.ASP NIPITKIN ENVIRONMENTAL HEALTH DEPARTMENT
APf'iWTION FOR INDIVIDUAL SEWAGE DISPOS jWYSTEM
130 S. Galena St.. Aspen Colorado 81611
Phone 970 920-5070/Fax 970-920-5039
will[ 01(t0M Parce111)R ,26y3- /La?- d0- o/7
pe Alit For: New Installation (/Repair ( ) Remodel () Emergency Use ( )
I
,lame of OWNER Q L L-Z�E-�e FAV Q L/ /
Owners Mailing Address A
Business Phone: — Home Phone: — b
Name of Agent
Agent's Mailing Address
Business Phone: Cell Phone: Fax:
Copy of permit to be sent to: Owner Uii Agenl ( ) Both ( )
Street Address q V l- 7�ri)- �-4>1-7
Legal Description: Lot 1 -{ J i. : limk S:.. .t .4vindvisim7 W IV1� %o
V
Size of lot; .3� arses Type of proposed structure: Size of bldg. envelope: boa
Total areal iving space (sq. ft): �- _ 9 of Bedrooms, offices acrd similar size :rooms:
Caretaker Unit: Attached tacked A of Bedrooms offices and similar size rooms: O �✓ i
Wale (APnvate well Spring ( )Stream( ) Communilylloubflc (Name of System)
Is Proof of Adequate Water Attached ? (x yesj 1 No
Has this project been approved by Pitkin County ?�/ () Yes allo
Is a coov of the floor plan attached (reouired 1 ? 171 Yes ( ) No
Application W an Individual sewage disposal system is hereby submkled. The iMnsigned acknowledges that the above Information is true and that false information will
Invaldale the application and any subsequent permit. Issuance of the perm does not imply, the approval of cry other permit required for cdnsbualon pursuant to Pilkin Counly
codes No construction may
. be kuntan - sprils apemks own"a assumes as resporuAdaies n ®se or fare or inadequacy//��
of this
system
Signaturam/y te
l0
Al For deoadment use below
PERMIT FOR INDMOUAL SEWAGE DISPOSAL SYSTEM
Septic lank capacity: gallons Absorption area: Sa sq. fl. -W
dk
1/0 /ineal JeeJ o+ Pipe 7nu5� be added 46 J{k CYis1h'ng pie N !gl'"l bed.
'rte div+l e- fm+ueen �Jisirr'brcf+ol Una in a bed mush 1o4. be more `,471 G /
v 44wre mush be a Q Ura- ,,.,;.µ„n 3 r of 4LL a7dew" a air,Ihe bed. 41t 51x4-bd_cb
Mas+ Ir .U.wn-1u ud (see &,kcW )neo uai,ol) . Tis dee rd oy,-,f reguesfs OfPr
-b UOVL -4G4- ev e.t+ -lrbu 4" ba(,s.�-,I'r /. pl
Is required prior to backfill of any component of the distdbu cl_N �e�m �"�" 5t ", L
Oe Sion by Engineer Required ? ( ) Yes (Y) No All plans and specifications of the engineer must be followed. Any changes must be approved in
wnling and the engineer must certify the final installation to the Environmental Health Department in writing.
✓, .n 1 /
Permit approval by: Iv A�1R/' 1 Dale 17- /a - �fO
Plans and specifications of Ne proposed individuanevIage dis I system haw bent revieweE Son are considered satisfactory. Perussiorl is hereby granted to the owner or
Vit, ages: to perform he work indicated km accord ce with the lo Caunly ISDN Regulalion in erect al the time of issue. This permit bermes invalid 6 months from the date I
na: ere pernn was IssuedLLuntess system consbudion has conmenc d or has been approvedit Writingby the Dpartment.
Installer' 'rYien— v 7 ` K I.IiT VRZ -3 /1— -7301)
As -Built drawings must be Included with this permit before the final approval will be Issued.
