111 ] •'=-',1=: -' 1-:4=',J : IF:Me 4 111 - • I 1 or-,..1A,, i 1 \. ..,__H 1 kit 0j, . ., I s. moe,sm. - =WM MAZY ,,s,„.4„,, MAP VOIre MEM P.M,1.L111111111 ii!.-i 0 M11111i 1. , 1 f" i ii 1 r 1 , 41 4 ,ku,444 ,, 2- ,,•.44.0.SMOGRA MOVER OMB WWI.RAM i I ''; A I.DE 0,11 L,5 • ,,-, •,.. .17111--c--._, , . ..• ' 1riti!'••''''1'0----,71-9-1-F-Hfc ,i___ 1 , . . ea,. IT , . . . \ ,I, .-,.._,L_H,,, .41160. . d® ® trg 11 !--- --' ,. II- C-il . Imo ,_' CELL-! LL , , , ee il 11 ,: ,, ‘,.,__ii...,,,,414 ,...,,, , . =1: C, Lacaustr.40 SET fit..BM VLF CLIWED ,.........; LOBBY ri=•LL 1___„ kr''' ',.. 1\ CONOVE WNW-LION J --rr r 1 r 6) . ., 1 Illi 0 ') y MIS 1 '''. au : OVISH RALF Ks1r44.:',,L ) : MOT APT i 1 IISIMISSii EillgiMint z:7) - INSTIMilfiZ-MBIBENIEN- .7.; Li : , •__ ,• , ; ' 7 1 0 illceu i mo ', ill OE0 , . 0116,OL 1.. a.. i .... IC.IIK.,II II I II P-IXII 6: , , =] MCI i 17 -• ) .17 'H r I .1/KLUIROCILMILI 0 .4. CELL 1 il Ali i 1 1 0 I I u. .....,, 11 C li' 1 e kgdo.. 0 I 1 =I = ,--, ® (10) . I. 1 Lmj ta _ situ ffi, CELL i • , ..__, ,,E ,,,,, ,,,„,,, , ,„,- . , 8 j ..-. I 111111111111111M1 • = ak . 1 pall k N14- = 0 0 0 ®. CELL : I 1! 1 \ suer CEI Ikur. , 1 II I IL , , . ),II,,,i, i •• - i 03) I I I 1 , i 1 ID L— 1 650 1 I )\) i 1 (14) 13EFAI 1; il 1 -', • . . . , 1 asnis, 14 LI 1 1 -_, 1. 1.• , , 1 : : , ' ( ':•'‘.-''-:;.' '' i .. ......... ., 1., ab. 11 ii 1 • _ : • I 1. : . ____.) i, _.4".. : : T.N SP.N. I MAIN LEVEL PLUMBING PLAN ....... , ...•'''•''' MAIN LEVEL (A ) C DF \ I I 8 G ; (-I', ' ' WALL ins•Ar PLUMBING PLAN P 1.02 E PLUMBING LEGEND E 8 PIPING 541130 S p/WRING/AYFR5 PLUMBING ABBRMAPONS PLUMBING SPECYF7CA77ON 6mt .wrrrg a®z ems. 6aA'Am I mer. ' APR winswmaat rmwx Sv:Lnwr ACEnrS WARN, t psnol2CM 0.14602 MT MOM �'O; �o rawc P No Auvsv., R..w ANAL AL mom Nom OV PE p.m.AvOMP MOON TOM NOM AvO 016 A —re RPM roPm _ r TON TC COMM INC APO MOON TM MENNOr NEVENT7 MY A COMM-ME (MO ws MOM M 00MM Mr MOSE POMO.Off/Air Nr (I)f`c'o oommoop ,ANAP MAC o cacwrPrc AMON OCANTIC PM AMP AN VON OPPONC TM TIIN MO AN MOM Mr M ATM �F eE.EAs<NM wswra'AcCMS i APRON o-rte WOOL MO.waYrzcr—ItPIM POILAWNG AWN KW MOW OE ACPWILLMED II A MORENEN Am -ur TAM s.nsncmar m ro m pm Ammo pm sopm Am F— aw NUK ORME MN REffeffov_Mr MCP N� ANN AS ON NP serrPw PR MOOS 0.0 SOWN AWN o w000Lo .AIEVICAII ROM o<n"+ne♦ oEr¢ an P MP ramrmW Ewm.Sar rev ALL �� o ANENT MEM Pa/rr•WO) As naWL momrc DENTIS wn Or ME MARE Mn wan mcEm. V ATTENN—TA—TE—T—ragrom as l,o Nu) 0. DIVAAaCrfw �—.. - Ops Ir�) *0 NAAR N.,.mom,.ovorffvo /CP TAINEV MIK PLAN NNW,WM INE WORIONG ammo•omr NAANA oE MC AMA Br AUnrw Mr MINN AN IMPONEVAT NcoNnascrow SAIll Mr PS SOF OF POW TM 70 SENVISOOP OF ON NO NO n PONT, P m Aawwm¢s NU Ptixv�Ln mwnE NOr E,NmuweE Ts POMISSOP MATONN MOTT LAS I,Pc) To Nom mwswo pow NE PATIMPAN or AMY sr570I —GY III/MIN PRESSURE.. - r wr Or RELATE moan, —C—CE PEM BMCPI SPTAffr AMC AMC PPM Or rnEPLOW PT FORCE Mr M MATO MO AMPS 1 OXIM PP WPM • LLOMM MOD cutter RN Oar Farr PER Low, RPN REMINCAS MR WPM- m M PPs K[v.',/,'PPNLtEW.s . C LODNIPPION 9011 0044W WO PAO FM ALL pumas APO APPEMONS, - MP NA Am 11471£e Bela.Bela.Pre Red.WV / ..mss OF Au Mara AV EL54rIEn TOMS Om OC'MONOm rir Atwmer. 'roan MOM CM COM s, SANTE Era OW COACTVE MONNTOPP NM MN.A NATO!R7 Cr —F.,1- -- COW COWNCIPA ccwoELrrAwSW Ar O P 00 TONT NO TOP m-INA ALm.0N TO TAME m amp 61— "mum.NEK a' • • _ __ °.