HomeMy WebLinkAboutpitkin.eh.264316102010 (2006-2015)MEMORANDUM
To: Mike Kraemer, Planning Department
From: Kurt Dahl, Environmental Health Department
Date: March 19, 2015
Re: ElamNagneur Gravel Pit Annual Review (2015), (Case P010-15;
Parcel ID #2643-161-02-010)
SUMMARY OF RELEVANT PARTS OF APPLICATION: Elam Construction Inc. has submitted
an application for their annual review for the operation at the Vagneur pit.
DISCUSSION: The Pitkin County Environmental Health Department has reviewed the details
of the 2015 Annual Report for the Vagneur Gravel Pit under the authority of the Pitkin County
Land Use Code and the Pitkin County OWTS Regulation.
Resolution No. 052-2009, "Approving the Elam Construction, Inc. Special Review to Expand the
Vagneur Pit," outlines conditions of approval.
A site visit was conducted on March 19, 2015 with Mike Kraemer of the Pitkin County
Community Development Department and Gayle Lyman of Elam Construction, Inc.
--- WATER SUPPLY:
Bottled water for drinking is brought in for employees. Water is hauled in from Mid -Valley Metro
for plumbing within the office trailer.
There is a well (Colorado Division of Water Resources Well Permit Number 41824 -F -R) on the
lower part of the property, but is used for dust suppression; no potable uses. The well is
permitted for pumping that shall not exceed 230 GPM and use is limited to industrial and
irrigation purposes.
--- SEWAGE TREATMENT AND COLLECTION:
Individual Sewage Disposal System (ISDS) Permit 89018 documents a system was approved
for use of the office by 6 employees. This system consists of one 1000 gallon tank and two
deep gravel trenches totaling approximately 100 square feet of absorption area.
ISDS Permit 98063 documents the system was approved for use by 20 RV units during summer
months. This system utilizes a 2000 gallon tank installed in 1998 and two existing 1250 gallon
tanks with effluent distributed via a distribution box to 8 deep gravel trenches for a total of 1820
square feet of absorption area. The area over the absorption field was seeded in the fall of
2008, and large boulders were placed around it to prohibit vehicles from driving over the area.
Printed on Recycled Paper
An inspection of both OWTSs was conducted on June 5, 2014 by Carla Ostberg of CBO, INC
(Pitkin County License number 17). Pumping of the tanks for both systems was not
recommended and there was no evidence of failure for the system serving the office.
The last septic tank (1,250 gallon) prior to the soil treatment area of the RV OWTS appears to
be leaking. CBO, Inc is proposing to by-pass the tank since the 1,250 gallon capacity is not
needed to meet the existing OWTS requirements and the 3,000 gallon capacity of the two tanks
that would be left in place would meet the minimum standards. The Environmental Health
Department is okay with this proposal and as a minor repair, a permit would not be required.
However, the EH Department does ask that the repair be completed prior to seasonal
occupancy of the RV Camp and Elam submit documentation of the repair to the EH Department
for our files.
--- AIR QUALITY:
The Environmental Health Office did not receive an air quality complaint in the last year.
At the site inspection on April 2, 2013 the dirt berm closest to noise sampling point #8 had a
straw mat covering it to help protect the seeded vegetation and to retain moisture. At the March
17, 2014 inspection the straw mat was verified to still be in place and at the March 19, 2015
inspection the straw mat was still in place with evidence of vegetation growing underneath it.
Emissions Permits issued by the Colorado Department of Public Health and Environment
include:
X610 Crusher: 97POO820
V-755 Asphalt Plant: 09PI1168
Vagneur Pit: 13PI388-5
--- NOISE:
The Environmental Health Office did not receive a noise complaint in the last year.
Elam does have a noise sampling protocol and performs daily readings at the northern most
points of the property. Gayle Lyman confirmed in conversation that the company's noise meter
is calibrated each year. The data indicates compliance with the noise regulations and there
were no samples above the 55 dB threshold.
--- WATER RESOURCES:
The area of the pit used for snow dumping in the winter is on a reclaimed area on the north end
of the pit and is permitted separately from the annual review.
Elam has developed a protocol for sampling both soil and water as part of Elam's Water
Resource Protection Plan.
Soil Sampling:
One composite sample is taken for each 20,000 cubic yards of soil. The soil is tested for the
following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
Printed on Recycled Paper
Benzene, toluene, ethylebenzene, and xylenes (BTEX)
Total RCRA Metals
Water Sampling:
Water samples are taken from surface water within the floor of the gravel pit. The water is
tested for the following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Records of the samples were reviewed and all of the results were in compliance with the
allowable applicable standards, with one exception. The June water sample had a cadmium
result of 0.008 ppm, over the 0.005 ppm standard. The July cadmium sample was 0.005 ppm
and subsequent samples were less than 0.005 ppm. During our site visit the spike was
discussed with Gayle but a determining factor was not identified. If a spike in the water sample
is evident next year, please contact the EH Department promptly to determine if the water
should be resampled.
Recommendation: This Department has no objection to continued operation, including
minor amendments.
3
Printed on Recycled Paper
05/03/2012 21:02 9636070 B R SEPTIC PAGE 02
JUN. 30, 2011 4:01PMi ENVIRO HEALTH NAT RESOURCE NO. 749 P, 6
Onsite WastewaterTrie%atmertSysteMs (OWES) Use
Permit inspection Form
rllilV •
151-tl6ri county Environmental Health Department
4 o4o5 Casdr. Creek Road, Suite 10, AtperE, C081611
—. , ., Cv���C� .__..,, Phont:970-92D-5070 Faz 970.920-5077
owner's Name,
Address:
Farces Number.
irupection bate:
inspector's Name:
s}tsiness Name:
Phone ra mber
email:
sneucame lNunwe
Pitkin rounty systems tncror v.
dlt be rer»Fttarl to PW,, Ct,,O iN Emt tr,,m, f --FAA- ft—ar gn by-
Leop thh; ett- a r� aE
theLke , d JIM etf Wrthrn6odcvsofthef
a amaaarrIf. ofi•�►arf,ertAesysfie
0-099
f UE5T1lJRt5 FDR PRoMyy OuMER PRIOR iO FNSPEC'MN:
Is the home currenTly occupled?
�
If NO, haw long tms the home Seen vacant?
bedrooms are in the home?�u�
/ �•CJ'
How many
When was the tank fast pumped?
1–
Name of pumping company:
if second ary treatment is used, who IS the
maintenance provider?
._ /V
RECORDS:
Wemsystem records available from, Pitkin County? yP5 NO
if YES: Permitnumber. C�
Oats of Fina{ Approval: ^ 1D
# of bedrooms permitted' ���
Was an as -built drawing available? Gii NO
Is the as -built drawing accurate? YE5 NO
If NO: Complete o drawing of fbe systtM on lost page of this farm os c=mtely as
passible.
Ar3V QUeWQ" marked rAIL will require correction before an OLWTS We permit is Issued—
SITE CONDITIONS;
Propergmding,noevidenceaferosion? PASS FAR
improper vegetative cover'? YES
Evidence of compacilon such as heavy machinery or livestock? YES
improper dlschorgeasuch asstraightpipes? PA FAIL
Evidence of high ground water? M
Snow Dover present?
Page I
05/03/2012 21:02 9636070 B R SEPTIC
JUN. 30. 2011 4:01PM ENVIPO HEALTH NAT RESOURCE NO, ?44
TANK:
Tank
Tank2—'
Tank3
TankcapacIty
MIMIJ 07
gallons
G%
gallons
16eg O geilons
Tank material
'
PASS
FAIL
SECONDARYTRFATMENT:
of con artmen%
Is a secondary treatment unit present? YES
(g5
UNKNOWN
if YES, does tate unit appear to be in good working condition? YES
NO
ode vflast pumping
Does the owner have a current maintenance contract for the unit? YES
C5
-/- 1
Main:enancePravider: _ _AA--;-�. __Phone:
- f • 2
L-Idsjdwrs in good cc dfion
CfASS
FAIL
PA -W
FAiL
P FAIL
Risers to rade
Riser height
om
No
E
NO
NO
Riser condition/wmrt ghtncss
Inletsah*AaryTJbaftle
FAiL
tMP3
FAIL
FAIT.
Outlet sari t v /batheFAl
FA I.
PASS AiL
Effluentfilter (if part of design)
PASS FAIL
P FAIL
P FAIT N
Candiron of tank material
111@4S
FAIL
PASS -
PAIL
FAIL
Tankwaj pumped for Inspection
Y
NO
YE
NO
NO
Scum level (1st compartment)
inches
0
Inches
O indies
Sludge level (ist cogil rKVent)
inches
p
inches
CrJ inches
scum level (2nd compartment}
p
inches
inches
inches
sludge level (znd compartment)
inches
inches
d inches
Baekliow (if pymped)
PASS
FAIL
P
FAIL
FAR
Midunk haffTe
PASS FAIL
PA FAIL
N/A
b—FAIL N
Watertightness
P
FAIL
ASS
FAiL I
S2011ZFAiL
PUMPS/DOSING SIPHONS:
N an
is a pump or dosing siphon present?
YES
YFS
If YES, Is the pump/dosing siphon functioning properly?
PASS
FAIL
Does the pump/wiring/dosing siphon appear to be in good condition?
PASS
FAIL
Is tht high water alarm working, both visible and audible?
PASS
FAIL
SECONDARYTRFATMENT:
Is a secondary treatment unit present? YES
(g5
UNKNOWN
if YES, does tate unit appear to be in good working condition? YES
NO
Does the owner have a current maintenance contract for the unit? YES
C5
UNKNOWN
Main:enancePravider: _ _AA--;-�. __Phone:
if there is no maintenance contract, a contract must be in place prior to occupancy of the home. A
copy of the contract must be submitted to Pitkin County Environmental health Department
ABSOR8170N AREA:
Effluerrt surfacing?
Evidence of past surfacing?
Surface dampness?
Excessive odors?
Field location verified by observation ports or probing:
Liquid in observation port?
I YES, record depth:
Disvibution Box or ADV part of original design?
If YES, is it accessible from grade?
Is it level and in good candition?
PASt3 FAiL
0YES
N an
YES
N
YFS
PProbing
N
YES
�- _inches
N
FAIL'
Page 9
UNYNOWN
PAGE 03
% D Y�f'J-L'Yl3
05/03/2012 21:02 9636070 B R SEPTIC
JUN, 35',2011 4:01PM ENVIRO HEALTH NA- RESOURCE
/i'rlri.-T_
PAGE 04
NO. 749 P. 7
TANK:
Tank ca acl
Tank
f
gallons
Tank
gallons
Tank3
gallons
Tank material
is the high water alarm working, both visible and audible?
PASS FAIL
SECONDARY TREATMENT
Is a secondarytreatment unit present? YES
UNKNOWN
If YES, does the unit appear to be in good working candttton? YES
NO
aFcompartment3
rfq—' UNKNOWN
Maintenance Provider:&2WL _ Phone:
if there is na maartenance contract a cantratt mustbe in place prior to occupattey of the home. A
copy of the coraxact;muct be submitted to Pit{un CountyEnvironmeatal Hcnith Department
Date of last pumping
Lida/rays in good eonclittion
kimrsto rade
(PAM)
YES
FAIL
NO
PASS
YES
FAIL
Nd
PASS
YES
FAIL
NO
Riser het t
Riser Gond rVi n/waterti htnaa
kdetsanimrVT/baflk+
FAIL
PASS
FAIL
PASS
FAIL
outlet sankary T/btli4
Muentfilter rif part of dvWi n}
VA
PASS FA!
FAIL
N/
PASS
PASS FAIL
FAIL
N/A
PASS
PASS FAIL
FAIL
N/A
condition of tank matA!Aa!P
i=AlL
PASS
PAIL
PASS
FAIL
Tank was pumped far inspection
—t"Y-E0
NO
YES
NO
YES
NO
Scum level (Sstcompartment)
ri
inches
Inthes
inches
Sludge level fist eomp&titnent}
scum Ievel 2nd compartment)
''
ep
Inches
inches
inches
inches
inches
inches
Sludge level (2nd compartment)
Backnow(Npum
Mldtank baffle
jr
P FAIL
inches
PAIL,
N/A
PASS
PASS FAIL
inches
fAIL
N/A
PASS
PASS FAIL
Inches
FAIL
NjA
WatertigErtness
PASS
FAIL
PASS
PAIL
PASS
FAIL
PUMPS/DoSING SIPNOtdS.
Is a pump ordosingArphon present?
YFS N
if YES, istha pump/dosing siphon functioning properly?
PASS FAIL
Does the pump/wiring/do4ng siphon appear to be In good condition?
PASS FAIL
is the high water alarm working, both visible and audible?
PASS FAIL
SECONDARY TREATMENT
Is a secondarytreatment unit present? YES
UNKNOWN
If YES, does the unit appear to be in good working candttton? YES
NO
Does the owner have a current maintenancecontractfortheunit? YES
rfq—' UNKNOWN
Maintenance Provider:&2WL _ Phone:
if there is na maartenance contract a cantratt mustbe in place prior to occupattey of the home. A
copy of the coraxact;muct be submitted to Pit{un CountyEnvironmeatal Hcnith Department
ABSORBTION AREA:
Effluent surfacing?
Evidence of past surfacing?
Surface dampness?
Excessive odors?
Field location verifled by observation ports or Probing.-
Liquid
robing=Liquid in observation port?
If YES, record depth:
Distribution Box or ADV part of original design?
if YES, is It accessible from grade?
Is it level and in good condition?
VP FAIL
YES
YES
Cao YE$
Ports Probing Aj/V
YES
inches
YES .� UNKNOWN
YES N
PASS FAIL
Page 2
05/03/2012 21:02 9636070 B R SEPTIC PAGE 05
JUN. 30.2011 4:01PM ENVIRO HEALTH NAT RESOURCE N0, i49 P. 3
Any problems with the system that ware not addressed in the inspection checkilst?
please rtstany recommendadons for the continued use of the rystarn:
Were any repairs done as a result of this Inspection? NO YES
If YES, please describe the repairs.
To th�e bestof my knowledge and training, the inforMati I collected in Pis inspection is qkcVate as of
/
�- - - 20, Lgo
Licensed Systems InspectorSlgnazure: 2i
z a x O'eeyr
Additional Notes:
Clearly,rabel aV pictures and attach them to this fdrm
Rage 3
49 B & R Septic Service, Inc.
Rooter & Jetting Service
Video Inspection Service
0603 Handy Drive
Carbondale, CO 81623
Bili TO
Elam Construction
Box 13
Woody Creek, CO 81656
Invoice
_ Date Invoice #
2/29/2012 7613
M,qY 2 3 �01� P.O. No. Tenons Project
Quwft Description Rate Amount
Septic Inspection of all tanks 250.00 250.00
Service - installed 4" biotube on effluent line on the last tank of the RV 200.00 200.00
Park and replaced 10 ft of cast pipe with SDR35 PVC pipe on same line.
Cast iron pipe was completely corroded and had to be replaced.
Parts - filter & pipe 177.00 177.00T
Sales Tax - Pitkin 3.40% 6.02
043'2
00-tb i o 2 - a S--
Thank
f
Thank you for your business. Carbondale Aspen
_ Fax
_ 9 _0_ Total �$`63
3.02(970) 963-3814 2059 0
MEMORANDUM
To: Mike Kraemer, Planning Department
From: Kurt Dahl, Environmental Health Department
Date: April 2, 2013
Re: Elam/Vagneur Gravel Pit Annual Review (2013), (Case P006-13;
Parcel ID #2643-161-02-010)
SUMMARY OF RELEVANT PARTS OF APPLICATION: Elam Construction Inc. has submitted
an application for their annual review for the operation at the Vagneur pit.
DISCUSSION: The Pitkin County Environmental Health Department has reviewed the details
of the 2012 Annual Report for the Vagneur Gravel Pit under the authority of the Pitkin County
Land Use Code and the Pitkin County OWTS Regulation.
Resolution No. 052-2009, "Approving the Elam Construction, Inc. Special Review to Expand the
Vagneur Pit," outlines conditions of approval.
A site visit was conducted on April 2, 2013 with Mike Kraemer of the Pitkin County Community
Development Department and Patrick Bourke and Gayle Lyman of Elam Construction, Inc.
WATER SUPPLY:
Bottled water for drinking is brought in for employees. Water is hauled in from Mid -Valley Metro
for plumbing within the office trailer.
There is a well (Colorado Division of Water Resources Well Permit Number 41824 -F -R) on the
lower part of the property, but is used for dust suppression; no potable uses. The well is
permitted for pumping that shall not exceed 230 GPM and use is limited to industrial and
irrigation purposes.
--- SEWAGE TREATMENT AND COLLECTION:
Individual Sewage Disposal System (ISDS) Permit 89018 documents a system was approved
for use of the office by 6 employees. This system consists of one 1000 gallon tank and two
deep gravel trenches totaling approximately 100 square feet of absorption area.
ISDS Permit 98063 documents the system was approved for use by 20 RV units during summer
months. This system utilizes a 2000 gallon tank installed in 1998 and two existing 1250 gallon
tanks with effluent distributed via a distribution box to 8 deep gravel trenches for a total of 1820
square feet of absorption area. The area over the absorption field was seeded in the fall of
2008, and large boulders were placed around it to prohibit vehicles from driving over the area.
Printed on Recycled Paper
An inspection of both septic systems was performed on February 1, 2012 by B&R septic
service. The systems are in good condition. The inspector did recommend the installation of
an effluent filter on the outlet side of the 3rd septic tank at the Camper Area. A receipt, dated
February 29, 2012, was provided and indicated an effluent filter was installed in the 3rd tank and
10 feet of cast iron pipe was replaced.
--- AIR QUALITY:
A complaint was received by this office. Mike Kraemer and Kurt Dahl did a site inspection on
August 29, 2012 in part to discuss the dust complaint. An investigation of the site included a
visual inspection of the pit and a discussion of the requirements of the 2009 Resolution
(Resolution 052_2009). The resolution states "the applicant shall water haul roads 4 times per
day during dry conditions". The applicant was able to provide a log from the watering truck but
it was difficult to determine compliance from this log. Based on the site visit recommendations
were made to change the watering log to make it easier to read and determine if they are in
compliance. The applicant was reminded the resolution requires watering 4 times per day in dry
conditions.
At the site inspection on April 2, 2013 the dirt berm closest to noise sampling point #8 had a
straw mat covering it to help protect the seeded vegetation and to retain moisture. One of the
dust complaints submitted to the applicant stated dust was coming off of the berm and the mat
and future vegetation should resolve this issue.
Emissions Permits issued by the Colorado Department of Public Health and Environment
include:
X610 Crusher: 97PO0820
V-755 Asphalt Plant: 09PI1168
Vagneur Pit: 13PI388-5
--- NOISE:
Elam has developed a noise mitigation plan to address expansion of the pit and impacts on
nearby neighbors whose lot lines are within 1000 feet of the pit boundaries. The plan proposes
the use of berms surrounding the pit operations, locating the crusher within the excavated area
of the pit, and modification of driving routes in the pit to minimize the use of back up beepers.
Elam has also committed to replacing traditional back up alarms on their vehicles permanently
assigned to the pit with white noise style back up alarms.
--- CONFORMANCE WITH RESPECT TO OTHER ISSUES:
The Colorado Department of Labor and Employment, Division of Oil and Public Safety performs
inspections on the fuel storage areas. Elam does not receive documentation of the inspection.
Extensive work was done in the summer of 2008 in the fuel storage areas as a result of some
deficiencies found during a State inspection.
--- WATER RESOURCES:
Printed on Recycled Paper
The area of the pit used for snow dumping in the winter is on a reclaimed area on the north end
of the pit.
Elam has developed a protocol for sampling both soil and water as part of Elam's Water
Resource Protection Plan.