Final Inspection Approval: Date: Date requested:
Date Pd � pZ -1(0 Received by: _Information complete:
b —1 L Receipt o
a : 5-6 e r^
Kt -6
/z69
8-1-16 Ovckcd flacelbf 2 1 d-" 9K l(cn "02 uic Izr am
C'o c(d not vGr, �� 7's "re P15V %n(c 4uacJ� P
(�nc�bk check feud reof putir,n9 4t iL Asau.ut- PUY A l- ;,,Sift lled
lid
lr,,cu sys-Fc�c , �c n�L9,,�d-NcV
ay .r rs4ca.�' r�.6lx.- i+ccJC is Placcd
1
aroa,a riS -- �Sr 4� P,l %h% .4 ddd,4iiat /{cd, Feld 4r" wal bo
eollchd In 4 feta wc4s• 4,?W-5�ed ln5 a c4%,&j afrpuxpin' -�in�
to -Ig -qC 6bserved cxccur'cfi`a� of dwd ex�nst`a� (//,o t. F) W
Plec G.dded fu Pi2c 4 yrcurl lzd (evi5h+,9� • 4kG.ouJh led excuuz, -
hucl �ao do -u, P"K v 5ratl u.Y. )l addccl ye{ . Cxcaua6r eiLpw
wall -care pi64),es -v docuaO4. p1�c WA & cu^nckd � cuddlc a�
hcd -6 &A -)o; d s&4wa4,'a, a.+ ,x. end • P k.
t
LJ
en / Pitkin Environmental Health Departm�
Contact Log Sheet
Name Brad FcLyaxr Aallie ParcellD o2�y3' Ue.2-.00-D/7
Streetaddress is. l?d•
Date Received:
If
Application .
p
Fee
Q'
Perc test
Lg' .
Soil profile
p'.
Site plan
p'.
House floor plan
A/ce�s 46 wroued
b C�uuriy 1
5- L- Yi, i /i•PP'JI 7-10-9G
s -n- 9L
ewes A/a-*arn 4 A� Water Quality
5-4-4G 0/ Water
Quantity
s- to - yia Zo gpw
3
PI
�1G►/I7IJ7��i. =
3
pen / Pitkin Environmental Health Departn
Contact Log Sheet
Name:
IJira ,r &Waurtl;
Parcel ID#:
- /(-,R _ 00 -617
Address:
2106% ; F
Date
Person Spoken To
Comments / Action to be Taken Initials
-If- C
prIt, Ile.-
a 'Sid
W cc.l tr'b- 8/C
lli Q6141a
r ✓ b
3 -
4 werenlnq
-
0
4 w
0
Gn
(s -JLj
)
44u
-so
da
Isarer
so
s.
'9
B
i
t r
J w r
not t
Sur c wa s u
LI
-B, -}s y WW a re-
-Pko -ib s zrF- -t, d% !/lel
i;:;� 11GLIC
f-0 (,k" lam- ,bu-r
j(OUAA.d c vis X0211
aid w,t-� -f-ke. CSS a t8
v,,ver So cdos- �0N1 '16,�
4;((6,dd- �l �
�,,.y l��j�• S
m
p+
have coves
Affl`
,ti G� yo1.L
6222-d S AO
m
T � '
w
W-4
fiftal,
1 4%
P.
1
E
May 16, 1996
Mr. Brad Miller
406 Twinning Flats
P.O. Box 89
Woody Creek, CO 81656
Subject: Percolation Test Results
Miller Residence
Pitkin County, Colorado
Job No. GS -1831
Gentlemen:
As requested, we performed percolation tests at the Miller Residence in Pitkin
County, Colorado. This letter presents the results of our tests.
We performed percolation testing on May 13, 1996 in percolation holes
prepared and saturated by the owner on May 12, 1996. Test results are presented
on the attached Figures 1 through 3. We recommend a design percolation rate of
30 min/inch.
The percolation rate determined for Hole No. P-3 is inaccurate due to large
cobble encountered. We recommend the excavation for the new percolation field
be inspected to confirm that suitable soils are exposed.
We appreciate the opportunity to work with you on this project. If you have
questions, please call.
