Loading...
HomeMy WebLinkAboutpitkin.eh.264321200804 (1997)_MEMO COUGAR CANYONParcel Multiple Search Results tkin County Assessor Search Results Assessor Properly Search I Assessor Subset Query I Assessor Sales Search Clerk & Recorder Reception Search I Treasurer Tax Search Search GIS Map I GIS Heln Subdivision Search The following parcels were selected. The records are sorted by Parcel Number. To display detail information for a selected parcel, click on the respective Account Number. To sort by a different field, click the column heading of the field by which you wish to sort. SNOWMASS VILLAGE Subdivision: COUGAR CANYON PUD Lot: 1 R003333 264321200804 IF PITKIN COUNTY JUNIPER HILL DR ASPEN Subdivision: COUGAR CANYON PUD Section: 21 Township: 9 Range: 85 A TRACT OF LAND DESC BY MBS IN LOT 4 OF SEC 21-9-85 CONT APPROX 40 AC DESC IN BK 228 PG 599 AKA COUGAR CANYON OUT PARCEL OUT PARCEL 6 Record(s) Displayed. http://pitkinassessor.org/assessor/PareelMultipleResults.asp 1/2 MEMORANDUM . To: Suzanne: Wolff Community Development Dept. From: Nancy MacKenzie, Environmental Health Dept Through: Lee Cassin, Assistant Environmental Health Director fC Date: Friday,. May 30, 1997 Re: Cougar Canyon Affordable Housing Units Parcel ID # 2643-212-00-004 ...The Aspen/Pitkin Environmental Health Department has reviewed the details .of this application for two Affordable Housing units under the authority of the Pitkin County Code, title II, Land Use Code and has the following-comments.. ADEQUATE PROVISIONS FOR WATER NEEDS: Sections-2-170 and-3-110.4: "It .is the policy of theCountyto insure the availability-of .a water supply of adequate quality, quantity, pressure and dependability for fire protection and,support of a proposed land use prior to,apprbval of the use. The County shall require land uses to-hook up to existing public systems if•service.is available." This parcel is-located close to the water supply line for the Brush Creek Subdivision District,. A condition of approval is that the applicant must have a.letter from the water District stating that the District will.or will not/cannot provide water'to"this development. If this development is out of the District and the District cannot- serve this project, then.a well maybe drilled. This Department will . need adequate.. information on the quantity and the.quality of water available for domestic use. 'The well's yield can be determined by a .water engineer's or well driller'.s pump report and'the results submitted to.this department for our analysis. The bacterial quality is'determined by having a water sample tested.by.a laboratory such as. the Snowmass Water ;and Sanitation'District or Aspen.Consolidated Sanitation District.., Should the laboratory report for the. water sample indicate levels of-bacteria of concern, this department can advise .the applicants on remediation methods. Beforea septic permit" can be issued, the well must be drilled-to assure that setback requirements from the well to the sewage disposal system.can'be maintained. Pitkin County Land Use,Code requires that the well site •'be.within the building envelope. Then,. a condition of approval for this application i the receipt of information documenting that the location of the 'well(s) meet setback requirements and can be placed within.the building envelope and that the quantity and quality'of the well water are adequate. without meeting these requirements a sewage disposal system permit and building permit cannot be issued.: it i's recom*xided thatlow water landscaping ,(xeriscaping) be used., and that the'timing of any sprinkler systemsbe decreased for low W ater plants. The Colorado State University Cooperative Extension. office can be contacted for more information on xerisc.aping.' SEWAGE TREATMENT AND.COLLECTION: Sections 2-180 and 3-110.5: ,It is the policy of. the County to ensure.that adequate.sewage. treatment :facilities •are available to serve' existing. and new developments:,. Public and private sewage disposal.systems. and connections iso such.systems: shall comply with,the sewage'-.disposal guidelines. of Pitkin County's Individual Sewage Disposal System Regulation." Lots in the Brush Creek area are served by individual sewage. disposal.systems. All'.,such systems installed within Pitkin County --require septic permits issued by the Environmental Health Department., and must c,oinply with the County's sewage disposal regulations To receive'a septic permit, the applicant will need to submit a septic permit-application•and appropriate fee with a completed .Soil Data Form including percolation test.results.and profile hole information. It must-be possible to-design an adequate sewage disposal system before.a building permit can be issued. The Aspen/Pitkin Environmental Health Department will design the system for the applicant as part of.the permit fee, if an engineered' system is not required.. We will do a site visit, advise the applicant about the-best location for'.the'system:and provide a system design. We will determine'if.an engineered system is needed based on Ail soil test re"sults. Aengineered system is 'required if any one of the following conditions exists.: a percolation rate faster than 5 mpi or.slower than 60 mpi;-maximum