Loading...
HomeMy WebLinkAboutbocc.con.amended.122.2015A 7'2015 kjin pirKIN Pitkin County CouNT' Contract Cover Sheet Please complete the Contract Cover Sheet when the contract is completed and signed by Contractor/Vendor and Pitkin County Project Lead. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments to Procurement (procurement_help@pitkincounty.com).Any contracts$50,000 and over will be routed for signatures to County Manager and Attorney's Office(if required)by Procurement&Contracts Manager. Contract Information Contract Number 122.2015 A Project Name Architecture Design Services for 911 Dispatch Remodel Contractor Poss Architecture and Planning Budget Line Item 110.40.82840.82001 $ Additional Budget Line $ Item(s) $ (Please fully allocate New $ Contract Total) $ Contract Start Date 1/1/2016 Contract End Date 8/31/2016 Automatic Renewal Yes ❑ No® If Construction: Retainage Yes$ or % No® If this is a new contractor,please request they complete and submit to Finance a W-9 Form. Contact Information: Department Facilities Project Manager Jodi Smith Project Manager (970)920-5396 Phone Provide a brief description of the contract: Scope of work adjustment to include planning approvals,value engineering,generator and trailer op and non-dispatch building move Contract Value Summary: Original Contract Amount $82,000.00 Previous Change Order/Amendment Amount(if applicable) $ This Change order/Amendment amount(if applicable) $46,360.25 New Contract Total $ 128,360.25 Procurement Method: None ❑ Informal Formal El Sole Source 0 Emergency 0 Contract Renewal 0 . Contract Type: Services/Maintenance ® Construction ❑ Goods,Equipment, Supplies ❑ Change Order/Amendment 0 Other,please explain 0 Click here to enter text. NOTE: CLERKS OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE.ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST. Contract# 122.2015 Rev. 8.31.11 jaa/js Budget Line Item# 110.40.82840.82001 ‘91fTKIN COUNT @/- .C-N(?) CHANGE ORDER/CONTRACT AMENDMENT Change Order Number: 122.2015 A OWNER: Pitkin County Aspen, Colorado 81611 CONTRACTOR: Poss Architechture and Planning The Provision of Architecture Design Services for 911 Dispatch Remodel (the "Agreement") dated 3/15/2016 between the Board of County Commissioners of Pitkin County (the "County") and Poss Architechture and Planning(the"Contractor"), is hereby amended as follows: Description of Change: Scope of Work changed to include Planning Approvals, Value Engineering, Generator and Trailer Op, and Non-Dispatch Building Move Reason for Change: Amendment to include all costs required for change in Scope of Work Original Contract Amount $ 82,000.00 Previous Change Order/Amendment Amount(if applicable) $ This Change Order/Amendment Amount(if applicable) $ 46,360.25 New Contract Total $ 128,360.25 In all other respects the Agreement is in full force and effect and remains unchanged by this Amendment. Poss Architechture and Planning Date Procurement Officer Date Jon Peacock,County Manager Date *Increases over$25,000 and/or 10% (single increase or accumulative) of original contract must have County Manager signature. Cantrwl tl '22.2A a Fe►.L!!it fm'fr Pudigt Lint Iwo*I 111-4152$40.112001 jjihIN Cour T CH '~GF,ORDER(CONTRACT rtMEANDN1ENT Claw UnlerlYurnt er 122.2015. A OWNER: t'itkin Camay Asrci.,Colotade 31611 CO)4r ACJ()k Pass Arch,terlstaw and Planing The Pmvision cit Architccturc Dcsign getvises for S i i 13oratch Rcinol c!. (the "Agrement' eared 3/151:10 heltw'cen tie Basal of Cunt, Con lissiotlt-M of Pitkin Calmy (thf "GhWlty') Rik:. AnLite .-urn an+1 (Ihc"Ctuntrectt ^,s,1 htveby gme,I tl a raDtwug.! 1 sCRp0fA.gti f; Scope of Wolk clanged to include Planking ApFacevattt. Value t:tlpnrerin . Generator End"Tui ler Op, aad Non-Dispatch i3uildiig Mow j cast n kw;hangs;Atrtcndtocr.