Very truly yours,
CTL/THOMPSON, INC.
JC"
Dan Downing
Laboratory/Field Manager
DD:JM:cd
(3 copies sent)
Reviewed by:
V,
John Mechling, P.P. '
Branch Manager ..
CTUTHOMPSON, INC.
CONSULTING ENGINEERS
234 CENTER DRIVE ■ GLENWOOD SPRINGS, COLORADO 81601 ■ (970) 945-2809
Ib
SATURATION AND PREPARATION
DATE: 5/12/96
TIME AT START OF SATURATION: 7:00pm
PERCOLATION TEST
DATE: 5/13/96
WATER IN BORING AFTER 24 HOURS
X YES _ NO
PERCOLATION TEST RESULTS
HOLE
NUMBER
DEPTH
(INCHES)
TIME AT
START OF
INTERVAL
TIME
INTERVAL
(MINUTES)
DEPTH TO WATER
CHANGE
IN WATER
DEPTH
(INCHES)
PERCOLA-
TION RATE
(MIN/INCH)
START OF
INTERVAL
(INCHES)
END OF
INTERVAL
(INCHES)
P-1
31.5
9:40
15
24.0
26.25
2.25
7
9:55
15
26.25
27.25
1.0
15
10:10
15
27.25
28.25
1.0
15
10:25
15
28.25
29.0
0.75
20
10:40
15
26.0
27.0
1.0
15
10:55
15
27.0
27.75
0.75
20
11:10
15
27.75
28.5
0.75
20
11:25
Job No. GS -1831 Fig. 1
'SATURATION AND PREPARATION PERCOLATION TEST
DATE: 5/12/96 DATE: 5/13/96
TIME AT START OF SATURATION: 7:00pm WATER IN BORING AFTER 24 HOURS
YES X NO
PERCOLATION TEST RESULTS
HOLE
NUMBER
DEPTH
(INCHES)
TIME AT
START OF
INTERVAL
TIME
INTERVAL
(MINUTES)
DEPTH TO WATER
CHANGE
IN WATER
DEPTH
(INCHES)
PERCOLA-
TION RATE
(MIN/INCH)
START OF
INTERVAL
(INCHES)
END OF
INTERVAL
(INCHES)
P-2
30.0
9:40
15
20.5
22.25
1.75
9
9:55
15
22.25
23.25
1.0
15
10:10
15
23.25
24.25
1.0
15
10:25
15
24.25
25.5
1.25
12
10:40
15
25.5
26.75
1.25
12
10:55
15
23.75
24.50
0.75
20
i
11:10
15
24.50
25.25
0.75
2
11:25
3
`
3
Job No. GS -1831 Fig 2
j<
SATURATION AND PREPARATION I PERCOLATION TEST
DATE: 5/12/96 1 DATE: 5/13/96
TIME AT START OF SATURATION: 7:00pm WATER IN BORING AFTER 24 HOURS
X YES -NO
PERCOLATION TEST RESULTS
HOLE
NUMBER
DEPTH
(INCHES)
TIME AT
START OF
INTERVAL
TIME
INTERVAL
(MINUTES)
DEPTH TO WATER
CHANGE
IN WATER
DEPTH
(INCHES)
PERCOLA-
TION RATE
(MIN/INCH)
START OF
INTERVAL
(INCHES)
END OF
INTERVAL
(INCHES)
P-3
30.0
9:40
15
19.5
19.75
0.25
60
9:55
15
19.75
19.75
0.0
-
10:10
15
19.75
19.75
0.0
-
10:25
15
19.75
19.75
0.0
-
10:40
15
19.75
20.0
0.25
60
10:55
15
20.0
20.0
0.0
-
11:10
15
20.0
20.0
0.0
-
11:25
Job No. GS -1831 Fig. 3
•
B R A D M I L L E R
BOX 89
Woody Creek, Colorado 81656
(shipping) 406 Twining Flats Road
(970) 923-6766
5-6-95
Betsey Kipp
Aspeny Pitkin Environmental Health Department
130 South Galena
Aspen, CO 81611
Dear Betsey,
I am writing this letter to accompany our leach field expansion application and
survey for our proposed Caretaker Unit located at the above address. There are still a
few possible variables with the design. The most important is the expansion of the
leach field itself. This design assumes good perk tests in the area we plan to expand
into. We should have perk test results within the nest two weeks.
