Loading...
HomeMy WebLinkAboutpitkin.eh.264321102031 (2009)iTIK, IN Cott Nol Permit #: 09019 ONSITE WASTEWATER TREA"i __.cNT SYSTEM (OWTS) CONSTRUCTION PERMIT 0405 Castle Creek Road, Suite 10 - Aspen, CO - 81611 Phone: 970.920.5070 Fax: 970.920.5077 Parcel ID #: 2643-211-02-031 Permit Issued: ®NEW ❑REPAIR ❑REMODEL/ADDITION ❑TANK ONLY ❑FIELD ONLY ❑AMENDMENT Owner(s): Paul Tefft Property Address: TBD Lower Bullwinkle Road /bG Lo-kH r 8a I/w, Legal Description: Lot 69 Filing 4 W/J Ranch Size of Lot: Size of Building 376 Acres Detached Accessory Unit: ❑YES ®NO 3500 Sq. Ft. Size of Accessory Unit: The system is desigred for: 4 bedrooms (office is not considered to be a potential bedroom) Designed By: All Service Septic, LLC Phone #: 970-618-5033 Fax # 303-216-2796 Perc Rate: 20 mpi Minimum Tank Capacity: Project #: Sq. Ft. 1602 Dated: June 4, 2009 Mailing Address: PO Box 2844 Glenwood Springs, CO 81602 Email Address: Tpetzl @comcast.net Profile Hole Depth: P1, P2 8 ft Depth to Groundwater or Bedrock: 1125 gallons Minimum Absorption Area Permit Conditions: Greater than 8 ft 563 so ft w/ 50% reduction This OWTS Construction Permit is approved on the condition of compliance with the engineer design as submitted with the application and the specifications cited above. Changes must be approved by this Department and the engineer prior to construction. This system will consist of one 1500 gallon two-compartment tank with an Biotube pump vault in the second compartment. A 2" line will pump effluent to the distribution box and then to 4 trenches, each with 15 Quick 4 gravelless chamber units in each for a total of 60 chambers. There must be at least 6' of undisturbed soil between each trench. The distribution box must be have a baffle, should be leveled with water at the time of final inspection to be sure effluent is being distributed evenly, and be accessible from finished grade. This Permit must be kept on-site curing installation. The engineer must do a final inspection of the installation and submit an "as -built" letter to this Department within 30 days of the final inspection, unless a longer period of time has been agreed upon, in writing. This Department must also be called for the final inspection with a minimum of 48 hours notice. Minimum horizontal distances between components of the system and physical features shall conform to the requirements of the Pitkin County OWTS Regulation. This Permit is conditioned upon the property owner(s) providing for regular inspection, cleaning, and maintenance of the system by qualified personnel, in accordance with the manufacturer's recommendations and the requirements of the Pitkin County OWTS Regulation. THIS PERMIT IS EXPRESSLY CONDITIONED UPON COMPLIANCE WITH ALL REQUIREMENTS OF THE PITKIN COUNTY OWTS REGULATION, INCLUDING BUT NOT LIMITED TO THOSE CONDITIONS SPECIFIED ABOVE. Plans and specifications for the proposed OWTS have been reviewed and are considered satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated in accordance with the Pitkin County OWTS Regulation. This Permit will expire 1 year from the date of issuance unless construction on the system has commenced. An "as -built" drawing must be submitted and approved by EH/NR before final approval of the system will be issued. Issued By: �/� ���sC Date: (� �i` Expires:lC��l Installer: t , License #: Reactivation Authorized by: L �n 3 Final Approval Issued B: 0Date: New Expiration Date: Fee PaW �. / ONSITE WASTEWATER TREATM( t SYSTEM (OWTS) D CONSTRUCTION PERMIT APPLICATION E 0405 Castle Creek Road, Suite 10 • Aspen, CO • 81611 F[/NR Phone: 970.920.5070 Fax: 970.920.5077 Parcel ID# (available from the Pitkin County Assessor's Office Company: 970-920-5160 or at City, State, Zip: Purpose of Permit: NEW El REPAIR DUE TO FAILURE ❑ REMODEL/ADDITION ❑TANK ONLY ❑FIELD ONLY Cost of System Repair or Remodel/Addition (approximate): Fax Number: Property Address: L_ t (c 1 S -,Q Lot: Block: Fi in : (' Subdivision: L,)i y f2,,jn� Property Owner(s)`:_ Email Address: Owner's Mailing Address: City, State, Zip: ® S N ,! ow Iti 1 fi S s U`tL C 0 HopV Phoneg\Busin Phone: l4 1-0) (i -�.l 7)C1 _S �� 1 I � p � 'Contact information must be provided for the owner sianina this application Primary Contact Person/Applicant (if not owner): Company: Contact/Applicant Mailing Address: City, State, Zip: Cell Phone: Business Phone: Fax Number: Email Address: Building Permit # (if applicable): Lot Size (in acres): Size of Building (square feet): Number of Potential Bedrooms: ,SCG Li rvrfit— Detached Accessory Unit? ❑ YES ® NO Size of Accessory Unit (square feet): Number of Potential Bedrooms In or Fixture List for the Accessory Unit: Water Source: ❑ PRIVATE WELL [—]SURFACE WATER ❑ SPRING 0 COMMUNITY/PUBLIC WATER SYSTEM Name of Community/Public Water System (if applicable): k1) j I1-6 