#to iincludc al stat rvct►Tircd for clhanac is Soaps of Work {>rtglaal Contract.tmonat S 82.10n4 .00 tresloas L`;ITtttn.c OnirrMmealairnt Amount it , 'cow 3 This Chang*8rdrrMxiuedmeat Mimosa to gierdontso S416.360.25 New Coo few?'Total S 1210160.29 In all oiled t ez:l5 the Agt,:citrctlt LS in dull ftuatn d clTcct y this AMtntinkent. Polis Ardutrcl .uc and Huai ng u s'. .:;I: a: 11.10/201G 37 PM Pmutvrnoit Officer I}alc Jan 1'cacock,Courtly Mannser Dote `lrtrreascs over SZc I))4 ail'or 10%isin`le increase orsiecamulathvp n[original contract mot !rave Co unity Si an sip=tune. . i i CFIANGE ORDER - --- PROJECT: Pitkin N40 Dispatch Relocation CHANGE ORDER NUMBER: One(1) CHANGE.ORDER DATE: 07/05/16 COUNTY'S PRO.1. NO.: 122.2015 TO: Poss Architecture and Planning CONTRACT FOR: Design Services CONTRACT DATE: ATTN: Richard De Campo COST CODE: 110.40.82840.82001 (if different than contract code): You are directed to make the following changes In this Contract: 1. Planning Submittal Services-hourly $26,310.00 2 VE Services-hourly $12,031.25 3 Construction Administration Services-hourly (556.00) -$12,280.00 4 Design for Fire Dept Work-hourly $1,145.00 5 Generator Enclosure Design $7,430.00 46,360.25 _$59;196.25 The original Contract Sum was $82,000.00 Net change by previous Change Order $0.00 The Contract Sum prior to this Change Order was $82,000.00 The Contract Sum will be INCREASED by this Change Order 46,360.25 •$53,196.25 The new Contract Sum including this Change Order will be 128,360.25 -$141;130:26 The Contract Time will be increased by zero days. The Date of Completion as of the date of this Change Order remains unchanged. Pass Architecture and Planning Pitkin County Architect By: ,} By: podi Sm 4. 7.444,4 V ntdoa' �� 11/09/2016 10:07:12 AM Dato 1;1,1M LI • August 10,2016 Pilkfn County Project No: 21511.01 Invoice No: 22809 c/o Ditivid Detwiler 485 Rio Grande Place,@101 Aspen, CO 81011 Project 21511.01 Pitkin County Dispatch Relocation Change Order Number:99.2015A Prof seal Services trot July_1,2016 to Jut 31,3.0_L§ Phase A1001 Design Task A000 General Administration&Oversight Fee Total Fixed Foe 9,600.00 Percent Complete 10.00 Total Earned 050.00 Previous Feo Billing 0.00 Current Fee Billing 960.00 Total Fixed Fee 960.00 Total this Task $960.00 Total this Phase $960.00 Total this Invoice $960.00 Billings to Date Current Prior Total Foe 950.00 0.00 950.00 Totals 950.00 0.00 • 960.00 • PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE•THANK YOU I t ;y I�J!'Olr,i Seplombor 4, 2013 Project No: 21611.01 PltkI n County Involco No: 22898 do David Detwiler 486 Rio Grando Place,#101 Aspen,CO 81611 Project 21611.01 Pitkin County Dispatch Relocation Professional Services from August 1,?,015 to Au/rUst 31, 2015 Phase A1001 Design Fee Total Fixed Fee 9,600.00 Percent Complete 20.00 Total Earned t900.00 Previous Foe Billing 950.00 Current Foe Billing 950.00 Total Fixed Fee 960.00 Total this Task $950.00 Total this Phase $950.00 Phase RA001 Architectural Reimbursablos Reimbursable Expenses REPRODUCTION-PUSS 8/31/2016 In House Plots&Prints In House Plots&Prints 11.00 Total Rolmbursablos 11.00 11.00 Total this Phase $11.00 Total this Invoice $961.00 Outstanding lnvolcos Number Date Balance 22809 8/10/2015 950.00 Total 950.00 Total Now Duo $1,911.00 Billings to Date Current Prior Total Fee 950.00 950.00 1,900.00 Expense 11.00 0.00 11.00 Totals 961.00 960.00 1,911.00 PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE-THANK YOUI tI t ii'.'ay Iii4glf.l November 19,2016 Project No: 21511.01 • Pitkin County Invoice No: 23030 c/o David Dotwilor 485 Rio Grande Plato,l/101 Aspen, CO 81611 Project 21511.01 Pitkin County Dispatch Relocation • Prolossicnal.6.4rvlcos from OctobocL2 0:1.29.4tobor 3'L2015 Phase A1001 Design Task r ~ A000 General Administration&Oversight _ �~ Foo Total Fixed Fee 9,600.00 Percent Complete 100.00 Total Earned 9,600.00 Previous Fee Billing 1,900.00 Current Foe Billing 7,600,00 Total Fixed Foo 7,800.00 Total this Task $7,600.00 Total this Phase $7,600.00 • w w ..+ w. ... .....�. ..v w --- rr ... r. •.'.-+ ..+. ... .