HomeMy WebLinkAboutbocc.ord.017.2016 CONTRACT#__,_,_35--10/6 (A- e ,ed ) ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY, COLORADO ACCEPTING A TEMPORARY CONSTRUCTION EASEMENT FROM FORK FRONT BASALT LLC ON EMMA ROAD FOR ACCESS TO THE ROARING FORK RIVER FOR INSTALLATION OF RECREATIONAL IN-CHANNEL DIVERSION STRUCTURES ORDINANCE NO. Ga'? 2016 1. Pitkin County intends to install recreational in-channel diversion structures into the Roaring Fork River as part of its Pitkin County River Park Project pursuant to the Decree issued in Case No. 2010CW305 on June 12, 2014, Concerning the Application of the Board of County Commissioners of Pitkin County for Surface Water Right Appropriations for Recreational In-Channel Diversion. 2. The Pitkin County River Park Project includes construction of two (2) recreational in- channel diversion recreation features, installation of bank stabilization, installation of five (5) geomorphic structures, and care and control of Roaring Fork River water throughout construction. 3. Fork Front Basalt LLC owns property known as Basalt Commercial Park, Lot J. A temporary construction easement on the Fork Front Basalt LLC property provides the access and staging for construction of the Pitkin County River Park Project. 4. Fork Front Basalt LLC will provide a temporary construction easement for the construction of the Pitkin County River Park Project and Pitkin County will pay Fork Front Basalt LLC a sum of $500.00 the easement.All construction activities shall be carried out at the County's expense. 5. The terms of the easement agreement are set forth, and the Chair (or Chair's designee) shall be authorized to execute a Temporary Construction Easement from Fork Front Basalt LLC on Emma Road for Access to the Roaring Fork River for Installation of Recreational In-Channel Diversion Structures in its present form or in a substantially similar form approved by the County Attorney. 6. The Board finds that adoption of this ordinance is necessary for the immediate preservation of the public health, safety and welfare of the citizens of Pitkin County and therefore declares this ordinance and legislation to be effective immediately upon adoption. NOW, THEREFORE, BE IT ORDAINED that the Board of County Commissioners of Pitkin County hereby approve an Ordinance Accepting a Temporary Construction Easement from Fork Front Basalt LLC on Emma Road for Access to the Roaring Fork River for Installation of Recreational In-Channel Diversion Structures and authorize the Chair or Chair's designee to execute the easement agreement in its present form or in a substantially similar form approved by the County Attorney. RECEPTION#: 631422, 08/15/2016 at 02:01:20 PM, 1 OF 10, R $0.00 Doc Code ORDER 1 Janice K. Vos Caudill, Pitkin County, CO INTRODUCED AND FIRST READ ON THE 1311'DAY OF JULY,2016 AND SET FOR SECOND READING AND PUBLIC HEARING ON THE 27TH DAY OF JULY 2016. SECOND READING AND PUBLIC HEARING CONTINUED TO THE 10TH DAY OF AUGUST 2016. NOTICE OF PUBLIC HEARING AND TITLE AND SHORT SUMMARY OF THE O INANCE PUBLISHED IN THE ASPEN TIMES WEEKLY ON THE /y ' DAY OF u( 2016. NOTICE OF PUBLIC HEARING AND THE FULL TEXT OF THE ORDINANCE POSTED ON THE OFFICIAL PITKIN COUNTY WEBSITE(www.pitkincounty.com ) ON THE /9'4" DAY