Loading...
HomeMy WebLinkAboutpitkin.eh.264306401003 (2011)Document Layout (From Most Recent to Oldest Permit) Permit Application Log Sheet/Notes & Photos Communications As -built Design Engineer Design Soil Information Water Permit & Information Second System on property Third System etc. Floor Plans Please See Building and Land Use Approvals Files for additional information. ONSITE WASTEWATER TREA&NT SYSTEM (OWTS) C CONSTRUCTION PERMIT 0405 Castle Creek Road, Suite 10 Aspen, CO 81611 Phone: 970.920.5070 Fax: 970.920.5077 Permit #: 10012 Parcel I D #: 2643-064-01-003 Permit Issued: ®NEW ❑REPAIR ❑REMODEL/ADDITION ❑TANK ONLY ❑FIELD ONLY ❑AMENDMENT Owner(s): Roaring River Ranch, LLC Property Address: 300 Sadie Lane Legal Description: Lot 3, Aspen Village River Homes Size of Lot: Acres Detached Accessory Unit: DYES ®NO Size of Building: 3908 Sq. Ft. Size of Accessory Unit: Sq. Ft. Designed By: 1840 Partners, LLC Project #: Dated: June 7, 2010 Phone #: 866-934-8140 Mailing Address: PO Box 0426, Eagle, CO 81631 Fax #: Email Address: Perc Rate: 21 mpi Profile Hole Depth: 8 ft Depth to Groundwater or Bedrock: Greater than 8 ft Minimum Tank Capacity: 1406 gallons Minimum Absorption Area: 722 sq ft w/ 50% reduction This OWTS Construction Permit is approved on the condition of compliance with the engineer design as submitted with the application and the specifications cited above. Changes must be approved by this Department and the engineer prior to construction. This design calls for one 1500 gallon two compartment tank followed by a pump tank with a pump that meets engineer specifications. If the pump does not have a built-in filter, an effluent filter must be placed on the outlet of the 1500 gallon tank. A baffled distribution box, accessible from grade, will be used to distribute effluent to 3 trenches. Each trench will consist of 25 Quick 4 chambers for a total of 75 chambers. There must be at least 6' of undisturbed soil between each trench. This Permit must be kept on-site during installation. The engineer must do a final inspection of the installation and submit an "as -built" letter to this Department within 30 days of the final inspection, unless a longer period of time has been agreed upon, in writing. This Department must also be called for the final inspection with a minimum of 48 hours notice. Minimum horizontal distances between components of the system and physical features shall conform to the requirements of the Pitkin County OWTS Regulation. This Permit is conditioned upon the property owner(s) providing for regular inspection, cleaning, and maintenance of the system by qualified personnel, in accordance with the manufacturer's recommendations and the requirements of the Pitkin County OWTS Regulation. THIS PERMIT IS EXPRESSLY CONDITIONED UPON COMPLIANCE WITH ALL REQUIREMENTS OF THE PITKIN COUNTY OWTS REGULATION, INCLUDING BUT NOT LIMITED TO THOSE CONDITIONS SPECIFIED ABOVE. Plans and specifications for the proposed OWTS have been reviewed and are considered satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated in accordance with the Pitkin County OWTS Regulation. This Permit will expire 1 year from the date of issuance unless construction on the system has commenced. An "as -built" drawing must be submitted and approvve//d by EH/NR before final approval of the system will be issued. Issued By: 4 %RY�2eHCl Date: qlb l0 Expires: mlLot lI Installer: License #: Reactivation Authorized by: ' r l yll Final Approval I Date: TVy(a New Expiration Date: []FkmIYii 2l all 0OOOul or 5-4 Carla Ostberg From: Debbie Weinant Sent: Monday, June 07, 2010 2:29 PM To: AnnMarie Prince; Bonnie Waechtler; Brian Nichols; Brian Pawl; Brian Pettet; brucer romero forward; Carla Ostberg; Catherine Berg; Cory Garske; 'Dawn Sager; Debbie Weinant; Debby Payne; Dwight Shellman; gavette@carbondalefire.org; Ginny Bultman forward; Jan Schubert forward; Jeff Rice; 'Jim Wilson'; Joanna Schaffner; Kathy Rogo; Lee Ledesma; Mary Lackner; 'Qwest Addressing'; Sam Irmen; Sandy Boteilho; 'Scott Thompson'; Tom Parry; Tony Fusaro; Tony Popish; USPS Aspen; 'USPS Basalt'; 'USPS Carbondale'; 'USPS Snowmass'; Vicki Monge Subject: New Rd Name "Sadie Ln" and New Addresses - Aspen Attachments: Sadie Ln.pdf Address: 100 Sadie Lane PIN: 2643-064-01-001 Owner: Roaring River Ranch Address: 200 Sadie Ln Formerly: 30135 Hwy 82 PIN: 2643-064-01-002 Owner: Roaring River Ranch New proposed house Address: 300 Sadie Lane PIN: 2643-064-01-003 Owner: Roaring River Ranch Address: 400 Sadie Ln Formerly: 30133 Hwy 82 PIN: 2643-064-01-008 Owner: Roaring River Ranch Debbie Weinant Pitkin County Community Development 130 5 Galena St Aspen, CO 81611 970-920-5525 11111,1♦ -it 1 [ 00002 pativ\-u i I0OI7- ONSITE WASTEWATER TREATMEr SYSTEM (OWTS) D II� CONSTRUCTION PERMIT APPLICATION IiH/hR I 0405 Castle Creek Road, Suite 10 Aspen, CO 81611 Phone: 970.920.5070 Fax: 970.920.5077 Parcel ID# (available from the Pitkin County Assessor's Office 2643 064 01 003 970-920-5160 or at www.pitkinassessor.orgl: - - - Purpose of Permit: X❑ NEW ❑ REPAIR DUE TO FAILURE ❑ REMODEL/ADDTTION ❑ TANK ONLY ❑ FIELD ONLY Cost of System Repair or Remodel/Addition (approximate): $12,000 Property Address: ROARING RIVER RANCH, LLC HIGHWAY 82 (SEE ADDRESS FOR97— Lot: 3 Block: . N/A Filing: NIA Subdivision: ASPEN VILLAGE RIVER HOMES I rroperry �;wnerls)-: ROARING RIVER RANCH, LLC tmail Address: RICHARD_KINDER@KINDERMORGAN.COM 2929 LAZY LANE 970-923-7622 HOUSTON, TX 77019 Primary Contact Person/Applicant (if not owner): Company: Number of Potential Bedrooms In or Fixture List for the Accessory Unit: RICHARD SHAW DESIGN WORKSHOP, INC. Contact/Applicant Mailing Address: City, State, Zip: Name of Community/Public Water System (if applicable): ASPEN VILLAGE 120 FAST MAIN STREET ASPEN, CO 81611 Cell Phone: Business Phone: 970-710-9539 970.925-8354 Fax Number: Email Address: 970-920-1387 RSHAW@DESIGNWORKSHOP.COM Building Permit # (if applicable): NOT AVAILABLE Lot Size (in acres): B&H GENERAL CONTRACTORS 5317 CR 154 #206, GLENWOOD SPRINGS, CO 81601 970-945-0102 Size of Building (square feel): Number of Potential Bedrooms: FAR = 5,288 (3,908 SF OF WHICH IS HOME) 5 (Includes 2 Sets of Bunks on Lower Level) Detached Accessory Unit? ❑YES ®NO Size of Accessory Unit (square feet): Number of Potential Bedrooms In or Fixture List for the Accessory Unit: NIA Water Source: ❑ PRIVATE WELL ❑ SURFACE WATER ❑ SPRING Q COMMUNITY/PUBLSC WATER SYSTEM Name of Community/Public Water System (if applicable): ASPEN VILLAGE Engineering Finn: Job Number: Phone Number: Fax Number. 8140 PARTNERS, LLC N/A 970-45-8810 877.934-8141 Mailing Address: City, State, Zip: PO BOX 0426 Eagle, CO 81631 PLEASE READ BEFORE SIGNING: 1 certify that the above information is complete and accurate and that I have provided complete and accurate Information In all of the documents included In my application package. I acknowledge that EH/NR may revoke any permit I am Issued if my application is found to contain any Inaccurate, false, or misleading Information. I understand that no construction may be undertaken on an OWTS until an OWTS Construction Permit is Issued. Owner Si lur squired): / Date: April 20, 2010 Applicant Signature:Date. Qoo-3 ,4(s ,, Al gh-0j- April 20, 2010 FOR OFFICE, j _;:.., ':' - .. .x Received by ENIHR Staff. W Fee & Receipt #: Date: 4 A.liR9�b vera cb �a f /aa3 97 60//10 Pitkin County Environmental Health Department Contact Log Sheet i Uwlft" I&* January 26, 2011 Ms. Carla Ostberg Environmental Health Manager, Pitkin County 0405 Castle Creek Road, Suite 30 Aspen, CO 81611 • RE: Septic Construction/Installation Certification, Roaring River Ranch LLC, Aspen Village River Homes— Lot 3, Pitkin County, Colorado Dear Ms. Ostberg: This letter and attached "as -built' drawings are being submitted to the Department to document the final inspection of the constructed septic system for the subject project. Per onsite inspections, observed testing (September 1, 2010) and coordination with the contractor,`1110motion aiftallation of the systems was completed in accordance with the team ofthe e(igineered design sWamAmmi4o-and approved by the Department, asmodlffed per Department 5/fdggestions. . Not all the project improvements interacting with the septic system have been completed to date (i.e. finished pavement of the driveway and finished material on the stairs). However, all primary construction associated with the septic system have been completed, inspected, tested and GPS surveyed per Department requirements and pipe trenching (Class A) at driveway and stair crossings meet the required minimum standards and are properly bedded and covered. Should there be questions concerning the installation, please contact me at (970) 445-8810. Regards, Sam Otero, P.E. CC: Richard Shaw, Design Workshop Eagle Office 11143 Capitol Street, Suite 205 1 PO Box 426 1 Eagle, CO 81631 Golden Office 114143 Denver West Parkway, Suite 170 1 Golden, CO 80401 00M'5 P: 866-934-8140 1 F:877-934-8141 T I� �2-s � T, DSTEDDGE O ���_�••�.,�ROARING FORK RIVER - � �.. APPROXIMATE IOD -YEAR FLOODPLAIN \/L \)158 ' ` EXST. ,/MUILDING �ENVELOPE G Gn ♦ PROP. /\\ O / •p PPIPE L LANDSCAPING MND / VC O ``♦\\ '.. y PROP. SEPTIC RISERS I ����\��i'1� i P BOTTOM OF LWN AT ELEV. 7158.11 /••�' 7I891 OGV \\ 8 \ 59'17•44.0' N \T 10635' E PR4� rA � �{-EXST. SEPTIC TAMPS I, I�� I• 2 PIMEGORE E)IST, BULgry(• ®2DD P.SL I i, 5S— 1II�I I I EXST GRAVEL DRIVEY/AY D / I PIT 3APPIRWIMA e I I OF I 09'O'N.f 0655,0.E I I ®PI°E C \ \ I \\ I DST BUILBING�\ \ \ I ENVELOPE \ \ I \J EXST. PRIVATE DRNEWAY� I 0000UG Z ' 20 0 ZO AD SCALE N Pat 0417'X5.7' N QO ; ME HYDRANT / I VA IBS JD / 1 /118 / ♦)110.]5 ALL UTILITY SERVICES TO E INSTALLED PER MANUFACTURE SPECIFGATIONS AND N ACCORDANCE YAM ALL APPLIDABLE STANDARDS. ME CONTRACTOR SHAUL OBTAIN ALL PERMITS AND APPROVALS FROM ALL UTILITY AGENC[S PRIOR TO UTKOIES CONNECTOR AND INSTALLATION. UTILITY CONNECTIONS AND INSTA.ATaNs SHALL BE COMPLETED BY ERSONNEL AUTHORIZED RONLY. EXISTING SOILS k GEOTECHHCAL INFORMATION WAS OBTAINED FROM AN EXISTING DINTS PERMIT NO. 960)). • CONTRACTOR SILLLL WRIFY ALL DIMENSIONS AND ELEVATIONS PROM TO CONSTRUGII • CONTRACTOR SHALL VERIFY LOCATION OF Al MISTING UOLMES IN ADVANCE OF CONSTRUCTION AND MAKE ANY OBSEWATONS THAT AFFECT CONSTRUCTION KNOWN W ME MINER'S REPREENTATNE. LEGEND PROP. SANITARY` SEND LINE —PY/— PROP. !