�. Phase RA001 Architectural Relmbursables Reimbursable Expensos • REPRODUCTION-POSS • 9/30/2015 In House Plots&Prints In House Plots&Prints 13.86 10/31/2015 In House Plots&Prints In House Plots&Prints 51.81 Total Reimbursablos 65.67 05.07 Total this Phase $65.07 Total this Invoice $7,665.67 Outstanding Invoices Number Date Balance 22869 8/10/2015 950.00 22898 9/4/2015 981.00 Total 1,911.00 Total Now Duo $9,576,67 Billings to Dato Current Prior Total Foo 7,600.00 1,900.00 9,500.00 Expense 65.67 11.00 76.67 Totals 7,665,67 1,011,00 0,576.67 PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE-THANK YOUI Pi) 111Voit:l. December 23,2015 Project No: 2161 1.01 • Pitkin County Invoice No: 2.3085 c/o David Detwiler 485 Rio Grande Place,1/101 Aspen, Co 81611 Projoct 21511.01 Pitkin County Dispatch Relocation 'iof!essIonai Service. te»November 1.2015 to November 30.2016 Phase A1002 Planninglpprovals Task A000 Goneral Administration&Oversight Professional Personnel Hours Rate Amount do Campo, Richard 2.00 170.00 340.00 Totals 2.00 340.00 Total Labor 340.00 • Total this Task $340.00 Task APO() Agoncy Review and Approvals Process Professional Porsonnol • ' Hours Rate Amount do Campo,Richard 11.00 170.00 1,870.00 • Totals 11.00 1,870.00 •• Total Labor 1,870.00 Total this Task $1,870.00 Task 0000 Design Profossional Porsonnol Hours Rate Amount de Campo,Richard 6.00 170.00 1,020.00 Totals 6.00 1,020.00 Total Labor 1,020.00 Total this Task $1,020.00 Task P000 Production/Documentation Professional Personnel Hours Rate Amount Harries,Joel 12.50 105.00 1,312.50 • PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE•THANK YOUI III)','., IA70li:r ..r Project 21511.01 Pitkin County Dispatch Relocation Invoice 23085 ''Milkier,Marc 62.00 106.00 6,510.00 Totals 74.60 7,822.60 Total Labor 7,822.60 Total this Task $7,822.60 Task QMOO Quality Management Professional Personnel Hours Rate Amount do Campo,Richard .50 170.00 85.00 Totals .50 85.00 Total Labor 85.00 • Total this Task $85.00 • Total this Phaso $11,137.60 Phase M005 Construction Documents Task A000 General Administration&Oversights Foo Total Fixed Foe 36,000.00 Percent Complete 50.00 Total Earned 18,000.00 Previous Fee Billing 0.00 Current Fee Billing 18,000.00 Total Fixed Fee 18,000.00 • Total this Task $18,000.00 Total this Phase $18,000.00 Phase RA001 Architectural Reimbursables Reimbursable Expenses REPRODUCTION-POSS 11/30/2015 In House Plots&Prints In House Plots&Prints 207.62 Total Reimbursables 207.62 207.62 Total this Phase $207.62 Total this Invoice $29,346.02 !JOSSIIIru►t:c Project 21511.01 Pitkin County Dispatch Relocation Invoice 23085 Outstanding Invoices Number Date Balance 22696 9/4/2015 961.00 23030 11/10/2015 7,665.67 Total 8,626.67 Total Now Otte $37,971.69 Billings to Date Currant Prior Total Fee 18,000.00 9,500.00 27,500.00 Labor 11,137.60 0.00 11,137.50 Expense 207.52 76.67 284.19 Totals 29,345.02 9,576.67 30,921.69 • PLEASE REMIT PAYMENT WITHIN 30 DAYS PROM f7ATP OF INVOICE•THANK VOl II u o 1 11r)'S MCI March 22,2016 Pitkin CountyProject No: 21611.01 Invoice No: 23232 do David Detwiler 485 Rio Grande Place,11101 Aspen,CO 81611 Project 21611.01 Pitkin County Dispatch Relocation rofessional_Services frail Decor bo r 16 t• .. uar 29 20 l3 Phase A1002 Planning Approvals-Add Service Professional Personnel Hours Rate Amount do Campo,Richard 27.25 185.00 6,041.26 1-larrios,Joel 6.00 120.00 600.00 Winkler,Marc • 76.26 105.00 7,901.25 Totals 107.60 13,642.50 Total Labor 13,642,60 • Total this Phase $13,642.60 Phase A1000 Value Engineering-Add Servicew Professional Personnel Hours Rate Amount • • do Campo,Richard 20.00 185.00 3,700.00 • Harries,Joel 38.00 120.00 4,500.00 Winkler,Marc 8.60 105.00 892.60 Totals 66.50 9,152.60 Total Labor 9,162.60 Total this Phase $9,162.60 mow Phase A1007 Construction Administration Professional Personnel Hours Rate Amount Harries,Joel 1.00 120.00 120.00 Totals 1.00 120.00 Total Labor 120.00 Total this Phase $120.00 Phase A1008 Generator&Trailer Encl Options-AS PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE-THANK YOI n PW.:; • MIMIC!. ProJoct 21511.01 Pilkin County Dispatch Relocation Invoice 23232 Professional Personnel Hours Rate Amount do Campo,Richard 14.00 185.00 2,590.00 Harries,Joel 26.00 120.00 3,120.00 Totals 40.00 5,710.00 Total Labor ,. 