Loading...
HomeMy WebLinkAboutpitkin.eh.264316200018 (2001)Document Layout (From Most Recent to Oldest Permit) Permit Application Log Sheet/Notes & Photos Communications As -built Design Engineer Design Soil Information Water Permit & Information Second System on property Third System etc. Floor Plans Please See Building and Land Use Approvals Files for additional information. 3 Pitk#unity Environmental Health Departn* Pen.tut for an Individual Sewage Disposal Syst,,m ' 130 S. Galena St., Aspen, Colorado 81611 Phone 970-920-5070 / FAX 970-920-5074 Permit # O 1 CC:� Parcel ID # 2643-162-00-018 Type of permit New( x ) Repair( ) Addition to House( ) Name of Owner Dr. Robert Karp Street Address 181 Property legal description Size of lot 2 acres Water source Private well # of bedrooms in house Caretaker unit N/a Creek Total square footage of the house 5750 3 # of offices, lofts & similar sized rooms in house Total square footage of the caretaker unit # of bedrooms in caretaker unit # of offices, lofts & similar sized rooms in caretaker unit Designed for what # rooms (list) 3 bedrooms Permit information Designed by High Country Engineering, Scott Stevens Mailing Address 923 Cooper Ave., Glenwood Springs, CO 81601 Perc rate 50 Profile hole depth 8 ft Depth to groundwater or bedrock 5 ft to Bedrock Minimum Septic tank capacity 1312 gallons Minimum Absorption area 1039 sq ft Septic permit approved per compliance with the engineer design and specifications dated December 19, 2000. Any changes must be approved by this department and the design engineerrp for to them being made. The permit must be kept on-site by the contractor during installation. Minimum horizontal distances between components of the system and physical features shall conform to the Pitkin County ISDS regulations. Setback from the well to the absorption field must be at least 100 ft. The engineer has stated that the 100 foot separation between the proposed absorption area and surface water or ground water is appropriate to prevent contamination. There must be at least a 10 foot separation between the field and the property line, 20 foot separation between the field and the house, and 5 feet between the house and the tank. This design calls for a 2500 gallon septic tank followed by a 1000 gallon dosing chamber. The field will be in a bed configuration containing 67 gravelles chamber units. Installation of these units must not exceed 1 ft due to bedrock at 5 ft. There must be a 4 ft separation between the bottom of the chambers and bedrock. This department does not endorse any brand of products. The engineer must do a final inspection of the installation and submit an as -built letter to this department. This department must also be called for an inspection with a minimum of 48 hours advanced notice. ( IDII71 UI KVV i Permit approved by: ( IClc Date: _LIN , �_(0V--Itv IS Q'Virl' 3� I l �) _� Qac lu° o� Plans and specifications of the proposed individual sewage disposal system have been reviewed and are considered + ' ll Ile V, rr�utr� satisfactory. Permission is hereby granted to the owner or the agent to perform the work indicated in accordance with the Pitkin County ISDS Regulation in effect at