Soil Sampling:
One composite sample is taken for each 20,000 cubic yards of soil. The soil is tested for the
following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Water Sampling:
Water samples are taken from surface water within the floor of the gravel pit. The water is
tested for the following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Records of the samples were reviewed and all of the results were in compliance with the
allowable applicable standards. The spikes that were present in the 2012 samples were not
present in the 2013 samples. The applicant should pay attention to the sampling times and
frequencies. The soil samples taken in February and June were not analyzed until August and
may have been in storage too long. Storage of BTEX samples for 2 months or more before
analysis may not be part of an approved method and staff is investigating this. The previous
annual review required monthly water samples through October of 2012 and the applicant did
not meet this requirement.
Recommendation: This Department has no objection to continued operation, including
minor amendments.
3
Printed on Recycled Paper
TPH
-�i
To: Elam Construction Date: September 19, 2012
1225 South 7th Street No: ECA/ELAM 12-01
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Soil, VAG-S 12-01
Comments: Kept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Liw x q&MPSon
Liese K_ Thompson
Lab Director
u,u'u25
Date Sampled: Feb. 23, 2012
Date Received: August 22, 2012
Date Tested: August 22 -Sept. 6, 2012
E:11 -loll ft
0.020 mg/Kg
<0.050 mg/Kg
<0.050 mg/Kg
<0.050 mg/Kg
<0.150 mg/Kg
0.012 mg/Kg
0.320 mg/K9
5.00 mg/Kg
1.00 mg/Kg
15.0 mg/Kg
0.0075 mg/Kg
0.008 mg/Kg
<0.030 mg/Kg
SEP 2 0 2012
E
To: Elam Construction Date: September 19, 2012
1225 South 7th Street No: ECA/ELAM 12-03
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Soil, VAG-S12-03
Comments: Kept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Lime x 2fmnepsoX
Liese K. Thompson
Lab Director
uJU027
Date Sampled August 22, 2012
Date Received: August 22, 2012
Date Tested: August 22 -Sept b, 2012
RESULTS
<0.010 mg/Kg
<O.050 mg/Kg
<0.050 mg/Kg
<0.050 mg/Kg
<0.150 mgMg
0.004 mg/Kg
0.230 mg/Kg
3.00 mg/Kg
1.50 mg/Kg
14.0 mg/Kg
0.0086 mg/Kg
0.002 mg/Kg
<0.030 mg/Kg
SEP 8 0 2012
A]
To: Elam Construction Date: September 19, 2012
1225 South 7th Street No: ECA/ELAM 12-02
Gland Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman Date Sampled: June 7, 2012
Sample I.D.: Soil, VAG-S 12-02 Date Received: August 22, 2012
Comments: Kept 4C till tested Date Tested: August 22 -Sept. 6, 2012
RESULTS
' : e 77 t.
TRPH <0.010 mg/Kg
BTEX:
Benzene <0.050 mg/Kg
Toluene <0.050 mg/Kg
Ethylbenzene <0.050 mg/Kg
Xylenes, total <0.150 mg/Kg
RCRA
Arsenic
0.006 mg/Kg
Barium
0.270 mg/Kg
Cadmium
4.00 mg/Kg
Chromium
1.30 mg/Kg
Lead
44.0 mg/Kg
Mercury
0.0108 mg/Kg
Selenium
0.002 mg/Kg
Silver
<0.030 mg/Kg
Results submitted
for Enviro-Chem Analytical, Inc.
Luau x Tkompson
Liese K. Thompson
Lab Director
jj6j26
SEP 2 0 2012
®_ ®_
NmBm
�W
.ii
mg"4,
CD
�11111 OMAN
offm -i#m EFIT#-,qm Eff-r-n-'s ME, T.#Z#m Offiyil#�Tm
MOM
jjjc;jr#�-fm
VAGNEUR GRAVEL PIT
SURFACE WATER
SUMMARY OF ANALYTICAL RESULTS
an ZMAN
2012
®_ ®_
NmBm
r�!
mmcs# #
.ii
�11111 OMAN
offm -i#m EFIT#-,qm Eff-r-n-'s ME, T.#Z#m Offiyil#�Tm
MOM
jjjc;jr#�-fm
an ZMAN
0 1 M 11-71 Z
0 .1 1 1 M
0 FT,'7 M,
0 ff #To 77- Z
0 r- 1J 9 M
0 .1 # o -71, B
off #T# 7w
0 C M 117.1 Z
0 .# M5M
0 al 1a 0
0 0 Z1 1 1 11
NFITZ"M
or-ITIZA
0 WT,1-77 =
0 .i 11 E
EMU,M
ME oWNE
EM, r#.—,, 0
NNMtY
.1 I -7Z
NOME1
IK
ffiro-571.2
Or, MUM
offiT,77m
offiTill,"rm
EM
JAN 2 2 2013
To: Elam Construction
1225 South 7th Street
Grand Junction, CO 81501
Date: Dec. 29, 2012
No: ECA/ELAM 12-11
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Soil, VAG-S12-04
Comments: Kept 4C till tested
Parameters
TPH
BTEX: (EPA 8260)
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Ue,w K. Thotgjon,
Liese K. Thompson
Lab Director
OUG-828
Date Sampled: Dec. 5, 2012
Date Received: Dec. 6, 2012
Date Tested: Dec. 6-21, 2012
RESULTS
0.008 mg/Kg
N.D. <0.0005 mg/Kg
N.D. <0.001 mg/Kg
N.D. <0.001 mg/Kg
N.D. <0.003 mg/Kg
0.450 mg/Kg
21.0 mg/Kg
1.50 mg/Kg
<0.050 mg/Kg
43.50 mg/Kg
0.000023 mg/Kg
0.009 mg/Kg
1.50 mg/Kg
To: Elam Construction Date: September 19, 2012
1225 South 7th Street No: ECA/ELAM 12-05
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W12-01
Comments: Kept 4C till tested
Parameters
TRPH
vp BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Gun X I&Mpson
Liese K. Thompson
Lab Director
jjOj3O
Date Sampled: August 22, 2012
Date Received: August 22, 2012
Date Tested: August 22 -Sept. 6, 2012
RESULTS
<1.000 mg/L
<0.001 mg/L
<0.001 mg/L
<0.001 mg/L
<0.003 mg/L
<0.001 mg/L
0.032 mg/L
<0.005 mg/L
<0.010 mg/L
<0.005 mg/L
0.00003 mg/L
0.008 mg/L
<0.005 mg/L
SEP 2 0 2012
D
To: Elam Construction Date: September 19, 2012
1225 South 7th Street No: ECA/ELAM 12-06
Grand Junction, CO S 1501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W12-02
Comments: Dept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium.
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Lion X 9fionpon
Liese K. Thompson
Lab Director
ouoJ31
Date Sampled: August 22, 2012
Date Received: August 22, 2012
Date Tested: August 22 -Sept. 6, 20I2
RESULTS
<1.000 mg/L
<0.001 mg/L
<0.001 mg/L
<0.001 mg/L
<0.003 mg/L
<0.001 mg/L
0.027 mgIL
<0.005 mgfL
<0.010 mg/L
<0.005 mg/L
0.00003 mg/L
0.007 mg/L
<0.005 mg/L
SFP 2 0 2012
To: Elam Construction Date: September 26, 2012
1225 South 7th Street No: ECA/ELAM 12-10
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W12-03
Comments: Kept 4C till tested
Parameters
TRPH
Bim'
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Lim X on
Liese K. Tbompson
Lab Director
U00032
Date Sampled: Sept. 6, 2012
Date Received: Sept. 6, 2012
Date Tested: Sept. 6-23, 2012
RESULTS
<1.,000 mg/L
<0.001 mg/L
<0.001 mg/L
<0.001 mg/L
<0.003 mg/L
<0.001 mg/L
0.024 mg/L
<0.005 mg/L
<0.010 mg/L
<0.005 mg/L
0.00003 mg/L
0.006 mg/L
<0.005 mg/L
To: Elam Construction Date: October 20, 2012
1225 South Wh Street No: ECAIELAM 12-8
Grand Junction, CO 81501
SAMPLE 1DENTiFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W12-W
Comments: Kept 4C till tested
Parameters
TRPH
® BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Loss x gkxIP n
Liese K. Thompson
Lab Director
JJGJ33
Date Sampled: Oct. 4, 2012
Date Received: Oct. 4, 2012
Date Tested: Oct. 4-28, 2012
RESULTS
<1.000 mgt
<0.001 mg/L
<0.001 mg/L
<0.001 mg/L
<0.003 mg/L
0.002 mg/L
0.044 mg/L
<0.005 mg/L
<0.010 mg/L
<0.005 mg/L
0.00008 mg/L
0.006 mg/L
<0.005 mg/L
EI
To: Elam Construction Date: November 14, 2012
1225 South 7th Street No: ECA/ELAM 12-9
Grand Junction, CO 81501
SAMPLE IDENTiFiCATiON
Submitted by: Gayle Lyrnan
Sample I.D.: Water, VAG-W12-05
Comments: Kept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Lieu x 71toapm
Liese K. Thompson
Lab Director
ODUJ34
Date Sampled: Oct. 31, 2012
Date Received: Oct. 31, 2012
Date Tested: Oct. 31 -Nov. 7, 2012
RESULTS
<1.000 mg/L
<0.001 mg/L
<0.001 mg/L
<0.001 mg/L
<0.003 mg/L
0.004 mg/L
0.037 mg/L
<0.005 mg/L
<0.010 mg(L
<0.005 mgt
0.00006 mg/L
0.005 mg/L
<0.005 mg/L
MEMORANDUM
To: Mike Kraemer, Planning Department
From: Carla Ostberg, Environmental Health Department
Date: March 6, 2012
Re: ElamNagneur Gravel Pit Annual Review (2012), (Case P007-12;
Parcel ID #2643-161-02-010)
SUMMARY OF RELEVANT PARTS OF APPLICATION: Elam Construction Inc. has submitted
an application for a minor amendment to a development permit and annual review for the
operation at the Vagneur pit.
DISCUSSION: The Pitkin County Environmental Health Department has reviewed the details
of the 2011 Annual Report for the Vagneur Gravel Pit under the authority of the Pitkin County
Land Use Code and the Pitkin County OWTS Regulation.
Resolution No. 052-2009, "Approving the Elam Construction, Inc. Special Review to Expand the
Vagneur Pit," outlines conditions of approval.
A site visit was conducted on March 6, 2012 with Mike Kraemer of the Pitkin County Community
Development Department and David Heilberger and Gayle Lyman of Elam Construction, Inc.
Carla Ostberg with Pitkin County Community Development Department discussed some of the
issues relating to Environmental Health with those who viewed the site by phone.
--- WATER SUPPLY:
Bottled water for drinking is brought in for employees. Water is hauled in from Mid -Valley Metro
for plumbing within the office trailer.
There is a well (Colorado Division of Water Resources Well Permit Number 41824 -F -R) on the
lower part of the property, but is used for dust suppression; no potable uses. The well is
permitted for pumping that shall not exceed 230 GPM and use is limited to industrial and
irrigation purposes.
--- SEWAGE TREATMENT AND COLLECTION:
Individual Sewage Disposal System (ISDS) Permit 89018 documents a system was approved
for use of the office by 6 employees. This system consists of one 1000 gallon tank and two
deep gravel trenches totaling approximately 100 square feet of absorption area.
ISDS Permit 98063 documents the system was approved for use by 20 RV units during summer
months. This system utilizes a 2000 gallon tank installed in 1998 and two existing 1250 gallon
tanks with effluent distributed via a distribution box to 8 deep gravel trenches for a total of 1820
Printed on Recycled Paper
square feet of absorption area. The area over the absorption field was seeded in the fall of
2008, and large boulders were placed around it to prohibit vehicles from driving over the area.
A pump report dated April 7, 2008 was provided as evidence of ongoing maintenance of the
existing systems.
Preliminary inspections of both systems have been conducted by Roger Maynard, Pitkin County
Licensed Systems Inspector. However, the inspection reports have not yet been submitted to
Pitkin County Environmental Health. Through the course of the inspections, the inspector has
verified the systems are functioning properly by checking the site conditions, the tank condition
and components, absorption area condition via ground surface, distribution box, and inspection
ports. When the inspections are finalized and the reports are submitted, environmental health
staff will review the reports and make comments and recommendations based on the inspection
findings. These reports should be submitted no later than August 31, 2012.
--- AIR QUALITY:
No complaints were received by this Department in the last year.
Emissions Permits issued by the Colorado Department of Public Health and Environment
include:
X610 Crusher: 97PO0820
V-755 Asphalt Plan: 09PIl 168
Vagneur Pit: 13PI388-5
--- NOISE:
Elam has developed a noise mitigation plan to address expansion of the pit and impacts on
nearby neighbors whose lot lines are within 1000 feet of the pit boundaries. The plan proposes
the use of berms surrounding the pit operations, locating the crusher within the excavated area
of the pit, and modification of driving routes in the pit to minimize the use of back up beepers.
Elam has also committed to replacing traditional back up alarms on their vehicles permanently
assigned to the pit with white noise style back up alarms.
--- CONFORMANCE WITH RESPECT TO OTHER ISSUES:
The Colorado Department of Labor and Employment, Division of Oil and Public Safety performs
inspections on the fuel storage areas. Elam does not receive documentation of the inspection.
During the site visit, Mike Kramer observed the containment barriers at the fuel storage areas.
Extensive work was done in the summer of 2008 in the fuel storage areas as a result of some
deficiencies found during a State inspection.
--- WATER RESOURCES:
The area of the pit used for snow dumping in the winter is on a reclaimed area on the north end
of the pit. The Applicant states that only two loads of snow were received for the 2011/2012
winter thus far.
Panted on Pe, yded Paper
Elam has developed a protocol for sampling both soil and water as part of Elam's Water
Resource Protection Plan.
Soil Sampling:
One composite sample is taken for each 20,000 cubic yards of soil. The soil is tested for the
following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Water Sampling:
Water samples are taken from surface water within the floor of the gravel pit. The water is
tested for the following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Records of these samples have been reviewed constituents were within the allowable
applicable standards with the exception of cadmium in one of the water samples and arsenic
and lead (all RCRA metals) in another water sample. These spikes were explained to Elam
staff by Enviro-Chem analytical staff as isolated events, possibly influenced by increased
turbidity in the sample. A letter of summary will be provided to environmental health department
staff no later than August 1, 2012. Additionally, all sampling protocols will be reviewed for
quality assurance and a plan will be created to identify any trending. This protocol may include
re -sampling in the case of an exceedance. The protocol and sampling are in place to identify
any potential risks to human health and the environment.
Recommendation: This Department has no objection to continued operation, including
minor amendments.
Printed on Pecydcd Paper
ELAM CONSTRUCTION, INC.
VAGNEUR GRAVEL PIT
NOISE MITIGATION PLAN
On August 12, 2009, The Pitkin County Board of County Commissioners (BOCC) approved the Elam
Construction, Inc. Special Review to expand the Vagneur Gravel Pit. This is documented by Resolution
No. 052 — 2009. During Elam's annual review in front of the BOCC on April 27, 2011, the BOCC again
granted approval of Elam's operation with Resolution No. 039-2011. This Resolution included a
requirement that Elam develop a noise mitigation plan. Specifically, Condition No 6 states "The
Applicant shall prepare a noise mitigation plan to address noise from backup beepers on Elam vehicles
and noise emanating from the crusher. This plan shall be submitted with the 2022 annual review
submission.
INTRODUCTION
The subject property, known as the Vagneur Gravel Pit, contains 104.72 acres and is split into two
parcels. The larger parcel contains 98.33 acres and is currently permitted for and used for the extraction
and processing of gravel product. Uses of this parcel also include an asphalt plant, concrete batch plant,
and a crusher to process the aggregate. The smaller parcel contains 6.39 acres and is permitted for the
use of truck/equipment storage and a seasonal campground. There is also a 1,000 gallon water storage
tank and an overhead power line located within the smaller parcel. Both parcels, under common
ownership and a single Parcel Identification Number, are within the boundaries of a sand and gravel
mining permit issued by the State of Colorado Division of Reclamation Mining and Safety and Pitkin
County. All current uses at this property have been approved by the appropriate State and the County
regulatory agencies.
Inherent with Elam's operation are noises associated with heavy equipment and processing of material.
This plan will discuss ways to address noise associated with these activities.
VEHICLE NOISE
There are two primary sources of noise associated with heavy equipment in operation at Elam's Vagneur
Pit. They are engine noise and a backup alarm. Engine noise is partially controlled through a muffler.
Both the Occupational Safety and Health Administration (OSHA) and the Mine Safety Health
Administration (MSHA) require construction vehicles be equipped with a backup alarm that warns
workers that are potentially in a blind spot of the operator that the vehicle is backing up. These backup
alarms must remain fully functional during operation of the equipment. The most common type of
backup alarm produces a high pitch beeping noise. By replacing the traditional beeping back up alarm
with a broad band or white noise back up alarm, the noise impact will be significantly less. Encouraging a
traffic pattern that minimizes, or in some cases eliminates the back up movement of vehicles that
incorporate back up alarms is another way to reduce noise.
6UUJ.L5
CRUSHER NOISE
The primary source of noise from crushers originates from the crushing process of turning large rocks
into smaller rocks. This is accomplished by using steel jaws break apart the larger rocks. Mitigation for
crusher noise is limited. Following are some methods to reduce the impact of noise to surrounding
residences:
• Use of berms around the perimeter of the operations
• Location of crusher within the pit excavation. By operating within an excavated hole, the noise
utilizes natural barriers as a means of noise reduction
CONCLUSION
Elam has committed to replace traditional beeping backup alarms on their vehicles permanently
assigned to the pit operations with the white noise style back up alarms. This replacement is currently
implemented on permanently assigned equipment, and will continue into the future. Elam has
encouraged truck drivers, including non -Elam trucks, arriving at the pit to receive a load of material or
deposit a load if import material to drive through and not execute a back up maneuver. Although this
practice can work in some cases, there will be circumstances that prevent a drive thru practice and a
back up maneuver is the only means to access a location within the pit.
The use of berms surrounding the pit operations and locating the crusher within the excavated area of
the pit is currently implemented by Elam. By operating within an excavated hole, the noise utilizes
natural barriers as a means of noise reduction.
Figure 1- Aerial Photo Detailing the Expansion Area, Property Boundary and Permit Boundary are
identical.. This photo was taken before construction of Braun residence -
Cl
duo -J-09
11
-6
A
ENVIRO-CHEM
ANALYTCAL. INC
ANALYTICAL TESTING LABORATORY
685 W Gunnison, suite tt08. Grand ;unction, CO 81501-7249, (970) 242-8154, FAX (970) 245-9270
To: Elam Construction
1225 South 7th Street
Grand Junction, CO 81501
Date: April 26, 2011
No: ECA/ELAM 11-02
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Soil, VAG-S 11-01
Comments: Kept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Siler
Results submitted
for Enviro-Chem Analytical, Inc.
Liese x Thompson
Liese K. Thompson
Lab Director
Date Sampled: April 21, 2011
Date Received: April 22, 2011
Date Tested: April 22-26, 2011
RESULTS
0.012 mg/Kg
<0.001 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
0.600 mg/Kg
1.454 mg/K'
1-00 mg/Kg
1.30 mg/Kg
16.0 mg/Kg
0.0002 mg/Kg
0-051 mg/Kg
0.035 mg/Kg
ENVIRO-CHEM
ANALYTICAL INC
ANALYTICAL TESTING LABORATORY
685 vV Gunnison. Suite x108, Grand Junction, CO 81501-7249 i4 -,0i 242-6154 FAX 19701245-9270
To: Elam Construction Date: June 12, 2011
1225 South 7th Street No: ECA/ELAM 11-05
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Soil, VAG-S11-02
Comments: Kept 4C till tested
Parameters
TRPH
® BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RC RA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted
for Enviro-Chem Analytical, Inc.
