HomeMy WebLinkAboutbocc.con.051.2017 B-1Pitkin County COO `T' Contract Cover Sheet Please complete the Contract Cover Sheet when the contract is completed and signed by ContractorNendor and Pitkin County Project Lead. Return all Contract Cover Sheets and Contracts/Change Orders/Amendments to Procurement (procurement helpL&pitkincounly.comd. Any contracts $50,000 and over will be routed for signatures to County Manager and Attorney's Office (if required) by Procurement & Contracts Manager. Contract Information Contract Number 051.2017B -I tearhnent Manager Project Name Redstone South Bridge -2017 Re a_ir_s -SG (970) 920-5206 Contractor -M Budget Line Item 110.54.96600.82760 $ Additional Budget Line Item(s) (Please fully allocate New Contract Total) $ $ $ $ Contract Start Date 2/10/2017 Contract End Date 9/1/2017 Automatic Renewal Yes E No® If Construction: Retainage Yes $ or % No® It this is a new contractor, please request they complete and submit to Finance a W-9 Form. Contact Information: Provide a brief description of the contract: Plan preparation and specifications for the Redstone South Indigo _ Contract Value Summary: Original Contract Amount _ T$48,428.40 Previous Change Order/Amendment Amount pfapplicablc) _ $ 0.00 This Change order/Amendment amount if applicable) _ $ 0.00 New Contract Total _ $ 48,428.40 ?rocurcment Method None ❑ InformalE Formal ® Sole Source ❑ Emergency ❑ Contract Renewal ❑ Contract Type: Services/Maintenance 0 Construction E Goods, Equipment, Supplies ❑ Change Order/Amendment ❑ Other, please explain ❑ Click here to enter text. NOTE: CLERKS OFFICE: WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST. F.n ineerinect tearhnent Manager G.R. Fielding Project Manager Phone (970) 920-5206 Provide a brief description of the contract: Plan preparation and specifications for the Redstone South Indigo _ Contract Value Summary: Original Contract Amount _ T$48,428.40 Previous Change Order/Amendment Amount pfapplicablc) _ $ 0.00 This Change order/Amendment amount if applicable) _ $ 0.00 New Contract Total _ $ 48,428.40 ?rocurcment Method None ❑ InformalE Formal ® Sole Source ❑ Emergency ❑ Contract Renewal ❑ Contract Type: Services/Maintenance 0 Construction E Goods, Equipment, Supplies ❑ Change Order/Amendment ❑ Other, please explain ❑ Click here to enter text. NOTE: CLERKS OFFICE: WILL KEEP ORIGINAL DOCUMENTS IN COMPLIANCE WITH COLORADO STATE ARCHIVES RETAINAGE SCHEDULE. ALL ATTACHMENTS MUST BE WITH THIS CHECKLIST. Contract #: bocc.con.051.2017 d rKIN C(►UNTO( TASK ORDER Task Order/Project Name: Redstone South Bridge - 2017 Repairs Task Order Number: B.1 Task Order Budget Line item: 110.54.96600.82760 OWNER: CONTRACTOR: GR Fielding — Engineering Michael Fowler, Project Manager Pitkin County SGM, Inc. 76 Service Center Road 118 W. 6th Street, Suite 200 Aspen, CO 81611 Glenwood Springs, CO 81601 Phone: (970) 920-5206 Phone: (970) 945-1004 gerald.fielding@pitkincounty.com mikef@sgm-inc.com PROJECT NAME: REDSTONE SOUTH BRIDGE - 2017 REPAIRS The Master Service Agreement for Provision of On -Call Engineering Services (tire "Agreement") dated January 18, 2017 between the Board of County Cmmnissioners of Pitkin County (the "County") and SGM, Inc. 118 W. 6th Street, Suite 200 Glenwood Springs, CO 81601 (the "Contractor"), shall include the following services. 