OF d Vi/ 2016. ADOPTED AFTER FINAL READING AND PUBLIC HEARING ON THE 10TH DAY OF AUGUST 2016. PUBLISHED BY TITLE AND SHORT SUMMARY, AFTER ADOPTION, IN THE ASPEN TIMES WEEKLY ON THE J DAY OF ((tAri 2016. POSTED BY TITLE AND SHORT SUMMARY ON THE OFFICIAL PITKIN COUNTY WEBSITE (www.pitkincounty.com)ON THE /Stg*DAY OF ���1 2016. THIS ORDINANCE IS EFFECTIVE ON AUGUST 10, 2016. ATTEST: BOARD OF COUNTY COMMISSIONERS BY /./I i./..' /L llliJ By: ii 41W Jea :tte Jones, Rach= E. Richards, Chai De. �ty County Clerk Date: V'/,-'24/6 APPROVED AS TO FORM: MANAGER APPROVAL __.aidalp Laura C. Makar, Jon 'eacock, County Manager Assistant County Attorney 2 ic 4Z/k./ A TEMPORARY EASEMENT FOR CONSTRUCTION ACCESS TO THE ROARING FORK RIVER FROM BASALT COMMERCIAL PARK LOT J,BASALT FOR THE PURPOSE OF INSTALLING RECREATIONAL IN-CHANNEL DIVERSION STRUCTURES This Temporary Easement Agreement in Pitkin County, Colorado ("Agreement") is made and entered into this / .14-' day of Jl is t , 2016 by and between Fork Front Basalt LLC c/o Aaron Ward, 562 Highway 133 Carbondale, CO 81623 ("Fork Front") and the Board of County Commissioners of Pitkin County, Colorado, 530 E. Main St., Ste. 302, Aspen, CO 81611 (the "County"). RECITALS A. Fork Front owns real property located in Pitkin County, described as Basalt Commercial Park Lot J, and more fully described in the attached Exhibit A (the "Subject Property"). The Subject Property is adjacent to the Pitkin County River Park Project and associated Recreational In-Channel Diversion construction site. B. The County is scheduled to install recreational in channel diversion structures into the Roaring Fork River as part of the Pitkin County River Park Project pursuant to the Decree issued in Case No. 2010CW305 on June 12, 2014, Concerning the Application of the Board of County Commissioners of Pitkin County for Surface Water Right Appropriations for Recreational In- Channel Diversion. The Pitkin County River Park Project includes construction of two (2) recreational in-channel diversion recreation features, installation of bank stabilization, installation of five (5) geomorphic structures, and care and control of Roaring Fork River water throughout construction. C. The parties wish to execute a temporary construction easement agreement to allow the County access across and use of the Subject Property for construction of the Pitkin County River Park Project. A more detailed depiction of the construction easement area is attached hereto as Exhibit B. NOW, THEREFORE, in consideration of the foregoing recitals and the covenants contained herein, and for the sum of Five Hundred Dollars ($500) to be paid by the County to Fork Front, and such other good and valuable consideration, the sufficiency of which is hereby acknowledged, Fork Front and the County covenant and agree as follows: 1. Grant of Temporary Construction Easement. Fork Front, for itself and for its successors and assigns, hereby grants to the County, its successors and assigns, a temporary, non-exclusive easement (the "Temporary Construction Easement") on the Subject Property for the purpose of construction of the Pitkin County River Temporary Construction Easement Page 12 Park Project (hereinafter, the "River Park Project"). The boundaries