Liese X 2liompson
Liese K. Thompson
Lab Director
'UuGj.L8
Date Sampled: May 26, 2011
Date Received: May 26, 2011
Date Tested: May 31 -June 7, 2011
RESULTS
0.016 mg/Kg
<0.001 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
0.454 mg/Kg
2.267 mg/Kg
2.00 mg/Kg
8.00 mg/Kg
49.5 mg/Kg
0.0052 mg/Kg
0.051 mg/Kg
0.800 mg/Kg
ENVIRO-CHEM
ANALYTICAL INC
SEP 0 7
ANALYTICAL TESTING LABORATORY
685 W Gunnison. Swte m8. Grand Just;hon. Co 811,01-7249 18701242-6154 FAX 07M 245-027n
To: Elam Construction Date: Aug. 27, 2011
1225 South 7th Street No: ECA/ELAM 11-8
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Soil, VAG-S11-03
Comments: Kept 4C till tested
Parameter
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA Metals:
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted by
Enviro-Chem Analytical, Inc.
.0,,40" lig. `11>�icjs "
Liese K. Thompson
Lab Director
uU0J.L'-)
Date Sampled: July 18, 2011
Date Received: July 18, 2011
Date Tested: July 18-25, 2011
RESULTS
0.012 mg/Kg
<0.001 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
0.050 mg/Kg
0.750 mg/Kg
2.10 mg/Kg
5.20 mg/Kg
14.50 mg/Kg
0.00238 mg/Kg
0.180 mg/Kg
0.500 mg/Kg
•
c:
ENVIR4-CHEM
ANALYTICAL INC
ANALYTICAL TESTING LABORATORY
685 W Gunnison, suite 4108 Grand Junction, CC 81501-7,44 +9701 21422-6154 FAX 10701 ?35-4270
To: Elam Construction Date: Nov. 2, 2011
1225 South 7th Street No: ECA/ELAM l I-10
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample 1.D.: Soil, VAG-S 11-04
Comments: Kept 4C till tested
Parameter
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA Metals:
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted by
Enviro-Chem Analytical. Inc.
2cede k. 41"ispdc"
Liese K. Thompson
I.ab Director
bucJ2J
Date Sampled: Sept. 30, 2011
Date Received: Oct. 3, 2011
Date Tested: Oct. 3-26, 2011
RESULTS
0.018 mg/Kg
<0.001 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
<0.020 mg/Kg
12.50 mg/Kg
2.00 mg/Kg
10.00 mg/Kg
18.00 mg/Kg
0.00151 mg/Kg
0.205 mg/Kg
0.500 mg/Kg
Jan 30 12 04:02p Enviro Chem Analytical
t
ENVIRO-CHEM
ANALYTICAL, WC.
9702459270 p.2
ANALYTICAL TESTING LABORATORY
685W G.,nrKon, S.rie 4108. Oland Juntlron, = 8150-7249.1970) 242.6154, FAX ;9701 245-92?D
To: Elam Construction Date: January 27, 2012
1225 South 7th Sweet No: ECA/ELAM 11-15
Grand Junction., CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman Date Sampled: Dec. 6, 2011
Sample I.D.: Soil, VAG-S 11-05 Date Received: Dec. 15, 2011
Comments: Kept 4C till tested Date Tested: Dec. 22, 2011- Jan. 15, 2012
RESULTS
Parameter
TPH 0.010 mg/Kg
BTEX:
Benzene
Toluene
Ethylben2ene
Xylenes, total
RCRA. Metals:
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted by
Enviro-Chem Analytical, Inc.
Liese K. T urupson
Lab Director
juG-1121
<0.001 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
0.032 mg/Kg
191 mg/Kg
1.15 mg/Ka
4.80 mg(Kg
13.50 mg/Kg
0.0037 mg[Kg
0.167 mg/Kg
0.460 mg/Kg
0
IL
U U'u, j "_1 2
ENVIRO-CHEM
ANALYTICAL, INC
ANALYTICAL TESTING LABORATORY
685 W Gunnison. Suite #108. Grand Junction, CO 81501 .7249. ;970) 242.6154, FAX (970) 245-9270
To: Elam Construction Date: April 26, 2011
1225 South 7th Street No: ECA/ELAM 11-03
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W11-01
Comments: Kept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
- Cadmium
Chromium.
Lead
Mercury
Selenium
Silvgr
Results submitted
for Enviro-Chem Analytical, lnc.
Liese x Thompson
L,iese K. Thompson
Lab Director
Date Sampled: April 21, 2011
Date Received: April 22, 2011
Date Tested: April 22-26, 2011
RESULTS
<0.002 mg/L
<0.0005 mg/L
<0.001 mg/L
<0.001 mg/L
0.0026 mg/L
<0.001 mg/L
0.085 mg/L
0.01 mg/L
<0.010 mg/L.
<0.005 mg/L
0.00007 mg/L
0.022 mg/L
-0.005 mg/L
<")
-0 0-1
N� �
0
9-1-1
ENVIRO-CHEM
ANAL(TICAL INC
ANALYTICAL TESTING LABORATORY
6a5 W Guri Suite #108. Grand Junction CO 81501-7244 19701 242.6154 FAX 1470, �145-9270
To: Elam Construction Date: June 12, 2011
1225 South 7th Street No: ECA/ELAM 11-04
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W 11-02
Comments: Kept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Date Sampled: May 26, 2011
Date Received: May 27, 2011
Date Tested: May 31, 2011
RESULTS
<0.002 mg/L
<0.0005 mg/L,
<0.001 mg/L
<0.001 mg/L
0.0021 mg/L.
Arsenic
<0.001 mg/L.
Barium
0-076 mga--
Cadmium
— <() I -
Chromium
<0.010 mg/L
Lead
0.005 mg/L
Mercury
0.00004 mg/L
Selenium
0.024 mg/l.
Silver
- 0.005 mg/1.
Results submitted
for Enviro-Chem Analytical, Inc.
Luse X 41ompson
Liese K. Thompson
Lab Director
uuu23
A
10 ENVIRO-CHEM
ANALYTICAL INC
UvjU C—Li
07 21111
ANALYTICAL TESTING LABORATORY
685 W r1unr4son Suite 9108 Grand Junction Co 81501.7-14? 19701 242.6154 FAX (970j _45 9270
To: Elam Construction Date: Aug. 27, 2011
1225 South 7th Street No: ECA/ELAM 11-6
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W] 1-03
Comments: Kept 4C till tested
Parameter
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA Metals:
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Siler
Results submitted by
Enviro-Chem Analytical, Inc.
.Pie" <. CIAOMP40i
Liese K. Thompson
Lab Director
Date Sampled: July 18, 2011
Date Received: July 18, 2011
Date Tested: July 18-25, 2011
RESULTS
<0.002 mg/L
<0.0005 mg/L
<0.001 mg/L
<0.001 mg/L
0.002 mg/L
0.005 mg/L
0.041 mg/L
<0,005 mg/L
<0.010 mg/I,
<0.005 mg/L
0.00005 mg/L
0.013 mg/L.
0.Otl5 mg/l.
r 1
u
El
ENVIRO-CHEM
ANALYTICAL INC
ANALYTICAL TESTING LABORATORY
685 W Gur raison Suite 4108, Grand Junction Co 81501-7,4g 1970) 242.6154 FAX 19701245-11270
To: Elam Construction
1225 South 7th Street
Grand Junction, CO 81501
Date: Sept_ 16. 2011
No: ECA/ELAM 11-9
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W 11-04
Comments: Kept 4C till tested
Parameter
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA Metals:
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted by
Enviro-Chem Analytical. Inc.
Mede JCS. `I"Mr"rc
Liese K. Thompson
Lab Director
LjuCJ25
Date Sampled: August 17, 2011
Date Received: August 18, 2011
Date Tested: August 18-26, 2011
RESULTS
<0.002 mg/L
<0.0005 mg/L
<0.001 mg/L
<0.001 mg/L
<0.001 mg/L
0.004 mg/L
<0.10 mg/L
<0.005 mg/L
<0.010 mg/L
0.010 mg/L
0.00005 mg/L
0.031 mg/l.
—0.005 1 wl ,
ENVIRO-CHEM
4raALYTiCAI. iNC
ANALYTICAL TESTING LABORATORY
685 W Gunnison Swte x108, Grand Junctwn, CO 81501-72-9 1970} �14; -6154 FAX 9'01 -'45-9270
To: Elam Construction Date: Nov. 2, 2011
1225 South 7th Street No: ECA/ELAM 11-11
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAU-W11-05
Comments: Kept 4C till tested
Parameter
TRPH
BTEX:
Bo=ne
Toluene
Ethylbenzene
Xylenes, total
RCRA Metall:
Arsenic
Barium
Cadmium
Chromium
-,�,l,ead
Mercury
Scicniu ,
silver
Results submitted by
Enviro-Chem Analytical, Inc.
Liese K. Thompson
Lab Director
Date Sampled: Sept. 30, 2011
Date Received: Oct. 3, 2011
Date Tested: Oct. 3-26, 2011
RESULTS
<0.002 mg/L
<0.0005 mg/i,
<0.001 mg/L
<0.001 mg/I.
<0.401 mg/L
0-030 mg/L. ("
0.50 mg/l, v`
0.005 mgff
<0.010 zng/L S
0.070 mg/L
0.00001 mg/L
0.008 mg/L
`--0.005 mgA. �S
ANALYTICAL TESTING LABORATORY
685 W. Gunnison, Suite 11108, Grand Junction, CO 81501-7249, (970) 242-6154, FAX (970) 245-9270
To: Elam Construction Date: April 26, 2011
1225 South 7th Street No: ECA/ELAM 11-02
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman Date Sampled: April 21, 2011
Sample I.D.: Soil, VAG-S 11-01 Date Received: April 22, 2011
Comments: Kept 4C till tested Date Tested: April 22-26, 2011
RESULTS
Parameters
TRPH
0.012 mg/Kg
-1(9
BTEX:
1.454 mg/Kg
`S - -
Benzene
<0.001 mg/Kg
0. 1-1
Toluene
<0.005 mg/Kg
1�
Ethylbenzene
<0.005 mg/Kg
1 o -1 .3
Xylenes, total
<0.005 mg/Kg
1�0 0
I' •71
Arsenic
0.600 mg/Kg
-1(9
Barium
1.454 mg/Kg
Cadmium
1.00 mg/Kg
"
3
Chromium
1.30 mg/Kg
Lead
16.0 mg/Kg
4 0 O
Mercury
0.0002 mg/Kg
-�
Selenium
0.051 mg/Kg
Silver
0.035 mg/Kg
Results submitted
for Enviro-Chem Analytical, Inc.
Liese X ghmpson
Liese K. Thompson
Lab Director
t
ENVIRO-CHEM
ANALYTICAL. INC.
ANALYTICAL TESTING LABORATORY
685 W. Gunnison, Suite #108, Grand Junction, CO 81501-7249. (970) 242-6154, FAX (970) 245-9270
To: Elam Construction Date: June 12, 2011
1225 South 7th Street No: ECA/ELAM 11-05
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman Date Sampled: May 26, 2011
Sample I.D.: Soil, VAG-S11-02 Date Received: May 26, 2011
Comments: Kept 4C till tested Date Tested: May 31 -June 7, 2011
RESULTS
Parameters
TRPH 0.016 mg/Kg
43 1WA
Benzene
<0.001 mg/Kg
Toluene
<0.005 mg/Kg
Ethylbenzene
<0.005 mg/Kg
Xylenes, total
<0.005 mg/Kg
RCRA
Arsenic
0.454 mg/Kg
Barium
2.267 mg/Kg
Cadmium
2.00 mg/Kg
Chromium
8.00 mg/Kg
Lead
49.5 mg/Kg
Mercury
0.0052 mg/Kg
Selenium
0.051 mg/Kg
Silver
0.800 mg/Kg
Results submitted,
for Enviro-Chem Analytical, Inc.
Liese X gUmpson
Liese K. Thompson
Lab Director
i
-A
ENVIRO-CHEM
ANALYTICAL, INC.
SEP 0 7
ANALYTICAL TESTING LABORATORY
685 W. Gunnison, Suite #108, Grand Junction. CO 81501-7249. (970) 242-6154, FAX (970) 245-9270
To: Elam Construction Date: Aug. 27, 2011
1225 South 7th Street No: ECA/ELAM 11-8
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: AG -S 11-03
Comments: Kept 4C till tested
Date Sampled "f8, 2011
Date Received: July 18, 2011
Date Tested: July 18-25, 2011
RESULTS
Parameter
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA Metals:
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted by
Enviro-Chem Analytical, Inc.
241?4e k. 'FAGOT 400t
Liese K. Thompson
Lab Director
0.012 mg/Kg
<0.001 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
<0.005 mg/Kg
0.050 mg/Kg
0.750 mg/Kg
2.10 mg/Kg
5.20 mg/Kg
14.50 mg/Kg
0.00238 mg/Kg
0.180 mg/Kg
0.500 mg/Kg
t
ENVIR4-CHEM
ANALYTICAL INC. ,._
ANALYTICAL TESTING LABORATORY
685 W. Gunnison, Suite #108, Grand Junction, CO 81501-7249, (970) 242-6154, FAX (970) 245-9270
To: Elam Construction Date: April 26, 2011
1225 South 7th Street No: ECA/ELAM 11-03
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W 11-01
Comments: Kept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silvpr
Results submitted
for Enviro-Chem Analytical, Inc.
Liese X Thompson
Liese K. Thompson
Lab Director
Date Sampled: April 21, 2011
Date Received: April 22, 2011
Date Tested: April 22-26, 2011
RESULTS
<0.002 mg/L
<0.0005 mg/L
<0.001 mg/L
<0.001 mg/L
0.0026 mg/L
<0.001 mg/L
0.085 mg/L
0.01 mg/L
<0.010 mg/L
<0.005 mg/L
0.00007 mg/L
0.022 mg/L
<0.005 mg/L
t
ENVIRO-CHEM
ANALYTICAL. INC
ANALYTICAL TESTING LABORATORY
685 W. Gunnison, Suite #108, Grand Junction, CO 81501-7249. (970) 242-6154, FAX (970) 245.9270
To: Elam Construction Date: June 12, 2011
1225 South 7th Street No: ECA/ELAM 11-04
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W11-02
Comments: Kept 4C till tested
Parameters
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
Date Sampled: May 26, 2011
Date Received: May 27, 2011
Date Tested: May 31, 2011
RESULTS
<0.002 mg/L
<0.0005 mg/L
<0.001 mg/L
<0.001 mg/L
0.0021 mg/L
Arsenic
<0.001 mg/L
Barium
0.076 --
Cadmium
<0,005wgfL
Chromium
<0.010 mg/L
Lead
<0.005 mg/L
Mercury
0.00004 mg/L
Selenium
0.024 mg/L
Silver
<0.005 mg/L
Results submitted
for Enviro-Chem Analytical, Inc.
Giese X qfiompson
Liese K. Thompson
Lab Director
2013
ANALYTICAL TESTING LABORATORY
685 W. Gunnison, Suite #108, Grand Junction, CO 81501-7249.(970) 242-6154, FAX (970) 245-9270
To: Elam Construction Date: Aug. 27, 2011
1225 South 7th Street No: ECA/ELAM 11-6
Grand Junction, CO 81501
SAMPLE IDENTIFICATION
Submitted by: Gayle Lyman
Sample I.D.: Water, VAG-W11-03
Comments: Kept 4C till tested
Parameter
TRPH
BTEX:
Benzene
Toluene
Ethylbenzene
Xylenes, total
RCRA Metals:
Arsenic
Barium
Cadmium
Chromium
Lead
Mercury
Selenium
Silver
Results submitted by
Enviro-Chem Analytical, Inc.
.. ie4e k. <1400waoi
Liese K. Thompson
Lab Director
1
Date Sampled: July 18, 2011
Date Received: July 18, 2011
Date Tested: July 18-25, 2011
RESULTS
<0.002 mg/L
<0.0005 mg/L
<0.001 mg/L
<0.001 mg/L
0.002 mg/L
0.005 mg/L
0.041 mg/L
<0.005 mg/L
<0.010 mg/L
<0.005 mg/L
0.00005 mg/L
0.013 mg/L
<0.005 mg/L
MEMORANDUM
To: Mike Kraemer, Planning Department
From: Carla Ostberg, Environmental Health Department
Date: April 12, 2011
Re: ElamNagneur Gravel Pit Annual Review (2011), (Case P005-11;
Parcel ID #2643-161-02-010)
SUMMARY OF RELEVANT PARTS OF APPLICATION: Review the operation at the Elam site
and the 2010 Annual Report for the Vagneur Gravel Pit.
DISCUSSION: The Pitkin County Environmental Health Department has reviewed the details
of the 2010 Annual Report for the Vagneur Gravel Pit under the authority of the Pitkin County
Land Use Code and the Pitkin County OWTS Regulation.
Resolution No. 052-2009, "Approving the Elam Construction, Inc. Special Review to Expand the
Vagneur Pit," outlines conditions of approval.
A site visit was conducted on April 8, 2011 with Carla Ostberg and Mike Kraemer of the Pitkin
County Community Development Department, GR Fielding of Pitkin County Public Works
Department, and David Heilberger of Elam Construction, Inc.
--- WATER SUPPLY:
Bottled water for drinking is brought in for employees. Water is hauled in from Mid -Valley Metro
for plumbing within the office trailer.
There is a well (Colorado Division of Water Resources Well Permit Number 41824 -F -R) on the
lower part of the property, but is used for dust suppression; no potable uses. The well is
permitted for pumping that shall not exceed 230 GPM and use is limited to industrial and
irrigation purposes.
--- SEWAGE TREATMENT AND COLLECTION:
Individual Sewage Disposal System (ISDS) Permit 89018 documents a system was approved
for use of the office by 6 employees. This system consists of one 1000 gallon tank and two
deep gravel trenches totaling approximately 100 square feet of absorption area.
ISDS Permit 98063 documents the system was approved for use by 20 RV units during summer
months. This system utilizes a 2000 gallon tank installed in 1998 and two existing 1250 gallon
tanks with effluent distributed via a distribution box to 8 deep gravel trenches for a total of 1820
square feet of absorption area. The area over the absorption field was seeded in the fall of
2008, and large boulders were placed around it to prohibit vehicles from driving over the area.
Printed on Recycled Paper
A pump report dated April 7, 2008 was provided as evidence of ongoing maintenance of the
existing systems.
Suggestions for continued maintenance of existing onsite wastewater treatment systems
(OWTSs):
• Systems should be inspected by a Pitkin County Licensed Systems Inspector. A list of
inspectors can be found on Pitkin County's website www.aspenpitkin.com/ehnr. Link to
pdf:
http://www.aspenpitkin.com/Portals/0/docs/county/Com%2ODev/EHNR/OWTS inspector
list report.pdf
Through the course of the inspection, the inspector will verify if the system is functioning
properly by checking the site conditions, the tank condition and components, absorption
area condition via ground surface, distribution box (if applicable), and inspection ports if
they exist. The inspector will also determine if the tank needs to be pumped. This
determination can be made by measurement of scum and sludge in the primary tank. For
example, if the measurement indicates that the sludge and scum layer make up 25-30%
of the tank capacity, the tank should be pumped.
• An effluent filter should be installed on the outlet tee of the primary tank (1St tank in
series) and checked and cleaned, if necessary, as part of the inspection.
• The distribution box on the RV Park system should be located, if possible, and brought to
grade with risers to allow for inspections and access.
--- AIR QUALITY:
No complaints were received by this Department in the last year.