After talking to our excavator, Durais Excavation of Carbondale, it was
suggested that we tap into the existing leach field on the opposite side of the existing
point of entry. He pointed out that when he replaces saturated leach fields that
invariably the saturation is worst closest to the point of entry and best on the opposite
side of the field. Tapping into the opposite side of the leach field would even out the
saturation and would also makes back flow into the existing tanks not an issue.
We have drawn in a grinder pump outside the Caretaker Unit garage to get the
waste up to the septic tank. If ground water is low enough the excavator thought it
would be possible to have a gravity feed line (1/4" per foot drop) to the tank.
Thanks for your assistance with our application and design.
Sincerely,
Brad Mille Mollie Favour
MAY 0 6 1996
ENVIRONMENTAL i;c:1�TH
ASPEN / PITKEN
Stephen Kanipe,0
12:24 pP! 1/8/97 -, Re:
X-Sender: stephenk@comdev.aspen.co.us
Date: Wed, 08 Jan 1997 12:24:15 -0700
To: Betsey Kipp <betseyk@comdev.aspen.co.us>
From: Stephen Kanipe <stephenk@comdev.aspen.co.us>
Subject: Re:
We call it a "Conditional C.O." and yes, would issue it.At 01:03 PM 1/2/97
-0700, you wrote:
>Brad Miller & Mollie Favour are constructing a caretaker unit on Twining
>Flats which is nearing completion. This fall I was not able to inspect the
>new tanks for the septic system as they were almost completely covered. I
>alerted both the owner and Jeff Gerbaz, the installer, that the tanks will
>need to be uncovered for final inspection and before we can sign the CO.
The
>owners would like to start renting the unit in February. Jeff Gerbaz would
>like to wait until spring to uncover the tanks as there is a gas line
within
>8 inches of the tanks. If all other inspections are satisfactory, is a
>temporary CO ever issued for cases like this? Our department feels there
are
>no health risks having someone use the building, but will eventually need
to
>inspect the tanks before a final CO is issued. Thanks for your help.
Printed for Betsey Kipp <betseyk@comdev.aspen.co.us> 1
I
No Recipient, No
To: stephenk
From: Betsey Kipp <betseyk@comdev.aspen.co.us>
Subject:
Cc:
Bcc: tomd
X -Attachments:
Brad Miller & Mollie Favour are constructing a caretaker unit on Twining
Flats which is nearing completion. This fall I was not able to inspect the
new tanks for the septic system as they were almost completely covered. I
alerted both the owner and Jeff Gerbaz, the installer, that the tanks will
need to be uncovered for final inspection and before we can sign the CO. The
owners would like to start renting the unit in February. Jeff Gerbaz would
like to wait until spring to uncover the tanks as there is a gas line within
8 inches of the tanks. If all other inspections are satisfactory, is a
temporary CO ever issued for cases like this? Our department feels there are
no health risks having someone use the building, but will eventually need to
inspect the tanks before a final CO is issued. Thanks for your help.
Printed for Betsey Kipp <betseykecomdev.aspea.co.us> 1
I(D
• 0
ASPEN/PITKIN ENVIRONMENTAL HEALTH DEPARTMENT
ISDS DESIGN REQUIREMENTS
DEPARTMENT USE ONLY
Name Miller/Favour
House Size 685 (75 gpd, 100 gpd, or 130 gpd)
Number of Bedrooms, Lofts, Offices, Similar Rooms, Main House
Number of Bedrooms, Lofts, Offices, Similar Rooms, Caretaker unit
Average Daily Waste Flow_ 300 # bedrooms X 2 people/br X 75
State Review Required? no
Perc Rate 20 (T)
Design Flo w (Q) = # bedrooms X 2 people/bedroom X gpd X 1.75
Q= 525
Absorption Area (A= Q/5 X SQRT)
A = 469.5743 sq. ft. of absorption area required
26 infiltrator units without reduction
A maxim30%0 reduction is allowed for use of deep gravel or gravelless chambered system.