/H" POTABLE WATER UNE —E — PRIOR. ELECTRIC LINE —G — PROP_ GAS UNE —T PROP. TELEPHONE UNE 00) PROP. CLEANOUT EXST, FIRE N1'ORNNT p0 DST. WATER VALVE 01 EXE, TELEPHONE RISER Ek. EXST. CAS METER �. EXST. GAS VALVE TEST W LOATON V PERCOLATION TEST LOCATION \ / vP-3 j1 ♦718925 AS -BUILT NOTE: ME AS -BURT COINDnIONS ON M5 PLAN REPRESENT ME CONSTRUCTED CONg1ONS OF ME PROROSED SEPTIC A y` _ / SDIERSNOW ON 6 PLAN IS�� OR DAILY PROPOSED FORMAWN ONLY. J $ / PROP. pSTIBTRITION \ PROP. FENCE ®PROP. 69EWATON A PIPES (IPJ ° %°�A(19') , PROP. SEPTIC SYSTEM SIZING INFORMATION Fla v / E`M4�NpN / 10 / / ® NUMBER OF 1 MOR OOHS .55 / ♦4',y f(0 / /f it GALLONS PER DAY (GRID) PER PERSON - 75 / / / / ICS / PERSONS PER BEDROOM - 2 /I. ♦'/•/"/F M, .1•N PERC RATE - 21 MPI DST. MTIurY / // / 106 W / PROP. SEPTIC TANK SIZE: EASEMENT 1, // // / / VOLUME - TOTAL GPD X 2 PERSONS X (L5 X N0, BEDROOMS) X ( A HOURS Y OR 1.108 GAL - 755 x 2 x (IS X 5) XLEACH EASEMENTNT SEPTIC TANK ROUNDED TO /f / A / PROP. ABSORPTION AREA SIZE AREA.RM(�RIj / / (/ 1A0 SI..1.. (IL5) 21 / 01TS5 W t IF/ ML/ PM- 1.1 PER OWiS REGUTATIONS APST/ SEPTIC PROLTION OO- 1.5 X 22 PERSONS X NO. BEDROOMS X 75 GPD ABSOpgfgN RELIC 1.125 - IS X 2 X 5 X 75 OR / / � 1 PERC RATE I •N RPIION TRENCMA %J i 9t] 8EQUcwNs •FIRM A TOTAL OF ]• 1.. AS PER COONIY OWNS REGULAR(NNS ELM NFILTRATOR OUICA. S�p ^ • A ]0; REDOCTION 19 PERMITTED FOR ME USAGE OF GRAVELLE55 CNIABERS. L.LM (3 TPEYICNFS AT 100' L ® � A A 2Mt REDUCTION IS PERMIREO FOR ME USAGE OF DOSMG BY PIMPS. 712 SF.- .. S.F. % (0.30 (GRAVELlE55 REDUCTION) .0.20 (DOSING REDUCTION)) )CACTI-•, N -/y , . •TW ouK mmDA CN,Nml R 1' 24 CIMMBE16 - 722 S.F. /9.87 S.P. 4 6 ) B 1 9 1 10 ROARING RIVER RANCH ROARING RIVER RANCH LLC ASPEN VILLAGE RIVER HOMES - LOT! PITMN COUNTY, COLORADO AS -BUILT I A pFro>/1q ntMSMN -sunt ssRW I ! l l IElELiO MR EO6IBICIpII DATE: ROARING RIVER RANCH UTILITY PIAN K -TIF G F 0 SEPTIC FIELD PRIOR TO BACKFILL SEPTIC TANK DETAIL SCN_E: NTS SEE LANDSCAPE MATERIAL SERIES PLANS FOR SURFACE TREATMENT 8 ('i rJ hmm. 1. D-OUTSIOE DIAMETER OF PAVE. CLASS A PIPE TRENCH DETAIL SCALE: NTS 10007 1 3 GRIDS SEPTIC AND PUMP TANKS PRIOR TO BACKFILL ACCESS LID WATERRGNT HEAW DUTY PPLY TANK RISER TYP. .PING HIGH WATER .R TANK ADAPTER RING TYP. AM FLOAT CONCRETE PUMP TANK i (sB'xse') _ P' PURECORE 400 PS.1. AY INLET SLAT Yd- PER FO HALLODRNN BACK TO TANKNAFTER i�nnx� EACH PUMP CYCLE i TO TANKS SHALL BE SUBMERSIBLE WASTEWATER PUMP (1/4 HP) T ANO SOIL -TKAs. GOULD PUMP MODEL NO. 3885 CODE WE051IHN OR EOUAL WITH DUCK DISCONNECT SEPTIC PUMP TANK DETAIL SCALE: NTS Q //I O i >io SCALE: I'-1'-0' AS—BUILT NOTE: THE TAS -WART CONDRIONS ON THIS PLW REPRESENT THE CONSTRUCTED CONDITIONS OF THE PROPOSED SEPTIC SEWER SYSTEM ONLY. ADOITO A PRCP05ED INFORMATION SHOW ON THIS PUN 5 SHOWN FOR WFORWTION ONLY. TYPICAL LATERAL CLEANOUT DETAIL SCALE: NTS 3 1 4 1 5 1 1 1T 1 B 1 10 ROARING RIVER RANCH ROARING RIVER RANCH LLC ASPEN VILLAGE WVER HOMES - LOTS PITION COUNTY. COLORADO CONSULTANTS: P NNRMNw4,31. AS -BUILT I PROJECT MANAGER: W. OlIER01 ROARING RIVER RANCH UTILITY DETAILS SHEET NUMBER: Coos r Carla Ostberg From: Carla Ostberg Sent: Wednesday, July 21, 2010 9:36 AM To: 'William Dorais' Subject: RE: Hi from Bill Dorais 0 Bill, I really feel that you are being led in the wrong direction with his pump. It is a cheaper style pump (there are better ones out there) but still could be installed in a more user-friendly manner with a quick disconnect at the top of the riser rather than at the bottom of the tank. It's not a matter of IF the pump will need to be serviced, but when. If installed as Chris has described, they will have to do a confined space entry per OSHA requirements and general common sense to be safe. You NEVER want to go into a septic tank unless it's absolutely necessary - and with the pumps and applications that are available today, this should not be necessary. In addition, I'm extremely disappointed that no one from the engineering firm is able to complete an installation observation in a timely manner. The more time the system sits open, the more chance of compromising something with the installation that was done properly to begin with. We do have rain in the forecast and it is best to get that covered asap. In my mind, a week or 2 lag time for the observation is simply unacceptable. Most engineers we work with, even if they are working out of Denver, ask for maybe a 48 hour window to do the inspection. And, if they are not available, they hire someone to conduct the installation observation on their behalf so the installer can cover the system. If you wouldn't mind passing my comments along to Brad and Mike, that would be helpful. I don't mean to be harsh, and I'm happy to talk to Chris directly, but I'm a little disappointed in both their engineering choices for this system as well as their operational protocol. Please call me if you have questions. Carla Ostberg, MPH, REHS Environmental Health Manager Pitkin County Environmental Health 970-920-5438 -----Original Message ----- From: William Dorais [mailto:wdorais@gmail.com] Sent: Tuesday, July 20, 2010 6:50 PM To: Carla Ostberg Subject: Fwd: Hi from Bill Dorais ---------- Forwarded message ---------- From: Chris Snyder <chris.snyder@8140partners.com> Date: Tue, 20 Jul 2010 12:25:31 -0400 Subject: RE: Hi from Bill Dorais To: William Dorais <wdorais@gmail.com> Hi Bill - Thanks for the pictures. Sam Otero (my boss) lives in Eagle and will be able to stop by next week to take a look at the tanks and leach field. He's on vacation this week and I'm also away for business. From what I understand from the contractor, they may need to reset the tanks anyways due to a missunderstanding between the architect and us, _ t OOOO',3 though I'm waiting to hear mopfrom the contractor. • As far as someone reaching the pump in the pump tank for maintanence. We figured that if the pump needed to be serviced, they would first pump the effluent from the pump tank with a pump truck, and then climb into the pump tank to service it. The reasoning for this approach was that due to the depth of the pump tank, it would be easier to access the pump from inside the tank verses trying to reach/hang into the tank (from the top) to service the pump. (Send via Smartphone) -----Original Message ----- From: William Dorais [mailto:wdorais@gmail.com] Sent: Monday, July 19, 2010 7:47 PM To: Chris Snyder Subject: Hi from Bill Dorais Chris We had Carla Ostberg, from Oitkin County OSW. out this afternoon to inspect the work that we have completed. She wants to add observation ports on end inflitrator panels to the west, she said everything else looked good. She wants you to look at it also, before we can cover field. Please call me tues. and let me know you schedule. We also have concerns on being able to reach the discharge pump, if it has to be replaced in the future. We have steps in the 48 inch diam. riser above the pump tank where we can lay on top of tank, but we are not able to reach to the depth of the discharge elevation you requested .. Hope to hear from you tommorow Bill D. Email secured by Check Point z 0 0 OWTS DESIGN CALCULATIONS - for Pitkin Owner's Name ..:. ti•Parcel lD#*;.`4^.r.:;t••. House Size (sq. ft.)1.a1; 4 - (75 gpd or 100 gpd) 75 Number of Bedrooms in Main House alswim Number of Offices, Libraries, Studies, Similar -sized Rooms in Main House Number of Bedrooms in Detached Caretaker unit MMLI Number of Offices, Studies, Similar -sized Rooms in Caretaker Unit (If the caretaker unit is ATTACHED, treat as if put of main house.) Average Daily Waste Flow 750 State Review Required? no Pere Rate AWO (1) Design Flow (Q) = # potential bedrooms X 2 people/bedroom X gpd X 1.5 Q= 1125 Minimum tank capacity 1406 gallons Absorption Area (=Q/5 X SART pert rate)(1.4 loading factor) A = 1,444 sq. ft. of absorption area required Absorption Area (=Q/5 X SQRT perc rate) WITH SECONDARY TREATMENT (no loading factor) A= 1,031 sq. ft. of absorption area required Abs. Area w/ loading factor (B25) Trench Bed Quick4 Trench Quick4 Bed Pipe and Gravel (-10%) 1299 no red. 1444 132 146 Dosing (-20%) 1155 (-20%) UK 117 117 Chambers (-30"�) 1010 (-10%) 1299 102 132 Max Allowable (iw� 722 (-30x) 1010 73 102 Secondary Treatment Abs Area w/ out loading factor (B28) Trench Bed Pipe and Gravel (-10-.) 928 no red. 1031 94 104 Dosing (-20%) 825 (40%) M 84 84 Chambers (-an%) 772 (-10%) 929 73 94 Max Allowable (-50".q 516 (-30%) 722 52 73 110 SETBACK FROM WELL # of feet = 60 SETBACK FROM POND, STREAM OR IRRIGATION DITCH # of feet = 35 SETBACK FROM DRY GULCH # of feet — INIIGPl01 Parcel Detail • • Page 1 of 3 Pitkin County Assessor/Treasurer Parcel Detail Information Assessor/Treasurer PropertySearch I Assessor Subs LQuery I Assessor Sales Search Clerk & Recorder Reception Search Basic Building Characteristics I Tax Information Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Improvement Detail Land Detail I Photographs 000011 Tax AreaI Account Number I Parcel Number 2009 Mill Levy 057 j R013286 264306401001 21.125 Owner Name and Address ROARING RIVER RANCH LLC 2929 LAZY LANE HOUSTON, TX 77019 Legal Description Subdivision: ASPEN VILLAGE RIVER HOMES Lot: 1 Section: 4 Township: 9 Range: 85 LOT 1 SEC 6 & 4-9-85 Location Physical Address: HWY 82 SNOWMASS Subdivision: ASPEN VILLAGE RIVER HOMES Land Acres:4.3600001335144 Land Sq Ft: 0 Section Township Range 4=1 9 85 2010 Property Tax Valuation Information Actual Valu I Assessed Value Land: j 3,10g00j 899,000 http://pitkinassessor.org/assessor/Parcel.asp?AccountNumber=RO13286 5/26/2010 Parcel Detail Improvements:I 0 Total: 3,100,000 1 899,000 Sale Date: I 10/4/2001 Sale Price: 3,100,000 Basic Building Characteristics Number of Residential 0 Buildings: Number of Comm/Ind 0 Buildings: No Building Records Found Tax Information ce Due as of 5/24/2010 nt Year Balance Due luent Years' Balance Due Balance Due Tax Year Due In Tax + Special Assessment Amount 2009 2010 $18,991.36 2008 2009 $17,958.96 2007 2008 $17,215.12 2006 2007 $15,897.24 2005 2006 $15,126.40 Top of Page Assessor Database Search Options I Treasurer Database Search Options Pitkin County Home Page Page 2 Qf 3 The Pitkin County Assessor and Treasurer's Offices make every effort to collect and maintain accurate data. However, Good Turns Software and the Pitkin County Assessor and Treasurer's Offices are unable to warrant any of the information herein contained. 