4T-STJ""�Z�� Engineering Firm: Job Number: onetuber: Fax N tuber: S L- %L %JrU Sti I'T C i ru v? (�} — �U 3� Mailing,Mdress: City, State, Zip: I certify that the above information is complete and accurate and that I have provided complete and accurate information in all of the documents included in my application package. I acknowledge that EH/NR may revoke any permit I am issued if my application is found to contain any inaccurate, false, or misleading information. I understand that no construction may be undertaken on an OWTS until an OWTS Construction Permit is issued. OwnerSig :Required ' Date: Applicant ignature: Date: FOR OFFICE USE ONLY Received by EN! Staff: Fee & Receipt #: Date: > �ti a ���P � /02 � / / 150cc-, 0 Updated 10/7/08 H r PO Box 2844 Glenwood Springs, CO 81602 SE�Y�CE Ph 970-618-5033 L L tax 303-216-2796 December 20th 2010 Enviro-actions Productions, Attn: Paul Tefft PO Box 4784 Aspen, CO 81612, Installation Observations Lot 69, Filing 4, W/J Ranch, Permit 409019 Lower Bullwinkle Road Pitkin County, Colorado Paul and John, Project No. 1602 ALL SERVICE septic, LLC performed installation observations for the onsite wastewater treatment system (OWTS) on June 23rd and December 7th 2010 for the subject property. The installation included a 1500 -gallon, two-compartment, concrete septic tank with a Biotube Pump Vault, followed by gravelless chamber trenches. There were 4 trenches, each with 21 `Quick -4' chambers. The number of proposed chambers was increased due to not having the required spacing between trenches during construction. A total of 84 chambers, equaling 829 SF of area were installed. A distribution box, brought to grade, was installed to distribute effluent to the drain field. The control panel, pump, and alarm were installed and was tested on December 7th. The pumping system was wired and working and actively dosing the drain field. Drain back was observed. The OWTS was generally installed according to specifications. This observation is not a guarantee of workmanship and/or parts and materials. ALL SERVICE septic, LLC should be notified if changes are made to the OWTS. LIMITS: The observation was based on information submitted and our site visit. If conditions are different from conditions described in this letter, ALL SERVICE septic, LLC should be notified. All additional OWTS construction must be according to the county regulations. The installer should have documented and demonstrated knowledge of the requirements and regulations of the county in which they are working. Sincerely, ALL SERVICE septic, LLC Reviewed 1 Timothy R. Petz i 2 copies sent Richard H Copy sent to Pitkin County Health Dept. 377.1 S88E AS -BUILT LOT 69A - SEPTIC LOT FOR LOT 69 N N 39'34.661 OBSERVATION 106'22.135 PIPES (TYP) j "I \. N 39'34.660 FOUR GRAVELLESS CHAMBER W 106'22.133 TRENCHES WITH 21 'QUICK -4' CHAMBERS PER TRENCH. JD' SCALE: 1" = 30' TOTAL CHAMBERS = 84 TOTAL AREA = 830 SF /. ap\ SDR 35 PVC \ �ti N 39'34.658 / W 106'22.131 DISTRIBUTION BOX WITH / BAFFLE BROUGHT TO GRADE WITH SPRINKLER BOX RISERS. 2" PVC PUMP LINE (2% MIN FALL BACK TO TANK TO COMPLETELY DRAIN PIPE) R — -- - MlII10'E 1W.9D' M y F`. R mw.. N 39'34 645 o W 106 22.13'1 1500 -GALLON, CONTROL TWO-COMPARTMENT PRECAST O, `''` PANEL PROPOSED CONCRETE SEPTIC TANK WITH4-BEDROOM D BIOTUBE PUMP VAULT. } RESIDENCE \\® RESI 4" SEWER PIPE. SDR 35 PVC. 2% FALL TO TANK. LEANOUT \ LOT 69 \ 0.376 AC± LOT 69 AND LOT 69A ALL SERVICE SEPTIC, LLC PRO. NO. 160 W/J RANCH PO Box 2844, Glenwood Springs, CO 81602 PITKIN COUNTY, COLORADO 970-618-5033 Pitkin County Environmental Health Department Contact Log Sheet Mame: ParcellD#:Address: o 1r Date ._ Persona-ken To - Comments / Action to be. Taken _ :.- -- .Initials Time .0a OD V�f to iin vt c r o 0 47 /� Ci w.- io � •2C� G Carla Ostberg From: Debbie Weinant Sent: Monday, June 29, 2009 2:00 PM To: Andrea Orrison; AnnMarie Prince; Bonnie Waechtler; Brian Nichols; Brian Pawl; Bruce Romero; Carla Ostberg; Carole Twitchell; Catherine Berg; Cory Garske; 'Dawn Sager'; Debbie Weinant; Debby Payne; 'Dellis'; gavette@carbondalefire.org; Ginny Bultman; Jeff Rice; 'Jim Wilson'; Joanna Schaffner; Laura Meyer; Lee Ledesma; Mary Lackner; Sam Irmen; Sandy Boteilho; 'Scott Thompson'; Temple Glassier; Tom Parry; Tony Fusaro; Tony Popish; Tricia Louthis; Vicki Monge Subject: New Address 160 Lower Bullwinkle Attachments: Lower Bullwinkle 160.pdf New Address: 160 Lower Bullwinkle Ln PIN: 2643-211-02-031 Owner: Paul Tefft Debbie Weinant Pitkin County Community Development 130 5 Galena St Aspen, CO 81611 970-920-5525 Now OWTS DESIGN CALCULATIONS - for Pitkin Owner's Name Parcel ID # �. �t�,�� �� �� � 4 ;s a.-s•.