seasonal level.of the groundwater. table or bedrock less'.than four feet below the bottom of the proposed absorption system;.or a slope in.excess.of 30%.' Prior to initiating any tests at the site, the applicant should contact this office.for.a pre-application conference. It is highlyrecommended that percolation tests be performed between April 15 and November,l5.. This department does not feel confident accepting winter soils tests and will determine their validity'on a case by case.basis. : I v v The applicant will need to adhere to minimum horizontal setback requirements for placement of septic system components which.should be no problem on this lot. Assuming a 4 bedroom house over 2,000 sq ft and less than 6,000 sq feet in size,. the leach field will need to be located a minimum of 132 feet from the applicant's well and from any neighboring wells. The area for she leach field should be located in an area.of no traffic, planted with dry land grass, and should not be watered. It is desirable to.locate the system downhill from the house so that the system can operate by gravity instead of mechanical parts which require periodic maintenance and adjustment. The applicant should refer to the Pitkin County Individual Sewage Disposal System - Regulation for detailed inf.otmation, -and call our office to discuss this site. Because of the limited area in the building envelope due to steep slopes, the applicant has requested to do a combined absorption field for the two houses. We require that each house. has its individual septic tank located on its own property. The effluent could then be piped through a common pipe to one absorption field. However that area for the field would have to be legally owned by the two ADU lots, or some other legal method such as an easement to the area that would be dedicated to the absorption field. Based on -the slowest percolation rate'of 60 mpi and assuming a house with 4 potential bedrooms and a sq footage of greater than 2,000, but less than 6,000 sq ft. the overall area that would be required for the absorption filed would be an area of 60 ft X 80 ft.for each house. This square footage is based on constructing 3 foot wide trenches 8.0 feet long and maintaining a minimum of 6 foot wide separation of undisturbed soil between each trench and allowing a 30% reduction in size for using deep gravel or a gravelless chamber. system. A condition of approval for this application is the receipt and approval of the sewage disposal permit by the Environmental Health -Department before a building permit can be issued. The application must comply with all requirements of the sewage 'disposal; permitting process before a permit will be issued. WATER QUALITY IMPACTS: Sections 2-140 and -T-70.5 and 3-70.10: "It is the policy of the County to preserve and protect its present water resources, recognizing the County's semi -arid character, and. that significant transmountain and transbasin diversions and the vested rights of senior appropriators in the basin have materially curtailed the availability of an already scarce water resource. To. .this end it is the policy of the County that no land use be initiated which would adversely affect the quantity, quality, or, accessibility of the County's water resources; or which would occur at the expense of established water-dependent agricultural activities; or,which would result in increased salinization of water resources, loss of minimum stream flows, further destruction of wildlife habitat, or major expenditures to reacquire or redistribute.major water resources. It is also the policy of the County-to maintain a natural vegetative buffer along its surface waters such that the surface and groundwaters of the area are not encroached upon by land uses or other human activities which could cause deterioration of water quality or impair the natural treatment processes provided by meadows and wetlands." The Environmental Health Department is charged.with preserving and .protecting the quality of Pitkin'.County's water resources. Since a large percentage of.the population is-dependent upon water from wells, elimination of groundwater pollution., and protection of aquifers and their drainage areas are of utmost.importance. Roofs and asphalt driveways can be nonpoint sources of water,discharge which can contaminate water supplies. This Department recommends that nonpoint so.urces- of discharge must be retained on.the property bf origin which can be accomplished through landscaping, drainage patterns, detention ponds, and dry wells for water runoff from buildings, Surface.water and groundwater contamination can also be.caused by ..inadequate setback distances'from sewage disposal systems to, proximate wells, rivers,-creeks, ponds, and reservoirs. Minimum horizontal distances between components of a sewage disposal system and physical features, must be in accordance with the Pitkin. County Sewage.Regulation. AIR QUALITY: Sections 2-130 and 3-602: "Only that'development is permitted which will not'contribute significantly to degradation of.air quality." This Department has met with Bruce Hazzard to discuss what mitigation measures will be adequate to prevent significant increases in traffic or PM10 in .the nonattainment area from this application and for the application for. the 5 single family lots We have determined the average number of trips generated from both• development based on trip generation rates in the 5th edition of the ITE book-on Trip. Generation. 