000012 http://pitkinassessor.org/assessor/Parcel.asp?AccountNumber--RO 13 286 5/26/2010 Parcel Detail • • Page 3 of 3 Copyright C 2008 Good Tums Software. All Rights Reserved. Database & Web Design by Good Turns_Sofrware. 000013 http://pitkinassessor.org/assessor/Parcel.asp?AccountNumber—R013286 5/26/2010 ROARING FORK RIVER u GENERAL 1p1E5: - 'rte :'a w N ea ROARING RIVER \\ _ _. _ _ _ _ - RANCH \ I \ Llm raw wor .° °a°ns ° --..n . N.. ROARING RNER RANpILLC uMING R R ANCHLL A t •� \ feT u.,id ,,.s m,vEo rmN w NfM fAM.Y.CtlMmC ��rn°FL // \\\ ® Y�mM[ Y\\� '..I" IlwuN[No rwwnv:xs r. ntunvi warn q�,W KEY NOTES \ / O LrrFNn b ..\ \ I � EII51. &IILgNI' �/ =rtiru4 ��aws � i\ E%ST. RM.LWfi � PROP. SEPTIC SYSTEM SIZING INFORMATION R ' T. `=m mam B / hnnn nn�'.Ti / i / alroc. ow,ernon uu arc r�..r 'n Nacimon y yy yy , / .t / raanrr ae-,a .�amen.n an°eur nee N-u.r. s.n xn,aa I I�� r roc Na ROARING TYPRANCH UTILITY PLAN q�9Ry mv.-!N.:. �. ccz lwom imcea•ea°Imvw +ovxnll .1. eSSEr N e.a. m v. ar u. 0006 � :3 i3 u C 4 u n T ENE OFSRIVER ROARING FORK RIVER GENERAL NOTES: --- �-- ALL UTILITY SERVICES ToBE LED PER TANDFN ACRE SPECRlGT10N5 AND IN ALCgiDANCE WITH KLL APPA➢PIICABtE STANDARDS `�\`���/ '\`• _ ' - - -, _+1 L_ T\ _ _ J.y. • THE CONTRACTOR SHALL OBTAIN ALL PERMITS AND APPROVALS FROM ALL `IrIPPRO BWT N - - -- UTNTY AGENCIES PRIOR TO U ILInES CONNECTION AND INSTQLAnON. FUDODWI l71� - . UTIUTY CONNECTIONS AND INSTKunDNS SNALL BE COMPLETED BY %• _ _ EXIST _ - - AUTHORIZED PERSONNEL ONLY '\` ENVELOPE _. f _ • EXISTING SOILS k GEOIEO 9W INFORMATION WAS OBTAINED MOM AN ENVELOPE EXISTING OWfS PERMIT NO 960Tr. / . CONTRACTOR SHALE VERIFY ALL DIMENSIONS AND ELEVATIONS PRKKV TO PROP. _.�__ _ --_ _____- IANDSCM�I D / � CC 1 _ CONSTRUCTION. a e SCHEDULE - PROP. 40 pyD PIPE /� _ - -- . CONTRACTOR SH•LL VEIRM CANTON E ALL EXISTING THAT IN la / BUILDING PROP - _->>- - "- - - ADVANCE TI CgNOWN TO AND NER* ANY OBSEMATWE. TINT ISFECT \`�. ��,[ UP• ) PROP v", lArvx SEPTIC TANK YIiH RISERS----"-"_� _ CONSTRUCTION RENOWN TO THE OWNER'S REPRESENTATNE. "VLcLAJ I r s 1 A,a�A. wI➢R RqE RSA (ISM GALLONS)_ - ,X yam` - ,•,may qp' F 1 L ENVELOPE a- tali 1 PIT ILl ��k� _ _ �-E ISI. SEPTIC TANKS I �I r 3" ISO PS COIL PLASTIC P11 EXST. BUILDING OR, AS REou1 D PER PU)AP TANK NUFACTURE SPECIfINTi 1 SS I �CAS1 3' / --EXST SAN SEWER GRAVEL DRIVEWAY PIT 3 I r � J I I I I I \ I I V li EXST BUILDING \ \ I ENVELOPE I \ I I \J I EXST PRIVATE DRIVEWAY 20 0 10 AO SCALE IN FEET 000015 1 1 2 FIRE k ,71"25 P -J D I5AER 05� / pgpP 80X (INSTALL TOP Di DISTPIBUiION BOX t0 MATCH PROP. GRADE) /t\ t\ \ PROP DISTRIBBUTK)N PIPES (TYP.)�TBD3-- / f" 60 /HILL NOi INSTALL / \ I'FENCE POST IN THE EXST. OR 11 PROF. AB50xPnON MU j) / / / \ PROP. OBSERVATION PIPES (TYPP /y~ Ay Aly `PROP FENCE /is PROFILE V4 / PIT EzsT. unLRk / Fi.,a / LEACHFIELD CASEMENTEXST ADDL EnT IC /ABSORPTIONSFEEW-/ PROP. ABSORPTION TRENCHES INFL TOR CUUICKa ASTANOMDE CHAMBERS (3 TNEWINES AT IN' LORD X 3' WIDE) I P-1 I PLAN �/ 0 111d I — PW— KEY NOTES: PPS —E — CONNECT TO EXISTING GASLINE AND PROVIDE GAS METER AND GAS —0— PROP GAS LINE VALVES AS RECURRED PER UTILITY OWNER STANDARDS -_ •'�� O CONNECT TO EXISTING WATERLINE AT EXISTING WATER VALVE AND B EXIST. FIRE HYDRANT PROWDE WATER METER AS REQUIRED PER UTWN OWNER STANDARDS 7155_ O3 CONNECT TO EXISTING ELECTRICAL VAULT AND PROVIDE ELECTRIC METER PER UTILRY OWNER STANDARDS, EL OCONNECT TO EXISTING TELEPHONE RISER PER UDLM STANDARDS. / e CONNECT UTILITIES TO PROPOSED BUILDING PER LOCAL UTILITY Q O STANDARDS AND CODE. ,71"25 P -J D I5AER 05� / pgpP 80X (INSTALL TOP Di DISTPIBUiION BOX t0 MATCH PROP. GRADE) /t\ t\ \ PROP DISTRIBBUTK)N PIPES (TYP.)�TBD3-- / f" 60 /HILL NOi INSTALL / \ I'FENCE POST IN THE EXST. OR 11 PROF. AB50xPnON MU j) / / / \ PROP. OBSERVATION PIPES (TYPP /y~ Ay Aly `PROP FENCE /is PROFILE V4 / PIT EzsT. unLRk / Fi.,a / LEACHFIELD CASEMENTEXST ADDL EnT IC /ABSORPTIONSFEEW-/ PROP. ABSORPTION TRENCHES INFL TOR CUUICKa ASTANOMDE CHAMBERS (3 TNEWINES AT IN' LORD X 3' WIDE) I P-1 I PLAN �/ 0 111d I — PW— PROP. 3/4- POTABLE WATER ONE _SS— PROP. WIRARY SEINER LINE —E — PROP. ELECTRIC LINE —0— PROP GAS LINE —T — PROP. TELEPHONE LINE ODO PROP CLEANOIn Ty( EXIST. FIRE HYDRANT W EXST, WATER VALVE O EXST. TELEPHONE RISER EL EXST. GAS METER ba• Exv. CAS VALVE e ZEST PIT LOCATION Q PERCOLATION TEST LOCATION PROP. SEPTIC SYSTEM SIZING INFORMATION • NUMBER OF BEDROOMS -5 • NUMBER OF BATHROOMS= 5 • GAL -ONS PER DAY (GPD) PER PERSON = 75 • PERSONS PER BEDROOM - 2 • PERC RATE - 21 MPI PROP. SEPTIC TANK SIZE: HOURS VOLUME = TOTAL GPD X 2 PERSONS X (1.5 X N0. BEDROOMS) X l2A HWNS WY J OR 75 X 2 X (1 5 X 5) X ( 2 ) SEPTIC TANK ROUNDED TO 1.500 C L1ON< PROP, ABSORPTION AREA SIZE: AREA PvI3i„ - 1.NA S.F. =I ! (Imp) 21 PU • I A PER OWES REGULATIONS OD- 1.5 X 2 PERSONS X NO BEDROOMS X 75 GRD OR 1,125= 1.5A 2 A 5 X 75 1 - PERC RATE PRWP a�ORPT ON Me��C�R����S. AS PER COUNIT OATS REGULATIONS • A 30W REDUCTION IS PERMRTED FOR THE USAGE OF GRAVEUESS CHAMBERS. • A 20Z REDUCTION IS PERMITTED FOR THE USAGE OF DOSING BY PUMPS 4122 S.F. = 1.444 SE X (0.30 (GRAVELLESS REDUCTION) + 0.20 (DOSING REDUCTION)) ROARING RIVER RANCH ROARING RIVER RANCH LLC ASPEN VILLAGE RIVER HOMES - LOT 1 PRKIN COUNTY, COLORADO 914OP&MMM LLC P R - 1 3 0113/10 RELEASED FDR ODRiRUCRDB 1 PROTECT MPNACER. W OTERO DRAWN BY: C. LOAM CHECKED Fc C SNYOEN ROARING RIVER RANCH UTILITY PLAN CBO5 F PROP GRADE E Ll' MIN uomL _LEVEL 9"0 INLET \ 14" MIN, 3 TRANSFER PORT S C PRECAST %.. � S Q OG TANK TSG s' SEPTIC TANK DETAIL SCALE NTS ACCESS UO TYP SEPTIC SYSTEM PROFILE Sc 1'.10' NOTE PIPE TRENCH SHALL BE CLASS B PIPE TRENCH UNLESS NOTED OTHERWISE pm F-f%ST GROUND G PROP GRACE WATERTIGHT ACCESS PROP. GRADE 1- - • 1 SCHEDULE PROP PROP_ _ , w PJC PIPE RISERS STEPS - - P.) _ PROP G cLEANouT _ NOTE EL 7165.20 EL 916] W 2" 160 PSI COIL PLASTIC PIPE CLASS A PIPE TRENCH DETAIL �K r y000 OR AS REOUIRED PER WATERTIGHT HEAVY DUTY' g PROP PUMP TANK MANUFACTURE PROP SEPTIC o �S PU ITF SPECIMATIONS r 7µK j PROP BUILDING A FOOTING PE TRENC HOPE TANK RISEN TYP. LIMITS TANK ADAPTER PING ttP. F PROP GRADE E Ll' MIN uomL _LEVEL 9"0 INLET \ 14" MIN, 3 TRANSFER PORT S C PRECAST %.. � S Q OG TANK TSG s' SEPTIC TANK DETAIL SCALE NTS ACCESS UO TYP SEPTIC SYSTEM PROFILE Sc 1'.10' NOTE PIPE TRENCH SHALL BE CLASS B PIPE TRENCH UNLESS NOTED OTHERWISE NOTE' 1. ALL JOINTS TO TANKS SHALL EE SUBMERSIBLE WASTEWATER PUMP (I/2 HP) WATERTIGHT AND SOIL -TIGHT. COULD PUMP MODEL N0..SHS CODE WE0511HH OR EQUAL SEPTIC PUMP TANK DETAIL SCALE. HIS pm t_) PROP GRACE WATERTIGHT ACCESS .j 0 oa 3' OO / CLR. 9 = RISER WIN HE, 3 G� O_ 3 =I r A B" YIN. D 8" YIN NOTE WS 1. D -OUTSIDE DAME2R OF PIPE. SCARIFY E%IST TRENCH 6" IN CLASS A PIPE TRENCH DETAIL �K r y000 SCALENTS WATERTIGHT HEAVY DUTY' 2 HORE TANK RISER TYP. r WATERTIGHT HEAVY DUTY POWER SUPPLY ' HOPE TANK RISEN TYP. TANK ADAPTER PING ttP. TO BUILDING ` 20"P HIGH WATER MIN TANK ADAPTER RING TYP ' ALARM FLOAT CONCRETE TOY z I3 PUMP TANK F11 (l'%•' MIN) 2" 160 P51 LOLL PLASTIC PIPE AS REQUIRED (MANUFACTURE R(IP • s OIRLET !'m INLET PUMP TANOR 4EACH �' SLOPED AT IL' PER FOOT MIN. SHALL DRAIN BACK TO TANK AFTER LIQUID PUMP CYCLE NOTE' 1. ALL JOINTS TO TANKS SHALL EE SUBMERSIBLE WASTEWATER PUMP (I/2 HP) WATERTIGHT AND SOIL -TIGHT. COULD PUMP MODEL N0..SHS CODE WE0511HH OR EQUAL SEPTIC PUMP TANK DETAIL SCALE. HIS NOTF: I D-ODTSIDE DIAMETER OF PIPE CLASS B PIPE TRENCH DETAIL SCALE: NTS ] TOP SOIL pm t_) O_ _ .j 0 oa 3' OO / CLR. 9 = ap 3 G� O_ 3 =I r A B" YIN. D 8" YIN NOTE WS 1. D -OUTSIDE DAME2R OF PIPE. SCARIFY E%IST TRENCH 6" IN CLASS A PIPE TRENCH DETAIL �K r y000 SCALENTS 000016 2 NOTF: I D-ODTSIDE DIAMETER OF PIPE CLASS B PIPE TRENCH DETAIL SCALE: NTS ] TOP SOIL 12 MITI. 1140 P.�. 1 LC oU 042Se / 10-H, CO BIIIIIL•36 Pham 14. MIA.. I. �'^Y wwn 1.Opmnw-cwn JRAVELLESS INFILTRATOR - OUICK! STANDARD CHAMBER OR EOUAL NAifJE BACKFlLL �^ �II SCARIFY E%IST TRENCH 6" IN TYPICAL ABSORPTION TRENCH DETAIL SaLE r -r-0' TYPICAL LATERAL CLEANOUT DETAIL SCALE HIS ROARING RIVER RANCH ROARING RIVER RANCH LLC ASPEN VILLAGE RIVER HOMES -LOT 3 PITKIN COUNTY. COLORADO mLsuLrALJrs. 1140 P.�. 1 LC oU 042Se / 10-H, CO BIIIIIL•36 Pham 14. MIA.. I. �'^Y wwn 1.Opmnw-cwn F'LI PROJECT ROARING RIVER RANCH UTILITY DETAILS C006 0 • C�ecPtech HEPWORTH-PAWLAK GEOTECHNICAL GEOTECHNICAL ENGINEERING STUDY PROPOSED GUEST RESIDENCE LOT 3, ASPEN VILLAGE RIVER HOMES HIGHWAY 82 NORTH OF ASPEN PITKIN COUNTY, COLORADO JOB NO. 109 414A DECEMBER 28, 2009 v� Q@� aq". PREPARED FOR: DESIGN WORKSHOP, INC. ATTN: MIKE ALBERT 120 EAST MAIN STREET ASPEN, COLORADO 81611 000011 171 TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY........................................................................ FIGURE - 1 - BACKGROUND INFORMATION...................................................... I..................... - 1 - PROPOSED CONSTRUCTION................................................................................. - 2 - -SITESITE CONDITIONS................................................................................................... - 3 - -GEOLOGIC GEOLOGIC CONDITIONS........................................................................................ 3 - -FIELFIELD D EXPLORATION............................................................................................. 3 - -SUBSURFACE SUBSURFACE CONDITIONS...................................................................................4- ENGINEERING ANALYSIS...................................................................................... 4 - -DESIGN DESIGN RECOMMENDATIONS............................................................................. - 5 - SLOPE STABILITY AND SITE GRADING........................................................... 5 - FOUNDATIONS.................................................................................................... - 6 - FOUNDATION AND RETAINING WALLS.......................................................... 7 - FLOORSLABS...................................................................................................... - 8 - UNDERDRAINSYSTEM....................................................................................... 