� House Size (sq. ft.) " (75 gpd or 100 gpd) 75 Number of Bedrooms in Main House Number of Offices, Libraries, Studies, Similar -sized Rooms in Main House Number of Bedrooms in Detached Caretaker unitf Number of Offices, Studies, Similar -sized Rooms in Caretaker Unit =Iy 1 (If the caretaker unit is ATTACHED, treat as if part of main house.) Average Daily Waste Flow 600 State Review Required? no Perc Rate 20 (T) Design Flow (Q) _ # potential bedrooms X 2 people/bedroom X gpd X 1.5 Q= 900 Minimum tank capacity 1125 gallons Absorption Area (=Q/5 X SQRT perc rate)(1.4 loading factor) A = 1,127 sq. ft. of absorption area required Absorption Area (=Q/5 X SQRT perc rate) WITH SECONDARY TREATMENT (no loading factor) A= 805 sq. ft. of absorption area required Abs. Area w/ loading factor (B25) Trench Bed Quick4 Trench Quick4 Bed Pipe and Gravel (-10%) 1014 no red. 1127 103 114 Dosing (-20%) 902 (-20%) 902 91 91 Chambers (-30%) 789 (-10%) 1014 80 103 Max Allowable (5m 563 (-30%) 789 57 80 Secondary Treatment Abs Area w/ out loading factor (B28) Trench Bed Pipe and Gravel (-10%) 724 no red. 805 73 82 Dosing (-20%) 644 (-20%) 694 65 65 Chambers (-30%) 563 (-10%) 724 57 73 Max Allowable (-50%) 402(-30%) 563 41 57 100 SETBACK FROM WELL # of feet = 50 SETBACK FROM POND, STREAM OR IRRIGATION DITCH # of feet = 25 SETBACK FROM DRY GULCH # of feet = 0 Q 4 PO Box 2844 Glenwood Springs, CO 81602 Ph 970-618.5033 ( W303-216-2796 June 4, 2009 Enviro-actions Productions, Attn: Paul Tefft PO Box 4784 Aspen, CO 81612 Project No. 1602 Subsurface Evaluation and Revised Onsite Wastewater Treatment System Design, 4 -Bed Residence Lot 69, Filing 4, W/J Ranch Lower Bullwinkle Road Pitkin County, Colorado Paul, ALL SERVICE septic, LLC evaluated the subsurface conditions prepared by CTL Thompson, Pro No GSO4478-130 and prepared a revised onsite wastewater treatment system (OWTS) design for the subject residence. The revision is based on a change in the total number of bedrooms. The property is located outside of Woody Creek, in an area where OWTS are necessary. SITE CONDITIONS A 4 -bedroom residence is proposed as indicated. The proposed drain field area is relatively flat and is located approximately 100 feet to the northeast of the proposed residence. The proposed drain field area and surrounding area has been set aside by Pitkin County to serve the wastewater needs for the subdivision. Water is provided by the local water district. SUBSURFACE The subsurface was investigated by CTL Thompson, under Pro No GSO4478-130. The subsurface materials consisted of silty clay to sandy clay with gravel and cobbles. Groundwater or bedrock was not encountered. Percolation tests were conducted and a 20 minutes per inch (MPI) rate will be used to design the OWTS. DESIGN SPECIFICATIONS The OWTS design is based on 4 -bedrooms and an average sewage load of 600 GPD. The installation must include a 1500 -gallon, two-compartment, precast concrete septic tank with a Biotube pump vault, followed by a gravelless chamber trench drain field. The trenches must have 4 rows of 15 chambers for a total of 60 `Quick -4' chambers, equaling 593 square feet (SF) of infiltrative area. A distribution box with a baffle must be installed. The distribution box must have a riser to surface for access. Construction must be according to the Pitkin County Environmental Health and Natural Resources Department OWTS regulations, the OWTS Construction Permit provided by Pitkin County Environmental Health and Natural Resources Department, and this design. SubsurfaceEGaluation and Revised OWTS Design Project No. 1602 6/04/09 Page 2 OPERATION INFORMATION AND MAINTENANCE The surface of the drain field should be seeded upon completion. Vegetation is an important factor in drain field performance. Erosion control should be practiced prior to and during re -vegetation. Geo - fabrics or plastics should not be used over the drain field. No heavy equipment, machinery, or materials should be placed on backfilled drain field. Livestock should not graze on the drain field. Plumbing fixtures should be checked to ensure that no additional water is being discharged to OWTS. For Example, a running toilet or leaky faucet can discharge hundreds of gallons of water a day and harm a drain field. The homeowner should pump the septic tank every two years and clean the effluent filter as needed. Garbage disposal use should be minimized, and non -biodegradable materials should not be placed into the OWTS. Grease should not be placed in household drains. Loading from a water softener should not be discharged into the OWTS. No hazardous wastes should be directed into the OWTS. Mechanical room drains should not discharge into the OWS. The OWTS is engineered for domestic waste only. ADDITIONAL CONSTRUCTION NOTES If design includes a pump, air release valves and weep holes should be installed to allow pump lines to drain to minimize risk of freezing. Excavation equipment must not drive in excavation of drain field due to the potential to compact