5 single family homes will each generate 9.5.5 trips per day and the 2 affordable housing units will each generate.6.55 trips.per day. The.. average trip length in the non-attainment area has been established to be 5 miles. Therefore, 61 trips or.8.,5 lbs of PM10 need.to be mitigated. on air quality from The applicant has agreed to mitigate the impact this development by contributing to_funds established by the Parks Department. They will earmark these•towards:. (1)construction or linking of bike paths or (2) paving a portion of -a parking lot.. .A condition of approval should be that the exact'method•and cost to offset'B.5 lbs.of PM10 will be determined before final plat and approved by 'the Environmental Health Department and that the.dollar., contribution will be made before the plat is recorded. Activities such as road building and landscaping require a Fugitive Dust'. Plan. This plan would need to include, but is not limited -to,. fencing,.watering of"haul roads and disturbed areas, daily cleaning of. adjacent paved roads to.remove mud.that:has been carried out, speed limits, or other -measures necessary to.prevent windblown dust from crossing the property line or causing a•.nuisance. A condition should be approval by the Aspen/Pitkin Environmental Health Department of the fugitive dust control plan, containing enough measures to ensure that dust does not become a nuisance or blow onto adjacent property.. The-applicant•must`file a fireplace•/wbodstove permit with the Environmental.Health Department before the building -permit will be issued. The 'less densely populated parts of Pitkin County like Brush Creek. may 'have two devices 'per building:.a maximum of one wood burning fireplace,.and a. -second device which can be either a gaslog fireplace or- a.,certified woodstove. in addition,, unlimited numbers of decorative gas appliances are allowed. Coal may not be burned in any device,. No..wood burning device may be•installed in barns .or agricultural buildings: A condition of approval for this application is the receipt and approval o€.the fireplace/woodstove permit by the Environmental ..Health Department before the building permit can be issued. CONFORMANCE tITH OTHER ENVIRONMENTAL. HEALTH LAWS: -Section 2-70: "It is the-pllicy,of the County to ensure that no use or development bf land is: .p rmitted which is-ia violation of the laws of the County, the State"of Colorado, or the United States of.America." This Departnt is not•aware of any issues of concern regarding other environmental health laws. 120 E. Main Street Aspen. Colorado 81611 Telephone 970 9.25-835-+ Facsimile 970 920-1337 Albuquerque Denier Jackson Ulobe Phoenix Santa Fe Situ Paulo Fail Design Workshop, Inc. Landscape Architecture Land Planning Urban Design Tourism Planning MEMORANDUM To: Nancy McKenzie Aspen/ Pitkin Environmental Health From: Bruce Hazzard, Principal Design Workshop, Inc. Re: Cougar Canyon (1052) Detailed Submission/ Final Plat Date: May 28, 1997 Pursuant to our meeting in your office last week, the Applicant on the above referenced project is willing to mitigate the minor PM -10 impacts of the project through a reasonable cash -in -lieu payment to Pitkin County. The Applicant's interest lies in these monies going toward the future construction or paving of new trails within Pitkin County. Your help in determining the reasonable nature of this amount is appreciated. As always, feel free. to call me if you have questions. DESIGNWORKSHOP MEMORANDUM To: Suzanne Wolff, Community Development Department From: Nancy MacKenzie, Environmental Health Department Through: Lee Cassin, Assistant Environmental Health Director Date: September 23, 1997 Re: Cougar Canyon Parcel ID #2643-212-00-008 1. In reviewing my notes of 8/12 regarding the Affordable Housing units, I indicated that I had no information if the well permit allowed the well to be a shared well for 2 homes or if it is'for a single home 2. Earliest mitigation measures were dedication or purchase of bike paths and the length and the cost varied by project (lot length, steepness, etc varied but the amount purchased offset the numbers of trips the project generated. Costs varied from $2,520/lot to $11,220. To see if these amounts were reasonable, we compared them with the cost to maintain 1 mile of bike path: - One residential lot generates, say, an average of 9 trips/day About 1/2 mile section of busy bike path plowing might allow 20 people to walk/bike $11,220 pays for over 5 years worth of plowing. Printed on Re yded Paper The Cougar Canyon development will generate 61 trips or 8.5 lbs of PM10 so a contribution similar to that of Red Butte is appropriate. Red Butte generated 57 trips or 8 lbs of PM10. $ 78,540 would maintain one mile of bike path, summer and winter, for 5 years. $ 78,540 would mitigate around 60 trips or 81bs of PM10. $ 78,540 would construct 4/10ths of a mile of multi -use trail @ $40/ lineal ft In general a contribution could be based on the following, the contribution being used to acquire easements for trails, maintain bikepaths, or construct trails. $78,540 / 57trips = $1,380 would mitigate 1 _trip or 5VMT $78,540 / 8 lb = $9,820 would mitigate 1 lb of PM10 - Therefore for Cougar Canyon to mitigate their impact of 61 trips: 61 trips X $1,380 = $84,180 Contribution $84,180 contribution divided between the 5 free market lots = $16,800/lot Since there is no adverse impact until the homes are constructed, the payments need not be made until building permits are issued. 