the time of issue. This permit becomes invalid 6 months from the date that the permit was t(151o1 issued unless system construction has commenced or an extension has been approved in writing by the Department. As -built drawing mu t be included i this,pennit before the final approval will be issued. Installer: ,t Final Inspection approval: ,et A, -c _ j/%1 jamA Date: 0 ONSITE WASTEWATER TREATMENT SYSTEM (OWTS) NO PERMIT REQUIRED FORM Date: 1,11 J /09 Owner(s) Name(s): Project Name: Address of Property: 1 si I �.l C��_ 1 Cuw Building Permit Number: Parcel ID# L7 0'0 ( cow— ole—o!R Description of Project: n0 In it, ` lI B fll jun TnCCcGGu ct I l/✓Z� l c(La�n adv Remodel does not increase the bedroom/potential bedroom count a Existing OWTS is sized for this project Proposed buildings do not need an OWTS (i.e., garage, shed, barn, etc.) /\ Project is not located in the area of the existing OWTS 1 -f -I 0 m ct-k5 e rho h on /-- (fo F f ¢ t4"Prv%erJ' iF nudpd� No OWTS Construction Permit is required for this project. No further review is required by Environmental Health & Natural Resources. FOOD SERVICE FACILITY This facility contains a retail food establishment. Environmental Health & Natural Resources has reviewed and approved the plans. Office Use Only: Date: 1113 0405 Castle Creek Road, Suite 10 Aspen, Colorado 81611 Phone: (970) 920-5070 Fax: (970) 920-5077 www.aspenpitkin.com/ehnr a L- :LL r t BOARD -FORM IBY STRUCTURAL YODDO ENGINEERING OUTDOOR KITCHEN AREA DESIGTIONS BYSIONS AND LTD. (INTERIORS) OUCIEHHORNERERIORS) EXISTING COVERED TERRACE WITH NEW STONE PAVERS GUARD RAIL WITH POWDER COATED STEEL POSTS BOARD -FORM CONCRETE STRUCTURAL PARAPET WALL PER DETAIL BY ODDO ENGINEERING GUARD RAIL WITH POWDER COATED STEEL POSTS BOARD -FORM CONCRETE STRUCTURAL PARAPET WALL PER DETAIL BY ODDO ENGINEERING STONE TERRACE, N 0 RGJi�� e AIN SLES o,oa"o �9wo�. s=eal", SOD n S-9& /G i' < •i \eGl�O \ ♦ NATIVE / -044, \ LANDSCAPE/ NL 0 ^uosepioe°o ,� i / . 006,t0�9 I I ague � 1 / i \ / / v LOW NATIVE / GRASS MEADOW / /11\ 1 \ / -IN-GROUND E FULLY TILED AUTO COVER, COPING TO M - STONE T RI SUB- , B OP i i / 3 NEW ASPEN TREES TO RELPACE THOSE REMOVED f6R CONSTRUCTION" MARBLE CHAISE BY OWNER / SAND/ SET STONE PAVERS 61 J STEP TERF SET DRO WIT ANC FOR 3 Nov 27 00 11:57a Pitkin Co Env. Health (870)920-5077 ASPESITKIN.ENVIRONMENTAL HEALTH DEPARTMENT APPLICATION FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEM O'MC antra kd, Elk 10, Asp"-),(O9.Itoll Phone 970-920-5070/Fax 970-920-SD'j Name of OWNER Owner's Mailing Address Business Phone: Home Phone: (31 Z) L4z - Primary Contact Person (all communication regarding this permit will go through this person) Name fo#d Lhidb Company G /BSon/ AKCW l7'EcrrS Contact Maiiirg Address Zo A( MILL Sr/ol Co 8/(./ ILusiness Phone : 170-3007 Cell Phone: 970 3-7 - /o Fax: `%Zo - 3/0 at 920-5160 or at www.aspen.com/assessorl) Street address of property 2 L `i' 3- 16 2-. O D- O / g Legal Description: Lot Block Filing Subdivision Sws, t Size of Inc t/- 2 acres. Type of proposed structure: t'AM I r-�t Sizo of bldg. envelope: Total square feet of house Rea ref - 4150 S.F # of bedrooms in house 3 # of offices, lofts & similar sized rooms in