9 - SURFACEDRAINAGE.......................................................................................... 9 - PAVEMENT SECTION THICKNESS.................................................................. 10- LIMITATIONS........................................................................................................ - 10- 0- FIGURE 1 - LOCATION OF EXPLORATORY PITS FIGURE 2 - LOGS OF EXPLORATORY PITS FIGURE 3 - GRADATION TEST RESULTS 00001% 0 • PURPOSE AND SCOPE OF STUDY This report presents the results of a geotechnical engineering study for a proposed guest residence to be located on Lot 3, Aspen Village River Homes, also known as Roaring River Ranch, Highway 82 north of Aspen, Pitkin County, Colorado. Other landscape development is proposed on Lot 2 and Parcel B of Aspen River Homes. The project site is shown on Figure 1. The purpose of the study was to develop recommendations for the foundation design and evaluate the slope stability of the site with respect to the proposed development. The study was conducted in general accordance with our proposal for geotechnical engineering services to Design Workshop, Inc. dated November 23, 2009. Percolation testing discussed in the proposal has been eliminated at this time. A field exploration program consisting of exploratory pits was conducted to obtain information on the subsurface conditions. Samples of the subsoils obtained during the field exploration were tested in the laboratory to determine their classification and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation. This report summarizes the data obtained during this study and presents our conclusions, design recommendations and other geotechnical engineering considerations based on the proposed construction and the subsurface conditions encountered. The report includes a discussion of the stability of the steep slopes on the lot as well as recommendations for construction on and near the slopes. BACKGROUND INFORMATION Hepworth-Pawlak Geotechnical has performed previous geotechnical studies at Roaring River Ranch. These Studies include: Review of Boulder Wall Condition, Lot Z Aspen Village River Homes, Pitkin County, Colorado, Job No. 102 441, Dated June 28, 2002. Job No. 109 414A c�tect,,,1 [1 -2- • Subsoil Study for Foundation Design, Proposed Residence, Lot 1, Aspen Village River Homes, Pitkin County, Colorado, Job No. 197 550, report dated October 17, 1997. • Subsoil Study for Foundation Design, Proposed Residences, Lots 1 and 2, Aspen Village River Homes, Across Highway 82 from Aspen Village, Pitkin County, Colorado, Job No. 194 344-1, report dated October 8, 1996. • Subsurface Study for Lining of Proposed Ponds, Riverwaod Ranch Estates, Across Highway 82 from Aspen Village, Pitkin County, Colorado, Job No. 194 344, report dated October 12, 1994. Information from these reports has been reviewed and considered in the preparation of this report. PROPOSED CONSTRUCTION The guest residence will be located on the lot approximately as shown on Figure I and consist of a two story split level structure with a partial basement. Ground floors will be a combination of slab -on -grade and structurally supported over crawlspace. The detached slab -on -grade garage and access drive will be located above the guest residence near the existing barn, see Figure 1. Porch and exterior slabs for the residence, and the garage area driveway, will be located near the top of slope down to the Roaring Fork River along the east side of the lot. Walkways and stairs will be located on the slopes stepping down to the north and northwest. Grading for the structures is assumed to be relatively minor from the review of the grading plan with cut depths between about 3 to 8 feet. We assume relatively light foundation loadings, typical of the proposed type of construction. If building loadings, location or grading plans change significantly from those described above, we should be notified to re-evaluate the recommendations contained in this report. Job No. 109 414A Gg;teCh 000020 0 • -3- SITE CONDITIONS The lot is vacant and the ground surface appears mostly natural. The terrain at the site transitions fi•om an upper, relatively flat terrace down to an intermediate, strongly sloping terrace area where the guest residence is planned, then down to relatively flat ground adjacent the Roaring Fork River. The intervening slope down to the north between the upper and intermediate terrace is steep, on the order of 35 to 50%, and about 15 feet high. The intervening slope down to the north from the intermediate terrace to the relatively flat terrain near the river is moderately steep, on the order of 25%, and about 15 feet high. Along the east side of these terrace areas is a very steep slope down to the Roaring Fork River. The very steep slope below the upper terrace where the garage and drive is planned is about 1 `/< horizontal to I vertical (80%) and 40 feet high. The slope down from the intermediate terrace where the guest residence is planned is about 1 h horizontal to 1 vertical (67%) and 25 feet high. The slopes are vegetated and no signs of instability or seepage were observed. The vegetation consists of grass, weeds and sage brush with occasional evergreen trees. About 8 to 12 inches of snow covered the site at the time of our field exploration. GEOLOGIC CONDITIONS The surficial soil deposits at the site are older coarse granular river terrace deposits consisting of sandy gravel and cobbles with boulders. The underlying bedrock is the Maroon Formation. Potential geologic hazards at the site appear limited to the steep slopes and the potential for construction induced slope instability. The steep slopes at the site appear stable and the project should be planned, designed and constructed to limit impacts to the slopes. A further discussion of the slopes and recommendations for construction on and near the slopes is provided below in the report. FIELD EXPLORATION The field exploration for the project was conducted on December 16, 2009. Four exploratory pits were excavated at the locations shown on Figure 1 to evaluate the C P✓ n L Job No. 109 414A G( (&eCh 0 subsurface conditions. The pits were dug with a rubber -tire backhoe. The pits were logged by a representative of Hepworth-Pawlak Geotechnical, Inc. Samples of the subsoils were taken with disturbed sampling methods. Depths at which the samples were taken are shown on the Logs of Exploratory Pits, Figure 2. Undisturbed sampling of the subsoils was not possible due to the rock content. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Figure 2. The subsoils, below about %: to 1 foot of organic topsoil, consisted of relatively dense, silty to slightly silty sandy gravel and cobbles with boulders that extended down to the pit depths of 6 to 8 feet. Digging in the dense granular soils with the rubber tire backhoe was difficult due to the cobbles and boulders. Laboratory testing performed on samples obtained from the pits consisted of gradation analyses. Results of gradation analyses performed on disturbed bulk samples (minus 3 inch fraction) of the coarse granular subsoils are shown on Figure 3. No free water was encountered in the pits at the time of excavation and the subsoils were moist to slightly moist with depth. ENGINEERING ANALYSIS Development of the site as planned should be feasible based on geotechnical considerations. The existing slopes on the site appear currently stable. The development should be carefully planned, designed and constructed to limit impacts to the slopes and cause potential for construction induced instability. The natural coarse granular soils possess moderate bearing capacity and low settlement potential, and spread footings bearing on these soils should be suitable for foundation support of the buildings and other facilities. Footings adjacent the very steep slope along the east side if the site may need to be deepened to achieve the recommended set -back. Job No. 109 414A 000002 Gtech 0 • 5 - DESIGN RECOMMENDATIONS SLOPE STABILITY AND SITE GRADING A formal slope stability analyses for the site development was not performed. Our conclusions and recommendations are based on our experience in the area with similar subsurface and slope conditions. Based on the proposed site and grading plans, the proposed construction appears feasible with the recommendations provided below. The risk of construction -induced slope instability at the site appears low provided the facilities have adequate set -back from the very steep slopes along the east side of the site, and cut and fill depths are limited. Foundations located near the top of slopes should have adequate set -back or depth to penetrate an imaginary 1% horizontal to 1 vertical line extended up from the bottom of the slope. In general, patios and drives near the very steep slope along the east side of the site should be set back horizontally at least 5 feet on the intermediate bench in the area of the guest residence and 10 feet on the upper terrace in the area of the garage/drive. The walkway/stairs that transition the moderately steep, to steep north facing, slopes should have minor impact on slope stability due to the limited cuts and fills proposed. Surface water should not be allowed to discharge down the slopes at the site uncontrolled but rather collected and discharged in rip -rap or lined channels, or piped away from the slopes. We assume the cut depths for the basement level will not exceed one level, about 8 to 10 feet. Fills should be limited to about 6 to 8 feet deep and be compacted to at least 95% of the maximum standard Proctor density near optimum moisture content. The current proposed grading plan appears to meet the cut and fill depth recommendations. Prior to fill placement, the subgrade should be carefully prepared by removing all vegetation and topsoil and compacting to at least 95% of the maximum standard Proctor density. The fill should be benched horizontally into the portions of the site exceeding 20% grade and not placed on slopes steeper than 50%. OJn.M Job No. 109 414A -GecPteCh s Permanent unretained cut and fill slopes should be graded at 2 horizontal to 1 vertical or flatter and protected against erosion by revegetation or other means. The risk of slope instability will be increased if seepage is encountered in cuts and flatter slopes may be necessary. FOUNDATIONS Considering the subsurface conditions encountered in the exploratory pits and the nature of the proposed construction, we recommend the buildings and other facilities be founded with spread footings bearing on the natural granular coarse soils. The design and construction criteria presented below should be observed for a spread footing foundation system. 