soil. Extensions should be placed on all septic tank components to allow access to them from existing grade. Precast concrete tanks and distribution boxes should be used, unless plastic or fiberglass is required. Access to all tank compartments and distribution devices is optimal. INSTALLATION OBSERVATIONS ALL SERVICE septic, LLC, and the county must view the OWTS during construction. The OWTS observation should be performed before backfill, after placement of chambers and distribution pipes. Septic tanks, distribution devices, pumps, dosing siphons, and other plumbing, as applicable, must also be observed. ALL SERVICE septic, LLC should be notified 48 hours in advance to observe the installation. LIMITS: The design is based on information submitted. If soil conditions encountered are different from conditions described in report, ALL SERVICE septic, LLC should be notified. All OWS construction must be according to the county regulations. Requirements not specified in this report must follow county regulations. The installer should have documented and demonstrated knowledge of the requirements and regulations of the county in which they are working. Please call with questions. ALL SERVICE septic, LLC Timothy R. Petz 3 copies Reviewed �1 1� Richard H 40 �lc i o' c 4 SCALE: 1" = 20' LOT 69A - SEPTIC LOT FOR LOT 69 LOT 69 AND LOT 69A W/J RANCH ,U Project No. 1602 SPRINGS, 9GLENWOOD 0-618--5033 Genco Syetemem P`F Mur eek pammN(e) Rev. 06-04-09 eu wtra .Wvn[ sxnanH, artcan 4l.A-eatx F,berglus or concrete rear (recommentonk a4pfer eilh dN atlheave) ,pjpp,E; OBSERVATION FOUR GRAVELLESS CHAMBER May from Riser Stamm Steel Bolts PIPES (TYP) TRENCHES WITH 15'QUICK4 / P.0 Splice Boz "In Card Onpe I%0 are-xrot CHAMBERS PER TRENCH. Condail fo Canbd Panty Oixharge bumbF/ TOTAL CHAMBERS = 60 /q6 Hue TOTAL AREA = 593 SF o� SDR 35 PVC \ /=- \ / \ DISTRIBUTION BOX WITH BAFFLE BROUGHT TO GRADE WITH RISERS. 2" PVC OR PureCORE(tm) / PUMP LINE (2% MIN FALL j BACK TO TANK TO COMPLETELY DRAIN PIPE) 1500 -GALLON, TWO-COMPARTMENT PRECAST CONCRETE SEPTIC TANK WITH BIOTUBE PUMP VAULT.'X}} �aT 4' SEWER PIPE. SDR 35\ PVC. 2% FALL TO TANK. [CLEANOUT ;- \ LOT 69 0.376 ACt Iicvicwcd BY: laah®a LL eea, c Effluent Pumping System - 2000 -Gallon, 2-Compartment LOT 69 AND LOT 69A W/J RANCH ,U Project No. 1602 SPRINGS, 9GLENWOOD 0-618--5033 Genco Syetemem P`F Mur eek pammN(e) Rev. 06-04-09 eu wtra .Wvn[ sxnanH, artcan 4l.A-eatx F,berglus or concrete rear (recommentonk a4pfer eilh dN atlheave) ,pjpp,E; Slope Lound FMgku OaeketM Lid eifh (Ni) u9-wN May from Riser Stamm Steel Bolts fIG9sE P.0 Splice Boz "In Card Onpe I%0 are-xrot Condail fo Canbd Panty Oixharge bumbF/ _—Flnibk Hue ELECTRICAL SPECS km 2 X 20 AMP CIRCUITS TO SERVE PUMP AND CONTROL PANEL PUMP MUST BE CAPABLE OF 20 GPM, AND 17.7 FEET OF TOTAL DYNAMIC HEAD. PF30 - PUMP PACKAGE WITH STANDARD CONTROL PANEL 1/8 -Inch Weep Hole to Dram tine Le.A Contra Float Aoanby Check Vat,e (aPDarial) Vb'R mkt Parts Oren. Eftent PWnp nw Cartridge pain Port TANK SPECIFICATIONS aaabem P-9 Vwlt CAPACITY REQUIRED = 600 X 1.5 X (30 HOURS/24 HOURS) =1125 GALLONS REQUIRED TANK(S) AT STUDIO =1500 -GALLON, TWO-COMPARTMENT, CONCRETE SEPTIC TANK WITH A BIOTUBE® PUMP VAULT IN THE SECOND COMPARTMENT. TYPICAL PLAN VIEW - N.T.S. DISTRIBUTION OBSERVATION/VENT PIPES (TYP.) 2" PUMP LINE BOX WITH BAFFLE INLET FROM TANK BROUGHT TO GRADE FOR ACCESS \4" SDR 35 (I% FALL) INFILTRATOR(R) OU ICK(TM) CHAMBERS, 3' X 4' OUICKA(TM) ^ END CAPS', } _L— 1'4" SCR 35 (1% FALL TO TRENCHES, PIPE TO ENTER IN TOP PORT OF END PLATE 6' MIN. _ PIPE TO ADDITIONAL TRENCH INFILTRATOR(R) QUICK4(TM) CUT SHEET y'--% 12" 34" (EFFECTIVE LENGTH) I1'; 7---. (ii^T01 ,,,rBEDROOM MAIN RESIDENCE, <6000 SF (RSONS PER BEDROOM Q 75 GALS/PERSON/DAY) ,AVERAGE LOADING = 600 GALLONS/DAY PEAK LOADING = Q = 600 X 1.5 = 900 GALLONS/DAY LOADING = Q = 900 GALLONS PER DAY PER LATION RATE = 20 MINUTES PER INCH LCULATED AREA = ((1.5 X q) X sqrt 20) / 5 (X 1.4) =1127 REDUCTION OF 50% BASED ON DOSING AND TRENCHE = 564 SF> TRENCH SPECIFICATIONS n WIDTH OF TRENCHES = 3 FEET = 1 CHAMBER LENGTH OF TRENCHES = 60 FEET = 15 CHAMBERS TOTAL NUMBER OF CHAMBERS = 60 PROPOSED NEW INFILTRATIVE AREA = 593 SF FOUR TOTAL TRENCHES 3' 60 NOTES: TRENCHES MUST BE ANGLED TO FIT TOPOGRAPHY AND TO MINIMIZE REMOVAL OF EXISTING VEGETATION. INFILTRATOR(R) QUICK4(TM) CHAMBERS ARE CONSTRUCTED WITH A PIVOT POINTS FOR THIS PURPOSE. THE SLOPE AT THE PROPOSED DRAIN FIELD IS RELATIVELY FLAT. VEGETATION CONSISTS OF A MODERATE COVER OF NATIVE GRASSES AND WEEDS. LIMITATIONS -THESE PLANS MUST BE USED IN CONJUNCTION WITH LETTER AND SOILS DATA FORM PROVIDED. THE DESIGN IS BASED UPON INFORMATION SUBMITTED. IF SOIL CONDITIONS ENCOUNTERED ARE DIFFERENT FROM CONDITIONS DESCRIBED IN REPORT, ALL SERVICE SEPTIC L.L.C. SHOULD BE NOTIFIED. ALL OWS CONSTRUCTION MUST BE ACCORDING TO COUNTY