Loading...
HomeMy WebLinkAboutpitkin.eh.272929100006 (2010)_MEMOMEMORANDUM To: Lance Clarke and Cari Anne Holcomb, Planning Department From: Carla Ostberg, Environmental Health Department Date: December 10, 2010 Re: Redstone Castle Tours, Special Event Application SUMMARY: The applicant is requesting approval for tours of the Redstone Castle from January 1, 2011 through December 31, 2011. DISCUSSION: The Pitkin County Environmental Health Department has reviewed the details of the Redstone Castle Tour Application under the authority of the Pitkin County OWTS Regulation and has the following comments. Progress on approvals and construction for wastewater treatment facilities to serve the Redstone Castle are continuing. To date, approval for the Site Location Application has been granted by the state. Due to a delay in that process, a revised plan and timeline has been presented in a letter submitted by Sopris Engineering dated December 10, 2010. Sopris Engineering will be proceeding with the submittal of a design for a State -permitted onsite wastewater treatment system with design flows of approximately 7100 gallons per day to serve the current and future development of the Castle facilities and operations. Highlighted below are revised benchmarks that are to be accomplished during this application timeframe (prior to December 31, 2011). • Prior to December 31, 2010, submit completed Design Review Application to State; • Prior to February 28, 2011, obtain verbal approval of Design Review Application from District Engineer and begin discussions, as needed, with Pitkin County for existing and potential expanded usage of the facility; • Prior to May 30, 2011, obtain written approval of Design Review Application from State; • Prior to October 30, 2011, obtain any necessary permits from Pitkin County in preparation for construction and begin construction; With the assumption that these steps are accomplished under the anticipated timeline, commencement of work is anticipated by October 30, 2011. This department recommends approval of the Special Event Application with the following conditions: • Tours of no more than 80 people per day; • No food or beverage shall be provided; • There shall be no overnight lodging of guests; Printed on Recycled Paper Submission of documentation to this department detailing the accomplishment of the above referenced "benchmarks" on both May 30, 2011 and October 30, 2011; and Submission to this department of any revisions to the timeline and implementation of the plan that may be necessary. Printed on Reryrlyd Paper December 10, 2010 Carla Ostberg Pitkin County Environmental Health 0405 Castle Creek Road, Suite 10 Aspen CO 81611 RE: Redstone Castle — Draft Master Plan Status Summary and Revised Timeline for Sewage Improvements, Pitkin County, CO SE Job No. 27175.01 Dear Carla: Pursuant to our agreed limited operations protocol, this revised master plan status report presents a summary of our current status, continuing permit process and a revised time line to satisfy the permanent solution to handle sewage at the above referenced Site. The site Application has been approved by the State and we have been cleared to submit the design review application along with the Discharge permit application. The Site Approval Application was submitted on May 5, 2010. A request for additional information was received and a response was sent on June 23, 2010 and July 2, 2010 respectively. The final approval letter for the site application was received on August 21, 2010. Continued work on the Design Review plans has been performed, however due to the later than expected Site Location approval notice, our early fall work load and time availability the design review application submittal has been delayed. We anticipate submitting the package prior to the first of the year. The plan to be submitted for the final design review is the same as that approved in the Site Application with additional treatment system and infrastructure design and details. The Design criteria remains the same with anticipated design flows of approximately 7100 gpd to serve the current and future development of the Castle Facilities and operations. Additional specification and construction notes will be included. A Pitkin County OWTS Permit will be applied for with application reviews running concurrently. The Design Review package report, plans, details, construction drawings and appendices along with a accompanying Pikin County OWTS application will be submitted to