Emissions Permits issued by the Colorado Department of Public Health and Environment
include:
X610 Crusher: 97POO820
V-755 Asphalt Plan: 09PI1168
Vagneur Pit: 13PI388-5
--- NOISE:
This Department received one complaint in the last year. The complaint occurred on or around
November 4, 2010, after the plant had shut down for the year, but during a time of high truck
traffic from import material and aggregate sales. The Elam's Area Manager took a noise
reading at the property and found them not to exceed 55dB. Carrington Brown, Pitkin County
Enforcement Officer, also addressed a complaint on November 18, 2010, but observed no
activity at the plant.
Elam has developed a protocol for conducting noise monitoring. The protocol includes noise
measurements at various locations along the property boundary during mining operations. The
results are documented in a field logbook and kept on site.
Elam is also discussing an extension of a berm adjacent to the Braun property in order to be
proactive in addressing noise impacts to that property.
Printed on Recycled Paper
--- CONFORMANCE WITH RESPECT TO OTHER ISSUES:
The Colorado Department of Labor and Employment, Division of Oil and Public Safety performs
inspections on the fuel storage areas. Elam does not receive documentation of the inspection.
During our site visit, the containment barriers at the fuel storage areas appeared to be in good
condition and no stained soil was observed at that time. Extensive work was done in the
summer of 2008 in the fuel storage areas as a result of some deficiencies found during a State
inspection.
--- WATER RESOURCES:
The area of the pit used for snow dumping in the winter was clean and well maintained at the
time of the site visit. There was still standing water in the area where the majority of snow was
dumped.
Elam has developed a protocol for sampling both soil and water as part of Elam's Water
Resource Protection Plan.
Soil Sampling:
One composite sample is taken for each 20,000 cubic yards of soil. The soil is tested for the
following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Water Sampling:
Water samples are taken from surface water within the floor of the gravel pit. The water is
tested for the following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Records of these samples have been reviewed and all constituents were within the allowable
applicable standards with the exception of arsenic and barium (RCRA metals) in several of the
surface water samples. New snow dump sampling protocols have recently been adopted;
therefore, continue to work with the Community Development Department utilizing these newly
adopted standards. It should be noted that arsenic and barium are not constituents required to
be tested under the new protocol.
Recommendation: This Department has no objection to continued operation.
Printed on RecycW Paper
RECEPTION#: 563795, 10/21/2009 at 02:31:25 PM, 1 OF 47, R $0.00
Janice K. Vos Caudill, Pitkin County, CO
RECEPTION#: 563795,10121/2009 at
02:31:25 PM,
1 OF 47, R $0.00 Doc Code RESOLUTION
Janice K. Vos Caudill, Pitkin County, CO
RESOLUTION OF °IT14? BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY,
COLORADO, APPROVING THE ELAM CONSTRUCTION, INC. SPECIAL REVIEW TO
EXPAND THE VAG'.NEUR GRAVEL PIT
Resolution No.Xr -2009
RECITALS
1. Elam Construction Inc. (Applicant) submitted an application to the Pitkin County Board of County
Commissioners (BOCC) to expand the Vagneur gravel pit from the west to the east and maintain the
terns of operation for 20 years (plus one year for reclamation) for the sand and gravel extraction
operation and the asphalt hot mix/concrete operation.
2. The property is located in Woody Creek across from the Woody Creek Mobile Home Park and is more
specifically described in Exhibit A.
3. The Elam operation was granted Special Review approval by BOCC pursuant to Resolution Nos.88-
47 and 99-69. BOCC Resolution No. 129-2006 approved an identical expansion request described
above however, District Court Order Case Number P06 CV 230 vacated Resolution No. 129-2006. The
Order remanded the matter back to the BOCC for further proceedings consistent with the order.
4. The BOCC reviewed the application at a duly noticed public hearing on June 24, 2009 and a
continued public hearing on August 12, 2009, at which time evidence and testimony were presented
with respect to this application.
5. The BOCC finds that the application meets the provisions of Section 3-250 of the Pitkin County Land
Use Code.
6. The BOCC father finds that the 1000' setback requirement for a gravel pit from a residence can be
reduced to 480' and will result in substantially the same or less impact due to unique site features, the
nature of the equipment that will be utilized, and mitigation efforts employed.
NOW THEREFORE BE IT RESOLVED by the Pitkin County Board of County Commissioners
that it does hereby approve the Elam Sand and Gravel Pit and Asphalt/Hot Mix/Concrete plant request for
expansion and a 20 year extension of the Special Review approval of their operations, subject to the
following conditions:
1. Material Representations: Representations made by the Applicant thereafter referred to as the
("Operator") within its application and as amplified or expanded by the Operator's representations
during the processing thereof, will be adhered to by the Operator unless otherwise expressly
provided in this resolution.
2. Areas Covered by the Permit: The gravel permit agreement shall apply to those areas in the legal
description attached hereto as Exhibit A.
3. Cessation of Activities: The operator agrees to remove all stockpiled gravel and all facilities
necessary for such removal within 360 (three -hundred sixty) days of the termination of this
permit and to remove, within one -hundred eighty (180) days after termination, the hot -mix
asphalt plant and concrete batch plant and all other building improvements, equipment and
materials created, constructed or installed pursuant to this permit, or pursuant to or prior to
subsequent permits or approvals.
4. Hours of Operation: The permitted operations, and facilities, specifically including the asphalt
hot -mix plant, concrete batch plant, mining, equipment mobilization, and rock crushing may
RECEPTION#: 563795, 10/21/2009 at 02:31:25 PM, 2 Or 47,
Janice K. Vos Caudill, Pitkin County, CO
BOCC Radurton .va� 1009
Page Z orb
commence no earlier than TDO A.M. and shall cease no later than 7:00 P.M. However, deliveries
to the site may occur after 6:00 A.M. Operations Shall be limited to -Monday through Saturday.
5. Required Performance Standards: The Operator shall conduct its operations in accordance with
the following standards:
A. Drainage: Surface run-off shall be contained entirely within the site, including run-off
from storm or moisture situations, as more fully described. Prior to the initiation of
Phase 11, the Applicant shall provide a specific drainage plan for the eastern edge of the
operation as it relates to the drainage into Woody Creek. The plan shall be submitted for
review and approval to the County Land Use Engineer and Environmental health and
Natural Resources.
B. Air Pollution: Smoke and dust originating from the operation of the asphalt plant,
concrete batch plant and gravel operation shall be controlled as follows:
1) County and State Air Pollution Regulations, whichever are most stringent now or
hereafter adopted shall be strictly observed. Violations shall be subject to fines
and/or orders to cease and desist operations.
2) Sprinkler systems for pollution control shall be kept in good repair and function
properly at all times
3) Operations shall be conducted in such a mariner as to prevent damage to forest
and agricultural resources by air pollutants resulting from such operation.
4) The Operator shall utilize its best efforts to follow up and eliminate escape of
noxious and offensive odors and fumes from the site.
C. Water Pollution: Discharge of muddy water, resulting from dust and smoke suppression
measures or otherwise shall not be permitted, but the same shall be drained to settling and
percolation ponds. The water table or water quality thereof shall not be degraded or
altered without study and separate approval of the Board of County Commissioners of
Pitkin County, Colorado. Operations shall be conducted sufficiently above the water table
to prevent any contamination of ground water.
D. Noise: Noise from the operation as measured at any point on the property line of the
property shall be governed by applicable Pitkin County noise abatement ordinances.
Additionally, the Sound Level Monitoring Protocol (Exhibit C) shall be adhered to, and
discriminating back-up signals shall be utilized by the Operator's equipment and trucks.
F. Scenic Values: Operator shall harmonize operations with scenic values through such
measures as the design and location of operating facilities, including roads and other
means of access, vegetative screening of operations, and construction of structures and
improvements which blend with the landscape. Berms shall be
constructed to scroen operations. Adequacy and diligence of such measures shall be the
subject of the Operator's report and annual hearing procedures.
F. General Environmental Requirements: At all times the Operator shall take such measures
as will prevent or control on-site and off-site damage to the environment including, but
not limited to:
l) Control of erosion and prevention of landslides;
2) Prevention of water nm -off,
3) As part of the annual report the Operator shall provide a detailed report
inventorying toxic materials and disposal thereof as required by federal
regulations.
4) Elimination of hazards to public health and safety;
5) Restoration of fisheries and wildlife habitat in surface water bodies;
RECEPTION#: 563795, 10/21/2009 at 02:31:25 PM, 3 OF 47,
Janice K. Vos Caudill, Pitkin County, CO
aocceuor.,. No.651 2009
Page 3 of
6) Stabilization of access roads by proper grading, drainage control, surface
treatment and vegetation
G. Water Supply: Adequate water supply will be provided to meet Pitkin County Land Use
Regulations.
6. Revegetation and Reclamation:
A. Reclamation for Phase 1 shall be in accordance with the approved reclamation plan as
described in the text of the application submitted to the Planning Office on December 15,
1987 and consistent with Exhibit 3 of BOCC Resolution No. 88-47. Reclamation for
Phase 2 shall be in accordance with the approved reclamation plan as submitted in 2006
and approved in 2009.
B. Revegetation must be accomplished as soon as practicable after work has been completed
in an area where the Operator has concluded its work. The intent of this provision is that
exposed slopes shall be rehabilitated and revegetated at the earliest possible date.
C. Pitkin County recognizes that the State of Colorado's Mined Land Reclamation Board
will require a bond for revegetation. So as not to duplicate said bonding Pitkin County
will not require a bond at this time. However, Pitkin County shall review bonding and
reclamation provisions and progress thereunder at each of its annual hearings, and
reserves the power to impose additional reclamation provisions or require additional
security to assure proper reclamation and revegetation. Should reclamation plans or the
bonding provisions prove to be unsatisfactory, the County may require a bond of an
amount per acre of land to be disturbed which is reasonable to cover the costs of
reclamation and revegetation. This permit shall be null and void if the bond is not
furnished and the permittee shall cease all work hereunder.
7, Control of River Road Traffic: The Operator shall use its best efforts to minimize the impacts of
truck traffic on the River Road access to the subject property. The operator agrees that truck
traffic entering and leaving the Elam site shall exclusively utilize the new access road rather than
the old River Road access road. The operator shall control access within the permit site to
discourage use of the old River Road access road by trucks entering and leaving the site. These
provisions shall be evaluated at the annual hcaring, and may be modified by the Board
8. Camper Area: Camper spaces shall be provided for a maximum of 20 campers. Campers shall
only be on site from April 1" to December I' of each year. Use shall be restricted to temporary,
short-term, seasonal use by employees of the Operator only using campers, and not for longer-
term housing, mobile homes or other forms of habitation, except for the mobile home utilized to
provide year-round security, which may be occupied by the Security employee and his family.
Camper use is accessory only and shall be terminated in accordance with paragraph 3 of this
resolution
9. Weed Control: Operator shall abide by the weed control program described in Exhibit 5 of
Resolution No, 88-47 which may be amended as provided by paragraphs 6 A, B and C hereof, or
operation of law.
10. Term of Permit: Operator's long-term Sand and Gravel and Asphalt/Hot Mix Concrete Plant
permit, and special use approvals thereof, shall expire twenty (20) years after the approval of this
resolution, unless sooner terminated or extended pursuant to Code.
RECEPTION#: 563795, 10/21/2009 at 02:31:25 PM, 4 OF 47,
Janice K. Vos Caudill, Pitkin County, CO
ROCC Resolution No6sL 2009
Page 4 of 6
11. Non -Discrimination: Operator agrees that no discrimination shall be shown to any
purchaser within the County, but this provision shall not prevent the Operator from giving
quantity discounts or refusing to sell gravel to operators who access or leave the gravel pit via the
River Road access road or refusing to sell gravel to Operators with poor current credit standing.
12. The Water Resource Protection Plan dated September 1, 2006, shall be adhered to (attached as
Exhibit B),
13. Crusher operations shall be limited to the dates of April l through November 25 of each year.
Any required extensions beyond these dates must be approved by the BOCC in consultation with
the Woody Creek Caucus.
14. Any asphalt plants and/or rock crushers must be permitted by the Colorado Department of Public
Health and environment and stay in compliance with conditions ofthe permit
15. Fugitive dust from the pit operations must be contained to maintain compliance with applicable
state standards,
16. Night time operations beyond the standard allowed operating hours shall be permitted under the
following parameters:
A There may be a maximum of 10 nighttime operations in any one calendar year at the
Elam Asphalt/Hot Mix Plant in which operational hours may be extended to include 7:00
p.m. until 7:00 am. as well as normal daytime operating hours. These 10 nights can only
be to accommodate publicly owned projects. The Operator shall notify Pitkin County, the
W/J Homeowners Association, and the Woody Creek Caucus, in ,writing, as to
approximately when and how long the operations will be conducted at least 72 hours
prior to commencement of the nighttime operations.
B. This approval shall be limited to a maximum of 40 truck loads per night.
C. A traffic control plan shall be submitted to the County Engineer which will include
suitable methods for providing warnings, information, and signage (including lighted
warning signs) to persons using County roads and bike trails in the vicinity of the truck
activity area
D. The Operator, in conjunction with the public project owner shall implement a public
information/notification plan utilizing at least the follow mediums of communication_
public service announcements, newspaper notices, and neighborhood newsletters to alert
affected residents and other travelers of potential delays and hazards.
E. There shall be no gravel extraction, crushing, processing, nor stockpiling during the
extended nighttime hours.
F. The Operator must comply with all noise and air quality standards at the plant.
G. Trucks shall not use "Jake" brakes during nighttime operations except in an emergency
situation
18. The Applicant shall control dust to be substantially the same or less than 14.0 µg/cu. meter of
dust at the 480' residence under normal operating conditions. To ensure this, the Applicant shall
water haul roads 4 times per day during dry conditions and water the northern portion of Phase 2
within 1000' of the residence, as needed during mining operations.
19. To mitigate additional noise impact, the Applicant shall maintain a IS' — 25' natural berm along
the eastern facing slope isolating the mining area from the 480' residence to reduce noise. The
RECEPTION#: 563795, 10/21/2009 at 02:31:25 PM, 5 OF 47,
Janice K. Vos Caudill, Pitkin County, CO
BoCC Resolution I.'a. 6 S2 2009
Page S of 6
Applicant shall also limit the use of the Cat 966 loader or similar machine to at or below the 7403
elevation in the northern arca of Pbase 2, where the former topsoil stockpile was to be located, or
wfiatever elevation is necessary to ensure the noise at the 480' residence does not exceed
48dB(A).
20. To mitigate additional noise impact the Applicant shall mine the expansion area from south to north
and always push materials doom to the existing pit area leaving the east facing slope intact until the
end of the life of the expansion area.
21. To mitigate the additional noise and visual impact the Applicant shall mine the expansion area from
west to east leaving the east facing slope intact until the end of the life of the expansion area.
22. To mitigate the visual impact of removal of the hillside, the Applicant shall employ landscaping
in the form of tree plantings and/or landforms to the satisfaction of Staff to better screen the
expansion area from the 480' residence as illustrated in attachment D.
23. Annual Hearings:
A. During January of each year, but no later than January 31, the Operator shalt file a written
report with the Planning Director demonstrating compliance or non-compliance with
conditions of the sand and gravel permit and other provisions of the County Land Use
Code. The required amoral report will include an updated estimate of gravel reserves
remaining at the site. The Planning Office shall review the operator annual written report
to determine compliance with the permit and prepare a report to the Board to be reviewed
at a duly noticed public hearing. The purpose of the hearing shall be to review the annual
written report of the permittee and to provide an opportunity for the citizens of Pitkin
County to comment on the sand and gravel operation.
B. Based upon the annual hearing, the Board shall have the power upon good cause being
shown, to modify the permit to require certain corrective measures to be taken or to direct
the County staff or its agents to enter upon the premises and to take corrective measures
required by the Board; impose new or additional conditions, standards or restrictions to
address environmental concerns required by considerations of public health safety and
welfare or to achieve the objectives and purposes of the original permit or to bring the
permit into compliance with other laws or regulations regulating permits to or uses of the
silo; the cost to be assessed against the Operator and its sureties.
24. The Applicant shall provide a report discussing different housing options for the seasonal
workforce that utilizes the camping area from April 1° through December 1` of each year. The
report shall explore options for more permanent housing that could include sharing housing with
winter season employees of other companies, agencies, etc. The report shall be available for
review and discussion by the BOCC no later than the annual hearing scheduled for January of
2010,
25, Revocation. The County shall have the power to revoke the special use permit, upon showing of
good cause, after a public hearing on the same
NOTICE OF THE PUBLIC HEARING PUBLISHED IN THE
WEEKLY ON THE 24th DAY OF May 2009.
RECEPTION#: 563795, 10/21/2009 at 02:31:25 PM, 6 OF 47,
Janice K. Vos Caudill, Pitkin County, CO
&)CCRaw. N05---7009
Page 6 of 6
APPROVED AND ADOPTED on the 12" day of August, 2009.
PUBLISHED AFTER ADOPTION FOR VESTED REAL PROPERTY RIGHTS IN THE ASPEN
TIMES WEEKLY ON / - g' - 6 f
ATr ST:
BOARD OF COUNTY COMMISSIONERS
OF PITKfN COUNTY, COLORADO
By Y�tL
�9 - Aei�al'
! Jones
Patti Kay -Clapper, Chat
Clerk
Date _
AP OVED AS TO FORM:
APPROVED AS TO CONTENT:
John Ely,
County Atto
PWN 2643-161-02-0I0 and Case PC 17.09
,k' Y C 4
Cindy Houben,
Community Development Director
ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF PITKIN COUNTY,
COLORADO, AMENDING TITLE 8 OF THE PITKIN COUNTY CODE, SPECIFICALLY
THE 2006 LAND USE CODE FOR LAND USE CODE TEXT AMENDMENTS
Ordinance No. -2011
RECITALS
A Land Use Code amendment has been proposed to create a soil monitoring program for snow
dump sites throughout the County.
An amendment will be made to the following chapter and section:
Chapter 4
EXHIBIT A - Section 4-30-50(1): Snow Dumping/Trucking/Storage
2. The BOCC determined that the Code should be amended to monitor soil for contaminants and create
threshold levels for those contaminants. Thresholds will identify when a site has become
contaminated and snow dumping should cease.
3. The Planning and Zoning Commission reviewed the proposed amendments at regularly scheduled
meetings on October 5, 2010, November 9, 2010, February 1, 2011, and March 15, 2011. The
Commission voted 3-1 to recommend approval to the BOCC for a 200ppm TPH threshold for
existing snow dump sites and a 50ppm threshold for any new snow dump site.
4. The BOCC reviewed the proposed amendments on I" Reading at a regularly scheduled public
meeting on December 15, 2010 and at 2nd Reading at duly noticed public hearings on January 26,
2011, February 9, 2011, and April 13, 2011. Evidence and testimony were presented with respect
to these code amendments.
4. The BOCC finds that these Code Amendments are consistent with Pitkin County's goals and
policies and are necessary to properly site a snow dump.
The BOCC further finds that the adoption of these Code Amendments is necessary to promote
public, health, safety, and welfare.
The BOCC further finds that these Code Amendments will be administered as rules of general
applicability.
The BOCC further finds that the amendments to the Code are consistent with County
Comprehensive Plans and in compliance with Section 2-40-10.
NOW, THEREFORE, BE IT ORDAINED by the Pitkin County Board of County
Commissioners that it hereby amends the above -referenced Sections of the 2006 Pitkin County Land Use
Code, as set forth in Exhibit A as underlined.
NOTICE OF PUBLIC HEARING PUBLISHED IN THE ASPEN TIMES on the 26d' day of December,
2010.
INTRODUCED ON FIRST READING AT A PUBLIC MEETING on the 15" day of December, 2010.