°.� sO mum ACCT.,.SEM_ _ _NNE_ NM P ar WILTS WO WIN —�Q raPE no Dow NVK LAMP ors... nor Tarr CONN COM. sDI MN WWI Eprommo 0 S: men etwrm �MO Oew L ,MOM OE COMMENT a0 aLas AMU a srarrrev m Pr AMMO AI— OPw MAW Mn 7007 OA MAMA NII.- Oe 11-m rAmmo,my 'etEeur rat Fat AO.'(RV cies a EOU. Nom N MERMOSTAL �{ aao ® coo• W _ OMO 0 NAT SCOPE m ro. v a m xm EK COMMONTIPP& WINE CONIPCPR SNAIL wooer NM 000 MOM IV MONDE Orr Amrumwr P EL owls. O m cruse e OW EMMA,. ill MIWWWWIPS v nN[we ITTIOSIN EC OMEN.MINNOW MI LW WARN PTV.APO PAMTV NEMNIN [r nrtE MN M O4/9WL 1F mm[m WOOF O rpYEameF WIPP eOr.Vxxr xcompop onm TAMAN Or ME AMA ATOM'rA¢ssEW/NVLAVOMPS m MC AMEN NA MmMYNI. Nr Nar per ammo row.¢Y¢w O DFP'POP DOR OTTER M MT saw LMAPTM Ya 070 a0V70,4 nir 00.4.0.RAU MATE ALL SWOP MS TM NO LGK PC TOMO GMT FM PRGRY. PGG o FLOP amour 0III EtaMC m WVNOff W EIX/tWI TOnes �a I[CCMuMee EMT na m 00 mrtt aLNct/I MOTTOM E 0 TIM 9wll ens I]n P swarm ro Amapt AS PLOWS)mr As ARLO. f�L.m OCU.o- MOLE netwur OI Ma WANE n LOAD AWN WIMP.OR FLrrIP OW WE RAN nraoco Am Lyme, PM SUL N Min orm-u/surr rOP) J NV NAM TM I ISE Mame••• I rOR OW Noma.TO L t•Pa/I!0 Q —8— mom070,tggg,C MAY MLOOPP M▪N COLONS PPE NAPE wo. wow powwow PP a K.vr N fLIEEP NUS MIT mPrAY LtAAAm0. Z — DC COLON CONWILTIP PPP POCEW.O mot SS MC 4 INCIPCEMO PPM CM AMC I IF SMOTE 00 MC _ p 0 Mir PAW 0 Pi MINN Tr NANO TOMS MA I I E NES PE w2mrem NEKIP owoPOW,WPC ',s 1 ILAtm Party urn powwow[mn srnw¢ D 0 MI OP Ammo.,AA N.,pmp CTM AMC Gw mP AGOVWs A.NOW POOP ea.MAVE AVOW O W FLOP POP NIL• Nat fx/w.cP riaGWwA/rs swatMr Mom poop,worm.Pm xatE P mf or atEsc COM E J. —/h LO LO L Q Y SOWfil w reEeKx P.a.Ass My un.Pv M.RCM Am naves. H MOOR IDO ff/RPOTVAV —® Aas aew It WOW m Oar Mr WA W OE IIIDOIC mPx.EL.SO..t COMM RAS ME lr ww S AL N LP NOsrPEOS OR wa AVMS ERE RPM MAN } —® asvwmww ID AWE aww I.fmeats wt mom uli`ines CPP mm pArmums'`�im •o 1,05 SEcAREALPPALWAIE ma cameos PrP m 'r STAMIISona Mss ' CONOWC W KOLL.s PROW limner e mtr LA111.t P .MC come-mow R ,WACO m Esau"A I ROWwlOWN WP a ANECUP a Pon NOEL OE 0c WINNE"Arm PM AMATO MC ema. 1 MM.<M.o.Off POPrL SMILE PEsn.W OWL PW Paas, PP:e>MPROWS WAVOmmmswam"As.mmACONen.MEnm.W nL.solsLVWMONPsAs 1 VOL DOW IOL E" 3VC m mP 027400 700"" PLUNIWO LIPS POLL Mr CONEEOLP WNW OW WPMi mor AMMOE F P4 OMAWILNDw•APEarenas WEN Mr ANO MAKS mma,se,Pres" I Y a 3 e aG. i1 LEGENDNOTES AND P6.01 • FCI COR-003 Constructors,Inc. Detailed, Grouped by Each Number Pitkin County Jail Remodel Project# 10-15-060 FCI Constructors, Inc. -GJ 506 W. Main,Dept J,Aspen,CO 81611 Tel: tbd Fax: 970-434-7583 Category Reference PCCO Number Change Order Request Innovative Painting Systems Pricing Notes This change order has been developed to include all costs associated with the additional painting work at the Owners request,including the following items: 1.)Walls/Interior Apply two finish coats of paint to all specified walls.This price assumes Pitkin County will have a small lift for us to use for the tall walls.Also,the pink accent areas will be masked and left as is. 2.)Wood Doors/Frames Apply a glazed finish to all specified wood doors/frames. 3.)Wood Windows Apply a glazed finish to all specified wood windows. 4.)HM Doors/Frames Apply two coats of paint to all specified HM doors/frames. 5.)HM Windows Apply two coats of paint to all specified HM window frames 6.)Stencils Paint on specified door stencils.Stencils to be provided by Owner. 