REGULATIONS. THE INSTALLER SHOULD HAVE DEMONSTRATED KNOWLEDGE OF THE REQUIREMENTS AND REGULATIONS OF THE COUNTY IN WHICH THEY ARE WORKING. THE COUNTY AND ALL SERVICE SEPTIC L.L.C.MUST VIEW INSTALLATION ALL SERVICE septic, LLC PG BOX 2844 LOT 69 AND LOT 69A W/J RANCH ONSITE WASTEWATER TREATMENT SYSTEM DESIGN Project No. 1602 SPRINGS, 9GLENWOOD 0-618--5033 PITKIN COUNTY, COLORADO - Rev. 06-04-09 | K Lowe W/J, LLC P.O. Box 12393 Aspen, CO (11612 Attention: Mr. Jim DeFrancia Subject Percolation Testing Filings 2 and 4 Lowe W/J Project No. GSO4478-130 �11�� :kai tsr aeaa ae:r w at in or a ai ; This letter presents the results of our percolation testing for Filings 2 and 4 at Lowe W/J in Pitkin County, Colorado. Our scope of services for the project were outlined in our Proposal No. GS 05-133. The following sections describe our percolation test method and present percolation test results. Percolation 'rest Method The individual sewage disposal systems (ISDS) for lots in Filings 2 and 4 at Lowe W/J will be grouped together. Each of the twelve lots has been provided with a 1/2 acre parcel for the ISDS (see Figure 1). Our experience at the site indicates subsurface conditions are generally similar throughout Filings 2 and 4. Therefore, because of the close proximity of the ISDS locations, we judged percolation testing could be reduced to less than the typical, three pits per ISDS parcel. From a geotechnical engineering perspective, one percolation test per ISDS parcel is appropriate to estimate the design percolation rate.for all twelve of the ISDS systems in Filings 2 and 4. We discussed our proposed approach to percolation testing with Ms. Nancy MacKenzie of the Pitkin County Department of Environmental Health. Ms. MacKenzie agreed that one percolation pit in each of the ISDS parcels would likely be sufficient, provided actual conditions exposed in the pits were consistent across the site. Based on our conversation, we also decided to limit the number of profile pits at the site to two. Our staff engineer directed excavation of the profile and percolation pits on April 20, 2005. One percolation pit was excavated with a backhoe at the center of each of the twelve ISDS parcels. The centers of the ISDS parcels were staked by Schmueser Gordon Meyer, Inc., prior to excavation operations. Two profile pits 234 Center Drive I Glenwood Springs, Colorado 81601 Telephone: 970-945-2809 Fax: 970-945-7411 a 4 (Profile 1 and Profile 2) were excavated at the approximate locations shown on Figure 1. Profile pits were backfilled immediately after subsurface conditions were logged. Subsoils at the site generally consist of gravel, cobbles and boulders in a silty to clayey matrix. Graphic logs of the soil encountered in the profile and percolation pits are shown on Figure 2. Percolation Test Results The percolation pits were prepared for testing on April 21, 2005. Our staff engineer performed percolation testing in the pits on April 22, 2005. Inconsistent percolation test results occurred in pits P-1, P-3 and P-8. Thesethree percolation pits were cleaned out with a backhoe on May 11, 2005 and the pits were prepared for retesting. The retests were performed by our field representative on May 12, 2005. Test results are presented on Figures 3 through 6. Results from P-1, P-3 and P-8 are from the retests. Our percolation test results indicate that a percolation rate of about 20 min/inch should be used for design of ISDS systems in Filings 2 and 4. The absorption zone for the ISDS on each parcel should be in the silty to clayey gravel soils. We appreciate the opportunity to work with you on this project. If you have questions, ;please call. Very Truly fours CTL I THOMPSON, INC. Edward R. White, E.I. Staff Engineer Reviewed by: J es D. Kello P oject Engine,, ERW:JDK:cd LOWE W1J, LLC FILING NO. 2 AND 4, LOWE W/J PROJECT NO. G504478-130 2 i SATURATION AND PREPARATION TFERCOLAIION TEST DATE: P-1 05/11/05 and P-2 04/21105 DATE: P-1 05/12/05 and P-2.04122/05 TIME AT START OF SATURATION: 11:00 am . WAYTER IN ES XBORING AFTER 24 HOURS PERCOLATION TEST RESULTS LOWE WIJ, LLC FILING NO. 2 AND 4, LOWE WO PROJECT NO. GSO"78-130 TIME AT TART OF �TERVAL TIME INTERVAL (MINUTES) DEPTH TO WATER START OF END OF INTERVAL INTERVAL (INCHES) (INCHES) CHANGE IN WATER DEPTH (INCHES) PERCOLA- TION RATE (MIN/INCH) 1:30 15 5.25 5.75 0.5 30 1.45 15 5.75 6.0 0.25 60 2:00 15 6.0 6.25 0.25 60 -I5 15 4.5 5.0 0.5 30 -i-.-30 15 5.0 5.5 0.25 60 2: 45 15 5.25 5.5 0.25 60 3:00 15 5.5 5.75 0.25 60 3:15 15 4.0 4.5 0.5 30 3:30 15 4.5 4.75 0.25 60 3:45 15 4.75 4.75 0.0 -- 4:00 15 4.75 5.25 0.5 30 4:15 15 5.25 5.5 0.25 60 4:30 15 5.5 5.75 0.25 60 8:00 15 29.0 34.0 5.0 3 8:15 20 28.0 31.0 3.0 7 8:35 15 31.0 32.0 1.0 15 8.50 20 32.0. 33.0 1.0 20 9:10 20 33.0 35.0 2.0 10 -g-.