satisfy the County Design review requirements. Pitkin County OWTS permit approval will be contingent on State approval. In order to continue the process of implementing this chosen long term onsite solution we have created the following revised draft timeline schedule. The following items have been performed to date. Items performed: Submit application for Category 40 preliminary effluent limitations for individual permits Received PEL's and applicable onsite treatment processes. Cost analysis of Onsite versus consolidation. Submittal of pre site application and design review submittal package to District Engineer Submittal of formal request for State Site Application permit fee invoice. Begin assembly of Site Application documents and exhibits. Submit Site Application review package to State 'Recieved Site Location Application approval from state.1 Continue work to assemble Design Review Package. The following procedures are in progress with the anticipated schedule of future task as described below. 502 Main Street • Suite A3 • Carbondale, CO 81623 • (970) 704-0311 • Fax (970) 704-0313 j SumsENGINEERING LLC civil consultants Carla Ostberg SE Job No. 27175.01 December 10, 2010 Page 2 Complete Design Review Application with supporting documentation and Design plans and Details Wmit State Design Review Application submittal package to Pitkin County for signaturgr. Formal submittal of Design Review Application with supporting documentation and Design plans and Details to State District Engineer. Submit Application for Surface water Discharge permit. December 31 - February 28 Follow up on any additional request for information or clarification by the State or County. Obtain Wpal approval of design review acfeptance and/or approval from District Engineer or submit additional information response. In' discussions as needed with County for existing and potential expanded usage of facilities,: February 28 -May 30 ithin two to three months of Submittal) Copy Design Approval document to County. Preliminary Stake out of new onsite treatment facilities and improvements. County review of stake out site visit and obtain County Permit Approval. Follow up status of Discharge Permit Follow up discussions and responses to inquires by County on future usage at Castle. May 30—Ugober 30.20111 Awaiting final State Approvals for discharge Permit Follow up discussions and responses to inquires by County on future usage at Castle. Obtain any other necessary permits from County if needed. Commencement of work if funds are available. Final construction details, construction bids, material cost estimates, survey stakeout. Construction start The above schedule is tentative and may be further revised as needed pursuant to future discussions, reviews, response times and approvals.. SE will continue to update the County on the status of the State permit process and periodically revise the schedule based on the progress of items listed above. If you have any question or need any additional information at this time please contact us. Sincerely, SOPRIS ENGINEERING, LLC Paul E. Rutledge Yancy Nichol, PE Design Engineer Principal Redstone Castle Tour Redstone Castle Tour friendly view. Saturday, January 1, 2011 Primary Jurisdiction: Pitkin County Overall Status: Submitted Event Category: City of Aspen - Town of Snowmass Village - Pitkin County Special Event On-line Application Click HERE if you'd like to view the entire on-line application. Page 1 of 4 Click HERE for a printer Specific location(s): Redstone Castle 58 Redstone Blvd Redstone, CO. 81623 DATES/TIMES: A$tart: 01/01/2011 01:00 PM nd: 12/31/2011 03:00 PM PRIMARY CONTACT: Nicole Dimitrius Send e-mail Redstone Castle 58 Redstone Blvd Redstone, CO 81623 Phone: (626) 449-8566 Fax: (970) 963-9198 Work: (970) 963-9656 SECONDARY CONTACT: Susan McEvoy Send e-mail 58 Redstone Blvd Redstone, CO 81623 Phone: (970) 704-1843 Fax: (970) 963-9198 OTHER CONTACTS: During event - contact names & phone numbers Primary: Nicole Dimitrius (626) 449-8566 Secondary: Susan McEvoy (970) 704-1843 Medical: Susan McEvoy (970) 704-1843 Parking: Susan McEvoy (970) 704-1843 Safety: Susan McEvoy (970) 704-1843 Security: Susan McEvoy (970) 704-1843 Transportation: Susan McEvoy (970) 704-1843 DETAILS & DOCUMENTS: Event Summary: Attendance: 40 is average Personnel: 1-2 open to the public http://specialevents.aspenpitkin.com/details.cfm?printviewflag=l &eventid=581 12/2/2010 Page 2 of 4 $15 adults, $10 seniors and children, free under 5 yrs Limited to 80 people by