1. Contractor's Obligations. Contractor shall perform the work as described below: a. Project Description Prepare plans and specifications for bridge repair elements including bridge deck overlay and expansion joints. Prepare plans and specifications for see" mitigation elements including center pier foundations and southwest wingwall/south abutment. Prepare US Army Corps of Engimeers 404 Permit Pre -Construction Notification. b. Work Plan See attached scope of work. c. Deliverables See attached scope of work. d. Schedule See attached scope of work. e. Costs Time and materials to be billed at current SGM rates per Agreement. Not to exceed $48,428.40 for (his Task Order. See attached for detailed cost breakdown. f. Limitations and Exclusions See attached scope of work. Contract #: bocc.con.051.2017 Compensation and Exnenses Invoicing, Payment and Offset. The County shall compensate Contractor for its services in accordance with the Project Budget and Schedule set out in Paragraph I of this Task Order. It is expressly understood and agreed that in no event will the total compensation and reimbursement to be paid hereunder exceed the sum of $48,428.40 for all services rendered. By Task Order or Task Order Amendment, the County and Contractor may reallocate Ore budget among project tasks if the total budget amount remains unchanged. Contractor shall invoice for the project monthly based on hours worked, with payment expected within thirty (30) days of invoice, but any payment by the County may be offset by any amount the Contractor owes the County for any reason. Any invoices not sent in the following manner may have payment delayed. All invoices for this task order shall reference Task Order B.1 and Redstone South Bridge - 2017 Reoahs. Invoices shall be sent electronically in PDF format to genald.fielding@pitkincounty.cont. 3. Pitkin County's Obligations. Pitkin County shall administer this contract through a County Representative. OR Fielding will manage the project as the County's Representative. The services provided and products delivered by the Contractor under Oris contract will be subject to review by the County's Representatives, or a designee, for compliance with Contractor's obligations prior to final payment. 4. Formation of Task Order. This Task Order is issued in accordance with the provisions of the Agreement. Contractor agrees to provide services subject to the terms of this Task Order and for the avoidance of doubt this Task Order consists of the terms set out in the Agreement. In all other respects the Agreement is in full force and effect and remains unchanged by this Task Order. SGM, INC Michael Fowler Contractor PITKIN COUNTY, COLORADO: J OR Fieldin County Manager (Task Orders over $50,000.00) February 7, 2017 Date ,L 1 Date Date Contract#: bocc.con.051.2017 �` SGM Pitkin County Engineering J V Task Order/Project Name: Redstone South Bridge— 2017 Repairs Task Order Number: 131 Task Order Budget Line Item: 110.54.96600.82760 PROPOSED SCOPE OF WORK SGM proposes to execute the overall project through the following Phases: Phase 1 — Project Management and Meetings • We have assumed that the project will take approximately 6 months from kickoff to award of construction. We have estimated 4 hours per month will be required for ongoing project management which would include internal project coordination, communication with county staff and external agencies such as the US Army Corps of Engineers. • We have assumed that a project kickoff meeting will be held and the SGM Project Manager and lead Hydraulics Engineer would attend this meeting. • An allowance for