-3 _0 20 31.0 32.0 1.0 20 9:50 20 32.0 33.0 1:0 20 10:10 20 33.0 32.0 1.0 20 Fig. 3 . Fig. 4 LOWE WIJ, LLC FILING NO. 2 AND 4, LOWE WIJ PROJECT NO. G504478-130 •PERCOLATION SATURATION AND PREPARATION TEST DATE: p-3 5112104 and P4 & P-5 04/22/05 05/11/05 and P4 & P-5 04/21/05 DATE: P-3 WATER IN BORING AFTER 24 HOURS TIME AT START OF SATURATION: 11:00 am YES PERCOLATION TEST RESULTS - DEPTH TO WATER HOLE DEPTH TIME AT TIME START OF END OF CHANGE IN WATER: PERCOLA- TION RATE NUMBER (INCHES) START OF INTERVAL INTERVAL INTERVAL DEPTH (MIN/INCH) INTERVAL (MINUTES) (INCHES) (INCHES) (INCHES) 1:30 15 5.25 5.25 0.0 -- P-3 48 1:45 15 5.25 5.25 0.0 -- 2:00 15 5.25 5.5 0.25 60 2:15 15 3.5 4.5 1.0 15 2:30 15 4.5 5.0 0.5 30 2:45 15 5.0 5.25 0.25 60 3:00 15 5.25 5.5 0.25 60 3:15 15 5.5 6.0 0.5 30 3:30 15 6.0 6.5 0.5 30 3:45 15 6.5 6.75 0.25 60 4:00 15 4.75 5.5 0.75 20 4:15 15 5.5 5.75 0.25 60 4:30 15 5.75 6.0 0.25 60 10:35 20 35.0 39.0 4.0 5 P-4 39 10:55 10 35.0. 39.0 4.0 5 11:10 5 34.0 37.0 3.0 2 11:15 5 37.0 39.0 2.0 3 7:50 15 30.0 33.0 3.0 5 P-5 36 8:05 15 33.0 35.0 Z.0 8 8:20 20 29.0 30.0 1.0 20 8:40 15 30.0 32.0 2.0 8 8:55 20 32.0 34.0 2.0 10 9:15 20 30.0 32.0 2.0 10 9:35 20 32.0 34.0 2.0 10 . Fig. 4 LOWE WIJ, LLC FILING NO. 2 AND 4, LOWE WIJ PROJECT NO. G504478-130 SATURATION AND PREPARATION DATE: 04/21/05 TIME AT START OF SATURATION: 10:30 am PERCOLATION TEST DATE: 04122/05 WATER IN BORING AFTER 24 HOURS YES X NO PERCOLATION TEST RESULTS HOLE NUMBER DEPTH (INCHES) TIME AT START OF INTERVAL TIME INTERVAL (MINUTES) DEPTH TO WATER START OF END OF INTERVAL INTERVAL (INCHES) (INCHES) CHANGE IN WATER DEPTH (INCHES) PERCOLA- TION RATE (MIN/INCH) P-6 P-7 36 35 8:05 15 25.0 32.0 7.0 2 8:20 20 25.0 30.0 5.0 4 8:40 15 30.0 32.0 2.0 8 8:55 20 32.0 35.0 3.0 7 9:15 20 31.0 33.0 2.0 10 9:35 20 33.0 35.0 2.0 10 9:55 20 32.0 34.0 2.0 10 10:25 20 30.0 32.0 2.0 10 10:45 20 32.0 34.0 2.0 10 11:05 20 34.0 34.0 0.0 - 11:25 20 31.0 32.0 1.0 20 11:45 20 32.0 31.5 0.5 40 12:05 20 31.5 32.75 1.25 16 12:25 20 32.75 33.75 1.0 20 12:45 20 30.0 31.5 1.5 13 1:05 20 31.5 32.75 1.25 16 1:25 20 32.75 33.5 0.75 27 LOWE WIJ, LLC Fig. 5 FILING NO. 2 AND 4, LOWE WJJ PROJECT NO. GSO4478-130 LOVE WlJ, LLC Fig. 6 FILING NO. 2 AND 4, LOWE WJJ PROJECT NO. GS04476-130 SATURATION AND PREPARATION PERCOLATION TEST DATE: P-8 05/12/05 and P-9 04/22/05. DATE: P-8 05/11/05 and P-9 04/21/05 START OF SATURATION: 11:00 am WAYTER IN RING AFTER 24 HOURS TIME AT ES PERCOLATION TEST RESULT DEPTH TO WATER HOLE DEPTH TIME AT E TIME START OF END OF CHANGE IN WATER PE RCOLA- TION RATE NUMBER (INCHES) START OF INTERVAL INTERVAL INTERVAL DEPTH (MIN/INCH) INTERVAL (MINUTES) (INCHES) (INCHES) (INCHES) ------------ P-8 53 1:30 15 5.25. 1:45 15 5.5 2:00 15 5.25 8:0 2.75 6 2:15 15 5.5 9.0 3.5 4 2:30 15 4.5 8.5 4.0 4 2:45 15 5.0 9.25 4.25 4 3:00 15 5.25 8.5 3.25 5 3:15 15 6.0 9.5 3.5 4 3:30 15 5.5 8.0 2.5 6 3:45 15 4.75 7.75 3.0 5 4:00 15 5.5 9.5 4.0 4 4:15 15 5.5 9.0 3.5 4 4:30 15 6.0 8.75 2.75 6 36 7:55 15 32.0 35.0 3.0 5 P -9 8:10 15 35.0 35.0 0.0 8:25 15 32.0 32.0 0.0 -- 8:40 15 32.0 36.0 5.0 4 8:55 25 36.0. 36.0 0.0 - 9:20 20 34.0 36.0 2.0 10 9:40 20 32.0 32.0 0.0 -- 10:00 20 32.0 34.0 2.0 10 10:20 20 34.0 36.0 2.0 10 LOVE WlJ, LLC Fig. 6 FILING NO. 2 AND 4, LOWE WJJ PROJECT NO. GS04476-130 SATURATION AND PREPARATION DATE: 04/21/05 TIME AT START OF SATURATION: 10:30 am PERCOLATION TEST --� i DATE: 04/22/05 WATER IN BORING AFTER 24 HOURS YES X NO PERCOLATION TEST RESULTS HOLE NUMBER DEPTH (INCHES) TIME AT START OF INTERVAL TIME INTERVAL (MINUTES) DEPTH TO WATER CHANGE IN WATER DEPTH (!NCHES) PERCOLA- TION RATE (MIN/INCH) START OF END OF INTERVAL INTERVAL (INCHES) (INCHES) P-10 38 8:10 15 29.0 37.0 8.0 2 8:25 15 33.0 34.0 1.0 15 8:40 15 34.0 38.0 4.0 4 8:55 25 34.0 34.0 0.0 -- 9:20 20 34.0 36.0 2.0 10 9:40 20 36.0 34.0 2.0 10 10:00 20 32.0 36.0 2.0 10 P-11 35 10:25 20 31.0 32.0 1.0 20 10:45 20 32.0 33.0 1.0 20 11:05 20 33.0 35.0 2.0 10 11:25 20 31.0 31.5 0.5 40 11:45 20 31.5 32.5. 1.0 20 12:05 20 32.5 33.5 1.0 20 12:25 20 33.5 34.5 1.0 20 P-12 38.5 10:35 20 35.0 37.0 2.0 10 10:55 20 37.0 37.0 0.0. -- 11:15 20 35.0 36.0 1.0 20 11:35 20 36.0 37.25 .1.25 16 11:55 20 37.25 38.25 1.0 20 12:15 20 36.0 37.0 1.0 20 LOWE WIJ,LLC Fig. 7 FILING NO. 2 AND 4, LOWE WIJ FROJEGT NO. G504478-130 . $CALF 1 I a a ti Lowe WA LLC Fip Z & 4, Lowe WN project No. GSo4478-130 / 00 v' N .de 0 40 f �' ��' •� ' 01 I / APproxima' Locations of Percoiat Pits Fl9. aJ 5e 5C LEGEND: project No. GSO"78-130 1"Ims P-8 P-9 P-10 VIA J c. NOTES: Profile and percolation pits were excavated with a backhoe on April 20, 20Q . Pits fr=fi; P_3 and P-8 were extended on May 11, 2005. Profile pits were backfilled. immediately after Subsurface conditions were logged. Grrvsl, ;.ubb!