1) Footings placed on the undisturbed natural coarse granular soils should be designed for an allowable bearing pressure of 3,000 psf. Based on experience, we expect settlement of footings designed and constructed as discussed in this section will be about 1 inch or less. 2) To not adversely impact slope stability, footings placed adjacent to steep slopes should penetrate an imaginary 1 %x horizontal to 1 vertical line drain up from the base of the slope. The depth/set-back should be approximated during the design and field verified at the time of construction. 3) The footings should have a minimum width of 16 inches for continuous walls and 2 feet for isolated pads. 4) Exterior footings and footings beneath unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement of foundations at least 42 inches below exterior grade is typically used in this area. 5) Continuous foundation walls should be reinforced top and bottom to span Job No. 109 414A local anomalies such as by assuming an unsupported length of at least 12 feet. Foundation walls acting as retaining structures should also be designed to resist lateral earth pressures as discussed in the "Foundation and Retaining Walls" section of this report. E -7- 0 6) All existing fill, topsoil and any loose or disturbed soils should be removed and the footing bearing level extended down to the relatively dense natural coarse granular soils. The exposed soils in footing area should then be moistened and compacted. 7) A representative of the geotechnical engineer should observe all footing excavations prior to concrete placement to evaluate bearing conditions. FOUNDATION AND RETAINING WALLS Foundation walls and retaining structures which are laterally supported and can be expected to undergo only a slight amount of deflection should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 50 pcf for backfill consisting of the on-site granular soils. Cantilevered retaining structures which are separate from the buildings and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 40 pcf for backfill consisting of the on-site granular soils. The wall backfill should not contain vegetation, topsoil or oversized rocks. All foundation and retaining structures should be designed for appropriate hydrostatic and surcharge pressures such as adjacent footings, traffic, construction materials and equipment. The pressures recommended above assume drained conditions behind the walls and a horizontal backfill surface. The buildup of water behind a wall or an upward sloping backfill surface will increase the lateral pressure imposed on a foundation wall or retaining structure. An underdrain should be provided to prevent hydrostatic pressure buildup behind walls. Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum standard Proctor density at a moisture content near optimum. Backfill in pavement and walkway areas should be compacted to at least 95% of the maximum standard Proctor density. Care should be taken not to overcompact the backfill or use large equipment near the wall, since this could cause excessive lateral pressure on the wall. Some CJ00 j J lob No.1094f4A Meth 0 0 settlement of deep foundation wall backfill should be expected, even if the material is placed correctly, and could result in distress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the sliding resistance of the footing on the foundation materials and passive earth pressure against the side of the footing. Resistance to sliding at the bottoms of the footings can be calculated based on a coefficient of friction of 0.50. Passive pressure of compacted backfill against the sides of the footings can be calculated using an equivalent fluid unit weight of 400 pef. The coefficient of friction and passive pressure values recommended above assume ultimate soil strength. Suitable factors of safety should be included in the design to limit the strain which will occur at the ultimate strength, particularly in the case of passive resistance. Fill placed against the sides of the footings to resist lateral loads should be a well graded granular material compacted to at least 95% of the maximum standard Proctor density at a moisture content near optimum. FLOOR SLABS The natural on-site soils, exclusive of topsoil, are suitable to support lightly loaded slab - on -grade construction. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4 inch layer of free -draining gravel should be placed beneath basement level slabs to facilitate drainage. This material should consist of minus 2 inch aggregate with at least 50% retained on the No. 4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on-site granular soils devoid of vegetation, topsoil and oversized rocks. Job No. 109 414A Gey E 0000 G 0 W UNDERDRAIN SYSTEM 0 Although free water was not encountered during our exploration, it has been our experience in the area that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can also create a perched condition. We recommend below -grade construction, such as retaining walls, crawlspace and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain system. The drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free -draining granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1% to a suitable gravity outlet. Free -draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 1% feet deep. SURFACE DRAINAGE The following drainage precautions should be observed during construction and maintained at all times after the buildings have been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the buildings should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 6 inches in the first 10 feet (5%) in unpaved areas and a minimum slope of 3 inches in the first 10 feet (2h%) in paved areas. CvnUL Job No. log 414A P -10- 0 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. 5) Landscaping which requires regular heavy irrigation should be located at least 5 feet from foundation walls. PAVEMENT SECTION THICKNESS The subgrade soils encountered at the site, below topsoil, consist of silty sandy gravel and cobbles which are considered a relatively good support for pavement sections. We assume relatively light traffic for the access drive consisting of automobiles, pick-up trucks and occasional delivery type trucks. Based on our experience, we estimate an 18 kip EDLA of about 5 for the assumed traffic. Assuming the above traffic loading, a Hveem "R" value of the granular subgradc soils of about 50, a Regional Factor of 2.0 and a serviceability index of 2.0, we recommend the pavement section thickness for the access drive and parking areas consist of at least 3 inches of asphalt on 8 inches of base course. For portland cement concrete pavement, we recommend a minimum section of 51/2 inches of concrete on 4 inches of base course. The asphalt should be a batched hot mix, approved by the engineer and placed and compacted to the project specifications. The concrete should have a minimum 28 day compressive strength of 4,500 psi and be air entrained. The base course should meet CDOT Class 6 specifications. All base course and required subgrade fill should be compacted to at least 95% of the maximum standard Proctor density at a moisture content within 2% of optimum. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pits excavated at the locations indicated on Figure 1, the proposed type of construction and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or Job No. 109 414A 0000L3 0 • other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our findings include interpolation and extrapolation of the subsurface conditions identified at the exploratory pits and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We recommend on-site observation of excavations and foundation bearing strata and testing of structural fill by a representative of the geotechnical engineer. Respectfully Submitted, HEPWORTH - David A. Younger _216 Reviewed by: Steven L. Pawlak, P.E. DAY/ksw INC. Job No. 109 414A G9&ec l a5 APPROXIMATE SCALE: 1'=60' TO H2s 109 414A �000T3 E 0 LOT 2 ' EXISTING MAIN / RESIDENCE < ,, r v L - LOT 3 7150_p�NG/�OP�I I 1 7 7160_ _--- 6��� I 1 7170 7180 \ OPOS PIT 1 / / / \ PIT 2UEST Y�RE�S�I�DEEE PIT 4 'ROPO D \ SARA F Y I I I I ROPOSED P■3 DRIVE I f I I Q _Lo 1 I I I EXISTING BARN 1 I I I I I I L-� r-� I I I I I I I I I I I I I I I I I I I I I L ---J 1 I ----------- LOCATION OF EXPLORATORY PITS Q I / I / 1 Figure 1 0 • PIT 1 PIT 2 PIT 3 PIT 4 ELEV.= 7166' ELEV.= 7169' ELEV.= 7184' ELEV.= 718T 0 0 .. r .• .r �".r' p�r 't.• � '•a. tea: � oa LL 1 ••4• LL L '•. q .d.• i +4=59 ed.. • -- -� -200=7 '•% a +4=73 _ j _ `�• ' -200=4 Q 10 10 LEGEND: GUEST RESIDENCE GARAGE AND DRIVEWAY TOPSOIL; organic silty clayey sand with scattered gravel and cobbles, frozen, moist, dark brown. GRAVEL AND COBBLES (GM); with boulders, sandy, silty to slightly silty with depth, dense, moist to slightly moist with depth, brown, rocks are primarily rounded to sub -rounded. Disturbed bulk sample. NOTES: 1. Exploratory pits were excavated on December 16, 2009 with a Case 580 backhoe. 2. Locations of exploratory pits were measured approximately by pacing from features shown on the site plan provided. 3. Elevations of exploratory pits were obtained by interpolation between contours shown on the site plan provided. The pit logs are drawn to depth. 4. The exploratory pit locations and elevations should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory pit logs represent the approximate boundaries between material types and transitions may be gradual. 