APPROVED AND ADOPTED ON SECOND READING AT A PUBLIC HEARING on the 13"' day
of April, 2011.
PUBLISHED AFTER ADOPTION IN THE ASPEN TIMES on the day of 2011.
ATTEST: BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COLORADO
Jeanette Jones Rachel E. Richards,
Deputy Clerk Chairwoman
APPROVED AS TO FORM:
John Ely,
County Attorney
Ordinance No. -2011
Page 2 of 5
Date:
APPROVED AS TO CONTENT:
Cindy Houben,
Community Development Director
EXHIBIT A
The underlined sections shall be added.
Chapter 4
4-30-50(I) Snow Dumping/Trucking/Storage
When a special review use is requested for a snow storage area, the applicant shall comply with the
following conditions when siting the storage area:
Ordinance No. -2011
Page 3 of 5
Setbacks
a. Setbacks shall be regulated by Section 7-20-80 and Chapter 5.
Slopes
a. Slopes in excess of 10% shall be avoided.
Snow storage and/or dumps shall not be located in areas of high groundwater
It must be demonstrated that the groundwater high water mark is 4 feet or more below
snow storage area.
4. Floodplain
a. Snow storage areas shall not be located within the 100- year floodplain
5. Surface Runoff
a. Snow storage shall not result in surface runoff unless best management practices are
utilized to remove sediment and other contaminants from melt water and promote
infiltration vs. runoff.
6. Dumping into waterway or water -body
a. Snow storage areas shall comply with section 7-20-80(d)(12).
b. Snow shall not be pushed or dumped into any waterway or water — body at any time.
7. Refuse removal/disposal
a. It will be a condition of approval that at the end of each winter season (when all snowmelt
is complete) that documented cleanup occurs at the site to remove non -snow refuse from
the storage site.
8. Scenic Impact Consideration
a. Potential scenic impacts of the location of proposed snow storage areas shall be addressed
in the application.
9. Revegetation
a. If a snow storage area is abandoned for more than two years, revegetation of the site
(where necessary) is required.
10. Trips
a. The Applicant shall present a dumping schedule for consideration that includes hours of
operation, estimated number of trucks per hour/day, source of snow, and load size in
average volume.
11. A loQ shall be created of the criteria outlined in condition # 10(a) and submitted for review to the
Community Development Department annually, when soil monitoring tests are submitted
12. Noxious Weed Control
a. The Applicant is required to control for noxious weeds.
13. Snow dump sites shall be sited at least 200' feet from private wells and public water systems.
The 200' setback from a public water system shall be measured from the source from which
water is collected for the public water system.
14. A snow dump site shall be located at least 50' from a property line The BOCC may increase this
setback if it is found that runoff or other negative impacts may implicate an adjacent property. The
BOCC may decrease this setback if it is found that runoff or other negative impacts will not
implicate an adjacent property.
15. An Applicant for an existing snow dumping site shall test soil annually in the springy or after the
dumping site has melted. An Applicant for an initial snow dumping site shall provide soil test
results in their application to the Community Development Department In both cases the
following contaminants shall be tested:
Ordinance No. -2011
Page 4 of 5
• Volatile Petroleum Hydrocarbons (VPH)
• Extractable Petroleum Hydrocarbons (EPH)
• B-tex Test
• Oil and Grease
a. Samnline testins shall occur on each snow dump site. If a dumping site is larger than 1
acre, every acre of the snow dump site shall be tested.
b. Testing shall occur on the down gradient of the site, and the test sample should be taken
from an eight (8) inch depth.
c. The threshold levels for the B-tex test shall be as follows:
Benzene = 1 ppm
Toluene = 1000 ppm
Ethylbenzene = 1000 ppm
Xylene = 280 ppm
d. The threshold levels for Total Petroleum Hydrocarbons (TPH) shall be 500ppm. TPH is
the sum of VPH, EPH, and Oil and Grease.
e. If testing shows that a site is over any of the thresholds mentioned above, the Applicant
shall not be allowed to dump snow at that site and reapplication will be required.
Ordinance No. -2011
Page 5 of 5
Carla Ostberg
From: Carla Ostberg
Sent: Tuesday, April 12, 2011 1:12 PM
To: 'dave.heilberger@elamconstruction.com'
Cc: Michael Kraemer
Subject: follow up from site visit
Hi Dave,
I just wanted to follow up with a few items before I put together all of my comments.
- Do you have a well permit # handy for the well you are using for dust suppression (located on the lower portion
of the property near the Braun's)? I'd just like to put the permit info in my file.
- I just want to confirm that you are open to more of a "management" scenario for your onsite wastewater
treatment system (OWTS) that serves the RV park? Also, I wanted to include the possibility of looking into the
feasibility of installing a complete OWTS for the office (tank and absorption area) in lieu of the holding tanks that
are in place now.
-Can you send me confirmation of CDPHE inspection of your fueling areas?
- Will you send 2010 reports from soil and water sampling?
I think that's it. If you have any questions about these bullet points, please give me a call. Thanks,
Carla Ostberg, MPH, REHS
Environmental Health Manager
Pitkin County Environmental Health
970-920-5438
C to
200c) coLk -
iz�o C6LQ f
l a-5 %-Oa c,
ahs ov� - A b Z)x
'1 +,- , ry Cf e S -7 ✓ ' x 3 .
I t,--cr,C,k �I g„ X 3,
Ong -cam gc� o r
ITJ06 cC 6.wk.
12't x 3' r, c� Y a xz I JQ
I?;zO
1
(.-a' C� CCU r,
Carla Ostberg
From: Dave Heiberger [Dave.Heiberger@elamconstruction.com]
Sent: Tuesday, April 12, 2011 3:35 PM
To: Carla Ostberg
Subject: RE: FYI
Carla,
Thanks for the OWTS information.
Colorado Dept. of Labor & Employment, Division of Oil & Public Safety does the inspections of our facilities. Elam submits
an annual visual inspection form and ullage logs to this department. Field inspectors conduct compliance site inspections
however Elam receives no documentation of this on-site visit. I am not aware of any violations.
Does this help you?
I am working on the well permit,air permit, soil and water sampling report.
Thanks
Dave
-----Original Message -----
From: Carla Ostberg (mailto•Carla Ostberg co.pitkin.co.usl
Sent: Tuesday, April 12, 2011 1:16 PM
To: Dave Heiberger
Subject: RE:
Hi Dave,
I just wanted to follow up with a few items before I put together all of my comments.
- Do you have a well permit # handy for the well you are using for dust suppression (located on the lower
portion of the property near the Braun's)? I'd just like to put the permit info in my file.
- I just want to confirm that you are open to more of a "management" scenario for your onsite
wastewater treatment system (OWTS) that serves the RV park? Also, I wanted to include the possibility
of looking into the feasibility of installing a complete OWTS for the office (tank and absorption area) in
lieu of the holding tanks that are in place now.
- Can you send me confirmation of CDPHE inspection of your fueling areas?
- Will you send 2010 reports from soil and water sampling?
I think that's it. If you have any questions about these bullet points, please give me a call. Thanks,
Carla Ostberg, MPH, REHS
Environmental Health Manager
Pitkin County Environmental Health
970-920-5438
From: Dave Heiberger jmaiIto: Dave. Heiberger(d)elamconstruction.coml
Sent: Tuesday, April 12, 2011 1:18 PM
To: Carla Ostberg
Subject:
�aC(- �I2l
MEMORANDUM
To- Lance Clark, Planning Department
From: Carla Ostberg, Environmental Health s
Date: 9 l V
Re: ElamNagneur Gravel Pit Annual Review 09), (Case P008-09;
Parcel ID #2643-161-02-010)
SUMMARY OF RELEVANT PARTS OF APPLICATION: Review the operation at the Elam site
and the -2408 Annual Report for the Vagneur Gravel Pit.
cA <) '
DISCUSSION: The Pitkin County Environmental Health & Natural Resources Department has
reviewed the details of the 2008 Annual Report for the Vagneur Gravel Pit under the authority of
the Pitkin County Land Use Code and the Pitkin County OWTS Regulation.
Resolution No. 99-69, "Granting a Major Amendment to the Special Review Approval of the s
Elam Construction Incorporated Sand and Gravel Pit and Asphalt/Hot Mix/Concrete Plant to �o
Allow a 10 Year Extension of Operations," outlines initial conditions of approval. I,�Q,,3v
A site visit was conducted on r-ebraFy °, 2009 with Carla Ostberg, and
f the Pitkin County Community Development Department -and David Heilberger
^nrl Inyle ! ymen of Elam Construction, Inc. -Iahv-neilntewiew was ee ducted with
--- WATER SUPPLY:
Bottled water for drinking is brought in for employees. Water is hauled in from Mid -Valley Metro
for plumbing within the office trailer.
J
--- SEWAGE TREATMENT AND COLLECTION:
ISDS Permit 89018 documents a system was' pproved for use of the office by 6 employees.
ISDS Permit 98063 documents a system was approved for use by 20 RV units during summer
months. The area over the absorption field was seeded in the fall of 2008, and large boulders
were placed around it to prohibit vehicles from driving over the area.
s.
�F --- AIR QUALITY:
I No complaints were received by this Department in the last year.
p � tV
Printed on Recycled Paper
e,,ts+(D 020-789�go
Pk 1-900401-gG22
--- NOISE:
4 3q goo 4 ((o5 5C Sy t. (0�
5130 109
t 3t4,aS1-4C, 0+c, { -1((((1
Q PsF" 6 �) y -"e a 0 ci3 r, cid ' -,,v
No complaints were received by this Department in the last year.
Elam has developed a protocol for conducting noise monitoring. The protocol includes noise
measurements at various locations along the property boundary during mining operations. The
results are documented in a field logbook and kept on site. These records were reviewed by
Carla Ostberg at the time of the site visit. There did not appear to be any violations of Chapter
6.36 of the Pitkin County Code, Noise Abatement.
--- CONFORMANCE WITH RESPECT TO OTHER ISSUES: 'I"��►�,��`' ,,��
0 `'a wA VL� �
Containment barriers at the fuel storage areas were properly positioned and in good condition
at the time of the site visit. No stained soil was observed at that time. Extensive work was done
in the summer of 2008 in the fuel storage areas as a result of some deficiencies found during a
State inspection. l
--- WATER RESOURCES: mak- rV,a,�
The area of the pit used for snow dump,in in the winter was clean and well maintained at the
time of the site visit. C,i��� ��c_!�h�l ��e+�.c �,.t„ ,�, A,y\,4- e-
Elam has developed a protocol for sampling both soil and water as part of Elam's Water
Resource Protection Plan.
Soil Sampling:
One composite sample is taken for each 20,000 cubic yards of soil. The soil is tested for the
following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Water Sampling:
Water samples are taken from surface water within the floor of the gravel pit. The water is
tested for the following constituents:
• Total Recoverable Petroleum Hydrocarbons (TRPH)
• Benzene, toluene, ethylebenzene, and xylenes (BTEX)
• Total RCRA Metals
Records of these samples have been reviewed and all samples are below applicable standards
for all contaminants. One quarterly soil test is missing from the 2008 report. Follow-up
sampling will be conducted on those soils and resubmitted to the lab for testing.
Recommendation: This Department has no objection to continued operation.
Printed on Recycled Paper
M ' CONSTRUCTION, INC.
556 Struthers Avenue
Grand Junction, CO 81501-3826
(970) 242-5370 Fax (970) 245-7716
February 1, 2011
Mr, Mike Kraemer
Pitkin County Community Development
130 South Galena St.
Aspen, CO 81611
RE: Vagneur Gravel Pit Annual Report. Parcel I.D. 2643-161-02-010, Application Fee.
Mike,
Please find attached check No. 086602 in the amount of $1,327.00. This is the application fee for Elam's
annual report identified in your email of January 31, 2011.
Please contact me at (970) 242-5370 or oayle Inman elamconstruction.com if you have any questions.
Submitted By:
r".46 O'�
Gayle L. an
Prop Division Manager
Elam Construction, Inc.
a0000�.J a3
,tq�cF� AFD
CONSTRUCTION, INC. p� . -141v
ryf r $ 1v
556 Struthers Avenue
Grand Junction, CO 81501-3826 epi
(970) 242-5370 Fax (970) 245-7716
January 28, 2011
Mr. Mike Kraemer
Pitkin County Community Development
130 South Galena St.
Aspen, CO 81611
RE: Resolution 052-2009, Vagneur Gravel Pit Annual Report. Parcel I.D. 2643-161-02-010.
Mike,
Attached are seven copies of the annual report required by the above referenced Resolution. Once the
application fee has been determined and Elam notified of said fee, a check will be promptly submitted
to the County.
Please contact me at (970) 242-5370 or Bayle.lvman@elamconstrurtion.com if you have any questions.
Submitted By:
Gayle . Ly n ,
Propert ivision Manager
Elam Construction, Inc.
enclosure
000002
Pitkin County, Colorado
2010 ANNUAL REPORT FOR:
VAGNEUR GRAVEL PIT
January, 2011
INTRODUCTION — On August 12, 2009 the Pitkin County Commissioners granted Elam
Construction, Inc. a 20 -year extension to the permit allowing continued operation at the
Vagneur Gravel Pit, with the approval of Resolution 052-2009. One of the conditions
contained within the operational permit requires the filing of a written report with the
County demonstrating compliance with the conditions of the permit and the County
Land Use Code. The report is required to contain an estimate of gravel reserves
remaining on the site and an inventory of petroleum products contained on site.
Major activities, which occurred during 2010 within the existing permitted site, remain
unchanged, and include:
Extraction of gravel deposits.
Crushing and processing of gravel deposits. Crushing of material
occurred during the months of September and October.
Stockpiling of extracted and processed gravel.
Operation of an asphalt plant.
Operation of a concrete batch plant.
Scale and portable office facilities.
Re -cycling of soil, asphalt and concrete rubble.
Acceptance of snow
RECLAMATION — Backfilling and sloping efforts began during the summer of 2000 and
continue as of this date. Approximately 15 acres in the northerly most portion of the pit
are being backfilled and sloped in accordance with the approved reclamation plan.
Reclamation efforts continued intermittently thorough out 2010.
FUEL STORAGE AREAS — Two primary fuel storage areas are currently located on the
site. The first is a 1,200 square foot area adjacent to the main office. The other is near
the concrete batch plant that has been designated as a fuel storage facility. An asphalt
oil tank is located adjacent to the asphalt plant. Also a diesel fuel tank is located near
the portable gravel -crushing unit. All fuel is stored in aboveground tanks and has lined
containment dikes to prevent any discharges of fuel from leaving the site or percolating
into the ground. An engineered Spill Prevention, Control and Counter Measure Plan
(SPCC) is on file with the State of Colorado Labor and Employment's Oil Inspection
Section. A key element of the SPCC plan includes annual training for workers at the
facility for spill containment and controls in the event that a spill should occur.
Petroleum products stored on site are depicted on the following chart:
PID #2643-161-02-010
nnnnn,�
PETROLEUM PRODUCT STORAGE
Type of Oil or Oil
Product Stored
Type of Tank or
Storage
Container
Number of
Tank(s) or
Storage
Containers
Max. Storage Cap.
of Ea. Tank/
Container (gal)
Total Storage
Capacity (gal)
Diesel Fuel # 2
Steel
one
5,900
5,900
Diesel Fuel # 2
Steel
3
10,000
30,000
Diesel Fuel # 2
Steel
1
16,000
16,000
Gasoline
Steel
one
4,000
4,000
Use Oil
Plastic
one
250
250
Lubricating Oil
Steel
9
55
495
Asphalt Oil
Steel
one
25,000
25,000
LIFE OF MINING AREA - Several factors affect the life of most sand and gravel
operations. Most notable are the surrounding communities' future gravel, asphalt and
concrete needs. Other factors include:
❑ Local, .State, and Federal Economic Trends
a Future Local Growth Trends
❑ Major Public Improvement Projects —
Highway & Roads
Rail and Airport
Major School
Major Governmental Building
❑ Major Commercial Buildings
One method in determining the life of an operation is to evaluate the past demand for
gravel resources. By using the last five years of production at the Vagneur Gravel Pit in
conjunction with the remaining resource, it is forecasted that the gravel within the Phase
1 area was nearly depleted in 2009. The Phase 2 mining expansion area, which was
granted in Resolution 052-2009, will provide an additional 15 to 20 years of resource,
depending on local economy. It should be pointed out that forecasts are based on
current and past information. Inherent with any forecast is a degree of uncertainty.
STATE MINING AND RECLAMATION PERMIT — Elam maintains a reclamation and
mining permit issued by the State Division of Reclamation, Mining and Safety.
WOODY CREEK CAUCUS — Representatives from Elam met with members of the
Caucus and Planning Commission as needed during 2010. Elam will continue to meet
with the Caucus and address concerns regarding pit operations in 2011.
PID #2643-161-02-0 10
on r,nnA
A
COMPLAINTS — Elam was notified of two complaints during 2010. They are
summarized below.
Pitkin County received a complaint regarding noise and dust originating from the
Vagneur Pit on or about November 4. Carla Ostberg with Pitkin County
Environmental Health notified Elam's Area Manager of the complaint. Carla was
informed that Elam's operations had already shut down for the year. However,
the gravel pit did have a high volume of truck traffic that day (both from import
material and aggregate sales). Additional watering of the internal haul roads was
implemented to mitigate the dust. Elam's Area Manager also took noise level
reading at the property lines and all readings were within the 55dB limits.
Pitkin County received a complaint on November 18, for noise. This individual
was hiking on a hillside in the Woody Creek area and heard a noise that was
described as a "scraping" noise. Although the source of the noise could not be
determined, the noise was assumed by this individual to originate from Elam's
gravel pit and thus it was called in. Carrington Brown, Code Enforcement Officer,
inspected Elam's pit that same day and observed no activity. No conclusion
could be made as to the source or location of the noise reported. No further
action was required
WATER RESOURCE PROTECTION — As part of Elam's revised Water Resource
Protection Plan approved by the County, Elam had developed soil and water
sampling/testing protocol to assure the protection of groundwater. Elam implemented
the approved testing protocol for both water and imported soil upon approval of this plan
and has continued that testing throughout 2010.
SUPPLEMENTAL INFORMATION — There were several plantings associated with the
Landscape Plan (Condition 22, Resolution 052-2009) that did not survive the first year.
These plantings were replaced during the fall of 2010. Elam will continue to monitor the
plantings associated with the Landscape Plan for success and replace any plantings as
needed.
CONCLUSION — During 2010, Elam Construction, Inc. paved and provided materials for
several construction projects that took place in Pitkin County. Some of the notable
projects include, Rio Grande Trail and the Pitkin County Jail parking lot.
Elam Construction, Inc. continues to work
County and its residents while limiting the
residents.
PID #2643-161-02-010
nnnnnp;
hard to provide a quality service to Pitkin
disturbance to neighbors and Woody Creek
VAGNEUR GRAVEL PIT
SURFACE WATER
SUMMARY OF ANALYTICAL RESULTS
2010
DATE
MOOR
VAGNEUR GRAVEL PIT
IMPORTED SOIL
SUMMARY OF ANALYTICAL RESULTS
2010
mg/Kg
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
��
� ��
� ��
� ��.
���i�®its
� ���.
:'•
' i
Carla Ostber
From: Dave Heiberger [Dave.Heiberger@elamconstruction.com]
Sent: Wednesday, April 13, 2011 8:57 AM
To: Carla Ostberg
Subject: RE: �! s VO
r/Well Permit Number is 41824-F
Attached are summary reports for soil and water tests
mission permits issued By CDPHE are:
X-610 Crusher: 97POO820 `�
A-755 Asphalt Plant: 09PI1168 217
,,/Vagneur Pit: 13PI388-5 }
AID
-----Original Message -----
From: Carla Ostberg Lmailto:Carla.Ostberg co.pitkin.co.usl
Sent: Tuesday, April 12, 2011 1:16 PM
To: Dave Heiberger
Subject: RE:
Hi Dave,
I just wanted to follow up with a few items before I put together all of my comments.