3 Printed on Re yded Paper MEMORANDUM To: Suzanne Wolff, Community Development Dept. From: Nancy MacKenzie, Environmental Health Dept. Through: Lee Cassin, Assistant Environmental Health Director e(iC Date: Wednesday, May 28, 1997 Re: Cougar Canyon Subdivision Detailed/Final. Plat Submission & Rezoning . Parcel ID # 2643-212-00-008 .. The-Aspen/Pitkin Environmental Health Department has conducted a site visit on 5/2.1/97 and reviewed the details of.the�Cougar Canyon application under the authority of the Pitkin County Code, Title II, Lund Use Code -and has the• fol-lowing comments. ADEQUATE PROVISIONS FOR WATER-NEEDS: Sections 2=17.0 and 3-1.10.4: "It is the policy.of the-County to insure,the.'availability of a water supply of adequate quality, quantity, pressure and dependability for fire protection and support of a proposed.land use prior to approval of :the-use.,The County shall require land 'uses to hookup to existing public'systems.if service is available." Wells test reports on test wells were-conducted-by Samuelson Pump Company, Inc. and indicate an average _flow rate of 20gpm at an average depth of 473 feet. It appears from these te.sts.that there will be adequate water to serve this development.. This Department will need adequate information, on the.quantity.and the quality ofwater available for domestic use-once the permanent wells are.drilled., The well'syield can be.determined by a water .engineer's or well driller's pump report and the results submitted.to this department for our analysis. The bacterial quality is determined by,having a water sample tested by a laboratory such as the Snowmass Water and Sanitation District or Aspen'Consolidated Sanitation ' District. Should the laboratory report for the water sample indicate levels of bacteria of concern,*this department.can advise-the applicants on remediation methods.-Before a septic permit can be issued, the well must be drilled to assure that setback requirements from the well to ,the sewage disposal system.can'be maintained. Pitkin.- County Land Use Code:requires that the well site be within.the building. -envelope. Based on a'house size of•+ 6,000 sq ft with 4 bedrooms and a detached 2 BR caretaker unit, -the required setback of the well from the.sewage disposal absorption field'will be a minimum of 238 feet. _ It is recommended that low water landscaping (.xeriscaping) be used ` and that the timing of any sprinkler systems'be decreased for -low water plants. The.Colorado State University Cooperative Extension office can be contacted for more information on.xeriscap.i'ng. A condition of.approval for this application is the receipt'of information documenting that the location of the well s) meet. setback requirements and can be placed within the building envelope and that the,quantity and quality of the well water are adequate. Without meeting these requirements a sewage disposal. system permit and.building permit cannot be issued. SEWAGE TREATMENT AND COLLECTION: Sections 2-180 and -3-110.5: "Tt is the policy of the County to:ensure that adequate sewage treatment facilities.are-available to.serve existing and new .:developments. Public. and -private sewage disposal systems, and connections too such-systems shall comply with the sewage disposal'.. guidelines of Pitkin.County's Individual Sewage Disposal System Regulation. Lots ir.this area are served by individual sewage disposal systems. All such systems installed within Pitkin County require septic permits issued by the.Environmental Health Department,'and must comply with the County"s sewage disposal regulations. To receive a . septic permit, the applicant will need to submit a septic permit application and appropriate fee with a completed Soil Data Form including percolation test.results and profile_ hole information.• l0 foot preliminary profile borings were drilled on.each lot by CTL/Thompson;and_indicated no ground water was present,.however. the tests -were conducted in early October_ Because of the many areas of wetlands observed during the.site visit,.surface water drainage,, and the possibility of high ground water near several of the proposed absorption.fields,'it should be made a condition of that all profile holes and percolation tests must be conducted `during'the period of highest ground water and runoff, normally towards the end of May through early June. Water drainage from runoff could impair the functioning of the sewage disposal system by overloading and saturating the soils.• This would. severely impair the soil's function to absorb and filter water from the sewage system. Measures to mitigate water drainage could include but are not limited to culverting or creating diversion swales to move the water away from:the.sewage system.. 