- s, bou3ders, silty to clayey, dense 90 very dense, gray, brown. (Girt, 2. Percolation pits were excavated at the center of GC—GM) each planned ISDS parcel. The centers of tho ISDS parcels were staked by Schmueser Gordon Meyer, Inc. Locations of profile pits are approximate. SUMMARY LOGS OF PERCOLATION PITS R 10 q 0 T }� x 5 O v rr m s b z o o z N O CD , xgwy��axg� 1O b WOWz N m oo, i O CO as i� ��o��wH z o a 50 oNioiaw (> > =ipcoii�io 4% N 3 imHON: M oj. WWowoi`w¢7 O o6R LL� H-M,4w;CL uU� �� w°oU Na4rW3 w Ono dr �naJpugOa� °?W °� ZSu2 pU'ww> a iwo�� GkGk LL_Q pwx° <pW6 ny W<FR-� �d FQ�N �OUYp ZJ I01n � N�aiow�6 ZZ J ¢.O zD' m�3 ae -ooi5 Gr OLLUU I�'K Z pE06 r1Q 7��pNQp0 N ep N K f U w E LL O ZnZ< fa� opn2 U�$Q m np 8i CWg.p n � a =w woox o�w ��E z V5p�g <„ ww- xC'n^� zmUO UowWm Il U01 W VJ 6w0 pm< W zzw w 2z, ��w2 N �~Ep F O�wa O S °iy z 0N¢u¢o z55� U ox o N waWY ODU� z �t�J<n ¢ O8zg2 CO Sbvi z CWC N�I J J U CL W $ U � Lu W fA �BS J M Qaum H~ U � h £J ^ ,3 T 2 '60 _ -10 lo o0 €1X.x0 z OZ s? he ry s b z o o z N O CD , xgwy��axg� 1O b WOWz N m oo, i O CO as i� ��o��wH z o a 50 oNioiaw (> > =ipcoii�io 4% N 3 imHON: M oj. WWowoi`w¢7 O o6R LL� H-M,4w;CL uU� �� w°oU Na4rW3 w Ono dr �naJpugOa� °?W °� ZSu2 pU'ww> a iwo�� GkGk LL_Q pwx° <pW6 ny W<FR-� �d FQ�N �OUYp ZJ I01n � N�aiow�6 ZZ J ¢.O zD' m�3 ae -ooi5 Gr OLLUU I�'K Z pE06 r1Q 7��pNQp0 N ep N K f U w E LL O ZnZ< fa� opn2 U�$Q m np 8i CWg.p n � a =w woox o�w ��E z V5p�g <„ ww- xC'n^� zmUO UowWm Il U01 W VJ 6w0 pm< W zzw w 2z, ��w2 N �~Ep F O�wa O S °iy z 0N¢u¢o z55� U ox o N waWY ODU� z �t�J<n ¢ O8zg2 CO Sbvi z CWC N�I J J U CL W $ U � Lu W fA �BS J M Qaum rn � e-e -_, ,- - - - - - - - - - ----------- - - - - ----------- - - - - - or 1 1 I I I I I 1 I I 1 i I ' I I I i , I � , I , I I I I I , I I I 1 I I 1 I I I , I I , # 1--------- ----------------- - I r 1 I � I I I I , I , I I i I I I , I I t I I , 1 I I I___----------- F _______- I I i � I I � I --------------- - 1 * w II 1 � , 1 - 1 I �- ----- --- ------ ------------- ----- -� 1 -0-- -G June 3, 2009 Re: Lot 69 Water Service Dear Mr. Tefft: In follow up to your request, Lot 69 is in the W/J PUD and is within the W/J Metro District. In the BOCC approval dated June 93, 2006, up to a 3,000 square foot unit was approved. This represents one EOR of domestic service from the District. The original service plan for the District also provided for up to 2,500 square feet of irrigation. The District can and will serve Lot 69 under these terms. Please provide a house plan and landscape plan for review. The tap fee of $2,000.00 must be paid and meter installed per District regulations prior to service. The WJJ District wiil also be responsible for operation of the OWTS system once it is installed. The system must be constructed to District specifications and is subject to District review prior to installation. Based on the above terms, the W/J District can provide service to Lot 69 Very trul yours, ----OA-� ilbe J Vqand Presides zA25315200%Lot 59 ran and wilt serve ltr r 1.12 Liabili . Any person violating any of the provisions of these rules and regulations shall be liable to the board for any expense, loss or damage to the District occasioned by such violation, including the District's reasonable costs and attorneys' fees to require adherence to thes rules and regulations or to collect the penalties, fees, tolls and charges due hereon er. 1.13 District Standards and Specifications. The Standards and Specifications of the W/J Metropolitan District are incorporated herein as an integral part of these Rules and Regulations. In the event any rule, regulation, or standard, adopted by the District conflicts with another rule, regulation, of standard, the District in its sole discretion shall determine which rule, regulation, or standard shall control. 1.14 Coopgative Agreement. The District has entered into a cooperative agreement with the W/J Homeowners Association. This agreement calls for the District and HOA to cooperate on matters that affect both entities, such as damage to common facilities, roads, signs, water systems, open space, et cetera, and to withhold deposits or other fees paid to ensure compliance with covenants, guidelines, rules and regulations of both entities. SECTION II. SERVICE POLICY 2.1 Eligibility of Service. All properties situated inside the corporate boundaries of the District as of its date of incorporation shall be eligible to receive water, and other services provided by the District, upon compliance with these rules and the payment of all required fees. 2.2 Inclusion of Proaerty into the District. Property not eligible for service by the District may petition the District Board for inclusion into the District, however, the decision on whether to include any property lies solely within the discretion of the District's Elected Board of Directors. Landowners wishing to include property into the District must petition the District for inclusion of such property in strict compliance with Colorado Revised Statutes, Sections 32-1-401 and 32-1-402 complete, and all administrative rules of the District as of the date of petition for inclusion. The Petitioner must pay all fees and costs associated with the inclusion and agree to be bound by all District Rules, Regulations, Standards and Specifications. 