- Do you have a well permit # handy for the well you are using for dust suppression (located on the lower
portion of the property near the Braun's)? I'd just like to put the permit info in my file.
- I just want to confirm that you are open to more of a "management" scenario for your onsite
wastewater treatment system (OWTS) that serves the RV park? Also, I wanted to include the possibility
of looking into the feasibility of installing a complete OWTS for the office (tank and absorption area) in
lieu of the holding tanks that are in place now.
- Can you send me confirmation of CDPHE inspection of your fueling areas?
- Will you send 2010 reports from soil and water sampling?
I think that's it. If you have any questions about these bullet points, please give me a call. Thanks,
Carla Ostberg, MPH, REHS
Environmental Health Manager
Pitkin County Environmental Health
970-920-5438
From: Dave Heiberger [maiIto: Dave. Heiberger(aelamconstruction.coml
Sent: Tuesday, April 12, 2011 1:18 PM
To: Carla Ostberg
Subject:
Email secured by Check Point
Form No. OFFICE OF THE STATE ENGINEER
GWS-2fr . COLORADO DIVISION OF WATER RESOURCES
ala C*nter,.W Bldg., 1313 Sherman St, Deaver, Colorado 80243
(303) aw-3581
APPLICANT
WEYL PEFuT NUMBFA 44' 2 29� --R
DIV. 5 CNTY. 49 WD 38 DES. BASIN MD
Lot: Block: Filing: 5undw:
ELAM CONSTRUCTION INC
1225 S 7TH ST
GRAND JUNCTION CO 81501-
(970)242-5370
ocQurr Tn l mp AN EXISTING WELL
APPROVED WELL LOCATION
PITION COUNTY
NE 1/4 NE 1/4 Section 16
Twp 9 S RANGE 85 W 6th P.M.
DISTANCES FROM SECTION LINES
1050 Ft. from North Section Line
655 Ft. from East Section Line
ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT
COND71401INI3 Ot= APPROVAL
1) This wail shall be used in such a way as to cause no material injury to existing water rights. The Issuance of the permit does
not assure the applicant that no injury will occur to another vested water right or preclude another owner of a vested water right
from seeking relief in a civil court action.
2) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402-2, unless approval of a
variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation Contractors in
accordance with Rule 19,
3) Approved pursuant to CRS 37-90-137(2) for the replacement of an existing well, permit no. 41824-F (decreed by the Division 5
Water Court as the Elam Well no. 1, case nos. 80CW296, 85CW199, and 85CW188). The old well must be plugged according
to the Water Well Construction Rules. A VAA Abandonment Report must be s Awroled within sbdy (60) days after constnxMon
of the now weft, a fuming that the old well was plugged.
4) This well Is subject to administration by the Division Engineer In accordance with applicable decrees, statutes, rules, and
regulations.
5) Approval of this replacement permit shall not result in an expanded use of ground water. The use of ground water from this well
Is limited to Industrial and irrigation purposes as decreed in case nos. 80CW296, 85CW199, and 85CW188.
6) The maximum pumping rate shall not exceed 230 GPM.
7) The average annual amount of ground water to be appropriated shall not exceed 70 acre-feet.
8) A totalizing flow meter must be installed on the well and malntalned In good working order. Permanent records of all diversions
must be maintained by the well owner (recorded at least annually) and submitted to the Division Engineer upon request.
9) The owner shall mark the well In a conspicuous place with well permit number(s), name of the aquifer, and court case number(s)
as appropriate. The owner shall take necessary means and precautions to preserve these markings.
10) This well shall be constructed not more than 200 feet from the location specified on this permlt. and not more than 200 feet from
the location decreed for the Efam Well No. 1 in case nos. 80CW296, 85CW199, and 65M188.
11) Approved for the Installation of a pump in, and the use of, an existing well, constructed on August 25, 1996, to a depth of 39 feet,
under monitoring hole notice Mfi3, acknowledged August 7, 1996.
12) This permit has been approved for the above referenced location. You are hereby notified that you have the right to appeal the
Issuance of this permit, by filing a written request with this office within sixty (60) days of the date of Issuance, pursuant to the
State Administrative Procedures Act, (See Section 24.4.104 through 106, C.R.S.)_
�D
APPROVED
JD2
StWe &Vnew
Recelpt No. 0405432
DATE ISSUED a C 1 a 3 1996
et
EXPIRATION DA'Z'E (I r r n 1 1A
RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF
PITKIN COUNTY, COLORADO, GRANTING A MAJOR AMENDMENT TO
THE SPECIAL REVIEW APPROVAL OF THE ELAM CONSTRUCTION
INCORPORATED, SAND AND GRAVEL PIT AND ASPHALT/HOT MIX/
CONCRETE PLANT TO ALLOW A 10 YEAR EXTENSION OF
OPERATIONS
Resolution No. 99-_0
WHEREAS, Elam Construction Incorporated (Applicant) submitted an application to the
Pitkin County Board of County Commissioners (BOCC) to extend the terms of operation for 10
years for the sand and gravel extraction and asphalt/hot mix/concrete plant which was granted
special review approval by BOCC Resolution No. 88-47; and
WHEREAS, the original 10 year permit approval expired May 24, 1998; and
WHEREAS, the BOCC granted a one year extension permit, until May 24, 1999, in
order to allow the Applicant time to prepare and submit a request for a new long term permit;
and
WHEREAS, the BOCC determined that an entire new application would not be required
for the long term extension request; and
WHEREAS, the Pitkin County Planning and Zoning Commission considered the
Applicant's request on March 2, 1999, and has forwarded a recommendation of approval to the
BOCC; and
WHEREAS, the BOCC considered Elam's application at a duly noticed public
hearing held on April 14, 1999; and
WHEREAS, the Board has considered all of the above and has determined that the
special use permit and a sand and gravel operation permit should be extended for 10 years
subject to the establishment of and compliance with stringent protective conditions and annual
monitoring of the operations to guarantee that the operations being extended hereby respect the
residential character of the Woody Creek area and reasonably mitigate the impacts of the Elam
Gravel Pit on the neighborhood.
1111111111111111111111111111111111111111111111111111111
430751 05/06/1999 01:23P RESOLUTI DAVIS SILVI
I of 9 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO
Resolution No. 99--0
Page 2
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners
that it does hereby approve the Elam Sand and Gravel Pit and AsphaIt/Hot Mix/Concrete plant
request for a 10 extension of the special review approval of their operations until April 14, 2009,
subject to the following conditions:
Material Representations: Representations made by the Applicant (hereafter referred to
as the "Operator") within its application and as amplified or expanded by the Operator's
representations during the processing thereof, will be adhered to by the Operator unless
otherwise expressly provided in this resolution.
Areas Covered by the Permit: The gravel permit agreement shall apply to those areas in
the legal description attached hereto as Exhibit 1.
3. Cessation of Activities: The operator agrees to remove all stockpiled gravel and all
facilities necessary for such removal within 360 (three -hundred sixty) days of the
termination of this permit and to remove, within one -hundred eighty (180) days after
termination, the hot -mix asphalt plant and concrete batch plant and all other building
improvements, equipment and materials created, constructed or installed pursuant to this
permit, or pursuant to or prior to subsequent permits or approvals.
4. Hours of Operation: The permitted operations, and facilities, specifically including the
asphalt hot -mix plant, concrete batch plant, mining, equipment mobilization, and rock
crushing may commence no earlier than 7:00 A.M. and shall cease no later than 7:00
P.M. However, deliveries to the site may occur after 6:00 A.M.
Required Performance Standards: The Operator shall conduct its operations in
accordance with the following standards:
A. Drainage: Surface run-off shall be contained entirely within the site, including
run-off from storm or moisture situations, as more fully described.
B. Air Pollution: Smoke and dust originating from the operation of the asphalt plant,
concrete batch plant and gravel operation shall be controlled as follows:
1) County and State Air Pollution Regulations, whichever are most stringent
now or hereafter adopted shall be strictly observed. Violations shall be
subject to fines and/or orders to cease and desist operations.
2) Sprinkler systems for pollution control shall be kept in good repair and
function properly at all times.
I11 111
111111111111111111111111111111111101111111111N
1 0/06/1999 01:23P RESO�UTI DAV1s
2 of 9 R 0.00 0 0.00 N a.ss PITKIN COUNTY CO
Resolution No
Page 3
C.
MM
3) Operations shall be conducted in such a manner as to prevent damage to
forest and agricultural resources by air pollutants resulting from such
operation.
4) The Operator shall utilize it best efforts to follow up and eliminate escape
of noxious and offensive odors and fumes from the site.
Water Pollution: Discharge of muddy water, resulting from dust and smoke
suppression measures or otherwise shall not be permitted, but the same shall be
drained to settling and percolation ponds. The water table or water quality thereof
shall not be degraded or altered without study and separate approval of the Board
of County Commissioners of Pitkin County, Colorado. Operations shall be
conducted sufficiently above the water table to prevent any contamination of
ground water.
Noise: Noise from the operation as measured at any point on the property line of
the property shall be governed by applicable Pitkin County noise abatement
ordinances.
E. Scenic Values: Operator shall harmonize operations with scenic values through
such measures as the design and location of operating facilities, including roads
and other means of access, vegetative screening of operations, and construction of
structures and improvements which blend with the landscape. Berms shall be
constructed to screen operations. Adequacy and diligence of such measures shall
be the subject of the Operator's report and annual hearing procedures.
F. General Environmental Requirements: At all times the Operator shall take such
measures as will prevent or control on-site and off-site damage to the environment
including, but not limited to:
1) Control of erosion and prevention of landslides;
2) Prevention of water run-off,
3) As part of the annual report the Operator shall provide a detailed report
inventorying toxic materials and disposal thereof as required by federal
regulations.
4) Reshaping and revegetation of all disturbed areas as soon as feasible to the
specifications shown on Exhibit 3 of BOCC Resolution No.88-47 and
revegetation of disturbed areas;
S) Elimination of hazards to public health and safety;
6) Restoration of fisheries and wildlife habitat in surface water bodies;
7) Stabilization of access roads by proper grading, drainage control, surface
treatment and vegetation.
111111111111111111111111111111111111111111111111111 IN
430701 09/06/1999 01:23P RESOLUTI ORVIS SILVI
3 of 9 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO
Resolution No. 99-40
Page 4
G. Water Supply: Adequate water supply will be provided to meet Pitkin County
Land Use Regulations.
Revegetation and Reclamation:
A. Reclamation shall be in accordance with the proposed reclamation plan as
described in the text of the application submitted to the Planning Office on
December 15, 1987 and consistent with Exhibit 3 of BOCC Resolution No. 88-47.
Such plan shall be amended to include permanent noxious weed prevention and
suppression measures approved by the County official responsible for weed control,
or by the Board.
B. Revegetation must be accomplished as soon as practicable after work has been
completed in an area where the Operator has concluded its work. The intent of this
provision is that exposed slopes shall be rehabilitated and revegetated at the earliest
possible date.
C. Pitkin County recognizes that the State of Colorado's Mined Land Reclamation
Board will require a bond for revegetation. So as not to duplicate said bonding
Pitkin County will not require a bond at this time. However, Pitkin County shall
review bonding and reclamation provisions and progress thereunder at each of its
annual hearings, and reserves the power to impose additional reclamation
provisions or require additional security to assure proper reclamation and
revegetation. Should reclamation plans or the bonding provisions prove to be
unsatisfactory, the County may require a bond of an amount per acre of land to be
disturbed which is reasonable to cover the costs of reclamation and revegetation.
This permit shall be null and void if the bond is not fzunished and the permittee
shall cease all work hereunder.
7. Designated Pit Site: As additional consideration for and condition of the permit herein
granted:
A. The Operator shall make its unmined sand and gravel reserves available for public
works projects as a designated pit site which includes the rights to quarry sand
and gravel, and to process the same into asphalt, hot -mix, concrete and other
products herein approved for the Operator, and ingress and egress to, from and
within the site provided that:
1) A royalty for the sand or gravel extracted shall be paid to the Operator at the
prevailing market rate;
11111111111111011 IN 11111111111111111 Ili 111111111 Ilii
430751 05/06/1M 01.23P RUDLUTI D
4 of 9 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO
Resolution No. 99-k
Page 5
2) The designated pit activities and the activities of the Operator can be
managed so As to avoid significant interference with the Operator's normal
operations;
3) This right applies only to parties responding to, and/or award recipients
pursuant to invitations to bid for public works projects;
4) A suitable bond as set by the Board shall be posted with the Operator and/or
the County as to each such designated pit project to ensure operations in
compliance with this permit, the designated pit permit, cleanup and
revegetation; and
5) Separate special review and sand and gravel permits shall be obtained by the
public entity proposing to permit its successful bidders to use the designated
pit site, which permits shall specify the extent and the nature of extractive
and processing operations to occur on the site and any mitigation procedures
necessary, and shall contain conditions no less restrictive than those
contained herein.
8. Control of River Road Traffic: The Operator shall use its best efforts to minimize the
impacts of truck traffic on the River Road access to the subject property. The operator
agrees that truck traffic entering and leaving the Elam site shall exclusively utilize the
new access road rather than the old River Road access road. The operator shall control
access within the permit site to discourage use of the old River Road access road by
trucks entering and leaving the site. These provisions shall be evaluated at the annual
hearing, and may be modified by the Board.
Rights of Enforcement: The County or any member of the public who is aggrieved by a
failure by Operator to comply with the terms and conditions hereof shall have standing to
enforce the terms of applicable permits or any amendments hereto as provided by law.
10. Camper Area: The existing Operator employee camper area may be expanded from 13 to
20 spaces for the term of this extension subject to approval and installation of an ISDS
suitable to serve 20 RV/trailer units. Camper spaces shall be provided for a maximum of
45 1
20 campers. Campers shall only be on site from April I" to December 1" of each year.
Use shall be restricted to temporary, short-term, seasonal use by employees of the
Operator only using campers, and not for longer-term housing, mobile homes or other
forms of habitation, except for the mobile home utilized to provide year-round security,
which may be occupied by the Security employee and his family. Camper use is
accessory only and shall be terminated in accordance with paragraph 3 of this resolution.
I I!lIII!lIII!lIII! ILII !I!lIII !I !IIlI!!I III HIM III ILII
430761 05/06/1598 01:23P RESOLUTI DAVIS SILVI
5 of 9 R 0.00 0 0.00 N 0.00 PITKIN COUNTY CO
Resolution No. 9941
Page 6
11. Weed Control: Operator shall abide by the weed control program described in Exhibit 5
of Resolution No. 88-47 which may be amended as provided by paragraphs 6 A, B and C
hereof, or operation of law.
12. Term of Permit: Operator's long-term Sand and Gravel and Asphalt/Hot Mix Concrete
Plant permit, and special use approvals thereof, shall expire ten (10) years after the
approval of this resolution, unless sooner terminated or extended pursuant to Code.
13. Non -Discrimination: Operator agrees that no discrimination shall be shown to any
purchaser within the County, but this provision shall not prevent the Operator from
giving quantity discounts or refusing to sell gravel to operators who access or leave the
gravel pit via the River Road access road or refusing to sell gravel to Operators with poor
current credit standing.
14. Potable water in sufficient quantity and quality must continue to be provided at all times
to support the amount of people on site on any given day.
15. The area drain line that travels through the containment basin shall be repaired to not
allow spilled fuel to enter the pipe. Fuel dispensing nozzles shall be serviced so they do
not drip, and a method to contain spilled fuel from this source shall be instituted. These
measures shall be accomplished to the satisfaction of the EHD prior to BOCC approval of
any extension of the permit.
16. Any asphalt plants and/or rock crushers must be permitted by the Colorado Department
of Public Health and environment and stay in compliance with conditions of the permit.
17. Fugitive dust from the pit operations must be contained to maintain compliance with
applicable state standards.
18. Night time operations beyond the standard allowed operating hours will be permitted
under the following parameters:
A. There may be a maximum of 10 nighttime operations in any one calendar year at
the Elam Asphalt/Hot Mix Plant in which operational hours may be extended to
include 7:00 p.m. until 7:00 a.m. as well as normal daytime operating hours.
These 10 nights can only be to accommodate publicly owned projects. The
Operator shall notify Pitkin County, the W/J Homeowners Association, and the
Woody Creek Caucus, in writing, as to approximately when and how long the
operations will be conducted at least 72 hours prior to commencement of the
nighttime operations.
B. This approval shall be limited to a maximum of 40 truck loads per night.
C. A traffic control plan shall be submitted to the County Engineer which will
include suitable methods for providing warnings, information, and signage
(including lighted warning signs) to persons using County roads and bike trails in
the vicinity of the truck activity area.
1111111 VIII 111111 IN 111111111111111111111111111111111
430751 05/06/1009 01:23P RESOLUTI DAVIS SILVI
0 of 9 R 0.00 0 0.00 N 0.80 PITKIN COUNTY CO
Resolution No. 99-,0
Page 7
D. The Operator, in conjunction with the public project owner shall implement a
public information/notification plan utilizing at least the follow mediums of
communication: public service announcements, newspaper notices, and
neighborhood newsletters to alert affected residents and other travelers of
potential delays and hazards.
E. There shall be no gravel extraction, crushing, processing, nor stockpiling during
the extended nighttime hours.
F. The Operator must comply with all noise and air quality standards at the plant.
G. Trucks shall not use "Jake" brakes during nighttime operations except in an
emergency situation.
19. Annual Hearings:
A. During November of each year, but no later than November 30, the Operator shall
file a written report with the Planning Director demonstrating compliance or non-
compliance with conditions of the sand and gravel permit and other provisions of
the County Land Use Code. The required annual report will include an updated
estimate of gravel reserves remaining at the site. The Planning Office shall
review the operator annual written report to determine compliance with the permit
and prepare a report to the Board to be reviewed at a duly noticed public hearing.
The purpose of the hearing shall be to review the annual written report of the
permittee and to provide an opportunity for the citizens of Pitkin County to
comment on the sand and gravel operation.
B. Based upon the annual hearing, the Board shall have the power upon good cause
being shown, to modify the permit to require certain corrective measures to be
taken or to direct the County staff or its agents to enter upon the premises and to
take corrective measures required by the Board; impose new or additional
conditions, standards or restrictions to address environmental concerns required
by considerations of public health safety and welfare or to achieve the objectives
and purposes of the original permit or to bring the permit into compliance with
other laws or regulations regulating permits to or uses of the site; the cost to be
assessed against the Operator and its sureties.
20. Revocation. The County shall have the power to revoke the special use permit, upon
showing of good cause, after a public hearing on the same.
NOTICE OF PUBLIC HEARING PUBLISHED IN THE ASPEN TIMES WEEKLY ON
THE 13TH DAY OF MARCH, 1999.
1111111111111111 IN 11111111111111111111111111111 IN
430751 03/06/1899 01:23P RESOLUTI DAVIS SILVI
7 of 9 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO
Resolution No. 99-7
Page 8
APPROVED AND ADOPTED ON THE 14" DAY OF APRIL, 1999.