house Caretaker Unit: At,s&ed ( ) Detached ( # of bedrooms In caretaker Total aren;sq. ft,) of caretaker unit unit Permit is ec New Home (� ) Repair due to failure ( ) Remodel/Addition ( ) Emergency use ( ) i Water: Private well (X ) Spring ( ) Stream ( ) Community/Public Water System , If ccr. munity systpm: Name of system p.3 The fee for a 13CS appllcacon is $330 for a permit that takes 6 hours or less for the department to approve. If approval takes Innger than ^ hours, a rate of $55 per hour will be charged. The maximum fee is $1000. The basic fee of $330 is due a! the time of app!:cstion. The remainder, if any, will be due in two stages: first, at the time of issuance of the ISOS permit second, before final approval of the ISDS permit Application for an Incirvidual sewage disposal system is hereby submitted. I hereby certify that the above infermation is hue and accurate and that I have provided true and accurate information animations of all eristirg ant uropcser! welts, contour intervals, buildings, Property lines, ditches, slopes, waterlines, springs, suction or i-igatien fines. drinkirg water cisterns, drain bins, irrigation ditches, lakes. water courses, streams, tloodplains, dry gulches. and existine septic oyctems. I hereby certify that any such features not shown on attached site map are not present Issuance of :he permit does not imply the enprovel of any other permit required for construction pursuant to Rifkin Ceuny codes. No construction may be undertaken until -!I appwvais and permits have been obtained. The Awert/F'.kic Environmental Heallh Department, Pitkin County and employees of these agencies wV be held hannls;s sheuid the indNidual sewage disposal systema)I or malfunction. The permit to construct is issued on information submi ea b tt/ e app,;cant or his/her representatives. Theq*n�r as>)urytes fuJ responsibility in case of failure of the system. Signature o, Date !I Z7 00 • v Name: ParcelID#: Address: Date Person Spoken To r1 Comments / Action to be Taken Initials Ti e l asud 1 side two 0 0 0 0 M F F U -A 41 R, O1 ri O d' N O r -I U) Q H a s4 x 3 0 0 ME IL a November 5, 2001 Carla Block Pitkin County Environmental Health 130 South Galena Aspen, CO 81601 Re: Karp ISDS —171 Liberty Lane HCE Project Number 2000004.34 Dear Carla: 0 RECEIVED Nnv 8 2001 PITKIN COUNTY ENVIRONMENTAL HEALTH On October 24, 2001, High Country Engineering personnel observed the construction of the septic tank installation and infiltrator units at 171 Liberty Lane, in Pitkin County, Colorado. The system was installed in conformance with the intent of the design except for the placement of the 2,500 - gallon septic tank. The tank was rotated 90° as shown on the as -built plan. All actual setbacks are shown on the As -Built Plan. An effluent filter was placed in the discharge side of the septic tank as required by Pitkin County. Photos of the installed components are included for your use. If you have any questions, or need additional information, please contact us. Sincerely, HIGH COUNTRY ENGINE G, INC., e r J: Roger D. Neal, P.E. Project Manager W e cc: John Rowland, Gibson Architects Encl. RDN/sls 923 Cooper Avenue, Glenwood Springs, CO 81601 Telephone: (970) 945-8676 - Pan (970) 9452555 29975 A- 14 hwemess Drive Fast Suite &144 Englewood, CO 80112 Telephone (303) 925-544 - Fax (303) 925-0547 In Page 1 of 1 To: Nancy MacKenzie <nancym@ci.aspen.co.us> Subject: 181 Liberty Lane Mike from Woodhouse builders is enquiring about this property. Very small. I couldn't find the file on it - parcel #2643-162-00-018, but he thinks it may not be in our files because the house could be anywhere from 25-50 years old. THis isn't the one that we talked about before where the taxidermist Terry Doyle lives. Anyhow, the construction people are "green" builders and were wondering about a split gray/black water system. High Country is working on it now - don't know what they will propose. THey said we would probably just let them keep what's there if they added a new system)ust for the addition. I told him that wasn't necessarily the case. We would need to check the integrity of the system and it might not be in his best interest to leave it there if it was that old. They might be meeting first thing thurs am at the site and I thought maybe if it was at 8 you could stop by on your way in. He will call tomorrow to co�firm. cb Carla Block Environmental Health x5438 Printed for Nancy MacKenzie <nancym@ci.aspen.co.us> 09/27/2000 1z ASPEN/PITKIN ENV40ONMENTAL HEALTH DEPARTAT ISDS DESIGN CALCULATIONS Owner's Name Parcel ID # House Size (sq. ft.) (75 gpd, 100 gpd, or 130 gpd) l00 Number of Bedrooms in Main House Number of Offices, Libraries, Studies, Similar -sized Rooms in Main House Number of Bedrooms in Detached Caretaker unit Number of Offices, Studies, Similar -sized Rooms in Caretaker Unit (If the caretaker unit is ATTACHED, treat as if part of main house.) Average Daily Waste Flow 600 State Review Required? no Perc Rate -(T) Design Flow (Q) = # potential bedrooms X 2 people/bedroom X gpd X 1.75 Q= 1050 Absorption Area (=Q/5 X SQRT perc rate) A = 1484.9242 sq. ft. of absorption area required 96 gravelless chamber units without reduction # of Perc Holes Required: 3 1 in every soil type? Spaced uniformly over proposed area? A maximum 300% reduction is allowed for use of deep gravel or gravelless chambered system, only if the lot sin and soil conditions are optimal. If a reduction is being proposed, describe why lot size and soil conditions are optimal: A = / 1039.447 Oft. with reduction 67 velless chamber units with reduction Type of system: []Absorption trenches []Absorption bed [] Gravelless chambers []Dry well []Seepage Pit []Other (type) Minimum tank capacity 1312.5 ga on SETBACK FROM WELL # of feet = AM SETBACK FROM POND, STREAM OR IRRIGATION DITCH # of feet = 54 SETBACK FROM DRY GULCH # of feet = 29 Printed on Recycled Paper NOV-28-00 TUE 04:02 PM HIGH COUNTRY ENGINEERING 0.1-P GEOTEr_H tech elv,iust21, 2000 Dr. Robert Karp No Gibson Architects, LLC Atur: David Gibson FAX NO, 970 945 2555 • HepwwIh•Pawlak C.eoteMnlnl, Inc. 3718 Count It d 1.0 Glenwood Maas, Colorado 81681 Phone: 970-999 S -IM Far. 970-945-9454 hPpo@hPecotech.aoso P. 02/04 201 N. Mill Street, #101 Aspin, Colorado 81611 Job No. 100610 Subject: Percolation Testing, Proposed Septic Disposal System, 171 Liberty Lane, Woody Creek, Pitkin County, Colorado. Darr