Loading...
HomeMy WebLinkAbout04 Midnight Mine AIS 7 26 AGENDA ITEM SUMMARY WORK SESSION DATE: July 26, 2016 AGENDA ITEM TITLE: Midnight Mine Improvements STAFF RESPONSIBLE: G.R. Fielding, County Engineer ISSUE STATEMENT: Staff received direction to bring various improvements back to the BOCC for consideration on Midnight Mine Road. BACKGROUND: On May 17th Staff presented a privately funded project to add pavement and drainage features to Midnight Mine Road. The BOCC believed this project would affect the character of the area too greatly, however, asked to see various safety improvements and a toned down project brought back for consideration. Staff would handle this project through an administrative permit for work in the right-of-way. The work proposed would include: • Drainage improvements o The drainage improvements would be located on either side of the bridge and included drop inlets and culverts to direct water towards Castle Creek. These improvements would replace the ditches that are cut in 1-3 times a year. Additionally,trench drains would be located at both ends of the bridge. • Asphalt apron o The apron would be constructed at the approaches to the bridge and extend about 100 feet in each direction. • Safety Improvements o Site distance improvements would be made at the intersection of Castle Creek Road and Midnight Mine Road by adjusting some grades adjacent to the roads. LINK TO STRATEGIC PLAN: • This item would address the responsibly maintained and enhanced County assets success factor from the Core Focus Flourishing Natural and built environment. KEY DISCUSSION ITEMS: • Does the BOCC approve of this scaled down project? BUDGETARY IMPACT: There would be no budgetary impact to the County at this time. The County could save money on operations in the future. RECOMMENDED BOCC ACTION: Direct Staff to begin the permitting process with the resident proposing the work. ATTACHMENTS: Project Map Images (all attachements will be distributed at the meeting)