daily ticket sales No volunteers No music Site Plan (and maps): 0474 06 Castle garkine.iAg 632.52 k Communication Plan: Susan McEvoy or other Tour guide: 970-963-9656 Susan McEvoy 970-704-1843 No radios The Castle phone is located through front door, first room on roght: 970-963-9656 The caretaker phone is located in apartment off kitchen: 970-704-1843 Public information about the tour, tour schedule and any changing information is available at ticket sales locations: Redstone General Store (963-3126), Tiffany of Redstone (963-1769), Crystal Club Cafe (963-9515) all located on Redstone Blvd. As tour guests arrive, tour guide directs parking, where and when tour begins and where the restrooms are located Security Plan: No professional security No law enforcement Security contact is Susan McEvoy 58 Redstone Blvd. Redstone 970-704-1843 Tour guide on duty would be security in absense of Susan McEvoy 963-9656 Medical Plan: Yes, 911 will be used for emergency Susan McEvoy 970-963-9656 experienced in calling 911 Ambulance pick-up designated on parking site map No onsite professional EMS needed Safety Plan: 80 persons in 2 groups Tour guests would request aid, call 911 on Castle phone See parking plan for emergency vehicle access and parking Fire extinguishers are located at all nine exits, on all levels of building, in kitchen, laundry room and boiler room Event takes place in daylight hours Main entrance is on first floor through porte cochere, serves as an exit also. Additional exit on basement level by game room. There are seven additional exits in case of emergency. Tour takes place entirely indoors during inclement weather No substantial risks http://specialevents.aspenpitkin.com/details.cfm?printviewflag=l &eventid=581 12/2/2010 Page 3 of 4 No wilderness, swift water or potential to affect normal public safety No aircraft Safety contact is the tour guide, 970-963-9656 0474 10 exits.ip2 369.04 k Transportation/Traffic Plan: After purchasing tickets on Redstone Blvd, tour guests drive their own vehicles to the Castle and park. Occasionally people ride bikes or walk. Tours might average 2 buses a year and is more likely to have Senior vans. Vehicles drive one mile from the lower parking lot of the Redstone Inn on a gravel road. Signage along the road encourages 15 mph speed limit Vehicles are allowed to arrive up to 30 minutes prior to the tour and they depart in their own timely fashion. Parking Plan: 25 total parking spaces 25 public spaces 4 days a week for duration parking is onsite next to the Castle No vendors etc... Privately owned free parking by Redstone Castle Tour Guide is onsite to direct traffic Traffic flow patterns are set to accomodate safe ingress and egress No tow company contracted Night lighting not applicable, tours are daytime only Parking contact: Susan McEvoy or other tour guide 58 Redstone Blvd Redstone, CO. 81623 963-9656 704-1843 Sanitation/Recycling Plan: No professional security neccessary Waste service provider to Redstone Castle is Waste Management, 970-963-5583 One bear proof dumpster Trash generated by tour is minimal recyclabes handled in Redstone bi-monthly by Pitkin County No portable restrooms Restrooms available inside Castle Paul Rutledge of Sopris Engineering has detailed septic system layout Alcohol Mitigation Plan: No sale or distribution of alcohol Accessibility Plan: There is a clear path from the parking area to the tour start in the courtyard. Disabled parking is directly adjacent to Castle and marked by a Handicapped parking sign. A wheelchair ramp is available to enter the building. http://specialevents.aspenpitkin.com/details.cfm?printviewflag=l &eventid=581 12/2/2010 Page 4 of 4 No portable restrooms, food, beverage or vending. Yes, exit signs are posted at all public exits. Event is held in daylight hours only. Alcohol Permit & License: No alcohol is provided or distributed Food Permit: No food No cooking No storage Parks/Open Space Permit: Reviewed and accepted: YES Sales Tax & Bus. License: no goods are sold Reviewed and accepted: YES Miscellaneous Permits: no temporary structures no fireworks Public Notification: Tour road letter 2011.doc 22.53 k Liability Insurance: not within the City of Aspen Liability insurance to be provided by FAX or email, whichever is preferable References: Susan McEvoy has conducted tours of Redstone Castle since 1998 Castle tours have been permitted to Ralli Dimitrius (Redstone Castle owner) since 2007 Reference: Debby Strom former General Manager Redstone Inn 963-8113 There