Mr, Karp: As requested by Deric Walter of High Country Engineering, a representative of ffopworth-l'awlak Geotechnical, Inc. conducted percolation testing at the subject site to evablaw the feasibility of an infiltration septic disposal system. The results of our work aw prcsentcd in this report. The work was done in accordance with our agreement for peol,.,ssional services to you, dated August 9, 2000. We previously conducted a subsoil study for foundation design and presented our findings in a report dated August 9, 2006, Job No. 100 610. A profile boring and three shallow borings were drilled at the locations shown on Fig. 1, The test holes wpre soaked one day prior to testing. The soils exposed in the �r lcolalion holes are similar to those exposed in the pmft be tg�d hit of /a' kxx of topsail avexlying dcosc tally sandy gravel with cobbles and boalders to (f117Jiug mfusal at a depth of 5 feet. Groundwater was not encountered in the profile borinz and the soils wcrc slightly moist. Based on the previous subsoil study, we txpect lira gravel soils and depth to groundwater are relatively deep. Pareolntion test; were performed on Arty 2g, 20011 by a representative of H worth- PawNk Geotechnical, Inc. 77ic percolation test results are presented on Table 1, The p %LN)!,aion test results indicate an infiltration rate between about 45atl 6G jffihNftper melt. Rased on the subsurface conditions observed and the percolation test results, the nit;ttd arta should be suitable for a conventional infiltration septic disposal system. If there arc any questions or if we may be of further assistance, please let us know. sincerely, Iffil 101ZT1I - PAWLAK GEOTECHNICAL, INC, Jordy Z. Adamson, Jr., P.E. F:cw. by: llEli JZA!'ww uttdch:nelits Cc: High Country Engineering - Attn: Deric Walter 14 NOV-28-00 TUE 04:02 PM :CP-1R-.w,khl G7.4� HIGH COUNTRY ENGINEERING •11-P CEOTECH F•PPRDXIMATF SCALE I" = 30' FAX NO, 970 945 2555 • P. 03/04 P.03/04 101) Elio IANE LIBER PROPERTY INE 300 J ^" EXISTING BUILDING SETSACK .--"' GARAGE J�� (SHADED) LINES � \ I PROPOSED I --- RESIDENCE 1 EXISTING I 1 I CABIN (SHADED) I ( 300 PROFILE ,•.1 BORING P-3 290 1 ` 270 `--�--� 280 .. •^ ` ...-�''r�� 270 101) Elio NOV-28-00 TUE 04:02 PM HIGH COUNTRY ENGINEERING 01-P GEOTECH v.1. HOLE N0. �•7 h -3 ... _....... �:'JV S:4'. FAX NO. 970 945 2555 • HEPWORTH-PAWLAK GEOTECHNICAL, INC, 'TABLE I PERCOLATION TEST RESULTS P. 04/04 P.04104 JOB NO. 100 810 IIOLk DEPTH (INCITES) LENGTH OF INTERVAL IMINI WATER DEPTH AT START OF INTERVAL (INCHESI WATER DEPTH AT END OF INTERVAL (INCHE61 DROP IN WATER LEVEL IINCHESI AVERAGE PERCOLATION RATE MANAPICH) 22 15 11 10 Y. K 60 r0 % 10 Y 10 9 K Ya 9K 9Y. Y 9 V. 9 K BY BK K 24 15 9 7 •/. 1 Y. 46 7% 7 % 7 6% Y 6 SK Y GY BY Y 5 Y. 5 Y _ 20 18 101% _ 9 Y 1 45 -11 BY. 8Y. K 8% 8K Y 8K 8Y % 81/1 7 % Y. 7 Y 7 h Y. 7 Y 7 '. '6 Note: Perenlntion test holes were drilled with a 6 -inch diameter auger and were soaked on August 17, 2000. Percolation tests were conducted on August 18, 2000. The average percolation rates were based on the last three readings of each test. TOTAL P.04 10 1 ...._., b �\\ \ `> // First Floor Plan /�N -8" Be.Waa.: la/ae/aB Pelely e.t 11/01/ae Pe.mlt B.