5,710.00 Total this Phase $5,710.00 Phase A1009 Non•Dlspatch Building Modifications-AS Professional Personnel Hours Rate Amount de Campo,Richard 1.00 185.00 185.00 Harries,Joel Totals 8.00 120.00 060.00 9.00 1,14 5.00 Total Labor 1,145.00 Total this Phase $1,145.00 Phase C1001 Consultant Services._.. •� M. ~� � ----. �.. �. - �� Consultants , STRUCTURAL CONSULTANTS-ADD SERVICES 2/29/2016 Studio NYL,Inc. Professional Services- 1,250.00 Additional 2/29/2016 Studio NYL,Inc. Professional Services- 750.00 Additional MECI-IANICAUELECTRICAL CONSULT-ADD SERVIC 1/27/2016 Rader Engineering,Inc Professional Services 1,305.00 • Total Consultants 3,305.00 3,305.00 Total this Phase $3,305.00 Phase RA001 Architectural Roimbursables Reimbursable Expenses REPRODUCTION-POSS 12/31/2015 In House Plots&Prints In Houso Plots&Prints 335.94 1/31/2016 In House Plots&Prints In House Plots&Prints 880.72 2/5/2016 Aspen Reprographic,Inc. Reproduction,Laminating, 66.70 Mounting 2/29/2016 Technesls February 2016 In House Plots&Prints 111.21 Total Roimbursables 1,394.67 1,394.57 Total this Phase $1,394.67 Phase RC001 Consultant Reimbursabies • PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE•THANK Mil Donn 0 MK;���j Lt ' 1i,1'I11L� • Project 21511.01 Pitkin County Dispatch Relocation Invoice 23232 Rolmbr.a�sahla Expenses RE FRODUCTION-CONSULTANT • 1/13/2010 Aspen Reprographic, Inc. Reproduction&Mounting 250.43 Total Roimhursabios 260.43 260,43 Total this Phase $260.43 Total this Invoice ' $34,620.00 Outstanding Invoices Number Dato Balance 22898 9/4/2015 961.00 23030 11/19/2015 7,605.07 23085 12/23/2015 29,345.02 Total 37,971.68 Total Now Duo $72,591.69 Billings to Data Current Prior Total Foe 0.00 27,600.00 27,500.00 Labor 29,670.00 11,137.50 40,807.50 Consultant 3,305.00 0.00 3,306.00 Exportso 1,645.00 284.19 1,929.19 Totals 34,620.00 30,921.69 73,641,69 • . • PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE-THANK YOUI pQ,,, . NyorA Studio NYL,I►lo. • .2(30%1 fi�ssoline Road Invoice 8u1to 314 Boulder,CO 60303 Dale _ Invoice 11 • - 2J2912010 4009 Phone 11 (303)6684146 • 0111 To • . • POSE Architecture+Planning , (Y "V......._j 6Ma11 Only" • ' .5 AP//k, • • / 9 t` Terms Project • ' ' 1 0049 r Duo on receipt 16066 Pitkin County pisetch eeloca on Description ^y Rate Hours/Miles Amount Lump Sum-VE changes to RTU screen and adding guardrail • 1260.00 1,260.00__ • Lump Sum-Generator enclosure(6 hrs 7 $126/hr) !60.00 60.00 • X11 101 - McOS ( . • 6kiriolore 45( A) \ . . . • W . •1b ef t e4ro rt . • • • Thank you for your business. ' Total. • $2,000.00. Ow For Studio NYL',trio. • • : . . • • • Julian J.B.Lineham,P.E.,Principal • - if you have any questions retarding this Invoice,please call the Principal in Charao of this oroiect. J • • Radar•finf;inct 1ht , inc.. •. Invoice Po}dc 8610 Avon, Ct:) 81620 DATE INVOICE NO. • • 1/27/2016 15097.00A • P ssArchitecturc+Planning Z1 r • • 66 East Main Street . Avon,CO 81611 OK. --- -- i, • • . • • • . • .• . • . . . • • • .._. . . • .. • • • . . • . • . . .. . . . . . .. • Contract amount • TERMS . Project No. Project V . • see below Net 15 ' • 15097.00 Pitkin County-911 Dispatch DESCRIPTION • • . . AMOUNT ' •' Coniraot H:eakdown•ESTIMATED PEES • " . • • • -Mcchanhal Design•$8,500.00 . . • -Mechani:af C.A.-Hourly as requested • - Value T3tgincoring(V13)-Hourly ' • (Hours from 12/10/15-01/24/16) . • PROPBSSIONAL ENGINEERING SERVICES TO DESIGN AND CbORDINATH REDUNDANT HVAC SYSTEM AS OUTLINED IN OUR CONTRACT: • PROFESSIONAL ENGINEER,MECHANICAL-48.25 hrs.0)SI50.00/HR 7,237.50 MECHANICAL DESIGN ENGIN131312• 14.0 hrs.@590.00/liR .02100 1,260.00 •RBIM13UKSAI3LR BXI'ENSES tvi •-MILEAGE.200 miles QS0.575/niilo on 12/16/15-site visit - •115,00 • -MEALS-1 lunch at$12.00 ,--�__ _-----_----------__ � 12.00 • . ADDrrip.NAL ENGINEERING SERVICES-AS•1(VALUP ENGINEERING DISCUSSIONSAND. • E-MAILS TO REVIEW OPTIONS FOR V/iLUB ENGINEBR114— 513—AS`ra Rl)1S1=1CP'PkO) ,• BUDGET. • • PROFESSIONAL ENGINEER,MECHANICAL-8.25 hrs.®S150.00/HR ' • �a12,10 01• 1;237.50 • MECHANICAL DESIGN ENGINEER-0.75 hrs.Q$90.00/HR 67.50 CUaf �.) ,//.,���, '7 • • • • • • WI3 NOW ACCEPT CREDIT CARDS(3%surcharge). • ' • • • 1 Credll, Exp _.Verification Code• • Amount Due $9,929.50 • Sionaturo • Visa. MC . 