are no agencies currently assigned to approve this event. http://specialevents.aspenpitkin.com/details.cfm?printviewflag=l &eventid=581 12/2/2010 December 1, 2010 To property owner, The Redstone Castle is seeking permission from Pitkin County to continue guided tours 4 days a week in the summer and 2 days a week in the winter into the year of 2011. The tour access will continue to be 30 minutes prior to the start time of the tour with the access closed following the tour. Please contact Susan McEvoy, Tour Coordinator, with any questions or concerns. Respectfully, Susan McEvoy 970-704-1843 v�\ http://aspenuploads.aspenpitkin.comispecialevents10581_06_0474_06_Castle%20parking.j ... 12/2/2010 0 Page 1 of 1 t11ti i I i t u tpage i of 4u, Cleveholm Manor: C4si3k: Interior P http://aspenuploads.aspenpitkin.com/specialevents/0581_10_0474_10_exits.jpg 12/2/2010 MEMORANDUM To: Lance Clarke and Cari Anne Holcomb, Planning Department From: Carla Ostberg, Environmental Health Department Date: April 15, 2010 Re: Redstone Castle Tours, Special Event Application ------------------------------------------------- ------------------------------------------------- SUMMARY: The applicant is requesting approval for tours of the Redstone Castle from May 1, 2010 through December 31, 2010. DISCUSSION: The Pitkin County Environmental Health Department has reviewed the details of the Redstone Castle Tour Application under the authority of the Pitkin County OWTS Regulation and has the following comments. After pursuing the feasibility of consolidating with Redstone Water and Sanitation District, it has been determined that it will be cost prohibitive. The plan and timeline has been updated in a letter submitted by Sopris Engineering dated April 14, 2010 proceeding with the submittal of a design for a State -permitted onsite wastewater treatment system with design flows of approximately 7100 gallons per day to serve the current and future development of the Castle facilities and operations. Highlighted below are benchmarks that are to be accomplished during this application timeframe (prior to December 31, 2010). • Prior to April 23, 2010, send completed Site Application to State; • Prior to May 30, 2010, obtain verbal approval of Site Application from District Engineer and submit application for Surface Water Discharge Permit; • Prior to June 30, 2010, obtain written approval of Site Application and formally submit Design Review Application to District Engineer; • Prior to August 1, 2010, obtain verbal approval of Design Review Application from District Engineer and begin discussions with Pitkin County for expanded usage of facilities; and • Prior to September 30, 2010, obtain written approval of Design Review Application and continue discussions with Pitkin County regarding placement of onsite wastewater treatment facilities and future usage at Castle. With the assumption that these steps are accomplished under the anticipated timeline, commencement of work is anticipated by June 30, 2011. This department recommends approval of the Special Event Application with the following conditions: • Tours of no more than 80 people per day; • No food or beverage shall be provided; Printed on Recycled Paper There shall be no overnight lodging of guests; Submission of documentation to this department detailing the accomplishment of the above referenced "benchmarks" no later than November 15, 2010; and Submission to this department of any revisions to the timeline and implementation of the plan that may be necessary. Printed on Recycled Paper Carla Ostberg From: Paul Rutledge [prutledge@sopriseng.com] Sent: Wednesday, April 14, 2010 4:35 PM To: Carla Ostberg Cc: Redstone Castle; Susan McEvoy; Cari Anne Holcomb Subject: Re: Special Event Permit - Redstone Castle Tour Attachments: revised -Master-planrepo rt- Pitkin -4-14-10. pdf Please excuse the delay we are working to acheive the chosen alternative to implement the permitting and installation of a on site system. We have had delays due to communication, discussions with interest parties, responses and the complexity of the various alternatives cost and feasibility analysis. Attached is a status report and revised timeline. We believe this information should allow for the continued Special Use Permit. We will forward the listed documents associated with the Site Application to you as soon as possible. Paul Rutledge Design Engineer Sopris Engineering ----- Original Message ----- From: "Carla Ostberg" Ostberg@co.pitkin.co.us> To: "Redstone