2 ; Another consideration is.minimum horizontal distances between . components of a sewage disposal system.and pertinentphysical features must be in accordance with the Pitkin County Sewage Regulations. The minimum horizontal.distance required from cut banks. to.individual sewage disposal system components discharging effluent into the surrounding soil shall be four time (4) times the'heilght of the bank, measured from the top edge of the bank: The average : setback from creeks would be.178 feet.. CTL/'Thompson'S recommended design-percolation rates ranged from 15 MP to 60 mpi based on the preliminary percolation tests conducted on each lot. Based on the slowest rate, 60.mpi, which would require the largest- absorption field; the overall area that would'be required for the.field is 112 ft X 80.ft. This-'square footage is based on constructing.3-foot.wide trenches 80 feet-long and maintaining a minimum 6 foot-wide separation of undisturbed soil between each•- trench and allowing a 30% reduction in size for using deep'gravel or a gravelless chamber system. The applicant has requested a separate envelope, outside the building envelope, on-each lot exclusively for the sewage absorption field. Based on the preliminary percolation data done by CTL%Thompson, Inc.,, it-would be difficult to locate the sewage disposal system within the' building envelope and still-maintain the 238.foot setback.from the well. The Aspen/Pitkin Environmental Health.Department will design. the system for.the applicant as part'of the permit fee,. if an engineered. system is not required. we will do a site visit, advise the. applicant about the best location for the''syst,em and provide a system design.-We will determine if an engineered system is needed based .on soil test results.--An engineered system is required if any one of the following conditions exists.: a percolation rate'.faster than 5.mpi, or.*lower than 60 mpi;'maximum seasonal level of the-groundwater table or bedrock less-,than four feet below the bottom of the proposed absorption system;.or a slope,ih excess of 30%. .'Prior to initiating. --'any tests at the site, the applicant'should contact this office for a pre-application conference. The area for the leach field should be located in an area of no traffic, planted with dry land grass, and should not be watered. It is desirable to locate the system..downhill from .the house so'that the. system can operate-bygravity instead of mechanical parts which require periodic maintenance and adjustment. The applicant should refer to the-Pitkin County Individual Sewage.Disposal System Regulation for detailed information, and call our office to discuss this site. 3 Under `General Restriction' -in the proposed Protective Covenants for Cougar Canyon,.Article•7.27(b) states that the sewage disposal system may_"not"be located or constructed above 'grade...." This Department does not agree with this condition. .If slow percolation rates."are encountered and require an engineer designed system,'a built-up mound or sand filter system. might be necessary. A.condition of.approval for this application is•the receipt and approval of the sewage disposalpermit.by the Environmental. Health Department.before a building permit can be'issued. The application must comply with all requirements of the•sewage disposal_ permitting process before -a permit will be issued. WATER QUALITY IMPACTS: Sections -2-140 and.3-70.5 and 3-70.10: ,it is the policy of:the County to preserve and protect its present - water resources,. recognizing the -County's semi -arid character and that significant transmountain and transbasin diversions and the vested rights of senior appropriators in the basin have materially curtailed the availability of an already scarce water resource..To this end it is the policy of the•County'that'no land use be -initiated which would adversely affect_the•quantity, quality, or accessibility of the County.'s.Water resources; or which would occur at the expense. ofestablished' water -dependent agricultural activities; or which .would result'in.increased:salinization of water resources,'loss of - minimum stream flows further destruction of wildlife habitat, or ma j•or.expendi:tures to reacquire or redistribute major water - resources. It is also. the:policy of.the. County.to.maintain a natural vegetativebuffer along its surface waters.siich.that the surface and groundwater.s of the area are riot encroached upon by land uses: or other human activities which could cause deterioration of water quality or i pair the natural treatment processes provided by.meadows and wetlands The Environmental Health Department is -charged with preserving and protecting the quality, of Pitkin County's water resources.. Since.a large percentage..of .the population is.dependent upon water from wells, elimination of -groundwater pollution, and protection of aquifers and their drainage areas are of utmost importance. Roofs --arid asphalt driveways.can be.inonpoint'sources of water discharge which can contaminate water supplies. This Department recommends that nonpoint sources of -discharge must be retained on the property of origin which .can be accomplished through landscaping, drainage .patterns, detention ponds, and dry wells for water runoff from buildings. Surface water.and groundwater contamination can also be caused by' inadequate-setback.distances from sewage disposal systems to. proximate wells, rivers, creeks; ponds, and reservoirs.