11(1 ; I111/01cl April 26, 2016 Project No: 21511.01 • Pilkin County invoice No: 23298 do David Detwiler 405 Rio Grande Place,#101 Aspen, CO 81611 Project 21511.01 Pitkin County Dispatch Relocation [?rofesolonal Services from March 1,2.0.46 to March 31,2016 Phase _ ~ A1002 Planning Approvals-Add Service Professional Porsonnol Hours Rate Amount do Campo,Richard 5.00 185.00 925.00 Harries,Joel 1.50 120.00 180.00 Winkler,Marc 5.00 105,00 525.00 Totals 11.50 1,630.00 Total Labor 1,630.00 • Total this Phase $1,630.00 Phase A1005 Construction Documents Fee • Total Fixed Fee 52,500.00 Percent Complete 100.00 Total Earned 52,500.00 Previous Fee Billing 18,000.00 • Current Fee Billing 34,500.00 Total Fixed Foe 34,500.00 •Totai;thls Phase $34,500.00 Phase A1006 Value Engineering•Add Service Professional Porsonnol Hours Rate Amount de Campo,Richard 1.75 185.00 323.75 Totals 1.75 323.75 • Total Labor 323,76 Total tills Phase $323.76 Phase A1007 Construction Administration • PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE-THANK YOUI 111):•i;) Ittvr�lr.r. Project 21511.01 Pilltln County Dispatch Relocation Invoice 23298 Professional Personnel Hours Rate Amount Ilthios,Joel 1.50 120.00 180.00 Totals 1.60 180.00 Total Labor 180.00 Total this Phaso $180,00 Phase A1008 Generator&Trailer Fuel Options-AS Professional Porsonnol Flours Rate Amount do Campo,Richard 2.00 185.00 370.00 Harries,Joel 5.00 120.00 600.00 Totals 7.00 970.00 Total Labor 970.00 Total this Phase $970.00 1.4 Phaso RA001 Architectural Relmbursables Relmbursablo Exponsos REPRODUCTION-FOSS • 3/31/2016 In House Plots&Prints In House Plots&Prints 45.65 POSTAGE/SHIPPING-POSS 3/14/2016 Potty Cash Postage/Shipping • 53.90 MISC. REIMBURSABLE-FOSS • 2/29/2016 BOA 03.05.16 Feb Chi's Miscellaneous Hardware 31.39 Total Relmbursables 130.94 130.94 Total`thls Phase $130.94 Total this Invoice $37,734.69 Outstanding Invoices Number Date Balance 23085 12/23/2015 29,345.02 23232 312.2/2016 34,620.00 • Total 63,966.02 Total Now Duo $101,699.71 Billings to pato Currant Prior Total Fee 34,500.00 27,500.00 62,000.00 Labor 3,103.75 40,807.50 43,911.25 Consultant 0,00 3,305.00 3,305.00 Expense 130.94 1,929.19 2,060.13 Totals 37,734.69 73,541,69 111,276.38 PI FARP RFMIT PAVMFNT WITHIN 3n nAYR I RnM nATF nr wvrnP.F.1-114h11(vni /I II .•j;'s • • u:vnita May 25,2010 Project No: 21611.01 • Pitkin County Invoice No: 23342 clo David Detwiler 485 Rio Grande Place,1/101 Aspen,CO 81611 Project 21611.01 Pitkin County Dispatch Relocation ProfessJon l Servlcos from Anrll 1,2016 to May 1$,2016 Phase M007 Construction Administration Professional Personnel Hours Rate Amount de Campo, Richard 4.76 185.00 878.75 Harries,Joel 40.00 120.00 4,800.00 Totals 44.75 5,078.75 Total Labor 6,678.76 Total this Phase $6,678.76 Phaso C1001 Consultant Services Consultants ELECTRICAL CONSULTANTS 4/26/2016 Architectural Engineering Professional Services 1,271.25 Design Group Total Consultants 1,271.26 1,271.26 Total this Phaso $1,271.26 Phase RA001 Architectural Reimbursables Reimbursable Exponsos REPRODUCTION-POSS 4/30/2016 In House Plots&Prints In House Plots&Prints 142.74 5/20/2016 In House Plots&Prints In House Plots&Prints 180.73 Total ReImbursabies 323.47 323.47 Total this Phase $323.47 • Total this Invoice $7,273.47 Outstanding Invoices Number Onto Ealanco 2.3085 12/23/2015 29,345.02 23232 3/22/2016 34,620.00 23298 4/26/2010 37,734.69 Total 101,699.71 Total Now Duo $100,973.18 • PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE•TIIANK YOVI 1111:)S 1101010I. Project 21611.01 Pi!kinn County Dispatch Relocation Invoice 23342 �w Billings to Date Curront Prior Total Fee 0.00 62,000.00 62,000.00 labor ' 5,678.75 43,911.25 49,590.00 Consultant 1,271.25 3,305.00 4,570.25 Exponso 323.47 2,060.13 2,383.60 Totals 7,273,47 111,276.38 118,649.85 • PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE•THANK YOU! Page 2 ' '. .a•..'.: 19001V ,e Street i Suite 350 J Denver,Coluradn 1cr)2U2 I MI3..296.1034 main I 301,2')6.31135 Ilex � w'u•w.awleuitm•iue.eoln I. • e/), A/41,re„. (..i, r? t li..2-- 1 ( . (..) I .� 1 rJ ' (? 