an intermediate design review meeting is included. Phase 2 — Initial Project Development • This work includes all necessary field data collection on the existing structure, topographic survey of the project area and survey of river cross sections to be used in the HEC -RAS analysis. Phase 3 — Bridge Repairs • We have assumed that the bridge repairs will include deck repairs and Installation of new expansion joints. • The deck repairs will likely consist of Class 1 & 2 repairs and an overlay system. Options for overlays include polyester concrete, thin bonded epoxy overlay and standard asphalt overlay. • Currently, there is an open joint In the deck at the pier location and open joints at the abutments. It may be desirable to seal these joints with an expansion joint system. There are various options that are dependent upon the type of overlay system. We can discuss this further with the County and decide if expansion joints are desired. Phase 4 — Hydraulic Analysis and Scour Design • Based on our previous experience on recent Garfield County scour mitigation projects, we have assumed that a HEC -RAS analysis will be required to size the riprap and design the scour countermeasures for this project. • Scour mitigation at the existing pier foundation(s) will likely require a cofferdam for construction. It has been our experience that a certain level of construction specifications are required to ensure in -stream work can be performed in such a manner that water quality impacts can be minimized. Phase 5 — Permitting • It is likely that a US Army Corps 404 permit will be required for the in -stream work. We have included wetlands survey and reporting in the scope to support the 404 permit process. • We do not anticipate other environmental studies will be required, but ultimately this decision is up to the USAGE. 1 of 2 Contract 4: bocc.con.051.2017 Pitkin County Engineering 6SGM Phase 6 - Bid Phase • SGM will provide plans and specifications to the County for inclusion into the bid documents. • It is anticipated that a Pre -Bid meeting will be held and there will be a nominal effort during bidding to respond to questions and evaluate bid proposals. SCHEDULE It is anticipated that the desired construction timeframe is late summer/early fall for lower water levels in the river. The following schedule is based upon weather considerations (e.g. snow cover and water levels for surveying, growing season for wetlands study) and LISACE review period. Phase Project Management February - July Phase 2 Initial Project Development February - March (depends on snow cover and water level) Phase 3 Bridge Repairs March - May Phase 4 Hydraulics and Scour March - May Phase 5 Permitting April -July (fieldwork in April, PCN process -2 months) Phase 6 Bid Phase July LIMITATIONS AND EXCLUSIONS Other Items which may be required, but are excluded from this scope of work are: • FEMA CLOMR or LOMR • Easement agreements and exhibits • Construction management and inspection FEE ESTIMATE - SEE ATTACHED 2 of amu- SGM , � x•*w'y�'u Code PM ESTIMATED BY: Mike Fowler PROJECT: Redstone South Bridge -2017 Repairs DATE: 1/24/2017 CLIENT: Pitkin County Engineering - Task Order B.1 REVISION: 1.0 .."� No. 1 , � x•*w'y�'u Code PM . �.6�,SG[iA311¢jS,P£"fgjltlir Personnel D. • Project Manager Description b_ri,�h. i'g...