Castle" <redstonecastle@yahoo.com>, "Susan "Cari Anne Holcomb" <CariAnne.Holcomb@co.pitkin.co.us> Cc: "Paul Rutledge" <prutledge@sopriseng.com> Sent: Wednesday, April 14, 2010 2:22:21 PM Subject: RE: FW: Special Event Permit - Redstone Castle McEvoy" <redstonesuemac@gmail.com>, Tour I thought we'd be receiving a timeline that I could comment on. I did receive on the email from Paul, which was very informative - but I would like to see the more formal documentation requested below (and I have attached the entire referral document as well). Paul did indicate in his email that he would be drafting something - my worry was that I would not receive it in time to submit my comments to Cari Anne by Friday. I hope this helps clarify what we're looking for. Thank you. * Submission of documentation to this department detailing the accomplishment of the above referenced "benchmarks" no later than March 31, 2010. * Submission of a detailed, realistic timeline and implementation plan to this department for upgrades to the wastewater treatment system as a continuation to previous work and research no later than March 31, 2010. * The continued plan must include details for implementation of the upgrade, including necessary permit approvals; * Evidence of secured arrangements with any agency required to accomplish the upgrade, such as RWSD; and * A realistic timeline for implementation. Carla Ostberg, MPH, REHS Environmental Health Program Supervisor Pitkin County Environmental Health 970-920-5438 From: Redstone Castle [mailto:redstonecastle@yahoo.com] Sent: Wednesday, April 14, 2010 1:56 PM To: Susan McEvoy; Cari Anne Holcomb Cc: Carla Ostberg; Paul Rutledge Subject: Re: FW: Special Event Permit - Redstone Castle Tour Hi All! I had received an email cc from Paul Rutledge which I believed to be his progress report. Was this sufficient or was there something else that was required of him? Please advise. Thanks! Nicole Dimitrius <https://www.logoworks.com/uploads/projects/170822047589/finalartwork/170822_1ogo_final.jpg> 58 Redstone Blvd. Redstone, CO 81623 Tel 970.963.9656 Fax 970.963.9198 info@redstonecastle.us <mailto:info@redstonecastle.us> www.redstonecastle.us <http://www.redstonecastle.us/> --- On Wed, 4/14/10, Cari Anne Holcomb <CariAnne.Holcomb@co.pitkin.co.us> wrote: From: Cari Anne Holcomb <CariAnne.Holcomb@co.pitkin.co.us> Subject: FW: Special Event Permit - Redstone Castle Tour To: "Susan McEvoy" <redstonesuemac@gmail.com>, redstonecastle@yahoo.com Cc: "Carla Ostberg" Ostberg@co.pitkin.co.us> Date: Wednesday, April 14, 2010, 10:12 AM Sue & Nicole: I just wanted to give you both a heads up: PJ April 14, 2010 Carla Ostberg Pitkin County Environmental Health 0405 Castle Creek Road, Suite 10 Aspen CO 81611 Draft RE: Redstone Castle — Draft Master Plan Status Summary and Revised Timeline for Sewage Improvements, Pitkin County, CO SE Job No. 27175.01 Dear Carla: Pursuant to your request, this revised master plan status report presents a summary of our recent findings in regard to thefeasibility and time line for a permanent solution to handle sewage at the above referenced Site. We have performed preliminary site design work to prepare for application for a state on-site permitted system. We have "pUW for v tt received PEL determination and have explored alternatives for consolidation with the RSWSD: Our draft cost analysis indicate that a gravity sewer main extension and our second consolidation alternative, that we previously described in our status/timeline letter dated 9-7-09, are prohibitive in terms of cost The current revised cost of an onsite system is significantly less than any of the consolidation alterative explored. Therefore the*decision► tM, been made to proceed with the State permitted system immediately.i The design and layout of the chosen onsite system alternative is essentially the same as previous submitted for conceptual review in March 2009. The Design criteria remains the same with anticipated d'lElows of ,t approximately 7100 gpd to serve the current and future development of the Castle Facilities and operations[ In order to continue the process of implementing this chosen alternative we have created the following draft timeline schedule. The following items have been performed to date. Items performed: • Submit application for Category 40 preliminary effluent limitations for individual permits • Reviewed PEL's and applicable onsite treatment processes. • Cost analysis of Onsite versus consolidation • Submit pre site application and design review submittal package to District Engineer Submit formal request for State Site Application permit fee invoice. Begin assembly of Site Application documents and exhibits. The following procedures are in progress with the anticipated schedule of future task as described below. Current -April 23 Complete onsite system design report and exhibits. Submit State Site Application submittal package to Pitkin County for signature. .