of the easement (the "Construction Easement Area"), and the route of ingress and egress to the River Park Project, are depicted on the attached Exhibit B. 2. Terms of Temporary Construction Easement. Temporary Construction Easement provides the County, its agents, representatives and contractors, with the rights of ingress and egress to and from the area of the River Park Project, with the right to perform necessary ancillary work within the construction easement itself, and with the right to perform reclamation and restoration work within the construction easement once the River Park Project is completed (no later than September 1, 2017, per the language below). The County shall also have the right under the Temporary Construction Easement to temporarily store materials and equipment, and to stage construction activities necessary for the River Park Project. The Temporary Construction Easement shall commence on the effective date of this Agreement. The parties anticipate that the Temporary Construction Easement shall be between August 10, 2016 through April 30, 2017 to perform the River Park Project. The County shall have the right to extend the temporary easement on a monthly basis from May 1, 2017 until September 1, 2017 at a monthly cost of$1,500 due to Fork Front by the 5th day of the month. The County shall give Fork Front 14 days' notice of its intent to invoke this extension provision and 14 days' notice of its intent to terminate this extension provision, if the extension provision invoked by the County. Any part or parts of the Subject Property, including the Construction Easement Area, which are damaged or disturbed during the process of the Work, shall be restored by the County at the County's expense. All construction activities for the River Park Project shall be carried out at the County's expense. 3. Restoration. County shall restore any areas of the Fork Front property disturbed by the use of this temporary construction easement to the final graded condition shown in Exhibit B with 5 inch minus screened alluvial material. Pavement shall be restored to conditions existing at the time of commencement of the River Park Project. Such restoration includes the areas delineated in Exhibit E. Upon completion of the restoration, County shall provide a survey to Fork Front which indicates the final grading of the Fork Front property and its relation to flood hazards. 4. Attorneys' Fees. In the event the interpretation or enforcement of this Agreement should ever become the subject of litigation, arbitration or mediation between the County and Fork Front, the substantially prevailing party shall be awarded its reasonable costs and attorneys' fees and costs incurred in connection therewith. Temporary Construction Easement Page 13 5. Insurance. The County agrees that it will promptly add Front Fork as an additional insured on its comprehensive general liability policy for purposes of liability or claims that arise out of the County's activities within the Construction Easement Area. 6. Whole Agreement; Severability. This Agreement is fully integrated and represents the entire agreement between the parties. If a court of competent jurisdiction finds or holds any part of this Agreement to be void, unenforceable, invalid, or illegal, the remainder of this Agreement shall nevertheless be continued in full force and effect. 