1 • Poss Architecture+Planning . > / //b Invoice number 3211.00.03 Richard do Campo Dale 04/20/20113 106 East Main Street --•. . Aspen,CO 81011 Protect 3211.0/KpiTKIN COUNTY DISPATCH For Pro fissional Foes From January 16,2010 to April 16,2010 Fee Percent Total Prior Current Doscrip tlrn Amount Complote _ Bitted Remaining flitted ,Billed CONST'AUCTION DOCUMENTS 10,600.00 100.00 10,600,00 0.00 10,600,00 0.00 UPS IDE$)6N 3,600.00 100.00 3,600.00 0.00 3,600.00 0.00 ADD SEOVICE-SITE VISIT(EA) 800.00 0.00 0.00 _ 000.00 _ 0.00 0.00 Total 14,000.00 94.69 14,000.00 000.00 14,000,00 0.00 .otlstrIACtlon kill/ larehlot, . Labor . • Filliod Hours Ci►ttc, Amount Wyo.J-J10--•-- ._____.._._ 3.60 125.00 437.50 torotorEnclosuroCoordbroli1 • ;orator - SlJbnillel Reviews RFts IQttricac M.Davidson 2:25 116.00 250.75 -GIroiriloronclosuro anerdinalon`: Answered queslioriiTtaii ►!Q llfd r umhorofc/rc►rlls pruvtdcd fit(Jeclr Dispatch operator station, Stanley 1.Hahn • 5.00 115.00 670.00 GoneralorsubnrlUol and corrloror►cv call RF/1-4 Phaso subtotal ___I,271.26 Invoice total I 1,271.261 Aging Summary l Invoice Number . Invoice Data Oulstandlog ` Current Over 30 Over 00 Ovor 00 Ovor 120 3211,00.01 12/23/2016 7,875.00 7,875.00 3211.00.02 01/25/2016 6,126.00 6,125.00 3211.00.03 04/26/2016 1,271.26 1,271.25 • Total -_� 15,271.26 1,2.71.26 0.00 • 0.00 6,126.00 7,076.00 II«S,�3 lii;'bl(:I July 26,2016 • Projocl No: 21511.01 Pilkin County involco'No: 23450 do David(Detwiler 485 Rio Grande Place,11101 Aspen,CO 81611 Project 21511.01 Pilkin County Dispatch Relocation P_rQfossional19.rvices from Ju tQ1,201U0 JunQ 30,_2j Phase A1007 Construction Administration Professional Personnol Hours Rate Amount de Campo,Richard 6.00 185.00 1,110.00 Harries,Joel 16.00 120.00 1,920.00 Totals 22.00 3,030.00 Total Labor 3,030,00 • Total this Phase $3,030.00 • Phase C1001 Consultant Sorvicos Consultants STRUCTURAL CONSULTANTS-ADD SERVICES • 5/16/2016 Studio NYL,Inc. Professional Services 750.00 ELECTRICAL CONSULTANTS 5/23/2016 Architectural Enginooring Professional Sorvicos 551.26 • Design Group I 6/22/2016 Architectural Engineering Professional Services 402.50 Design Group I Total Consultants 1,703.75 1,703.76 Total this Phase $1,703.75 Phase RA001 Architectural Reimbursables Reimbursable Expenses REPRODUCTION-POSS 6/30/2010 In Houso Plots&Prints In House Plots&Prints .13 Total Relmbursablos .13 .13 Total this Phase $,13 Total this invoice $4,733.88 Outstanding Invoices Number Date Balance 23085 12/23/2015 29,345.02 23232 3/22/2016 34,620.00 23298 4/26/2016 37,734.69 01 GASP l2FMIT PAYMFNT WITHIN!IA 1IAVR FrW h4 fl4TS til:InIVn1!`r_TS;Anew vrn 11 111 .>,P !limn Protect 21511.01 Pitkin County Dispatch Relocation Invoice 23450 . 23342 5/25/2016 7,273.47 Total 108,973.18 • Total Now Due $113,707.06 t3IIIlngs to Date Current Prior Total Fee 0.00 02,000.00 62,000.00 Labor 3,030.00 49,590.00 52,620.00 • Consultant 1,703.75 4,876.25 6,2.80.00 Exponse .13 2,383.60 2,383.73 Totals 4,733.88 118,549.85 123,283.73 PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE-THANK YOUI ;yr Studio NYL, Inc. 2605 Hasollno Road Invoice Suit°314 Houlder,CO 80303 Dale invoice 11 5/16/2016 4113 Phone 11 (303)556-3145 Date: 5/20/2016 Approved: Kim Bill To Project: 2151 1.01 POSS Architecture+ Planning Account: 511.01 Planning EMail Only' Phaso: C1001 Terms Project t)uo on receipt 15086 Pilkln County Oispatch Relocation Doscripifon Rate Flours/Miles Amount Additional Services-Generator slab 750.00 750.00 • Thank you for your business. Total $750.00 For Studio NYL,Inc. (1 Aip p g l ` Julian J.H. Lineham, P.E.,Principal l11 ` I )I(.-1N I in,...G,.„,,,l,,,,,,,.„..nd t k,I,ln.j Sn!uli..,, .,,,i,.„..,., }....,, t4u.I).,.. ..t,,:ion,? „ I ,,+:,,4 Approved by:f ideC Data: 711116 Project No.: 21511.01 Phase: A1000'7 • Poss Architecture+Planning Acct. Colo: x13,01 Involco nrnnbor 3211.00-04 Richard do Canipo Notes: Date 05123/2016 605 East Main Street Aspen,CO 81611 Project 3211.00 PI TKIN COUNTY DISPATCH ".