` Minimum 4 horizontal distances between 'components of a sewage disposal system and physical features must be in accordance with the Pitkin County Sewage Regulation. AIR QUALITY: Sections 2-130 and 3-602.: "Only that development is permitted which will not contribute significantly to degradation of air quality." This Department has met with Bruce Hazzard to discuss what mitigation measures will be adequate to prevent significant increases in traffic or PM10 in the nonattainment area from this application and from the application for the two affordable employee units. We have determined the average number of trips generated from both development based on trip .generation rates•in the 5th edition of the ITE book on Trip Generation. 5 single family homes will each generate 9.55 trips per day and the 2 affordable housing units will each generate 6..55 trips per day. The average trip length in the non -attainment area has be established.to be 5 miles. Therefore, 61 trips or 8.5 lbs of PM10 need to be mitigated. The applicant has agreed to mitigate the impact on air quality from this development by contributing to funds established by the Parks Department. 'They will earmark these towards;. (1)construction or linking o -f -bike paths or (2) paving a portion of a parking lot. A condition of approval should be that .the exact method and cost to offset 8.5' lbs of PM10 will be determined before final plat,and ;approved by the Environmental Health Department and that the dollar contribution will be made before the plat is recorded. FUGITIVE DUST PLAN Activities such_as road building and landscaping require a Fugitive. Dust Plan. 'This Plan i's in the application packet and is acceptable since it appears to contain enough measures to ensure that dust `does riot become a nuisance or blow onto adjacent property. ,FIREPLACE/WOODSTOVE The applicant must file a fireplace/woodstove permit. with the Environmental.Health Department before the building permit will be issued. The less densely populated parts of Pitkin County like Brush Creek may have two devices per building: a maximum of one wood burning fireplace and a second device which can be either a gas log .fireplace or a certified woodstove. In addition, unlimited -numbers of decorative gas appliances are allowed. Coal may not be burned -in any 5 • - •` device. No wood burning device may be installed in barns or agricultural buildings. A condition of approval for this application is the receipt and approval of.the fireplace/woodstove permit by the Environmental. Health Department before the building permit can.be issued. CONFORMANCE WZTH'OTHER ENVIRONMENTAL HEALTH LAWS: Section 2-70: "It is the policy of the County to ensure that no use.or development. of land is permitted which is in violation -of the laws of the County, the State of Colorado, or the United States of America." This Department is not aware of any issues of concern regarding other environmental health laws. 10 r2. All Design Workshop, Inc. Landscape Architecture Land Planning Urban Design Tourism Planning MEMORANDUM To: Nancy McKenzie Pursuant to our meeting in your office last week, the Applicant on the above referenced Albtttlttertlue project is willing to mitigate the minor PM -10 impacts of the project through a reasonable Denver cash -in -lieu payment to Pitkin County. The Applicant's interest lies in these monies going Jackson I1ole toward the future construction or paving of new trails within Pitkin County. Your help in determining the reasonable nature of this amount is appreciated. Phoenix Santa Fv As always, feel free to call me if you have questions. S, -Io Paulo Vail DESIGNWORKSHOP Aspen/ Pitkin Environmental Health 120 G. Main Street Aspen. Colorado From: Bruce Hazzard, Principal Inc. % �r Design Workshop, 81611 Telephone Re: Cougar Canyon (1052) 970 925-8354 Detailed Submission/ Final Plat Facsimile Date: May 28, 1997 970 930-1387 Pursuant to our meeting in your office last week, the Applicant on the above referenced Albtttlttertlue project is willing to mitigate the minor PM -10 impacts of the project through a reasonable Denver cash -in -lieu payment to Pitkin County. The Applicant's interest lies in these monies going Jackson I1ole toward the future construction or paving of new trails within Pitkin County. Your help in determining the reasonable nature of this amount is appreciated. Phoenix Santa Fv As always, feel free to call me if you have questions. S, -Io Paulo Vail DESIGNWORKSHOP MEMORANDUM To: Ellen Sassano, Planning. Office From: Lee Cassin, Environmental Health Department �I(K Date: August 21, 1995 Re:. Cougar Canyon Subdivision Conceptual Submission, Rezoning, GM.QS Exemption & 1041 Hazard Review Parcel ID # 2643-212-00-008 The Aspen/Pitkin Environmental Health Department has reviewed the details of the Cougar Canyon application under the authority of the Pitkin County Land Use Code and has the following. comments. ADEQUATE PROVISIONS FOR WATER NEEDS: Sections 2-17 