2.3 Exclusion of Property from the District. Fee owners of property within the District may petition the Board for exclusion of such property in accordance with Colorado Revised Statutes, Section 32-1-501. 2.4 Systempevelopment Charge (Tap Feel The right to take and use water distributed through or have collected by District facilities shall exist only under license and before any tap or connection is made to the District's water mains. The right to build and use an ISDS shall also exist only under similar license. Written permits, therefore, shall be obtained from the District and all required fees shall be paid. For owners building new homes on undeveloped property, there is an initial tap fee, or system development charge, of $2000/EQR *for non free-market properties and $6000IEQR * for free-market properties. This fed shall be collected at closing when any person purchases a parcel of undeveloped 0 proper from Lowe W1J, LLC. Tap fees may be used for any purpose authorized by the Board. Tap fees do not include any other fees or expenses related to connecting water lines or building ISDS, including all inspection fees. (*One EQR = 3000 square feet of grossAoor space excluding garages.) All pro erties within the District which were already developed and receiving water service from Lowe W/J, LLC, the owner of the water system prior to the transfer of'the Water stem to the District, are automatically licensed and not charged this tap fee. However, if and when any property owner's ISDS fails and has to be replaced old or new, said pr�perty owner shall pay this tap fee prior to replacement. Except for this fee, however, the replacement cost of the ISDS will be the responsibility of the District. Applieotion for water tap permits or road access shall be made to the District on forms furnished by the District which shall give a full description of the work to be done, the address of the property or unit seeking to connect, the name of the licensed & approved contractor to perform the work under the permit, and such other information as may be required by the individual permit. Any permit may be revoked if the installation or use covered by the permit is not in accordance with requirements of these regulations or any prescribed standard and specification of the District or any governing rule of the Board. The Licensee shall have the right to use water only on the licensed premises and for the purposes specified in the license, subject to the modification, suspension or revocation of such license as provided herein. Licenses attach to the licensed premises only. Licenses are not affected by changes in ownership of the licensed premises. Licenses can not be transferred from one premises to another without the prior written consent of the District. 2.4.1 Accessing District Facilities. No District water main or other district facility shall be tapped into or connected to without first having received a tap permit as described in Section Il, paragraph 2.4, above, and second, having scheduled a tapping or connection date and time with the District's manager. All taps and Connections to District facilities shall be made in accordance with the District's Standards & Specifications, Appendix II. No tap made to any District main shall be buried prior to inspection by a District Representative. Taps to District facilities shall only be made by District approved contractors or District Staff. See Appendix 2.4.2 Sewer or Water Service and Main Access Easements. Any landscaping improvements shall be precluded from easements that are expressly designated and anted upon which an access platform has been constructed, and which route is ecessary to serve as the only assess to District facilities. Examples of such improvements may include but are not limited to trees, berms, bushes, rock walls, d any landscaping or improvements that would inhibit the District's access to and long the access easement. Any landscaping in these areas will be the responsibility f the homeowner to install, maintain, or replace. I Sao, 20' x 443.10' I la J.I 1 '41 IR p 8�41 TO' 9 -Zi� -0 __J4F?W 147. 70' aml-io"t 14970' In r2.r. ro,!uw T_ Wov?c G) r 'o 0- -Orb, F-) WN8 LEN, ,ktn- 06 08Z 6�4,0 s W-41 0) ;u st V" nj TO jr It •78.80• Ld '41 Sam - 4 L Sao, 20' x 443.10' I la J.I 1 '41 IR p 8�41 TO' 9 -Zi� -0 __J4F?W 147. 70' aml-io"t 14970' In r2.r. ro,!uw T_ Wov?c G) r 'o 0- -Orb, F-) WN8 LEN, ,ktn- 06 08Z 6�4,0 s W-41 0) ;u st V" nj TO jr It •78.80• Ld '41 Sam - - . — — . — — — XW`­ AdIftL_ . — 4 - . — — . — — — XW`­ AdIftL_ . —