7. Recitals. The Recitals contained in this Agreement are hereby made an integral part of the Agreement. 8. Authority. The Signatories to this Agreement warrant that they have full authority to act on behalf of and bind their respective organizations to the terms of this Agreement. 9. Notice. All communications shall be routed to: Lisa MacDonald Pitkin County Attorney's Office 530 E Main St., Ste. #302 Aspen, CO 81611 Lisa.MacDonald@pitkincounty.com Fork Front Basalt LLC c/o Aaron Ward 562 Highway 133 Carbondale, CO 81623 Award(cvalbridge.com Temporary Construction Easement Page 14 DONE THIS 145 -4. DAY OF 111/51/5i 2016: The Board of County Commissioners of Fork Front Basalt LLC Pitkin County, Colorado .....‹.-------1:11 ..0 Rach 1E. Richards, Cham f Aaron A" STATE OF COLORADO ) ) ss. COUNTY OF PITKIN ) 11I 1 The above instrument is acknowledged before me thi day of 11 L ►,, 2016, by Rachel E. Richards. Witness my hand and seal. My commission expires: `* R47013 1 LISA MACDONALD N.NOTARY PUBLIC ` it. STATE OF COLORADO !►� 1 1 No r4o=V in# 19924015259 ! � �, MY CCM:: I ":ES NOVEMBER 18,2018 Not.! Public STATE OF COLORADO ) Temporary Construction Easement Page 1 5 � ) ss. COUNTY OF C7Gt��21 ) The above instrument is acknowledged before me this5riday of / 2016, by Aaron Ward. Witness my hand and seal. MISHEEL CHULUUN Notary Public �,✓ State of Colorado My commission expires: Notary 10 20154038113 My Commission Ex,ires Se, 25,2019 otary Public EXHIBIT A t 0 LEND AND NOTES • SURVEY CONTROL '9AZITettrAaarCUPUIY a rAM."01-5”M" PARKIN BRAPNIALLY MOEN ON MO PLAT NT NO/OW-MOM OR Ma IMMIMIIIMIlliill SEE MO PLAT FOR RIIILDINO INIRTRICTIRNS • III BR CI.1110VIV ROT \z............. .0,00•0106 1.11e ...,.................. \ , 4:1.. \ \ //\\ it.• '., \ \ \ / ./. 2 ••-.. \ \ \ / z A • • / •sa.v. \ \ -- ,/ / 0" ./. \ . • \ N, .>< / ..,• \ \ ./ )\ •°' / 0 .• . .1, \ \ ,/ / \ . \ X ( / \ \ \ \ \ , s. \• • \, \ .. LOT J \ 1.... Vranir4riMnirnEr \ N '61. 4 4. \ \ \ 44, \ ‘,‘ I, •,, \ pr' iE.1.7vre' ,>••\ ... • . y, \ \ •• ,t. \ . • .., 44, \ / .;. .p.,, \ \ ',. **, .• / \ \ .% \\ \ \ % \ \ ---- 4,4., . - ,,,....._ '41111/4. 41)• , N,lir ' Mr A . ge CERTIFICATION PlaTillreg4,7,:=41M3-, ORMEKEttiarta2rE"m"" 05rEqillaMi&067°A5::— °ATM_ IMPROVEMENT SURVEY OF itApptt71,11E.3 57411011171 varrrazor,-,anaz.ir 1:A4'MM PREPARED BY ASPEN SURVEY ENGINEERS. INC. 210 SOUTH GALENA STPEET ASPEN COLORADO 11611 PNONE/FAM 10701 122,21116 liTE712/1111t7KragFirl.. DATE 'JOS Liza0.LTN 4.n,.10.,mzx rnrxm v,.. VI. /0202 EXHIBIT B s g CONSTRUCTION NOTES: a oou, °r �� •, • 1. CONTRACTOR RESPONSIBLE FOR DESIGN, ` �'A"",+ Ht� �V�;tigiv.....—,..mr--* r` IMPLEMENTATION AND MAINTENANCE OF THE CARE • ¢fir, I TURBIDITY CURTAIN �� +a �a OF WATER SYSTEM. DETAILS INCLUDED IN THIS‘14, '" ":�' 'k' Av.p - (SEE DETAIL, �- • S. s a/xoi PLAN SET ARE FOR PLANNING AND COST ��4F�� e" c.SHEET D1) t. ESTIMATING PURPOSES ONLY. ry.y!UNALBN OIL BOOM Cr % t 2. FOOTPRINT OF THE CARE OF WATER SYSTEM, ti (SEE DETAIL, r t,: S% INCLUDING SHEET PILE DAM, PIPE TRENCH AND I— SHEET D1) �� & a» ^';1 PIPE OUTFALL SHALL BE RESTORED TO O PIP EXISTING COFFER DAM c'IA PRE—CONSTRUCTION