and 3-1104: "It is the policy of the County, to insure the availability of a water supply of adequate quality, quantity, pressure and dependability for fire protection and support of a proposed land use prior to approval of the use. The County shall require -land uses to hook up . to existing public systems if service is available." This Department will need adequate information on the quantity and the quality of water available.. Quantity can be evaluated by tests of on-site wells by a water engineer's or well driller's report. The applicant must ensure that the water quality is acceptable by having it tested.by a lab such as the Snowmass Water and Sanitation District or Aspen Consolidated Sanitation District. Water of acceptable quality and quantity has been obtained in other lots in this area. Before a septic permit can be issued, the well must be drilled to assure that setback requirements from the well to the septic system can be maintained within the building envelopes.'Pitkin County Land Use Code requires that the well site be within the building envelope. Water quality in some wells in the Brush Creek Village area is somewhat undesirable in that it may. have a taste or color due to minerals, but quality has been found to be acceptable in terms. of meeting health standards. Low water landscaping (xeriscaping) would decrease the amount of water required to serve these homesites. F__� A condition of approval for this application is the receipt of information documenting that the locations of the wells meet setback requirements and can be placed within the building envelopes and that quantity/quality of the well water are adequate. Without meeting these requirements, septic permits and building permits can not be issued. SEWAGE TREATMENT AND COLLECTION: Sections 2-18 and 3-1105: "It is the policy of the County to ensure that -adequate sewage treatment facilities are available to serve existing and new developments. Public and private sewage disposal systems and connections to such systems shall comply with the sewage disposal guidelines of Pitkin County's -Individual Sewage Disposal System Regulation." Lots in the Cougar Canyon area are served by individual septic systems. All such systems installed within Pitkin County require septic permits issued by the Environmental Health Department, and must comply with the County's septic regulations. The Aspen/Pitkin Environmental Health Department will design the system for the applicant as part of the permit fee, if an engineered system is not required: We will do a site visit, advise the applicant about the best location for the system and provide.a' system design. We will determine if an engineered system is needed based on soil test results. An engineered system is required if any one of the following conditions occurs: a percolation rate faster than 5 mpi or slower than. 60 mpi; :maximum seasonal level of the groundwater table or bedrock, less than four feet below the bottom of the proposed. absorption system; or a slope in excess of 30%. Prior to initiating any tests at the site, the applicant should contact this office. To receive a septic permit, the applicant should contact this office. It must be possible to design -an adequate septic system before a building permit can be issued: We believe it will be possible to install either a conventional or -an engineered septic system on these lots. Areas of over 30 % slope require engineered systems, but the applicant has located.building envelopes in relatively flat areas. The large.sizes of the houses will, require large septic systems, with systems of a couple of thousand square feet not uncommon. While the building envelopes are large, they are not large enough in every dimension to easily install a large, septic system, 100 ft from the well, and a large house, without carefully placing the components in the building envelopes. The area for the leach.fieldshould be located in ani area. of no traffic, planted with dry land grass, and should not be watered: It is desirable to locate the system below the house so that the system can operate by gravity. Measures to mitigate water drainage from runoff may be required, since these steep slopes often have melt water or spring. water on them a significant part 0f the year. These could include but are not limited to culverting or creating diversion swales to move the water away from the septic system. In regard to the discussion of reduction in density for steep slopes, the land with over a 45% slope could not have septic systems installed on it in any case, with the possible exception of engineered systems. A condition of approval for this application is the receipt and approval of the septic permit by the Environmental Health Department before.a building . permit can be issued. WATER QUALITY IMPACTS: Sections 2-14 and 3-705 and 3-710: "It is the policy of the County to preserve and protect its present water resources. To this end it isthe policy of the County that no land use be initiated which would adversely affect the quantity; quality, or accessibility of the County's water resources; or which would occur at the expense of established water -dependent agricultural activities; or which would result in increased