6. No free water was encountered in the pits at the time of excavating. Fluctuation in water level may occur with time. 7. Laboratory Testing Results: +4 = Percent retained on the No. 4 sieve -200 = Percent passing No. 200 sieve 109 414A LOGS OF EXPLORATORY PITS Figure 2 He worth—Pawlok GeotechNcal iJ'0031 EXISTING LO POND \ BUILDING \f ENVELAPEI 'PIT I' \ , , PIT 2 PI 8P2 PROFILE M PIT OP3/ APPROXIMATE 1 TOE OF STEEP SLOPE DOWN /FROM UPPER TERRACE LOT 2 'BUILDING I�ENVELOPE I PIT 3 �" PIT4 J APPROXIMATE SCALE / I° s ISO' 194 3441 HEPWORTH - PAWLAK LRATION OF EXPLORATORY PI1 GEOTECHNICAL, INC. AND PERCOLATION TEST HOLES 000033 DEPTH - FEET o io n O F - CL W v a CI L M. a II, ��$$z �t+S 1 III v o II Lo J o DEPTH - FEET 194 344 1 HEPWORTH - PAWLAK LOGS OF EXPLORATORY PITS Fig. 2 GEOTECHNICAL, INC. 09003 • LEGEND: ® TOPSOIL; organic sandy silt and silty sand, soft to firm, moist to wet with depth, dark brown to black. C:I SAND (SM); sllty, trace gravel, loose, wet, brown. GRAVEL AND COBBLES (GM -GC); sandy, silty to clayey, dense, moist, brown. GRAVEL AND COBBLES (GM -GP); with boulders, sandy, silty to silghtly silty, dense, wet in Pits 1 to 4, to moist in Profile Pit, mixed browns. Disturbed bulk sample Free water level in pit at time of observation, NOTES: 1. Exploratory pits were excavated prior to our site visit on September 23, 1996. 2. Locations of exploratory pits were measured approximately by pacing from features shown on the she plan provided. 3. Elevations of exploratory pits were not measured and logs of exploratory pits are drawn to depth. 4. The exploratory pit locations should be considered accurate only to the degree Implied by the method used. 5. The lines between materials shown on the exploratory pit logs represent the approximate boundaries between material types and transitions may be gradual. 6. Water level readings shown on the logs were made at the time and under the conditions indicated. Fluctuations in water level may occur with time, 7. Laboratory Testing Results: +4 = Percent retained on No. 4 sieve. -200 = Percent passing No. 200 sieve. PI — Plasticity Index (%) NP = Nonplastic 184 3441 I GEOTORTH - ALWI AKC. I LEGEND AND NOTES I Fig. 3 C?0035 CD C�D C7 0 W C -D HEPWORTH-PAWLAK GEOTECHNICAL, INC. JOB NO. 194 344-1 TABLE SUMMARY OF LABORATORY TEST RESULTS $pMHE IACATKIN NpTUppL Mob m CONTENT (1G1 NATDpgI DRY veN r 1%O GRADATION PERCENT PA NG N0. 200 s1E�/E ATTEPBERG IAV Ts DNCONPWED STRENGTH SOLL OR R ROC[YVPE PfT DE➢TN II,�D GRAVEL 1%) SAND 1%) uOLID L.ff 1x1 PL4ST)CCOMPRESSNE INOE% M)(p 2 3-332 1 78 21 j NP Silty sand 4 332-4 33 49 18 NP Silty sand and gravel Profile Pit 6-8 74 21 5 Sandy gravel with cobbles • • 0 HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE II PERCOLATION TEST RESULTS JOB NO. 194 344-1 HOLE NO. HOLE DEPTH (INCHES) LENGTH OF INTERVAL (MIN) WATER DEPTH AT START OF INTERVAL (INCHES) WATER DEPTH AT END OF INTERVAL (INCHES) DROP IN WATER LEVEL (INCHES) AVERAGE PERCOLATION RATE (MIN./INCH) P-1 41 20 refilled refilled 9 8 1 10 8 6 1/2 2 112 9 7 2 7 6 2 7 1/4 6 114 2 P-2 (boulder exposed In side and part of hole bottom) 40 - 20 refilled 7 314 7 1/2 114 ,' 40 7 112 6 3/4 314 6 314 6 112 1/4 61/2 6 1f2 8 314 8 1/4 112 8 1/4 7 314 1/2 P-3 50 20 refilled1/2 131/4 101/2 1 314 15 11/2 81/2 2 1126 314 1 314 P9, 8 1112 8 6 112 1 i/2 Note: Percolation test holes were hand dug in the bottom of backhoe pits and soaked on September 23, 1996. Percolation tests were conducted on September 24, 1996. 0Q0039 r 0 0 O O NN 3 Ill WgtlS ME OWENStONED TO INE Fp EOF FRgMINGIFO;EOFEONC UNl OTNERMSE NOTED S W", MCMTECT OF AW OWENSOML OISCREFMCES OISMVEREO OO NOT SG E ORMTNGs. SEEM 1 a ee] Gqt GOOfI Mo wmoow 6CHE fi. SEE LANDS. E FLANS FOR EXiEP10R TEAM.[ MopWJEWAr OEsl fi. NL INTERIOR .1. TTS/.vE IxMlunW 60LWO gtiENWTMG BAITS 1 G;TOREVIEW VLEMOF ER ECiRCN Tfl£9XONEW 60gTq ilkfS WI OWNEfl PRWfl TC ROUE M 6. WIRRgGTORmcWRomFTE CAS LINEsio nll , STOR¢s. 5 PEFEEMOT1E I... ME ONLrCMPMc REFRE6EM00 TOOEE OFTE" MOIFRVLL 10 4L UYO. TOIFFJRFE MMEO NL 6NOMEE IANAURE6ME E FRAMEI£S IYASS VROV61Eg. FlMls FOR REM XORDW.WE XgROWMEFINISM TO MATCX n3 Mlcfi.Arwlxa Put OR 6 529 .0 C 61621 W] W?4025 W 01661246)! ROARING RIVER RANCH GUEST HOUSE PITKIN COUNTY. COLORADO DATE: MAY 13.2010 DRAM BY - RL CHECKED BY. TK PROJECT NUMBER. 09150 ISSUE. 100%CONSTRUCTION DOCUMENIS REVISIONS_ LOWER LEVEL FLOOR PLAN scuE yr-ra A3.0 a ora« 1 s. Beau merz, Bi6B2740HBP5 werowBase manw6m�d+am.m„ ROARING RIVER RANCH GUEST HOUSE PITKIN COUNTY, COLORADO DATE: MAY 13.2010 D"" BY: RL CHECKED BY: TK PROJECT NUMBER: 08150 ISSUE. 100%C0NS11iUCTION DOCUMENTS REVISIONS: MAIN LEVEL FLOOR PLAN A3.1 DTXERWIBE 3xmlFr.vecwrett MAxroMEnswxu UPPER LEVEL oGCREVANCIEs wsroLkRFO OONOTw,LF FLOOR PLAN .. sEE AB I..2MRCCOR.NO1. .U`Es 6 3EE LANDSCAPE FLMIB FOR E FBOR MRRACE µD diNEWAY DESIGN 6. ALL IMEOON WALLS FO NAVE INSULATING 6OIMOATTENUATMGBATIS �.. 1 GC TO RENEW LA PCEMENT OF ALL ELECTNICA. TELEPNpIE { MFA WRETS WIOWNER VAION TC 6TM TO C6NpM/,TFGNS LMESTp4_ A3.2 NGONTRUN B. STNEµD1LLF lAYgRSggE OW.YGRAPIII[ I "RF NTAMNR TO DESCRIBE WTENML AMUAL LAYOUTS TO M O ERNNED 10. ALLSND0 BRENCLCGURESAREI?FAAMELES`: GLASS MOVIOE MLOWµCE FOR AE00 KUM81NRE NARmFW SNro NArcN PLuueluG FIXTURES o 6 BSYRRRk OIII[e W. 016 ..ry • 0 ASPEN VILLAGE METROPOLITAN DISTRICT 711 E. Valley Rd., Stuite 103 Basalt, Colorado 81621 (970) 273-3100 FAX (970) 273-3105 Donnie Lee, President Richard Jackson, Vice -President David Ritter, Treasurer Mike Haman, Secretary Brent Ford, Director Michael Kiernan, Manager Design Workshop Mike Albert & Richard Shaw I20 East Main Street Aspen, CO 8I6I I Re: Proof of Adequate Water Supply and Water Tap Fee for Lot 3, Aspen Village River Homes Subdivision April 20, 20I0 Mr. Albert and Mr. Shaw, As per our conversation, I am sending a letter along to clarify the issue of water taps fee for your project- While the property falls within the Aspen Village Metropoliran District, we are still in the process of determining the appropriate cost of the fee. In the spirit of cooperation and to ensure a timely application process for the remainder of your project, on behalf of the District, we recognize that Lot 3 of Aspen Village River Homes falls within the service district, and confirms that the District has sufficient water to supply the development and has agreed to do so. Therefore, I am writing to notify you that the District will provide water to service this residential use, granting you permission to tap into the district's water source. The existing service line is in place to the property line and is currently available for the Parcel. Sincerely, By_� % l%Ciilc/t� Michagl Kiernan District Manager on 0 0 4 4 0 Mr. Richard Shaw Design Workshop, Inc. 120 East Main Street Aspen CO 81611 0 December 14, 2009 RE: Roaring River Ranch, LLC — Water Rights and Water Resources for the Proposed Guest House Project Dear Richard: This letter report presents the water resources plan and documents the water rights for the Roaring Fork River, LLC (RRR) Guest House Project. The proposed project includes reconstruction of an existing water feature, a single family residential structure with detached garage, and associated landscaping. The improvements will be located on Lot 3, a portion of Lot 2, and a portion of Parcel B, Aspen Village River Homes Subdivision, near Woody Creek, Colorado. Each of the three water related components are discussed below. SUMMARY RRR has adequate water rights and physical water supply for the proposed domestic use, water feature and irrigation for the Guest House Project. The domestic water will be provided by connecting to the existing Aspen Village Metropolitan District central water system. Reconfiguration of the existing decreed water features is consistent with the water rights and plan of augmentation in Water Court Case No. 99CW240. Irrigation of proposed landscaping will utilize the existing pump stations on the Roaring Fork River and existing water court decrees in Case Nos. 94CW380, 94CW381 and 99CW240. Up to 3,000 square feet of irrigation could be supplied from the central water system. SINGLE FAMILY RESIDENCE DOMESTIC SUPPLY The proposed single family residence will be served by potable water from the Aspen Village Metropolitan District (AVMD) central water system. Aspen Village River Homes Subdivision (AVRH), Lots 1, 2 and 3 are each entitled to connect to the AVMD central system in accordance with the Declaration of Covenants, Conditions and Restrictions of Aspen Village River Homes recorded July 19, 1984 in Book 470, Page 216 and the Aspen Village River Homes Subdivision Improvements Agreement recorded July 19, 1984, in Book 470, Page 163 in the records of the Pitkin County Clerk and Recorder. Such water service is further defined in the Agreement between Aspen Village, Inc, and Ronald and Janice Koch recorded July 21, 1988, in Book 560, Page 188. The Agreement states that potable water service will be provided to AVRH Lots 1, 2 and 3 from the Aspen Village Central Water System for in-house uses and up to 5,000 square feet of irrigation subject to any limitation contained in the augmentation plan. A water main was extended from the AVMD pump house on AVRH Lot 1 to a point near the existing RRR Barn on AVRH Parcel B. The water main terminates at a fire hydrant. The proposed house on AVRH Lot 3 will be served by a'/. inch service line tap from the main line near the fire hydrant. In addition to fire protection available from the AVMD �non4� 0 0 central water system, fire protection water is available at a dry hydrant in the Pines Grove Pond located on AVRH Parcel B near the RRR entrance from Highway 82 (see Figure 1). Water rights and a plan for augmentation for the AVMD central water system were decreed in Case No. 81CW432. The engineering analysis for the water court decree indicates that the plan of augmentation covers one dwelling unit and up to 3,000 square feet of irrigation for each of the three AVRH lots served by the central water system. WATER FEATURE RECONSTRUCTION The existing water features on AVRH Lot 2 are proposed to be reconfigured to also flow through Lot 3. The existing water features were decreed as Kinder Pond No. 1 and waterfall, Kinder Pond No. 2 and associated stream feature and Kinder Pond No. 3 and associated stream feature in Case No. 99CW240 (see attached Figure 1). Kinder Pond No. 1 and waterfall will remain the same, Kinder Pond No. 2 and associated stream feature will move onto Lot