GRADE AND CONDITION Z UNLESS AS OTHERWISE INDICATED IN THESE Q TREES g ,•,3.,. (SEE DETAIL, PLANS. J �• -, aSHEET D1) \ (L CZ BYPASS PIPE �G,. �,- , 3. ALL TEMPORARY PIPES SHALL BE CORRUGATED J a OUTLET DEWATERING PUMP METAL OR DUAL WALLED HDPE PIPE. Z 0z (SEE DETAIL, SHEET CWO5) . AND FILTER W (SEE NOTE 6, THIS SHEET) (SEE DETAIL, SHEET D2 4. ENGINEER TO MARK AND CONTRACTOR TO O O )— AND SPECS FOR N. MAINTAIN LIMITS OF DISTURBANCE IN FIELD. Q ACCESS ROAD #2 PIP EXISTING c,,,4:,:-, INFORMATION) 1,4 ,. TREES r 5. HARVEST ALL STAKES AND POLES WITHIN LIMITS Z (SEE DETAILS, SHEET CW04) �� OF DISTURBANCE AND REUSE DURING Q 0 LL . POST—CONSTRUCTION RESTORATION. *_.._ DRAINAGE ♦ , "INLET PROTECTION 9.n • 6. CONTRACTOR TO MONITOR BYPASS OUTFALL FOR t W 4ti' EROSION AND MATERIAL REPAIRS/ADD MATERIAL > --- ,ir + AS REQUIRED. COORDINATE WITH ENGINEER ON p OZ r► ", ANY MODIFICATION TO THE OUTFALL DESIGN. Z Q PIP EXISTING W 1`4 r,, ', a 1 •' TREES ALONG RIVER `" U ¢1, -4' SPILL CLEAN UP "`��� .�. O Z STAGING AREA 4 ?„ KIT j y# . O • QZ • & FUELING AREA CS' - 'r •Ij• C <� RELOCATE V Z Z ,,',,,c0-;--,',.7'' EXISTING li ' 'y 1 0 G ilx,,, LARGE WOODY • ''h _ ♦ I- Z HLLJ DEBRIS ' LL LIMITS OF ` .= ♦ no NensnN/UPDATE D. o.:`,0' DISTURBANCE , � ' Q Mees.M. 0/14/14(TYP.) • -'' �j�jA ra - M I�� S kkyinE, yo: xan LOT J 4- ux _ 'r PIP EXISTING 1• OIL BOOM T Counr� CONSTRUCTION ems' TREES ALONG RIVER (SEE DETAIL, s'EASEMENT AREA „- SHEET D1) 3301.Man 3L-end Poon TURBIDITY CURTAIN TEMPORARY Aap.n,CO6I WM GI ti (SEE DETAIL, ACCESS RAMP 401061 ACCESS ROAD #1 STAGING SPILL CLEAN SHEET D1)' • SLILY (SEE DETAIL, SHEET CW04) AREA UP KIT • STAGING AREA GRADING TEMPORARY 2 X 60” CMP • A r.rooi.w�Box coe,sza SHEET PILEo"d•o e BYPASS PIPE _ _ ,,`'�, " ENGINE(APPROX 250 CY) Q COFFER DAM S wrciucoum �' .. ''''` ENGINEER TO PROVIDE (SEE DETAILS, SHEET CW03) DIGITAL TERRAIN MODEL. F (SEE SHEET CW02) �\ e,T...e,o,,.ii,.'o«rioN.nc WO) PROJECT LIMITS . rmKco-eomyeonwen �.° _ Brief,CO am,P .., •N'' - v - - CARE OF WATER-FISHERMAN'S PARK �.:la.Ear w� "" CARE OF WATER-MAIN SITE i ,_ ' i— MAY, 20,0 CWO I I' 3a l CONTRACT# A TEMPORARY EASEMENT FOR CONSTRUCTION ACCESS TO THE ROARING FORK RIVER FROM BASALT COMMERCIAL PARK LOT J,BASALT FOR THE PURPOSE OF INSTALLING RECREATIONAL IN-CHANNEL DIVERSION STRUCTURES This Temporary Easement Agreement in Pitkin County, Colorado ("Agreement") is made and entered into this / 14'' day of 1#6 t , 2016 by and between Fork Front Basalt LLC c/o Aaron Ward, 562 Highway 133 Carbondale, CO 81623 ("Fork Front") and the Board of County Commissioners of Pitkin County, Colorado, 530 E. Main St., Ste. 302, Aspen, CO 81611 (the"County"). RECITALS A. Fork Front owns real property located in Pitkin County, described as Basalt Commercial Park Lot J, and more fully described in the attached Exhibit A (the "Subject Property"). The Subject Property is adjacent to the Pitkin County River Park Project and associated Recreational In-Channel Diversion construction site. B. The County is scheduled to install recreational in channel diversion structures into the Roaring Fork River as part of the Pitkin County River Park Project pursuant to the Decree issued in Case No. 2010CW305 on June 12, 2014, Concerning the Application of the Board of