--,...._ --) . For Profontonal Foes From April 15,2016 to May 15,2016 Fee Percent Total Prior Curront Doscriptlan Amount Complete Billed Remaining Billed Billed CONSTRUCTION DOCUMENTS 10,600.00 100.00 10,600,00 0.00 10,600.00 0.00 UPS DESIGN 3,600.00 100.00 3,500.00 0.00 3,600.00 0.00 ADI)SERVICE-SITE ViSIT(EA) __000.00 0.00 0.00 800.00 0.00 0.00 Total 14,000.00 04.60 W_ 14,000.00 600.00 14,000.60--07-00. Construction Administration labor Billed (-lours Rate Amount Bryan J.Joss 0.60 126.00 62.50 gonorafor►a-dosif/n . '<Itirick M.Davidson 2.26 116.00 260.76 Lighting submittal mvlow. Review of onoratorspocUlcaIons illLSp lan In mporaflan for conloronco call. • CoordinafiorrrvillnV►Irrovato'n .0ffrii;.ontosurr►. Coordlnailon of o►fie aloronclosuro ronioviil. Stanley J.Hahn "- 2.00 115.00 230.00 1 hour confr call, 1 hr di grounding ornnils and►osponso. _ Phase subtotal _•� 661.25 Involco total L .-_ 651.261 f Aging Summary Invoice Numhor Invoice Dale Outstanding Current Over 30 Over 00 Over 00 Over 120 3211.00-01 12/23/20157,676.00 _ �. 7,075.00 3211.00.02 01/26/2010 6,125.00 0,126.00 32.11.00.03 04/20/2016 1,271.26 1,2.1.26 3211.00.04 05123/2010 551.25 _551.26 Total 16,022.50 1,022.60 0.00 0.00 0,126.00 7,076.00 pmmeimmow ti I I )I 1( ;N � . \ Ink'e)a,,t'(1''' ,,,55.k[1i.I ior.)Iwth )iPi)4rn. ,, • 1'.:)4)...,l.4)'h)) U)))oG Pi, Approved by:flcisG Uato: 7/1/16 Project No.: 21511.01 Phase: A1001 foss Architocturo•F Planning Acct. 00(10: 513.01 Invoice numbor 3211.00.05 Richard do Campo Notes: Dale 00/22/2016 005 East Mahn Strout Aspen,CO 81011 -cy 1 Protect 3211.00 PI1I(IN COUNTY DISPATCH For Professional Foos From May 16,2010 to Juno 1I5,2010 Foo Percent Total Prior Current Doscriptlon Anununt Comptoto _ Billed Romalnin 011lod lillod CONSTRUCTION DOCUMENTS 10,600.00 100.00 ~`10,600,00 0.00 10,600.00 _ 0.00 LIPS DISION 3,500.00 100.00 3,500.00 0.00 3,500.00 0.00 ADD SERVICE.SITE VISIT(GA) _ 000.00 0.00 0.00 000.00 0.00 0.00 Total 14,800.00 94.69 14,000.00 . .000.00 14,000.00 0.00 Construction Administration Labor • 011lod f lours Rob Amount ICiltricic M.Davidson ' _. ...~ 1.60 115.00 172.60 Finalize drawings ler roratoronclosur omaval and limo Parini,Anrandmonl drawings for lho building department. '..___,..__... __ Complete and sond AS!ill drawings. Stanley J.Hahn 2.00 115.00 230.00 Osnoralor!nclosure Revision Phase subtotal 402.50 Ack Involco total I- 402.60 O • AginSummary l Involco Number Invoice Date Oulstendln1_ Currant Ovor 30 Ovor 00 Ovor 90 Ovor 120 3211.00-01 12/23/2016 7,076.00 7,075.00 3211.00.02 01/25/2016 0,126.00 0,126.00 3211.00.03 04/26/2016 1,271.26 1,271.26 3211.00.04 05/2312.010 551.25 651.2.5 3211.00.05 00/22/2.016 402.60 402.60 Total 10,225.00 402.60 1,022.50 0.00 0.00 14,000.00 September 29,2016 Project No: 21511.01 Pilkin County Invoice No: 23550 do David Dotwilei 485 Rio Grande Place,#101 Aspen.CO 81611 Project 21511.01 Pitkin County Dispatch Relocation elStfgltt14na1 ServIces from..Augu tt_1...2016 to September 30,.2010 Phase A1007 Construction Administration Professional Personnel Hours Rate Amount ` de Campo,Richard 9.25 185.00 1,711.25 Harries,Joel 11.00 120.00 1,32.0.00 Laut,Kevin 4.00 120.00 480.00 Totals 24.25 3,511.25 Total Labor 3,511.26 • Total this Phav= $3,511.25 _ -_ _..�., __ Phase C1001 Consultant Services . . . .. .._ ._ ._ . . .,...._. _. .. ... . Consultants MECHANICAL/ELECTRICAL CONSULT-ADD SERVIC 8110/2016 Rader Engineerin!),Inc Professional Sci vices 2,437.50 ELECTRICAL CONSULTANTS 7/2612016 Architectural Engineering Processional Services 1,219.00 Design Group Inc • 8/22/2016 Architectural Engineering Professional Services 292.50 Design Group Inc • Total Consultants 3,949.00 3,949.00 Total this Phase $3,949.00 Phase RA001 Architectural Reirnbursables Reimbursable Expenses REPRODUCTION-POSS 7/31/2016 In House Plots&Prints In House Plots&Prints 24.13 8/31/2016 In House Plots&Prints In House Plots&Prints 11.70 Total Reirnbursables 35.83 35.83 Total this Phase $35.83 Total this Invoice $7,496.08 Outstanding Invoices Number Date Balance 23085 12/23/2015 29,345.02 23232 3/22/2016 34,620.00 PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE-THANK YOU! Project 21511.01 t- lkin County Dispatch Relocation Invoice 23550 23298 4/26/2016 37,734.69 23342 5/25/2016 7,273.47 2.3450 7/2.6/2016 4,733.88 Total 113,707.06 Total Now Due 3121,203.14 Billings to!)ate Currant Prior Total Fee 0.00 62,000.00 62,000.00 Labor 3,511.25 52,620.00 56,131.25 Consultant 3,949.00 6,280.00 10,229.00 Expense. 