No. 3, but remain within 200 feet of the decreed location. Kinder Pond No. 3 and associated stream feature will be slightly modified. The source of water for the water features is the Roaring Fork River via the Kinder Pump and Pipeline, also decreed in Case No. 99CW240. The Kinder Pump and Pipeline is decreed as an alternate point of diversion for 0.27 cfs of the Pines Grove Pipeline (decreed in 94CW380). The Pines Grove Pipeline water right includes up to 0.5 acre of new irrigation on the AVRH property, stock watering, recreational and piscatorial uses. Case No. 99CW240 includes a plan of augmentation, which in conjunction with Case No. 94CW381, provides for evaporation from 0.09 acre of water features and 0.5 acre of irrigation. In summary, the water feature will be supplied from the Roaring Fork River using the Kinder Pump and Pipeline with the Pines Grove Pipeline water right as decreed in Case No. 99CW240. The reconfigured water feature is composed of the Kinder Pond No. 2 and associated stream feature and the Kinder Pond No. 3 and associated stream feature water rights decreed in Case No. 99CW240. The evaporative losses are augmented pursuant to Case No. 99CW240 in conjunction with Case No. 94CW381. SP.I9T.'lei-J1: a12cN[4f_itfM2 Irrigated landscape for the proposed project will include small lawn areas, flower beds, shrubs, and trees. Some disturbed areas will be revegetated with native grasses and vegetation and will be initially watered for establishment. Based on planning and design for the project, up to 20,000 square feet of sprinkler and drip irrigation areas may be developed for the project. There are four potential sources of irrigation water for the project including the AVMD potable water supply, the Kinder Pump and Pipeline, the Pines Grove Pipeline, and the Brush Creek Ditch (alternate point of diversion at the Pines Grove Pipeline). As mentioned above, the AVMD water tap allows up to 3,000 square feet of irrigation. The Kinder Pump and Pipeline diverts from the Roaring Fork River and irrigates QnnoiiG 0 0 approximately 0.385 acre around the existing house on Lot 2. Up to 0.15 acre (the balance of the 0.5 acre allowed pursuant to the decree in Case Nos. 99CW240 and 94CW381) could be irrigated on Lot 3 from the Kinder Pump and Pipeline. The Pines Grove Pipeline was decreed for 0.728 cfs in Case No. 94CW380 for irrigation of 21 acres. The RRR ownership of Brush Creek Ditch was changed to an alternate point of diversion at the Pines Grove Pipeline in Case No. 94CW381. This water court case included Basalt Water Conservancy District (BWCD) contract water in a plan of augmentation to replace up to 8.94 acre feet of out -of -priority diversions by the Pines Grove Pipeline. RRR currently irrigates up to 14.4 acres with the Pines Grove Pipeline (shoulder season irrigation) and the Brush Creek Ditch water rights diverted at the Pines Grove Pipeline. Up to 5.6 acres could be irrigated on Lot 3 with the Pines Grove Pipeline, but areas not historically irrigated by the Brush Creek Ditch would be subject to curtailment from downstream senior water rights. There is enough contract water remaining for Case No. 94CW381 to augment approximately 1.75 acres of irrigation for the proposed project. The recommended plan for irrigation on Lot 3 includes use of at least two and up to three sources of legal and physical water supply. The lower terrace area of Lot 3 around the proposed water feature includes about 5,000 square feet (0.12 acre) of irrigation and can be irrigated with the Kinder Pump and Pipeline system that irrigates Lot 2. Up to 3,000 square feet around the proposed house could be irrigated from the potable water system or by extension of the existing upper terrace Pines Grove Pipeline system. The hillside and upper areas of the project around the driveway and garage should be irrigated by extension of the existing Pines Grove Pipeline system. In summary, RRR has adequate legal and physical water supply for landscape irrigation of the proposed project. It is recommended that the lower terrace proposed irrigation be integrated with the Kinder Pump and Pipeline system and the hillside/upper area proposed irrigation be integrated into the Pines Grove Pipeline system. Use of the potable water system for lawn, flower beds, shrubs and trees around the house can be utilized for up to 3,000 square feet if appropriate to optimize design of the irrigation system(s). Please call if you have any questions or need additional information Sincerely, RESOURCE ENGINEERING, INC. Michael J. Erion, P.E. Water Resources Engineer MJE/mmm 901-2.0 MCIentsNI ROARING RIVER RANCH Q.01richard shag water rgts for guest hcuse.doc CC: Art Daily, Esq. Holland & Hart LLP 00000 ALT•. i _ PINES GROVE PIPELINE DIVERSION • 990`9 ' , 'LOT l ` ;o AVMD PUMP HOUSE r �f PINES GROVE POND NO. 1 AND WATERFA LOT 2 �. PARCEL B KINDER POND NO. 3 AND ASSOCIATED STREAM FEATURE KINDER PUMP D PIPELINE DIVERSION 1 IT 3; KINDER POND NO. 2 AND ASSOCIATED STREAM FEATURE FIRE HYDRANT DATE: DECEMBER 14, 2009 JOB NUMBER: 901-2.0 1 DRAWN BY: RKM CHECKED BY: MJE I SCALE: 1" = 4W RESOURCE ROARING RIVER RANCH FIGURE �N�iNEE R�N�. 1Nc. WATER RESOURCES/WATER RIGHTS LOCATION MAP 1 C-) C-) C) C') CD 0 MEMORANDUM To: Suzanne Wolff, Planning Department E From: Carla Ostberg, Environmental Health Department Date: March 15, 2010 Re: Roaring River Ranch, LLC (PID 2643-064-01-001; Case P134-09) SUMMARY OF RELEVANT PARTS OF APPLICATION: The applicant is requesting development beyond a previously approved and platted building envelope on Lot 3, which includes a portion of Lot 2 and part of Parcel B for the purposes of access, onsite wastewater treatment, landscaping, and pond and stream improvements. The proposed development would include a single family house of less than 5750 square feet and a detached garage with a caretaker dwelling unit (CDU). DISCUSSION: The Pitkin County Environmental Health Department has reviewed the details of the Roaring River Ranch, LLC application under the authority of the Pitkin County Land Use Code and the Pitkin County Onsite Wastewater Treatment System (OWTS) Regulation and has the following comments. On March 11, 2010, Carla Ostberg, Catherine Berg, and Suzanne Wolff from the Pitkin County Community Development Department conducted a site visit to the property with Mitch Haas, representative of the owner. --- WATER SUPPLY: According to the applicant, domestic water will be supplied to the development from Aspen Village Metropolitan District. A letter from the District describing the intent to serve the development must be submitted to this department with any OWTS Construction Permit Application. If there are any wells on the properties, they must meet required setback distances to any OWTS. -- SEWAGE TREATMENT AND COLLECTION: There are three existing OWTS permits on these parcels. • 97069 was issued to serve a 10,424 square foot single family home with five bedrooms and an attached CDU on Lot 1. This development was never constructed and the permit has expired. • 97004 was issued to serve an accessory stable with fixtures including a sink, toilet, and shower. This system was installed and the permit finaled in 1997. • 96077 was issued to serve an 8000 square foot home with five bedrooms. This system was installed and the permit finaled in 1999. , rnno4 0 9 Although Parcel B was covered with snow at the time of the site visit, there appears to be no constraints in the large, open field area cited as the proposed area for the OWTS that will serve the new development. In reviewing the existing OWTS permits and documents for these properties, groundwater had been in an issue in at least two of the designs. Soil conditions should be carefully scrutinized and groundwater conditions should be monitored at a time of high runoff and/or irrigation in the proposed absorption area. Any wells on the parcels must meet required setback distances to all OWTS components. Since the proposed OWTS absorption area will be located on parcel B, a recorded easement must be provided with the OWTS Construction Permit Application. All OWTSs installed within Pitkin County require an OWTS Construction Permit issued by the Environmental Health Department, and must comply with the County's OWTS regulations. The County cannot issue a Building Permit until an OWTS Construction Permit has been obtained. ro505,m�,�P.� Carla Ostberg From: Carla Ostberg Sent: Monday, December 14, 2009 10:43 AM To: chris.snyder@8140partners.com' Cc: Bryan Daugherty Subject: HP report Attachments: 20091214103446192.pdf Hi Chris, Here is the HP report you requested. One more page in following email. It looks like there is an introduction letter that accompanies the figures. I'm happy to send those your way as well. Did you only request a portion of the report? Looking through the file, the permit issued by this department in 1997 (ISDS 97069) is expired. It was never finaled and therefore should not exist - or if it does, it is not legal. This system was for Lot 1, a 10,424 sq ft home w/ 5 bedrooms and a caretaker unit. Another permit issued for the property, Lot 2, appears to be in order. This is ISDS 97004 for the barn. The file seems to be pretty detailed and I'm happy to review this with you if you have any questions. Thanks, Carla Ostberg, MPH, REFS Environmental Health Program Supervisor Pitkin County Environmental Health 970-920-5438 -----Original Message ----- From: carlab [mailto:carlab@co.pitkin.co.us] Sent: Monday, December 14, 2009 8:35 AM To: Carla Ostberg Subject: This E-mail was sent from "RNPE2ADCB" (Aficio MP 5000). Scan Date: 12.14.2009 10:34:45 (-0500) 1 ocx5os1 A- 1PITKIN ENVIRONMENTAL HEALTH D 1MENT AlS t TION FOR INDIVIDUAL SEWAGE DISPOW SYSTEM 130 S. Galena. St_ Aspen Colorado 81611 1 Phone 970-920-5070/Fax 970-920-5039 Perma� x /o Parcelloo R6N3- NqV- to ( ^OCi I Permit For: New Installation (7 Repair( Remodel( ) Emergency use( ) Name of OWNER RS rev A. v,c - Mery us inwS SNC. Street Address 13 Z 8' [ r4 e L Ay a v o e Owners Mmling Address 318 ETI, e L A Ve N Ll e. � dot -r4 Id o 11 J lr ova l d L I Fo n Nr 4 r/ /60 r I a .... — Ph.,,,.2"\ Home Phone: Legal Description: Lot I ,Block Suboivisnn ASC Size of lot a D acres Type of proposed structure: �QOD f envelope