►Send Completed Site Application to State. AApril23 - May 30 Follow up on any additional request for information or clarification. Complete Design Review Application with supporting documentation and Design plans and Details Obtain verbal approval of Site Application acceptance and/or approval from District Engineer. • Submit Applicatin for Surface water Discharge permit. 502 Main Street • Suite A3 • Carbondale, CO 81623 • (970) 704-0311 • Fax (970) 704-0313 SopRis ENGINEERING* LLC civil consultants Carla Ostberg SE Job No. 27175.01 April 14, 2010 Page 2 .) MgyI - June30 Obtain written Approval of Site Application. (Within two months of Submittal) Copy Site Approval document to County Formal submittal of Design Review Application with supporting documentation and Design plans and Details to D'it ' it E s rc ngmeer. Follow up on any additional request for information or clarification. ' July I- August 1 ft 1 r"C V��-t�►� Obtain verbal approval of CIO-, pgiiL�tiertacceptance and/or approval from District Engineer. Begin discussions as needed with County for expanded usage of facilities. August 1 -September 30 Obtain written Approval of Design Review. (Within two months of Submittal) Copy Design Approval document to County Preliminary Stake out of new onsite treatment facilities and improvements Followup status of Discharge Permit Follow up discussions and responses to inquires by County on future usage at Castle. September30 —June 30, 2011 Awaiting final State Approvals for discharge Permit Obtain any necessary permits from County Commencement of work if funds are available. Final construction details, construction bids, material cost estimates, survey stakeout. Construction start The above schedule is tentative and may be somewhat optimistic in terms of the discussions, reviews, response times and approvals. The availability of capital improvements funds and short term generation of revenue are the most influential factors governing this process. SE will further develop and periodically revise the schedule based on the progress of items listed above. If you have any question or need any additional information at this time please contact us. Sincerely, SOPRIS ENGINEERING, LLC Paul E. Rutledge Yancy Nichol, PE Design Engineer Principal Page 1 of 4 Event: Redstone Castle Tour, 05/01/2010 01:00 Redstone Castle Tour Saturday, May 1, 2010 Click HERE for a printer friendly view. City of Aspen - Town of Snowmass Village - Pitkin County Special Event On-line Application Click HERE if you'd like to view the entire on-line application. Application Information: Primary jurisdiction: Pitkin County Specific location(s): Redstone Castle 58 Redstone Blvd. Redstone, CO. Overall Status: Not Yet Reviewed Event Category: Dates/Times: Start: 05/01/2010 01:00 PM End: 12/31/2010 03:00 PM Primary Contact: Full Name: Nicole Dimitrius Business Name: Redstone Castle Business Phone: (970) 963-9656 Phone: (323) 681-2680 Fax: (626) 793- 0160 Address: 58 Redstone Blvd. Redstone, CO 81623 Secondary Contact: Full Name: Sue McEvoy Business Name: Castle Tour Coordinator Business Phone: (970) 963-9656 Phone: (970) 704-1843 Fax: Address: 58 Redstone Blvd Redstone, CO 81623 Event Contacts: During event - contact names & phone numbers Primary Contact Name: Nicole Dimitrius (323) 681-2680 Secondary Contact Name: Sue McEvoy (970) 704-1843 Details and Documents: Event Summary: Attendance: 40 is average Personnel: 1-2 Open to public $15 adults, $10 seniors & children, free under 5 Limited to 80 people by daily ticket sales No volunteers No music Site Plan (and maps): Castle parking.ipg 632.52 k Communication Plan: Sue McEvoy or other Tour Guide: 970-963-9656 Sue McEvoy: 970-704-1843 http://specialevents.aspenpitkin.com/details.cfm?printviewflag= l &eventid=471 4/7/2010 Page 2 of 4 r No radios The Castle phone is located through front door, first room on the right: 970-963- 9656 The caretaker phone is located off kitchen: 970-704-1843 Public information about the tour, tour schedule and any changing information is available at ticket sales locations: Redstone General Store (963-3126), Tiffany of Redstone (963-1769) and Crystal Club Cafe (963-9515) all located on Redstone Blvd. As tour guests arrive, tour guide tells people where to park, where and when tour starts (in courtyard) and where the restrooms are. Security Plan: No professional security No law enforcement The security contact is Sue McEvoy 58 Redstone Blvd. Redstone 704-1843 Tour guide on duty would be security contact in absence of Sue McEvoy 963-9656 Medical Plan: Yes 911 will be used for emergency Sue McEvoy 963-9656 experienced in calling 911 ambulance pick-up designated on parking site map No on site professional EMS needed Safety Plan: 80 persons in 2 groups/ Tour guests would request aid, call 911 on Castle phone See parking plan for emergency vehicle access and parking Fire extinguishers are located at all exits, on all levels of building, in kitchen, laundry room and boiler room. Event takes place during daylight hours Main entrance is on first floor through breezeway, serves as an exit also. Additional exit in basement level by game room. There are 7 additional exits in case of emergency. Tour takes place entirely indoors during inclement weather No substantial risks No wilderness, swift water or potential to affect normal public safety No aircraft Safety contact is the tour guide 963-9656 exits.jpg 369.04 k Transportation/Traffic Plan: After purchasing tickets on Redstone Boulevard, tour guests drive their own vehicles to the Castle (see Castle Parking map attached). Occasionally people walk or ride bikes. Tour might average 2 tour buses a year, more likely to have Senior vans. Vehicles drive 1 mile from the lower parking lot of the Redstone Inn on a gravel http://specialevents.aspenpitkin.com/details.cfm?printviewflag=l &eventid=471 4/7/2010 Page 3 of 4 road (10 minute drive). Signage along the road encourages 15 mph speed limit. Vehicles are allowed to arrive up to 30 minutes prior to the tour and they depart in intervals following the tour. Parking Plan: 25 total parking spaces 25 public spaces 4 days a week for duration parking on site next to Castle No vendors etc... Privately owned free parking by Redstone Castle Tour Guide is on site to direct traffic Traffic flow patterns are set to accommodate safe ingress and egress No tow company contracted Night lighting not applicable as tours are during the day Parking Contact: Sue McEvoy 58 Redstone Blvd Redstone, CO. 963-9656 704-1843 Sanitation/Recycling Plan: No professional security necessary Waste service provider to Redstone Castle and Dimitrius residence is Waste management at 970-963-5583 One bear proof dumpster Trash generated by tours is minimal Recyclables handled in Redstone bi-monthly No portable restrooms Restrooms available inside Castle Paul Rutledge of Sopris Engineering has detailed septic system layout, if desired 970-274-4780 Alcohol Mitigation Plan: No sale or distribution of alcohol Accessibility Plan: Tour participants travel into courtyard, into Castle, through rooms as a group with guide. Disabled parking is directly adjacent to Castle. A wheelchair ramp is available to enter building. No portable restrooms necessary. No food, vending etc... Yes, exit signs are posted at public exits Event is held during daylight hours only. Alcohol Permit & License: No alcohol provided or distributed Food Permit: No food No cooking No food storage Parks/Open Space Permit: Not located on Open Space http://specialevents.aspenpitkin.com/details.cfm?printviewflag=l &eventid=471 4/7/2010 Page 4 of 4 Reviewed and accepted: NO Sales Tax & Bus. License: No goods or services sold on site Reviewed and accepted: NO Miscellaneous Permits: No temporary structures No fireworks Public Notification: There are no road closures or rerouting that affect the private land owners. In winter, Castle lower road is closed for sleigh use. There are 2 adjacent neighbors and 2 other homes on private road to Castle. They have been notified by letter. Liability Insurance: Not within City of Aspen Liability Insurance will be provided by FAX or email, whichever is preferable References: Sue McEvoy has conducted tours of Redstone since 1998. Castle tours were permitted to Ralli Dimitrius in 2007 References: Debby Strom Redstone Inn 82 Redstone Blvd. Redstone 963-2526 There are no agencies currently assigned to approve this event. http://specialevents.aspenpitkin.com/details.cfm?printviewflag=l &eventid=471 4/7/2010 Page 1 of 1 http://aspenuploads.aspenpitkin.com/specialevents/0471_06_Castle%20parking.jpg 4/7/2010 11) � rr