328.702 sq.ft. with reduction /
8 infiltrator units with reduction
A5
Type of system: []Absorption trenches [absorption bed [] Gravelless chambers
[]Dry well []Seepage Pit [.]Pumping Chamber
Is an Engineer -Designed System required? no ✓
yes _ reason:
Minimum tank capacity 750 gallons
SETBACK FROM WELL
# of feet = 100
Permit #
Parcel ID# Z(, Y3- /G 2— 00-0/1
75
yrs\ V�
21t
60
b
0
3
(c r o,r Its 5 it ee r) (i'n[S
3 r 0'- less -�o lash l'nL
is slaum-il 0+' 6e(j
Remember: 8 feet of additional distance for each 100 gallons/day of design flow over 1,000 gallons/day
should be added unless an RPE can verify that it is not necessary to prevent contamination.
APPROVED FOR ISSUE BY:
SYSTEM INSTALLED BY:
DATE OF FINAL INSPECTION REQUEST:
FINAL INSPECTION BY:
Printed on Recycled Paper
DATE:
DATE:
0
W
U
0
co
Go
Z
W
U
0
u
r
cc
Q
D
03
A&
CC
a
o
0
(E
UI
N
0
U
U
oZi
T
3N
3N
T
>
E
E
o
a
T
C
ti
NN
w
N
.N
N
F
N
of
UW
UW
b W
W>L
F
oa¢?
ian
o�
r
-x
ii
o
J
6
6
a
W
bre
JJ-
N
ru
wigw
¢Q H
d62
ti
M
Z
I1
O
J
s
W
<jz
�FhWJ—
ry
V
N
M
�-^h
~
a2u
LF
O
M
M
N
wok
'1
i
0
a
r
�
L
N
0
3
4
0
4
en and associates, inc. -
0.1 1.V iu .vv
APPLIED PRESSURE — ksf
Mo,slure Content = 13.2 percent
Dry Unit Weight = 109.9 pct
Sample of Clay with claystone
fragments
From. Pit 1 at 2 feet
J
Ar
`N�
movem
nt
0
o
ent up
)n w
tt
n
0.1 1.V iu .vv
APPLIED PRESSURE — ksf
01 0 W w
APPLIED PRESSURE — ksf
4 202 37 SWELL -CONSOLIDATION TEST RESULTS Fig.._ 6
IqI
Moisture Content = 9.5 percent
Dry Unit Weight = 111.9 pcf
Sample of: clay with claystone
fragments
From: Pit 1 at 7 feet
J
-k
0
o
ent up
)n w
tt
n
01 0 W w
APPLIED PRESSURE — ksf
4 202 37 SWELL -CONSOLIDATION TEST RESULTS Fig.._ 6
IqI
ILA -IA -/9
J
CIO and associates, inc. •
0I
APPLIED PRESSURE — ksf
4 202 87 SWELL -CONSOLIDATION TEST RESULTS
Fig S —_ —
mmilwN 1},,,fent = 7. 1 percent
D'., Urul Wr-Ighf . 118.4 pct
l.,rnple oc sandy clay
F .r,rn. Hole 1 at 5 feet
Tt
Ex
du
an
t3
i
n
e
i
constant
Ire
!sur
0I
APPLIED PRESSURE — ksf
4 202 87 SWELL -CONSOLIDATION TEST RESULTS
Fig S —_ —
F
W
3
N
O
N
a
v ti
0
ro o
oG E r'
v,a x
o
G. 3
a
� ¢ a
O
0
O
a
0
ti
a
4 202 87 1 Chen & Associates
op /
F a Cd /
o we
X H 7
W U N
N v
00
/ ac
/ rUC
0 j \
O W
'r
1 I
laaj - uoilenai3
Cross Section A -A
F;¢ 4
LEGEND:
® ropsoil; organic, soft, black.