7.)Ductwork Paint a small amount of exposed ductwork. NOTES: A.)Pitkin County to supply stencils that match current lettering/numbering at doors. B.)Jodi Smith confirmed that a small lift could be supplied by Pitkin County Facilities Dept.for use to access upper areas of wall when painting.,so no additional costs have been included in this COR for a lift. C.)Pricing assumes that all furniture items and items hung on the wall(i.e.picture frames,bulletin boards,marker boards,etc.)will be removed by the County prior to painting and re-hung by the County post-paint.FCI has not included any labor costs to remove or reinstall items on the walls. Itemized Details: General Description Quote Recd Proposed Innovative Painting Systems,Inc. $31,500.00 This proposal includes work clearly itemized herein and attached sub-contractor quotes Should delivery of materials effected by this change delay the work,time extension and General Conditions cost rights are reserved The right to cumulative impact costs is reserved This proposal is good for seven days from date of issuance Prolog Manager Printed on: 4/14/2016 FCI PM Data Page 1 COR Report •I FC I Detailed, Grouped by Each Number Constructors,Inc. Description of Work: This change order has been developed to include all costs associated with the additional painting scope requested by Owner, including,but not limited to: 1.)Walls/Interior Apply two finish coats of paint to all specified walls.This price assumes Pitkin County will have a small lift for us to use for the tall walls.Also,the pink accent areas will be masked and left as is. 2.)Apply a glazed finish to all specified wood doors/frames. 3.)Apply a glazed finish to all specified wood windows. 4.)Apply two coats of paint to all specified HM doors/frames. 5.)Apply two coats of paint to all specified HM window frames 6.)Paint on specified door stencils.Stencils to be provided by Owner. 7.)Paint a small amount of exposed ductwork. FCI Constructors, Inc.-GJ $79.00 Description of Work: Builders Risk Insurance FCI Constructors, Inc.-GJ $126.00 Description of Work: General Liability FCI Constructors, Inc.-GJ $317.00 Description of Work: Bond FCI Constructors, Inc.-GJ $2,562.00 Description of Work: Fee Requested Days: 0 Total Change: $34,584.00 Approval: Date: Prolog Manager Printed on: 4/14/2016 FCI PM Data Page 2 Innovative Painting Systems, Inc. Estimate 898 Highway 133 Suite 403 Date Estimate# Carbondale CO 81623 4/8/2016 2919 Name/Address FCI Constructors,Inc P.O.Box 1797 Grand Junction,Co 81502 Rep Project Mike Alternate Painting Item Description Product Total Walls/Interior Apply two finish coats of paint to all specified walls. This price 8,900.00 assumes FCI will have a small lift for us to use for the tall walls. Also,the pink accent areas will be masked and left as is. Doors/Frames Apply a glazed finish to all specified wood doors/frames. 2,400.00 Windows Apply a glazed finish to all specified wood windows. 800.00 Doors/Frames Apply two coats of paint to all specified HM doors/frames. 9,400.00 Windows Apply two coats of paint to all specified HM Window frames. 9,100.00 Misc.#1 Paint on specified door stencils. Stencils to be provided by FCI. 700.00 Misc.#1 Paint a small amount of exposed ductwork. 200.00 Total $31,500.00 Signature