bldg. envep Total arealliwng space (sq. it) /o t e% ay is of Bedrooms, offices ands rod _ Primary Contact Person Contact Mailing Address 310 3 i H t✓ y/ . ou on Water( !P"atewed ( )Spring ( ,Stream ( ommu /Public(Na meofSvstem Aslpe,l ViLLar�e Assnl, Is Proof of Aeecuate Water Attached I Required) ? ( Y ( ) ( A water quality test and .veil pump test or approval letter trout Community system) Has this protect teen approved by Pitkin County 7 ( !! l ) No Is a copy of:`e floor plan altacrlea ( it ) 9 (/V' Y 1 No Is a mov of :Ce tine clan attacn� /Yes 1 )No tpoiration'ar 3n m0iwdu wage aiso05ai s eWiis hereby 5u0mmed. I hereby oettity mat me above information is we and accurate and that I have prowdea true aria accurate in", soon an qua _ 0 ",WlnWnd proposed wails, contour imerva s. Oullurl prober:)' ones, addles. slpes, 'watenines, springs. suCbOn or ImQatim lines, drinking water am'. drain g.ditch lakes, water courses. streams. flocoObms. ary guimes, and existing septic systems. I addrowledge that any false or ncomplete nt0nnauod Will m ate N bplipatlon and any subsequent permit. Issuance of me prime does not imply the approval of any 000 perm required for construction pursuant 10 =':kin County codo n may be ndMaxen until all approvals and I,ermns have seen ablibrI'he owner assumes all reepdhsiblime, m Use of failure ar madequa_! cf :nis system. ou Signature ]f aODlicam CtioDate _________________________________ _ F r n use opiow P ERMIT FOR INDIVID11 A9 5 EWAGE Dt$PUAL SYSTEM Design Criteria of system 10 be Installed I Any cnandes must be submitted and aooroved in writinq Pefc Rate_ min per inch Profile Hole Deotn p feet Seotie :ane cagacdY. 3500 gallons Absorption area ,?Sri y sq. 9. Flu rtuixd plans 4 CalarLl4 a1s dtLlz(d� u- 6^-f 9 6 8n't;nLCr , lf't� eecl, Al (Iocnfrt/ Cn�iCUl•j must be 4/&wed`fa' 44c sa,ncl iili,- or 9lundxrd Jn�/irx�i un. is /1rt a prtssu.c d0s', / •�As SfkCi A. td lGt F�rta l,'7ar al fs .5Aor�tld nv* be Use),ll 4o%p r1dgC-Ir•ca70 » 7116'Ved "tvl4livA'lirediaes •y 59tore 4016gt la l7sf o. 113 unrls. fi: b7,00O141 ks� wj4j &j Ivif/eS /Oils h"e- 46 be 4,neAarCG- All SJ" MUbe a,inW'veO 1, An inspection is required prior to backfill of any component of the distribution system. Design by Engmeer Required 7 ( ) Yes (XNo All plans and specifications of the engineer must be followed. Any changes must be approved by the Asoenlpitkin Envvommntal Health De artment in writing and the engineer must certify the final installation to the Environmental Health Department in writing i Permit approval by: Date J1—�l97 Plans and s0e rricalions of the proposed individua swage di system have been reviewed and are consideree satisfactory. Permission u hereby granted to the owner or the agent :o perforin :he ,Wrx moi sted in accordance with the Pekin County ISDS Regulation in edea M the lime of issue. Tis permit recitalist irwaad 6 malls into Vie date Inst the aer-in was :Soled a JIMIs system consbuGpn has commenced or an extension has been approved in writing by me Department. As -Built drawings must be included with this permit before the final approval will be issued. Installer: XZ- Receipt '+ � Site Plan Well Permit and ✓ Soils Test Date received Floor Plan Waver Quality Test or Date Info Complete Received by ✓ Comm Dev Approval JL'Na;er Svstem Letter Final Insp Requested Ahad( V;ifgt_ WAlir L4:� titin - Finallnsicec:ion Aporovai: Cate: arENo tans l �/�!!6 / i1eludi'll W A- 8110' `5 �kock I,a�� A.,- wells 40 J&J -n ketch �-,id * h'clds. 4, L.a.�ccu,�I Cc�rcLueji� .ncccl5 �e recorded Laf'S I bec 4« ce.�, iz�+c o✓� 6ccw�c,�,�y ;s issu<.d. L'53 9spen / Pitkin Environmental Health Departmu t Contact Log Sheet Q0005�F Parcel ID#7 Address: Date Person Spoken To Comments / Aclion to be Taken 1�71fA�� rte.. -- . MI, LRY4 �Vj- .... I wIIMM `ir�a� Q0005�F W c m ww 0 w ao w N •• O C) U 0 o �+ .-4 4J r. 4J :3 (d 0 U 0 N q N9 oX Cq4.) NIrl N P4 d O rl rJJi h � �ro 00 U N N ox H wo W .1 U r. ROARING RIVER RANCH ACTIVITY ENVELOPE AND SITE PLAN LOT Z, 3 and PARCEL B, Parcel Le! Lot 2, Aspen Village River Homes As shown in Plat Hook 16 at Page 34 and in Plat Book 37 at Page 983 in the records of the Pitkin County Clerk and Recorder. Tow. nship 9 South, Range 85 West of the 6th Principal Meridian, County of Pitkin, State of Colorado Lot 3, Aspen Village River Homes As shown in Plat Book 16 at Page 34 and in Piat Book 37 at Page 98 in the records of the Pitkin County Clerk and Recorder. Township 9 South, Range 85 West of the 6th Principal Meridian, County of Pitkin, State of Colorado Parcel B, Aspen Village River Homes As shown in Plat Book 16 at Page 34 and in Plat Book 37 at Page 98 in the records of the Pitkin County Clerk and. Recorder. Township 9 South, Range 85 West of the 6th Principal Meridian, County of Pitkin, State of Colorado Access Instructions The lots can be accessed through two access points. 1) From the intersection of Highway 82 and Gerbaz Way, take Gerbaz Way north appfummately 600 feetuntil you reach a gated entrance, From the gated enhance, follow the internal ranch road to the east until it dead ends, 1) From the intersection of Highvray 82 and Gerbaz Way, take High, wray 82 east approximatelyi,200 feet until you reach a gated entrance. From the gated entrance, follow the internal ranch road to the east until it dead ends. Signature Blocks Discfaimer: VILLAGE RIVER HOMES , C L RADO -00► , AND 2643=064=01=008, RESPECTIVELY The owner acknowledges that he/she has been informer! by Pitkin County of the existence of "environmental hazard areas° that might affect the property, any improvements, and the use and occupancy thereof. Pitkin County Community Development Director This Roaring River Ranch Site Plan/Activity Envelope Plan has been reviewed and approved by the Community Development Director tbis_,Ax ay of t,4tr_ 2 . subject to Administrative Determination No. recorded as Reception Nol'. Pitkin County Community Development Director, <; j Acceptance for recording This Roaring River Ranch Site Plan/ Activity Envelope Plan has been accepted for filing in the office of the Cleric and Recorder of the counter of Pitkin, state of Colorado; thik-,,7,& day of Jr. Plat Book _ at Pageas Reception Number RECEPTION#: 558771; 04.'2212010 at 10:00;28 AAV1 CF 4. R $41.00 Janice K. Vos Candi,;, Pitkin County, CC PLAT SK 93 PG 78 Map I Scale: 1 "-20OW PROJECT LOCATION �ICHWAY 82 Sheet Index Sheet Sheet Title Drawings: Parfet Man hIsT. . 000055 I O N 0 o M .. rn 0 (d ao ro 0 oH W N \ O NU N d O J � .a r- U Co 0 W 'N Lo A a o� E H W � U � CID s LEGEND II Existing Budding Envelope or Dnvaway Easement Proposed Lanvs�ape Envelope QESIGNWORKSHOP Landscape fir Wdecture . Land Planning Urban Design . Tourism Planning Ax.heviite . Aspen - Austin . D tee* . Sa@a Lake Cifs Phoenix . Lake Tahoe 120 East Main Street Asper, Coicirado 81611 (970 925-8354 Facsimile (970) 920-1387 e • T m - �_. so, OFF M RIVER HwL _ _ 9E FROM � _ :`"` ®'* 'W OFFSET FROM RIVER We- _ t EX3,S-FNGLOT 3 .a••' e /) J t,►,xsw3.ot� sUJ jUj >W LU0 r _ Ed CC}pT%Vea ar k -. • "ate. _� - a?.3-E ». aAR -� tri ' E D 19 OF J 0 e NORTH 3 20' 4Q' BU' *=4V—Q I SSSUE DATt: 4.2.2Ma REVISIONS DRAWk PMAMG R AIEWhM RS 1 EE PLAN FRO EC; Fite`E`ER=:'5''_ TIY Lu"P Ono?YRi Gut G00556 9 3 cm F J PROPEF7Y L€NE LOTS 2&3 ATH --- �� 'LOT 2 —1 ,LP DSCAPE ENVEi( iEXISTING POND ALIGNMENT r LOT 2 ENVELOPE , 1 GO -YEAR FLOODPt.NN LOT 3�v€r EXISTING LOT 3 � � � � i BUILDING ENVELOPE ROAR .� fi-- LOT 3 LANDSCAPE ACTIVITY ENVELOPE • - k ----------- DECK REALIGNED RIPARIAN 1 EATURE Li EifELLrs7 _ COVER, WC KWAY Sao flop ¢ nn< 0010 SIDE%CE `,� VEHICULART�ROUND 000 1 v �-�.` ,, \ '� , tom' o � �� '�--'-- -•- t i � • Q /� ys 1/ ------ l r I`7 vsva LOCATION OF F111,PLAOE�r1EI4T 1 ` � ° ►� 8F. �i#�xs t r, r � ' �. `1 t � ,r GAcar t�AG' 1 EXISTING BARN ,a;TFNG RESIDENCE , 1 i lI !� 1 ' Lfl'F 4 3' N PE 4 P 7 i f if 1 r f ,v IN v�f 1 •i fi \ ,;r,� I, r if F7 r - La i A TiU6(( j PR}PER TY LINE FVEL#PE l � ! (. f r / LOT 2 & PARCEL E3 � �! '. � If �I PAR:;EL'3' ACTW?iY ENVELOPE LOCATION OF FILL PLACEMENT LOCATION OF ONSITE IWAS I ENNATER TREATMENT SYSTEM U _ 3 f — PROPERTY LINE LOT 3 & PARCEL 8 — 56' OFFSET FROM RIVER HWL — 1W OFFSET FROM RIVER HWL r PARCEL'S' ACTIV=,iY ENVELOPE F ! I ; iswam NORTH .3 30:4v 3v' 3 DPSIG111 1WIOSHOP Landscape Architecture • Lard Plar ing Urban rjesign . Taudsm Plaruni g dskxWI& ..Asper: • Awurn Den—,w - Sail C. Ph£, U . Lake 1213 East Main Street Aspen, Colorado 81611 (9'17 k925-8354 Faosim. ffe (970) 920-1387 W W%,,.0 ES f 0 k W 0`11':4 S H 0 P. 00 M, A : E. 4.2.2009 � 4s ONS DRAWN, MA10C REVIEWED: RS I—_A PRC -ECT Nlji,,,9FR' 45'2 S. . a �. _. S-ieey NUMBER, Lv fit v z`•�,. ,.:.•. � - . _ __ ,re r. 000057 8 i s O e m z O m 2 m 0 a oa42 c O M 0 ox a PQ `e 0 E fC O0 P4 Cq wU N 11d ffi O 4J . O t U r m r: a 4O A a LO k x 4J z H s za E � LL `1 - � U - 9 3 cm F J PROPEF7Y L€NE LOTS 2&3 ATH --- �� 'LOT 2 —1 ,LP DSCAPE ENVEi( iEXISTING POND ALIGNMENT r LOT 2 ENVELOPE , 1 GO -YEAR FLOODPt.NN LOT 3�v€r EXISTING LOT 3 � � � � i BUILDING ENVELOPE ROAR .� fi-- LOT 3 LANDSCAPE ACTIVITY ENVELOPE • - k ----------- DECK REALIGNED RIPARIAN 1 EATURE Li EifELLrs7 _ COVER, WC KWAY Sao flop ¢ nn< 0010 SIDE%CE `,� VEHICULART�ROUND 000 1 v �-�.` ,, \ '� , tom' o � �� '�--'-- -•- t i � • Q /� ys 1/ ------ l r I`7 vsva LOCATION OF F111,PLAOE�r1EI4T 1 ` � ° ►� 8F. �i#�xs t r, r � ' �. `1 t � ,r GAcar t�AG' 1 EXISTING BARN ,a;TFNG RESIDENCE , 1 i lI !� 1 ' Lfl'F 4 3' N PE 4 P 7 i f if 1 r f ,v IN v�f 1 •i fi \ ,;r,� I, r if F7 r - La i A TiU6(( j PR}PER TY LINE FVEL#PE l � ! (. f r / LOT 2 & PARCEL E3 � �! '. � If �I PAR:;EL'3' ACTW?iY ENVELOPE LOCATION OF FILL PLACEMENT LOCATION OF ONSITE IWAS I ENNATER TREATMENT SYSTEM U _ 3 f — PROPERTY LINE LOT 3 & PARCEL 8 — 56' OFFSET FROM RIVER HWL — 1W OFFSET FROM RIVER HWL r PARCEL'S' ACTIV=,iY ENVELOPE F ! I ; iswam NORTH .3 30:4v 3v' 3 DPSIG111 1WIOSHOP Landscape Architecture • Lard Plar ing Urban rjesign . Taudsm Plaruni g dskxWI& ..Asper: • Awurn Den—,w - Sail C. Ph£, U . Lake 1213 East Main Street Aspen, Colorado 81611 (9'17 k925-8354 Faosim. ffe (970) 920-1387 W W%,,.0 ES f 0 k W 0`11':4 S H 0 P. 00 M, A : E. 4.2.2009 � 4s ONS DRAWN, MA10C REVIEWED: RS I—_A PRC -ECT Nlji,,,9FR' 45'2 S. . a �. _. S-ieey NUMBER, Lv fit v z`•�,. ,.:.•. � - . _ __ ,re r. 000057