County Commissioners of Pitkin County for Surface Water Right Appropriations for Recreational In- Channel Diversion. The Pitkin County River Park Project includes construction of two (2) recreational in-channel diversion recreation features, installation of bank stabilization, installation of five (5) geomorphic structures, and care and control of Roaring Fork River water throughout construction. C. The parties wish to execute a temporary construction easement agreement to allow the County access across and use of the Subject Property for construction of the Pitkin County River Park Project. A more detailed depiction of the construction easement area is attached hereto as Exhibit B. NOW, THEREFORE, in consideration of the foregoing recitals and the covenants contained herein, and for the sum of Five Hundred Dollars ($500) to be paid by the County to Fork Front, and such other good and valuable consideration, the sufficiency of which is hereby acknowledged, Fork Front and the County covenant and agree as follows: 1. Grant of Temporary Construction Easement. Fork Front, for itself and for its successors and assigns, hereby grants to the County, its successors and assigns, a temporary, non-exclusive easement (the "Temporary Construction Easement") on the Subject Property for the purpose of construction of the Pitkin County River RECEPTION#: 631423, 08/15/2016 at 02:01:21 PM, 1 OF 8, R $0.00 Doc Code EASEMENT Janice K.Vos Caudill, Pitkin County, CO Temporary Construction Easement Page I2 Park Project (hereinafter, the "River Park Project"). The boundaries of the easement (the "Construction Easement Area"), and the route of ingress and egress to the River Park Project, are depicted on the attached Exhibit B. 2. Terms of Temporary Construction Easement. Temporary Construction Easement provides the County, its agents, representatives and contractors, with the rights of ingress and egress to and from the area of the River Park Project, with the right to perform necessary ancillary work within the construction easement itself, and with the right to perform reclamation and restoration work within the construction easement once the River Park Project is completed (no later than September 1, 2017, per the language below). The County shall also have the right under the Temporary Construction Easement to temporarily store materials and equipment, and to stage construction activities necessary for the River Park Project. The Temporary Construction Easement shall commence on the effective date of this Agreement. The parties anticipate that the Temporary Construction Easement shall be between August 10, 2016 through April 30, 2017 to perform the River Park Project. The County shall have the right to extend the temporary easement on a monthly basis from May 1, 2017 until September 1, 2017 at a monthly cost of$1,500 due to Fork Front by the 5th day of the month. The County shall give Fork Front 14 days' notice of its intent to invoke this extension provision and 14 days' notice of its intent to terminate this extension provision, if the extension provision invoked by the County. Any part or parts of the Subject Property, including the Construction Easement Area, which are damaged or disturbed during the process of the Work, shall be restored by the County at the County's expense. All construction activities for the River Park Project shall be carried out at the County's expense. 