FClay (CL); low plasticity, silty, sandy, slightly gravelly, scatterd cobbles,
very ;tiff, slightly moist, brown and grey -brown.
Clay (CL -SC); low plasticity, silty, sandy and gravelly with claystone shale
fragments, stiff, moist, grey -brown.
Gravel (GM); with cobbles, probable boulders, sandy, silty, dense to very dense,
slightly moist, brown, subrounded.
Relatively undisturbed drive sample; 2 -inch I.D. California liner sample.
Drive sample; standard penetration test (SPT), 1 3/8 -inch I.D. split spoon
sample.
Relatively undisturbed hand driven liner sample.
32/12 Drive sample blow count; indicates that 32 blows of a 140 -pound hammer falling
30 inches were required to drive the California or SPT sampler 12 inches.
TPractical rig refusal.
NOTES:
I. Exploratory boring was drilled on May 19, 1987 with 4 -inch diameter continuous
flight power auger. Existing backhoe pit was excavated by others prior to our
field work.
2. Locations of exploratory boring and backhoe pit were determined by pacing from
the building corners which were staked in the field.
3. Elevations of exploratory boring and backhoe pit were measured by instrument
level and refer to the Bench Mark on Pig. 1.
4. The lines between materials shown on the exploratory boring log represents the
approximate boundaries between material types and transitions may be gradual.
S. No free water was encountered in the boring at the time of drilling or when
checked nine days later. No free water evident in backhoe pit during our site
visit:.
I
6. Laboratory Testing Results:
WC = Water Content (%)
DD = Dry Density (pcf)
-200 = Percent passing No. 200 sieve
LL = Liquid Limit (%)
PI = Plasticity Index (°)
4 102 37Chen & Associates Legcnd and Notes Fig 3
Hole L
Pit 1
Elev. = 94.S'
Elev. = 99.5'
100
100
Approximate
Proposed
IVC=13.2
Ground Floor
DD=109.9
Elevations
95
�
95
WC=9.5
DD=111.9
L4---200=30
32/12
90
21/12
90
W'C=7. 1
—
DD=118.4
LL=29
o
PI=10
0
ro
18/12
m
85
85
SO
0
8n
30/6,40/5
WC=4.4
200=15
75
7S
Note: Explanation of symbols
presented on Fig. 3.
Logs of Exploratory Boring
4 202
87
Chen & Associates I
and Existing Backhoe Pit
Fig. 2
APPROXIMATE SCALE
1 = 40
i
EDGE OF
ROAD ------ UTILITY EASEMEN
TWINING I ABANDONED
<y BUILDING
FLATS
ROAD
NOTE: SEE FIGURE 4 FOR CROSS-SECTION A -A
I_1
ROARING
FORK
RIVER
m
H
4 202 87 I Chen & Associates I LOCATION OF EXPLORATORY BORING I FirI
Zu�
i BENCH MARK GROUND
AT BUILDING STAKE;
ELEV = 100.00
,
ff
ASSUMED.
PROPOSED
BUILDING
A
3
� Cl
4FHOLEI
PIT I
EXISTING
i
i
NOTE: SEE FIGURE 4 FOR CROSS-SECTION A -A
I_1
ROARING
FORK
RIVER
m
H
4 202 87 I Chen & Associates I LOCATION OF EXPLORATORY BORING I FirI
Zu�
nature and extent of subsurface variations across the site may
not become evident until excavation is performed. If during
construction, fill, soil, rock or water conditions appear to be
different from those described herein, this office should be
advised at once so reevaluation of the recommendations may be
made. We recommend on-site observation of excavations and foun-
dation bearing strata by a representative of the soil engineer.
p�• P O
r' 15222
DAY/ec
cc: Denis Cyrus, Architect
Chen &Associates
Very truly yours,
CHEN & ASSOCIATES, INC.
M
Reviewed By
Steven L, Pawlak, P.E.
z
0
2 �
■
L(