ATTF, S/T:
l'
I
L dee R. Dean
eputy County Clerk
APPROVED AS TO FORM
John Ely, Couney
2643-161-02-0.10
P162-98
G:planning/pitkin/lance/doe elamreso88-47
cuftm104115/99
BOARD OF COUNTY COMMISSIONERS
OF PITKIN COUNTY, COLORADO
•op
APPROVED AS TO CONTENT
'e. . 99
Cindy Houben, Community Development
Director
1111111111111111111111111111111111111111111111111111111
438751 85/06/1909 01:23P RESOLUTI DAVIS SILVI
8 of 9 R 0.00 D 0.00 N 0.00 PITKIN COUNTY CO
s
MEMORANDUM
To: Lance Clark, Planning Department
X52`
a2�z�✓
From: Carla Ostberg, Environmental Health & Natural Resources
Department
r R,C� ��
Date: February 17, 2009 R
Re: ElamNagneur Gravel Pit Annual Review (2009), (Case P008-09;
Parcel ID #2643-161-02-010)
SUMMARY OF RELEVANT PARTS OF APPLICATION: Review the operation at the Elam site
and the 2008 Annual Report for the Vagneur Gravel Pit.
DISCUSSION: The Pitkin County Environmental Health & Natural Resources Department has
reviewed the details of the 2008 Annual Report for the Vagneur Gravel Pit under the authority of
the Pitkin County Land Use Code and the Pitkin County OWTS Regulation.
A site visit was conducted on February 9, 2009 with by Carla Ostberg, Bryan Daugherty, and
Lance Clark of the Pitkin County Community Development Department and David Heilberger
and Gayle Lyman of Elam Construction Inc,, gyp(\ r . -
--- WATER SUPPLY:
4*,AIL
J �,
k
--- SEWAGE TREATMENT AND COLLECTION:
. .. in -6--Vv 1_5 7 k v fov,
L="ta`` A,IA
--- AIR QUALITY: y.
--- NOISE:
W1D OU 4S .� iJ t. `i 5 at �t
11
a 1'U 05-r- . LY) < Ser
--- CONFORMANCE WITH RESPECT TO OTHER ISSUES: SO l I GO YIA f'
--- WATER RESOURCE:
d on Recycled Paper
Vo vJ61 u\
1-0
raA S Tl�' P P)
2f
0,A
vq 4� GIT cQ-1
a vs- U 150
6*0,14 EeUio"c"i (2pp-A'O-Voj N) W-I-�
61AM N. -Ylelblax-cl�411�11-x-1
c 11170. U /
ct-,i
Septic, Rooter & JeQng Services
Video Inspection Services
0603 Handy Drive
Carbondale, CO 81623
Bill To
Elam Construction
Box 13
Woody Creek, CO 81656
Quantity Description
4,600 Pump trailer park
1,000 j Pump office
i
5,600 Dump Fee
Jet washed main line
i
Trip Charge
Sales Tax
Q Invoice
1 Date Invoice #
R
APR 1 1 2008 }
4/7/2008 657
—L
ECI — .M SEN
P.O. No. Terms Project
Due on receipt
Thank you for your business. Carbondale Aspen
(970)963-3814 (970)920-2059
Rate
0.27
0.27
0.15
300.00
100.00
3.90%
Fax
Total
(970)963-6070
Amount
1,242.00
270.00
840.00
300.00
I
100.00
0.00 I
$2,752.00
fir+ -000,
PITKIN COUNTY
COMMUNITY DEVELOPMENT DEPARTMENT
130 South Galena Street
Aspen, Colorado 81611
Phone (970) 920-5526 FAX (970) 920-5439
MEMORANDUM
TO: Environmental Health and Natural Resources
Woody Creek Caucus
FROM: Lance Clarke, Community Development Department
RE: Elam/Vagneur Gravel Permit Annual Review (2009),
(CASE P008-09; PID 2643-161-02-010)
DATE: February 3, 2009
Attached for your review are materials for an application submitted by Elam Construction Inc. The Board of
County Commissioners will review the application on Wednesday, March 25, 2009.
Please return your comments to me by Friday, March 13, 2009.
PLEASE RETURN APPLICATION MATERIALS TO COMMUNITY DEVELOPMENT IF YOU HAVE
NO FURTIHER NEED OF THEM.
Thank you.
2/R l09
Pitkin County, Colorado
2008 ANNUAL REPORT FOR:
VAGNEUR GRAVEL PIT
January, 2009
INTRODUCTION — On October 11, 2006 the Pitkin County Commissioners
granted Elam Construction, Inc. a 20 -year extension to the permit allowing
continued operation at the Vagneur Gravel Pit, with the pprovat of Resolution
129-2006. This 20 year extension replaced the previoukfl so ution 9�On
November 10, 2006, William Braun filed a complaint against the Board of County
Commissioners of the County of Pitkin and Elam Construction, Inc. alleging
violations of Pitkin County Land Use Code regulations. On Saptember 8th, 2008,
District Court Judge Gail H. Nichols orde ed Resolution 12_9-2006 e vacated
and remanded back to the Pitkin County oard of County Commissioners for
further proceedings. The Judge's order required Elam to default back to the
previous resolution, 99-69, which is to expire April 14, 2009. Elam has submitted
an application to the Pitkin County Community Development requesting a 12 -
month extension to Resolution 99-69, in order to allow sufficient time for Elam
and their consultants to complete the preparation of additional data, and for Pitkin
County to process this submittal, including public hearings.
One of the conditions contained within the operational permit requires the filing of
a written report with the County demonstrating compliance or non-compliance
with the conditions of the permit and the County Land Use Code. The report is
required to contain an estimate of gravel reserves remaining on the site and an
inventory of petroleum products contained on site.
Elam applied for and was granted an amendment to their Development Permit to
allow for snow dumping and storage at the Vagneur Pit. Elam submitted a
request to Community Development requesting continued snow dumping at the
Vagneur Pit for the 2008-2009 snow season. This use was again granted to
Elam. '~
Major activities, which occurred during 2008 within the existing permitted site,
remain unchanged, and include:
• Extraction of gravel deposits.
• Crushing and processing of gravel deposits. Crushing began on
May 5, 2008 and ceased the first week of September.
• Stockpiling of extracted and processed gravel.
• Operation of an asphalt plant.
• Operation of a concrete batch plant.
• Scale and portable office facilities.
• Re -cycling of soil, asphalt and concrete rubble.
Acceptance of snow
RECLAMATION — Backfilling and sloping efforts began during the summer of
2000 and continue as of this date. Approximately 15 acres in the northerly most
portion of the pit are being backfilled and sloped in accordance with the approved
reclamation plan. Reclamation efforts will continue intermittently throughout the
upcoming 2009 season.
FUEL STORAGE AREAS — Two primary fuel storage areas are currently located
on the site. The first is a 1,200 square foot area adjacent to the main office. The
other is near the concrete batch plant that has been designated as a fuel storage
facility. An asphalt oil tank is located adjacent to the asphalt plant. Also a diesel
fuel tank is located near the portable gravel -crushing unit. All fuel is stored in
aboveground tanks and has lined containment dikes to prevent any discharges of
fuel from leaving the site or percolating into the ground. An engineered Spill
Prevention, Control and Counter Measure Plan (SPCC) is on file with the State of
Colorado Labor and Employment's Oil Inspection Section. A key element of the
SPCC plan includes annual training for workers at the facility for spill containment
and controls in the event that a spill should occur. Petroleum products stored on
site are depicted on the following chart:
PETROLEUM PRODUCT STORAGE
Type of Oil or Oil
Product Stored
Type of Tank or
Storage
Container
Number of
Tank(s) or
Storage
Containers
Max. Storage Cap.
of Ea. Tank/
Container (gal)
Total Storage
Capacity (gal)
Diesel Fuel # 2
Steel
one
5,900
5,900
Diesel Fuel # 2
Steel
3
10,000
30,000
Diesel Fuel # 2
Steel
1
16,000
16,000
Gasoline
Steel
one
4,000
4,000
Use Oil
Plastic
one
250
250
Lubricating Oil
Steel
9
55
495
Asphalt Oil
Steel
one
25,000
25,000
LIFE OF MINING AREA - Several factors affect the life of most sand and gravel
operations. Most notable are the surrounding communities' future gravel, asphalt
and concrete needs. Other factors include:
o Local, State, and Federal Economic Trends
a Future Local Growth Trends
❑ Major Public Improvement Projects —
Highway & Roads
Rail and Airport
Major School
Major Governmental Building
Major Commercial Buildings
One method in determining the life of an operation is to evaluate the past
demand for gravel resources. By using the last five years of production at the
Vagneur Gravel Pit in conjunction with the remaining resource, it is forecasted
that the gravel within the Phase 1 area will be depleted in about 1 to 2 years. The
Phase 2 mining expansion area, which was the extension originally granted in
Resolution 129-2006, would provide an additional 16 years of resource. It should
be pointed out that forecasts are based on current and past information. Inherent
with any forecast is a degree of uncertainty.
STATE MINING AND RECLAMATION PERMIT — Elam currently operates under
the State Division of Reclamation, Mining and Safety Permit No. M-1980-055.
WOODY CREEK CAUCUS — Representatives from Elam continued to meet with
members of the Caucus and Planning Commission on a regular basis during
2008. Elam will continue to meet with the Caucus and address concerns
regarding pit operations throughout 2009.
COMPLAINTS — Elam received two complaints from private citizens during 2008.
The first was received on May 27th involving LaFarge concrete trucks utilizing
McClain Flats Road to Cemetery Lane in order to gain access to Highway 82 and
the Maroon Creek Bridge project. An internal investigation revealed LaFarge had
obtained County authorization through the project's General Contractor to haul
materials on the above described route for a bridge project. The findings were
discussed with the citizen the same day by Elam's Area Manager and Property
Manager.
The second complaint was received near the end of June regarding a LaFarge
truck speeding and running a stop sign. LaFarge was immediately contacted by
Elam's Area Manager to discuss the infraction. A discussion was had regarding
Elam's commitment to Pitkin County for safe driving and any continued driving
infractions could result in suspension of using the pit.
WATER RESOURCE PROTECTION — As part of Elam's revised Water
Resource Protection Plan approved by the County, Elam had developed soil and
water sampling/testing protocol to assure the protection of groundwater. Elam
implemented the approved testing protocol for both water and imported soil upon
approval of this plan and has continued that testing throughout 2008.
SUPPLEMENTAL INFORMATION — Resolutio 048-2 required the Elam
comply with certain conditions of approval during the 2008 calendar year. They
are as follows:
Condition 3 required the septic system absorption area be seeded with
native grasses by October 31, 2008. Elam applied seed to the specified
area during early July 2008. Elam will monitor the growth once the snow
has melted and apply additional seed as needed. A permanent barrier was
also installed in July utilizing boulders. This will allow for a wildlife friendly
passage while keeping vehicular traffic off.
Condition 5 required'Elam to�explore the feasibility of vegetative screening
between the Vagneur Pit and the Braun Property. The area in question is
located east of an existing berm and the proposed expansion area. As
discussed during the May 14, 2008 BoCC hearing, this area is directly
under an overhead power line belonging to Holy Cross Electric
Association. Elam has agreed, be executing the agreement with Holy
Cross, that landscaping and other improvements made within the
Easement will be minimized. The Easement Agreement also grants the
right to Holy Cross to cut trees outside the designated easement that they
feel may be in conflict with the power lines.
Condition 6 required Elam to place
alerting truckers to safety concerns.
exiting the property.
additional signage on the property
A sign has been placed at the gate
CONCLUSION — During 2008, Elam Construction, Inc. paved and provided
materials for some major construction projects that took place in Pitkin County.
Elam paved the intersection of Smith Way and Highway 82 at no cost to either
the County or the State of Colorado. By allowing acceptance of imported soil,
the impact at the Pitkin County Landfill has been reduced, thus extending the life
of the landfill.
Elam Construction, Inc. continues to work hard to provide a quality service to
Pitkin County and its residents while limiting the disturbance to neighbors and
Woody Creek residents.
Pitkin County Environmental Health Department
Contact Log Sheet
��// M" 1►,II•� `,_ ��_,i�/ / ✓- ' l a�� UZA
�..�.
MWIM N.J.IMI. -.. III 1 . RI _ i / _/,Wi / . _�tl-/ �MqR
MEMORANDUM
To: Lance Clark, Community Development Department
From: Warren Rider and Nancy MacKenzie, Pitkin County Environmental Health & Natural
Resources Department
Date: May 1, 2008
Re: Elam/Vagneur Gravel Pit Annual Review
Parcel ID # 2643-161-02-010; Case P032-08
SUMMARY OF RELEVANT PARTS OF APPLICATION: Annual review of the operation at the
Elam site for compliance or non-compliance with the conditions of the permit and the County
Land Use Code.
A visit to the sight was conducted on April 14, 2008, by Nancy MacKenzie, Warren Rider,
Lance Clark, and Cari Ann Holcomb of the Pitkin County Community Development Department.
David Heiberger, manager of the Elam operation was on site for the visit. There was limited
activity in the pit at the time of the visit.
The Pitkin County Environmental Health & Natural Resources Department (EH/NR) has
reviewed the details of the Elam/Vagneur Gravel Pit permit application under the authority of the
Pitkin County Land Use Code and has the following comments:
WATER SUPPLY
Potable drinking water is provided to staff and the RV Park in bottled form.
SEWAGE TREATMENT AND COLLECTION
The office and the RV Park are each served by onsite wastewater treatment systems (OWTSs).
Heiberger stated that the tanks are pumped more frequently than the frequency defined in
County OWTS regulations. An invoice was provided that indicated both tank were pumped on
4/7/08.
In 2006 the earthmoving contractor for the Woody Creek Trailer Park had stock piled earth on
top of the absorption area component of the RV Park OWTS. The contractor has removed the
earth and the absorption area has been barricaded, but the area must be reseeded. This area
is adjacent to the new water tank that will serve the Park.
Condition of Approval: When the water tank area is completed, but no later than this fall,
the absorption area of the OWTS must be reseeded and a permanent type barrier
installed so there can be no vehicle traffic over the absorption area.
Printed on Recycled Paper
AIR QUALITY
One complaint was received in May 2007 of a large amount of dust blowing over the berm and
towards a house on the Woody Creek Road. MacKenzie was told by Gayle Lyman of Elam that
a LaFarge employee error caused a hose to become disconnected and spill dry cement. At
about the same time a `dust devil' crossed the property. Lyman said that they will commit to
checking all hoses and replacing safety pins if necessary.
NOISE
During the site visit there was no noise since minimal activity was occurring at the site.
Elam has developed a protocol for conducting their own noise monitoring. The protocol includes
noise measurements at the various locations along the property boundary during all mining
operations. The results are documented in a field logbook and maintained in company files for
review by the County and the public. These files were reviewed by MacKenzie and Clark at the
time of the site visit. The reports indicate that Elam is in compliance with the County Code's
Noise Abatement regulations.
CONFORMANCE WITH OTHER ISSUES
Fuel Storage Areas: Containment were properly positioned and in good condition. No stained
soil was observed. One fuel storage tank is not being used and will be removed. Contaminated
water in the containment structure will be pumped out and taken to an approved sight for
disposal.
WATER RESOURCES
Sample reports were on-site and in good order. No contaminants had been identified in the
water samples or the soil samples conducted during the permit period.
Snow storage areas were well maintained away from the low-lying areas of the gravel
operations. Future operations for snow storage will be exclusively located at the highest
portions of the pit and will be graded to ensure infiltration of snow melt waters.
Recommendation: The EH/NR Department recommends approval of the application with
the stated conditions.
Printed on Recycled Paper
0 . Page 1 of 2
Nancy Mackenzie
From: Nancy Mackenzie
Sent: Thursday, September 14, 2006 10:37 AM
To: Ezra Louthis
Subject: RE: Need update on Woody Creek Subdivision Minor Amendment, Case P205-06
The septic field for the RV park is close to the area where they will install the tank, so they need to ensure that no
construction traffic goes over this area. If the tank is set below ground level, there might be setback issues, but
I've been told it will be completely above the ground. There are water line setbacks from the septic field, but all
lines going to WCMHP shouldn't be a problem.
From: Ezra Louthis
Sent: Tuesday, September 12, 2006 9:07 AM
To: Nancy Mackenzie
Subject: RE: Need update on Woody Creek Subdivision Minor Amendment, Case P205-06
Is there anything you need to look at regarding this? I wouldn't say it is a done deal, but...
From: Nancy Mackenzie
Sent: Friday, September 08, 2006 8:18 AM
To: Ezra Louthis
Subject: FW: Need update on Woody Creek Subdivision Minor Amendment, Case P205-06
It is Friday and I hadn't heard back from you on this. ??
From: Nancy Mackenzie
Sent: Wednesday, September 06, 2006 3:04 PM
To: Ezra Louthis
Subject: Need update on Woody Creek Subdivision Minor Amendment, Case P205-06
Ezra,
We received a referral for this application on August 29, with a response due by this coming Friday, September
8th. I saw that there was an MOU to the BOCC on yesterday's agenda. Based on the MOU, it sounds like the
decisions have been made and that you really don't want or feel it is necessary for EH input on this. So just
wondering why this was sent to us for a quickie response.
Also when a fee is not collected at time of submission, we invoice people directly. So I don't want us to do
needless review and needless charge if this is a done deal.
So please let me know
Thanks, Nancy
Nancy MacKenzie
970-920-5076
Sr. Environmental Health Specialist
Pitkin County
Environmental Health & Natural Resources Department
9/14/2006
ELAM CONSTRUCTION, INC.
SOIL SAMPLING PROTOCOL
VAGNEUR GRAVEL PIT
Pitkin County, Colorado
Revised September 1, 2006
To insure that Vagneur Pit soil stockpile samples are properly collected, handled
and analyzed, Elam Construction, Inc. (Elam) has implemented the following
protocol. Composite samples will be collected from the soil stockpile using
decontaminated sampling tools and following standard protocol for environmental
sample collection and handling, as described below.
1. Proper sampling equipment includes: stainless-steel spoon and bowl,
latex (or Nitrile) gloves, laboratory -supplied pre -cleaned sample jars,
sample jar labels, pen and field logbook, laboratory chain -of -custody
(CoC) forms, and pre -chilled cooler (using Blue Ice°, or similar).
2. All non -disposable sampling equipment will be decontaminated before
and after sampling. Decontamination of sampling equipment will
consist of washing with non -phosphate soap (such as Liquinox° or
Alconoxo) and rinsing with distilled water.
3. At least one composite sample will be taken for each 20,000 cubic
yards of soil accepted at Elam's designated site within the Vagneur
Gravel Pit. At a minimum, one composite soil sample shall be taken
quarterly from the imported soil stockpile. As an example, a composite
sample will include collection of soil from at least three separate
locations within the stockpile (3 spots), collected in equal proportion
using the stainless-steel spoon and bowl. The collected soil should be
homogenized (i.e., sufficiently mixed) in the bowl prior to final
placement in the sample jar.
I
4. The sample collection date and time, sampler initials, and requested
laboratory analyses will be placed on the sample jar label and chain -of -
custody (CoC) form.
5. All samples will be placed in a cooler immediately after collection and
the inside cooler temperature shall be maintained at or near 4° C (39°
F), until delivery to the analytical laboratory.
6. A field logbook will be maintained to document all sampling activities,
and all field notes will be entered in permanent ink. The log sheet shall
contain the following information: collection date and time, sampler
initials, and comments
7. Each soil sample will be submitted for laboratory analysis of the
following parameters, on a standard turn -around basis:
ANALYSIS
8.
METHOD
Total Recoverable Petroleum Hydrocarbons (TRPH)
EPA 418.1
Benzene, toluene, eth (benzene, and xylenes BTEX
EPA 8021 B
Total RCRA Metals
EPA 6000 &
7000 seri---
eries
8. The soil samples will be submitted to a qualified testing laboratory via
hand delivery or overnight courier (i.e., FedEx).
9. Records of each sampling event, including the CoCs and laboratory
report forms, will be maintained at either Elam's Grand Junction or
Vagneur Pit offices.
10. In the event that obviously contaminated soil (unusual dark staining or
discoloration, petroleum odor, or solid wastes) is identified during the
2
E
sampling process, all work in the immediate area will cease and the
facility manager will be notified.
