Loading...
HomeMy WebLinkAboutpitkin.eh.264322301037 (2001) MEMOC Joanna Schaffner, 02:47 PM 05/30/2001, Sailor Building permit To: Joanna Schaffner <joannas@ci.aspen.co.us> From: Nancy MacKenzie <nancym@i.aspen.co.us> Subject: Sailor Building permit Cc: Bcc: Attached: Michael Sailor 0496 McLain Flats Rd No change is required to the septic system. The original system was sized for 4 bedrooms and the changes do not increase the bedroom count. Please sign off for me on the building permit for a remodel. Thanks - Nancy Printed for Nancy MacKenzie <nancym@ci.aspen.co.us> Omsk (ry -3 - D%- 073% Pitkin County Environmental Health Department Contact Log Sheet Name: ParcelID#: Address: -. two Date I Person Spoken To Comments / Action to be Taken -c Initials ITime i 05/05/2001 07:36 FAX 9709202369 MichaelSallorIns Michael C. Sailor 600 E. Hopkins Ave., Suite 303 Aspen, CO 81611 970-920.9500, phone 970-920-2363,fax February 9. 2001 To: Joanna Schaffner, Community Development From: Michael Sailor Subject: Updated Permit Application Addendum for 0496 McLain Flats Road Per our previous discussion, the following information will describe work done at my home. 1. Bath 1: Replaced bathroom sink in a bathroom that was "wall mounted," to a cabinet and sink top. 2. Bath 1: Replaced bathroom sink in a bathroom that was "wall mounted,' to a cabinet and sink top. 3. Bed 1: Added closet organizer. 4. Bath1: Added new showerhead. 5. Kit 1: Added under cabinet microwave and exterior vent to blow cooking fumes out of home instead of recycled through my home. 6. Bed 3: Added an exterior deck (10' X 10') and a door for access. 7. Study 1: Added interior nonstructural wall and closet including internal frame of unfinished doorway, (doorway to be completed this summer). 8. BA 1: Wet Bar Area added cabinets, sink, dishwasher, stovetop, and washer/dryer. Work permit request for future work to be done. 1 _ Study 1: Install and complete doorway on interior wall. 2. BA 1: Remove stovetop and replace with cabinet. 3. Kit 1: Add under counter cabinet and removable trash bins. 4. Bath 1 & 2: Plumbing, add hot water pressure valve in each bathroom, upgrade one toilet, upgrade on hot water heater. 5. Various: Replace some exterior windows and doors. 5. L 1: Add coat closet and shelves. 7. Bed 1: Repair hole in bathroom wall_ 8. R 1: Reattach ceiling fan. 9. L 1 & Kit 1: Pargo or other brand kitchen/laundry floor. Thank you for you help. I look forward to speaking with you soon. Z02 S jo I� Z'J U 3o js �b �r S� SS 60 TaEFo�E 0 CA � P�Iek -SX y P", % lNul