\ !m 1: let Ps W.C.C. DrP.n BP: !.R Mb: 11/01/a0 Cep.4et a Baan In 10 rl 00 _ O W cad �U aa; °3 G I8 -"-A ARCHITECTS, LLC A.pw M. Zal N. Y01 St—el 4WC 101 Aspen, 81611 CO P4ane %6-BYo-adBT Pwtlmlle TO -BYO -91o9 T.Ilunde OM.. P.O. a.. Z m Int B- C61n..de A- Tellunde. CO 61495 PL 970-728-607 P.mwile %0-)2B-6058 fMet Nu.4 . A 1.04a -� + Scale: NIS + f B.Meu tB/m/W Plinio. Bx It/D1/00 P.emlt B.1 les k 1.x Iae a.c.c. Deawo Sr. M Date: 11/0I/DO mookeG 00/00/00 cep]r*ht O 2000 ARCHITECTS, LLC A.pee D 201 N. M S" Baeet shine 101 Aepeo. 8I811 Phone %P eI-il:o] NO -M-9105 T.D.Nee Mo. P.D. Be. 218 101 F. C'I—ade Ave. Te11er18eCO 81155 Ph... p]0-]2B-pL6B �°et DemBvr A1.04b 1� Sent By: ,.CSD Wastewater Facila 9708257278; 00 14:02; Post -it* Fax Note 1 7671 STANOAM BAGTM OLOWAL WATER TEST ,ymW U y ryl AIM CONSOLIDATED SANITATION DISTRICT_- AINHRo COMOFNE AMM COLONAOO $loll RESULTS p1q fS77S2 .VENERSX FLTE DIRECT -...• ._ MVss7 Srsrlamm SFnI)'�:--TAM: GTEcL•9-Q'k.E �/g.� ��, " OF Ni11REn mw -,y tai T k: l YJ sAArtm� .X PSOAL AMM PRESENT ( ) CMRtW YSUPPLY I ) ROIITMi alsyMmun N6YB7WRIWSLY 1) NOMCMAMTY I 1 CHWKSA11PLE 1 1 PROCESSWATER 11 D>MR+A RRuc ( 1 Mt;flw I 1 s SMIPu L1dT7 r�wr ( isPECw PfMVOeo sAPIPIF TFACdWR: l� uuRrl suLFATE $R . ALL MO MAIM St NOT SN WM, 71E &AILD! WILL M MWARCEC. DIA R'EMAMM RMMTO g4pm1101)�E Bui Fb,ts N ADDRESS 301 V AJ I T V A,B G VA �n.c-arc�7 WN RM l0CVlL &(lATONE OIt*CW wrtN AIN$ADAI DRWWaNc wATEI wren Ll WOICATE NO WAIB -SEESISTRUCIIONSONSACKMAR- SF°PFrUVM FOP 771E WWATM. SAW LMWISTRUC704 NO OVWTOA. � /4 x q Zo - C17 7 9 7. r T TO/TB 39Vd s2m-lLlH 3Sf1OF3GOM ILL603GOL61 97:60 2/2 e � . 11/09/2000 22:11 197092097 I • water Flow Test 10:45 6011. 10:50 62 R 10:55 641 11:00 65 8 11:05 66R 11:10 679 11:15 67A.6m 11.20 67 IL 6 in. 11:25 67 k 6 in. 11:30 67 it, 6 in. 11:35 68 & 11:40 68 ft. 11:45 68 ft. Equipment observed is in mtiatl Should you haw any questions, ,�/YouL,f Rob Leeson CWS 11 Td WUET:60 000E OT '^oN WODEHOUSE BUILDE PAGE 01/01 Post -It' Fax Note 7671 Dam YI-lfl pa 30 T-,yC�AApp ��t�w Few^ f7l W A COwpt- CA Phone a Plgna aa, 0 — O ):2, Fax t - 7 1'C7 ?j � F- Icy 2_C)— j `7 79 12 gpm, MOutaim 15 gpm 15 a= 150M xy coudilim mu give roe a tali at (970) 6254522. GVS BLS : 'ON 3NOHd dWld 8 !]NITUNG SN'I-FlQ:3/O 3 S : 1•CRli Z� 10' CLEANOUT (TY 14' PRESSURE DOSING PIPE N.T.S. NATURAL GROUND 1/4" 0 HOLES DRILLED INFILTRATOR UNITS (TYP.) USE PLASTIC WIRE TIES TO HANG 1-1/2"0 PERFORATED PIPE IN INFILTRATOR UNITS (TYP) 4'- 0" MIN. TO BEDROCK 2"0 P GRAPHIC SCALE 20 40 ( 1N FEET ) 1 inch = 20 Ft. 1 REMOVABLE PVC CAP-\ FINISH GRADE 4" COUP 4" SEWER Old 0,6avd GRADE TO DRAIN BACK TO DOSING TANK 4" PV( 411 X 4"� sC4 GENERAL NOTES TREATED ELEC. JCT. BOX 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE PITKIN POST DOSING 2" AIR VENT RISER(S) TO TANK � ARRANGEMENT GROUND SURFACE- 0 _ (7 CAULK/SEAL WELL "-� REGULATIONS OF INDIVIDUAL SEWAGE DISPOSAL SYSTEMS, EVEN ALL SUCH REQUIREMENTS ARE NOT SPECIFICALLY NOTED ON THE 2" FEEDER LINE TO 0_ k kk FIELD, SLOPED AT INLET Z 1/8" PER FT. MIN. SHALL DRAIN BACK THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUCH SPECIFIC DETAILS AS TO TANK AFTER N.T.S. ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS EACH PUMP CYCLE. J o a Z "ALARM" Q a =D BOTTOM LEVEL AND ROUGHENED Y 0 CO QUICK DISCONNECT INFILTRATOR UNIT (TYP.) M OR UNION 0] Z z (5 &o a Z U n p Z � "ON" W COIL AND TIE AN e0 ADDITIONAL 10' OF o WEIGHT WIRE FOR PUMP 4. REMOVAL � Q PROJECT SUBMERSIBLE WASTEWATER PUMP .4 00 °OFF° SET PUMP APPROX. fE�47� 8" OFF FLOOR 4 4 NOTES: 1. SWITCHES TO BE MERCURY FLOAT TYPE. 2. FLOAT SWITCH DIMENSIONS ARE BASED ON A COPELAND 1000 GAL. TANK. (CISTERN) 3. DOSING TANK SHALL BE OF WATERTIGHT CONSTRUCTION. 4. ALARM SHALL BE BOTH AUDIBLE AND VISIBLE, LOCATED WITHIN THE HOUSE AND ON A CIRCUIT SEPARATE FROM THE PUMP. 5. PUMP SHALL BE CAPABLE OF AT LEAST 50 GPM 0 10 FT. OF HEAD. (ELEVATION DIFFERENCE AND PIPE LENGTHS SHALL BE FIELD MEASURED BY CONTRACTOR AND REFERRED TO ENGINEER FOR VERIFICATION OF PUMP PARAMETERS.) 6 USING A DESIGN FLOW OF 1050 GPD FIELD WIL BE DOSED AN AVERAGE OF 4 VICINITY MAP SCALE: 1"=2000' TIMES PER DAY AT 265 GALLONS PER DOSE, GIVEN THE FLOW ARRANGEMENT ABOVE. sC4 GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE PITKIN COUNTY DOSING LL TANK � ARRANGEMENT 12 0 _ (7 REGULATIONS OF INDIVIDUAL SEWAGE DISPOSAL SYSTEMS, EVEN ALL SUCH REQUIREMENTS ARE NOT SPECIFICALLY NOTED ON THE THOUGH DRAWINGS. 0_ k kk CONSTRUCT Z SWALE _O n THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUCH SPECIFIC DETAILS AS N.T.S. ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS EP BEND `CLEAN OUT ASSEMBLY SEWER CLEAN OUT DETAIL N. T. S. BACKFILL WITH SELECT ONSITE MATERIAL � 12" MIN. COVER N.T.S. 4" 0 - SOLID PIPE REMOVABLE CAP 2. FLOW FOR BED: 3 BEDROOMS * 2 PERSONS/BEDROOM * 100 GALLONS/PERSON/DAY AND 600 GPD = AVERAGE DAILY FLOW, DESIGN 1.75 * AVERAGE = 1050 GPD (Q) SEPTIC TANK: MINIMUM TOTAL TANK SIZE: 1050 GPD * 1 DAY/24 HRS * 30 HRS = 1313 GPD MINIMUM SIZE = 1500 GALLONS STANDARD ABSORPTION AREA: CUT HOLE IN TOP OF A = Q q Q=MAXIMUM FLOW INFILTRATOR UNIT AT 75- t=PERCOLATION RATE = 50 min./in. CENTER FOR INSTALLATION OF INSPECTION WELL PIPE = 1050 F5 = 1485 SF \�� 30.0% REDUCTION FOR USE OF INFILTRATOR UNITS: IN BED CONFIGURATION - 1040 S.F. ® 15.5 S.F./UNIT, 67 UNITS REQUIRED. RECOMMEND AT LEAST 67 UNITS. 3. CLEAN OUTS ARE REQUIRED AT ALL BENDS AND AT LEAST EVERY 100 FEET ALONG THE HOUSE SEWER. 4" 0 PERFORATED PIPE 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL WATER TIGHT COMPONENTS, PRIOR TO THE ABSORPTION AREA, TO PREVENT INFILTRATION. 5. TOPSOIL COVER MAY BE VARIED (WITH 1 FOOT MINIMUM) TO ALLOW LANDSCAPING. 6. INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS POINTS TO WITHIN ONE-HALF FOOT OF FINAL GRADE. 7. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND SLOPES MEET THOSE REQUIRED. B. PROVIDE POSITIVE DRAINAGE OF SURFACE WATER AWAY FROM ABSORPTION BED AREA USING DRAINAGE SWALES AS NECESSARY. 9. SOILS AND PERCOLATION INFORMATION FROM INFORMATION PROVIDED BY H.P GEOTECH, INC., JOB NO. 100 610, DATED AUGUST 8, 2000. 10. THIS DRAWING DOES NOT CONSTITUTE AN ISDS PERMIT. PERMIT MUST BE OBTAINED FROM APPROPRIATE CITY OR COUNTY OFFICIALS. ENGINEER MUST OBSERVE CONSTRUCTED SYSTEM BEFORE BACKFILL AND PROVIDE REPORT TO COUNTY. 