3. Restoration. County shall restore any areas of the Fork Front property disturbed by the use of this temporary construction easement to the final graded condition shown in Exhibit B with 5 inch minus screened alluvial material. Pavement shall be restored to conditions existing at the time of commencement of the River Park Project. Such restoration includes the areas delineated in Exhibit B. Upon completion of the restoration, County shall provide a survey to Fork Front which indicates the final grading of the Fork Front property and its relation to flood hazards. 4. Attorneys' Fees. In the event the interpretation or enforcement of this Agreement should ever become the subject of litigation, arbitration or mediation between the County and Fork Front, the substantially prevailing party shall be awarded its reasonable costs and attorneys' fees and costs incurred in connection therewith. Temporary Construction Easement Page 13 5. Insurance. The County agrees that it will promptly add Front Fork as an additional insured on its comprehensive general liability policy for purposes of liability or claims that arise out of the County's activities within the Construction Easement Area. 6. Whole Agreement; Severability. This Agreement is fully integrated and represents the entire agreement between the parties. If a court of competent jurisdiction finds or holds any part of this Agreement to be void, unenforceable, invalid, or illegal, the remainder of this Agreement shall nevertheless be continued in full force and effect. 7. Recitals. The Recitals contained in this Agreement are hereby made an integral part of the Agreement. 8. Authority. The Signatories to this Agreement warrant that they have full authority to act on behalf of and bind their respective organizations to the terms of this Agreement. 9. Notice. All communications shall be routed to: Lisa MacDonald Pitkin County Attorney's Office 530 E Main St., Ste. #302 Aspen, CO 81611 Lisa.MacDonald@pitkincounty.com Fork Front Basalt LLC c/o Aaron Ward 562 Highway 133 Carbondale, CO 81623 Awardavalbridge.com Temporary Construction Easement Page 14 DONE THIS /'S DAY OF Al/y6i 2016: The Board of County Commissioners of Fork Front Basalt LLC Pitkin County, Colorado RachEE. Richards, Chai Aaron f STATE OF COLORADO ) )ss. COUNTY OF PITKIN ) kI , The above instrument is acknowledged before me thi day of I\L. .., 2016, by Rachel 5:kl% E. Richards. Witness my hand and seal. My commission expires: \� Riav LISA MACDONALD ` NOTARY PUBLIC STATE OF COLORADO 1 ' 1 FAI NO'is'<•; In# 19924015259 i!i1 Llipd M:.;.;:.;, t ':E.NOVEMBER 18,2018 Not.! Publics STATE OF COLORADO ) Temporary Construction Easement Page 15 ec/ )ss. COUNTY OF �7�� / The above instrument is acknowledged before me this3r day of, / 2016, by Aaron Ward. Witness my hand and seal. MISHEEL CHULUUN Notary Public State of Colorado My commission expires: �Ie!7 o�� Notary ID 20154038113 M Commission Ex•fres Se 25, 2019 otary Public EXHIBIT A 1 0 LEGEND AND NOTES • SURVEY CONTROL . 'IdiTAFF57444 155Fi El-DOMAIN AIAD LOUIS OF DISTURBANCE SGLED FROD SUDO PLAT SEE SUDO PLAT FOR!WILDING RESTRICTIONS kl S syitVEr FOOT ...... mi.:.