11.Analytical laboratory results will be compared to current State (or
Federal) standards for allowable petroleum hydrocarbon and/or metals
levels.
12. Questions about this soil sampling protocol should be directed to the
Property Division Manager in Elam's Grand Junction office (970-242-
5370).
3
ELAM CONSTRUCTION, INC.
SOIL SAMPLING PROTOCOL
VAGNEUR GRAVEL PIT
Pitkin County, Colorado
Revised September 1, 2006
To insure that Vagneur Pit soil stockpile samples are properly collected, handled
and analyzed, Elam Construction, Inc. (Elam) has implemented the following
protocol. Composite samples will be collected from the soil stockpile using
decontaminated sampling tools and following standard protocol for environmental
sample collection and handling, as described below.
1. Proper sampling equipment includes: stainless-steel spoon and bowl,
latex (or Nitrile) gloves, laboratory -supplied pre -cleaned sample jars,
sample jar labels, pen and field logbook, laboratory chain -of -custody
(CoC) forms, and pre -chilled cooler (using Blue Ice°, or similar).
2. All non -disposable sampling equipment will be decontaminated before
and after sampling. Decontamination of sampling equipment will
consist of washing with non -phosphate soap (such as Liquinox(5 or
Alconoxo) and rinsing with distilled water.
3. At least one composite sample will be taken for each 20,000 cubic
yards of soil accepted at Elam's designated site within the Vagneur
Gravel Pit. At a minimum, one composite soil sample shall be taken
quarterly from the imported soil stockpile. As an example, a composite
sample will include collection of soil from at least three separate
locations within the stockpile (3 spots), collected in equal proportion
using the stainless-steel spoon and bowl. The collected soil should be
homogenized (i.e., sufficiently mixed) in the bowl prior to final
placement in the sample jar.
4. The sample collection date and time, sampler initials, and requested
laboratory analyses will be placed on the sample jar label and chain -of -
custody (CoC) form.
5. All samples will be placed in a cooler immediately after collection and
the inside cooler temperature shall be maintained at or near 4° C (39°
F), until delivery to the analytical laboratory.
6. A field logbook will be maintained to document all sampling activities,
and all field notes will be entered in permanent ink. The log sheet shall
contain the following information: collection date and time, sampler
initials, and comments
7. Each soil sample will be submitted for laboratory analysis of the
following parameters, on a standard turn -around basis:
ANALYSIS METHOD
Total Recoverable Petroleum Hydrocarbons (TRPH) EPA 418.1
Benzene, toluene, eth (benzene, and xylenes BTEX EPA 8021 B
Total RCRA Metals EPA 6000 &
7000 series
8. The soil samples will be submitted to a qualified testing laboratory via
hand delivery or overnight courier (i.e., FedEx).
9. Records of each sampling event, including the CoCs and laboratory
report forms, will be maintained at either Elam's Grand Junction or
Vagneur Pit offices.
10. In the event that obviously contaminated soil (unusual dark staining or
discoloration, petroleum odor, or solid wastes) is identified during the
4
sampling process, all work in the immediate area will cease and the
facility manager will be notified.
11.Analytical laboratory results will be compared to current State (or
Federal) standards for allowable petroleum hydrocarbon and/or metals
levels.
12. Questions about this soil sampling protocol should be directed to the
Property Division Manager in Elam's Grand Junction office (970-242-
5370).
3
ELAM CONSTRUCTION, INC.
WATER SAMPLING PROTOCOL
VAGNEUR GRAVEL PIT
Pitkin County, Colorado
Revised September 1, 2006
To insure that surface water in the Vagneur Gravel Pit has not been adversely
impacted by mining operations, Elam Construction, Inc. (Elam) has implemented
the following protocol for sampling surface water impounded within the floor of
the gravel pit. Samples will be collected from the impounded water by Elam
personnel utilizing the procedure described below.
1. New, disposable gloves (either latex or nitrile) will be donned before
sampling.
2. The water sample will be collected by slowly immersing laboratory -
supplied glass bottles and/or vials in the water column, approximately
4 to 6 inches below the surface, if possible.
3. If the glass bottles and/or vials contain laboratory -supplied acid
preservation, this material shall not be allowed to flow from the
container during sample collection.
4. At least one surface water sample will be collected monthly when
seasonally present in pit floor within the Vagneur Gravel Pit.
5. The sample collection date and time, sampler initials, and requested
laboratory analyses will be placed on the sample jar label and chain -of -
custody (CoC) form.
6. All samples will be placed in a pre -chilled cooler immediately after
collection, and transported immediately to the selected analytical
laboratory.
7. A field logbook will be maintained to document all sampling activities,
and all field notes will be entered in permanent ink. The log sheet shall
contain the following information: collection date and time, sampler
initials, and comments.
8. Each water sample will be submitted for laboratory analysis of the
following parameters, on a standard turn -around basis:
ANALYSIS METHOD
Total Recoverable Petroleum Hydrocarbons TRPH EPA 418.1
Benzene, toluene, eth (benzene, and xylenes BTEX EPA 8021 M/602
Total RCRA Metals EPA 200 series
9. The water samples will be submitted to a qualified testing laboratory
via hand delivery or overnight courier (i.e., FedEx).
10. Records of each sampling event, including the CoCs and laboratory
report forms, will be maintained at either Elam's Grand Junction or
Vagneur Pit offices.
11. Questions about this water sampling protocol should be directed to the
Property Division Manager in Elam's Grand Junction office (970-242-
5370).
E
ELAM CONSTRUCTION, INC.
VAGNEUR GRAVEL PIT
IMPORTED MATERIAL
2008
WEEK
ENDING
WEEKLY
IMPORT
QUANTITY
CUMMULATIVE
IMPORT
TOTAL
COMMENTS
5 -Jan
50
50
12 -Jan
80
130
19 -Jan
26 -Jan
40
110
170
280
2 -Feb
110
390
9 -Feb
70
460
16 -Feb
350
810
23 -Feb
180
990
1 -Mar
670
1,660
8 -Mar
760
2,420
15 -Mar
370
2,790
22 -Mar
280
3,070
29 -Mar
210
3,280
Sample VAG-S08-01; VAG-W08-01, 02
5 -Apr
350
3,630
12 -Apr
1,510
5,140
19 -Apr
2,120
7,260
26 -Apr
1,830
9,090
3 -May
1,930
11,020
10 -May
1,930
12,950
17 -May
1,270
14,220
24 -May
1,790
16,010
31 -May
565
16,575
7 -Jun
1,270
17,845
14 -Jun
480
18,325
21 -Jun
850
19,175
Sample VAG-S08-02, VAG-W-08-03
28 -Jun
650
19,825
5 -Jul
670
20,495
12 -Jul
2,230
22,725
19 -Jul
660
23,385
26 -Jul
4,614
27,999
2 -Aug
760
28,759
9 -Aug
220
28,979
16 -Aug
1,000
29,979
23 -Aug
330
30,309
30 -Aug
100
30,409
6 -Sep
120
30,529
13 -Sep
660
31,189
20 -Sep
350
31,539
Sample VAG-S08-03,
27 -Sep
730
32,269
4 -Oct
800
33,069
11 -Oct
210
33,279
18 -Oct
200
33,479
25 -Oct
120
33,599
1 -Nov
0
33,599
8 -Nov
0
33,599
15 -Nov
10
33,609
22 -Nov
0
33,609
29 -Nov
80
33,689
6 -Dec
130
33,819
13 -Dec
360
34,179
Sample VAG-S08-04
20 -Dec
130
34,309
27 -Dec
1560
35,869
MEMORANDUM OF INTEREST
TO: Board of County Commissioners
FROM: Rose Ann Sullivan, Environmental Health & Natural Resources Department
RE: Disposal of Smuggler Soil and Other Potentially Contaminated Soil Outside of
the Landfill
DATE: July 11, 2006
The purpose of this Memorandum is to confirm that the Board is in agreement with the
guidelines that Environmental Health & Natural Resources ("EH&NR") and Community
Development propose to follow in instances where a developer desires to utilize soil
from the Smuggler Superfund Site ("Smuggler"), or another potentially contaminated
site, as fill in unincorporated Pitkin County.
Background
Soil tipping fees at the Pitkin County Landfill have risen over the last year. Additionally,
the Landfill recently reinstituted soil tipping fees for soils and other excavated material
from Smuggler. As a result of these changes, large developments on Smuggler are
looking for alternative locations to dispose of uncontaminated soil.' Fox Crossing, the
first of these large developments, is interested in providing uncontaminated soil for use
as a road base at a new development in Wingo Junction. Thus, there is an immediate
need to provide developers with guidelines for alternative disposal of Smuggler soil in
Pitkin County.
EH/NR and the Landfill contacted the Hazardous Materials and Waste Management
Division of the Colorado Department of Public Health and Environment (the "Division') to
clarify the regulatory requirements associated with disposal of soils and other excavated
material from Smuggler. Staff then prepared a "protocol" for dealing with requests to
transport material from Smuggler (or another potentially contaminated site) to a location
other than the Pitkin County Landfill, or another licensed facility. This "protocol" was
reviewed with the Division and has resulted in the recommendations summarized
below.
Analysis and Recommendations
• Smuggler Institutional Controls: The Smuggler Institutional Controls adopted by
both the County and the City of Aspen require that soils or other material with lead
concentrations of > 1,000 ppm that are removed from Smuggler must be disposed of at
"a duly licensed and authorized facility," such as the Pitkin County Landfill. The County
' Under the Smuggle Institutional Controls, "uncontaminated soil" is soil containing lead
concentrations of < 1,000 ppm.
2 Both Staff and the Division were unsuccessful in obtaining specific input on a "protocol" from
the U.S. EPA Region VIII Remedial Project Manager for Smuggler. A Memorandum summarizing
staff's discussions with Division staff and the recommendations contained in this Memorandum of
Interest has been forwarded to him.
tracks disposal of contaminated soil and other contaminated materials by a "Smuggler
Mountain Superfund Site Soil Removal Permit' system. This disposal requirement and
this tracking system will remain in place.
The Smuggler Institutional Controls also allow the respective jurisdictions to "require any
person undertaking ... development within the Site to test any soil or material to
establish its total lead (Pb) content for purposes of determining the application of [the
Institutional Controls]." Such testing must utilize and adhere to protocols established or
approved by the U.S. EPA. Under this authority, staff will permit a developer to conduct
suitable sampling and testing of excavated materials, when necessary, to differentiate
and segregate contaminated soils and other materials (which must be disposed of at the
Pitkin County Landfill or another duly licensed facility) from uncontaminated soils and
other materials (which are not subject to the Institutional Controls). Staff will require the
developer to: (i) obtain staff review and approval of its sampling methodology,
(ii) certify, 3 in writing, that its sampling methodology and testing utilized and adhered to
U.S. EPA established protocols, and (iii) provide staff with its analytical test results
demonstrating a lead content of < 1,000 ppm.
• Earthmoving Permits Access Driveway Development Permits Building
Permits and Other Land Use Approvals: Historically, the County has requested an
environmental assessment of a site when the review of a permit application, or other
land use review, "raised a red flag." Some permit applications, such as the current
Earthmoving Permit, specifically require disclosure of the source of the fill covered by the
permit.4 Due to the potential increase in disposal of soils from Smuggler outside of the
Landfill, and developers' desire for certainty with respect to County requirements for
disposal of such material, Community Development (with referrals to EH/NR and/or the
Landfill, as appropriate) will follow the "protocol" summarized below in its permit reviews.
Uncontaminated Soils and Other Material from Smuggler: A developer that
desires to utilize fill material that has passed Institutional Controls testing for lead (as
outlined above) will be required to further analyze the proposed fill material and support
its County permit application with the following documentation:
i. A description of the sampling and testing methodology used on the fill
material, an analysis of the test results, and a certification that U.S. EPA -established
protocols were utilized and adhered to.
ii. A certification that: (a) under federal and state law, the fill material does not
constitute a hazardous substance requiring disposal at a duly licensed and authorized
receiving facility for hazardous waste; and (b) the fill material does not exceed the values
for the "Metals and Inorganic Compounds" listed in the attached Table.'
3 It is staffs expectation that the "certifications" required under this Memorandum of Interest will
be provided by a professional environmental consultant knowledgeable and experienced with
respect to the requirements of federal and state law governing characterization of hazardous
substances and hazardous waste management.
4 Staff is in the process of adding a similar disclosure requirement to its other permit
applications.
5 The attached Table is derived from Table 1, "Soil Cleanup Value Standards," in the Division's
"Proposed Soil Remediation Objectives Policy Document' (December 1997). Table 1 was
2
Potentially Contaminated Soils and Other Material from Other Abandoned
Mine Sites Sites Which Previously Stored Junked Vehicles Oil or Gasoline Tanks,
or Other Chemicals: In those instances where a developer desires to utilize potentially
contaminated fill material from another abandoned mine site, or other parcel which staff
believes may contain hazardous substances, the developer will be required to analyze
the proposed fill material and support its permit application with the following
documentation:
For abandoned mine sites:
(a) The results of a Toxicity Characteristic Leaching Procedure ("TCLP")
analysis of the fill material, demonstrating that the material passes the TCLP test
with respect to all eight of the Resource Conservation and Recovery Act
(°RCRA") metals.6
(b) A certification that, under federal and state law, the fill material does
not constitute a hazardous substance requiring disposal at a duly licensed and
authorized receiving facility for hazardous waste.
(c) A certification that (1) the fill material does not exceed the values for
the "Metals and Inorganic Compounds" listed on the attached Table (supported
by the actual test results), and (2) U.S. EPA -established protocols for sampling
and testing were utilized and adhered to in determining this fact.
Depending upon the history of the site, staff may also require sampling and
analysis for additional compounds listed on the attached Table.
For other potentially contaminated sites:
(a) A certification that, under federal and state law, the fill material does
not constitute a hazardous substance requiring disposal at a duly licensed and
authorized receiving facility for hazardous waste.
designed to support a methodology for calculating soil remediation objectives. The levels of the
various compounds in Table 1 "were established using conservative assumptions about
contaminant migration in the subsurface and evaluating potential exposures through direct
contact ... and migration to groundwater."
The Division's original Table 1 allows for higher levels of chemicals in both "Commercial" and
"Industrial" areas. The attached Table utilizes the lower levels designated by the Division for
"Residential/Unrestricted" land uses for all parcels in the County. Additionally, the Division's
original Table 1 does not specify maximum concentration levels for some chemicals when there is
a specific need to be protective of groundwater, and, in some instances, allows higher chemical
concentrations than those associated with a designated land use. Staff is requiring that, at a
minimum, the "Residential/Commercial/Industrial/Unrestricted Land Use" levels be utilized as
threshold indicators for groundwater protection.
6 The TCLP test is designed to simulate leaching in a municipal landfill. The test identifies
wastes which pose a threat to groundwater if improperly managed and uses a landfill situation as
a "worst case scenario."
r�
(b) A certification that (1) the fill material does not exceed the values for
the relevant compounds listed on the attached Table (supported by the actual
test results), and (2) U.S. EPA -established protocols for sampling and testing
were utilized and adhered to in determining this fact. The "relevant compounds"
must be determined, in consultation with staff, on a case by case basis
(depending upon an analysis of the history of the site).
_Sites in Proximity to Surface Waters Groundwater, or Other Sensitive
Environments: Potential soil contamination is only one factor to be considered in
evaluating a permit application. Whether the fill is "uncontaminated" soil from Smuggler
or from another potentially contaminated location, the site specific characteristics of the
receiving parcel must also be evaluated. Thus, a developer may also be required to
independently address any technical or regulatory concerns staff may have with
placement of the fill in proximity to surface waters, ground water, or other sensitive
environments (e.g., wetlands).
BOCC ACTION: None required, unless the Board is not in accord with the proposed
guidelines.
Attachment
Ccs: Lance Clarke, Assistant Director, Pitkin County Community Development
Tony Fusaro, Chief Building Official, Pitkin County
John Ely, County Attorney
Brian Pettet, Director of Pitkin County Public Works
Lee Cassin, Director of City of Aspen Environmental Health
Chris Hoofnagle, Solid Waste Operations Manager, Pitkin County Landfill
4
.................. ................. .
Table: Soil Value Standards [mg/kg] (6)
Chemical
Volatile Organic Compounds
CAS
Residential/
Commercial/
Industrial/ Unrestricted
Soil Concentration
Protective of
Groundwater 4
Leachate
Reference
Concentration
[mg/kg] Notes [mg/kgl L [mg/kNotes
[mg/11 Notes
Benzene
71-43-2
0.60
c
0.17
NA
Carbon Tetrachloride
56-23-25
0.23
c
0.925
NA
1,1-Dichloroethane
75-34-3
546.80
nc
16.5
NA
1,1-Dichloroeth lene
75-35-4
0.05
c
12.0
NA
Eth lbenzene
100-41-4
1,000
5,nc
104.3
NA
Pentachlorophenol
87-86-5
0.51
c
0.045
NA
Tetrachloroethylene
127-18-4
2.02
c
1.875
NA
Toluene
108-88-3
667.85
nc
85
NA
1,1,1 -Trichloroethane
71-55-6
797.19
nc
62.5
NA
Trichloroethylene
1 79-01-6
2.99
c
0.675
NA
Vinyl chloride
75-01-4
0.02
c
7.0
NA
Semi -Volatile Organic Compounds
Naphthalene
91-20-3
289.1Anc
51.4
NA
Phenol
108-95-2
1,000
23.675
NA
Xylene total
1330-20-7
1,000
1,000
5
NA
Pesticides/PCBs
DDT
50-29-3
0.58
c
1,000
5
NA
Dieldrin
60-57-1
0.01
c
1,000
5
NA
PCBs
1336-36-3
0.07
c
1,000
5
NA
-Arocfor 1016
1 126-74-112
2.99
nc
1,000
5
NA
-Aroclor 1254
110-97-691
O.g3L
nc
1,000
5
NA
Metals and Inorganic Compounds
Arsenic
7440-38-2
78.0
c, 7
NA (Use 78.0)
Cadminum and compounds
7440-43-9
99.5
nc
NA (Use 99.5)
0.11
Chromium VI
7440-47-3
53.94
nc
NA (Use 53.94)
2.2 1
Copper and compounds
7440-50-8
2,570
nc
NA (Use 2,570)1
22
Lead
1 7439-92-1
400
nc,3
NA (Use 400)
1.1
Mercury (inorganic)
7439-97-6
17.66
nc
NA (use 17.66)1
0.044j_LLL:j
.................. ................. .
NOTES:
c - Standard based on carcinogenic risk.
nc - Standard based on noncarcinogenic risk.
NA - Not Applicable: use of this Table to select soil remediation objectives under Tier 2 (as described in the CDPHE's "Proposed Soil
Remediation Objectives Policy Document" (Dec. 1997)) does not allow for the calculation of a soil concentration under this column.
1. For total chromium
2. Includes residential areas, playgrounds, parks and other public areas, as well as industrial and commercial sites.
3. EPA, July 14, 1994 "Revised Interim Soil Lead Guidance for CERCLA Site and RCRA Corrective Action Facilities," OSWER Directive 9355.4-
12.
4. To be utilized when there may be direct contact with surface or groundwater resources. (Most restrictive standard to be used+A11.)
5. Upper Concentration Limit
5. Derived from Table 1, "Soil Cleanup Value Standards," of the CDPHE's "Proposed Soil Remediation Objectives Policy Document" (Dec. 1997)
7. Higher Arsenic level utilized than in the CDPHE's Table 1 (reflecting higher natural background levels), based upon the recommendation o�
CDPHE staff in a June 21, 2006 conference call.
Ad b7,:Sti:17 9007,/S U8 - l IJHd dad 1WS�l ON - - x