salinization of water resources, loss of minimum stream flows; further destruction of wildlife habitat, or major expenditures to reacquire or redistribute major water resources. It is also the policy of the County to maintain a natural vegetative buffer along its surface waters such that the surface and groundwaters of the area are not encroached upon by land uses or other human activities which. could cause. deterioration of water quality or impair the natural treatment processes provided by meadows and wetlands." . The Environmental Health Department will be addressing water- quality impacts on down stream water quality. This application is not expected to impact down stream water quality if the minimum horizontal distances between components of the septic systems and physical features are in accordance with the Pitkin County Sewage Regulations. There is no. condition of approval for water quality impacts. AIR QUALITY: Sections 2-13 and 3-602: "Only that development is permitted which will not contribute significantly to degradation of air quality in Pitkin County. Developments may not constitute an indirect or direct air pollution source under Federal, State or County _regulations." This project would contribute to air quality degradation in Pitkin County; especially in the PM10 norlattainment area, .if mitigation measures were not included. The PM10 emissions from 70 VPD in the nonattainment area must be mitigated. Proposed mitigation. measures will have to be evaluated to ensure they will fully offset any increases in traffic or PM -10. The applicant has not discussed or listed any proposed mitigation measures. Possible measures include provision of bike paths, .paving of presently unpaved areas, provision of van service, or participation in mass transit. A condition of approval should be: "prior to -detailed submission, the applicant must provide a PM10 mitigation program containing. specific, enforceable control measures, which must be approved bythe Environmental Health Department. The plan must include documentation showing that the proposed.. mitigation measures will fully mitigate or offset all PM10 increases caused by the project in the. nonattainment area." Activities such as road building and landscaping require a Fugitive Dust Plan. This'plan would need to include, but is not limited to,.fencing, watering of haul roads and disturbed areas, daily cleaning of adjacent paved roads to remove mud that has been carried out, speed limits, .or other measures necessary to prevent windblown dust from crossing the property line or causing a nuisance. A condition should.be approval by the Aspen/Pitkin Environmental Health Department of the fugitive dust control plan, containing enough measures to ensure that dust does not become a nuisance or blow onto adjacent property. The less densely populated parts of the county like the Cougar Canyon/ Cozy Point area may have two devices per building: a maximum of one wood burning fireplace and a second device which can be either a gas log fireplace or a certified woodstove. In addition, unlimited numbers of decorative gas appliances are allowed. Coal may-not be burned in any device. No,fireplace or solid fuel burning stove may be installed inbarns or agricultural buildings. A-condition of approval for this application is the receipt and approval, of the fireplace/woodstove permit by the Environmental Health Department before the building permit can be issued. CONFORMANCE WITH OTHER 'ENVIRONMENTAL HEALTH LAWS: Section 2-7: "it is the policy of the County to ensure that no use os development of land is permitted which is in violation of the laws of the County, the State of Colorado, or the United States of America." This Department is not aware. of any issues of concern regarding other environmental health laws. coat/' LJ U U� Of L'i W 40 Z S L�j 20 7 h C *35 E S2 LZ < Uj V) < P; IHI 7_� Ll A —A — - --- -------- .42 ......... .... v Xfj < /* U A 3h.ZrX0400 N-' <; in, .01 0 V CN O� CL 4\ 0 ')e 0 J f \N N Zo A_ VQ �Zz, 7- 7r77:777 -z, �*r, R14041 IMPROVEMENTS AND SERVICES- �".P "i 4�J ROADS AND ACCESS F— C) .j q �g j 0 r FIZ A COUGAR CANYON EXISTING CONDITIONS 16 Z _Ott :-- ` '. 1, j ", i � - k - , :,,, , I . 7�� I Pitkin County, Colorado �,V r �G, Tol _N 1. L 0400", N A-1 Z, CONCEPTUAL SUBMISSION: "Well 113 71' Scale: 1 400' February 15, 1995 Prepared for: Coz) Point Partners, L.P. Prepared by: Design Workshop, Inc. Myler Stuller Schwartz, PC 120 E. Main Street 100 South Mill Street Aspen, Colorado 81611 Aspen, Colorado, 81611 o� Q CL 4-j x 1"- > 7, C44 "'.1 V 0 00 LO (31 & C) CO CO bx V CN O� CL 4\ 0 ')e 0 J f \N N Zo A_ VQ �Zz, 7- 7r77:777 -z, �*r, R14041 IMPROVEMENTS AND SERVICES- �".P "i 4�J ROADS AND ACCESS F— C) .j q �g j 0 r FIZ A COUGAR CANYON EXISTING CONDITIONS 16 Z _Ott :-- ` '. 1, j ", i � - k - , :,,, , I . 7�� I Pitkin County, Colorado �,V r �G, Tol _N 1. L 0400", N A-1 Z, CONCEPTUAL SUBMISSION: "Well 113 71' Scale: 1 400' February 15, 1995 Prepared for: Coz) Point Partners, L.P. Prepared by: Design Workshop, Inc. Myler Stuller Schwartz, PC 120 E. Main Street 100 South Mill Street Aspen, Colorado 81611 Aspen, Colorado, 81611 Z �11 -k 4-j 0 00 LO C) CO CO bx L(S C\2 m Q) 0 co C\2 0 ,---i co Z �11 -k