11. THIS SYSTEM IS SIZED F, -,R TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS OR FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM. 12. SITE PLAN INFORMATION FROM FIELD SURVEY AND OWNER. �\ 13. INSTALL BLUEBOARD INSULATION OVER SEWER PIPE WHEREVER DEPTH IS LESS THAN 5.0 FEET. 14. EXISTING MAPPING AND PLANIMETRICS PROVIDED BY OWNER. PROPOSED PLANIMETRICS PROVIDED BY R.C. ROBERTSON ARCHITECTS. 15. DESIGN OF INFILTRATOR SYSTEM BASED ON PROFILE WITH 1' OF TOPSOIL OVER 4.0' OF DENSE SILTY SANDY GRAVEL WITH COBBLES AND BOULDERS. HP -GEOTECHNICAL TESTS INDICATED A PERCOLATION RATE OF APPROXIMATELY 550 MPI OR FASTER. 16. BASED ON GEOLOGICAL AND/OR ENGINEERING CONTROLS AND EVALUATION OF RISK OF CONTAMINATION OF SURFACE WATER AND GROUND WATER, IT IS NOT NECESSARY TO ADD 8 FEET ADDITIONAL DISTANCE FOR EACH 100 GALLONS OF WASTEWATER PER DAY SURFACE OF DESIGN FLOW OVER 1000 GALLONS PER DAY AS SPECIFIED IN THE TABLE TO PREVENT CONTAMINATION. THE 100 FOOT SEPARATION BETWEEN THE PROPOSED ABSORPTION AREA AND SURFACE WATER OR GROUND WATER IS APPROPRIATE TO PREVENT CONTAMINATION. INFILTRATOR UNIT INSPECTION WELI DETAIL N.T.S. X1.5:1 MINIMUM SLOPE BED CROSS SE N.T.S. CONSTRUCT SWALE SANDY GRAVE WITH COBBLES AND BOULDERS, 0 C. oil, 0 a i, GENERAL ABSORPTION BED NOTES 1. ABSORPTION BED SHALL NOT EXCEED 100 FEET IN LENGTH. 2. THE BOTTOM OF ABSORPTION BED SHALL BE LEVEL. 3. DRAINAGE DITCHES ARE TO BE PROVIDED ABOVE AND AROUND BED, AS NECESSARY, TO PREVENT SURFACE RUNOFF FROM ENTERING ABSORPTION AREA. 4. INSTALL INFILTRATOR IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS. 5. ABSORPTION BED BOTTOM AND SIDEWALLS MUST BE RAKED TO REMOVE SOIL SMEARS INCURRED DURING EXCAVATION. NO EXCAVATION OF ABSORPTION FIELD IS TO BE DONE DURING WET WEATHER OBSERVED S0IL PROFILE AND USE OF RUBBER TIRE VEHICLES OVER TRENCH AREA IS PROHIBITED TO MAINTAIN GOOD SOIL STRUCTURE. N. T. S. r m J U sC4 Z LULU Z Q W LL U � �c C', 12 0 _ (7 O rn O v S 0_ k kk CONSTRUCT Z SWALE _O n � > w J o a w Q Z =D BOTTOM LEVEL AND ROUGHENED Y 0 CO J INFILTRATOR UNIT (TYP.) M X1.5:1 MINIMUM SLOPE BED CROSS SE N.T.S. CONSTRUCT SWALE SANDY GRAVE WITH COBBLES AND BOULDERS, 0 C. oil, 0 a i, GENERAL ABSORPTION BED NOTES 1. ABSORPTION BED SHALL NOT EXCEED 100 FEET IN LENGTH. 2. THE BOTTOM OF ABSORPTION BED SHALL BE LEVEL. 3. DRAINAGE DITCHES ARE TO BE PROVIDED ABOVE AND AROUND BED, AS NECESSARY, TO PREVENT SURFACE RUNOFF FROM ENTERING ABSORPTION AREA. 4. INSTALL INFILTRATOR IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS. 5. ABSORPTION BED BOTTOM AND SIDEWALLS MUST BE RAKED TO REMOVE SOIL SMEARS INCURRED DURING EXCAVATION. NO EXCAVATION OF ABSORPTION FIELD IS TO BE DONE DURING WET WEATHER OBSERVED S0IL PROFILE AND USE OF RUBBER TIRE VEHICLES OVER TRENCH AREA IS PROHIBITED TO MAINTAIN GOOD SOIL STRUCTURE. N. T. S. r m J U z sC4 Z LULU Z Q W LL U � �c C', 12 0 _ (7 O rn O v S 0_ k kk U Z _O n � > w J o a w Q Z D Y 0 CO J M 0] Z z (5 &o a Z U p Z � W a a 0 D � Q PROJECT N0. 2000004.34 LJ 0 J 0 _W z_ G- � U N (n X a H W W _J J 0 D M M N I Q Q w \ \ \ W O LO \ \ \ 0- cv r7 z O O O_ J O M w .. W 0 Y � Q w z sC4 LULU Z Q zw LU 0_ LL U � �c C', 0 _ (7 O rn = v S 0_ k kk GO J o a Q D Y 0 CO J M 0] Z z (5 &o a W m U p Z � J a a z PROJECT N0. 2000004.34 SHEET 1 OF 1 09/02/2001 07:50:53 area3.dwg i' 1