Contract Information
Contract Number 321.2016A
Project Name Redstone South Bridge Repair
Contractor Mueller Construction
Budget Line Item 110.54.96600.82760
Additional Budget Line Item(s) Click here to enter text.
and special notes to Finance
Contract Start Date 10/17/2016
Contract End Date 12/17/2016
Automatic Renewal Yes ❑ NoZ
If Construction: Retainage Yes$ or % No®
If this is a new contractor, please request they complete and submit to Finance a W-9 Form.
Contact Information:
Department Engineering _
Project Manager G.R. Fielding Project Manager (970)920-5206
Phone
Provide a brief description of the contract:
Rock anchors, shoterete,and structural concrete to stabilize the cast abutment and prevent additional
undercutting.
Contract Value Summary:
Original Contract Amount $58,588.00
Previous Change Order/Amendment Amount(if applicable) $0.00
This Change order/Amendment amount(if applicable) $964.00
New Contract Total $ 59,552.00
Procurement Method:
None ❑ Informal❑ Formal LI Sole Source ❑ Emergency ❑ Contract Renewal ❑
Contract Type:
Services/Maintenance ❑ Construction Z Goods, Equipment, Supplies ❑
Change Order/Amendment ❑ Other, please explain ❑ Click here to enter text.
NOTE: CLERKS OFFICE WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STAVE
ARCHIVES RETAINAGE SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST.
Contract#321.2016 Rey.8.31.11jaa/'s
Budget Line Rem#110.54.96600.82760
44,
gripcNg
CHANGE ORDER/CONTRACT AMENDMENT 1/9,6%
•
Change Order Number: 321,2016A
OWNER: Pitkin County PO-yj'j et es
76 Service CI/ 590/
Aspen,Colorado 81611 AA,��OA
Y
CONTRACTOR:
The Provision of Redstone South Bridge Repair Contract(the"Agreement") dated 10/17/2016 between
the Board of County Commissioners of Pitkin County (the "County') and Mueller Construction (the
"Contractor"), is hereby amended as follows:
Description of Change: Repair to damage at the top of the downstream center pier as proposed via email
11/16/2016:
Mobilize to the site with tools and power
Grind with a wire wheel the reinforcing steel and remove any unsound concrete
Coat the exposed reinforcing steel with Sika Armatec 110
Apply a scrub coat of the repair mortar
Apply a repair patch to the affected area
Reason for Change: This damage was found at a site visit after the project had started.This is a similar type
of repair as to what the main work was.
Original Contract Price $58,588.00
Net Increase/Decrease in Contract Price(this change order) $964:00
*Total Adjusted Contract Price(including this change order) $59,552,00
hr all other respects the Agreement is in full force and effect and remains unchanged by this Amendment.
11/22/2016
Con me Datc
Procmcm: I wet � Date
County Manager Date
*Increases over$25,000 and/or 10% (single increase or accumulative) of original contract must have
County Manager signature.