•. Fowler Jacob McNutt Dave Kot $156.00 $114.00 $156.00 _ 72 $ 11,232.00 48 $ 5,472.00 _ 2 3 4 5 SE HY CE CAD Structural Engineer Hydraulics Engineer Civil Engineer CAD Drafter _ Survey Project Manager Field Survey Crew 18 $ 2,808.00 96 $ 9,024.00 64 $ 6,016.00 Anthony Alfini $94.00 Jaimal Proctor _ Josh Wilson 2 Man Crew Tim Barnett $94.00 8 —SPM $104.00 4 $ 416.00 7 FS2 $200.001 16 $ 3,200.00 8 9 10 SST WS SWS Sr. Survey Technician Wetlands Specialist Sr. Wetlands Specialist 'Dave GIS Specialist 'Rachel $94.00 $125.00 $182.00 16 $ 1,504.00 44 $ 5,500.00 6 $ 1,092.00 Cindy Adams Mehan _ KaBnig Preisner- 11 Other Direct Costs $94.00 $66.00 _ 4 $ 376.00 14 $ 924.00 _ 12 _GIS ADM Admin. Assistant (Joan Subtotals 402 $ 47,564.00 TOTAL LABOR $ 47,564.00 OTHER DIRECT COSTS $ 162.00 SGM TOTAL COSTS $ 47,726.00 TOTAL LABOR $ 520.00 OTHER DIRECT COSTS $ 182.40 OUTSIDE TOTAL COSTS $ 702.40 TOTAL TASK ORDER COSTS $ 48,428.40 .w-.-,. a TotalPhase 1.0 Project Management and Meetings $ 5,616.00 $ 6,952.00 2.0 Initial Project Development $ 10,192.00 3.0 Bridge Repairs $ 12,792.00 4.0 Hydraulic Analysis and Scour Design 5.0 Permitting $ 7,920.00 $ 4,612.00 6.0 Bid Phase ODC Other Direct Costs $ 344.40 TOTAL PROJECT COSTS $ 48,428.40 Date: 212/2017 Page 1 of 3 Redstone South Bridge -2017 Repairs SCHEDULE OF FEES SGM.pERSONNEL,.. OU S .,,, :, SGI11" U01 O8T.S PHAStk AND TASKS 3 wofHWia" °� p� suMNa�';- f.+ x.. I Project Matiagementand Meetings 1.1 Project Management -Assume6 rens. @4 M/mo. 1.2 Meetings Kickoff Meeting Intermediate Desgn Review Meeting .... . Subtotal: Phase 1,9 24__ 4 4 42 4 4 --. --- 1 _. 24 $3,141 0 1a - -_-. e $1,248 4 U24 j, _. - ss_jla.GJG _ - eko, 2.1 Data Collection and milia/ Site Recomaissance 4 4 4 12 $1.4% 2.2 River Cross Section Survey 4 2 8 6 22 $2,936 2.3 Topographic S urvey 2 e a to $2.50i_ �... Subtotal: Phase 2.0 ,.4 4 1 1 8 4 18 i6 ,m.. �. 52 >.61915i5 3.1 Bridge Deck Overlay 3.2 Bridge Expansion Joints 3.3 Specigcatlons 3.4 Quantities and Cost Estimate 416 18 4 4 z4 44 54,704 36 $3,952 6 $768 6 $768 -. 4 2 16 JI 2 Subtotal; Phasa;3.Q 12 4o do -L , ..; . 92 > 'i 0. 2 4h•-:?,-- •'u 4.1 HECRAS Anaylsis 4.2 Socer Mitigation Design 4.3 DORertlam Design 4.4 Spaciticalions - - 4.5 QuamUtiee and Cost Estimate 9 4 az 24 46$4,256 52 E5,13fi ifi $1,504 6 Sees 6 $688 E520 -- 24 2 18 n Al 2 8p14$Al P,h1sefid0R I• 5.1 Wagered. Delineation Survey 8 a E1,000 B 16 5.2 Wetlands Mapping 5.3Wetlands Repot 5.4 Consultation xlth USACE 4 iz $1,376 4 4 24 $2,992 4 =0-- - 4 2 + 5.5 404 Pereall Pre-Constmctiov N.UnceUon e z is $2= .. _,=i,... Subtotal•,Phase Ni0 ] I M. w - A. 4 84.,.0 -1Z.920A r... 6.1 Bid Documents 6.2 Pre -Bid Meeting 6.3 Design Support during Advertisement 6.4 Bid Evaluations e 4 4 4 0 2 16 $1 ,776 s E758 4 4 12 $1,156 - - 4 4 $624 Subtotal: Phase'BiO. 40 1 r 1 1,41 1 lJ ,'". a^ •±: - 10 3E - .£%612$ .• - PROJECT TOTAL$ �l2 d6. 18. 88 84 4 •182^18='M":•8.. 4 14 .42,SK]5645 15820' Print Dale: 2/2/2017 Page 2 of 3 Redstone South Bridge - 2017 Repairs SSGM OTHER DIRECT COSTS 77. Description Quantity Per diem (CONUS Rale) _ $219.00 per day 0 • $0.00 Mileage (from GWS office) $0.54 per mile 300 $162.00 Plotting, 2436, BMJ $5.50 per plot 0 $0.00 Plotting, 2036, Mylar $19.00 per plot 0 _ $0.00 Plot9 $30.00 percopy 0 $0.00 on , 24x36, Color Photocopies__ $0.25 percopy 0 _ $0.00 _Newsletters, Tri -fold, Color _ _ $0.75 percopy _ 0 $0.00 Newspaper Nolice _ $500.00 percopy_ 0 $0.00 Postage $5.00 each 0 $0.00 Subtotal $162.00 Description Mileage $0.540 per mile 60 $32.40 Materials Testing (Gradation) _ $75 as 2 $150.00 $0.00 Subtotal $182.40 Date: 2/2/2017 Page 3 of 3