35.83 2,383.73 2,419.56 Totals 7,496.08 173,7.83.73 130,779.01 PLEASE REMIT PAYMENT WITHIN 30 DAYS FROM DATE OF INVOICE-THANK YOU! — _ _ Page 2 Radon Engineering, Inc. Invoice �- PO 1iox 8610 Avon, CO 81620 DATE INVOICE NO. Approved by: lade() 8/10/2016 I5097.00C Date: 9/1/16 RILL TO Proj ct No.: 21511.01 Poss Architecture+Planning Pha e: A1007 605 East Main Street Aspen,CO 81611 Acct Code: 512.01 Nets: Contract amount TERMS Project No. Project sco below NO 15 15097.00 Pitkin Co-911 Dispatch DESCRIPTION AMOUNT Contract-Untidy - -Constriction Admuiislralion-Hourly as requested (Flours from 03/21 -08/07/2016) MECI IANICAL CONSTRUCTION ADMINISTRATION SERVICES AS LISTED BELOW: -REVIEW GENERATOR SUBMITTALS. S. -RESPOND TO RH I. UPDATE MECIJANICAL DRAWING WITFI GENERATOR ENCLOSURE. -REVIEW CONTROL SUBMTITALS. -ANSWER CONTRACTOR QUESTIONS. -RESPOND TO RPI 021. -REVIEW TAB REPORT. PROFESSIONAL ENGINEER,MECHANICAL- 15.0 hrs.«S 150.00/HR 2,250.00 MECHANICAL PROJECT ENGINEER- 1.5 Ins.(rt)5125.00/HR 187.50 \VE NOW ACCEPT CREDIT CARDS(3%surcharge). ti CiCdl1_, lixp__ Verilicalion Code Amount Due \,¢1 d17 to • , . . . . , 1 ..r'''..? Intcgratcd Lif kiting and Electrical Solutions 19W Mir,Suri;4350,1):n.pr,CO130101 I 303196 31)34 POs Architecture+ Planning Invoice number 3211.0006 Richard do Campo Date 07/26/2016 605 East Main Stroot Aspen, CO 81611 Protect 3211.00 PITKIN COUNTY DISPATCH For Professional Fees From August 2.0,2016 to July 15,2016 Fee Percent Total Prior Current Description Amount Complete Billed Remaining Billed Billed CONSTRUCTION DOCUMENTS 10,500.00 100.00 10,500.00 0.00 10,500.00 0.00 UPS DESIGN 3,500.00 100.00 3,500.00 0.00 3,500.00 0.00 ADD SERVICE-SITE VISIT(EA) 800.00 100.00 800.00 0.00 0.00 800.00 Total 14,800.00 100.00 14,800.00 0.00 14,000,00 800.00 Conshucllon Administration Labor Billed Approved by: RdeC Hours Rale Amount Stanley J. Hahn 2.00 115.00 230.00 RF/ Date: 9/6/16 Project No.: 21511.01 Expense Phase: A1007 Billed Acct. Code: 513.01 Amount Milos 189.00 Notes: (Correctec as Phase subtotal 419.00 requested Invoice total 1,219.00 Aging Summary Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120 3211.00-01 12/23/2015 7,875.00 7,875.00 3211.00-03 04/26/2016 1,271.25 1,271.25 3211.00.04 06/23/2016 551.25 551.25 3211.00.05 06/22/2016 402.50 402.50 3211.00.06 07/26/2016 1,219.00 1,219.00 3211.00-07 08/22/2016 292.50 292.50 Total 11,611.50 292,50 1,219.00 402.50 551.25 9,146.25 ' I )11.)1( )NI ' : .._ itt,'iati'cllighlingan.1liICNciaalSolutions 110:1m....s..:,.I)o,Ur,..,,cotom) .tplin.to)I Pass Architecture*Nanning Invoice number 3211.00-07 Richard do Campo Dale 08/22/2010 005 East Main Street Aspen,CO 81611 Project 3211.00 PITKIN COUNTY DISPATCH For Professional Foos From July 16,2010 to Ati ust 20,2016 Foe Percent Total Prior Curront Doscrlpiton Amount Complolo Billed Romalntng Billed Billed_ CONSTRUCTION DOCUMTNT8 10,600.00 100.00 10,600.00 0.00 10,600.00 0.00 UPS DESIGN 3,500.00 100.00 3,500.00 0.00 3,500.00 0.00 ADD SERVICE•SITE VISIT(EAS 800.00 100.00 800.00 0.00 800.00 0.00 ___ T. 14 800.00 10/.!011,800.00_ 0.00 14,800.00 0.00 Construction Administration Labor Approved by: RdeC flitted Date: 9/1/2016 _mows Halo Amount OOryan J.Jose 0.60 125.00 62.60 .UPS coordburilon Project No.: 21511.01 Stanley J.Hahn Phase: Al00 7 2.00 116.00 230.00 'UPS noise Issue Acct. Code: 513,01 f'hnso subtotal 292.50 Notes: invoice total 202260] w 111111 0\\- Aging Summary Invoice Number htvoico Date •t : , t Current Over 30 Over 60 ._ Over 80 Ovor 120 3211.00.01 12/23/2.015 7;875.00 . 7,075.00 3211.00.02 01/26/2010 0,126.00 6,12.5.00 3211,00.03 04/26/2010 1,271.25 1,211.25 3211.00.04 05/23/2010 551.26 651.2.6 3211.00.05 00/22/2010 402.50 402.50 3211.00.08 07/20/2010 2,264,00 2,264.00 3211.00.07 08/22/2016 292.60 292.50 Total 18,771.60 2,546.60 -^^0.00 '102.50 _1,02.2.50 14,000.00 g 6 i5 in o s �► EZ o OS I CO0io U vi o v M Mto cri Ol a1 t0 m U:).. CO 0.1 N n v N I r: 0% cr; N .t h o N no m C s N 01 v a • a N o 9 o Ce C.1 a I a ca w CV m tnil q d CO W CO .oil ,-I O av1 O N O t W ro Mr1� > > N. M .-1 M H o 0 0 O 0 0 0 0 to U1 V1 0 0 U1 111 0 0 Ul N o q O Vl O O o n n N O O n N V1 U1 N • V,t.. O O 0 h 0 0 Ui tri co e-i