— "... ....... \ 4•• 4;ks \ \ / - •. \ \ / -/ 2 ''-.• N •, N ,/ / \ • ____ / / .,,,, / , \ \• X / 4, ,./ \ ,... ,\ \ „/ >, er,'/ , 1\ ,/ 7 \ ... / ittre • , ., LIMITS OF \ \ ( \ \ • •, N \ -. LOT J \ raumr..NA.Lmmr, \ 1%, ,,-, • . \ \ , 1. wr 1). kO "''''''' N \ .4., ''', %%\'\ ' / \ \ \ ' , / \ \ .t.,,,, \ * •-s, Q \', leA,,I,L, 'IL Ltc,i3O p.' 4G.Z''A Mr , De gillgrA1/4,12171;71FAn'N'::P7:5;;:liNFPA:PAtItC°:717:"T?"7 EtiilifirL:NYSIP0742LETIF:E'Eilkl°117' MAGI 11 NORIORTX P L S MLA IMPROVEMENT SURVEY op Vicliiptipgaili Filii,:fp s'avrepr,wimr.znagma“ riroaligo PREPARED BY ASPEN SURVEY ENGINEERS. INC. 210 SOUTH CALERA STREET ASPEN COLORADO 11611 PRONE/FAY 19701 925-3816 iki gird i:PP ny'IS re.S Wt.F..4;"708“ DATE JOB kr,r,r7o.r.8.0AiNaireyfitiln 5/14 44202 44-444484-4444444-44049-444,-44.“46.6, EXHIBIT B 410 '. CONSTRUCTION NOTES:44 .. 0014 '�, 'B., 1. CONTRACTOR RESPONSIBLE FOR DESIGN, �� ^ae. Fe 's y IMPLEMENTATION AND MAINTENANCE OF THE CARE j am @k TURBIDITY CURTAIN OF WATER SYSTEM. DETAILS INCLUDED IN THIS 4 1/2016 -y, (SEE DETAIL, PLAN SET ARE FOR PLANNING AND COST ° e SHEET D1) ;;F' ESTIMATING PURPOSES ONLY. � o� bx�?, OIL BOOM t (SEE DETAIL, b 2. FOOTPRINT OF THE CARE OF WATER SYSTEM, SHEET D1) • >" • • INCLUDING SHEET PILE DAM, PIPE TRENCH AND I- �' \ �`: �� PIPE OUTFALL SHALL BE RESTORED TO 0 PIP EXISTING PRE-CONSTRUCTION GRADE AND CONDITION W Z UNLESS AS OTHERWISE INDICATED IN THESE C3 Q TREES �;. (SLE UET `fi SHEET D1) \' PLANS. J BYPASS PIPE n- 3. ALL TEMPORARY PIPES SHALL BE CORRUGATED OUTLET DEWATERING PUT E (SEE DETAIL, SHEET CW05) AND FILTER METAL OR DUAL WALLED HDPE PIPE. Z (SEE NOTE 6, THIS SHEET) �•• (SEE DETAIL, SHEET 4. ENGINEER TO MARK AND CONTRACTOR TO U 11-1 • AND SPECS FOR \ ,� MAINTAIN LIMITS OF DISTURBANCE IN FIELD. Q ACCESS ROAD #2 PIP EXISTING INFORMATION) • TREES �'•, `' 5. HARVEST ALL STAKES AND POLES WITHIN LIMITS Z • (SEE DETAILS, SHEET CW04) .. � OF DISTURBANCE AND REUSE DURING () 0 `* POST-CONSTRUCTION RESTORATION. DRAINAGE ( 0 `'INLET PROTECTION '' \ - 6. CONTRACTOR TO MONITOR BYPASS OUTFALL FOR i W Tri k EROSION AND MATERIAL REPAIRS ADD MATERIAL > W +4 F. _ c� g AS REQUIRED. COORDINATE WITH ENGINEER ON — " , ANY MODIFICATION TO THE OUTFALL DESIGN. _ s SPILL CLEAN li A 'T a W STAGING AREA KIT " V 0 Z a. & FUELING AREA 6 rx ��` �� %` Z m" 2 RELOCATE #>S, EXISTING i Z ' LARGE WOODY - .0,", <% DEBRIS LIMITS OF \ 6 065.0+/u 0o0r 01 DISTURBtii _ �� (TYP.) 11111, _ 1 • /110111 Q sl'300,�.ew.�. ensue - .4 LOT J � OIL BOOM , Coonr� PIP EXISTING ` DETAIL, cam— CONSTRUCTION ^4 TREES ALONG RIVER & (SEE —� EASEMENT AREA r<{ NFFT D Pm"co q Co0ux Pbss TURBIDITI' CURTAIN IEMFURARY ACCESS ROAD #1 STAGING ACCESS RAMP SPILL CLEAN (SEE DETAIL, • (SEE DETAIL, SHEET CW04) AREA UP KIT • SHEET D1)' • 3� I • s STAGING AREA GRADING TEMPORARY 2 X 60" CMP ,� P.O.Box 240 r <(APPROX 250 CY) Q BYPASS PIPE SHEET PILE .� Carbondale,coe er., ENGINEER TO PROVIDE (SEE DETAILS, SHEET CW03)• COFFER DAM \ DIGITAL TERRAIN MODEL. (SEE SHEET CW02) COUNTY PROJECT LIMITS ` wi"" a.*.rortwn e "M Raerol `.{" - Nye', Ron rg Park b.r.. �4'` i• Bctlt,C08,521 j • CARE OF WATER-FISHERMAN'S PARK .rtbn Gouty RIM CARE OF WATER-MAIN SITE 1 I MAY 12oic CWO I 8 I". I'-30' l