HomeMy WebLinkAboutpitkin.bldg.264321200851 (2016)DOCUMENT
LAYOUT
Certificate of Occupancy or Letter of Completion
Permits
Final Inspections
Any Supporting Documents
Site Plans
(NOTE: All structural plans will be grayed out. If you require the ability to see structural
plans, you must have a letter from the owner stating you are allowed to have plans. This
letter must be submitted to Pitkin County Community Development Department)
PERMITS
6-I- 16 �r,J�uesO»y
PITKIN COUNTY BUILDING PERMIT APPLICATION
130 S GALENA ST ASPEN, CO 81611
OFFICE PH0NE 970.920-5526 FAX: 970-920-5439 /��`t I n /( (�1� r7�,�^
INSPECTION LINE: 970-920-5532 htlo7Avww of&incounN.com 0 ) 1 U I' r 1 `/)I" 1
Applicant to complete numbered spaces only. Permit Number (Office Use Only) PennR
1. J0BAB0RE65Hi0ypgAQdr9sF4Or1P!/ rig) Pbl ox 8064 Aspen, CO379-2323Du
L �U JU1II�JCf flI'I 1� U
COn
2. OWNER MYkr{AOYsd News
DE
Aspen TREE PO Box 8064 Aspen, CO 81612 (970) 379-2323
FD
FN
S
3. CONTRACTOR+
ox 6 sen, CO 81612 970 379-2323
FSdo
MH
4. ARCHITECT OR ENGINEER OF RECORD sty+a+aw node
Ms
Eden
s
6. Parcel ID0(Call 920-5160) 2643 212 00851
ZG
D
A Vard
go
7. CLASS OF W0RN
ZONIrwoElosiGIS FEE
m
3
M
NEW ADDITION Al1ERATiON REPAIR
8. Use of Building
USETAX PERM m ZONING FEE WIMPACT FEE
(970)
00
1
i
ant
I6 0
1
379
Residential mccrumcial MA811.1tural Otherternp
-
OTHER IMPACT Deed neevktlen
2323
9. IS LP Gas used? yes No
M IWFEE MMP FEE FEE Aq'di
Curomeir Existing 54 Total 54 Footage
10. Valuation New so Footage Footage for TNlspermtt
0 798.62 6
Typeer
5
TataiMcfelw A ual Value on No.of Sum. Constructlan
11. Description of work (include Main Bing Permit If it this is a change order)
I
I
info@
Ns.dbaleser No. of
a�en-
A VN
Edctlng Added Dwelling Units Cama"'
'
tree.org
y - 1 1 -6
Ox Group occluded bt Sita Use Ease
APPROVALS AIInfOROED BY DATE
raring
tandlhe,
MAC
EWM
Separate permits are required M ElaN1ol, Plumbing, Heating. Ventilating or Air E,Inesbe
Conditioning. Fha., S_Z•i-
This permit becomes null and win Nwork or construction authorized is not commenced
within 12 months or R construction or work is suspended or abandoned for a period of Fin SPnddieRegldMiYM Alarm Reslbed>YM
180 days at any time after work Is commenced.
I hereby certify that I have read and examined this application and know Na same to be C'N of aspen worm (TAP Fes)
oe.wnrsbe
true and corrin. All provisions of laws and ordinarcez governing this type of work willFEZ.-
complied with whether specified herein or mt. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or Iwl em.law
Law
regulating construction or me performance of construction. It i5 my respomlbility to ',review
the approved plans and any comments that are contained thereon and see that
the structure and/or projett Is buillt in compliance with aD applicable codesw
Nte s City VAewn WWr. Pani d Pxy fix Qtrol Mod,
NOTE: a" 'I. milt. d Wod swrted wlMeuu pmmh wllibedpubNfee'd.Il Nevdw F^d4repWadYPsmllapeeaebnsdxmultllmcadW1upe
Gry DWIy a
trYtl On as M1N Ncrh Aeon CAry Mall
x (b x
Contactor'[ a re Date Signature of er (N Owner Balder) Dale
(iI(/7
X /,49/U•A� klt*� x a} 4.25.244-6
Print Date Print Date
For OIOee Use Only
APPNAIMIN APpwVEO FOR
9NMITrAI A[@e® pwnS EYED Issu"
Iv17 SVPmilblF 0.eceipted: , 1
�
one core �
41 ( �MAA d1�1i
I c!�I�
Paid Eld,y Cede Ns
Paid Plan CAM Pae
Ped ion, Dam.,
Pai9�pwd
Italiano. Fees Reaceipbed:
Pad Ptrniw
M1Id AN ImOaR rex
IW demand,2onlq red
Pai
leu Tax
Pada pFN
oaks Fs
oU
APPLICATON
MATERIAL
0
April 25, 2016
Eden Vardy
AspenTREE
PO Box 8064
Aspen, CO 80203
RE: Proposed teepee shade structure for.AspenTREE Farm Park
Dear Eden,
0 0 16 2 01 6 P v-��
TRE CITY OP ASPEN
This letter serves as an approval from'the City of Aspen Parks bepartment for the installation of a
temporary teepee to serve as a shade structure for kids groups through the summer months. It is our
understanding that the teepee will be 18 feet in diameter, 20 feet high at the top of the lodge pole-
supportlogs and the canvas exterior will be white and no higher than 17 feet. The teepee will either
have a dirt floor or a tarp will be used to serve as a floor. It is our understanding that the teepee will be
located north east of the'dome, in the corner of thg Farm Park, east of the solar thermal panels and
grain bin, opposite the area currently used for compost. The structure will be temporary and will be in
place from the first of June through the end of September. Once the teepee has been removed the site
will be returned to the condition that existed prior to it's construction.
Please contact the Cory Point Manager, Rob Covington, at least 5 days prior to the assembly and -
construction of the teepee in order to inform him of the pending changes of use of the property. If the .
specifications for the teepee change at any time, you must notify th@ Parks Department for additional
approvals prlor.to the construction of the teepee.
Be egar ,
Pitkin County
Austin Weiss UR 2 6 60;1
Open Space Manager
City of Aspen Parks & Open Space Community Development
585 Cemetery Lane
Aspen, -CO 81611'
970-429-2623
` 130 Soma GAC A Smear - AsemN, COLOP o 81611-1975 • Pnom 970.9205000 • Ax 970.920.5197
www. mpenpitkin.mm
' IYNtrdan m.cycLAl9Pn�.